Loading...
08/29/2006 - City Council Special (2)SPECIAL CITY COUNCIL MEETING AUGUST 29, 2006 5:30 -PM EAGAN ROOM-EAGAN MUNICIPAL CENTER AGENDA I. ROLL CALL AND AGENDA ADOPTION II. VISITORS TO BE HEARD 1 III. PARKS AND RECREATION CIP 0 QR IV. PATRICK EGAN PARK MASTER PLAN UPDATE V.. OTHER BUSINESS VI. ADJOURN r� i •Agenda Memo August 29 City Council Workshop III. 2007-2011 PARKS AND RECREATION CIP ACTION TO BE CONSIDERED: To provide feedback and direction to the APrC regarding the 2007-2011 capital improvement projects outlined in this report. FACTS:. • One of the primary. responsibilities of the APrC is the annual preparation and updating of the Departmental Capital Improvement Plan which serves as a blueprint and planning guide for park projects. CIP projects must be either, park development or improvement but cannot, be maintenance based. • Funding for the CIP comes from the Park Site Fund (PSP), which isprimarily money collected from developments at the time of platting in lieu of land dedication. • The CIP proposal presented by the APrC to the City Council encompasses 2007 through 2011. Historically after the review process the Council approves the first year (2007) as a budget and the next years as a general plan subject to change as part of future reviews. • The CTP has generally been driven by the projected ongoing balance of the Park Site Fund. To provide a better view of the future, recent versions of the CIP have included all potential projects though they may not be funded for years to come. There has also been considerable discussion regarding the identification of alternative funding sources for the CIP. • A number of projects in the proposed 2007 CIP represent the continuation of ongoing programs and initiatives specific to replacement and upgrade. Examples include the installation of playgrounds, skating rinks and tennis courts in parks with aged facilities. Other improvement projects such as those at Patrick Eagan Park and Holz Farm are tied to the implementation of Master Plans. •' The CIP also includes two line item allocations that are renewed on an annual basis as needed. These are the land. acquisition "opportunity" fund which would be used to help acquire priority open space should it become available and the "small projects" fund which is used to complete smaller, unanticipated, capital projects or to help leverage additional financial assistance from an association or alternative fiznding source. • The projection included on page is a conservative projection that does not include any large land acquisitions. • The projected revenue is based upon much smaller developments that split an existing lot • into 2-5 new lots rather than developments of entire new neighborhoods. • New to the CIP process are "Inclusion Criteria". These criteria were developed recently by the Acquisition/Development sub -committee as a means of categorizing projects and funding, and better defining eligibility for consideration. The criteria includes: Inclusion Criteria; • PA: Replacement of park amenities based on the Parks Renewal/Replacement Schedule • MP: Progressive phases of the implementation of approved master plans • AP: Set aside funds for the potential acquisition of property • SP: Set aside funds for small projects and partnership opportunities • ND: New development to existing facilities • UG: Projects requested by specific user groups on City property ATTACHMENTS: • List of 2007 CIP projects, Page • List of 2007-2011 projects, Page— • Recap of Park Site Fund, Page �. • 0 9 • • An overview of the 2007 project summary is outlined below: • Patrick Eagan Park Phase 1 of the implementation of the new Master Plan, primary focus most likely to be trail improvement, erosion mitigation and signage. • Playground Development (3) Continuation of the ongoing rotational installation program. Candidate sites include Skyhill, Captain Dodd and Bridle Ridge Parks. • Holz Farm Continuation of the ongoing implementation of the Master Plan • Thresher Fields Construction of a restroom/storage building and pavilion adjacent to the athletic fields. • Oak Chase Park Continuation of the ongoing rotational change of existing tennis courts in neighborhood parks. • Rink Upgrades Continuation of the ongoing rotational change of rinks at skating sites. • Signage System Upgrade • First phase of the installation of new entrance signage, beginning with neighborhood parks • Small Projects Funding for opportunities and need • Acquisition Funding for acquisition opportunities 0 PARKS AND RECREATION DEPARTMENT 2007 - 2011 CAPITAL IMPROVEMENT REQUESTS G:\Budget\Park.