01/02/2019 - City Council Regular
AGENDA
EAGAN CITY COUNCIL
EAGAN MUNICIPAL CENTER BUILDING
JANUARY 2, 2019
6:30 P.M.
I. ROLL CALL AND PLEDGE OF ALLEGIANCE
II. ADOPT AGENDA
III. RECOGNITIONS AND PRESENTATIONS
A. OATHS OF OFFICE – Mayor Maguire and Councilmembers Bakken and Hansen
B. RECOGNIZE the retirement of Bob Brown, Park Maintenance Worker, for his 20 years of work
with the City of Eagan
IV. CONSENT AGENDA (Consent items are acted on with one motion unless a request is made for
an item to be pulled for discussion)
A. APPROVE MINUTES
B. PERSONNEL ITEMS
C. APPROVE Check Registers
D. APPROVE Contracts
E. ADOPT a Resolution accepting a donation from an Eagan Citizen to Support the Police K9s
F. APPROVE Change Order #6 for Project 18-06, Police Department and City Hall Renovation
G. AUTHORIZE submittal of Fiscal Year 2019 Community Development Block Grant application
H. APPROVE On-Sale Liquor and Sunday License for Cielito Lindo Restaurant LLP doing business as
Cielito Lindo Restaurant, 1981 Silver Bell Road
I. RECEIVE Draft Feasibility Report for Street Improvement Project 1307, Lone Oak Circle, and
Schedule Public Hearing for February 5, 2019
J. RECEIVE Draft Feasibility Report for Street Improvement Project 1308, Poppler Lane, and
Schedule Public Hearing for February 5, 2019
K. RECEIVE Draft Feasibility Report for Street Improvement Project 1309, Country Home Heights,
and Schedule Public Hearing for February 5, 2019
L. RECEIVE Draft Feasibility Report for Street Improvement Project 1312, Ridgeview Acres/ Jon
Croft Acres, and Schedule Public Hearing for February 5, 2019
M. RECEIVE Draft Feasibility Report for Street Improvement Project 1313, Old Sibley Highway, and
Schedule Public Hearing for February 5, 2019
N. RECEIVE Draft Feasibility Report for Street Improvement Project 1314, Meadowland 1st
Addition, and Schedule Public Hearing for February 5, 2019
O. APPROVE Public Works Committee Recommendations for Water Meter Surcharge Appeals
P. APPROVE 2019 Fee Schedule for General Municipal Services
Q. APPROVE a Temporary On-Sale Liquor License and waive the license fee for Trinity School at
River Ridge on February 2, 2019 at 601 River Ridge Parkway
R. AUTHORIZE Letter in Opposition to MN Environmental Quality Board Rules Change on
Environmental Assessment Worksheets
S. APPROVE a Planned Development Amendment – TCF Bank / Dave Nelson - A Planned
Development Amendment to modify the color of the building exterior and base of the
monument sign located at 3380 Denmark Avenue
V. PUBLIC HEARINGS
VI. OLD BUSINESS
VII. NEW BUSINESS
A. PURCHASE AGREEMENT for Lot 1, Block 1, Yankee Plaza 2nd Addition located southeast of
Duckwood Drive and Federal Drive
B. PLANNED DEVELOPMENT AMENDMENT-The House Church / Jamey VanGelder - A Planned
Development Amendment to allow expansion of the church building and parking lot located
at 2024 Rahn Road
VIII. LEGISLATIVE / INTERGOVERNMENTAL AFFAIRS UPDATE
IX. ECONOMIC DEVELOPMENT AUTHORITY
X. ADMINISTRATIVE AGENDA
A. City Attorney
B. City Council Comments
C. City Administrator
D. Director of Public Works
E. Director of Community Development
XI. VISITORS TO BE HEARD (for those persons not on the agenda)
XII. ADJOURNMENT
Memo
To: Honorable Mayor and City Council Members
From: City Administrator Osberg
Date: December 28, 2018
Subject: Agenda Information for January 2, 2019 City Council Meeting
ADOPT AGENDA
After approval is given to the January 2, 2019 City Council agenda, the following items
are in order for consideration.
Agenda Information Memo
January 2, 2019, Eagan City Council Meeting
RECOGNITIONS AND PRESENTATIONS
A. Oath of Office for Mayor Mike Maguire, Council Member Paul Bakken and
Council Member Gary Hansen
Facts:
The Oath of Office will be administered to Mayor Maguire, Council Member
Bakken and Council Member Hansen, who were re-elected to four-year terms.
Per State Statute, mayor and council members’ terms begin the first Monday in
January following their election. In 2019, this date is Monday, January 7. The
verbal oaths of office will be administered before the start date of the new
terms, but the official, written oaths will not be signed until after January 7.
The written oaths will be brought to the January 8 Special City Council meeting
for signatures.
Attachments: (0)
Agenda Information Memo
January 2, 2019, Eagan City Council Meeting
RECOGNITIONS AND PRESENTATIONS
B. Recognize the retirement of Bob Brown, Park Maintenance Worker for his 20
years of work with the City of Eagan
Facts:
Bob Brown has now worked just over 20 years with the City of Eagan. Of those
20 years, the last four were with the Parks Division within Parks and Recreation
Department. The previous 16 years were as a mechanic in the Fleet
Management division within Public Works.
It is quite possible Bob has been involved in something during his 20 years that
has impacted each and every employee of the city.
Bob has always worked very hard for the citizens of the City of Eagan, looking at
ways to help with operational efficiencies.
Bob’s coworkers describe him as a skilled individual, a hard worker that is
disciplined, dedicated and always focused and determined to get the job done.
Different supervisors throughout his years of employment speak of Bob’s
flexibility to help with whatever the latest project was that needed to get done.
Bob has skills across the board, including mechanical skills, ability to craft unique
and significant items from wood, concrete and steel. When someone was
needed to get the job done, done on time and with high quality performance,
they always knew they could count on Bob Brown.
Mr. Brown’s last day in the office was Monday, December 17 and will vacation
out through January.
As a token of staff’s appreciation, we present a certificate of retirement to Mr.
Brown and thank him for his time and service to the Eagan Community.
Attachments: (0)
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
The following items referred to as consent items require one (1) motion by the City Council. If
the City Council wishes to discuss any of the items in further detail, those items should be
removed from the Consent Agenda and placed under Old or New Business unless the discussion
required is brief.
A. Approve Minutes
Action To Be Considered:
To approve the minutes of December 11, 2018 Special City Council minutes, and December 18,
2018 regular City Council meeting, as presented or modified.
Attachments: (2)
CA-1 December 11, 2018 Special City Council Minutes
CA-2 December 18, 2018 City Council Minutes
MINUTES
SPECIAL CITY COUNCIL MEETING
DECEMBER 11, 2018
5:30 P.M.
EAGAN FIRE STATION #2
City Councilmembers present: Mayor Maguire, Councilmembers Fields, Bakken, Hansen and Tilley.
City staff present: City Administrator Osberg, Assistant City Administrator Miller, and Human Resource
Manager Peterson-Weitzel.
ROLL CALL AND ADOPTION OF THE AGENDA
Councilmember Fields moved, Councilmember Bakken seconded a motion to adopt the agenda
as presented. Aye: 5 Nay: 0
VISITORS TO BE HEARD
There were no visitors to be heard.
INTERVIEW COMMUNICATIONS AND ENGAGEMENT DIRECTOR
The City Council interviewed three applicants for the position of Communications and Engagement
Director: Bridgett Bornstein Straub, Joe Ellickson, and Telly Mamayek.
Upon completion of the three, 30-minute interviews, there was unanimous City Council consensus to
make a conditional offer to Joe Ellickson with formal action to name the candidate at the January 2,
2019 City Council meeting.
ADJOURNMENT
Councilmember Fields moved, Councilmember Hansen seconded a motion to adjourn the meeting at
8:16 p.m. Aye: 5 Nay: 0
Date
Mayor
City Clerk
MINUTES OF A REGULAR MEETING OF THE
EAGAN CITY COUNCIL
Eagan, Minnesota
DECEMBER 18, 2018
A Listening Session was held at 6:00 p.m. prior to the regular City Council meeting. Present were Mayor
Maguire, Councilmember Bakken, Fields, Hansen and Tilley.
Theresa Eisele and Randy Bright addressed the Council with their concerns regarding the intersection of
Braddock Trail and Diffley Road.
A regular meeting of the Eagan City Council was held on Tuesday, December 18, 2018 at 6:30 p.m. at the
Eagan Municipal Center. Present were Mayor Maguire, Councilmembers Bakken, Fields, Hansen and
Tilley. Also present were City Administrator Osberg, Assistant City Administrator Miller, Public Works
Director Matthys, Parks and Recreation Director Pimental, Community Development Director
Hutmacher, City Planner Ridley, Finance Director Pepper, Assistant Finance Director Feldman, Police
Chief New, ETV Executive Director McIntee, City Attorney Dougherty and Executive Assistant Stevenson.
AGENDA
Councilmember Hansen moved, Councilmember Tilley seconded a motion to approve the agenda as
presented. Aye: 5 Nay: 0
RECOGNITIONS AND PRESENTATION
Presentation of “Wind Horse” a Public Art Piece, by Parks & Recreation
Staff and Public Artists, The Milligan Studio
Parks and Recreation Director Pimental introduced the item noting “Wind Horse” was installed on
November 1, 2018 at the southeast easement corner of Pilot Knob and Yankee Doodle. “Wind Horse”
was designed and fabricated by the Milligan Studio, Alan and Nicole Mary Milligan.
Recreation Program Supervisor Andersen gave a PowerPoint presentation. Andersen introduced artists
Alan and Nicole Mary Milligan. The Milligan’s gave an overview of the art piece design and installation.
CONSENT AGENDA
Councilmember Tilley moved, Councilmember Hansen seconded a motion to approve the consent
agenda as amended: Aye: 5 Nay: 0
A. It was recommended to approve the minutes of December 4, 2018 regular City Council meeting,
as presented or modified.
B. Personnel Items:
1. It was recommended to accept the resignation of Dakota Kenyon, Fitness Coordinator at the
Eagan Community Center and authorize the recruitment and replacement of this position.
City Council Meeting Minutes
December 18, 2018
2 page
2. It was recommended to accept the resignation/retirement of Robert Brown, Parks
Maintenance Worker and authorize the recruitment and replacement of this position.
3. It was recommended to authorize the hiring of part time recurring Tree Inspector, Kevin
Sturgeleski.
4. It was recommended to authorize the hiring of a full time Mechanic, to be named.
5. It was recommended to approve 2019 Compensation Plans for all City of Eagan Employees;
including the Compensation Plans for all non-union; exempt, non-exempt, Part Time
Recurring, Seasonal/Temporary employees.
6. It was recommended to approve adjustments to the City Administrator’s 2019
compensation to meet restrictions imposed by the State.
7. It was recommended to approve the medical insurance premium rates for 2019.
8. It was recommended to approve the dental insurance premium rates for 2019.
9. It was recommended to approve the hiring of winter rink attendants.
C. It was recommended to ratify the check register dated November 30 and December 7, 2018.
D. It was recommended to approve the ordinary and customary contracts with the Minnesota
State Arts Board, Coyote Wild, Dan Schwartz, Ultimate Events, iCIMs, Inc., School District 196,
Purair Products, and Thyssenkrupp Elevator Corporation.
E. It was recommended to approve a fiduciary agreement between City of Eagan and Dakota
County Drug Task Force for the receipt, maintenance and spending of the Department of Justice
and Department of the Treasury Equitable Sharing Funds.
F. It was recommended to accept a 2019 Minnesota Department of Public Safety grant for
$295,546 on behalf of the Dakota County Drug Task Force.
G. It was recommended to receive the Draft Feasibility Report for Project 1315 (Woodgate 3rd –
Tiberon - Mallard Park 3rd Additions – Street Improvements), and schedule a public hearing to be
held on January 15, 2019.
H. It was recommended to receive the Draft Feasibility Report for Project 1316 (Pinetree Pass 2nd,
4th & 6th – Street Improvements), and schedule a public hearing to be held on January 15, 2019.
I. It was recommended to receive the Draft Feasibility Report for Project 1317 (Gardenwood
Ponds 4th – Street Improvements), and schedule a public hearing to be held on January 15, 2019.
J. It was recommended to receive the Draft Feasibility Report for Project 1318 (Oak Pond Hills 1st
& 2nd – Street Improvements), and schedule a public hearing to be held on January 15, 2019.
K. It was recommended to receive the Draft Feasibility Report for Project 1319 (Majestic Oaks 1st –
3rd – Street Improvements), and schedule a public hearing to be held on January 15, 2019.
L. It was recommended to receive the Draft Feasibility Report for Project 1320 (Southern Lakes
West – Street Improvements), and schedule a public hearing to be held on January 15, 2019.
M. It was recommended to approve Change Order No. 1 for Contract 18-22 (Ashbury Sanitary Lift
Station Rehabilitation), and authorize the Mayor and City Clerk to execute all related
documents.
N. It was recommended to receive the bids for Contract 19-02 (Lexington/Diffley Reservoir
Reconditioning) award the contract to Elevation Coatings, Inc. for the base bid in the amount of
$173,950.00, and authorize the Mayor and City Clerk to execute all related documents.
O. It was recommended to approve the updated Sperry Tower Lighting Schedule.
P. It was recommended to approve a Final Plat to create one lot located at 2170 James Street.
Q. It was recommended to approve and authorize purchase agreement with Musco Sports Lighting
LLC through Sourcewell (formerly known as National Joint Powers Alliance) to purchase field
lighting equipment, and direct staff to prepare appropriate contract for the Mayor’s and City
Clerk’s signature.
City Council Meeting Minutes
December 18, 2018
3 page
R. It was recommended to adopt Findings of Fact, Conclusions & Resolution of Denial of a request
for an Interim Use Permit to allow off-site hotel/airport parking on Lot 1, Block 1, Blue Ridge 3rd
Addition.
S. It was recommended to approve a 90-day extension of time to record the Planned Development
Agreement for Costco, upon approximately 18.1 acres located east of Highway 55 and north of
Blue Gentian Road.
T. It was recommended to approve Vacation of public easements on Outlot A, Kieffer Addition and
Outlot B, Hills of Stonebridge. It was recommended to approve a Final Subdivision (Haven
Woods) to create 10 lots upon approximately 5.7 acres located at 3955 Dodd Road.
U. It was recommended to adopt a resolution accepting a $300 cash donation from Michelle Rowe-
Johnson to be used for the K-9 program, and direct the funds to revenue account number
1102.2862 for accounting purposes.
V. It was recommended to approve Change Order #3 to Gerling and Associates contract with the
City of Eagan and the City of Burnsville (Cities). The order extends the Cities acceptance date of
the truck to December 20, 2018, which is approximately 35 business days later than the original
contract terms. Also approve Change Order #3 to AVI Systems, Inc. contract with the Cities that
moves the acceptance date to February 15, 2019, which is approximately 50 business days later
than the original contract terms.
PUBLIC HEARINGS
2019 Fee Schedule
City Administrator Osberg introduced the item noting the Council is being asked to approve the
2019 Fee Schedule establishing the fees for various City services, supplies and materials.
Assistant Finance Director Feldman shared several of the proposed changes for the 2019 Fee Schedule.
Mayor Maguire opened the public hearing. There being no public comment, he turned the discussion
back to the Council.
Councilmember Fields moved, Councilmember Bakken seconded a motion to close the public hearing
and adopt a resolution approving the 2019 Fee Schedule establishing fees for various City services,
supplies and materials. Aye: 5 Nay: 0
OLD BUSINESS
Variance – Eagan Self Storage
City Administrator Osberg introduced the item noting this item was before the City Council at their
regular meeting of October 16, 2018. The Council was asked to consider a Variance to allow insulated
metal panels as a Class II building material for a new structure at 540 Yankee Doodle Road. Osberg
noted the Council continued the item to the December 18, 2018 meeting to allow staff to do some
research and evaluate industry standards on metal panel standards.
City Planner Ridley gave a staff report and provided a quick summary of the exterior classes. Ridley
noted that, by definition, the proposed material is a Class III material. He went on to say that staff
City Council Meeting Minutes
December 18, 2018
4 page
surveyed a number of cities and consulted with an architect and found that Eagan’s metal panel
standards are similar to other cities; however, the exterior coverage percentage allowed in other cities
ranged from 35%-50%. He also said staff learned the quality of metal panel building systems have
improved dramatically over the last decade. Ridley suggested the City Council may wish to consider an
amendment that would differentiate the newer metal panel systems and possibly increase the allowed
exterior percentage coverage acknowledging that the newer metal panel systems are far more durable
than the typical Exterior Insulation Finishing Systems (EIFS).
The Council discussed the request. It was noted that Mr. Johnson had extended his original request to
allow the Council time to review the current Ordinance language regarding classifying the proposed
material. Mayor Maguire asked Mr. Johnson if he was willing to continue the item to allow time for an
Ordinance Amendment to be drafted and acted upon.
Jeff Johnson, Johnson Property Services, LLC, was supportive and gave his consent to table his Variance
request until February 20, 2019.
Mayor Maguire opened the public comment. There being no public comment, he turned the discussion
back to the Council.
Councilmember Bakken moved, Councilmember Fields seconded a motion to continue the Variance for
Eagan Self Storage to the February 20, 2019 City Council meeting. Aye: 5 Nay: 0
Councilmember Bakken moved, Councilmember Fields seconded a motion to direct staff to draft an
ordinance amendment that generically addresses metal panel building systems. Aye: 5 Nay: 0
NEW BUSINESS
There was no new business to be heard.
LEGISLATIVE / INTERGOVERNMENTAL AFFAIRS UPDATE
There was no legislative/intergovernmental affairs update.
ADMINISTRATIVE AGENDA
CITY COUNCIL
Mayor Maguire noted he spoke at the All Employee Training and Recognition earlier today and is
constantly hearing compliments on City Staff. Mayor Maguire and Councilmembers thanked City Staff
for the great work they do.
Councilmember Hansen congratulated employees that were recognized for their milestone awards,
from 5-30 years of service.
VISITORS TO BE HEARD
There were no visitors to be heard.
City Council Meeting Minutes
December 18, 2018
5 page
ADJOURNMENT
Councilmember Tilley moved, Councilmember Hansen seconded a motion to adjourn the meeting at
7:13 p.m. Aye: 5 Nay: 0
_______
Date
______
Mayor
_______
City Clerk
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
B. Personnel Items
ITEM 1.
Actions to be considered:
Provide to City Councilmembers the same health insurance benefits that are offered to full-time
City employees, effective January 1, 2019.
Approve 2019 budget amendment of $5,900 for such health insurance benefits.
Facts:
Prior to 2010, the City provided the same level of health insurance benefits for Councilmembers
as it did for full-time staff.
In 2010, as a budget-cutting measure in the height of the Great Recession, the Council took
action to reduce the City’s insurance premium contribution for any Councilmember who elected
family coverage (which now includes employee + spouse and employee + child(ren) coverages)
to the contribution level of single coverage, which is less than the contribution level for the
various family coverages.
In 2019, the total annual premium cost for family coverage under the VEBA 2 plan with base
dental, for example, is $22,488. In this case, for full-time staff, the City currently contributes
$16,880 toward the premiums; for Councilmembers, the City contributes $10,970. The portion
a full-time staff member must therefore contribute is $5,608; the portion a Councilmember
must contribute is $11,518. The difference in contribution between staff and Councilmembers
is $5,910.
For 2019, only one Councilmember elected family coverage; therefore, the required budget
amendment is $5,900, which will be covered by the Contingency line item in the General Fund.
This item was directed to the January 2, 2019 Consent Agenda following Council discussion at
the December 18, 2018 City Council meeting.
ITEM 2.
Actions to be considered:
Authorize the hiring of Joe Ellickson for the position of Communications and Engagement Director.
Facts:
The process to hire the new Director of Communications and Engagement began in
October, 2018 following the retirement of Tom Garrison.
The City received 136 applications for the position.
The City interviewed 19 candidates in the first round of interviews, and followed up with
seven candidates interviewed in the second round.
The City Council interviewed three finalists for the position on December 11, 2018, and
recommended an offer be extended to Joe Ellickson.
Mr. Ellickson has been with the City of St. Paul since 2015 and is currently serving as the
Communications and Digital Media Manager.
Mr. Ellickson has passed the background check and has accepted the City’s offer to be
the next Director of Communications and Engagement. His anticipated start date is
Monday, January 14.
INFORMATIVE:
Andrew Timm was hired as the Mechanic/Equipment Maintenance Worker.
o This position was approved for hire on November 5, 2018
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
C. Ratify Check Registers
Action To Be Considered:
To ratify the check registers dated December 14 and 21, 2018, as presented.
Attachments: (2)
CC-1 Check register dated December 14, 2018
CC-2 Check register dated December 21, 2018
12/13/2018City of Eagan 16:02:20R55CKR2 LOGIS101
1Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018--
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202556 12/14/2018 115497 A & A GLOBAL INDUSTRIES
227.98 VENDING RESALE 288623 0417210 6629.6855 Merchandise for Resale Vending
227.98
202557 12/14/2018 153530 ADAMS, LOREN
26.34 11822-OVRPMNT 956 SAVANNAH RD 288624 120418 9220.2250 Escrow Deposits Public Utilities
26.34
202558 12/14/2018 149624 ALL AMERICAN TITLE COMPANY
36.70 11822-OVRPMNT 586 TODD AVE 288625 120418 9220.2250 Escrow Deposits Public Utilities
36.70
202559 12/14/2018 151329 ALL FURNITURE
200.00 ALL FURNITURE, RIVER TRAILER 288627 41331 5045.6310 Professional Services-General Temporary Office/Moving Expens
891.00 ALL FURNITURE, DEC RENTAL FURN 288626 41332 5045.6660 Office Furnishings & Equipment Temporary Office/Moving Expens
1,091.00
202560 12/14/2018 146368 ALLEGRA
27.50 BUSINESS CARDS 288628 43657 1107.6211 Office Printed Material/Forms Support Services
27.50
202561 12/14/2018 150476 ALLSTREAM
3.60 TELEPHONE 288649 15723462 1221.6347 Telephone Service & Line Charg Administration-Fire
5.84 TELEPHONE 288649 15723462 2460.6347 Telephone Service & Line Charg Building And Grounds
12.59 TELEPHONE 288649 15723462 0501.6347 Telephone Service & Line Charg General & Admn-Finance
14.83 TELEPHONE 288649 15723462 1108.6347 Telephone Service & Line Charg Communications
39.92 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
42.07 TELEPHONE 288649 15723462 0301.6352 Telephone Circuits IT-Gen & Admn
42.07 TELEPHONE 288649 15723462 0301.6352 Telephone Circuits IT-Gen & Admn
42.07 TELEPHONE 288649 15723462 0301.6352 Telephone Circuits IT-Gen & Admn
42.07 TELEPHONE 288649 15723462 0301.6352 Telephone Circuits IT-Gen & Admn
42.07 TELEPHONE 288649 15723462 0301.6352 Telephone Circuits IT-Gen & Admn
42.07 TELEPHONE 288649 15723462 0301.6352 Telephone Circuits IT-Gen & Admn
42.08 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
42.08 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
42.08 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
42.08 TELEPHONE 288649 15723462 0301.6352 Telephone Circuits IT-Gen & Admn
42.08 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
42.08 TELEPHONE 288649 15723462 0301.6352 Telephone Circuits IT-Gen & Admn
42.08 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
42.08 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
12/27/18
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
2Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202561 12/14/2018 150476 ALLSTREAM Continued...
42.08 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
42.08 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
42.08 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
42.08 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
42.08 TELEPHONE 288649 15723462 3304.6347 Telephone Service & Line Charg Bldg/Facilities Maintenance
42.08 TELEPHONE 288649 15723462 0301.6352 Telephone Circuits IT-Gen & Admn
42.15 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
44.65 TELEPHONE 288649 15723462 3106.6347 Telephone Service & Line Charg Structure Care & Maintenance
44.95 TELEPHONE 288649 15723462 0301.6352 Telephone Circuits IT-Gen & Admn
44.95 TELEPHONE 288649 15723462 1108.6347 Telephone Service & Line Charg Communications
44.95 TELEPHONE 288649 15723462 1105.6457 Machinery & Equipment-Rental Investigation/Crime Prevention
44.95 TELEPHONE 288649 15723462 0301.6352 Telephone Circuits IT-Gen & Admn
52.49 TELEPHONE 288649 15723462 1221.6347 Telephone Service & Line Charg Administration-Fire
85.30 TELEPHONE 288649 15723462 2460.6347 Telephone Service & Line Charg Building And Grounds
183.72 TELEPHONE 288649 15723462 0501.6347 Telephone Service & Line Charg General & Admn-Finance
216.52 TELEPHONE 288649 15723462 1108.6347 Telephone Service & Line Charg Communications
51.26 TELEPHONE 288649 15723462 9116.6352 Telephone Circuits Cedar Grove Parking Garage
51.27 TELEPHONE 288649 15723462 9116.6352 Telephone Circuits Cedar Grove Parking Garage
51.27 TELEPHONE 288649 15723462 9116.6352 Telephone Circuits Cedar Grove Parking Garage
51.27 TELEPHONE 288649 15723462 9116.6352 Telephone Circuits Cedar Grove Parking Garage
51.27 TELEPHONE 288649 15723462 9116.6352 Telephone Circuits Cedar Grove Parking Garage
51.27 TELEPHONE 288649 15723462 9116.6352 Telephone Circuits Cedar Grove Parking Garage
1.35 TELEPHONE 288649 15723462 6101.6347 Telephone Service & Line Charg Water -Administration
19.68 TELEPHONE 288649 15723462 6101.6347 Telephone Service & Line Charg Water -Administration
42.06 TELEPHONE 288649 15723462 6146.6347 Telephone Service & Line Charg North Plant Building
42.06 TELEPHONE 288649 15723462 6154.6347 Telephone Service & Line Charg South Plant Building
42.07 TELEPHONE 288649 15723462 6154.6347 Telephone Service & Line Charg South Plant Building
42.07 TELEPHONE 288649 15723462 6154.6347 Telephone Service & Line Charg South Plant Building
42.07 TELEPHONE 288649 15723462 6146.6347 Telephone Service & Line Charg North Plant Building
42.07 TELEPHONE 288649 15723462 6146.6347 Telephone Service & Line Charg North Plant Building
42.07 TELEPHONE 288649 15723462 6146.6347 Telephone Service & Line Charg North Plant Building
42.07 TELEPHONE 288649 15723462 6146.6347 Telephone Service & Line Charg North Plant Building
42.08 TELEPHONE 288649 15723462 6239.6347 Telephone Service & Line Charg Lift Station Maintenanc/Repair
42.08 TELEPHONE 288649 15723462 6239.6347 Telephone Service & Line Charg Lift Station Maintenanc/Repair
1.80 TELEPHONE 288649 15723462 6601.6347 Telephone Service & Line Charg General/Administrative-Arena
26.25 TELEPHONE 288649 15723462 6601.6347 Telephone Service & Line Charg General/Administrative-Arena
1.80 TELEPHONE 288649 15723462 6716.6347 Telephone Service & Line Charg General Administration
26.25 TELEPHONE 288649 15723462 6716.6347 Telephone Service & Line Charg General Administration
3.15 TELEPHONE 288649 15723462 6801.6347 Telephone Service & Line Charg General & Administrative
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
3Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202561 12/14/2018 150476 ALLSTREAM Continued...
45.93 TELEPHONE 288649 15723462 6801.6347 Telephone Service & Line Charg General & Administrative
2,577.47
202562 12/14/2018 153526 ALLY FINANCIAL
11,695.89 MITSUBISHI PHEV PURCHASE OPTIO 288634 611925478723-12
0518
3508.6680 Mobile Equipment Equip Rev Fd-Dept 08
11,695.89
202563 12/14/2018 100058 ANDERSEN INC, EARL F
1,165.55 STREET SIGN INSTALL 288629 119231 2242.6257 Signs & Striping Material Signs-Installation & Mtn
1,165.55
202564 12/14/2018 144673 ARCADE ELECTRIC
3,075.00 ELECTRICAL FOR TREADMILL 288630 10448 6603.6630 Other Improvements Building Repair & Maint.
3,075.00
202565 12/14/2018 153531 ASHLEY, SCOTT
11.16 11822-OVRPMNT 3682 WIDGEON WAY 288631 120418 9220.2250 Escrow Deposits Public Utilities
11.16
202566 12/14/2018 121083 ASPEN MILLS
170.85 UNIFORM PANTS-SCOTT 288635 227292 1228.6224 Clothing/Personal Equipment Inspection and Prevention
113.90 UNIFORM PANTS- SPRINGER 288633 227377 1221.6224 Clothing/Personal Equipment Administration-Fire
6,045.00 FIRE JACKETS 288632 227378 1225.6224 Clothing/Personal Equipment Fire / EMS Equipment
6,329.75
202567 12/14/2018 101609 ASPEN WASTE
108.57 WASTE 288640 1-321981120118-
1118
3313.6539 Waste Removal/Sanitation Servi Fire Buildings
45.10 WASTE 288637 1-321999120118-
1118
3313.6539 Waste Removal/Sanitation Servi Fire Buildings
69.78 WASTE 288636 1-322005120118-
1118
3313.6539 Waste Removal/Sanitation Servi Fire Buildings
325.27 WASTE 288638 1-322021120118-
1118
3304.6539 Waste Removal/Sanitation Servi Bldg/Facilities Maintenance
52.65 WASTE 288639 1-322039120118-
1118
3316.6539 Waste Removal/Sanitation Servi Police
1,025.92 WASTE 288642 1-322104113018-
1118
3314.6539 Waste Removal/Sanitation Servi Central Maintenance
426.82 WASTE REMOVAL 288942 S1322047-120118 6603.6539 Waste Removal/Sanitation Servi Building Repair & Maint.
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
4Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202567 12/14/2018 101609 ASPEN WASTE Continued...
58.38 WASTE 288641 S1366341-120118 3313.6539 Waste Removal/Sanitation Servi Fire Buildings
2,112.49
202568 12/14/2018 140466 ASPENWALL TREE SERVICE INC.
500.00 CEDAR POND REMOVAL 288643 18-0324 3220.6535 Other Contractual Services Tree Removal
500.00
202569 12/14/2018 146829 AT&T MOBILITY
39.23 10/18/18-11/17/18 288644 287262588400X11
252018
2010.6355 Cellular Telephone Service General Engineering
39.23 10/18/18-11/17/18 288644 287262588400X11
252018
9701.6355 Cellular Telephone Service PEG-eligible
78.46
202570 12/14/2018 115432 AUDIOVISUAL, INC.
