Loading...
3311 Terminal Dr - BCBS RTU Documents 150510TG102218 Service Location Job Name Contact Address City State MN Zip Equipment Mfg Model Serial No Mfg Model Serial No MfgModelSerial No Date Worked 10/28/18 Insert Date2 Insert Date3 Insert Date4 Insert Date5 Insert Date6 Insert Date7 Insert Date8 Insert Date9 In 6:00 Out 4:00 Regular Overtime Double 10 Total 10 0 0 0 0 0 0 0 0 Complete N Service Work Order Extended Problem Description FBOU181000031 Problem EAGAN SITE CONTACT: SITE CONTACT: 651-236-0408 CONTRACTOR: SCHADEGG MECHANICAL CONTACT: BOBBY WEINBERGER # 651-292-9933 Needed RDT081DSYSY Used Parts Obtained From Vibration AnalysisRecovery Machine Vacuum Pump Parts Equipment Hours Hours Technician CTS Work Order # CTS+1 OF QTY-1 DAIKIN RTU EXACT REPLACEMENT RDT-081 COOLING ONLY MCQUAY ROOFTOP. ONLY THING UNIQUE, IS ABB VFD'S ARE REMOTE MOUNTED INSIDE MECHANICAL ROOM. UNIT IS ON GRADE, NORTH SIDE OF 4600 Churchill Street, Shoreview, MN 55126 Phone: 651-481-8000 Fax: 651-481-8621 2504 Main Ave W, Fargo, ND 58078 Phone: 701-356-0896 Fax: 701-356-0899 3311 TERMINAL DRIVE (NEW) Purchase Order # Site Instructions Work Order Type Invoice Type Hours 55120 CTS Schedule Date Daikin BLUE CROSS UNIVERSITY 181016-020 10/28/2018 Performed start up on Daikin RTU. Programmed VFDs for modbus communication and tested operation. Found bad motor overload on Cond fan motor 21. Isolated. Will order replacement. Integrated with BAS system. Performed point to point comissioning. Will need to return for proper cooling start up in spring. TYRRELL GRAHAM Torch / Brazing 730930 GTK Work Description Part Source Performed start up on Daikin RTU. Programmed VFDs for modbus communication and tested operation motor 21. Isolated. Will order replacement. Integrated with BAS system. Performed point to point comi cooling start up in spring. n. Found bad motor overload on Cond fan issioning. Will need to return for proper Please list any other site contact. Name Title Phone Email Address if different than work order.