& Rec Potential Dev\Park and Rec Potential Projects 2007-2011 BY YEAR POTENTIAL #. LOCATION PROJECT ESTIMATED INCLUSION FUNDING ESTIMATED DESCRIPTION COST CRITERIA SOURCES BALANCE PSF and/or OTHER 2007 As of 1/07 = $2,240,000 1 Patrick Eagan Park Master Plan, Phase I $150,000 MP 2 Proposed: Playground Installation $105,000 PA • . Sky Hill (3 @ $35,000) • Captain Dodd • Bridle Ridge 3 Holz Farm Park Farmstead Development $15,000 MP 4 Thresher Fields Shelter/Restroom $350,000 ND Construction 5 Oak Chase Park Tennis Court Development $50,000 PA 2 $25,000) 6 Bridle Ridge (1) Rink Construction $20,000 PA • Sky Hill (1 (2@ $10,000) 7 TBD Signage System Phase I $30,000 PA 12 $2500 8 Numerous Small Projects $30,000 SP Revenue = + $300.000 9 TBD Ac uisition Opportunities $650,000 AP $2,540,000 Sub -Total 750 000 $1,400,000 w/Ac _-L750.000 2008 1 TBD Playground Installation $105,000 PA 3 $35,000 As of 1/08 = $1,790,000 2 TBD Rink Construction $20,000 PA 2 $10,000 3 Trap Farm Park Sun Shelter $30,000 ND 4. Numerous Small Projects $30,000 SP 5 Country Home Park Tennis Court Development $30,000 PA Revenue = _La290.,000 6 TBD Signage System, Phase 11 $30,000 PA $2,090,000 (12@ $2,5000 Sub -Total $245,000 -S245,000 HI G:\Budget\Park.& Rec Potential Dev\Park and Rec Potential Projects 2007-2011 BY YEAR Cl PARKS AND RECON DEPARTMENT is --- 2007 - 2011 CAPITAL IMPROVEMENT REQUESTS # LOCATION PROJECT DESCRIPTION ESTIMATED COST INCLUSION CRITERIA POTENTIAL FUNDING SOURCES PSF and/or OTHER ESTIMATED BALANCE 2009 1 TBD Playground Installation $105,000 3 @ $35,000) PA As of 1/09 = $1,845,000 2 TBD Rink Construction $20,000 2 @ $10,000) PA 3 Captain Dodd Park Sun Shelter $30,000 ND 4 Numerous Small Projects $30,000 SP 5 Burr Oaks Park Tennis Court Development $30,000 PA Revenue = + $250.000 6 TBD Signap System, Phase III $40,000 PA $2,095,000 Sub -Total $255,000 - $255,000 2010 1 TBD Playground Installation $115,000 (3 @ $38,000) PA As of 1/10 = $1,840,000 2 Carlson Lake Park Fishing Pier $25,000 ND 3 Numerous Small Projects $30,000 SP Revenue = + $200.000 Sub -Total $170,000 2 040 000 -$170,000 2011 1 TBD Playground Installation $115,000 (3 @ $38,000 PA As of 1/11 = $ 1,870,000 2 TBD Sun Shelter $35,000 ND 3 TBD Small Projects $35,000 SP Revenue= + $200.000 Snb-Total $185,000 $2,070,000 - 185 000 TOTAL $1,635;000 ($2,285,000 w/Ac As of 1/12 = $1,885,000 - Ac uisition = -$650, 000 _ $1,235,000 G:1BudgetlPark & Rec Potential Dev\Park and Rec Potential Projects 2007=2011 BY YEAR 2 Rev.8/25/06 PARKS AND RECREATION DEPARTMENT POTENTIAL CAPITAL IMPROVEMENT PROJECTS # LOCATION PROJECT ESTIMATED DESCRIPTION COST INCLUSION CRITERIA POTENTIAL FUNDING SOURCES PSF and/or OTHER ESTIMATED BALANCE OTHER PROJECTS Lighting 1 Lexie on-Diffle Fields (6) $500,000 UG 2 Northview Courts $95,000 ND 3 Big Goat_ $90,000 PA 4 Ohmann Soccer Fields (3) $280,000 UG 5 Northview Fields 6-8 3) $300,000 PA 6 Rahn Courts $30,000 ND 7 Thresher Fields 129Q 000 UG Sub -Total $1,595,000 Park Development 1 Patrick Eagan Phase H (+ TBD MP 2 Holz Farm Park & Farmstead $425,000 MP 3 Moonshine Park $250,000 MP 4 Section 16(Federal Drive) $200,000 MP 5 Section 11 Thresher South) $200,000 MP _ 6 Rahn South 150 000 ND Sub -Total $800,000 Master Plans 1 Rahn Park South $25,000 MP 2 Section 16 $20,000 MP. Sub -Total $45,000 Park Improvements 1 Northview Courts Construction $200,000 PA 2 Rahn Courts Construction $120,000 PA 3 Wandering Walk Trail $100,000 ND 4 Bur Oaks Trail Paving $80,000 MP 5 Trail Signage System $30,000 PA 6 Festival Grounds Irrigation 50 000 ND Sub -Total $580,000 Misc. 1 School Site Partnerships TBD UG 2 O ortunities $650,000 AP [�Acuisitions TOTALS $3,020 000 (w/o Ac G:\Budget\Park & Rec Potential Dev\Park and Rec Potential Projects 2007-2011 BY YEAR Rev.8/25/06 • � _ • • • • Year End PART 111 PARKS CAPITAL IMPROVEMENT PROGRAM Cumulative SUMMARY Balance December 31, 2005 Fund $ Balance 2,310,000 Estimated Revenues Appropriations 2006 $ $ 330,000 40-0-10-0- -0 Estimated Balance 12-31-06 $ 2,240,000 2007 -- 2011 Capital Improvement Program: 2007 $ $ $ 300,000 750,000 1,790,000 2008 300,000 245,000 1,845,000 2009 250,000 255,000 1,840 000 2010 200,000 170,000 1,870,000 2011 $ 200,000 185,000 1,885,600 2007 -- 2011 CIP Total $ $ 1,250,000 1 605,000 Potential Land Acquisition(s) $ $ 650,000 1,235,000 Agenda Memo `August 29, 2006 City.Council Workshop IV. PATRICK EAGAN PARK MASTER PLAN UPDATE. ACTION TO BE CONSIDERED: This is an informational update for the City Council based on the work that has been done to date on the Patrick Eagan Park Master Plan. The Council will be asked to provide direction on the conceptual plans presented by consultant so that the plans may further developed. FACTS: • The development of a master plan for Patrick Eagan Park was part of the Council approved CIP for 2006. In May 2006 the City Council awarded the consulting contract to Hoisington Koegler Group for the completion of the master plan. • The primary focus for the consultant was to identify the resources that are contained within the park, develop a maintenance strategy, define potential opportunities that might be considered by the city in the short and long term, and help to create a vision that will allow this park to remain natural but invite pedestrian access and enjoyment. • . In addition to reviewing the physical inventory of the site the consultants were asked to meet with various stakeholder groups and host a public meeting to obtain input from interested citizens. To that end the following, meetings have occurred to date: o Meeting with Friends of Patrick EaganPark o Meeting with Capon Art Park Board o Meeting with Eagan Art House Board o Multiple meetings with the APrC and the Ad -Hoc sub -committee of the APrC assigned to work closely with the consultant and staff. o August 24 public meeting to solicit input from the community. Notices of the public meeting were mailed directly to all residents immediately surrounding Patrick Eagan Park to ensure .that they were all aware of the master plan review and were given the opportunity to comment. • The meetings provided the consultant with an overview of concerns and desires expressed by each group, which helped to define the guiding principals to be incorporated into the various conceptual plans that will be reviewed by the consultant. • The Council will be asked to respond to the conceptual plans and provide the consultant with specific direction regarding the plan that will best meet the needs of the community. • Once the overall conceptual plan for Patrick Eagan Park is identified the consultant will begin the next phase of the project, which is to formalize the plan and then develop criteria for Council consideration when property becomes available for purchase. BACKGROUND/DISCUSSION • During the evaluation of Patrick Eagan Park there was discussion pertaining to two specific structures that currently exist within the park. While each continues to serve a specific purpose it may be helpful for the City Council to become reacquainted with them to better assess their long term viability. Eagan Art House • The City of Eagan .purchased the Lillian McCarthy house and the surrounding property to become part of Patrick Eagan Park. The original intention was to provide for a more formalized entrance to the park. • The house was rented for a period of time as a private residence until there was an emerging interest from a fledgling art association that saw the need to provide a level of art programming in the community. The partnership with the City originally involved the use of the house in Patrick Eagan Park since there were no other city facilities that would be able to house this new programming element. • The Art House'provides a variety of art classes and art -related events to the community