1,975.60 COMREX LIVE UNIT BATTERIES 288645 88589345 9701.6640 Machinery/Equipment PEG-eligible
276.51 COMREX LIVE UNIT CASE 288646 88589723 9701.6640 Machinery/Equipment PEG-eligible
2,252.11
202571 12/14/2018 153532 AWAIJANE, ANTOINE
36.42 11822-OVRPMNT 1526 CLEMSON DR 288647 120418 9220.2250 Escrow Deposits Public Utilities
36.42
202572 12/14/2018 143108 BLOOMINGTON, CITY OF
735.00 BAC T TESTING 288650 1800319 6149.6323 Testing Services Water Sampling/Testing
735.00
202573 12/14/2018 102301 BOLDT, ROBERT
55.11 11822-OVRPMNT 4310 TRENTON TR 288651 120418 9220.2250 Escrow Deposits Public Utilities
55.11
202574 12/14/2018 144122 BRAND FARMS
12.00 11/17/18 MARKETFEST SNAP/EBT 288652 111718 3061.6220 PR003 Operating Supplies - General Market Fest
12.00
202575 12/14/2018 100024 BRAUN INTERTEC
4,225.00 MURPHY LS REHAB 288653 B152731 6239.6630 P1345 Other Improvements Lift Station Maintenanc/Repair
4,225.00
202576 12/14/2018 148751 CAMPBELL KNUTSON
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
5Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202576 12/14/2018 148751 CAMPBELL KNUTSON Continued...
2,808.70 CITY ATTORNEY BILL 288654 3407-013G-1118 0602.6311 Legal Prosecuting Attorney
2,808.70
202577 12/14/2018 153533 CARDINAL, ARNOLD
7.21 11822-OVRPMNT 4520 MALLARD TR 288655 120418 9220.2250 Escrow Deposits Public Utilities
7.21
202578 12/14/2018 147852 CAROLINA TANA FINE ARTS
427.43 ART SALE VENDOR PAYMENT 288661 2018 WINTER ART
SALE
3081.2290.1 Art House-Pottery Sale taxable Arts & Humanities Council
427.43
202579 12/14/2018 141765 CBL FLOORS
1,492.00 QUARRY CARPET 288662 9382 3624.6630 Other Improvements Facilities R&R Fd-Mtn Facility
1,492.00
202580 12/14/2018 151299 CINTAS
23.65 FD RUGS 288658 4012926326 3313.6569 Maintenance Contracts Fire Buildings
8.62 FD RUGS 288659 4012926347 3313.6569 Maintenance Contracts Fire Buildings
94.08 SHOP TOWELS 288656 4013255533 2401.6241 Shop Materials Gen/Adm-Central Services
168.00 SHOP TOWELS 288801 4013255560 2401.6241 Shop Materials Gen/Adm-Central Services
43.02 CH RUGS 288660 4013255618 3315.6569 Maintenance Contracts City Hall
60.52 SHOP TOWELS 288657 4013255619 2401.6241 Shop Materials Gen/Adm-Central Services
397.89
202581 12/14/2018 144199 CLEARY LAKE VETERINARY HOSPITAL
127.75 LOKI VET 288663 279368 1104.6325 Vet/Kennel Charge/Animal Dispo Patrolling/Traffic
127.75
202582 12/14/2018 144199 CLEARY LAKE VETERINARY HOSPITAL
96.23 BADGER VET 288664 277941 1104.6325 Vet/Kennel Charge/Animal Dispo Patrolling/Traffic
96.23
202583 12/14/2018 142286 COMCAST
8.42 COMCAST PD SQUAD DEC18 288665 877210508005718
1-112018
1104.6569 Maintenance Contracts Patrolling/Traffic
8.42
202584 12/14/2018 142286 COMCAST
21.08 COMCAST FEES-12/5/18-1/4/19 288668 877210508075712 1221.6535 Other Contractual Services Administration-Fire
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
6Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202584 12/14/2018 142286 COMCAST Continued...
9-112518
21.08
202585 12/14/2018 142286 COMCAST
2.10 12/9/18-1/19/19 288669 877210508073668
5-120118
6146.6535 Other Contractual Services North Plant Building
2.10
202586 12/14/2018 153524 COMCAST
925.00 BAND SHELL FIBER 288666 71306413 9704.6535 Other Contractual Services Non-ETV CIP expenditures
7,000.00 BAND SHELL FIBER INSTALL 288666 71306413 9704.6630 Other Improvements Non-ETV CIP expenditures
775.00 BAND SHELL FIBER 288667 72593881 9704.6535 Other Contractual Services Non-ETV CIP expenditures
8,700.00
202587 12/14/2018 100038 COMMERCIAL ASPHALT
325.24 STREET REPAIR SUPPLIES 288670 181115 2220.6255 Street Repair Supplies Bituminous Surface Maint
255.49 BLACKTOP FOR PATCHES 288670 181115 6160.6255 Street Repair Supplies Main Maintenance/Repair
580.73
202588 12/14/2018 146512 COMPASS MINERALS AMERICA
7,058.71 ROAD SALT 288671 352128 2240.6256 Snow Removal/Ice Control Suppl Street Plowing/Sanding
9,730.41 ROAD SALT 288672 353121 2240.6256 Snow Removal/Ice Control Suppl Street Plowing/Sanding
11,756.97 ROAD SALT 288673 354464 2240.6256 Snow Removal/Ice Control Suppl Street Plowing/Sanding
5,002.88 ROAD SALT 288674 355464 2240.6256 Snow Removal/Ice Control Suppl Street Plowing/Sanding
33,548.97
202589 12/14/2018 100040 CONT SAFETY EQUIP
446.40 PPE GLOVES FOR JETTING 288802 449087 6238.6222 Medical/Rescue/Safety Supplies Sewer Main Maintenance
446.40
202590 12/14/2018 150880 CORE & MAIN LP
107,160.00 STORZ UPGRADES 288676 J647522 6144.6630 Other Improvements Hydrant Maintenance/Repair
960.00 METER READING REPAIRS 288675 J801634 6162.6428 Field/Other Equipment Repair-L Meter Reading
131.36 PR STATIONS 288903 J834666 6152.6260 Utility System Parts/Supplies PRS Inspection/Maint/Repair
480.00 METER READING REPAIRS 288902 J849790 6162.6426 Small Equipment Repair-Labor Meter Reading
108,731.36
202591 12/14/2018 152916 CORNERSTONE PARKING GROUP
16,062.56 PARKING MANAG NOV 2018 288677 1642 9116.6535 Other Contractual Services Cedar Grove Parking Garage
16,062.56
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
7Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202591 12/14/2018 152916 CORNERSTONE PARKING GROUP Continued...
202592 12/14/2018 153519 COURTNEY INDUSTRIAL BATTERY
208.00 LABOR TO FIX CHARGER EAST 288680 298150 6602.6535 Other Contractual Services Equipment Repair & Maint.
208.00
202593 12/14/2018 100043 CUB FOODS
3.59 CUB FOODS 288678 111218 3092.6227 Recreation Equipment/Supplies CDBG - Seniors
3.59
202594 12/14/2018 113795 CULLIGAN
355.55 SOFTENER SALT 288679 708526 3313.6244 Chemicals & Chemical Products Fire Buildings
355.55
202595 12/14/2018 151049 DAHLEN, MITCHELL
94.98 CLOTHING ALLOW MITCH DAHLEN 288683 111618 2201.2115 Clothing Allowance Gen/Adm-Streets
94.98
202596 12/14/2018 110921 DAKOTA AWARDS & ENGRAVING
33.00 GEAR LOCKER LABELS 288681 19465 1225.6224 Clothing/Personal Equipment Fire / EMS Equipment
15.00 288682 19557 1221.6475 Miscellaneous Administration-Fire
48.00
202597 12/14/2018 144803 DAKOTA COUNTY - PERMITS OFFICE
250.00 COUNTY PERMIT 288805 24140 6143.6480 Licenses, Permits and Taxes Valve Maintenance/Repair
250.00
202598 12/14/2018 119154 DAKOTA COUNTY TREASURER
20.00 NOTARY RENEWAL - LUTOVSKY 288806 2019 2010.6480 Licenses, Permits and Taxes General Engineering
20.00 NOTARY RENEWAL - BRANDEL 288806 2019 0720.6210 Office Supplies General Admin-Planning & Zonin
20.00 NOTARY RENEWAL - HAMMER 288806 2019 1107.6479 Dues and Subscriptions Support Services
60.00
202599 12/14/2018 100050 DAKOTA ELECTRIC
147.20 HOLZ FARM 288684 100914-1-NOV18 3106.6405 Electricity Structure Care & Maintenance
21.19 DIFFLEY/LEXINGTON 288704 101738-3-NOV18 3106.6405 Electricity Structure Care & Maintenance
23.58 DIFFLEY/LEXINGTON 288685 102634-3-NOV18 3106.6405 Electricity Structure Care & Maintenance
27.92 OAK POND RD SAN LIFT STATION 288686 102843-0-NOV18 6239.6408 Electricity-Lift Stations Lift Station Maintenanc/Repair
25.30 DIFFLEY/LEXINGTON 288687 103085-7-NOV18 3106.6405 Electricity Structure Care & Maintenance
49.44 CARNELIAN LANE HOCKEY RINK 288709 128582-4-OCT18 3106.6405 Electricity Structure Care & Maintenance
29,842.28 RIVER HILLS STREET LITES 288688 129548-4-NOV18 6301.6406 Electricity-Street Lights Street Lighting
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
8Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202599 12/14/2018 100050 DAKOTA ELECTRIC Continued...
45.04 JOHNNYCAKE/CLIFF SIGNALS 288689 141558-7-NOV18 6301.6407 Electricity-Signal Lights Street Lighting
31.92 GUN CLUB ROAD LIFTSTATION 288705 166469-7-NOV18 6239.6408 Electricity-Lift Stations Lift Station Maintenanc/Repair
9.43 RIDGE CLIFF PARK 288710 170637-3-OCT18 3106.6405 Electricity Structure Care & Maintenance
24.27 PILOT KNOB PARK 288711 177545-1-OCT18 3106.6405 Electricity Structure Care & Maintenance
4,056.17 HOLLAND STORM 288690 183413-4-NOV18 6439.6408 Electricity-Lift Stations Lift Station Maintenanc/Repair
60.78 BERRY RIDGE STORM 288712 189767-7-OCT18 6439.6408 Electricity-Lift Stations Lift Station Maintenanc/Repair
101.99 ELRENE RD HOCKEY RINK 288691 192536-1-NOV18 3106.6405 Electricity Structure Care & Maintenance
14.00 FISH LAKE AERATOR 288725 198290-9-OCT18-
1
6520.6405 Electricity Basin Mgmt-Aeration
118.97 LEXINGTON RESERVOIR 288706 200603-9-NOV18 6154.6409 Electricity-Wells/Booster Stat South Plant Building
20.84 PILOT KNOB WELL SITE RINK 288713 200813-4-OCT18 3106.6405 Electricity Structure Care & Maintenance
29.98 WESCOTT STORM 288692 201101-3-NOV18 6439.6408 Electricity-Lift Stations Lift Station Maintenanc/Repair
672.83 HIGHLINE TRAIL STORM 288714 201116-1-OCT18 6439.6408 Electricity-Lift Stations Lift Station Maintenanc/Repair
163.70 WOODLANDS STORM 288693 201125-2-NOV18 6439.6408 Electricity-Lift Stations Lift Station Maintenanc/Repair
25.98 NORTHVIEW PARK 288694 203049-2-NOV18 3106.6405 Electricity Structure Care & Maintenance
1,861.38 WELL #19 288715 203725-7-OCT18 6154.6409 Electricity-Wells/Booster Stat South Plant Building
14.00 HEINE CT AERATOR 288716 203785-1-OCT18 6520.6405 Electricity Basin Mgmt-Aeration
23.13 OHMAN PARK SHELTER 288707 205375-9-NOV18 3106.6405 Electricity Structure Care & Maintenance
41.39 31/WESCOTT SIGNALS 288717 214661-1-OCT18 6301.6407 Electricity-Signal Lights Street Lighting
26.32 DIFFLEY RD TUNNEL LITES 288695 214662-9-NOV18 3106.6405 Electricity Structure Care & Maintenance
41.16 DIFFLEY/LEXINGTON 288696 221769-3-NOV18 3106.6405 Electricity Structure Care & Maintenance
14.00 620 CLIFF RD AERATOR 288697 226044-6-NOV18 6520.6405 Electricity Basin Mgmt-Aeration
27.12 MAJESTIC OAKS SAN 288698 288226-4-NOV18 6239.6408 Electricity-Lift Stations Lift Station Maintenanc/Repair
88.06 1275 TOWERVIEW RD 288718 321533-2-OCT18 3106.6405 Electricity Structure Care & Maintenance
39.90 CEDAR GROVE SIGNALS 288719 333642-7-OCT18 6301.6407 Electricity-Signal Lights Street Lighting
230.90 CEDARVALE BLVD LIGHTS 288724 346992-1-OCT18 6301.6406 Electricity-Street Lights Street Lighting
14.00 HAY LAKE RD AERATOR 288708 371946-5-NOV18 6520.6405 Electricity Basin Mgmt-Aeration
16.28 WESCOTT GAZEBO 288699 393793-5-NOV18 3106.6405 Electricity Structure Care & Maintenance
66.26 STEEPLECHASE CT LIFTSTATION 288700 401500-4-NOV18 6239.6405 Electricity Lift Station Maintenanc/Repair
14.00 DENMARK #SL SIGN 288720 405764-2-OCT18 6301.6407 Electricity-Signal Lights Street Lighting
478.75 ART HOUSE 288701 412157-0-NOV18 3106.6405 Electricity Structure Care & Maintenance
15.25 ART HOUSE GAZEBO 288702 440126-1-NOV18 3106.6405 Electricity Structure Care & Maintenance
51.08 MARSH COVE SAN LIFT STATION 288703 441453-8-NOV18 6239.6408 Electricity-Lift Stations Lift Station Maintenanc/Repair
20.73 CHLOE LANE LIFT STATION 288721 472429-0-OCT18 6239.6405 Electricity Lift Station Maintenanc/Repair
1,535.13 FIRE STATION 1 288722 572299-6-OCT18 3313.6405 Electricity Fire Buildings
5.00 CIVIL DEFENSE SIREN 288723 578913-6-OCT18 1106.6405 Electricity Emergency Preparedness
40,136.65
202600 12/14/2018 100405 DAKOTA ELECTRIC ASSOC
1,890.69 CLAIM CP63007 288906 2411627-091518 9591.6386 Insurance Deductible Risk Management
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
9Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202600 12/14/2018 100405 DAKOTA ELECTRIC ASSOC Continued...
976.68 CONTROLLER M SL 21 REPAIRS 288945 2411627-1115201
8
6301.6432 Utility System Repair-Labor Street Lighting
2,867.37
202601 12/14/2018 100447 DALCO
100.26 CUSTODIAL SUPPLIES 288727 3391561 6827.6223 Building/Cleaning Supplies Building Maintenance
100.26
202602 12/14/2018 148203 DATABANK HOLDINGS LTD
1,060.90 BUILDING RENTAL - DATABANK 288734 47828 4005.6456 Building Rental AccessEagan
1,060.90
202603 12/14/2018 130735 DAVIS EQUIPMENT CORPORATION
.50 PLOW EQUIP PARTS 288729 EI07995 2240.6231 Mobile Equipment Repair Parts Street Plowing/Sanding
14.16 PLOW EQUIP PARTS 288728 EI07995A 2240.6231 Mobile Equipment Repair Parts Street Plowing/Sanding
14.66
202604 12/14/2018 100053 DELEGARD TOOL CO
458.82 UNIT 150 288730 95032 9001.1415 Inventory - Parts General Fund
458.82
202605 12/14/2018 153534 DELEON, ELIZABETH
98.91 11822-OVRPMNT 1076 HUMMINGBIRD 288731 120418 9220.2250 Escrow Deposits Public Utilities
98.91
202606 12/14/2018 115141 DISPLAY SALES COMPANY
239.40 FLAG POLE 288732 INV-016381 1221.6210 Office Supplies Administration-Fire
239.40
202607 12/14/2018 126333 DUNN & SEMINGTON PRINTING DESIGN
345.00 AD SIGNS FOR MARK BURKE 288733 34644 6611.6220 Operating Supplies - General Learn To Skate
345.00
202608 12/14/2018 100387 EAGAN GENERAL REPAIR
1,597.39 THOMPSON PUMP REPAIR 288904 27553 6432.6425 Mobile Equipment Repair Labor Equipment Maintenance/Repair
78.11 SITE AMENITY REPAIR 288735 27573 3119.6252 Parks & Play Area Supplies Rink Amenity Mtn/Setup
1,675.50
202609 12/14/2018 100060 ECM PUBLISHERS INC
16.36 FEE SCHEDULE PH 288803 652809 0401.6359 Legal Notice Publication General & Admn-City Clerk
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
10Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202609 12/14/2018 100060 ECM PUBLISHERS INC Continued...
16.36
202610 12/14/2018 101006 EMERGENCY AUTO TECHNOLOGIES
115.64 NEW SQUAD 1133 288737 DL112618-24 3511.6680 Mobile Equipment Equip Rev Fd-Dept 11
40.54 UNIT 33 288736 DL112618-24A 9001.1415 Inventory - Parts General Fund
156.18
202611 12/14/2018 144411 ENVIROTECH SERVICES INC.
5,558.52 APEX 288738 CD201903351 2240.6256 Snow Removal/Ice Control Suppl Street Plowing/Sanding
5,558.52
202612 12/14/2018 100451 FASTENAL COMPANY
118.00 METER REPLACEMENT 288739 MNTC1223461 6161.6230 Repair/Maintenance Supplies-Ge Meter Replacement
145.32 PARTS FOR STP HIGH SERVICE PUM 288741 MNTC1224194 6155.6260 Utility System Parts/Supplies South Plant Production
260.15 PARTS FOR STP HIGH SERVICE PUM 288742 MNTC1224380 6155.6260 Utility System Parts/Supplies South Plant Production
25.40 TABLE REPAIR 288744 MNTC1224510 3103.6252 Parks & Play Area Supplies Site Amenity Maintenance
23.65 TOOLS 288743 MNTC1224528 3103.6240 Small Tools Site Amenity Maintenance
86.80 NUTS/BOLTS 288740 MNTC1224595 3103.6220 Operating Supplies - General Site Amenity Maintenance
51.66 STP TAPS FOR SERVICE PUMP 288745 MNTC1224646 6155.6240 Small Tools South Plant Production
710.98
202613 12/14/2018 153510 FAVIA, JUDITH
231.38 ART SALE VENDOR PAYMENT 288746 1801 3081.2290.1 Art House-Pottery Sale taxable Arts & Humanities Council
231.38
202614 12/14/2018 122976 FIRE SAFETY USA INC.
77.98 SAFETY VESTS - L-2 288747 117326 1225.6240 Small Tools Fire / EMS Equipment
65.00 GEAR NAMEPLATE 288748 117658 1225.6224 Clothing/Personal Equipment Fire / EMS Equipment
142.98
202615 12/14/2018 144138 FISCHER MINING LLC
1,026.24 FILL MATERIAL 288905 120934 6160.6255 Street Repair Supplies Main Maintenance/Repair
1,026.24
202616 12/14/2018 143971 FLEETPRIDE
408.40 UNIT 111 288749 15876993 9001.1415 Inventory - Parts General Fund
139.46 UNIT 157 288750 16121544 9001.1415 Inventory - Parts General Fund
46.64 GLOVES FOR LIFTSTATION REPAIR 288804 16319143 6239.6222 Medical/Rescue/Safety Supplies Lift Station Maintenanc/Repair
594.50
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
11Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202617 12/14/2018 100157 FORCE AMERICA INC Continued...
35.40 HOSE ENDS 288754 IN001-1251791 2244.6231 Mobile Equipment Repair Parts Street Equipment Repair/Mtn
675.36 COUPLERS FOR PLOWS 288753 IN001-1280549 2244.6231 Mobile Equipment Repair Parts Street Equipment Repair/Mtn
41.13 COUPLER FOR TRACTORS 288755 IN001-1296090 3128.6231 Mobile Equipment Repair Parts Vehicle Maintenance
93.17 PLOW EQUIP PARTS 288751 IN001-1296702 2240.6231 Mobile Equipment Repair Parts Street Plowing/Sanding
567.28 PLOW EQUIP PARTS 288752 IN001-1296826 2240.6231 Mobile Equipment Repair Parts Street Plowing/Sanding
1,256.08 UNIT 157 AND 122 288756 IN001-1297467 9001.1415 Inventory - Parts General Fund
2,668.42
202618 12/14/2018 147654 FOX RIDGE PRINTING
166.70 ART SALE PRINTING 288757 19331 3081.6357 Advertising/Publication Arts & Humanities Council
166.70
202619 12/14/2018 147955 GALLS LLC
22.49 KUEHNAST UNIFORM 288759 011370203 1104.6224 Clothing/Personal Equipment Patrolling/Traffic
154.95 LETOURNEAU UNIFORM 288762 011382458 1104.6224 Clothing/Personal Equipment Patrolling/Traffic
134.35-MEADE UNIFORM 288763 011384142 1104.6224 Clothing/Personal Equipment Patrolling/Traffic
196.90 SWEENEY UNIFORM 288758 11367918 1104.6224 Clothing/Personal Equipment Patrolling/Traffic
32.97 PATHWAYS UNIFORMS 288761 11378871 1104.6224 Clothing/Personal Equipment Patrolling/Traffic
53.95-RATZLOFF UNIFORM 288760 11396413 1104.6224 Clothing/Personal Equipment Patrolling/Traffic
199.00 LETOURNEAU UNIFORM 288764 11420548 1104.6224 Clothing/Personal Equipment Patrolling/Traffic
418.01
202620 12/14/2018 100529 GASTFIELD MAINTENANCE PLUS, BOB
896.00 CUSTODIAL 288775 11/30/18 3313.6537 Janitorial Service Fire Buildings
370.00 PARK BLDG CONTRACT CLEAN 288774 113018 3106.6537 Janitorial Service Structure Care & Maintenance
1,266.00
202621 12/14/2018 100077 GOPHER ST ONE CALL
540.00 ONE CALL FEE 288765 8110336 6234.6356 One Call Service Fee Utility Locates
160.65 ONE CALL FEE 288765 8110336 4002.6569 Maintenance Contracts Fiber capacity project
700.65
202622 12/14/2018 142804 GRAHAM, SCOTT
2.00 12/1/18 MARKETFEST-MARKETBUCKS 288766 120118 3061.6220 PR004 Operating Supplies - General Market Fest
5.00 12/1/18 MARKETFEST-SNAP/EBT 288766 120118 3061.6220 PR003 Operating Supplies - General Market Fest
7.00
202623 12/14/2018 100990 GRAINGER
205.39 CL2 EVAC SAFETY SWITCH 288768 9020508090 6146.6233 Building Repair Supplies North Plant Building
479.20 PR STATIONS 288767 9021875787 6152.6260 Utility System Parts/Supplies PRS Inspection/Maint/Repair
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
12Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202623 12/14/2018 100990 GRAINGER Continued...
684.59
202624 12/14/2018 153535 HANKES, JAMES
24.72 11822-OVRPMNT 4619 RIDGE CLIFF 288769 120418 9220.2250 Escrow Deposits Public Utilities
24.72
202625 12/14/2018 100085 HARDWARE HANK
9.42 STREET EQUIP REPAIR 288772 1800089 2244.6231 Mobile Equipment Repair Parts Street Equipment Repair/Mtn
14.10 MISC REPAIR SUPPLIES 288778 1800974 1225.6230 Repair/Maintenance Supplies-Ge Fire / EMS Equipment
2.99 MISC PARTS 288779 1801692 1225.6230 Repair/Maintenance Supplies-Ge Fire / EMS Equipment
23.94 HEAT PUMPS NTP FOR BLEED OFFS 288770 1801841 6146.6233 Building Repair Supplies North Plant Building
14.53 STP BOILER PARTS 288771 1802145 6154.6233 Building Repair Supplies South Plant Building
93.35 OPERATING SUPPLIES 288773 1802371 6603.6223 Building/Cleaning Supplies Building Repair & Maint.
129.01 EQUIP PARTS 288777 1803296 3127.6231 Mobile Equipment Repair Parts Equipment Maintenance/Repair
17.82 KEYS 288776 1804643 3106.6220 Operating Supplies - General Structure Care & Maintenance
305.16
202626 12/14/2018 138631 HEALTHEAST MEDICAL TRANSPORTATION
85.00 BLOOD DRAW SUSPECT 288780 18-48127 9115.6310 Professional Services-General DWI Forfeiture
85.00
202627 12/14/2018 100087 HENNEPIN CTY DISTRICT COURT
78.00 JAQUAYVION CORDON STOKES 288781 225095 9001.2260 Bail Deposits General Fund
78.00
202628 12/14/2018 143474 HILDEN, CORINE
22.00 EVENT SUPPLIES 288782 FARM TO TABLE
EVENT
3027.6227 Recreation Equipment/Supplies Holz Farm
22.00
202629 12/14/2018 153512 HOFFMAN WEBER CONSTRUCTION INC
2.00 BUILDING PERMIT 288787 153110 9001.2275 MCES Sewer Availability Charge General Fund
103.25 BUILDING PERMIT 288787 153110 0801.4085 Building General & Admn-Protective Insp
105.25
202630 12/14/2018 100090 HOTSY EQUIPMENT OF MINNESOTA
461.25 HOTSY SOAP 288784 61084 2401.6241 Shop Materials Gen/Adm-Central Services
326.40 HOTSEY REPAIRS 288783 61615 6146.6427 Building Operations/Repair-Lab North Plant Building
787.65
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
13Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202631 12/14/2018 145222 HOWIES HOCKEY TAPE Continued...
896.79 PRO SHOP RESALE 288785 38380 6608.6855 Merchandise for Resale Skate Shop/Sharpening
896.79
202632 12/14/2018 148985 HP INC.
1,321.04 COMPUTER REPLACEMENT PROGRAM 288786 60598252 6101.6670 Other Equipment Water -Administration
1,321.04
202633 12/14/2018 149714 HYDROCORP
5,365.00 CROSS CONNECTION CONTROL PROG 288788 0050288-IN 6131.6310 Professional Services-General Water Customer Service
5,365.00
202634 12/14/2018 102238 IDENTISYS
667.21 CARDS FOR SEASON PASSES 288941 418160 6716.6220 Operating Supplies - General General Administration
667.21
202635 12/14/2018 153481 IMMIGRANT LAW CENTER OF MINNESOTA
350.00 IMMIGRANT LAW CENTER 288789 10/18 EAGAN 3001.6535 Other Contractual Services General/Admn-Recreation
350.00
202636 12/14/2018 115944 INTEREUM, INC.
580.74-RETURN OF CHAIR CARTS 288790 150755 5501.6660 Office Furnishings & Equipment CMF expansion phase II
7,212.81 ECC - R&R - LOBBY FURNITURE 288791 152207 6801.6630 Other Improvements General & Administrative
6,632.07
202637 12/14/2018 103046 INTERSTATE COMPANIES, INC.
277.01 UNIT 312 288792 CO01148335:01 9001.1415 Inventory - Parts General Fund
277.01
202638 12/14/2018 153536 ITTY, CECIL
23.22 11822-OVRPMNT 1597 MALLARD DR 288793 120418 9220.2250 Escrow Deposits Public Utilities
23.22
202639 12/14/2018 144674 JACKSON & ASSOCIATES LLC
35,480.00 CLAIM CP33563 288809 7293 9591.6386 Insurance Deductible Risk Management
35,480.00
202640 12/14/2018 104485 JANECKY PLUMBING SERVICE, INC.
445.00 DISPOSAL INSTALL 288795 117517 3313.6535 Other Contractual Services Fire Buildings
530.00 TRASH DISPOSER FS2 REPAIR 288794 117527 1221.6660 Office Furnishings & Equipment Administration-Fire
975.00
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
14Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202640 12/14/2018 104485 JANECKY PLUMBING SERVICE, INC.Continued...
202641 12/14/2018 153537 JASKEN, RANDY
6.05 11822-OVRPMNT 3536 WIDGEON WAY 288796 120418 9220.2250 Escrow Deposits Public Utilities
6.05
202642 12/14/2018 153538 JEWETT, CHAD
35.75 11822-OVRPMNT 4490 RIDGEVIEW D 288797 120418 9220.2250 Escrow Deposits Public Utilities
35.75
202644 12/14/2018 151879 JOHNSON CONTROLS FIRE PROTECTION LP
975.73 FIRE ALARM REPAIR 288798 85403335 6827.6535 Other Contractual Services Building Maintenance
975.73
202645 12/14/2018 153539 JUST, GREG
24.70 11822-OVRPMNT 4842 SHEVLIN CT 288799 120418 9220.2250 Escrow Deposits Public Utilities
24.70
202646 12/14/2018 119410 KAMAN INDUSTRIAL TECHNOLOGIES
62.43 BELTS 288807 B84417 3313.6233 Building Repair Supplies Fire Buildings
23.65 BELTS 288808 B864182 3313.6233 Building Repair Supplies Fire Buildings
86.08
202647 12/14/2018 153541 KNEDLER, TYLER
8.25 11822-OVRPMNT 4375 SVENSK LANE 288810 120418 9220.2250 Escrow Deposits Public Utilities
8.25
202648 12/14/2018 100061 KRAEMER MINING & MATERIALS INC.
391.81 FILL MATERIAL 288811 274875 6160.6255 Street Repair Supplies Main Maintenance/Repair
679.07 FILL MATERIAL 288812 274966 6160.6255 Street Repair Supplies Main Maintenance/Repair
1,070.88
202649 12/14/2018 146762 KRAFT CONTRACTING & MECHANICAL LLC
2,227.72 BETTER KITS FOR BOILER STP 288813 13895 6154.6427 Building Operations/Repair-Lab South Plant Building
2,227.72
202650 12/14/2018 100662 LAW ENFORCEMENT LABOR
3,283.00 DECEMBER 2018 UNION DUES 288946 OFFICERS/SRGS
12/8/18
9592.2026 Ded Pay - Pol Off Unio Benefit Accrual
3,283.00
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
15Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202651 12/14/2018 100420 LEAGUE OF MINN CITIES INS TRUST Continued...
5,432.78 CLAIM CA69693 288814 4189 9591.6386 Insurance Deductible Risk Management
5,432.78
202652 12/14/2018 100490 LIFEWORKS
72.46 JANITORIAL SERVICE 288815 081978 3106.6537 Janitorial Service Structure Care & Maintenance
72.46
202653 12/14/2018 100118 MARKS TOWING
75.00 SQUAD TOW 288816 497521 1105.6538 Towing Charges Investigation/Crime Prevention
75.00
202654 12/14/2018 153544 MCAFEE, GREGORY
56.01 11822-OVRPMNT 663 WATERVIEW CO 288817 120418 9220.2250 Escrow Deposits Public Utilities
56.01
202655 12/14/2018 141330 MCKINLEY, PATRICIA
470.25 ART SALE VENDOR PAYMENT 288818 2018 WINTER ART
SALE
3081.2290.1 Art House-Pottery Sale taxable Arts & Humanities Council
470.25
202656 12/14/2018 153529 MEAN GREEN
10.00 12/1/18 MARKETFEST-SNAP/EBT 288819 120118 3061.6220 PR003 Operating Supplies - General Market Fest
10.00
202657 12/14/2018 153550 MELTON, CHRISTOPHER
100.00 REIMBURSEMENT FOR JG PLAQUE 288820 120318 9695.6210 Office Supplies Dakota Co Drug Task Force
100.00
202658 12/14/2018 100571 MENARDS-APPLE VALLEY
49.28 MAILBOX REPAIR 288821 50465 2240.6256 Snow Removal/Ice Control Suppl Street Plowing/Sanding
49.28
202659 12/14/2018 151095 MENARDS-BURNSVILLE
24.56 R&RCMF WINDOWS 288822 91674 3624.6620 Buildings Facilities R&R Fd-Mtn Facility
30.44 R&RCMF WINDOWS 288823 91838 3624.6620 Buildings Facilities R&R Fd-Mtn Facility
55.00
202660 12/14/2018 144554 METRO UPHOLSTERY
3,630.00 ECC - R&R - LOBBY FURNITURE 288824 3669 6801.6630 Other Improvements General & Administrative
3,630.00
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
16Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202660 12/14/2018 144554 METRO UPHOLSTERY Continued...
202661 12/14/2018 100452 METRO VOLLEYBALL OFFICIALS ASN
150.00 MEN'S VOLLEYBALL OFFICIALS 288825 327 3041.6327 Sporting Event Officials Adult Volleyball-Men
180.00 WOMEN'S VOLLEYBALL OFFICIALS 288825 327 3042.6327 Sporting Event Officials Adult Volleyball-Women
330.00 CO-REC VOLLEYBALL OFFICIALS 288825 327 3043.6327 Sporting Event Officials Adult Volleyball-Co-Rec
660.00
202662 12/14/2018 100849 MID AMERICA BUSINESS SYSTEMS
9,507.01 SCANNING - BUILDING INSPECTION 288826 745006 0401.6535 Other Contractual Services General & Admn-City Clerk
9,507.01
202663 12/14/2018 126555 MIENTKIEWICZ, RICHARD
23.98 MILEAGE 10/11 & 10/12 288839 101218-1 3304.6477 Local Meeting Expenses Bldg/Facilities Maintenance
23.98
202664 12/14/2018 113004 MIKLYA, THOMAS
15.82 DCBO LUNCH 12/6/18 288840 120618 0812.6477 Local Meeting Expenses Conferences/Training-Prot Insp
15.82
202665 12/14/2018 127813 MINGER CONSTRUCTION INC.
338,816.70 ASHBURY LS REHAB 288872 PAY EST #1 6239.6630 P1299 Other Improvements Lift Station Maintenanc/Repair
338,816.70
202666 12/14/2018 153545 MLG TITLE LLC
60.96 11822-OVRPMNT 3082 SIBLEY MEM 288827 120418 9220.2250 Escrow Deposits Public Utilities
60.96
202667 12/14/2018 100664 MN CHILD SUPPORT
664.51 PAYROLL ENDING 12/8/18 288947 GARNISHMENT
12/8/18
9592.2030 Ded Pay - Garnishments Benefit Accrual
354.86 PAYROLL ENDING 12/8/18 288948 GARNISHMENT
12/8/18-1
9592.2030 Ded Pay - Garnishments Benefit Accrual
230.73 PAYROLL ENDING 12/8/18 288949 GARNISHMENT
12/8/18-2
9592.2030 Ded Pay - Garnishments Benefit Accrual
1,250.10
202668 12/14/2018 120087 MN ENERGY RESOURCES CORP
153.65 RAHN PARK WARMING HOUSE 288828 0505212492-0000
1-NOV18
3106.6410 Natural Gas Service Structure Care & Maintenance
153.65
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
17Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202668 12/14/2018 120087 MN ENERGY RESOURCES CORP Continued...
202669 12/14/2018 103029 MN FIRE SERVICE CERTIFICATION BOARD
485.00 FF2 CERTS EFD 288829 6210 1223.6320 Instructors Training Fire & EMS
485.00
202670 12/14/2018 120715 MN OCCUPATIONAL HEALTH
345.00 PHYSICAL EXAM 288830 301694 1001.6318 Medical Services - Physical Ex General/Admn-Human Resources
345.00
202671 12/14/2018 138396 MN SECRETARY OF STATE
120.00 NOTARY RENEWAL - LUTOVSKY 288836 2018-LUTOVSKY 2010.6480 Licenses, Permits and Taxes General Engineering
120.00
202672 12/14/2018 100663 MN TEAMSTERS 320
1,257.00 DECEMBER 2018 UNION DUES 288951 CLERICAL
12/8/18
9592.2029 Ded Pay - Clerical Union Dues Benefit Accrual
2,900.00 DECEMBER 2018 UNION DUES 288950 PUB WKS MAINT
12/8/18
9592.2027 Ded Pay - Pub Wks Union Dues Benefit Accrual
4,157.00
202673 12/14/2018 151514 MODULAR SPACE CORPORATION
474.00 STORAGE FOR RENOVATION 288831 502635190 5045.6220 Operating Supplies - General Temporary Office/Moving Expens
474.00
202674 12/14/2018 101571 MUNICIPAL CODE CORP
475.00 CITY CODE HOSTING 288832 00321805 0401.6535 Other Contractual Services General & Admn-City Clerk
475.00
202675 12/14/2018 125742 NATIONAL DRIVE
2.00 PAYROLL ENDING 12/8/18 288952 120818 9592.2037 Ded Payable-Teamsters DRIVE Benefit Accrual
2.00
202676 12/14/2018 152201 NEWMAN SIGNS INC
81.54 SIGNS- ALDEN LN 288833 TRFINV008004 2242.6257 Signs & Striping Material Signs-Installation & Mtn
81.54
202677 12/14/2018 147869 NOVACK, POLONIA ODAHARA
423.14 ART SALE VENDOR PAYMENT 288837 001013 3081.2290.1 Art House-Pottery Sale taxable Arts & Humanities Council
423.14
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
18Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202678 12/14/2018 143383 OERTEL ARCHITECTS Continued...
1,810.00 TRAPP BLDG PROF. SERVICES 288838 TRAPP FARM 1 2842.6751 Design & Engineering (External Trapp Farm Park
1,810.00
202679 12/14/2018 108599 OFFICE DEPOT, INC.
5.04 SUPPLIES 288841 234724434001 3047.6220 Operating Supplies - General Recreational T-Ball
5.05 SUPPLIES 288841 234724434001 3057.6220 Operating Supplies - General Preschool Programs
6.24 SUPPLIES 288841 234724434001 3001.6210 Office Supplies General/Admn-Recreation
6.25 SUPPLIES 288841 234724434001 0201.6210 Office Supplies General & Admn-Admn
6.25 SUPPLIES 288841 234724434001 0501.6210 Office Supplies General & Admn-Finance
10.78 CALENDARS 288841 234724434001 3301.6210 Office Supplies General Management
11.69 C SCIPIONI CALENDAR 288841 234724434001 0401.6210 Office Supplies General & Admn-City Clerk
6.99 SUPPLIES 288842 238084739001 0820.6210 Office Supplies General/Admn-Housing
6.99 SUPPLIES 288842 238084739001 2010.6220 Operating Supplies - General General Engineering
7.00 SUPPLIES 288842 238084739001 0720.6210 Office Supplies General Admin-Planning & Zonin
9.82 SUPPLIES 288842 238084739001 0201.6210 Office Supplies General & Admn-Admn
9.82 SUPPLIES 288842 238084739001 0501.6210 Office Supplies General & Admn-Finance
9.82 SUPPLIES 288842 238084739001 3001.6210 Office Supplies General/Admn-Recreation
2.07 SUPPLIES 288843 238085769001 0201.6210 Office Supplies General & Admn-Admn
2.07 SUPPLIES 288843 238085769001 0501.6210 Office Supplies General & Admn-Finance
2.07 SUPPLIES 288843 238085769001 3001.6210 Office Supplies General/Admn-Recreation
10.95 OFFICE SUPPLIES 288844 238582972001 0820.6210 Office Supplies General/Admn-Housing
10.95 OFFICE SUPPLIES 288844 238582972001 2010.6220 Operating Supplies - General General Engineering
34.34 OFFICE SUPPLIES 288844 238582972001 0720.6210 Office Supplies General Admin-Planning & Zonin
.90 OFFICE SUPPLIES 288845 241769755001 0720.6210 Office Supplies General Admin-Planning & Zonin
.91 OFFICE SUPPLIES 288845 241769755001 0820.6210 Office Supplies General/Admn-Housing
.91 OFFICE SUPPLIES 288845 241769755001 2010.6220 Operating Supplies - General General Engineering
7.29 OFFICE SUPPLIES 288845 241769755001 0501.6210 Office Supplies General & Admn-Finance
9.89 OFFICE SUPPLIES 288845 241769755001 1001.6210 Office Supplies General/Admn-Human Resources
46.11 OFFICE SUPPLIES 288845 241769755001 0201.6210 Office Supplies General & Admn-Admn
53.57 OFFICE SUPPLIES 288848 242757979001 2401.6210 Office Supplies Gen/Adm-Central Services
16.64 RIDLEY CALENDAR 288846 243418655001 0720.6210 Office Supplies General Admin-Planning & Zonin
4.09 OFFICE SUPPLIES 288847 243418933001 0201.6210 Office Supplies General & Admn-Admn
4.09 OFFICE SUPPLIES 288847 243418933001 0501.6210 Office Supplies General & Admn-Finance
7.77 OFFICE SUPPLIES 288847 243418933001 0820.6210 Office Supplies General/Admn-Housing
29.59 OFFICE SUPPLIES 288847 243418933001 3001.6210 Office Supplies General/Admn-Recreation
345.95
202680 12/14/2018 109423 OFFICE TEAM
1,080.00 OFFICE TEMP HELP 288849 52354650 6101.6535 Other Contractual Services Water -Administration
1,080.00 OFFICE TEMP HELP 288850 52371119 6101.6310 Professional Services-General Water -Administration
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
19Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202680 12/14/2018 109423 OFFICE TEAM Continued...
2,160.00
202681 12/14/2018 118718 ONDREY, JILL
567.35 ONDREY MILEAGE 6/5-10/24 288851 102418 1104.6353 Personal Auto/Parking Patrolling/Traffic
567.35
202682 12/14/2018 144492 OSBERG, DAVE
80.88 MILEAGE - OCTOBER 288852 103118 0201.6353 Personal Auto/Parking General & Admn-Admn
46.65 MILEAGE - NOVEMBER 288853 112718 0201.6353 Personal Auto/Parking General & Admn-Admn
127.53
202683 12/14/2018 100653 PARADISE CAR WASH
191.20 SQUAD CAR WASH 288854 52020-101518 1104.6354 Car Washes Patrolling/Traffic
286.80 SQUAD CAR WASH 288855 52020-111518 1104.6354 Car Washes Patrolling/Traffic
59.75 CAR WASH 288856 52025-111518 1221.6354 Car Washes Administration-Fire
537.75
202684 12/14/2018 153546 PHELPS, TONY
15.21 11822-OVRPMNT 1708 TERRA GLENN 288857 120418 9220.2250 Escrow Deposits Public Utilities
15.21
202685 12/14/2018 100307 PILOT KNOB ANIMAL HOSP
1,030.66 ANIMAL CONTROL BOARDING 288858 153135 1110.6325 Vet/Kennel Charge/Animal Dispo Animal Control
1,030.66
202686 12/14/2018 149769 PIONEER CRITICAL POWER
569.06 GENERATOR 288859 180713-012 3313.6535 Other Contractual Services Fire Buildings
569.06
202687 12/14/2018 107142 PSC ALLIANCE, INC.
651.00 ANTENNA ANALYSIS 288860 20009908 6301.6310 Professional Services-General Street Lighting
155.00 PW RADIO UPGRADE - TESTING 288861 20009909 6101.6310 Professional Services-General Water -Administration
806.00
202688 12/14/2018 153556 PURAIR
600.00 PURAIR O2 288835 111051 1104.6226 Public Safety Supplies Patrolling/Traffic
204.00 PURAIR O2 288834 111171 1104.6226 Public Safety Supplies Patrolling/Traffic
804.00
202689 12/14/2018 138652 QUALITY LOCKSMITH SERVICE INC.
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
20Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202689 12/14/2018 138652 QUALITY LOCKSMITH SERVICE INC.Continued...
168.00 KEYS NEEDED FOR FIELD AND EXTR 288862 QLS13534 6146.6260 Utility System Parts/Supplies North Plant Building
168.00
202690 12/14/2018 100361 R & R SPECIALTIES INC
60.00 BLADES SHARPENED 288863 0066570-IN 6602.6230 Repair/Maintenance Supplies-Ge Equipment Repair & Maint.
239.15 ZAMBONI PARTS 288864 0066599-IN 6602.6230 Repair/Maintenance Supplies-Ge Equipment Repair & Maint.
299.15
202691 12/14/2018 143557 RANDSTAD (R)
1,299.75 EVID TECH 11/18-11/24/18 288868 R23974549 9695.6561 Temporary Help-Labor/Clerical Dakota Co Drug Task Force
1,299.75
202692 12/14/2018 146677 RANGER CHEVROLET BUICK GMC
21,477.10 NEW UNIT 108-VIN 4467 288869 74467 3521.6680 Mobile Equipment Equip Rev Fd-Dept 21
21,477.10
202693 12/14/2018 110070 RDO EQUIPMENT CO.
265.88 ROPE AND SAW BLADES 288865 P44123 3222.6220 Operating Supplies - General Equipment Mtn
265.88
202694 12/14/2018 152980 REMTECH INC. PEST PROTECTION
173.60 PEST CONTROL 288866 11260 3304.6535 Other Contractual Services Bldg/Facilities Maintenance
173.60
202695 12/14/2018 107013 RONNING, DALE
74.99 SAFETY JACKET 288870 120718 2010.6224 Clothing/Personal Equipment General Engineering
74.99
202696 12/14/2018 103065 ROTARY CLUB OF EAGAN
156.00 4TH QTR 2018-HUTMACHER 288940 2016-2005 0720.6477 Local Meeting Expenses General Admin-Planning & Zonin
156.00 ROTARY CLUB-3RD QTR 2018 288871 2016-2032 1221.6477 Local Meeting Expenses Administration-Fire
312.00
202697 12/14/2018 142209 RUCKMAN, DARLENE
25.67 11822-OVRPMNT 2078 CARNELIAN 288867 120418 9220.2250 Escrow Deposits Public Utilities
25.67
202698 12/14/2018 153547 SCHMIDT, FRED
61.14 11822-OVRPMNT 4081 DEERWOOD TR 288901 120418 9220.2250 Escrow Deposits Public Utilities
61.14
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
21Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202698 12/14/2018 153547 SCHMIDT, FRED Continued...
202699 12/14/2018 153517 SCHREIBER, MERRI
31.05 ACTIVITY REFUND 288886 902931 3001.2250 Escrow Deposits General/Admn-Recreation
31.05
202700 12/14/2018 100187 SEH
222.37 ATT SAFARI 5C ENG COSTS 288873 359601 6005.6310 AAT&T Professional Services-General Safari Antenna Location
1,022.34 ENG COST FOR SPRINT TRIBAND 288875 359602 6001.6310 ASPRI Professional Services-General Deerwood Antenna Location
1,227.86 ENG COST FOR VERIZON PCSLTE 288875 359602 6001.6310 AVERI Professional Services-General Deerwood Antenna Location
1,254.88 ENG COST FOR SPRINT TRIBAND 288875 359602 6003.6310 ASPRI Professional Services-General Lexington Antenna Location
1,265.14 ENG COST FOR SPRINT TRIBAND 288875 359602 6005.6310 ASPRI Professional Services-General Safari Antenna Location
65.02 ENG. COST VERIZON LEX REHAB 288874 359603 6003.6310 AVERI Professional Services-General Lexington Antenna Location
65.02 ENG. COST DAKCO LEX REHAB 288874 359603 6003.6310 ADAKO Professional Services-General Lexington Antenna Location
146.01 ENG. COST SPRINT LEX REHAB 288874 359603 6003.6310 ASPRI Professional Services-General Lexington Antenna Location
146.01 ENG. COST TMOB LEX REHAB 288874 359603 6003.6310 ATMOB Professional Services-General Lexington Antenna Location
508.26 ENG. COST DAKCO LEX REHAB 288874 359603 6108.6310 Professional Services-General Antenna Leases
5,922.91
202701 12/14/2018 152205 SEMA EQUIPMENT INC
69.36 EQUIP PARTS 288876 1229040 3127.6231 Mobile Equipment Repair Parts Equipment Maintenance/Repair
69.36
202702 12/14/2018 147479 SHEEHAN, STEPHEN
440.00 STAINED GLASS 288887 11-18 WORKSHOP 3081.6320 Instructors Arts & Humanities Council
440.00
202703 12/14/2018 146625 SHRED-IT USA
37.21 SHREDDING 288878 8126079844 3001.6457 Machinery & Equipment-Rental General/Admn-Recreation
37.22 SHREDDING 288878 8126079844 0501.6457 Machinery & Equipment-Rental General & Admn-Finance
59.54 SHREDDING 288877 8126096498 2201.6210 Office Supplies Gen/Adm-Streets
125.14 SHREDDING 288877 8126096498 1101.6210 Office Supplies General/Admn-Police
81.46 SHREDDING 288877 8126096498 6801.6210 Office Supplies General & Administrative
340.57
202704 12/14/2018 100193 SIGNATURE CONCEPTS
3.98 SHIPPING-MITCH DAHLEN 288881 954762 2201.2115 Clothing Allowance Gen/Adm-Streets
3.98 SHIPPING-DANNY PELOWSKI 288881 954762 2201.2115 Clothing Allowance Gen/Adm-Streets
54.00 CLOTHING-DANNY PELOWSKI 288881 954762 2201.2115 Clothing Allowance Gen/Adm-Streets
54.00 CLOTHING-DANNY PELOWSKI 288881 954762 2201.2115 Clothing Allowance Gen/Adm-Streets
55.35 CLOTHING-DANNY PELOWSKI 288881 954762 2201.2115 Clothing Allowance Gen/Adm-Streets
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
22Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202704 12/14/2018 100193 SIGNATURE CONCEPTS Continued...
74.00 CLOTHING-DANNY PELOWSKI 288881 954762 2201.2115 Clothing Allowance Gen/Adm-Streets
84.00 CLOTHING-DANNY PELOWSKI 288881 954762 2201.2115 Clothing Allowance Gen/Adm-Streets
1.18 SHIPPING-ERIC FROELLICH 288881 954762 6201.2115 Clothing Allowance San Sewer-Administration
27.00 CLOTHING-MITCH DAHLEN 288884 954763 2201.2115 Clothing Allowance Gen/Adm-Streets
27.32 CLOTHING-MITCH DAHLEN 288884 954763 2201.2115 Clothing Allowance Gen/Adm-Streets
32.00 CLOTHING-MITCH DAHLEN 288884 954763 2201.2115 Clothing Allowance Gen/Adm-Streets
55.35 CLOTHING-STEVE MUELLER 288884 954763 2401.2115 Clothing Allowance Gen/Adm-Central Services
21.00 CLOTHING-TOM RISHEL 288884 954763 6101.2115 Clothing Allowance Water -Administration
24.00 CLOTHING-TOM RISHEL 288884 954763 6101.2115 Clothing Allowance Water -Administration
34.00 CLOTHING-ERIC FROELICH 288884 954763 6201.2115 Clothing Allowance San Sewer-Administration
55.35 CLOTHING-ERIC FROELICH 288884 954763 6201.2115 Clothing Allowance San Sewer-Administration
66.00 CLOTHING-TOM RISHEL 288884 954763 6101.2115 Clothing Allowance Water -Administration
15.00 CLOTHING-GREGG HOVE 288882 954764 3201.2115 Clothing Allowance Administrative/General
24.00 CLOTHING-GREGG HOVE 288882 954764 3201.2115 Clothing Allowance Administrative/General
25.00 CLOTHING-GREGG HOVE 288882 954764 3201.2115 Clothing Allowance Administrative/General
30.00 CLOTHING-STEVE MUELLER 288882 954764 2401.2115 Clothing Allowance Gen/Adm-Central Services
104.70 CLOTHING-DAN CURTIN 288882 954764 3170.2115 Clothing Allowance General AdmIn-Parks
9.75 CLOTHING-ERIC FROELICH 288882 954764 6201.2115 Clothing Allowance San Sewer-Administration
37.00 CLOTHING-NICK WILSON 288882 954764 6201.2115 Clothing Allowance San Sewer-Administration
13.50 CLOTHING-ANGIE ELLISON 288880 954765 2201.6224 Clothing/Personal Equipment Gen/Adm-Streets
23.32 CLOTHING-JASON CLOWARD 288880 954765 2201.2115 Clothing Allowance Gen/Adm-Streets
28.00 CLOTHING-JASON CLOWARD 288880 954765 2201.2115 Clothing Allowance Gen/Adm-Streets
35.00 CLOTHING-JEFF BROOKER 288880 954765 2201.2115 Clothing Allowance Gen/Adm-Streets
58.00 CLOTHING-ANGIE ELLISON 288880 954765 2201.6224 Clothing/Personal Equipment Gen/Adm-Streets
64.00 CLOTHING-ANGIE ELLISON 288880 954765 2201.6224 Clothing/Personal Equipment Gen/Adm-Streets
74.00 CLOTHING-ANGIE ELLISON 288880 954765 2201.6224 Clothing/Personal Equipment Gen/Adm-Streets
108.00 CLOTHING-JEFF BROOKER 288880 954765 2201.2115 Clothing Allowance Gen/Adm-Streets
112.00 CLOTHING-JEFF BROOKER 288880 954765 2201.2115 Clothing Allowance Gen/Adm-Streets
36.00 CLOTHING-ANTHONY DAHLE 288880 954765 6101.2115 Clothing Allowance Water -Administration
42.00 CLOTHING-ANTHONY DAHLE 288880 954765 6101.2115 Clothing Allowance Water -Administration
54.00 CLOTHING-NICK WILSON 288880 954765 6201.2115 Clothing Allowance San Sewer-Administration
56.00 CLOTHING-NICK WILSON 288880 954765 6201.2115 Clothing Allowance San Sewer-Administration
114.70 CLOTHING-ANTHONY DAHLE 288880 954765 6101.2115 Clothing Allowance Water -Administration
19.50 UNIFORMS 288879 954766 3201.2115 Clothing Allowance Administrative/General
165.00 WINTERSEAS.UNIFORM 288879 954766 3074.6224 Clothing/Personal Equipment Trapp Farm Tubing
3.98 SHIPPING-LOREN DANSON 288883 954767 3201.2115 Clothing Allowance Administrative/General
3.98 SHIPPING-GREGG HOVE 288883 954767 3201.2115 Clothing Allowance Administrative/General
3.98 SHIPPING-DAN CURTIN 288883 954767 3170.2115 Clothing Allowance General AdmIn-Parks
3.98 SHIPPING-ANGIE ELLSION 288883 954767 2201.6224 Clothing/Personal Equipment Gen/Adm-Streets
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
23Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202704 12/14/2018 100193 SIGNATURE CONCEPTS Continued...
3.98 SHIPPING-JASON CLOWARD 288883 954767 2201.2115 Clothing Allowance Gen/Adm-Streets
3.98 SHIPPING-JEFF BROOKER 288883 954767 2201.2115 Clothing Allowance Gen/Adm-Streets
3.98 SHIPPING-STEVE MUELLER 288883 954767 2401.2115 Clothing Allowance Gen/Adm-Central Services
4.00 SHIPPING-SEASONALS 288883 954767 3074.6224 Clothing/Personal Equipment Trapp Farm Tubing
25.00 CLOTHING-LOREN DANSON 288883 954767 3201.2115 Clothing Allowance Administrative/General
28.00 CLOTHING-LOREN DANSON 288883 954767 3201.2115 Clothing Allowance Administrative/General
31.80 CLOTHING-DAN CURTIN 288883 954767 3170.2115 Clothing Allowance General AdmIn-Parks
34.98 CLOTHING-LOREN DANSON 288883 954767 3201.2115 Clothing Allowance Administrative/General
50.00 CLOTHING-DAN CURTIN 288883 954767 3170.2115 Clothing Allowance General AdmIn-Parks
90.00 SEASONALS 288883 954767 3074.6224 Clothing/Personal Equipment Trapp Farm Tubing
700.00 SEASONALS 288883 954767 3074.6224 Clothing/Personal Equipment Trapp Farm Tubing
2.80 SHIPPING-ERIC FROELLICH 288883 954767 6201.2115 Clothing Allowance San Sewer-Administration
3.98 SHIPPING-NICK WILSON 288883 954767 6201.2115 Clothing Allowance San Sewer-Administration
3.98 SHIPPING-ANTHONY DAHLE 288883 954767 6101.2115 Clothing Allowance Water -Administration
3.98 SHIPPING-TOM RISHEL 288883 954767 6101.2115 Clothing Allowance Water -Administration
65.00 MEN'S VB AWARDS SHIRTS 288943 957083 3041.6227 Recreation Equipment/Supplies Adult Volleyball-Men
65.00 WOMEN'S VB AWARD SHIRTS 288943 957083 3042.6227 Recreation Equipment/Supplies Adult Volleyball-Women
151.14 CO-REC VB AWARD SHIRTS 288943 957083 3043.6227 Recreation Equipment/Supplies Adult Volleyball-Co-Rec
3,208.50
202705 12/14/2018 148036 SPOK INC.
4.58 PAGER 288885 B0318109X 3301.6351 Pager Service Fees General Management
4.58
202706 12/14/2018 100854 ST PAUL STAMP WORKS, INC.
45.92 DEPOSIT STAMP INK PADS 288888 427896 0501.6210 Office Supplies General & Admn-Finance
45.92
202707 12/14/2018 107307 SVL SERVICE CORPORATION
1,344.25 CMF CONTRACT REPAIR 288944 181105-004 3304.6535 Other Contractual Services Bldg/Facilities Maintenance
1,344.25
202708 12/14/2018 151851 SYSCO-MINNESOTA INC
33.84-CREDIT-CHIPS 288893 14716620P 6806.6855 Merchandise for Resale Concessions
46.82-CREDIT-LIDS 288895 14717480P 6806.6220 Operating Supplies - General Concessions
12.66-CREDIT-PEPSI 288892 247052950 6806.6855 Merchandise for Resale Concessions
84.67 CUPS/LIDS 288891 247141999 6609.6855 Merchandise for Resale Concession Sales/Vending
44.80 PITCHERS 288894 247150724 6806.6855 Merchandise for Resale Concessions
30.59 ICE SCOOP 288897 247165225 6831.6220 Operating Supplies - General Food and Beverage
30.59 ICE SCOOP 288896 247174667 6831.6220 Operating Supplies - General Food and Beverage
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
24Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202708 12/14/2018 151851 SYSCO-MINNESOTA INC Continued...
89.60 PITCHERS 288898 247184408 6831.6220 Operating Supplies - General Food and Beverage
31.72 CANDY 288899 247188048 6806.6855 Merchandise for Resale Concessions
1,370.21 MILK/PRETZELS/COOKIES 288889 247194138 6831.6855 Merchandise for Resale Food and Beverage
67.53-CREDIT-COOKIE DOUGH 288900 247195458 6806.6855 Merchandise for Resale Concessions
252.84 CLEANING SUPPLIES 288890 247197599 6603.6223 Building/Cleaning Supplies Building Repair & Maint.
604.09 BURGERS/HOT DOGS/CHIPS 288890 247197599 6609.6855 Merchandise for Resale Concession Sales/Vending
2,378.26
202709 12/14/2018 146364 TAPCO
11,455.00 YANKEE SIGNAL REPAIR 288907 I620413 1221.6535 Other Contractual Services Administration-Fire
11,455.00
202710 12/14/2018 143384 TAYLOR ELECTRIC COMPANY
8,325.00 YANKEE SIGNAL REPAIR 288908 1276 1221.6535 Other Contractual Services Administration-Fire
248.00 DENMARK ELECTRICAL TROUBLESHHO 288909 1294 6239.6432 Utility System Repair-Labor Lift Station Maintenanc/Repair
8,573.00
202711 12/14/2018 134135 THOMSON REUTERS
237.04 CLEAR MONTHLY FEE 4 PD 288919 839179347 1105.6457 Machinery & Equipment-Rental Investigation/Crime Prevention
237.04
202712 12/14/2018 153509 THOMSON REUTERS
1,090.00 CASE LAW BOOKS 288920 TRIALHANDBOOK
18/19
1104.6215 Reference Materials Patrolling/Traffic
1,090.00
202713 12/14/2018 113124 TOLL GAS & WELDING SUPPLY
291.69 STREET SIGN INSTALL 288911 10275052 2242.6257 Signs & Striping Material Signs-Installation & Mtn
21.36 CYLINDER EXCHANGES 288910 40092723 6130.6457 Machinery & Equipment-Rental Curb Stop Inspctn/Maint/Repair
313.05
202714 12/14/2018 101017 TOM'S MOBILE LOCK SERVICE
99.00 RANGE LOCKBOX KEYS 288921 102218 1104.6228 Ammunition Patrolling/Traffic
99.00
202715 12/14/2018 100218 TOTAL TOOL
638.93 CURBSTOP REPAIR 288912 01316835 6130.6240 Small Tools Curb Stop Inspctn/Maint/Repair
638.93
202716 12/14/2018 102250 TRENCHERSPLUS
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
25Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202716 12/14/2018 102250 TRENCHERSPLUS Continued...
56.99 CHIPPER REPAIR PARTS 288913 IT94656 3222.6231 Mobile Equipment Repair Parts Equipment Mtn
56.99
202717 12/14/2018 113197 TRUCK UTILITIES, INC.
2,214.00 PO 2018-83 288914 0331532 9001.1415 Inventory - Parts General Fund
2,214.00
202718 12/14/2018 119899 TSCHERNE, LESLEY
57.13 11822-OVRPMNT 3812 BLACKHAWK R 288915 120418 9220.2250 Escrow Deposits Public Utilities
57.13
202719 12/14/2018 111810 U S BANK (R)
68.00 MAJOR CASE CC 288916 2668-111518 1105.6520 Major Investigation Expenses Investigation/Crime Prevention
68.00
202720 12/14/2018 100232 UHL CO INC
306.00 ACCESS CONTROL EQUIP ORDER I 288917 4823 0301.6230 Repair/Maintenance Supplies-Ge IT-Gen & Admn
306.00
202721 12/14/2018 120163 ULINE INC.
175.98 METER REPLACEMENT 288918 102844165 6161.6230 Repair/Maintenance Supplies-Ge Meter Replacement
175.98
202722 12/14/2018 122951 UNITED BUSINESS MAIL INC.