including the Eagan Art Festival. The Parks and Recreation Department does not offer art -based classes. • Art House classes had 1,341 registered participants in 2005 and estimated an additional 1,700 people attended programs, classes and events not using City registration. This is similar to the number of participants in City preschool programs during the same year. Total recreation program registrations in 2005 were 25,000. • The Art house leases the house in Patrick Eagan Park for $1.00 per year. The City provides lawn • maintenance, snow and ice removal (except for sidewalk to house entrance), trash pick-up, pumping of septic tanks and general repairs as needed. • City improvements to the building for the Art House have included: remodeling of the original house into class room space with an accessible restroom, addition to an accessible ramp, remodeling of garage into pottery studio, connected City water service, rewired house for kilns, replaced house roof and constructed a stage for Art House events. • The City provides clerical management for most Art House class registrations and promotes Art House classes in the Discover brochure. The cost of the space in the Discover brochure including mailing is $12,840. The cost of the clerical time required to manage the registrations is approximately $5,000. • The City retains 8% of Art House class registration revenues. In 2005 this was $6825. • The Art House Board has been discussing the possibility of a campaign to solicit funding for future expansion of the existing building and/or campus in order to expand programming opportunities. Deerwood House • The residential structure known as the "Deerwood House" is located within the bounds of Patrick Eagan Park. Access to the house is from Pilot Knob Road via Deerwood Drive, a City street. Deerwood Drive is paved east to Denmark Avenue at which point it becomes gravel until its easterly terminus. The gravel portion of the road also provides access to several homes located along its south side. I • • The house was constructed in 1965. Many features considered innovative and energy efficient for that time period were incorporated into the design including earth berming along the exterior walls, a low voltage electrical system, concrete floors intended to retain solar'heat, large banks of south facing windows and a rock covered tar roof. The house was and continues'to be serviced by a private well and on-site septic system. • The property was acquired by the City from Janet Kehne in 1974 (thus the occasional reference to the " Kehne House" in some files). The intent being to add the five acre parcel to the area of Patrick Eagan Park, while also providing the City the option of utilizing the structure for some future, unspecified, programmatic purpose. The most significant portion of the value being the property itself. • Soon after the acquisition of the property the City utilized a variety of strategies to maintain a physical presence on the property. Given the isolated location of the property, there was seen to be a high potential for vandalism and a need for some minimal activity to ensure proper function of the house systems. The strategies ranged from City staff living on site during the first several years of ownership to leasing the house for residential use. The house is currently leased as residence to a private party. The existing lease is for a six month period that will expire on December 31, 2006. • Over time the house, and what were considered "cutting edge" design elements, have noticeably deteriorated. Some never functioned correctly. Considerable staff time and City money has been expended to make repairs to systems within the house including electrical and heat to keep it inhabitable. The septic drain field and, on-site well have both required significant repairs. There has been some water damage due to the earthen berms and the roof is deteriorating. An adjacent • garage/storage building has deteriorated to .the point of being nearly unusable. The estimated cost of the,soon to be needed renovations is $50k to '$80k, which does not include the cost of connecting to