1,500.00 POSTAGE DEPOSIT 288922 121018 9001.1420 Inventory - Postage Machine General Fund
1,500.00
202723 12/14/2018 103040 USABLUEBOOK
228.74 REPLACED GAUGES STP 288923 748794 6155.6260 Utility System Parts/Supplies South Plant Production
228.74
202724 12/14/2018 100236 VAN PAPER
38.00 BLDG CLEANING SUPPLIES 288924 484516-00 3106.6223 Building/Cleaning Supplies Structure Care & Maintenance
38.00
202725 12/14/2018 117947 VARITECH INDUSTRIES INC.
77.46 BRINE CHECK VALVES TRUCKS 288925 IN060-1014466 2244.6231 Mobile Equipment Repair Parts Street Equipment Repair/Mtn
77.46
202726 12/14/2018 119217 VERIZON WIRELESS (R)
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
26Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202726 12/14/2018 119217 VERIZON WIRELESS (R)Continued...
129.61 DEC 2018 CELL PHONE 288931 9819010289 9695.6355 Cellular Telephone Service Dakota Co Drug Task Force
70.02 DEC 2018 CELL PHONE 288932 9819149908 9695.6355 Cellular Telephone Service Dakota Co Drug Task Force
199.63
202727 12/14/2018 100237 VIKING ELECTRIC
152.30 FUSES FOR STOCK 288926 S002089576.001 6439.6260 Utility System Parts/Supplies Lift Station Maintenanc/Repair
152.30
202728 12/14/2018 153548 WARNERT, CHARLES
49.05 11822-OVRPMNT 4724 WESTON HILL 288927 120418 9220.2250 Escrow Deposits Public Utilities
49.05
202729 12/14/2018 100459 WEATHER WATCH INC
152.90 WEATHER WATCH-DEC18 288933 9809 2240.6535 Other Contractual Services Street Plowing/Sanding
152.90
202730 12/14/2018 141852 WENCK ASSOCIATES INC.
1,865.96 ENGINEERING SERVICES 288929 11808140 6542.6712 P1239 Project - Engineering Capital Proj-WQ dedictn-cr1127
18,386.21 ENGINEERING SERVICES 288930 11808141 6542.6712 P1324 Project - Engineering Capital Proj-WQ dedictn-cr1127
13,006.40 ENGINEERING SERVICES 288934 11808145 6542.6712 P1323 Project - Engineering Capital Proj-WQ dedictn-cr1127
9,208.66 TRAIL DESIGN AND ENGINEERING 288928 11808272 2852.6751 Design & Engineering (External General Park Site Improvmts
42,467.23
202731 12/14/2018 153525 WHITE BEAR MITSUBISHI
16,300.00 MITUBISHI PHEV DOWN PMT 288938 86296 3508.6680 Mobile Equipment Equip Rev Fd-Dept 08
16,300.00
202732 12/14/2018 153549 WILSON, KARYL
16.12 11822-OVRPMNT 1570 MALLARD VIE 288935 120418 9220.2250 Escrow Deposits Public Utilities
16.12
202733 12/14/2018 153520 WINDSTREAM COMMUNICATIONS LLC
1,578.00 ROW PERMIT #25390 REFUN 288939 113018 2010.4100 Utility Registration Fees General Engineering
1,578.00
202734 12/14/2018 113476 WISCONSIN SUPPORT COLLECTIONS TRUST FUND
208.15 PAYROLL ENDING 12/8/18 288953 GARNISHMENT
12/8/18
9592.2030 Ded Pay - Garnishments Benefit Accrual
208.15
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
27Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202735 12/14/2018 149263 WSI MANUFACTURING INC.Continued...
2,659.20 PATROL UNIFORM WINTER SIDELINE 288648 64887 1104.6224 Clothing/Personal Equipment Patrolling/Traffic
2,659.20
202736 12/14/2018 102230 ZARNOTH BRUSH WORKS, INC.
2,682.50 UNIT 139,138,137 288936 0172960-IN 9001.1415 Inventory - Parts General Fund
2,682.50
202737 12/14/2018 100247 ZIEGLER INC
1,398.97 GENERATOR 288937 SW050309415 3304.6535 Other Contractual Services Bldg/Facilities Maintenance
1,398.97
20180206 12/14/2018 100249 FIT
119,435.09 PAYROLL ENDING 12/8/18 288962 121418 9880.2011 Ded Payable - FIT Payroll
119,435.09
20180207 12/14/2018 100250 COMMISIONER OF REVENUE-PAYROLL
36,157.32 PAYROLL ENDING 12/8/18 288963 121418 9880.2012 Ded Payable - SIT Payroll
36,157.32
20180208 12/14/2018 100252 FICA
31,460.91 PAYROLL ENDING 12/8/18 288964 121418 9880.2014 Ded Payable - FICA Payroll
31,460.91
20180209 12/14/2018 100253 MEDICARE
12,412.19 PAYROLL ENDING 12/8/18 288965 121418 9880.2015 Ded Payable - Medicare Payroll
12,412.19
20180210 12/14/2018 147368 MN DEPT OF REVENUE - TAX LEVY
287.29 PAYROLL ENDING 12/8/18 288966 121418 9880.2030 Ded Pay - Garnishments Payroll
287.29
20180334 12/14/2018 100693 EAGAN PAYROLL ACCT
696,900.99 PAYROLL ENDING 12/8/18 288961 121318 9001.1115 Claim on Cash General Fund
12,933.07 PAYROLL ENDING 12/8/18 288961 121318 9197.1115 Claim on Cash ETV
71,877.14 PAYROLL ENDING 12/8/18 288961 121318 9220.1115 Claim on Cash Public Utilities
21,292.15 PAYROLL ENDING 12/8/18 288961 121318 9221.1115 Claim on Cash Civic Arena
3,941.82 PAYROLL ENDING 12/8/18 288961 121318 9222.1115 Claim on Cash Cascade Bay
34,526.67 PAYROLL ENDING 12/8/18 288961 121318 9223.1115 Claim on Cash Central Park/Community Center
3,924.10 PAYROLL ENDING 12/8/18 288961 121318 9225.1115 Claim on Cash Fiber Infrastructure Fund
43,873.10 PAYROLL ENDING 12/8/18 288961 121318 9592.6144 FICA Benefit Accrual
12/13/2018City of Eagan 16:02:20R55CKR2LOGIS101
28Page -Council Check Register by GL
Council Check Register by Invoice & Summary
12/14/201812/10/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20180334 12/14/2018 100693 EAGAN PAYROLL ACCT Continued...
89,580.34 PAYROLL ENDING 12/8/18 288961 121318 9592.1115 Claim on Cash Benefit Accrual
978,849.38
20182525 12/14/2018 115374 MN STATE RETIREMENT SYSTEM-HCSP
39,046.95 EMPLOYEE CONTRIBUTIONS 288954 121318 9592.2034 Ded Payable-HCSP Benefit Accrual
39,046.95
20183225 12/14/2018 138969 MN STATE RETIREMENT SYSTEM-MNDCP
7,361.27 EMPLOYEE CONTRIBUTIONS 288956 121318 9592.2032 Ded Pay - Great West Def Comp Benefit Accrual
7,361.27
20184226 12/14/2018 100892 ICMA RETIREMENT TRUST
44,067.86 EMPLOYEE CONTRIBUTIONS 288957 121318 9592.2031 Ded Pay - ICMA Benefit Accrual
44,067.86
20185226 12/14/2018 100283 BERKLEY ADMINISTRATORS
20,000.00 WC ADVANCE 288955 121318 9593.1650 Worker's Comp Advance to DCA Workers' Compensation Self-In
20,000.00
20185677 12/14/2018 147907 SELECT ACCOUNT
5,865.98 FLEX REIMBURSEMENT 288958 121318 9592.2215 Flex Plan Withholding Payable Benefit Accrual
5,865.98
20188029 12/14/2018 100694 PUBLIC EMPLOYEE RETIREMENT
76.96 PAYROLL PERIOD 11/25-12/8/18 288959 434600-121418 9592.6146 PERA - DCP Benefit Accrual
41,839.39 PAYROLL PERIOD 11/25-12/8/18 288959 434600-121418 9592.6142 PERA - Coordinated Benefit Accrual
56,222.44 PAYROLL PERIOD 11/25-12/8/18 288959 434600-121418 9592.6143 PERA - Police Benefit Accrual
73,819.33 PAYROLL PERIOD 11/25-12/8/18 288959 434600-121418 9592.2013 Ded Payable - PERA Benefit Accrual
171,958.12
20188547 12/14/2018 151185 HEALTHPARTNERS INC
3,291.51 DENTAL CLAIMS REIMBURSEMENT 288960 121018 9594.6158 Dental Insurance Dental Self-insurance
3,291.51
2,312,113.25 Grand Total Payment Instrument Totals
Checks 2,312,113.25
Total Payments 2,312,113.25
12/13/2018City of Eagan 16:03:25R55CKS2LOGIS100
1Page -Council Check SummaryNote: Payment amount may not reflect the actual amount due to data sequencing and/or data selection.
12/14/201812/10/2018 -
Company Amount
820,747.0109001GENERAL FUND
85.0009115DWI Forfeiture
16,370.1709116CEDAR GROVE PARKING GARAGE
23,924.4109197ETV
624,117.7909220PUBLIC UTILITIES
27,833.8909221CIVIC ARENA
4,637.0809222CASCADE BAY
48,012.6709223CENTRAL PARK /COMMUNITY CENTER
5,145.6509225FIBER INFRASTRUCTURE FUND
11,018.6609328PARK SYS DEV AND R&R
49,588.6309335EQUIPMENT REVOLVING
1,547.0009336GENERAL FACILITIES RENEW & REP
1,565.0009353POLICE & CITY HALL REMODEL
580.74-09355 MAINTENANCE FACILITY EXPANSION
42,803.4709591RISK MANAGEMENT
410,653.8709592BENEFIT ACCRUAL
20,000.0009593WORKERS' COMPENSATION SELF-INS
3,291.5109594Dental Self-insurance
1,599.3809695DAK CO DRUG TASK FORCE
199,752.8009880PAYROLL
Report Totals 2,312,113.25
12/20/2018City of Eagan 15:44:01R55CKR2 LOGIS102V
1Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018--
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202738 12/17/2018 100125 METRO COUNCIL ENVIRONMTL SERV-SAC
149.10- NOVEMBER 2018 288967 110118 0801.424612/17/2018 Administrative Fee on SAC Coll General & Admn-Protective Insp
14,910.00 NOVEMBER 2018 288967 110118 9220.227512/17/2018 MCES Sewer Availability Charge Public Utilities
14,760.90
202739 12/17/2018 100683 SAMS CLUB GECF
15.98 CAKE 288968 003661 6609.685512/17/2018 Merchandise for Resale Concession Sales/Vending
64.20 POP 288968 003661 6629.685512/17/2018 Merchandise for Resale Vending
33.32 POP 288969 002113 6629.685512/17/2018 Merchandise for Resale Vending
80.24 SUPPLIES 288970 006276 3079.622712/17/2018 Recreation Equipment/Supplies Special Events
151.58 HALLOWEEN SUPPLIES 288971 006697 3057.622712/17/2018 Recreation Equipment/Supplies Preschool Programs
59.88 SUPPLIES 288972 007092-102618 3079.622712/17/2018 Recreation Equipment/Supplies Special Events
6.88 COFFEE FILTERS 288973 000572 1107.621012/17/2018 Office Supplies Support Services
69.88 SUPPLIES 288974 000594-102918 3078.622712/17/2018 Recreation Equipment/Supplies Senior Citizens
215.98 SUPPLIES-STATION 2 288975 001007 1221.622012/17/2018 Operating Supplies - General Administration-Fire
15.98 CAKE 288976 003109-110218 6609.685512/17/2018 Merchandise for Resale Concession Sales/Vending
134.66 VENDING-CANDY 288976 003109-110218 6629.685512/17/2018 Merchandise for Resale Vending
49.82 SUPPLIES-HIGH TEA 288977 009138 3078.622712/17/2018 Recreation Equipment/Supplies Senior Citizens
66.64 SUPPLIES-DHMS 288978 008744 3075.622712/17/2018 Recreation Equipment/Supplies CDBG - Teens
37.92 SUPPLIES-BHMS 288979 008745 3075.622712/17/2018 Recreation Equipment/Supplies CDBG - Teens
12.48 CHIPS 288980 009099 0101.647712/17/2018 Local Meeting Expenses Legislative/Policy Development
15.98 CAKE 288981 003067 6609.685512/17/2018 Merchandise for Resale Concession Sales/Vending
15.00 MEMBERSHIP-J. FINELLLI 288982 999999-111018 3001.647912/17/2018 Dues and Subscriptions General/Admn-Recreation
9.93 GLOVES 288983 005880 6601.623012/17/2018 Repair/Maintenance Supplies-Ge General/Administrative-Arena
31.30 SUPPLIES 288984 003555 3079.622712/17/2018 Recreation Equipment/Supplies Special Events
79.90 CAKES 288985 003729 6609.685512/17/2018 Merchandise for Resale Concession Sales/Vending
91.97- REFUND 288986 004277 3079.622712/17/2018 Recreation Equipment/Supplies Special Events
11.98 SUPPLIES 288987 003805-111618 3081.622712/17/2018 Recreation Equipment/Supplies Arts & Humanities Council
15.00 MEMBERSHIP-J. BOHLKEN 288988 999999-111718 6801.647912/17/2018 Dues and Subscriptions General & Administrative
6.47 WATER 288989 000276 1101.647712/17/2018 Local Meeting Expenses General/Admn-Police
1,109.03
202740 12/21/2018 152114 3 GUYS SEWING
12.00 J. PLUTA SHIRT LOGO 289112 5505 3170.211512/20/2018 Clothing Allowance General AdmIn-Parks
36.00 J. PLUTA SHIRT LOGO 289113 5793 3170.211512/20/2018 Clothing Allowance General AdmIn-Parks
48.00
202741 12/21/2018 147198 ADVANCED ENGINEERING AND ENVIRONMENTAL
1,602.00 LEXDIF BOOSTER STATION REHAB 289100 60993 6133.6630 P128812/20/2018 Other Improvements Booster Station Maint/Repair
1,602.00
12/28/18
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
2Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202742 12/21/2018 119218 ALLENS SERVICE INC. (R)Continued...
145.00 18-SAV-27807 CHEVY EQUINOX TOW 289101 215912 9695.658912/20/2018 Forfeiture Expenditures Dakota Co Drug Task Force
243.00 18-DC-534 DODGE RAM TOWING 289132 209483 9695.658912/20/2018 Forfeiture Expenditures Dakota Co Drug Task Force
100.00 NOV 2018 STORAGE 289144 NOVEMBER2018 9695.653812/20/2018 Towing Charges Dakota Co Drug Task Force
488.00
202743 12/21/2018 142987 APPLE CHEVROLET BUICK NORTHFIELD
106.19 UNIT 1132 289102 60000 9001.141512/20/2018 Inventory - Parts General Fund
497.55 UNIT 212 289103 60012 9001.141512/20/2018 Inventory - Parts General Fund
93.19 UNIT 503 289104 60108 9001.141512/20/2018 Inventory - Parts General Fund
696.93
202744 12/21/2018 100360 APPLE FORD LINCOLN APPLE VALLEY
54.17 UNIT 1120 289105 439760 9001.141512/20/2018 Inventory - Parts General Fund
312.32 UNIT 319 289106 439833 9001.141512/20/2018 Inventory - Parts General Fund
416.22 UNIT 502 289107 439845 9001.141512/20/2018 Inventory - Parts General Fund
846.78 UNIT 1101 289108 438626 9001.141512/20/2018 Inventory - Parts General Fund
304.48 UNIT 1137 289109 439648 9001.141512/20/2018 Inventory - Parts General Fund
72.72 INV. BLADES FRO SQUADS 289110 439498 9001.141512/20/2018 Inventory - Parts General Fund
1,080.29 UNIT 1103 289111 438635 9001.141512/20/2018 Inventory - Parts General Fund
293.91 DETECTIVE LEASE NOV 18 289114 1120-252574-112
518
1105.645712/20/2018 Machinery & Equipment-Rental Investigation/Crime Prevention
57.19 UNIT 382 289115 438669 9001.141512/20/2018 Inventory - Parts General Fund
304.48 UNIT 1137 289116 439746 9001.141512/20/2018 Inventory - Parts General Fund
2.78 UNIT 220 RO 1362 289117 444215 9001.141512/20/2018 Inventory - Parts General Fund
106.03 RO 1367 UNIT 1113 289118 444218 9001.141512/20/2018 Inventory - Parts General Fund
10.04 UNIT 311 RO 1368 289119 444216 9001.141512/20/2018 Inventory - Parts General Fund
56.85 UNIT 1109 RO 1368 289120 444098 9001.141512/20/2018 Inventory - Parts General Fund
305.94 UNIT 1109 RO 1356 289121 443964 9001.141512/20/2018 Inventory - Parts General Fund
386.56 UNIT 117 289122 444835 9001.141512/20/2018 Inventory - Parts General Fund
54.54 STOCK BLADES 289123 444857 9001.141512/20/2018 Inventory - Parts General Fund
28.11 RO 1418 289124 445209 9001.141512/20/2018 Inventory - Parts General Fund
4,693.41
202745 12/21/2018 101609 ASPEN WASTE
292.47 WASTE 289125 S1321957-120118 6827.653912/20/2018 Waste Removal/Sanitation Servi Building Maintenance
292.47
202746 12/21/2018 115432 AUDIOVISUAL, INC.
6,079.87 COUNCIL CHAMBER DOCUMENT CAM 289126 88589321 9701.664012/20/2018 Machinery/Equipment PEG-eligible
7,429.53 LIVE TRUCK ENGINEER WORK - AVI 289127 88574288 9701.668012/20/2018 Mobile Equipment PEG-eligible
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
3Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202746 12/21/2018 115432 AUDIOVISUAL, INC.Continued...
3,796.17 COMREX RACKMOUNT UNIT 289128 88590510 9701.664012/20/2018 Machinery/Equipment PEG-eligible
3,977.00 AVI - EDITSHARE 2019 SUPPORT 289129 88590451 9701.656912/20/2018 Maintenance Contracts PEG-eligible
4,249.21 AVI -EDITSHARE SETUP AND TRAIN 289130 88590568 9701.647612/20/2018 Conferences/Meetings/Training PEG-eligible
3,957.41 LIVE MOBILE TRANSMITTER-COMREX 289131 88591883 9701.664012/20/2018 Machinery/Equipment PEG-eligible
29,489.19
202747 12/21/2018 100015 BACHMANS INC
638.40 NEAR BLACKHAWK PARK ART BENCH 289133 866746/50 3214.663012/20/2018 Other Improvements Landscape Planting-Park Sites
638.40
202748 12/21/2018 147094 BARTA, COLE
162.28 UNIFORMS 289134 121118 3170.211512/20/2018 Clothing Allowance General AdmIn-Parks
162.28
202749 12/21/2018 100016 BAUER BUILT
2,337.12 PO2018-84 289135 180240513 9001.141512/20/2018 Inventory - Parts General Fund
702.32 UNIT 1146 289136 180240505 9001.141512/20/2018 Inventory - Parts General Fund
3,039.44
202750 12/21/2018 146483 BIRCH
3,285.00 CONTRACT CDS SNOW REMOVAL 289137 26161 2240.656412/20/2018 Snow & Ice Removal Street Plowing/Sanding
2,542.50 CONTRACT CDS SNOW REMOVAL 289138 26047 2240.656412/20/2018 Snow & Ice Removal Street Plowing/Sanding
5,827.50
202751 12/21/2018 100017 BITUMINOUS ROADWAYS
330,202.47 CONT 18-10 PMT 2 FINAL 289145 112618 8291.671012/20/2018 Project - Contract P1291 2018 Trail & Parking lot
330,202.47
202752 12/21/2018 121444 BLUE CROSS AND BLUE SHIELD OF MINNESOTA
58,185.49 MEDICAL PREMIUM - JAN 2019 289146 181212457479 9592.201712/20/2018 Ded Payable-Insurance BCBS Benefit Accrual
292,489.36 MEDICAL PREMIUM - JAN 2019 289146 181212457479 9592.615112/20/2018 Health Insurance Benefit Accrual
350,674.85
202753 12/21/2018 131767 BOLTON & MENK INC.
8,732.50 ASHBERRY LS REHAB 289139 0226545 6239.6630 P129912/20/2018 Other Improvements Lift Station Maintenanc/Repair
2,298.50 MURPHY LS REHAB 289140 0226546 6239.6630 P134512/20/2018 Other Improvements Lift Station Maintenanc/Repair
11,031.00
202754 12/21/2018 100022 BOYER TRUCK PARTS
122.25 UNIT 110 RO 1373 289141 15368D 9001.141512/20/2018 Inventory - Parts General Fund
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
4Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202754 12/21/2018 100022 BOYER TRUCK PARTS Continued...
122.25
202755 12/21/2018 144122 BRAND FARMS
5.00 MARKETFEST 12/15/18-SNAP EBT 289142 121518 3061.6220 PR00312/20/2018 Operating Supplies - General Market Fest
15.00 MARKETFEST 12/15/18-POP CLUB 289142 121518 3061.6220 PR00512/20/2018 Operating Supplies - General Market Fest
20.00
202756 12/21/2018 114552 BRIN NORTHWESTERN GLASS COMPANY
8,688.76 REPLACEMENT WINDOWS AT CMF 289143 4688 3624.662012/20/2018 Buildings Facilities R&R Fd-Mtn Facility
8,688.76
202757 12/21/2018 136791 CALLAHAN, DANIEL P
17.34 HOME DEPOT - PAINT GREEN WALL 289160 12/5/18 9701.647512/20/2018 Miscellaneous PEG-eligible
17.34
202758 12/21/2018 148751 CAMPBELL KNUTSON
423.00 2008 FORD FOCUS-CASE 17000623 289147 225242 9115.653812/20/2018 Towing Charges DWI Forfeiture
423.00
202759 12/21/2018 115040 CARDIAC SCIENCE, INC.
489.60 DEFIB PADS 289148 7340652 1104.622012/20/2018 Operating Supplies - General Patrolling/Traffic
489.60
202760 12/21/2018 142846 CENTURYLINK
141.08 289149 612E12-8187409-
DEC18
6101.634712/20/2018 Telephone Service & Line Charg Water -Administration
135.74 COMM LINE BTWN TRMNT PLANTS 289150 612E06-1331048-
DEC18
6101.635212/20/2018 Telephone Circuits Water -Administration
66.00 289151 612E12-1121206-
DEC18
6101.634712/20/2018 Telephone Service & Line Charg Water -Administration
141.08 289152 612E12-0825197-
DEC18
6101.634712/20/2018 Telephone Service & Line Charg Water -Administration
423.24 289153 612E12-1089411-
DEC18
6101.634712/20/2018 Telephone Service & Line Charg Water -Administration
141.08 289154 612E12-6449410-
DEC18
6101.634712/20/2018 Telephone Service & Line Charg Water -Administration
547.74 OAK POND LIFT STATION 289155 612E06-3878017-
DEC18612
6239.634712/20/2018 Telephone Service & Line Charg Lift Station Maintenanc/Repair
1,595.96
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
5Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202761 12/21/2018 142837 CENTURYLINK (R)Continued...
1,031.79 DEC 2018 TELEPHONE 289161 1455928843 9695.634712/20/2018 Telephone Service & Line Charg Dakota Co Drug Task Force
1,031.79
202762 12/21/2018 148187 CERTIFIED POWER INC.
597.29 PARKS MOWER PARTS 289156 50295922 9001.141512/20/2018 Inventory - Parts General Fund
597.29
202763 12/21/2018 151299 CINTAS
36.58 RUGS 289157 4013584739 6101.656912/20/2018 Maintenance Contracts Water -Administration
34.20 ECC RUGS 289158 4013584603 6827.656912/20/2018 Maintenance Contracts Building Maintenance
23.65 RUGS 289159 4013584747 3313.656912/20/2018 Maintenance Contracts Fire Buildings
8.62 RUGS 289162 4013584664 3313.656912/20/2018 Maintenance Contracts Fire Buildings
103.05
202764 12/21/2018 142286 COMCAST
32.65 MONTHLY DUES 12/18-1/17/19 289167 877210508072454
1-120818
6603.635712/20/2018 Advertising/Publication Building Repair & Maint.
32.65
202765 12/21/2018 100040 CONT SAFETY EQUIP
62.40 CLOTHING ALLOW RICK ROBOHM 289163 449086 2201.211512/20/2018 Clothing Allowance Gen/Adm-Streets
62.40
202766 12/21/2018 150880 CORE & MAIN LP
227.56-IRRIGATION REPAIR PARTS CREDIT 289354 J823078 3117.623412/20/2018 Field/Other Equipment Repair Irrigation System Mtn/Install
1,011.98 IRRIGATION REPAIR PARTS 289355 J789262 3117.623412/20/2018 Field/Other Equipment Repair Irrigation System Mtn/Install
784.42
202767 12/21/2018 153564 CREEK ENTERPRISE INC
3,565.00 TEMP HYDRANT 289164 121318 9220.225412/20/2018 Construction Meter Deposits Public Utilities
195.00 TEMP HYDRANT 289164 121318 6101.452112/20/2018 Construction Meter Permit Fees Water -Administration
390.00-TEMP HYDRANT 289164 121318 6101.452112/20/2018 Construction Meter Permit Fees Water -Administration
852.00-TEMP HYDRANT 289164 121318 6101.450512/20/2018 Water Sales Water -Administration
2,518.00
202768 12/21/2018 113795 CULLIGAN
355.55 SOFTENER SALT 289165 710447 6827.624412/20/2018 Chemicals & Chemical Products Building Maintenance
355.55
202769 12/21/2018 136461 CULLIGAN (R)
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
6Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202769 12/21/2018 136461 CULLIGAN (R)Continued...
54.95 WATER 289166 707378 9695.621012/20/2018 Office Supplies Dakota Co Drug Task Force
54.95
202770 12/21/2018 153569 DAK CTY ENVIRONMENTAL MANAGEMENT
526.50 MARIJUANA DISPOSAL 289175 121018 9695.658912/20/2018 Forfeiture Expenditures Dakota Co Drug Task Force
526.50
202771 12/21/2018 100050 DAKOTA ELECTRIC
21.53 OLD TOWN HALL 288990 100749-1-NOV18 3304.640512/21/2018 Electricity Bldg/Facilities Maintenance
61.92 CARLSON LAKE SAN 288991 102339-9-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
54.88 SOUTHERN HILLS TOWER 288992 103460-2-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
4,871.23 FIRE SAFETY CENTER 288993 108247-8-NOV18 3313.640512/21/2018 Electricity Fire Buildings
2,331.80 PUB WORKS GARAGE 288994 110986-7-NOV18 3304.640512/21/2018 Electricity Bldg/Facilities Maintenance
244.48 YANKEE DOODLE WATER TANK RSVR 288995 112682-0-NOV18 6146.640912/21/2018 Electricity-Wells/Booster Stat North Plant Building
340.21 LONE OAK SAN 288996 112832-1-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
342.62 WELL #1 288997 112885-9-NOV18 6146.640912/21/2018 Electricity-Wells/Booster Stat North Plant Building
385.29 CARLSON LAKE STORM 288998 122797-4-NOV18 6439.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
203.39 WELL #2 288999 124865-7-NOV18 6146.640912/21/2018 Electricity-Wells/Booster Stat North Plant Building
3,291.00 MUNICIPAL CENTER 289000 127189-9-NOV18 3304.640512/21/2018 Electricity Bldg/Facilities Maintenance
28.38 BLACKHAWK COVE SAN 289001 127325-9-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
175.01 RAHN PARK 289002 132778-2-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
388.57 LEXINGTON STORM STATION 289003 133789-8-NOV18 6439.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
21.76 ZOO METER 289004 136873-7-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
11,856.95 WELL #4/TREATMENT PLANT 289005 137781-1-NOV18 6146.640912/21/2018 Electricity-Wells/Booster Stat North Plant Building
742.77 LODGEPOLE CT SECURITY LITES 289006 138267-0-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
459.85 CLIFF BOOSTER STATION 289007 139958-3-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
114.62 LEXINGTON BOOSTER STATION 289008 143222-8-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
215.16 FIRE STATION 3 289009 146053-4-NOV18 3313.640512/21/2018 Electricity Fire Buildings
138.79 OAK CHASE STORM 289010 146920-4-NOV18 6439.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
84.51 COVINGTON STORM 289011 149810-4-NOV18 6439.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
58.39 TH 77/CO RD 32 SIGNALS 289012 152634-2-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
35.11 TH 77/CO RD 32 SIGNALS 289013 152635-9-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
5.00 CIVIL DEFENSE SIREN 289014 155062-3-NOV18 1106.640512/21/2018 Electricity Emergency Preparedness
5.00 CIVIL DEFENSE SIREN 289015 155063-1-NOV18 1106.640512/21/2018 Electricity Emergency Preparedness
5.00 CIVIL DEFENSE SIREN 289016 155064-9-NOV18 1106.640512/21/2018 Electricity Emergency Preparedness
31.12 SAFARI RESERVOIR 289017 159673-3-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
473.63 HURLEY STORM 289018 159822-6-NOV18 6439.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
424.17 SCHWANZ STORM 289019 160898-3-NOV18 6439.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
47.89 LONE OAK/35 SIGNALS 289020 162414-7-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
68.54 OAK CLIFF STORM 289021 165267-6-NOV18 6439.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
7Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202771 12/21/2018 100050 DAKOTA ELECTRIC Continued...
191.44 NORTHVIEW PARK 289022 167128-8-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
30.09 35E 289023 167845-7-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
27.81 35E/CLIFF SIGNALS 289024 167846-5-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
31.12 35E/PILOT KNOB SIGNALS 289025 167849-9-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
31.12 35E/PILOT KNOB SIGNALS 289026 167850-7-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
44.24 35E/YANKEE DOODLE SIGNALS 289027 167851-5-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
29.98 RAHN PARK 289028 169262-3-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
136.91 GOAT HILL PARK HOCKEY RINK 289029 170635-7-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
140.40 GOAT HILL PARK BASEBALL FIELD 289030 170636-5-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
49.72 ASHBURY SAN 289031 172471-5-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
87.03 BLUE CROSS PARK 289032 177546-9-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
479.96 YANKEE STORM 289033 180516-7-NOV18 6439.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
1,936.41 WELL #8 & #9 289034 187147-4-NOV18 6146.640912/21/2018 Electricity-Wells/Booster Stat North Plant Building
40.36 BLACKHAWK/CLIFF SIGNALS 289035 187873-5-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
361.75 COUNTRY HOLLOW STORM 289036 193140-1-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
223.45 COUNTRY HOLLOW STORM 289037 193575-8-NOV18 6439.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
717.58 FIRE STATION 4 289038 195895-8-NOV18 3313.640512/21/2018 Electricity Fire Buildings
166.29 WELL #10 289039 196322-2-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
260.60 THOMAS LAKE STORM 289040 196919-5-NOV18 6439.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
216.88 WELL #11 289041 197761-0-NOV18 6146.640912/21/2018 Electricity-Wells/Booster Stat North Plant Building
72.88 MURPHY SAN 289042 198484-8-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
45.95 CLIFF & CLIFF LAKE RD SIGNALS 289043 198522-5-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
29.51 CLIFF LAKE RD SIGNAL LIGHT 289044 198523-3-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
179.04 WELL #13 289045 200399-4-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
594.58 WELL #12 289046 200417-4-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
2,451.06 WELL #14 289047 200823-3-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
210.82 WELL #15 289048 200922-3-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
4,867.40 SOUTH TREATMENT PLANT 289049 201358-9-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
83.10 BLACKHAWK PAVILLION 289050 211088-0-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
14.00 BLACKHAWK PARK AERATOR 289051 211089-8-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
14.57 WEST GROUP NORTH 289052 212539-1-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
1,571.75 POLICE STATION 289053 217026-4-NOV18 3304.640512/21/2018 Electricity Bldg/Facilities Maintenance
6,325.04 CIVIC ICE ARENA 289054 220593-8-NOV18 6601.640512/21/2018 Electricity General/Administrative-Arena
55.99 DENMARK/TWN CNTR SIGNALS 289055 224458-0-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
5.00 CIVIL DEFENSE SIREN 289056 224623-9-NOV18 1106.640512/21/2018 Electricity Emergency Preparedness
5.00 CIVIL DEFENSE SIREN 289057 224624-7-NOV18 1106.640512/21/2018 Electricity Emergency Preparedness
5.00 CIVIL DEFENSE SIREN 289058 224625-4-NOV18 1106.640512/21/2018 Electricity Emergency Preparedness
1,113.69 WELL #18 289059 224626-2-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
28.15 DEERWOOD RESERVOIR 289060 224893-8-NOV18 6154.640912/21/2018 Electricity-Wells/Booster Stat South Plant Building
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
8Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202771 12/21/2018 100050 DAKOTA ELECTRIC Continued...
98.55 YANKEE/WASHINGTON STREET LITES 289061 226048-7-NOV18 6301.640612/21/2018 Electricity-Street Lights Street Lighting
125.70 YANKEE/35E STREET LITES 289062 226049-5-NOV18 6301.640612/21/2018 Electricity-Street Lights Street Lighting
219.83 YANKEE/DENMARK STREET LITES 289063 226050-3-NOV18 6301.640612/21/2018 Electricity-Street Lights Street Lighting
146.47 YANKEE/PROMENADE STREET LITES 289064 226051-1-NOV18 6301.640612/21/2018 Electricity-Street Lights Street Lighting
119.09 NORTHWD/PROMENADE STREET LITES 289065 226052-9-NOV18 6301.640612/21/2018 Electricity-Street Lights Street Lighting
554.70 AQUATIC ADMIN BLDG 289066 256881-4-NOV18 6719.640512/21/2018 Electricity Building Maintenance
495.58 AQUATIC PARKING LOT LIGHT 289067 263297-4-NOV18 6719.640512/21/2018 Electricity Building Maintenance
158.06 AQUATIC MECH BLDG 289068 272182-7-NOV18 6719.640512/21/2018 Electricity Building Maintenance
1,008.10 AQUATIC CHANGE FACILITY 289069 272183-5-NOV18 6719.640512/21/2018 Electricity Building Maintenance
14.00 WEST GROUP SOUTH 289070 300763-0-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
43.89 CLUBVIEW/LEXINGTON SIGNALS 289071 313127-0-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
43.10 LEX/N ARMSTRONG BLVD SISGNALS 289072 313127-3-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
769.70 GENERATOR 289073 326096-5-NOV18 3304.640512/21/2018 Electricity Bldg/Facilities Maintenance
40.25 THOMAS LAKE PARK 289074 348080-3-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
14.00 THRESHER PARK 289075 349188-3-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
39.45 DUCKWOOD/TOWN CNTR SIGNALS 289076 357166-1-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
15.00 1960 CLIFF LAKE RD AERATOR 289077 412466-5-NOV18 6520.640512/21/2018 Electricity Basin Mgmt-Aeration
14.34 DEERWOOD/35E SPDSIGN 289078 417173-2-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
45.60 THRESHER PARK BLDG 289079 427290-2-NOV18 3106.640512/21/2018 Electricity Structure Care & Maintenance
358.01 SHERMAN CT BRIDGE LITES 289080 440715-1-NOV18 6301.640612/21/2018 Electricity-Street Lights Street Lighting
14.00 1940 CLIFF LAKE RD 289081 452288-4-NOV18 2271.640512/21/2018 Electricity Boulevard/Ditch Mtn
100.15 RAHN/DIFFLEY RD #LIGHTS 289082 453294-1-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
14.23 4237 DANIEL DRIVE #SIGN 289083 456815-0-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
14.11 4266 DANIEL DRIVE #SIGN 289084 456817-6-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
6,698.12 CIVIC ICE ARENA 289085 463323-6-NOV18 6601.640512/21/2018 Electricity General/Administrative-Arena
111.10 FEDERAL DRIVE STREET LITES 289086 483732-4-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
35.79 DEERWOOD/PILOT KNOB SIGNALS 289087 590475-0-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
221.69 DE SWITCH/COMM BLDG 289088 529232-1-NOV18 6147.640812/21/2018 Electricity-Lift Stations North Plant Production
714.96 EAGAN 289089 529233-9-NOV18 6147.640812/21/2018 Electricity-Lift Stations North Plant Production
256.35 CAMPUS GENERATOR/TRANSFORMER 289090 529234-7-NOV18 6147.640812/21/2018 Electricity-Lift Stations North Plant Production
388.96 DENMARK LIFT STATION 289091 532128-6-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
459.49 WITHAM LANE LIFT STATION 289092 545622-3-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
44.57 PROMENADE DR #SIGNALS 289093 549208-7-NOV18 6301.640712/21/2018 Electricity-Signal Lights Street Lighting
1,675.86 WELL #3 289094 555257-5-NOV18 6146.640912/21/2018 Electricity-Wells/Booster Stat North Plant Building
429.89 BRINE/SALT STORAGE 289095 555450-6-NOV18 3304.640512/21/2018 Electricity Bldg/Facilities Maintenance
375.98 UTILITY BUILDING 289096 555451-4-NOV18 6146.640512/21/2018 Electricity North Plant Building
17.93 BLACKHAWK PARK AERATOR 289097 557042-9-NOV18 6520.640512/21/2018 Electricity Basin Mgmt-Aeration
33.82 WIDGEON WAY 289098 571231-0-NOV18 6239.640812/21/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
607.62 CENTRAL MAINTENANCE FACILITY 289099 1001469-2-NOV18 3304.640512/21/2018 Electricity Bldg/Facilities Maintenance
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
9Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202771 12/21/2018 100050 DAKOTA ELECTRIC Continued...
66,942.28
202772 12/21/2018 100405 DAKOTA ELECTRIC ASSOC
142.88 STREET LIGHT REPAIR 289168 241162-7-120618 6301.643212/20/2018 Utility System Repair-Labor Street Lighting
142.88
202773 12/21/2018 130735 DAVIS EQUIPMENT CORPORATION
12.66 PLOW EQUIP PARTS 289169 EI07995B 2240.623112/20/2018 Mobile Equipment Repair Parts Street Plowing/Sanding
12.66
202774 12/21/2018 118917 DEPARTMENT OF LABOR AND INDUSTRY
3,077.86 BLDG PRMT 11/18 289170 110118 9001.219512/20/2018 Due to State - Permit Surcharg General Fund
3,077.86
202775 12/21/2018 101693 DICK'S SANITATION SERVICE INC.
57.11 COMPOST 289171 DT0002388735 3304.653912/20/2018 Waste Removal/Sanitation Servi Bldg/Facilities Maintenance
54.57 WASTE REMOVAL 289171 DT0002388735 6603.653912/20/2018 Waste Removal/Sanitation Servi Building Repair & Maint.
268.57 COMPOST 289172 DT0002366865 6827.653912/20/2018 Waste Removal/Sanitation Servi Building Maintenance
58.35 FIRE SAFETY CENTER 289176 DT0002392045 3313.653912/20/2018 Waste Removal/Sanitation Servi Fire Buildings
438.60
202776 12/21/2018 101784 DISCOUNT STEEL INC.
43.50 UNIT 322 FLEET 2018-1415 289173 4407340 9001.141512/20/2018 Inventory - Parts General Fund
43.50
202777 12/21/2018 109681 DODGE OF BURNSVILLE
1,021.95 UNIT 1140 RO 1357 289174 6035635/1 9001.141512/20/2018 Inventory - Parts General Fund
1,021.95
202778 12/21/2018 137998 DWYER, GINA
74.80 TONER CARTRIDGE REIMBURSEMENT 289177 12112018 0501.622012/20/2018 Operating Supplies - General General & Admn-Finance
74.80
202779 12/21/2018 101697 EAGAN CONVENTION & VISITORS BUREAU
93,651.23 OCT 2018 LODGING TAX 289185 1018 9001.221012/20/2018 Due to Convention Bureau General Fund
1,347.78-OCT 2018 LODGING TAX 289185 1018 6801.462112/20/2018 Building Rent General & Administrative
16.70-OCT 2018 LODGING TAX 289185 1018 6801.634712/20/2018 Telephone Service & Line Charg General & Administrative
20.00-OCT 2018 LODGING TAX 289185 1018 6801.634712/20/2018 Telephone Service & Line Charg General & Administrative
1,051.71-OCT 2018 LODGING TAX 289185 1018 9337.1386.112/20/2018 Due from ECVB Community Investment
414.96-OCT 2018 LODGING TAX 289185 1018 9337.4613.412/20/2018 Int on IR-ECVB Community Investment
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
10Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202779 12/21/2018 101697 EAGAN CONVENTION & VISITORS BUREAU Continued...
90,800.08
202780 12/21/2018 108624 EBERT CONSTRUCTION
1,456,556.34 CONT 18-06 PMT 7 289186 121918 5041.671012/20/2018 Project - Contract Phase 1-PD,Garage,&Traing room
1,456,556.34
202781 12/21/2018 100060 ECM PUBLISHERS INC
28.63 PH-THE HOUSE CHURCH 289178 654645 0401.635912/20/2018 Legal Notice Publication General & Admn-City Clerk
28.63 PH-TCF BANK 289179 654644 0401.635912/20/2018 Legal Notice Publication General & Admn-City Clerk
57.26
202782 12/21/2018 101006 EMERGENCY AUTO TECHNOLOGIES
254.80-RETURNED UNUSED SEAT 289180 DL072618-26CM 1104.623112/20/2018 Mobile Equipment Repair Parts Patrolling/Traffic
120.20 UNIT 1107 289181 DL121318-22 9001.141512/20/2018 Inventory - Parts General Fund
310.20 UNIT 1130 289182 DL121318-23 9001.141512/20/2018 Inventory - Parts General Fund
207.80 UNIT 1132 289183 DL120618-32 9001.141512/20/2018 Inventory - Parts General Fund
383.40
202783 12/21/2018 152585 EPG SECURITY GROUP
99.80 EPG - SECURITY 289184 15462 6801.653512/20/2018 Other Contractual Services General & Administrative
99.80
202784 12/21/2018 100062 FACTORY MOTOR PARTS CO
94.44 DEF FLUID STREETS 289187 1-5791510 2244.623512/20/2018 Fuel, Lubricants, Additives Street Equipment Repair/Mtn
94.44
202785 12/21/2018 100451 FASTENAL COMPANY
86.02 TOOLS 289188 MNTC1225049 3129.624012/20/2018 Small Tools Shop Mtn/General Repairs
32.13 TOOLS 289189 MNTC1224969 3129.624012/20/2018 Small Tools Shop Mtn/General Repairs
118.15
202786 12/21/2018 123200 FERG, BRADLEY
372.97 11822-OVRPMNT 3842 MILL RUN LN 289190 120418 9220.225012/20/2018 Escrow Deposits Public Utilities
372.97
202787 12/21/2018 122976 FIRE SAFETY USA INC.
18,981.28 FIREFIGHTER TURNOUT GEAR 289191 118251 1225.622412/20/2018 Clothing/Personal Equipment Fire / EMS Equipment
18,981.28
202788 12/21/2018 143971 FLEETPRIDE
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
11Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202788 12/21/2018 143971 FLEETPRIDE Continued...
29.43 UNIT 122 289192 16214651 9001.141512/20/2018 Inventory - Parts General Fund
2.95 UNIT 317 289193 16451239 9001.141512/20/2018 Inventory - Parts General Fund
32.38
202789 12/21/2018 100157 FORCE AMERICA INC
386.14 UNIT 111 289194 IN001-1298273 9001.141512/20/2018 Inventory - Parts General Fund
130.73 MOWER PARTS 289195 IN001-1298168 9001.141512/20/2018 Inventory - Parts General Fund
516.87
202790 12/21/2018 143919 FOSTER, JOHN HENRY
267.68 SUPPLIES FOR NTP FILTER BANK D 289196 10402084-00 6147.626012/20/2018 Utility System Parts/Supplies North Plant Production
267.68
202791 12/21/2018 147955 GALLS LLC
199.00 LOUNSBURY UNIFORM 289197 011429164 1104.622412/20/2018 Clothing/Personal Equipment Patrolling/Traffic
55.65 PATHWAYS 3X OFFICERS.289198 011431694 1104.622412/20/2018 Clothing/Personal Equipment Patrolling/Traffic
9.85 FARNHAM UNFIORM 289199 011433369 1104.622412/20/2018 Clothing/Personal Equipment Patrolling/Traffic
123.25 SYVERTSEN UNIFORM 289200 011440235 1104.622412/20/2018 Clothing/Personal Equipment Patrolling/Traffic
387.75
202792 12/21/2018 147866 GIBBS, JOE
24.53 MILEAGE 11/26-12/19- GIBBS 289203 121918 0501.635312/20/2018 Personal Auto/Parking General & Admn-Finance
24.53
202793 12/21/2018 152667 GRACENOTE MEDIA SERVICES LLC
400.00 GRACENOTE - ELECTR PROG GUIDE 289204 9747013655 9701.631012/20/2018 Professional Services-General PEG-eligible
400.00
202794 12/21/2018 100990 GRAINGER
18.14 IGNITOR REPLACEMENT 289201 9028913110 6146.623012/20/2018 Repair/Maintenance Supplies-Ge North Plant Building
364.14 PADLOCKS 289202 9029248201 3118.622012/20/2018 Operating Supplies - General Athletic Field Mtn/Setup
382.28
202795 12/21/2018 111043 H&L MESABI
356.70 BLADES FOR PLOWS 289205 02448 2244.623112/20/2018 Mobile Equipment Repair Parts Street Equipment Repair/Mtn
1,520.00 120 WING EDGE 289206 02377 9001.141512/20/2018 Inventory - Parts General Fund
1,876.70
202796 12/21/2018 100084 HANCO
24.46 UNIT 1137 289207 449024 9001.141512/20/2018 Inventory - Parts General Fund
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
12Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202796 12/21/2018 100084 HANCO Continued...
24.46
202797 12/21/2018 100085 HARDWARE HANK
22.98 STREET SIGN INSTALL 289208 1803529 2242.625712/20/2018 Signs & Striping Material Signs-Installation & Mtn
4.76 UNIT 124 289209 1804184 9001.141512/20/2018 Inventory - Parts General Fund
12.48 PARTS FOR NTP ADMIN BATHROOM D 289210 1802399 6146.623312/20/2018 Building Repair Supplies North Plant Building
1.68 NUTS AND BOLTS 289211 1805233 3106.622012/20/2018 Operating Supplies - General Structure Care & Maintenance
20.36 MOUSE TRAPS 289212 1790672 3313.622012/20/2018 Operating Supplies - General Fire Buildings
29.33 SHOP SUPPLIES 289213 1798057 3313.624112/20/2018 Shop Materials Fire Buildings
41.16 SHOP SUPPLIES 289214 1798281 3304.624012/20/2018 Small Tools Bldg/Facilities Maintenance
16.97 289215 1803385 2010.622412/20/2018 Clothing/Personal Equipment General Engineering
.99 NUTS/BOLTS 289216 1792286 2010.622412/20/2018 Clothing/Personal Equipment General Engineering
22.28 SHOP SUPPLIES 289217 1803934 3304.624112/20/2018 Shop Materials Bldg/Facilities Maintenance
2.48 RO 1413 289218 1805076 9001.141512/20/2018 Inventory - Parts General Fund
175.47
202798 12/21/2018 100267 HAYES ELECTRIC
604.05 RINK REPAIR PARTS 289219 4256-120318 3109.623912/20/2018 Park Facility Repair Parts Lighting Maintenance
940.00 RINKLIGHT REPAIR LABOR 289219 4256-120318 3109.642812/20/2018 Field/Other Equipment Repair-L Lighting Maintenance
126.54 BLDG REPAIR PARTS 289220 4264 3106.623312/20/2018 Building Repair Supplies Structure Care & Maintenance
564.00 BLDG REPAIR LABOR 289220 4264 3106.642712/20/2018 Building Operations/Repair-Lab Structure Care & Maintenance
2,234.59
202799 12/21/2018 100082 HEALTHPARTNERS
1,630.20 DENTAL ADMIN FEE - JAN 19 289221 85930921 9594.616112/20/2018 Dental self-insurance admin fe Dental Self-insurance
1,630.20
202800 12/21/2018 101708 HONSA LIGHTING SALES & SVC. INC.
97.00 SUPPLIES 289227 86848 3125.622012/20/2018 Operating Supplies - General Trail/Walkway/Lot Maintenance
97.00
202801 12/21/2018 148985 HP INC.
101.00 LAPTOP DOCKING 289222 60697819 1104.666012/20/2018 Office Furnishings & Equipment Patrolling/Traffic
101.00
202802 12/21/2018 145513 IMPACT PRINTING
50.49 PRINTING FORMS 289223 47928 6101.637012/20/2018 General Printing and Binding Water -Administration
50.49
202803 12/21/2018 143243 IMPACT PROVEN SOLUTIONS
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
13Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202803 12/21/2018 143243 IMPACT PROVEN SOLUTIONS Continued...
1,626.12 UTILITY BILL MAILING - NOV 289224 137191 6101.653512/20/2018 Other Contractual Services Water -Administration
1,626.13 UTILITY BILL MAILING - NOV 289224 137191 6201.653512/20/2018 Other Contractual Services San Sewer-Administration
3,252.25
202804 12/21/2018 115233 I-STATE TRUCK CENTER
351.77 UNIT 312 289225 C242560619:01 9001.141512/20/2018 Inventory - Parts General Fund
351.77
202805 12/21/2018 144674 JACKSON & ASSOCIATES LLC
600.00 ROOF REPAIRS 289226 7277-SV 3313.653512/20/2018 Other Contractual Services Fire Buildings
600.00
202806 12/21/2018 153159 JAG FITNESS SERVICES LLC
425.00 JAGFITNESS.OCTANE.REPAIR 289228 130646 6807.623212/20/2018 Small Equipment Repair Parts Fitness Center
425.00
202807 12/21/2018 119878 KATH FUEL
15,858.92 GASOLINE TANK 1 AND 2 289229 642481 9001.141112/20/2018 Inventory - Motor Fuels General Fund
15,858.92
202808 12/21/2018 153540 KLEIN, BRIAN
250.00 11822-OVRPMNT 709 MCFADDENS TR 289230 120418 9220.225012/20/2018 Escrow Deposits Public Utilities
250.00
202809 12/21/2018 140952 LAMPERTS
11.74 LATE FEE FOR BILLING 289231 5126597-112518 3511.668012/20/2018 Mobile Equipment Equip Rev Fd-Dept 11
11.74
202810 12/21/2018 100420 LEAGUE OF MINN CITIES INS TRUST
105,514.00 INSURANCE PREMIUM 3RD INSTALL 289232 40001024-120418 9591.638512/20/2018 Insurance Risk Management
100.00 CLAIM GL65891 289233 4207 9591.638612/20/2018 Insurance Deductible Risk Management
105,614.00
202811 12/21/2018 153542 LEEGWATEER, MATTHEW
139.19 11822-OVRPMNT 906 WILD ROSE CT 289234 120418 9220.225012/20/2018 Escrow Deposits Public Utilities
139.19
202812 12/21/2018 101622 LEHMAN'S GARAGE INC
7,295.93 CLAIM CA69693 289235 3126 9591.638612/20/2018 Insurance Deductible Risk Management
7,295.93
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
14Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202812 12/21/2018 101622 LEHMAN'S GARAGE INC Continued...
202813 12/21/2018 137999 LIBERTY TIRE RECYCLING LLC
93.50 SCRAP TIRE 289236 1493255 9001.141512/20/2018 Inventory - Parts General Fund
199.25 TIRE RECYCLING 289237 1484853 2401.653912/20/2018 Waste Removal/Sanitation Servi Gen/Adm-Central Services
292.75
202814 12/21/2018 153543 LIND, TODD
150.00 11822-OVRPMNT 800 QUAIL RIDGE 289238 120418 9220.225012/20/2018 Escrow Deposits Public Utilities
150.00
202815 12/21/2018 147898 LITIN
455.99 CONCESSION RESALE 289239 504158 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
65.40 CONCESSION RESALE 289240 504158A 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
521.39
202816 12/21/2018 100112 LONE OAK COMPANIES
512.22 PRINT-EBN-Q4-2018 289241 80679 0903.637012/20/2018 General Printing and Binding Eagan Business News
250.00 MAIL-PREP-EBN-Q4-2018 289241 80679 0903.634612/20/2018 Postage Eagan Business News
762.22
202817 12/21/2018 143145 LYLE SIGNS INC.
122.94 SIGN MATERIALS 289242 000922754-08151
8
2242.625712/20/2018 Signs & Striping Material Signs-Installation & Mtn
122.94
202818 12/21/2018 141510 MADISON NATIONAL LIFE
5,270.19 LTD-DECEMBER 2018 289356 8862-1218 9592.615212/20/2018 Life Benefit Accrual
5,270.19
202819 12/21/2018 114678 MAGUIRE, MIKE
146.31 OCT/NOV MILEAGE 289245 111218 0101.635312/20/2018 Personal Auto/Parking Legislative/Policy Development
146.31
202820 12/21/2018 100118 MARKS TOWING
500.00 FORFEITURE CASE 17000623 289243 225242 9115.653812/20/2018 Towing Charges DWI Forfeiture
500.00
202821 12/21/2018 151095 MENARDS-BURNSVILLE
35.34 REC PROGRAM SUPPLY 289244 92936 3048.622712/20/2018 Recreation Equipment/Supplies Adult Softball-Men
61.59 PARK IMPROVEMENTS 289244 92936 3108.625212/20/2018 Parks & Play Area Supplies Park Improvements
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
15Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202821 12/21/2018 151095 MENARDS-BURNSVILLE Continued...
96.93
202822 12/21/2018 100034 MIDWEST COCA COLA
724.68-CONCESSION RESALE 289246 3605206590 6713.685512/20/2018 Merchandise for Resale Concessions
75.00-CONCESSION RESALE 289247 3605206777 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
433.17 CONCESSION RESALE 289248 3605206776 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
502.22-CONCESSION RETURNS 289249 3605206778 6713.685512/20/2018 Merchandise for Resale Concessions
623.17 CONCESSION RESALE 289250 3605205156 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
300.00-CONCESSION RESALE 289251 3605205399 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
75.00-CONCESSION RESALE 289252 3605206100 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
75.00-CONCESSION RESALE 289253 3606204750 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
75.00-CONCESSION RESALE 289254 3607203006 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
468.34 CONCESSION RESALE 289255 3641202048 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
75.00-CONCESSION RESALE 289256 3641202053 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
150.00-CONCESSION RESALE 289257 3641202480 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
150.00-CONCESSION RESALE 289258 3641203501 6713.685512/20/2018 Merchandise for Resale Concessions
75.00-CONCESSION RESALE 289259 3641203639 6713.685512/20/2018 Merchandise for Resale Concessions
75.00-CONCESSION RESALE 289260 3641203708 6713.685512/20/2018 Merchandise for Resale Concessions
75.00-CONCESSION RESALE 289261 3650201966 6713.685512/20/2018 Merchandise for Resale Concessions
75.00-CONCESSION RESALE 289262 3605207147 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
580.78 CONCESSION RESALE 289263 3605207146 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
1,651.79 CONCESSION RESALE 289264 3605206329 6713.685512/20/2018 Merchandise for Resale Concessions
1,255.35
202823 12/21/2018 100133 MIKES SHOE REPAIR
225.00 WORK SHOES-DALE RONNING 289266 11082018 2010.622412/20/2018 Clothing/Personal Equipment General Engineering
169.00 WORK SHOES-D. WESTERMAYER 289267 12122018 2010.622412/20/2018 Clothing/Personal Equipment General Engineering
110.00 UNIFORM BOOTS-BUECKSLER 289268 12042018 3170.211512/20/2018 Clothing Allowance General AdmIn-Parks
504.00
202824 12/21/2018 102753 MINNCOR INDUSTRIES
113.00 ENVELOPES 289265 SOI-075537 0201.621012/20/2018 Office Supplies General & Admn-Admn
113.00 ENVELOPES 289265 SOI-075537 0501.621012/20/2018 Office Supplies General & Admn-Finance
113.00 ENVELOPES 289265 SOI-075537 3001.621012/20/2018 Office Supplies General/Admn-Recreation
113.00 ENVELOPES 289265 SOI-075537 0726.621012/20/2018 Office Supplies Sign Administration
113.00 ENVELOPES 289265 SOI-075537 1001.621012/20/2018 Office Supplies General/Admn-Human Resources
113.00 ENVELOPES 289265 SOI-075537 0820.621012/20/2018 Office Supplies General/Admn-Housing
113.00 ENVELOPES 289265 SOI-075537 2010.622012/20/2018 Operating Supplies - General General Engineering
113.00 ENVELOPES 289265 SOI-075537 0720.621012/20/2018 Office Supplies General Admin-Planning & Zonin
113.00 ENVELOPES 289265 SOI-075537 2401.621012/20/2018 Office Supplies Gen/Adm-Central Services
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
16Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202824 12/21/2018 102753 MINNCOR INDUSTRIES Continued...
113.00 ENVELOPES 289265 SOI-075537 6101.621012/20/2018 Office Supplies Water -Administration
1,130.00
202825 12/21/2018 138393 MINNESOTA DEED
13,125.00 AUG-DEC 18 MIF LOAN - CORVIDA 289269 120118 9118.650812/20/2018 MIF Repayment to State MIF Revolving Loan
1,305.18 MIF LOAN = PURAIR - SEPT 18 289270 09012018 9118.6508 MI00112/20/2018 MIF Repayment to State MIF Revolving Loan
2,610.36 MIF LOAN = PURAIR - OCT-NOV 18 289271 11302018 9118.6508 MI00112/20/2018 MIF Repayment to State MIF Revolving Loan
17,040.54
202826 12/21/2018 147222 MINNESOTA TRUCK AND TRAILER
1,739.26 RO 1411 289274 112925 9001.141512/20/2018 Inventory - Parts General Fund
1,739.26
202827 12/21/2018 121807 MN CLAY COMPANY USA
365.00 PROGRAM SUPPLIES 289272 107476 3081.622712/20/2018 Recreation Equipment/Supplies Arts & Humanities Council
100.38 PROGRAM SUPPLIES 289273 107779 3081.622712/20/2018 Recreation Equipment/Supplies Arts & Humanities Council
465.38
202828 12/21/2018 100682 MN DEPT OF HEALTH
32,424.00 WATER CONNECTION FEE 289275 4TH QTR 2018 9220.227212/20/2018 Water Testing Surcharge Payabl Public Utilities
32,424.00
202829 12/21/2018 120087 MN ENERGY RESOURCES CORP
345.75 FIRE STATION 2 289276 0507084666-0000
1-DEC18
3313.641012/20/2018 Natural Gas Service Fire Buildings
93.24 ART HOUSE 289277 0506085756-0000
1-DEC18
3106.641012/20/2018 Natural Gas Service Structure Care & Maintenance
3,254.10 SOUTH TREATMENT PLANT 289278 0503582559-0000
1-DEC18
6154.641012/20/2018 Natural Gas Service South Plant Building
168.02 BRIDLE RIDGE PARK 289279 0502896570-0000
6-DEC18
3106.641012/20/2018 Natural Gas Service Structure Care & Maintenance
90.11 OLD TOWN HALL 289280 0504848982-0000
1-DEC18
3304.641012/20/2018 Natural Gas Service Bldg/Facilities Maintenance
4,046.03 FIRE STATION 1 289281 0502896570-0000
4-DEC18
3313.641012/20/2018 Natural Gas Service Fire Buildings
2,702.28 CIVIC ICE ARENA 289282 0504859971-0000
1-DEC18
6601.641012/20/2018 Natural Gas Service General/Administrative-Arena
10,699.53
202830 12/21/2018 138430 MN ENERGY RESOURCES CORP (R)
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
17Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202830 12/21/2018 138430 MN ENERGY RESOURCES CORP (R)Continued...
274.75 NOV 2018 NATURAL GAS 289283 0507678830-0000
1-NOV18
9695.641012/20/2018 Natural Gas Service Dakota Co Drug Task Force
257.64 NOV 2018 NATURAL GAS 289284 0504461082-0000
1-NOV18
9695.641012/20/2018 Natural Gas Service Dakota Co Drug Task Force
532.39
202831 12/21/2018 103029 MN FIRE SERVICE CERTIFICATION BOARD
345.00 INSPECTOR TESTS 289285 6250 1223.632012/20/2018 Instructors Training Fire & EMS
345.00
202832 12/21/2018 138821 MN LIFE INSURANCE COMPANY
1,559.25 BASIC LIFE-DECEMBER 2018 289357 DEC18 9592.615212/20/2018 Life Benefit Accrual
1,559.25
202833 12/21/2018 146682 MN LIFE INSURANCE COMPANY
5,164.05 VOL LIFE-DECEMBER 2018 289358 0033843-DEC18 9592.202112/20/2018 Ded Payable - Insurance Benefit Accrual
5,164.05
202834 12/21/2018 153565 MN LIMITED
3,565.00 TEMP HYDRANT 289286 121318 9220.225412/20/2018 Construction Meter Deposits Public Utilities
195.00 TEMP HYDRANT 289286 121318 6101.452112/20/2018 Construction Meter Permit Fees Water -Administration
455.00-TEMP HYDRANT 289286 121318 6101.452112/20/2018 Construction Meter Permit Fees Water -Administration
1,218.00-TEMP HYDRANT 289286 121318 6101.450512/20/2018 Water Sales Water -Administration
45.88-TEMP HYDRANT 289286 121318 6101.450512/20/2018 Water Sales Water -Administration
2,041.12
202835 12/21/2018 153570 MN MECHANICAL LLC
59.00 289292 153106 0801.408712/20/2018 Plumbing General & Admn-Protective Insp
1.00 PLUMBING PERMIT 289292 153106 9001.219512/20/2018 Due to State - Permit Surcharg General Fund
60.00
202836 12/21/2018 145327 MNSPECT LLC
13,218.19 11/26/18-12/7/18 289287 7598 0805.631012/20/2018 Professional Services-General Construction Insp-Field
13,218.19
202837 12/21/2018 151289 MOE, DAN
6.00 MARKETFEST 12/15/18-SNAP EBT 289288 121518 3061.6220 PR00312/20/2018 Operating Supplies - General Market Fest
6.00
202838 12/21/2018 143252 MOSS & BARNETT
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
18Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202838 12/21/2018 143252 MOSS & BARNETT Continued...