City water and sewer. AD SPECIAL CITY COUNCIL MEETING AUGUST 29, 2006 5:30 -PM EAGAN ROOM-EAGAN MUNICIPAL CENTER AGENDA I. ROLL CALL AND AGENDA ADOPTION II. VISITORS TO BE HEARD 1 III. PARKS AND RECREATION CIP 0 QR IV. PATRICK EGAN PARK MASTER PLAN UPDATE V.. OTHER BUSINESS VI. ADJOURN r� i •Agenda Memo August 29 City Council Workshop III. 2007-2011 PARKS AND RECREATION CIP ACTION TO BE CONSIDERED: To provide feedback and direction to the APrC regarding the 2007-2011 capital improvement projects outlined in this report. FACTS:. • One of the primary. responsibilities of the APrC is the annual preparation and updating of the Departmental Capital Improvement Plan which serves as a blueprint and planning guide for park projects. CIP projects must be either, park development or improvement but cannot, be maintenance based. • Funding for the CIP comes from the Park Site Fund (PSP), which isprimarily money collected from developments at the time of platting in lieu of land dedication. • The CIP proposal presented by the APrC to the City Council encompasses 2007 through 2011. Historically after the review process the Council approves the first year (2007) as a budget and the next years as a general plan subject to change as part of future reviews. • The CTP has generally been driven by the projected ongoing balance of the Park Site Fund. To provide a better view of the future, recent versions of the CIP have included all potential projects though they may not be funded for years to come. There has also been considerable discussion regarding the identification of alternative funding sources for the CIP. • A number of projects in the proposed 2007 CIP represent the continuation of ongoing programs and initiatives specific to replacement and upgrade. Examples include the installation of playgrounds, skating rinks and tennis courts in parks with aged facilities. Other improvement projects such as those at Patrick Eagan Park and Holz Farm are tied to the implementation of Master Plans. •' The CIP also includes two line item allocations that are renewed on an annual basis as needed. These are the land. acquisition "opportunity" fund which would be used to help acquire priority open space should it become available and the "small projects" fund which is used to complete smaller, unanticipated, capital projects or to help leverage additional financial assistance from an association or alternative fiznding source. • The projection included on page is a conservative projection that does not include any large land acquisitions. • The projected revenue is based upon much smaller developments that split an existing lot • into 2-5 new lots rather than developments of entire new neighborhoods. • New to the CIP process are "Inclusion Criteria". These criteria were developed recently by the Acquisition/Development sub -committee as a means of categorizing projects and funding, and better defining eligibility for consideration. The criteria includes: Inclusion Criteria; • PA: Replacement of park amenities based on the Parks Renewal/Replacement Schedule • MP: Progressive phases of the implementation of approved master plans • AP: Set aside funds for the potential acquisition of property • SP: Set aside funds for small projects and partnership opportunities • ND: New development to existing facilities • UG: Projects requested by specific user groups on City property ATTACHMENTS: • List of 2007 CIP projects, Page • List of 2007-2011 projects, Page— • Recap of Park Site Fund, Page �. • 0 9 • • An overview of the 2007 project summary is outlined below: • Patrick Eagan Park Phase 1 of the implementation of the new Master Plan, primary focus most likely to be trail improvement, erosion mitigation and signage. • Playground Development (3) Continuation of the ongoing rotational installation program. Candidate sites include Skyhill, Captain Dodd and Bridle Ridge Parks. • Holz Farm Continuation of the ongoing implementation of the Master Plan • Thresher Fields Construction of a restroom/storage building and pavilion adjacent to the athletic fields. • Oak Chase Park Continuation of the ongoing rotational change of existing tennis courts in neighborhood parks. • Rink Upgrades Continuation of the ongoing rotational change of rinks at skating sites. • Signage System Upgrade • First phase of the installation of new entrance signage, beginning with neighborhood parks • Small Projects Funding for opportunities and need • Acquisition Funding for acquisition opportunities 0 PARKS AND RECREATION DEPARTMENT 2007 - 2011 CAPITAL IMPROVEMENT REQUESTS G:\Budget\Park.& Rec Potential Dev\Park and Rec Potential Projects 2007-2011 BY YEAR POTENTIAL #. LOCATION PROJECT ESTIMATED INCLUSION FUNDING ESTIMATED DESCRIPTION COST CRITERIA SOURCES BALANCE PSF and/or OTHER 2007 As of 1/07 = $2,240,000 1 Patrick Eagan Park Master Plan, Phase I $150,000 MP 2 Proposed: Playground Installation $105,000 PA • . Sky Hill (3 @ $35,000) • Captain Dodd • Bridle Ridge 3 Holz Farm Park Farmstead Development $15,000 MP 4 Thresher Fields Shelter/Restroom $350,000 ND Construction 5 Oak Chase Park Tennis Court Development $50,000 PA 2 $25,000) 6 Bridle Ridge (1) Rink Construction $20,000 PA • Sky Hill (1 (2@ $10,000) 7 TBD Signage System Phase I $30,000 PA 12 $2500 8 Numerous Small Projects $30,000 SP Revenue = + $300.000 9 TBD Ac uisition Opportunities $650,000 AP $2,540,000 Sub -Total 750 000 $1,400,000 w/Ac _-L750.000 2008 1 TBD Playground Installation $105,000 PA 3 $35,000 As of 1/08 = $1,790,000 2 TBD Rink Construction $20,000 PA 2 $10,000 3 Trap Farm Park Sun Shelter $30,000 ND 4. Numerous Small Projects $30,000 SP 5 Country Home Park Tennis Court Development $30,000 PA Revenue = _La290.,000 6 TBD Signage System, Phase 11 $30,000 PA $2,090,000 (12@ $2,5000 Sub -Total $245,000 -S245,000 HI G:\Budget\Park.& Rec Potential Dev\Park and Rec Potential Projects 2007-2011 BY YEAR Cl PARKS AND RECON DEPARTMENT is --- 2007 - 2011 CAPITAL IMPROVEMENT REQUESTS # LOCATION PROJECT DESCRIPTION ESTIMATED COST INCLUSION CRITERIA POTENTIAL FUNDING SOURCES PSF and/or OTHER ESTIMATED BALANCE 2009 1 TBD Playground Installation $105,000 3 @ $35,000) PA As of 1/09 = $1,845,000 2 TBD Rink Construction $20,000 2 @ $10,000) PA 3 Captain Dodd Park Sun Shelter $30,000 ND 4 Numerous Small Projects $30,000 SP 5 Burr Oaks Park Tennis Court Development $30,000 PA Revenue = + $250.000 6 TBD Signap System, Phase III $40,000 PA $2,095,000 Sub -Total $255,000 - $255,000 2010 1 TBD Playground Installation $115,000 (3 @ $38,000) PA As of 1/10 = $1,840,000 2 Carlson Lake Park Fishing Pier $25,000 ND 3 Numerous Small Projects $30,000 SP Revenue = + $200.000 Sub -Total $170,000 2 040 000 -$170,000 2011 1 TBD Playground Installation $115,000 (3 @ $38,000 PA As of 1/11 = $ 1,870,000 2 TBD Sun Shelter $35,000 ND 3 TBD Small Projects $35,000 SP Revenue= + $200.000 Snb-Total $185,000 $2,070,000 - 185 000 TOTAL $1,635;000 ($2,285,000 w/Ac As of 1/12 = $1,885,000 - Ac uisition = -$650, 000 _ $1,235,000 G:1BudgetlPark & Rec Potential Dev\Park and Rec Potential Projects 2007=2011 BY YEAR 2 Rev.8/25/06 PARKS AND RECREATION DEPARTMENT POTENTIAL CAPITAL IMPROVEMENT PROJECTS # LOCATION PROJECT ESTIMATED DESCRIPTION COST INCLUSION CRITERIA POTENTIAL FUNDING SOURCES PSF and/or OTHER ESTIMATED BALANCE OTHER PROJECTS Lighting 1 Lexie on-Diffle Fields (6) $500,000 UG 2 Northview Courts $95,000 ND 3 Big Goat_ $90,000 PA 4 Ohmann Soccer Fields (3) $280,000 UG 5 Northview Fields 6-8 3) $300,000 PA 6 Rahn Courts $30,000 ND 7 Thresher Fields 129Q 000 UG Sub -Total $1,595,000 Park Development 1 Patrick Eagan Phase H (+ TBD MP 2 Holz Farm Park & Farmstead $425,000 MP 3 Moonshine Park $250,000 MP 4 Section 16(Federal Drive) $200,000 MP 5 Section 11 Thresher South) $200,000 MP _ 6 Rahn South 150 000 ND Sub -Total $800,000 Master Plans 1 Rahn Park South $25,000 MP 2 Section 16 $20,000 MP. Sub -Total $45,000 Park Improvements 1 Northview Courts Construction $200,000 PA 2 Rahn Courts Construction $120,000 PA 3 Wandering Walk Trail $100,000 ND 4 Bur Oaks Trail Paving $80,000 MP 5 Trail Signage System $30,000 PA 6 Festival Grounds Irrigation 50 000 ND Sub -Total $580,000 Misc. 1 School Site Partnerships TBD UG 2 O ortunities $650,000 AP [�Acuisitions TOTALS $3,020 000 (w/o Ac G:\Budget\Park & Rec Potential Dev\Park and Rec Potential Projects 2007-2011 BY YEAR Rev.8/25/06 • � _ • • • • Year End PART 111 PARKS CAPITAL IMPROVEMENT PROGRAM Cumulative SUMMARY Balance December 31, 2005 Fund $ Balance 2,310,000 Estimated Revenues Appropriations 2006 $ $ 330,000 40-0-10-0- -0 Estimated Balance 12-31-06 $ 2,240,000 2007 -- 2011 Capital Improvement Program: 2007 $ $ $ 300,000 750,000 1,790,000 2008 300,000 245,000 1,845,000 2009 250,000 255,000 1,840 000 2010 200,000 170,000 1,870,000 2011 $ 200,000 185,000 1,885,600 2007 -- 2011 CIP Total $ $ 1,250,000 1 605,000 Potential Land Acquisition(s) $ $ 650,000 1,235,000 Agenda Memo `August 29, 2006 City.Council Workshop IV. PATRICK EAGAN PARK MASTER PLAN UPDATE. ACTION TO BE CONSIDERED: This is an informational update for the City Council based on the work that has been done to date on the Patrick Eagan Park Master Plan. The Council will be asked to provide direction on the conceptual plans presented by consultant so that the plans may further developed. FACTS: • The development of a master plan for Patrick Eagan Park was part of the Council approved CIP for 2006. In May 2006 the City Council awarded the consulting contract to Hoisington Koegler Group for the completion of the master plan. • The primary focus for the consultant was to identify the resources that are contained within the park, develop a maintenance strategy, define potential opportunities that might be considered by the city in the short and long term, and help to create a vision that will allow this park to remain natural but invite pedestrian access and enjoyment. • . In addition to reviewing the physical inventory of the site the consultants were asked to meet with various stakeholder groups and host a public meeting to obtain input from interested citizens. To that end the following, meetings have occurred to date: o Meeting with Friends of Patrick EaganPark o Meeting with Capon Art Park Board o Meeting with Eagan Art House Board o Multiple meetings with the APrC and the Ad -Hoc sub -committee of the APrC assigned to work closely with the consultant and staff. o August 24 public meeting to solicit input from the community. Notices of the public meeting were mailed directly to all residents immediately surrounding Patrick Eagan Park to ensure .that they were all aware of the master plan review and were given the opportunity to comment. • The meetings provided the consultant with an overview of concerns and desires expressed by each group, which helped to define the guiding principals to be incorporated into the various conceptual plans that will be reviewed by the consultant. • The Council will be asked to respond to the conceptual plans and provide the consultant with specific direction regarding the plan that will best meet the needs of the community. • Once the overall conceptual plan for Patrick Eagan Park is identified the consultant will begin the next phase of the project, which is to formalize the plan and then develop criteria for Council consideration when property becomes available for purchase. BACKGROUND/DISCUSSION • During the evaluation of Patrick Eagan Park there was discussion pertaining to two specific structures that currently exist within the park. While each continues to serve a specific purpose it may be helpful for the City Council to become reacquainted with them to better assess their long term viability. Eagan Art House • The City of Eagan .purchased the Lillian McCarthy house and the surrounding property to become part of Patrick Eagan Park. The original intention was to provide for a more formalized entrance to the park. • The house was rented for a period of time as a private residence until there was an emerging interest from a fledgling art association that saw the need to provide a level of art programming in the community. The partnership with the City originally involved the use of the house in Patrick Eagan Park since there were no other city facilities that would be able to house this new programming element. • The Art House'provides a variety of art classes and art -related events to the community including the Eagan Art