904.50 CENTURYLINK MEETING 289289 700686 9701.631112/20/2018 Legal PEG-eligible
904.50
202839 12/21/2018 152976 MRA INTERNATIONAL
1,182.50 REPLACEMENT CPU - FELDMAN 289290 19438 0501.666012/20/2018 Office Furnishings & Equipment General & Admn-Finance
1,182.50
202840 12/21/2018 129168 NOW MICRO INC.
9,088.00 DELL OPTIPLEX 5050 - 8 COMPUTE 289291 2250 9697.666012/20/2018 Office Furnishings & Equipment DCDTF Capital Equipment
9,088.00
202841 12/21/2018 122435 OFFICE DEPOT (R)
54.09 TOWEL, CUP, CREAMER 289293 242960217001 9695.621012/20/2018 Office Supplies Dakota Co Drug Task Force
83.97 COFFEE, BATTERY, MOUSE 289294 242865560001 9695.621012/20/2018 Office Supplies Dakota Co Drug Task Force
138.06
202842 12/21/2018 142091 OFFICE OF MN IT SERVICES
21.60 FOBS-NOVEMBER 2018 289295 DV18110498 0301.656912/20/2018 Maintenance Contracts IT-Gen & Admn
21.60
202843 12/21/2018 151029 OLDENBURG, DEB
491.70 ART SALE VENDOR PAYMENT 289296 111818 3081.2290.112/20/2018 Art House-Pottery Sale taxable Arts & Humanities Council
491.70
202844 12/21/2018 149331 PARISI, JULIET
392.08 ART SALE VENDOR PAYMENT 289297 2018 WINTER ART
SALE
3081.2290.112/20/2018 Art House-Pottery Sale taxable Arts & Humanities Council
392.08
202845 12/21/2018 143557 RANDSTAD (R)
1,299.75 EVID TECH 11/25-12/1/18 289298 R24016554 9695.656112/20/2018 Temporary Help-Labor/Clerical Dakota Co Drug Task Force
1,299.75 EVID TECH 12/2-12/8/18 289299 R24041432 9695.656112/20/2018 Temporary Help-Labor/Clerical Dakota Co Drug Task Force
2,599.50
202846 12/21/2018 143983 RED'S SAVOY PIZZA
516.74 CONCESSION RESALE 289300 120118 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
516.74
202847 12/21/2018 152980 REMTECH INC. PEST PROTECTION
250.00 HOLZ SQUIRRELS 289301 11438 3106.642712/20/2018 Building Operations/Repair-Lab Structure Care & Maintenance
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
19Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202847 12/21/2018 152980 REMTECH INC. PEST PROTECTION Continued...
250.00
202848 12/21/2018 145085 RICE LAKE CONSTRUCTION GROUP
3,565.00 TEMP HYDRANT 289302 121318 9220.225412/20/2018 Construction Meter Deposits Public Utilities
195.00 TEMP HYDRANT 289302 121318 6101.452112/20/2018 Construction Meter Permit Fees Water -Administration
390.00-TEMP HYDRANT 289302 121318 6101.452112/20/2018 Construction Meter Permit Fees Water -Administration
906.00-TEMP HYDRANT 289302 121318 6101.450512/20/2018 Water Sales Water -Administration
85.45-TEMP HYDRANT 289302 121318 6101.450512/20/2018 Water Sales Water -Administration
2,378.55
202849 12/21/2018 103065 ROTARY CLUB OF EAGAN
156.00 ROTARY CLUB DUES - OSBERG 289303 2016-2020 0201.647912/20/2018 Dues and Subscriptions General & Admn-Admn
156.00
202850 12/21/2018 102784 RYAN CONSTRUCTION, R.J.
3,565.00 TEMP HYDRANT 289304 121018 9220.225412/20/2018 Construction Meter Deposits Public Utilities
195.00 TEMP HYDRANT 289304 121018 6101.452112/20/2018 Construction Meter Permit Fees Water -Administration
455.00-TEMP HYDRANT 289304 121018 6101.452112/20/2018 Construction Meter Permit Fees Water -Administration
1,026.00-TEMP HYDRANT 289304 121018 6101.450512/20/2018 Water Sales Water -Administration
12.55-TEMP HYDRANT 289304 121018 6101.450512/20/2018 Water Sales Water -Administration
2,266.45
202851 12/21/2018 150474 SCHWARTZ FARM
5.00 MARKETFEST 12/15/18-SNAP EBT 289305 121518 3061.6220 PR00312/20/2018 Operating Supplies - General Market Fest
9.00 MARKETFEST 12/15/18-MEDICA 289305 121518 3061.6220 PR00712/20/2018 Operating Supplies - General Market Fest
14.00
202852 12/21/2018 153568 SCOTT'S BEES AND HONEY
10.00 MARKETFEST 12/15/18-MARKETBUCK 289306 121518 3061.6220 PR00412/20/2018 Operating Supplies - General Market Fest
10.00
202853 12/21/2018 100187 SEH
1,999.12 PROF SVCS 289307 360580 8340.671312/20/2018 Project - Outside Engineering P 1340 Yankee Doodle Rd light
1,999.12
202854 12/21/2018 141461 SHAWN, JACK P
4,080.00 MEN'S BASKETBALL OFFICIALS 289308 121318 3076.632712/20/2018 Sporting Event Officials Adult Basketball-Men
4,080.00
202855 12/21/2018 142493 SIOUX VALLEY ENVIRONMENTAL INC.
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
20Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202855 12/21/2018 142493 SIOUX VALLEY ENVIRONMENTAL INC.Continued...
800.00 POLY BOTH PLANTS 289309 10453 6147.624412/20/2018 Chemicals & Chemical Products North Plant Production
520.00 POLY BOTH PLANTS 289309 10453 6155.624412/20/2018 Chemicals & Chemical Products South Plant Production
1,320.00
202856 12/21/2018 107313 SOLAR SHIELD
319.99 SQUAD 11 TINT 289310 47540 3511.668012/20/2018 Mobile Equipment Equip Rev Fd-Dept 11
319.99
202857 12/21/2018 102392 SPARTAN PROMOTIONAL GROUP, INC.
405.11 PROGRAM SUPPLIES 289311 568214 3097.622712/20/2018 Recreation Equipment/Supplies MRAC Comm Arts Grant 2013-14
764.67 SPARTAN.WEDDINGCUPS 289312 568334 6825.635712/20/2018 Advertising/Publication Marketing
1,169.78
202858 12/21/2018 100326 ST PAUL, CITY OF
180.00 TRAINING PD 289313 IN00032145 1104.647612/20/2018 Conferences/Meetings/Training Patrolling/Traffic
180.00
202859 12/21/2018 121089 STEININGER INC., MAX
3,565.00 TEMP HYDRANT 289314 121318 9220.225412/20/2018 Construction Meter Deposits Public Utilities
195.00 TEMP HYDRANT 289314 121318 6101.452112/20/2018 Construction Meter Permit Fees Water -Administration
520.00-TEMP HYDRANT 289314 121318 6101.452112/20/2018 Construction Meter Permit Fees Water -Administration
1,308.00-TEMP HYDRANT 289314 121318 6101.450512/20/2018 Water Sales Water -Administration
280.04-TEMP HYDRANT 289314 121318 6101.450512/20/2018 Water Sales Water -Administration
1,651.96
202860 12/21/2018 127800 SUPERIOR MECHANICAL COLLISION
185.00 RO 1366 289315 0143394 9001.141512/20/2018 Inventory - Parts General Fund
122.10 RO 1363 289316 0143399 9001.141512/20/2018 Inventory - Parts General Fund
239.76 UNIT 310 289317 092818 9001.141512/20/2018 Inventory - Parts General Fund
546.86
202861 12/21/2018 107307 SVL SERVICE CORPORATION
400.00-HVAC CONTRACT 289318 181214-012 6827.656912/20/2018 Maintenance Contracts Building Maintenance
5,822.75 HVAC CONTRACT 289319 180530-004 6827.656912/20/2018 Maintenance Contracts Building Maintenance
1,256.00 HVAC CONTRACT 289320 181217-007 3313.656912/20/2018 Maintenance Contracts Fire Buildings
6,678.75
202862 12/21/2018 153527 SWARTZ, KURT T
69.97 MAILBOX REIMBURSEMENT 289321 111718 2240.625612/20/2018 Snow Removal/Ice Control Suppl Street Plowing/Sanding
69.97
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
21Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202862 12/21/2018 153527 SWARTZ, KURT T Continued...
202863 12/21/2018 151851 SYSCO-MINNESOTA INC
159.46 PAPER PRODUCTS 289323 247208660 6603.622312/20/2018 Building/Cleaning Supplies Building Repair & Maint.
767.56 MILK/PRETZELS/HOT DOGS 289323 247208660 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
988.21 ICE CREAM/YOGURT/JUICE 289324 247205230 6831.685512/20/2018 Merchandise for Resale Food and Beverage
45.45 CONCESSION RESALE-CANDY 289325 247216456 6609.685512/20/2018 Merchandise for Resale Concession Sales/Vending
1,960.68
202864 12/21/2018 143384 TAYLOR ELECTRIC COMPANY
345.80 ELECT WORK NTP 289322 1293 6146.642712/20/2018 Building Operations/Repair-Lab North Plant Building
345.80
202865 12/21/2018 100107 THYSSENKRUPP ELEVATOR
129.10 MAINT AGREEMENT-DEC18 289326 3004265661 6603.656912/20/2018 Maintenance Contracts Building Repair & Maint.
129.10 ELEVATOR CONTRACT-DEC18 289327 3004268776 3313.656912/20/2018 Maintenance Contracts Fire Buildings
129.10 ELEVATOR CONTRACT-DEC18 289327 3004268776 3316.656912/20/2018 Maintenance Contracts Police
191.07 ELEVATOR CONTRACT-DEC18 289327 3004268776 3315.656912/20/2018 Maintenance Contracts City Hall
258.20 ELEVATOR CONTRACT-DEC18 289327 3004268776 9116.622312/20/2018 Building/Cleaning Supplies Cedar Grove Parking Garage
129.10 ELEVATOR CONTRACT-DEC18 289328 3004268780 6827.656912/20/2018 Maintenance Contracts Building Maintenance
965.67
202866 12/21/2018 153572 TIBBITS, JOSH
800.00 DEVELOPER ESCROW REFUND 289329 121218 9001.2245 J042812/20/2018 Escrow - Private Development F General Fund
800.00
202867 12/21/2018 100475 TKDA
1,210.17 QUARRYSKYHILL ADA ASSESS 289330 002018005088 2852.675112/20/2018 Design & Engineering (External General Park Site Improvmts
1,210.17
202868 12/21/2018 153562 TOTAL COMFORT HEATING AND COOLING
59.00 MECHANICAL PERMIT 289351 153191 0801.408812/20/2018 Mechanical (Heating/Ventilatio General & Admn-Protective Insp
1.00 289351 153191 9001.219512/20/2018 Due to State - Permit Surcharg General Fund
60.00
202869 12/21/2018 100223 TRI STATE BOBCAT
112.52 CHAINSAW REPAIR 289331 W83476 2272.623112/20/2018 Mobile Equipment Repair Parts Tree Trimming
112.52
202870 12/21/2018 146014 UFC FARM SUPPLY
350.00 DEFLECTOR FOR 309 PLOW 289332 78645 3127.623112/20/2018 Mobile Equipment Repair Parts Equipment Maintenance/Repair
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
22Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202870 12/21/2018 146014 UFC FARM SUPPLY Continued...
350.00
202871 12/21/2018 120163 ULINE INC.
335.32 PD OFFICE SUPPLIES 289333 103760153 1107.621012/20/2018 Office Supplies Support Services
536.00 NTP SUPPLIES 289334 103034159 6146.623012/20/2018 Repair/Maintenance Supplies-Ge North Plant Building
871.32
202872 12/21/2018 100912 VERIZON WIRELESS, BELLEVUE
50.94 CELL PHONES 289335 9819679535 1001.635512/20/2018 Cellular Telephone Service General/Admn-Human Resources
221.87 CELL PHONES 289335 9819679535 0201.635512/20/2018 Cellular Telephone Service General & Admn-Admn
243.76 CELL PHONES 289335 9819679535 0301.635512/20/2018 Cellular Telephone Service IT-Gen & Admn
60.94 CELL PHONES 289335 9819679535 0501.635512/20/2018 Cellular Telephone Service General & Admn-Finance
254.70 CELL PHONES 289335 9819679535 0720.635512/20/2018 Cellular Telephone Service General Admin-Planning & Zonin
385.30 CELL PHONES 289335 9819679535 0805.635512/20/2018 Cellular Telephone Service Construction Insp-Field
152.82 CELL PHONES 289335 9819679535 0901.635512/20/2018 Cellular Telephone Service Gen & Admin-Communications
3,241.94 CELL PHONES 289335 9819679535 1108.635512/20/2018 Cellular Telephone Service Communications
610.22 CELL PHONES 289335 9819679535 2010.635512/20/2018 Cellular Telephone Service General Engineering
327.42 CELL PHONES 289335 9819679535 2201.635512/20/2018 Cellular Telephone Service Gen/Adm-Streets
9.14 CELL PHONES 289335 9819679535 2401.635512/20/2018 Cellular Telephone Service Gen/Adm-Central Services
888.76 CELL PHONES 289335 9819679535 3001.635512/20/2018 Cellular Telephone Service General/Admn-Recreation
394.24 CELL PHONES 289335 9819679535 3170.635512/20/2018 Cellular Telephone Service General AdmIn-Parks
61.14 CELL PHONES 289335 9819679535 3170.635512/20/2018 Cellular Telephone Service General AdmIn-Parks
152.82 CELL PHONES 289335 9819679535 3201.635512/20/2018 Cellular Telephone Service Administrative/General
28.72 CELL PHONES 289335 9819679535 3106.634712/20/2018 Telephone Service & Line Charg Structure Care & Maintenance
28.99 CELL PHONES 289335 9819679535 3301.635512/20/2018 Cellular Telephone Service General Management
458.46 CELL PHONES 289335 9819679535 1221.635512/20/2018 Cellular Telephone Service Administration-Fire
50.94 CELL PHONES 289335 9819679535 3071.622712/20/2018 Recreation Equipment/Supplies MN State Arts Board
213.76 CELL PHONES 289335 9819679535 9701.635512/20/2018 Cellular Telephone Service PEG-eligible
292.84 CELL PHONES 289335 9819679535 6101.635512/20/2018 Cellular Telephone Service Water -Administration
152.82 CELL PHONES 289335 9819679535 6128.635512/20/2018 Cellular Telephone Service CMMS - Utilities
50.94 CELL PHONES 289335 9819679535 6136.635512/20/2018 Cellular Telephone Service GIS - Utilities
255.30 CELL PHONES 289335 9819679535 6201.635512/20/2018 Cellular Telephone Service San Sewer-Administration
213.91 CELL PHONES 289335 9819679535 6501.635512/20/2018 Cellular Telephone Service G/A - Water Quality
152.82 CELL PHONES 289335 9819679535 6228.635512/20/2018 Cellular Telephone Service CMMS - Utilities
152.82 CELL PHONES 289335 9819679535 6601.635512/20/2018 Cellular Telephone Service General/Administrative-Arena
50.94 CELL PHONES 289335 9819679535 6716.635512/20/2018 Cellular Telephone Service General Administration
87.10 CELL PHONES 289335 9819679535 6801.635512/20/2018 Cellular Telephone Service General & Administrative
60.94 CELL PHONES 289335 9819679535 9225.635512/20/2018 Cellular Telephone Service Fiber Infrastructure Fund
50.02 DETECTIVE ROUTER NOV 18 289352 9819365087 1105.635512/20/2018 Cellular Telephone Service Investigation/Crime Prevention
35.01 AIR CARDS 289353 9819006076 0901.635512/20/2018 Cellular Telephone Service Gen & Admin-Communications
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
23Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202872 12/21/2018 100912 VERIZON WIRELESS, BELLEVUE Continued...
105.03 AIR CARDS 289353 9819006076 3057.622012/20/2018 Operating Supplies - General Preschool Programs
70.02 AIR CARDS 289353 9819006076 3101.635512/20/2018 Cellular Telephone Service Playground Maintenance
1,470.60 AIR CARDS 289353 9819006076 1104.634912/20/2018 Teleprocessing Equipment Patrolling/Traffic
35.01 AIR CARDS 289353 9819006076 1105.621212/20/2018 Office Small Equipment Investigation/Crime Prevention
2,460.63 AIR CARDS 289353 9819006076 1221.623012/20/2018 Repair/Maintenance Supplies-Ge Administration-Fire
35.01 AIR CARDS 289353 9819006076 1221.635512/20/2018 Cellular Telephone Service Administration-Fire
40.01 AIR CARDS 289353 9819006076 2401.635512/20/2018 Cellular Telephone Service Gen/Adm-Central Services
35.01 AIR CARDS 289353 9819006076 2010.635512/20/2018 Cellular Telephone Service General Engineering
140.04 AIR CARDS 289353 9819006076 0801.635512/20/2018 Cellular Telephone Service General & Admn-Protective Insp
285.08 AIR CARDS 289353 9819006076 2201.635512/20/2018 Cellular Telephone Service Gen/Adm-Streets
35.01 AIR CARDS 289353 9819006076 0301.635512/20/2018 Cellular Telephone Service IT-Gen & Admn
835.00 AIR CARDS 289353 9819006076 0201.635512/20/2018 Cellular Telephone Service General & Admn-Admn
35.03 AIR CARDS 289353 9819006076 3001.635512/20/2018 Cellular Telephone Service General/Admn-Recreation
70.02 AIR CARDS 289353 9819006076 0720.635512/20/2018 Cellular Telephone Service General Admin-Planning & Zonin
70.02 AIR CARDS 289353 9819006076 3170.635512/20/2018 Cellular Telephone Service General AdmIn-Parks
35.01 AIR CARDS 289353 9819006076 0805.635512/20/2018 Cellular Telephone Service Construction Insp-Field
105.03 AIR CARDS 289353 9819006076 3201.635512/20/2018 Cellular Telephone Service Administrative/General
35.01 AIR CARDS 289353 9819006076 9701.635512/20/2018 Cellular Telephone Service PEG-eligible
35.01 AIR CARDS 289353 9819006076 6234.635512/20/2018 Cellular Telephone Service Utility Locates
35.01 AIR CARDS 289353 9819006076 6239.640812/20/2018 Electricity-Lift Stations Lift Station Maintenanc/Repair
25.04 AIR CARDS 289353 9819006076 6239.635212/20/2018 Telephone Circuits Lift Station Maintenanc/Repair
35.01 AIR CARDS 289353 9819006076 6136.635512/20/2018 Cellular Telephone Service GIS - Utilities
35.01 AIR CARDS 289353 9819006076 6147.635512/20/2018 Cellular Telephone Service North Plant Production
70.02 AIR CARDS 289353 9819006076 6101.635512/20/2018 Cellular Telephone Service Water -Administration
35.01 AIR CARDS 289353 9819006076 6716.635512/20/2018 Cellular Telephone Service General Administration
35.01 AIR CARDS 289353 9819006076 6801.635512/20/2018 Cellular Telephone Service General & Administrative
15,594.03
202873 12/21/2018 119144 WASTE MANAGEMENT-SAVAGE (R)
605.27 DEC 2018 WASTE MANAGEMENT 289336 7965743-2282-5 9695.653912/20/2018 Waste Removal/Sanitation Servi Dakota Co Drug Task Force
605.27
202874 12/21/2018 107139 WEGENER, LANE
44.99 HIGH VISIBILITY JACKET 289349 121518 2010.622412/20/2018 Clothing/Personal Equipment General Engineering
44.99
202875 12/21/2018 141852 WENCK ASSOCIATES INC.
234.75 ENGINEERING SERVICES 289337 11808502 6542.6712 P132812/20/2018 Project - Engineering Capital Proj-WQ dedictn-cr1127
234.75 ENGINEERING SERVICES 289337 11808502 6542.6712 P132912/20/2018 Project - Engineering Capital Proj-WQ dedictn-cr1127
234.75 ENGINEERING SERVICES 289337 11808502 6542.6712 P133012/20/2018 Project - Engineering Capital Proj-WQ dedictn-cr1127
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
24Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202875 12/21/2018 141852 WENCK ASSOCIATES INC.Continued...
234.75 ENGINEERING SERVICES 289337 11808502 6542.6712 P133112/20/2018 Project - Engineering Capital Proj-WQ dedictn-cr1127
3,716.40 ENGINEERING SERVICES 289338 11808196 6542.6712 P132112/20/2018 Project - Engineering Capital Proj-WQ dedictn-cr1127
8,426.90 ENGINEERING SERVICES 289339 11808201 6542.6712 P132512/20/2018 Project - Engineering Capital Proj-WQ dedictn-cr1127
1,264.80 PLANNING SERVICES 289340 11808341 6513.631012/20/2018 Professional Services-General Water Quality Plan Update
14,347.10
202876 12/21/2018 104542 WSB & ASSOCIATES, INC.
682.00 OHMANN CIP 289341 R-011216-000-13 2849.675112/20/2018 Design & Engineering (External Ohmann Park
4,989.50 TRAPPBLDGWSB DESIGN SERVICES 289342 R-013080-000-1 2842.675112/20/2018 Design & Engineering (External Trapp Farm Park
1,606.75 SOOLINE DESIGN WSB 289343 R-013005-000-2 2852.675112/20/2018 Design & Engineering (External General Park Site Improvmts
7,278.25
202877 12/21/2018 101755 XCEL ENERGY
12.57 ALEXANDER LIFT STAITON 289344 51-6563387-4-12
1018
6236.640812/20/2018 Electricity-Lift Stations Assist - Streets
226.90 HWY 55 SAN LIFT STATION 289344 51-6563387-4-12
1018
6236.640812/20/2018 Electricity-Lift Stations Assist - Streets
239.47
202878 12/21/2018 101755 XCEL ENERGY
836.02 SIGNALS 289345 51-6563386-3-12
0418
6301.640712/20/2018 Electricity-Signal Lights Street Lighting
836.02
202879 12/21/2018 101755 XCEL ENERGY
2,850.55 STREET LIGHTS 289346 51-6563390-9-12
0318
6301.640612/20/2018 Electricity-Street Lights Street Lighting
2,850.55
202880 12/21/2018 101755 XCEL ENERGY
195.51 FESTIVAL GROUNDS 289347 51-6563391-0-12
0418
3106.640512/20/2018 Electricity Structure Care & Maintenance
166.87 CENTRAL PARK PUMP STATION 289347 51-6563391-0-12
0418
3186.640512/20/2018 Electricity Recreation Program Support
83.74 BAND SHELL 289347 51-6563391-0-12
0418
3106.640512/20/2018 Electricity Structure Care & Maintenance
271.31 CONCESSION STAND 289347 51-6563391-0-12
0418
3106.640512/20/2018 Electricity Structure Care & Maintenance
3,450.12 WELL #20 289347 51-6563391-0-12
0418
6148.640912/20/2018 Electricity-Wells/Booster Stat North Well Field
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
25Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202880 12/21/2018 101755 XCEL ENERGY Continued...
10,116.01 ECC-ELECTRICITY 289347 51-6563391-0-12
0418
6824.640512/20/2018 Electricity Utilities
3,519.47 ECC-NATURAL GAS 289347 51-6563391-0-12
0418
6824.641012/20/2018 Natural Gas Service Utilities
17,803.03
202881 12/21/2018 101755 XCEL ENERGY
11.31 SKYLINE RD HOCKEY RINK 289348 51-6563384-1-12
0418
3104.640512/20/2018 Electricity Site Amenity Installation
11.31 MCKEE ST ICE RINK LIGHTS 289348 51-6563384-1-12
0418
3104.640512/20/2018 Electricity Site Amenity Installation
82.38 QUARRY PARK 289348 51-6563384-1-12
0418
3106.640512/20/2018 Electricity Structure Care & Maintenance
105.00
202882 12/21/2018 101755 XCEL ENERGY
19,930.30 STREET LIGHTS NEW CONSTRUCTION 289350 51-0012483373-7
-120418
8245.671812/20/2018 Project - Other Charges P1245 Quarry Rd
19,930.30
20181202 12/21/2018 150536 MONEY MOVERS INC.
81.00 NOVEMBER 2018 289359 114241 6807.432112/21/2018 Memberships-Taxable Fitness Center
81.00
20181217 12/21/2018 138388 VANCO SERVICES LLC
234.26 NOVEMBER 2018 289360 00009299398 6101.653512/21/2018 Other Contractual Services Water -Administration
234.26
20185227 12/21/2018 100283 BERKLEY ADMINISTRATORS
155,000.00 WC ADVANCE 289367 122018 9593.165012/21/2018 Worker's Comp Advance to DCA Workers' Compensation Self-In
155,000.00
20185678 12/21/2018 147907 SELECT ACCOUNT
3,403.33 FLEX REIMBURSEMENT 289361 122018 9592.221512/21/2018 Flex Plan Withholding Payable Benefit Accrual
3,403.33
20185679 12/21/2018 147907 SELECT ACCOUNT
1,254.00 MONTHLY FEES 289362 122118 9592.653612/21/2018 Flex Plan Administration Fee Benefit Accrual
1,254.00
12/20/2018City of Eagan 15:44:01R55CKR2LOGIS102V
26Page -Council Check Register by GL
Check Register w GL Date & Summary
12/21/201812/17/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20186013 12/21/2018 100901 MN DEPT OF REVENUE Continued...
1,358.00 SALES TAX NOV 2018 289363 SALES TAX-NOV18 9001.227012/21/2018 Sales Tax Payable General Fund
49.00 TRANSIT TAX NOV 2018 289363 SALES TAX-NOV18 9001.227112/21/2018 Transit Imprv Tax General Fund
5,169.00 SALES TAX NOV 2018 289363 SALES TAX-NOV18 9220.227012/21/2018 Sales Tax Payable Public Utilities
188.00 TRANSIT TAX NOV 2018 289363 SALES TAX-NOV18 9220.227112/21/2018 Transit Imprv Tax Public Utilities
2,316.00 SALES TAX NOV 2018 289363 SALES TAX-NOV18 9221.227012/21/2018 Sales Tax Payable Civic Arena
77.00 TRANSIT TAX NOV 2018 289363 SALES TAX-NOV18 9221.227112/21/2018 Transit Imprv Tax Civic Arena
8,697.00 SALES TAX NOV 2018 289363 SALES TAX-NOV18 9223.227012/21/2018 Sales Tax Payable Central Park/Community Center
313.00 TRANSIT TAX NOV 2018 289363 SALES TAX-NOV18 9223.227112/21/2018 Transit Imprv Tax Central Park/Community Center
18,167.00
20187013 12/21/2018 100901 MN DEPT OF REVENUE
457.16 FUEL TAX (CENT SV) NOV 18 289364 FUEL TAX - NOV
2018
2244.623512/21/2018 Fuel, Lubricants, Additives Street Equipment Repair/Mtn
7.34 FUEL TAX (EQUIP) NOV 18 289364 FUEL TAX - NOV
2018
3128.623512/21/2018 Fuel, Lubricants, Additives Vehicle Maintenance
11.01 FUEL TAX (EQUIP) NOV 18 289364 FUEL TAX - NOV
2018
3127.623512/21/2018 Fuel, Lubricants, Additives Equipment Maintenance/Repair
12.13 FUEL TAX (SEWER) NOV 18 289364 FUEL TAX - NOV
2018
6232.623512/21/2018 Fuel, Lubricants, Additives Equipment Maintenance/Repair
487.64
20188548 12/21/2018 151185 HEALTHPARTNERS INC
2,885.19 DENTAL CLAIMS REIMBURSEMENT 289365 121718 9594.615812/21/2018 Dental Insurance Dental Self-insurance
2,885.19
20189013 12/21/2018 147691 HR SIMPLIFIED INC.
248.68 ADMIN FEES NOV 2018 289366 58469 9592.653612/21/2018 Flex Plan Administration Fee Benefit Accrual
248.68
2,955,942.00 Grand Total Payment Instrument Totals
Checks 2,955,942.00
Total Payments 2,955,942.00
12/20/2018City of Eagan 15:44:11R55CKS2LOGIS100
1Page -Council Check SummaryNote: Payment amount may not reflect the actual amount due to data sequencing and/or data selection.
12/21/201812/17/2018 -
Company Amount
225,627.7109001GENERAL FUND
923.0009115DWI Forfeiture
258.2009116CEDAR GROVE PARKING GARAGE
17,040.5409118MIF REVOLVING LOAN
31,059.8009197ETV
146,491.9109220PUBLIC UTILITIES
22,073.5909221CIVIC ARENA
2,352.2809222CASCADE BAY
30,259.4309223CENTRAL PARK /COMMUNITY CENTER
60.9409225FIBER INFRASTRUCTURE FUND
8,488.4209328PARK SYS DEV AND R&R
331.7309335EQUIPMENT REVOLVING
8,688.7609336GENERAL FACILITIES RENEW & REP
1,466.67-09337 COMMUNITY INVESTMENT
1,456,556.3409353POLICE & CITY HALL REMODEL
352,131.8909372REVOLVING SAF-CONSTRUCTION
112,909.9309591RISK MANAGEMENT
367,574.3509592BENEFIT ACCRUAL
155,000.0009593WORKERS' COMPENSATION SELF-INS
4,515.3909594Dental Self-insurance
5,976.4609695DAK CO DRUG TASK FORCE
9,088.0009697DCDTF Capital Equipment
Report Totals 2,955,942.00
Agenda Information Memo
January 2, 2019, Eagan City Council Meeting
CONSENT AGENDA
D. Approve Contracts
Action To Be Considered:
To approve the ordinary and customary contracts listed below.
Facts:
The contracts listed below are in order for Council approval. Following approval,
the contracts will be electronically executed by the Mayor and City Clerk.
Contracts to be approved:
Agreement with United Business Mail for mailing services
Agreement with LeadsOnline LLC for access to and use of an electronic crime
reporting and investigation system
Agreement with Starry Electric, Inc. for installation of Thresher Fields light poles
Agreement with Electric Systems of Anoka for electrical installation of Thresher
Fields light poles
Attachments: (0)
The contracts are available from the City Clerk’s Office.
Agenda Information Memo
January 2, 2019, Eagan City Council Meeting
CONSENT AGENDA:
E. Adopt A Resolution Accepting A Donation From An Eagan Citizen To Support The
Police K9s.
Action To Be Considered:
Adopt a resolution accepting a $1,000 cash donation from Patricia Judge in honor of her
late husband Gregg and direct the funds to revenue account number 1102.2862 for
accounting purposes.
Facts:
Patricia and her late husband, Gregg, are longtime Eagan Residents.
On December 12, 2018, Ms. Judge donated $1,000 to be used for our canine
program.
By approving the resolution, the funds will be transferred into revenue account
number 1102.2862 for accounting purposes.
The City seeks approval to accept the donation.
Attachments: (1)
E-1 Resolution
CITY OF EAGAN
RESOLUTION ACCEPTING DONATION TO THE CITY OF EAGAN
Patricia Judge
WHEREAS, the City Council of the City of Eagan encourages public donations
to help defray the costs to the general public of providing services in Eagan; and
WHEREAS, Patricia Judge has presented the police department with a donation
in the amount of $1,000 in memory of her husband Gregg Judge. The funds will be used
to support the Police Department’s Canine Program.
WHEREAS, Minnesota Statutes §465.03 requires that all gifts and donations of
real or personal property be accepted only with the adoption of a resolution approved by
two-thirds of the members of the City Council; and
NOW, THEREFORE, BE IT RESOLVED by the City Council of Eagan,
Dakota County, Minnesota, that the donation is hereby accepted for use by the City;
BE IT FURTHER RESOLVED, that the City sincerely thanks Patricia Judge for
the gracious and generous donation in memory of her husband Gregg.
ADOPTED this 2nd day of January, 2019.
CITY OF EAGAN
CITY COUNCIL
By: ____________________
It’s Mayor
Attest: __________________
It’s Clerk
Motion by:
Seconded by:
Those in Favor:
Those Against:
Date:
Agenda Information Memo
January 2, 2019 City Council Meeting
CONSENT AGENDA
F. Approve Change Order #6 for Project 18-06, Police Department and City Hall Renovation
Action to Be Considered:
Approve change order #6 for Project 18-06, Police Department and City Hall Renovation
Facts:
Contract 18-06 provides for the renovation of the Police Department and City Hall
facilities, including remodeled office space, building additions, a training room, and a
new parking garage for Police squad cars.
On March 20, 2018, the City Council awarded the base bid and alternates to Ebert
Construction.
The cost of the change order is $59,975.72. The most significant change relates to the
rerouting of the storm drainage system under the new lobby addition. The other specific
changes are noted in the attached letter from Wold Architects.
The cost of the additional work is consistent with bid prices received for relevant bid
items on other projects within the city and region.
The cost of the additional work under the change order will be the responsibility of the
project contingency fund.
Given the change orders associated with the first phase of the project were greater than
anticipated, the total project budget is being reviewed to ensure adequate contingency
dollars will be available for the remaining phase of work start ing next spring.
The change order has been reviewed by Wold Architects and the City’s project
leadership team, and found to be in order for favorable Council action.
Attachments:
CF-1 Wold Architects, Summary of Change Order
January 2, 2019
Dianne Miller, Assistant City Administrator
City of Eagan
3830 Pilot Knob Road
Eagan, Minnesota 55122
Re: City of Eagan
City Hall and Police Department Facility Remodel and Addition
Commission No. 172086
Dear Dianne:
We have concluded our review of various contract changes for the additions and renovation of the
City Hall and Police Facility and the following recommendations represents a fair value for the
work. This change order includes the following items:
PR #33
During coordination of the detention area, the hardware sets
were adjusted to be the same system as the rest of the doors per
Owner request. This cost represents the changes in the hardware
and electrical connections for those doors.
Add $ 4,133.41
PR 40.1 During demolition, the portion of the curtain wall in the upper
level Police Department that was previously covered by a
gypsum board wall had a film on the window that did not allow
light through. This cost represents the replacement of that glass
in order to provide vision glass in that office.
Add $ 4,066.00
PR #45
This is a credit for the adjustment from v-scored concrete block to
standard style.
Deduct ($1,200.00)
PR #46
During the construction of the new entry addition of the City
Hall, a storm sewer that was uncovered. This cost represents the
time and material cost to re-route the drain to avoid conflict with
the new addition.
Add $29,106.39
PR #51
During construction coordination, the window openings on the
upper level of the Police Department were adjusted. This credit is
represents the decrease in need for demolition, temporary
structural support, and labor.
Deduct ($3,434.70)
PR #60
Due to the existing mechanical systems near the evidence area, it
was decided that a gypsum board wall above the pass through
lockers would provide the most secure solution due to its
flexibility around duct work in comparison to concrete block
walls. This credit represents the substitution of materials.
Deduct ($1,435.00)
PR #61
During construction, floor openings needed supplementary
reinforcement. Part of this cost represents this added structural
component. Additionally, the structural connection between the
existing building and the SWAT garage needed to be modified.
This is also represented in this overall cost.
Add $10,592.85
PR #68
PR #68.1
Per Owner request, the door to the case management room was
relocated. There was also a small gypsum board wall added
behind casework between the Police building and the new garage
to maintain its separation. This cost represents these adjustments.
Add $ 823.90
$ 481.50
Letter to Dianne Miller
Page 2
PR #70
Per Owner request, additional phone jacks were added to the
scope of the project. This cost reflects that change.
Add $1,315.03
PR #74
Minor adjustments to the grading and curb style at the southeast
corner of the Police building due to the elevation of the catch
basin. This cost represents this change.
Add $2,780.04
PR #78
During construction, there were electrical connections that
needed to be adjusted due to the relocation of some equipment
and coordination of furniture placement. This cost is for those
changes.
Add $2,620.38
PR #82
Per Owner request, additional outlets were added to the pass
through lockers between Intake and Computer Forensics to
increase receptacles for power to electronics waiting to be
processed.
Add $ 268.30
PR #83
An existing penetration in the mechanical yard in the upper level
of the Police Department was no longer required and needed to
be capped. This cost represents the additional steel required for
capping.
Add $2,687.31
RFI 169
When the storage room off the multipurpose room was changed
to be a kitchenette, condensate pipe needed to be relocated out of
this area. This cost is for this relocation.
Add $2,074.97
RFI 173
The steel plates that serve as the structural connection between
the new and existing building needed to be enlarged to fit around
the existing precast plank. This represents the cost for this
adjustment.
Add $4,265.02
RFI 174
Due to existing conditions, a column baseplate needed to be
modified in order to properly connect to the structural grade
beam. This cost reflects this modification.
Add $ 830.32
Total Change Order No. 6 $59,975.72
Once approved by City Council, please have all three Change Orders signed and returned to my
attention. If you have any questions, please do not hesitate to call.
Sincerely,
Wold Architects and Engineers
John McNamara | AIA, LEED AP
Partner
cc: Melissa Stein, Wold
Amanda Marcott, Wold
MV/CI_Eagan/172086/crsp/jan19
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
G.Authorize submittal of FY 2019 Community Development Block Grant (CDBG)
Application
Action To Be Considered:
To authorize submittal of the City’s FY 2019 Community Development Block Grant (CDBG)
Application and adopt a Resolution approving the funding application request.
Facts:
The US Department of Housing and Urban Development (HUD) provides block grant
funding for programs that conform to national objectives and for eligible activities that
meet Community Development Block Grant (CDBG) Program regulations.
The City of Eagan’s CDBG allocation is administered through a subrecipient agreement
with the Dakota County CDA. The coordination of the program by the CDA permits cities
within the County to focus on eligible activities unique to their situations and the CDA is
able to balance the activities countywide to ensure that the overall County allocation
meets all HUD eligibility requirements.
The CDBG fiscal year begins July 1. The application deadline to the CDA for local
governments is January 18, 2019. A resolution adopted by the City Council is required to
finalize the application.
Estimated allocations are rebalanced yearly by the previous year’s allocation and
population changes. The Dakota County CDA estimates Eagan’s allocation for 2019 to be
$212,579. Final allocations will not be known until Federal budgets are approved.
Proposed Program Funding:
Housing Rehabilitation:
The CDA administers a County-wide housing rehabilitation program that assists income
qualified households with eligible housing upgrades. Funding for this program comes
from two sources – a base amount allocated by the CDA and additional funds designated
from CDBG allocations of the individual cities.
City staff suggests continuing to fund this program for FY 2019 with approximately 83.5%
of Eagan’s funding allotment. However, any increases or reductions as a result of final
federal appropriations are anticipated to impact this activity.
Public Service Programs:
The Eagan Parks and Recreation Department is proposing a budget of $35,000, equal to
what has been proposed in previous years, to fund successful Public Service programs that
serve seniors and youth. These programs include:
o Youth and after school programming at Dakota and Blackhawk Middle Schools
o Homeless youth programming held at Dakota Woodlands Homeless shelter
o Pre-school programming at Eagan facilities
o Senior service and enrichment activities held at various senior centers and
municipal buildings.
A more detailed description of each Public Service program and proposed funding
allocation is attached.
A proposed budget for all requested programs is attached along with previous years
funding allocations.
Attachments: (3)
CG-1 Proposed FY 2019 CDBG application budget
CG-2 Public Service Programming Proposal FY2019
CG-3 Resolution Authorizing FY 2019 Application
City of Eagan
2019 Proposed Community Development Block Grant Fund Budget
Activity Budget '16 Budget '17 Budget '18
Proposed
Budget '19
Housing Rehabilitation $148,077 $160,310 $163,397 $177,579
Weatherization Plus*$5,000
Youth and Family Development Services
After school programs $18,000 $18,000 $18,000 $22,000
Homeless youth programming $4,000 $4,000 $4,000 $5,500
Senior services*$10,500 $10,500 $10,500 $2,000
Preschool programming $2,500 $2,500 $2,500 $5,500
Total $188,077 $195,310 $198,397 $212,579
$35,000 % of Total 16.5%
*note: remaing Weatherization Plus pilot program
funding was shifted into Housing Rehabilitation by the
CDA and program terminated
Public Service
Activities
Total Public Service Activities (should not exceed 18% of total
budget)
CDBG Public Service Programming 2019/20
Youth After School Programming
CDBG funds will be used to support 200 youth in afterschool and summer programs held at Dakota Hills
Middle School and Blackhawk Middle School located in the City of Eagan.
55 % of the student participants will be eligible for funding based on income levels per the self-
certification document (meeting CDBG Low/Mod Household Income requirements).
These programs will be co-developed by the City of Eagan Recreation Supervisor, Independent School
District 196’s (ISD 196) Dakota Hills Middle School and Blackhawk Middle School staff and with student
stakeholders. Coordination will be the sole responsibility of the City of Eagan Recreation Supervisor and
City Staff. Program staffing will be a combination of ISD 196 and Eagan Parks and Recreation employees.
Specialty instructors will also be added to programs specific to each session’s focus.
The recreation based program will include activities such as sports, games, art, dance, science, video
production, homework help, leadership development, field trips, etc. targeting youth who are
underserved and/or disenfranchised from school and community. The goal of the program is to engage
youth in activities that will improve their connection to school and community in a safe learning
environment. In addition, the youth will be taught by both adult and teens who will serve as
appropriate role models encouraging healthy youth development.
Transportation home is also provided for participants and for all field trips.
Budget
Itemized Use of Funds/Expenses Costs
CDBG
Funds
Requested
2015
Spend
Down
Funds
Program
Revenue
Funds
Staff wages for 40 weeks of afterschool and
summer programming
$16,600
$8,400
$5,000
$3,200
School District contractual salaries for 5
weeks of programming
$1,200
$1,200
Independent contractors
$800
$800
Admission Fees for participants
$600
$600
Recreation equipment and supplies
$1,500
$1,500
Transportation for participants $9,500 $9,500
Total
30,2000
$22,000
$5,000
$3,200
Homeless Youth Programming
CDBG funds will be used to support a year round recreation program for 150 children, two (2) years of
age through seventeen (17) years of age. The year round program will be held at Dakota Woodlands
homeless shelter in Eagan, Minnesota. One hundred per cent of the children participating in the
program will be current residents of the homeless shelter (meeting CDBG Low/Mod Household Income
requirements).
The goal of the program is to offer recreational opportunities for children to help develop physical and
social skills in a safe environment. Activities of the program will be developed by City of Eagan and
Dakota Woodlands staff. Led by City of Eagan staff and specialty instructors, activities will include art,
fitness, sports and games and field trips.
Budget
Seniors Services
The City of Eagan provides programming for a growing senior population within the City. The program
goal is to help provide opportunities that focuses on keeping the senior population active, challenged,
connected and independent. Program activities focus on health and wellness such Tai Chi
Strength/Balance/Yoga, Fit for Life, watercolor painting, nutrition, and personal development and
lifelong learning classes.
In addition, the programs help to meet the needs of working seniors by offering program times outside
the Monday through Friday 9:00 -5:00 p.m., and outreaches to participants living in senior living
facilities. Current programs locations include facilities within the City of Eagan Municipal Buildings, three
senior housing complexes and other rental spaces in the City of Eagan. Presently, the senior housing
facilities sites include; O’Leary Manor Senior Housing and Gramercy Park Cooperative and Stonehaven
with plans to extend to two new facilities in the City of Eagan.
These supportive and enriching programs have become very popular and are in high demand. Although
the program activities have become more reliant on fee revenue, the City is requesting CDBG funds to
continue to keep the programs accessible for seniors.
Itemized Use of
Funds/Expenses Costs CDBG Funds
Requested
2015 Spend
Down Funds
Other Funding
Sources
Staff wages $5,200 $3,200 $2,000
Independent contractors $500 $500
Admission fees $550 $550
Transportation $600 $600
Recreation equipment and
supplies $650 $650
Total: $7,500 $5,500 $2,000
Budget
Pre-School Programming
The program funding is designed to defray preschool costs to 6 underserved families with 2-5 year olds.
Eligibility requirements will be verified with the same self-certification used in the after school
programming. The program is run and administered year-round through the Eagan Parks and Recreation
Department in City of Eagan facilities.
Budget
Itemized Use of
Funds/Expenses Costs CDBG Funds
Requested
2015
Spend Down
Funds
Program
Revenue
Funds
Seasonal Staff Salaries $35,750 6,000 $29,750
Building Rental $13,000 2,000 $11,000
Recreation equipment and
supplies $2,500 $2,500
Total: $51,250 $2,000 $6,000 $43,250
Itemized Use of
Funds/Expenses Costs CDBG Funds
Requested
2015
Spend Down
Funds
Program
Revenue
Funds
Seasonal Staff Salaries $32,554 $5,500 $27,054
Building Rental $3,547 $3,547
Recreation equipment and
supplies $1,820 $1,820
Total: $37,921 $5,500 $32,421
RESOLUTION NO. _________
CITY OF EAGAN
A RESOLUTION APPROVING THE APPLICATION
FOR FISCAL YEAR 2019 DAKOTA COUNTY COMMUNITY DEVELOPMENT BLOCK
GRANT FUNDING
WHEREAS, the City of Eagan is a participating jurisdiction with the Dakota County Community
Development Block Grant (CDBG) Entitlement Program for Fiscal Year 2019 (ending June 30, 2020);
and
WHEREAS, the Dakota County Community Development Agency (CDA) is a Subgrantee of
Dakota County for the administration of the CDBG Program; and
WHEREAS, the Dakota County CDA has requested Fiscal Year 2019 CDBG applications be
submitted by January 18, 2019, based on an allocation of funds approved in the Annual Action Plan.
NOW, THEREFORE, BE IT RESOLVED that the City of Eagan hereby approves the following:
1. The Fiscal Year 2019 CDBG application is approved for submission to the Dakota County CDA.
2. The City Administrator for the City is authorized to execute the application and all agreements
and documents related to receiving and using the awarded CDBG funds.
3. The Dakota County CDA is designated as the administrative entity to carry out the CDBG
program on behalf o the City/Township, subject to future Subrecipient Agreements that may be
required for specific CDBG-funded activities.
Motion by:
Second by:
Those in Favor:
Those Against:
CERTIFICATION
I, Mike Maguire, Mayor and Christina M. Scipioni, City Clerk, City of Eagan, Dakota County,
Minnesota, do hereby certify that the foregoing resolution was duly passed and adopted by the Eagan
City Council in a regular meeting thereof assembled this 2nd day of January, 2019.
______________________________
Mike Maguire, Mayor
______________________________
Christina M. Scipioni, City Clerk
Agenda Information Memo
January 2, 2019, Eagan City Council Meeting
CONSENT AGENDA
H. Approve On-Sale Liquor and Sunday License for Cielito Lindo Restaurant, LLP
doing business as Cielito Lindo, 1981 Silver Bell Road, Suite 1200
Action To Be Considered:
To approve an On-Sale Liquor and Sunday License for Cielito Lindo Restaurant, LLP doing
business as Cielito Lindo, located at 1891 Silver Bell Road, Suite 1200.
Facts:
Eloy Bravo, owner of Cielito Lindo Restaurant, LLP, has applied for an On-Sale
Liquor and Sunday License for his restaurant located at 1891 Silver Bell Road,
Suite 1200. The establishment currently holds an On-Sale Liquor License under
its previous name, Cosmos Diner, LLC.
All required documents have been submitted, reviewed and deemed in order by
City staff and the Police Department.
Attachments: (0)
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
I. Project 1307, Lone Oak Circle
Street Improvements
Action To Be Considered:
Receive the Draft Feasibility Report for Project 1307 (Lone Oak Circle - Street
Improvements) and schedule a public hearing to be held on February 5, 2019.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of Lone Oak Circle, a commercial-industrial cul-de-sac
street in northern Eagan located north of Lone Oak Road and east of Lexington
Avenue.
A structural mill and overlay of these streets is programmed for 2019 in the City of
Eagan’s 5-Year CIP (2019-2023).
A draft Feasibility Report has been prepared and is being present ed to the Council
for their consideration of scheduling a public hearing for Tuesday, February 5, 2019.
An informational neighborhood meeting will be held with the adjacent property
owners prior to the formal public hearing to review and discuss the propos ed
improvements.
Attachments (1)
CI-1 Draft Feasibility Report
F
Report for
Lone Oak Circle
Commercial Street Revitalization
City Project No. 1307
January 2, 2019
%b
EAGAN
F
Report for
Lone Oak Circle
Commercial Street Revitalization
City Project No. 1307
January 2, 2019
%b
* + , ,EAGAN
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Jan. 2, 2019
Re: Lone Oak Circle Street Revitalization
City Project No.: 1307
Attached is the feasibility report for the Lone Oak Circle Street Revitalization, City Project No.
1307. The report presents and discusses the proposed improvements and includes a cost
estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Aaron Nelson
Date: Reg. No. 45795
Reviewed By:
Department of Public Works Date:
Reviewed By:
Finance Department Date:
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Jan. 2, 2019
Re: Lone Oak Circle Street Revitalization
City Project No.: 1307
Attached is the feasibility report for the Lone Oak Circle Street Revitalization, City Project No.
1307. The report presents and discusses the proposed improvements and includes a cost
estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Aaron Nelson
Date: Reg. No. 45795
Reviewed By:
Department of Public Works Date:
Reviewed By:
Finance Department Date:
TABLE OF CONTENTS
ExecutiveSummary..................................................................................................... 1
Introduction/History.......................................................................................................2
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
Street Pavement Evaluation.........................................................................................3
Proposed Improvements..............................................................................................4
Easements/Perm its......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................6
Assessments................................................................................................................7
AssessmentFinancing Options.....................................................................................8
RevenueSource...........................................................................................................8
ProjectSchedule..........................................................................................................9
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
2 Street Improvement/Assessment Area Map
3 Typical Section — Mill & Overlay
Executive Summary
Background
Project Name
Lone Oak Circle
Project #
1307
Street Area
7,154 Sq. Yds.
Street Length
1,288 Feet
Streets Included
I
Lone Oak Circle
Constructed
1969, 1999
Reconstructed 2000
Crack Sealed
-
Seal Coated
2005, 2012
Absolute Location
S % of Section 2
Township 27, Range 23
Relative Location
East of Lexington Avenue
North of Lone Oak Road
Project Details
• Roadway resurfacing (Full width mill &
PCI Rating
39/100
2" overlay)
Recommended
Resurfacing•
Replacement of damaged curb & gutters
Improvement
$ 26,800
• Adjustment/Replacement of:
Curb Removal
14%
Scope o Sanitary/Storm sewer
-
$ 8,000
Total $ 169,700
$ 111,526 (66%)
o Utility castings
o Watergate valves
o Street signage
Commercial Lots
11
• Replacement of damaged commercial
driveway entrances
Cost Estimate/ Revenue
Lone Oak Circle
1
Property
City
Mill & Overlay w/ Signage $ 116,100
$ 92,726
$ 23,374
Repair Existing Concrete Curb & Gutter $ 26,800
-
$ 26,800
Driveway Entrance Repairs $ 18,800
I $ 18,800
-
Utility Improvements $ 8,000
-
$ 8,000
Total $ 169,700
$ 111,526 (66%)
$ 58,174 (34%)
Lone Oak Circle
1
Jan. 2, 2019
Neighborhood Street Revitalization
Lone Oak Circle
Eagan, Minnesota
Introduction/ History
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 1,288 feet of commercial roadway in the Lone Oak Circle area in North-Eastern Eagan has
been identified for 2019 street revitalization improvements. Figure 1, located in Appendix C,
illustrates the project location. The northern 488' of street was originally constructed in 1969
and overlayed in 2000. The southern section of street was constructed in 1999.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the road located within the project area, which is currently in the 19 to 20 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the street was seal coated in 2005 and 2012.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Lone Oak Circle
2
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scope
This project will provide resurfacing (full width mill and overlay) for approximately 1,288 feet of
roadway. Figure 2 in Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves, utility improvements, concrete driveway apron repairs, and replacement of street
signage.
Area to Be Included
Properties included in the project lie within the S % of Section 2, lying East of Lexington Avenue,
North of Lone Oak Road, in Township 27, Range 23, in the City of Eagan, Dakota County,
Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI
Recommended Improvement
56-100
Routine Maintenance/Crack Seal/Seal Coat
36-55
Patch/Repair and/or Overlay
0-35
Reconstruct/ Reclaim
The 2018 PCI rankings for the street segments have a weighted average pavement condition
rating of 39, which falls in the "Patch/Repair and/or Overlay" category, as mentioned above.
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
Lone Oak Circle
3
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Proposed Improvements
Pavement - The proposed street
improvements shown in Figure 3. The
existing street section for this roadway
consists of 4-1/2" bituminous pavement
supported by 24" gravel base. The
entire existing bituminous surface will
be milled to accommodate a 2 -inch
bituminous overlay. The overlay,
combined with the existing street
section, will provide a street section
consistent with current City standards
for commercial streets. The
combination of patching and overlay
will not eliminate cracking due to the
temperature extremes experienced in Minnesota. Bituminous overlays will show some
continued frost movements and reflective cracking consistent with the underlying pavement.
Routine maintenance will still need to continue under the City's Pavement Management
Program.
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalled, or settled. It is estimated that
approximately 14% of the existing concrete
curb and gutter will have to be replaced.
Boulevard turf will be removed and replaced
with seed. While the contractor who performs
the work is responsible for its establishment
(45 days for seed), adjacent property owners
are encouraged to consistently water the new
turf, where possible, to help ensure its growth.
Utility Adjustment/Replacement — Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
ensure quick and easy access by the City for maintenance and other purposes. There are a few
manhole structures that require new castings and doghouse repairs due to deterioration.
These manholes will be financed through the Combined Utility Fund.
Lone Oak Circle
4
Driveway Replacement — Many of the adjacent properties have concrete driveway aprons that
are in disrepair, and are proposed to be repaired/replaced. The entrances will be reconstructed
with 8" -thick concrete aprons in accordance with Eagan Standard Detail 440. These
replacements will provide commercial entrances of adequate strength and width, and will be
consistent with similar projects in commercial/industrial areas within the project area and
throughout the City.
Signage - Traffic and street identification signage within the project
limits have reached the end of their useful life expectancy and are in
need of replacement. Signs have been reviewed for compliance
with the Minnesota Manual on Uniform Traffic Control Devices
(MnMUTCD). Those that are required by the MnMUTCD will be
replaced to improve safety and night time visibility, and those that
are not will be permanently removed.
Street Lights — The street lights in the project area (maintained by Xcel Energy) are in good
condition and provide adequate coverage. No modifications to the existing street lights are
proposed.
Complete Streets — "Complete Streets" is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
Lone Oak Circle
5
The streets in this commercial were reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The streets are generally 44' wide and are primarily
intended for commercial/industrial and truck traffic. There is a trail located along Lone Oak
Road that connects pedestrians to the City and regional trail system. Pedestrian curb ramps in
the project area at the intersecting sidewalks will be replaced if necessary to meet current ADA
design standards. Given the existing and proposed elements available for all users, the streets
in this area meet the intent of the complete streets guidelines.
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that a right-of-way permit from Dakota County will be required to perform the work
within the Lone Oak Road right-of-way.
Feasibility and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement (resurfacing) is considerably less
expensive than complete reconstruction of this street. The mill and overlay is feasible in that
this type of improvement has been used successfully to extend the life expectancy of numerous
other streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 — 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Cost Estimate
Detailed cost estimates are located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 30%, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Lone Oak Circle
• Mill & Overlay........................................................................ $ 116,100
• Repair Existing Concrete Curb & Gutter ................................ $ 26,800
• Commercial Driveway Repairs ............................................... $ 18,800
• Utility Improvements............................................................. 8,000
Total........................................................................... $ 169,700
Lone Oak Circle
6
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for commercial roadways. All assessments will be
revised based on final costs. A preliminary assessment roll is included in Appendix B.
City Special Assessment Policy
Mill & Overlay—Commercial & Industrial
Repair Existing Concrete Curb & Gutter
Commercial Driveway Repairs
Utility Improvements
Assessment Ratio
Property City
100% -
- 100%
100% -
100%
Commercial/Industrial Parcels — All commercial/industrial properties (11 total) as shown on
Figure 2, adjacent to, or having access on to the street to be improved, are proposed to be
assessed. The City's Assessment Policy states that 100% of the mill and overlay costs are
assessable for commercial roadways, regardless of width. The estimated cost per net acre,
based on the City's Assessment Policy, is $1,385/ net acre and is calculated as follows:
• Total Front Feet (F.F.) = 2,576 F.F.
• Total Net Acreage = 66.95 acres
• C/I Streets = 2,093 F.F., 44' f -f width
• An early deterioration credit (5% per year) is proposed for the northern 488' (976 F.F.)
of Lone Oak Circle because the pavement condition has deteriorated prior to the
anticipated 20 -year pavement life cycle (1/20=5%).
o 976 F.F. (488'x2) of Lone Oak Circle deteriorated 1 year before its 20 year life
expectancy.
o The early deterioration adjustment factor for the area is (976 F.F. x 1/20) /
2,576 F.F.' = 1.9%
o 100% - 1.9% = 98.1%.
Mill & Overlay — (C/1)
o 2,093' C/I Frontage / 2,576' Total Frontage = 81.3% C/I Frontage
o $116,100 (Mill & Overlay Costs) x 100% (Assessment Rate) x 81.3% (C/I frontage)
x 98.1% (Early Deterioration) = $92,596
o $92,596 / 66.95 net acres = $1,383.06, rounded to $1,385 / net acre (C/1)
The remaining frontage within the project area (483' or 18.7%) is considered non- assessable
under the City's Assessment Policy.
Lone Oak Circle
7
Driveway Entrance Replacement — Several properties have driveway entrances with damaged
concrete driveway apron sections that will be repaired. Properties are proposed to be assessed
for the total cost of repairs. The estimated cost of driveway repairs is approximately $18,800
or $160/ SY and is calculated as follows:
Total area of concrete driveway apron repair = 117.5 SY
Total concrete driveway apron cost = $18,800
• Total cost/SY = $160.00, rounded to $160/ SY
Assessment Financing Options
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over ten
years for Commercial/Industrial owners. In 2018, the interest rate was set at 4.5%. The 2019
rate is not yet available, however, it is expected to be comparable and based on City policy will
be determined by the City Council in the spring. The following payment schedule is an example
of a commercial/industrial assessment for every $1,000 assessed, with an estimated 4.5%
interest for the assessed amounts, and assumes 14 months interest for the first year:
Per $1,000 assessed:
Principal / Year Interest / Year Cost / Year
11t Year I $100 I $53 ! $153
loth Year $100 $5 $105
Bonds may be issued to finance the improvements.
Revenue Source
A summary of revenue sources is listed below:
The Major Street Fund will finance the estimated street related project deficit of $50,174.
The Combined Utility Fund will finance the estimated $8,000 utility improvements.
Lone Oak Circle
8
Project Cost
' Property Assessment
City Contribution
Mill and Overlay (Including Signage)
$ 116,100
$ 92,726
$ 23,374 1
Repair Existing Curb & Gutter
$ 26,800
-
$ 26,800
Driveway Apron Repairs
$ 18,800
$ 18,800
-
Utility Improvements
$ 8,000
-
$ 8,000
Totals
$ 169,700
$ 111,526
$ 58,174
The Major Street Fund will finance the estimated street related project deficit of $50,174.
The Combined Utility Fund will finance the estimated $8,000 utility improvements.
Lone Oak Circle
8
Project Schedule
Present Feasibility Report to City Council/
OrderPublic Hearing.......................................................................................... Jan. 2, 2019
Informational Meeting.....................................................................................
Jan. 28, 2019
PublicHearing....................................................................................................Feb.
5, 2019
Approve Plans and Specifications....................................................................Feb.
19, 2019
BidDate........................................................................................................
March 28, 2019
AwardContract.................................................................................................April
2, 2019
StartConstruction.............................................................................................
May 1, 2019
ProjectCompletion..........................................................................................