Festival. The Parks and Recreation Department does not offer art -based classes. • Art House classes had 1,341 registered participants in 2005 and estimated an additional 1,700 people attended programs, classes and events not using City registration. This is similar to the number of participants in City preschool programs during the same year. Total recreation program registrations in 2005 were 25,000. • The Art house leases the house in Patrick Eagan Park for $1.00 per year. The City provides lawn • maintenance, snow and ice removal (except for sidewalk to house entrance), trash pick-up, pumping of septic tanks and general repairs as needed. • City improvements to the building for the Art House have included: remodeling of the original house into class room space with an accessible restroom, addition to an accessible ramp, remodeling of garage into pottery studio, connected City water service, rewired house for kilns, replaced house roof and constructed a stage for Art House events. • The City provides clerical management for most Art House class registrations and promotes Art House classes in the Discover brochure. The cost of the space in the Discover brochure including mailing is $12,840. The cost of the clerical time required to manage the registrations is approximately $5,000. • The City retains 8% of Art House class registration revenues. In 2005 this was $6825. • The Art House Board has been discussing the possibility of a campaign to solicit funding for future expansion of the existing building and/or campus in order to expand programming opportunities. Deerwood House • The residential structure known as the "Deerwood House" is located within the bounds of Patrick Eagan Park. Access to the house is from Pilot Knob Road via Deerwood Drive, a City street. Deerwood Drive is paved east to Denmark Avenue at which point it becomes gravel until its easterly terminus. The gravel portion of the road also provides access to several homes located along its south side. I • • The house was constructed in 1965. Many features considered innovative and energy efficient for that time period were incorporated into the design including earth berming along the exterior walls, a low voltage electrical system, concrete floors intended to retain solar'heat, large banks of south facing windows and a rock covered tar roof. The house was and continues'to be serviced by a private well and on-site septic system. • The property was acquired by the City from Janet Kehne in 1974 (thus the occasional reference to the " Kehne House" in some files). The intent being to add the five acre parcel to the area of Patrick Eagan Park, while also providing the City the option of utilizing the structure for some future, unspecified, programmatic purpose. The most significant portion of the value being the property itself. • Soon after the acquisition of the property the City utilized a variety of strategies to maintain a physical presence on the property. Given the isolated location of the property, there was seen to be a high potential for vandalism and a need for some minimal activity to ensure proper function of the house systems. The strategies ranged from City staff living on site during the first several years of ownership to leasing the house for residential use. The house is currently leased as residence to a private party. The existing lease is for a six month period that will expire on December 31, 2006. • Over time the house, and what were considered "cutting edge" design elements, have noticeably deteriorated. Some never functioned correctly. Considerable staff time and City money has been expended to make repairs to systems within the house including electrical and heat to keep it inhabitable. The septic drain field and, on-site well have both required significant repairs. There has been some water damage due to the earthen berms and the roof is deteriorating. An adjacent • garage/storage building has deteriorated to .the point of being nearly unusable. The estimated cost of the,soon to be needed renovations is $50k to '$80k, which does not include the cost of connecting to City water and sewer. AD