August, 2019
Final Cost Report........................................................................................September,
2019
Final Assessment Hearing......................................................................................Fall,
2019
First Payment Due with Property Tax Statement
........................................... May 15, 2020
Lone Oak Circle
9
Appendix A
Preliminary Cost Estimate
City Project 1307 Lone Oak Circle
Item No. Item Unit Unit Price Qty Estimated Cost
Part I - Bituminous Street Overlay
2021.501
Mobilization
2104.505
Remove Bituminous Pavement
2232.501
Mill Bituminous Pavement- Full Width (1-1/4" Depth)
2357.502
Bituminous Material for Tack Coat
2360.501
SP WEA340B Wearing Course Mixture (Overlay)
2360.501
SP WEA340B Wearing Course Mixture (Patch)
2504.602
Adjust Gate Valve Box
2504.602
Repair Gate Valve Mid Section
2504.602
Repair Gate Valve Top Section w/Cover
2506.602
Adjust Frame and Ring Casting (Manhole)
2563.601
Traffic Control
SP -1
Signage Remove and Replace
Subtotal
5% Contingency
Subtotal
30% Indirect Costs
Part I - Bituminous Street Overlay
LS
$
6,000.00
1
$
6,000.00
SY
$
6.00
178
$
1,068.00
SY
$
2.00
7154
$
14,308.00
GAL
$
2.75
465
$
1,278.75
TON
$
52.00
886
$
46,072.00
TON
$
100.00
54
$
5,400.00
EA
$
250.00
3
$
750.00
EA
$
500.00
1
$
500.00
EA
$
425.00
1
$
425.00
EA
$
700.00
7
$
4,900.00
LS
$
4,000.00
1
$
4,000.00
LS
$
325.00
1
$
325.00
$ 85,026.75
$ 4,251.34
$ 89,278.09
$ 26,783.43
$ 116,061.51
Item No. Item Unit Unit Price Qst Estimated Cost
Part II - Repair Existing Curb & Gutter
2104.501
Remove Concrete Curb and Gutter
LF
$
10.00
420
$
4,200.00
2104.505
Remove Concrete Driveway /Valley Gutter
SY
$
14.00
8
$
112.00
2211.501
Aggregate Base, CI.5 (100% Crushed)
TON
$
25.00
10
$
250.00
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
16
$
1,600.00
2504.602
Irrigation Repair
EA
$
160.00
2
$
320.00
2506.602
Adjust Frame & Ring Casting (CB) HDPE Rings
EA
$
550.00
6
$
3,300.00
2506.602
Remove & Replace Casting 3067V (Catch Basin)
EA
$
900.00
2
$
1,800.00
2506.602
Repair/ Grout CB or MH Invert/ Doghouses
EA
$
400.00
2
$
800.00
2506.602
Install 2 x 3 CB Erosion Barrier Shroud
EA
$
150.00
2
$
300.00
2531.501
Concrete Curb and Gutter, B618
LF
$
23.00
420
$
9,660.00
2531.507
Concrete Valley Gutter - High Early
SY
$
75.00
4
$
300.00
2531.507
Repair 8" Concrete Driveway Pavement - High Early
SY
$
85.00
8
$
680.00
2540.602
Repair Landscaping
EA
$
200.00
1
$
200.00
2572.503
Application of Water for Turf Establishment
GAL
$
0.15
3150
$
472.50
2573.530
Storm Drain Inlet Protection
EA
$
175.00
2
$
350.00
2575.550
Boulevard Topsoil Borrow - MnDOT 3877-2F
CY
$
80.00
8
$
640.00
2575.609
Seeding (MnDOT 270 w/Type 5 Hydromulch)
SY
$
7.50
70
$
525.00
Subtotal $ 25,509.50
5% Contingency
Subtotal
30% Indirect Costs
Part II - Repair Existing Curb & Gutter
Lone Oak Circle
10
$ 1,275.48
$ 26,784.98
$ 8,035.49
$ 34,820.47
Item No. Item i Unit Unit Price Es
{ Estimated Cost
y I i
Part III - Concrete Entrance Replacement
$ 18,788.20
Part I - Bituminous Street Overlay
$ 116,061.51
Part II - Repair Existing Curb & Gutter
$ 34,820.47
Part III - Concrete Entrance Replacement
2104.505 Remove Concrete Driveway/Valley Gutter
SY
$
14.00
118
$
1,652.00
2105.501 Common Excavation
CY
$
35.00
8
$
280.00
2211.501 Aggregate Base, Cl. 5 (100% Crushed)
TON
$
25.00
8
$
200.00
2360.501 SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
12
$
1,200.00
2531.507 Repair 8" Concrete Driveway Pavement - High Early
SY
$
85.00
118
$
10,030.00
2575.535 Water for Turf Establishment
GAL
$
0.15
765
$
114.75
2575.550 BoulevardTopsoiIBorrow—Mn DOT 3877-2F
TON
$
80.00
2
$
160.00
2575.604 Seeding (MnDOT 270 w/Type 5 Hydromulch)
SY
$
7.50
17
$
127.50
Subtotal
$
13,764.25
5% Contingency
$
688.21
Subtotal
$
14,452.46
30% Indirect Costs
$
4,335.74
Part III - Concrete Entrance Replacement
$ 18,788.20
Part I - Bituminous Street Overlay
$ 116,061.51
Part II - Repair Existing Curb & Gutter
$ 34,820.47
Part III - Concrete Entrance Replacement
$ 18,788.20
Project 1307 Total Cost
$ 169,670.18
Lone Oak Circle
11
Appendix B
Preliminary Assessment Roll
City Project # 1307 Lone Oak Circle
"* net acreage credit for ponding
easement
Total Assessments 70.71 1 66.95 0.00 $ 92,726 1 117.50 $ 18,800 $111,526
C/1 Frontage 2093 81.3%
Non -Assessable
Frontage 483 18.7%
Total Frontage 2576 100%
Lone Oak Circle
12
Lone Oak Circle
Industrial
P.I.N.
Gross Net
i Acreage Acreage
Unit
Assessment
Total Street
Assessment i
Concrete
Entrance
Area (SY)
Concrete
Entrance
Assessment
($160/SY)
Total
Assessment
2950 Lone Oak Cir*
102250100041
23.66
19.90
$ 1,385
$ 27,562
38.0
$6,080
$ 33,642
2980 Lone Oak Cir
102250100021
0.69
0.69
$ 1,385
$ 956
22.0
$3,520
$ 4,476
2926 Lone Oak Cir
102250100050
16.00
16.00
$ 1,385
$ 22,160
6.5
$1,040
! $ 23,200
part of 2926 Lone
Oak Cir
102250100064
1.89
1.89
$ 1,385
$ 2,618
$ 2,618
2929 Lone Oak Cir '
102250100066
7.91
7.91
$ 1,385
$ 10,955
27.0
$4,320
$ 15,275
2955 Lone Oak Cir
102250100080
4.91
4.91
$ 1,385
$ 6,800
4.0
$640
$ 7,440
2965 Lone Oak Cir
101460001010
2.50
2.50
$ 1,385
$ 3,463
$ 3,463
2975 Lone Oak Cir
101460001020
2.52
2.52
$ 1,385
$ 3,490
13.8
$2,200
$ 5,690
2985 Lone Oak Cir
102251001020
1.70
1.70
$ 1,385
$ 2,355
$ 2,355
2995 Lone Oak Cir
102251001011
3.44
3.44
$ 1,385
$ 4,764
6.3
$1,000
$ 5,764
2995 Lone Oak Cir
102251001012
5.49
5.49
$ 1,385
$ 7,604
$7,604
Subtotal
70.71
66.95
$ 92,726
117.5
$ 18,800
$111,526
"* net acreage credit for ponding
easement
Total Assessments 70.71 1 66.95 0.00 $ 92,726 1 117.50 $ 18,800 $111,526
C/1 Frontage 2093 81.3%
Non -Assessable
Frontage 483 18.7%
Total Frontage 2576 100%
Lone Oak Circle
12
2019 Street Revitalization - Project 1307
Lone Oak Circle
�. 1-494
NI Q MFNDOTA HEIGHTS
i of
V o•�,u i,
Lone Oak Circle
Project 1307
`"e l
p00
' 4
Lone O k Rd (Co Od: +E) Fl __ AJ.-
,'� .e✓`
�.��� a o.+f •M..e i°3y � �a,.r ��_� � `TS v.... .,.z._. ,. � J .�s
Yny"9 �d1e wooU Parkway
f/
r°
28 ODL RD Yankkee DD000dle �2d (Co Rd 28), 28 w
T�owng entero 1d R° ,„o. !— 6 ;2
❑ kw- d Dr14
3 � g ti
Bteak4s� ��� � _�
alvei Bell R $`� l..✓ °' �- y11,�xoll Road
f M.
a: HWd
0\1.,a..�\ ew Park �®'Rd,
frthh
e
1;:J^
li�. , � aa✓.F 6.�s g F i I 6 c M. � V6 � i � � r.
DiffleiR Jai",
-
m Lew
T r
R rr.<
d r
Document Path: L:\USERSIPUBWORKSIEngineeringlProjects12019 Street Improvements/? 307 -Lone Oak Circle\1307 Location.mxd Date: 12/12/2018
FIG 1
2019 Street Revitalization - Project 1307
p Lone Oak Circle
Document Path: L:IUSERSIPUBWORKS1Engineering\Projects12019 Street Improvements11307- Lone Oak Cirde113C7.mxd Date: 12/20/2018
FIG 2
2019 Street Revitalization - Project 1307
Lone Oak Circle
Typical Street Sections
60' ROW
44' F -F
LPAVEMENT SECTION
4.5" BASE COURSE
6" CLASS 5 AGG BASE
18" AGGREGATE SUB -BASE
EXIST. TYPICAL SECTION
LONE OAK CIRCLE
60' ROW
44' F -F
1.75" FULL WIDTH MILL 2"TYPE 2360 BITUMINOUS OVERLAY
T
BITUMINOUS TACK COAT
4.5" BITUMINOUS SURFACE
6" CLASS 5 AGG BASE
18" COMPACTED SUB -BASE
PROPOSED TYPICAL SECTION
LONE OAK CIRCLE
Document Path: L:\USERS\PUBWORKS\Engineering\Projects\2019 Street Improvements\1307 - Lone Oak Circle\1307 Fig 3.mxd
B618 CONCRETE
CURB AND GUTTER
8618 CONCRETE
CURB AND GUTTER
Date: 12/26/2018
FIG 3
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
J. Project 1308, Poppler Lane
Street Improvements
Action To Be Considered:
Receive the Draft Feasibility Report for Project 1308 (Poppler Lane - Street
Improvements) and schedule a public hearing to be held on February 5, 2019.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of Poppler Lane, a residential cul-de-sac in northern
Eagan located south of Lone Oak Road and east of Pilot Knob Road.
A structural mill and overlay of these streets is programmed for 2019 in the City of
Eagan’s 5-Year CIP (2019-2023).
A draft Feasibility Report has been prepared and is being presented to the Council
for their consideration of scheduling a public hearing for Tuesday, February 5, 2019.
An informational neighborhood meeting will be held with the adjacent property
owners prior to the formal public hearing to review and discuss the proposed
improvements.
Attachments (1)
CJ-1 Draft Feasibility Report
EAGAN
Report for
p
Poppler lane
Neighborhood Street Revitalization
City Project No. 1308
January 2, 2019
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Jan. 2, 2019
Re: Poppler Lane Street Revitalization
City Project No.: 1308
Attached is the feasibility report for the Poppler Lane Street Revitalization, City Project No.
1308. The report presents and discusses the proposed improvements and includes a cost
estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Date:
Reviewed By:
Department of Public Works Date:
Reviewed By:
Finance Department Date:
ron Nelson
Reg. No. 45795
TABLE OF CONTENTS
ExecutiveSummary..................................................................................................... 1
Introduction/History.......................................................................................................2
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
StreetPavement Evaluation.........................................................................................3
Proposed Improvements..............................................................................................4
Easements/Permits......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................6
Assessments................................................................................................................6
Assessment Financing Options.....................................................................................7
RevenueSource...........................................................................................................7
ProjectSchedule..........................................................................................................8
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
- 2 Street Improvement/Assessment Area Map
- 3 Typical Section — Mill & Overlay
Executive Summary
Background
Project Name i Poppler Lane
Project #
1308
Street Area 2,344 Sq. Yds.
Street Length
820 Feet
I
Streets Included Poppler Lane
Constructed
1996
Reconstructed
Curb Removal
Crack Sealed
-
Seal Coated
2002, 2009
Absolute Location NW % of Section 10
Township 27, Range 23
Relative Location
South of Lone Oak Road
East of Pilot Knob Road
Project Details
• Roadway overlay (edge mill & 1-1/2"
PCI Rating
55/100
overlay)
Recommended
Overlay
• Replacement of damaged curb & utter
Improvement
• Adjustment/Replacement of:
Curb Removal
7%
Scope o Sanitary/Storm sewer
o Utility castings
o Watergate valves
o Street signage
Residential Lots
9
• Utility Improvements j
Cost Estimate/ Revenue
Property City
Mill & Overlay w/ Signage $ 36,700 $ 18,360 $ 18,340
Repair Existing Concrete Curb & Gutter $ 12,000 - $ 12,000 j
I
Utility Improvements $ 2,800 - $ 2,800
j Total $ 51,500 $ 18,360 (36%) $ 33,140 (64%)
Poppler Lane
1
Jan. 2, 2019
Neighborhood Street Revitalization
Poppler Lane
Eagan, Minnesota
Introduction/ History
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 820 feet of residential street in the Poppler Lane neighborhood in Northern Eagan has been
identified for 2019 street revitalization improvements. Figure 1, located in Appendix C,
illustrates the project location. The street was originally constructed in 1996.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the road located within the project area, which is currently in the 23 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the street was seal coated in 2002 and 2009.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
Poppler Lane
2
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scope
This project will provide an overlay (edge mill and overlay) for approximately 820 feet of
roadway. Figure 2 in Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves, utility improvements, and replacement of street signage.
Area to Be Included
Properties included in the project lie within the NW %, Section 10, lying South of Lone Oak
Road, East of Pilot Knob Road, in Township 27, Range 23, in the City of Eagan, Dakota County,
Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI
Recommended Improvement
56-100
Routine Maintenance/Crack Seal/Seal Coat
36-55
Patch/Repair and/or Overlay
0-35
Reconstruct/ Reclaim
The 2018 PCI rankings for the street segments have a weighted average pavement condition
rating of 55, which falls in the "Patch/Repair and/or Overlay" category, as mentioned above.
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Poppler Lane
3
Proposed Improvements
Pavement - The proposed street
improvements shown in Figure 3. The
existing street section for this roadway
consists of 3" of bituminous pavement
supported by 6" gravel base. The
existing bituminous surface will be
milled adjacent to the existing curb and
gutter (6'-8' wide) to accommodate a
1% -inch bituminous overlay. The
overlay, combined with the existing
street section, will provide a street
section consistent with current City
standards for residential streets. The
combination of patching and overlay
will not eliminate cracking due to the temperature extremes experienced in Minnesota.
Bituminous overlays will show some continued frost movements and reflective cracking
consistent with the underlying pavement. Routine maintenance will still need to continue under
the City's Pavement Management Program.
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalled, or settled. It is estimated that
approximately 7% of the existing concrete curb
and gutter will have to be replaced. Boulevard
turf will be removed and replaced with seed.
While the contractor who performs the work is
responsible for its establishment (45 days for
seed), adjacent property owners are
encouraged to consistently water the new turf,
where possible, to help ensure its growth.
Utility Adjustment/Replacement — Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
Poppler Lane
4
ensure quick and easy access by the City for maintenance and other purposes.
Signage - Traffic and street identification signage within the project
limits have reached the end of their useful life expectancy and are in
need of replacement. Signs have been reviewed for compliance with
the Minnesota Manual on Uniform Traffic Control Devices (MnMUTCD).
Those that are required by the MnMUTCD will be replaced to improve
safety and night time visibility, and those that are not will be
permanently removed.
Street Lights — The street lights in the project area (maintained by
Dakota Electric Association) are in good condition and provide adequate
coverage. No modifications to the existing street lights are proposed.
Complete Streets — "Complete Streets" is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
The street in this neighborhood was reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The street is relatively narrow at 24 feet wide, have
low traffic volumes, limited access points, and a trail is available along Lone Oak Road (adjacent
to this neighborhood) to connect pedestrians to the City and regional trail system.
Pedestrian curb ramps in the project area at the intersecting sidewalks will be replaced if
necessary to meet current ADA design standards. Given the existing and proposed elements
Poppler Lane
available for all users, the streets in this neighborhood meet the intent of the complete streets
guidelines.
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that a right-of-way permit for Dakota County will be required to perform the work
within the Lone Oak Road right-of-way.
Feasibility and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement (resurfacing) is considerably less
expensive than complete reconstruction of this street. The mill and overlay is feasible in that
this type of improvement has been used successfully to extend the life expectancy of numerous
other streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 — 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Cost Estimate
Detailed cost estimates are located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 30%, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Poppler Lane
• Mill & Overlay........................................................................ $ 36,700
• Repair Existing Concrete Curb & Gutter ................................ $ 12,000
• Utility Improvements............................................................. 2,800
Total........................................................................... $ 51,500
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for residential streets. All assessments will be revised
based on final costs. A preliminary assessment roll is included in Appendix B.
Poppler Lane
6
City Special Assessment Policy
Assessment Ratio
Property City
Mill & Overlay - Low -Density Residential (R-1,2,3) 50% 50%
Repair Existing Concrete Curb & Gutter - 100%
Utility Improvements - 100%
Residential Lots —All residential lots (9 single family homes) as shown on Figure 2, having
driveway access on to the street to be improved are proposed to be assessed. The City's
Assessment Policy states that 50% of the mill and overlay costs are assessable for local
residential streets, based on a standard 32 -foot width. The estimated cost per residential unit,
based on the City's Assessment Policy, is $2,040/ lot and is calculated as follows:
Mill & Overlay - Residential Properties
o 1,640' Residential Frontage / 1,640' Total Frontage = 100%
o $36,700 (Mill & Overlay Costs) x 50% x 100% = $18,350 (Total R-1 Assessment)
o $18,350/9 lots= $2,038.89, rounded to $2,040/ single-family lot
Assessment Financing Options
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2019 rate is not yet
available, however, it is expected to be comparable and based on City policy will be determined
by the City Council in the spring. The following payment schedule is an example of a residential
lot assessment of $2,040 with an estimated 4.5% interest for the assessed amounts, and
assumes 14 months interest for the first year:
Principal / Year Interest/ Year cost / Year
1st Year $408 $107 $515
F2 th Year 1$408 $18 $426
Bonds may be issued to finance the improvements.
Revenue Source
A summary of revenue sources is listed below:
Project Cost
Property Assessment
City Contribution
Mill and Overlay (Including Signage)
$ 36,700
$ 18,360
$ 18,340
Repair Existing Curb & Gutter
$ 12,000
-
$ 12,000
Utility Improvements
$ 2,800
-
$ 2,800
Totals
$ 51,500
$ 18,360 (36%)
$ 33,140 (64%)
Poppler Lane
7
The Major Street Fund will finance the estimated street related project deficit of $30,340.
The Combined Utility Fund will finance the estimated $2,800 utility improvements.
Proiect Schedule
Present Feasibility Report to City Council/
OrderPublic Hearing..........................................................................................
Jan. 2, 2019
Informational Meeting..................................................................................... Jan. 28, 2019
PublicHearing....................................................................................................Feb. 5, 2019
Approve Plans and Specifications....................................................................Feb. 19, 2019
BidDate........................................................................................................ March 28, 2019
AwardContract.................................................................................................April 2, 2019
StartConstruction.............................................................................................
May 1, 2019
Project Completion..........................................................................................
August, 2019
Final Cost Report........................................................................................September,
2019
Final Assessment Hearing......................................................................................
Fall, 2019
First Payment Due with Property Tax Statement
........................................... May 15, 2020
Poppler Lane
8
Appendix A
Preliminary Cost Estimate
City Project 1308 Poppler Lane
Item No.
Item
Unit
Subtotal
Unit Price
Est City
Estimated Cost
Estimated Cost
Part I - Bituminous Street Overlay
Part II - Repair Existing Curb & Gutter
$
14,750.87
Part I - Bituminous Street Overlay
2104.501
2021.501
Mobilization
LS
$
6,000.00
1
$
6,000.00
2104.505
Remove Bituminous Pavement
SY
$
6.00
45
$
270.00
2232.501
Mill Bituminous Pavement (1- 1/4" depth, 6' Width)
SY
$
1.30
1280
$
1,664.00
2357.502
Bituminous Material for Tack Coat
GAL
$
2.75
152
$
418.00
2360.501
SP WEA340B Wearing Course Mixture (Overlay)
TON
$
52.00
218
$
11,336.00
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
11
$
1,100.00
2506.602
Adjust Frame and Ring Casting (Manhole)
EA
$
700.00
2
$
1,400.00
2506.602
Adjust Manhole Casting - Riser Adjustment
EA
$
250.00
1
$
250.00
2563.601
Traffic Control
LS
$
4,000.00
1
$
4,000.00
SP -1
Signage Remove and Replace
LS
$
450.00
1
$
450.00
Subtotal
EA
$
85.00
1
$
85.00
$ 26,888.00
5% Contingency
Subtotal
30% Indirect Costs
Part I - Bituminous Street Overlay
$ 1,344.40
$ 28,232.40
$ 8,469.72
$ 36,702.12
Item No.
I Item
Unit
Subtotal
Unit Price
Est City
Estimated Cost
Part II - Repair Existing Curb & Gutter
3,404.05
Part II - Repair Existing Curb & Gutter
$
14,750.87
Part I - Bituminous Street Overlay
2104.501
Remove Concrete Curb and Gutter
LF
$
10.00
130
$
1,300.00
2104.505
Remove Concrete Driveway /Valley Gutter
SY
$
14.00
17
$
238.00
2211.501
Aggregate Base, Cl. 5 (100% Crushed)
TON
$
25.00
5
$
125.00
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
9
$
900.00
2504.602
Irrigation Repair
EA
$
160.00
3
$
480.00
2506.602
Adjust Frame & Ring Casting (CB) HDPE Rings
EA
$
550.00
3
$
1,650.00
2506.602
Repair/ Grout CB or MH Invert/ Doghouses
EA
$
400.00
1
$
400.00
2506.602
Install 2 x 3 CB Erosion Barrier Shroud
EA
$
150.00
2
$
300.00
2531.501
Concrete Curb and Gutter, Surmountable
LF
$
23.00
130
$
2,990.00
2531.507
Concrete Valley Gutter - High Early
SY
$
75.00
17
$
1,275.00
2540.602
Repair Underground Electric Fence
EA
$
85.00
1
$
85.00
2540.602
Repair Landscaping
EA
$
200.00
1
$
200.00
2572.503
Application of Water for Turf Establishment
GAL
$
0.15
990
$
148.50
2573.530
Storm Drain Inlet Protection
EA
$
175.00
2
$
350.00
2575.550
Boulevard Topsoil Borrow - MnDOT 3877-2F
CY
$
80.00
2.5
$
200.00
2575.609
Seeding (MnDOT 270 w/Type 5 Hydromulch)
SY
$
7.50
22
$
165.00
Subtotal
$
10,806.50
5% Contingency
$
540.33
Subtotal
$
11,346.83
30% Indirect Costs
$
3,404.05
Part II - Repair Existing Curb & Gutter
$
14,750.87
Part I - Bituminous Street Overlay
$ 36,702.12
Part II - Repair Existing Curb & Gutter
$ 14,750.87
Project 1308 Total Cost
$ 51,452.99
Poppler Lane
9
Appendix B
Preliminary Assessment Roll
City Project #1308 Poppler Lane
Total R-1 Lots 9 9 $ 18,360
Residential Frontage 1,640 100.0%
Total Frontage 1,640 100.0%
Poppler Lane
10
Poppler Ln
R-1 Residential
P.I.N.
Lot Equivalent
# of Lots
Unit Assessment
Total
3035
Poppler Ln
105840101010
1
1
$
2,040
$
2,040
1310 Lone Oak Rd
105840000010
1
1
$
2,040
$
2,040
3020
Poppler Ln 1
105840000020
1
1
$
2,040
$
2,040
3030
Poppler Ln
105840000030
1
1
$
2,040
$
2,040
3046
Poppler Ln
105840000040
1
1
$
2,040
$
2,040
3060
Poppler Ln
105840000050
1 i
1
$
2,040
$
2,040
3070
Poppler Ln
105840000060
1
1
$
2,040
$
2,040
3055
Poppler Ln
105840101031
1
1
$
2,040
$
2,040
3045
Poppler Ln
105840101021
1
1
$
2,040
$
2,040
Subtotal
9
9
$
18,360
Total R-1 Lots 9 9 $ 18,360
Residential Frontage 1,640 100.0%
Total Frontage 1,640 100.0%
Poppler Lane
10
q Y
FJ �'' 2019 Street Revitalization - Project 1308
Popper Lane
ISHS
1 MENDI OTA HEIGHTS
.-
.1
Lone Ok Rd (Co)
— r .
l O j
Poppler Lane
` m o
Wood Park Y Project 1308
Wa
i r Y NICE ODLd RD i
�
S ( y �� (; Yankee Doodle d (Co Rd 28) 28
-�, R y
g
Mme"
Town nter D f#�
MM
D d Dr
37
ell
+ 1 PcsB LAI
L rke f_ � ye
Sliver Bell R
® cmoerm uer`O
d ✓ i�4N ' �7 �� 6s^ Gs<etlw E.or�.ak Y�' �'�i� 4 tl
1L. `°✓r Pf �� m;p ° I...e. x.y •vi a : F9�
orthwew Park d
o
1.0
s Y
r� Dlffle ad? r _ r DIF LEY R
30e.'., � T
^���1 K � rd.Pm od ♦ � ; 9 tr.: .i. c.. a nu.Nry � S
Document Path: 7—:IUSERSIPUBWORKS1Engineering7rojects12019 Street Improvements11308 - Poppler Lanek1308 Fig t .mzd Date: 12/12/2018
FIG 1
~ 0r E,q
U `,,; ;:;,:�Z 2019 Street Revitalization - Project 1308
- Poppler Lane
Document Path: L:IUSERSIPUBWORKS1EngineeringlProjects12019 Street Improvements11308 Poppler Lane11308.mxd Date: 12/18/2018
FIG 2
° Project 1308
Eq 9 2019 Street Revitalization -
- 2
�• -- Poppler Lane
o
1e� S"if-9 Typical Street Sections
1.25" EDGE MILL
8'-9 WIDE (rYP )
-------,
60' ROW
24' F -F
PAVEMENT SECTION
3" BASE COURSE
6" CLASS 5 AGG BASE
AGGREGATE SUBGRADE
EXIST. TYPICAL SECTION
POPPLER LANE
D412 CONCRETE
CURB AND GUTTER
60' ROW
24' F -F
1.5" TYPE 2360 BITUMINOUS OVERLAY -
- �- - - - ---------------
B412 CONCRETE
BITUMINOUS TACK COAT CURB AND GUTTER
1.5" BITUMINOUS SURFACE
6" CLASS 5 AGG BASE
COMPACTED SUBGRADE
PROPOSED TYPICAL SECTION
POPPLER LANE
Document Path: L:\USERS\PUBWORKS1EngineeringlProjects\2019 Street Improvements\1308 - Poppler Lane\1308 Fig 3.mxd
Date: 12/12/2018
FIG 3
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
K. Project 1309, Country Home Heights
Street Improvements
Action To Be Considered:
Receive the Draft Feasibility Report for Project 1309 (Country Home Heights - Street
Improvements) and schedule a public hearing to be held on February 5, 2019.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation the streets in Country Home Heights, a residential
neighborhood in north-central Eagan, located north of Lone Oak Road and west of
Pilot Knob Road.
A structural mill and overlay of these streets is programmed for 2019 in the City of
Eagan’s 5-Year CIP (2019-2023).
A draft Feasibility Report has been prepared and is being presented to the Council
for their consideration of scheduling a public hearing for Tuesday, February 5, 2019.
An informational neighborhood meeting will be held with the adjacent property
owners prior to the formal public hearing to review and d iscuss the proposed
improvements.
Attachments (1)
CK-1 Draft Feasibility Report
Report for
Country Home Heights
Neighborhood Street Revitalization
City Project No. 1309
January 2, 2019
A
R
Ilii _ agar.
Or.44
R. ow -*#A
EAGAN
Report for
Country Home Heights
Neighborhood Street Revitalization
City Project No. 1309
January 2, 2019
A
R
Ilii _ agar.
Or.44
R. ow -*#A
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Jan. 2, 2019
Re: Country Home Heights Street Revitalization
City Project No.: 1309
Attached is the feasibility report for the Country Home Heights Street Revitalization, City Project
No. 1309. The report presents and discusses the proposed improvements and includes a cost
estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Date:
Reviewed By:
Department of Public Works Date:
Reviewed By:
Finance Department Date:
Aaron Nelson
Reg. No. 45795
TABLE OF CONTENTS
ExecutiveSummary..................................................................................................... 1
Introduction/History.......................................................................................................2
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
Street Pavement Evaluation.........................................................................................3
Proposed Improvements..............................................................................................4
Easements/Permits......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................6
Assessments................................................................................................................6
Assessment Financing Options.....................................................................................7
RevenueSource...........................................................................................................8
ProjectSchedule..........................................................................................................8
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
- 2 Street Improvement/Assessment Area Map
- 3 Typical Section — Mill & Overlay
Executive Summary
Background
Project Name
Country Home Heights
Project #
1309
Street Area
21,597 Sq. Yds.
Street Length
7,769 Feet
Beam Lane
1970-1980 (gravel Construction)
Constructed
Burnside Ave.
1998 (Asphalt construction)
Reconstructed
Egan Ave.
Fairlawn Place
Crack Sealed
-
Streets Included
Inland Rd.
Rainier Ln.
Vilas Ln.
Seal Coated
2005, 2012
SW % of Section 3
East of Pilot Knob Road
Absolute Location
Township 27, Range 23
Relative Location
North of Lone Oak Road
Project Details
• Roadway overlay (edge mill & 1-1/2" PCI Rating 40/100
overlay) Recommended
Overlay• Replacement of damaged curb & utter Improvement
• Adjustment/Replacement of: Curb Removal 7%
Scope o Sanitary/Storm sewer
o Utility castings
o Watergate valves
o Street signage Lots 63 R-1
5 Neigh Park
• Utility Repairs
Cost Estimate/ Revenue
Mill & Overlay w/ Signage $ 218,000
Repair Existing Concrete Curb & Gutter $ 90,200
Utility Improvements $ 26,400
Property City
$ 106,080 $ 111,920
- $ 90,200
$ 26,400
Total $ 334,600 1 $ 106,080 (32%) 1 $ 228,520 (68%)
Country Home Heights
1
Jan. 1, 2019
Neighborhood Street Revitalization
Country Dome Heights
Eagan, Minnesota
Introduction/ History
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 7,769 feet of residential streets in the Country Home Heights neighborhood in North-
Central Eagan has been identified for 2019 street revitalization improvements. Figure 1,
located in Appendix C, illustrates the project location. The streets were originally constructed
between 1970-1980 (Gravel construction), and 1998 (asphalt construction).
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the roads located within the project area, which are currently in the 20 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the streets were seal coated in 2005 and 2012.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
Country Home Heights
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scope
This project will provide resurfacing (edge mill and overlay) for approximately 7,769 feet of
roadway. Figure 2 in Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves and replacement of street signage.
Area to Be Included
Properties included in the project lie within the SW %, Section 3, lying East of Pilot Knob Road,
North of Lone Oak Road, in Township 27, Range 23, in the City of Eagan, Dakota County,
Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI Recommended Improvement
56-100 Routine Maintenance/Crack Seal/Seal Coat
36-55 i Patch/Repair and/or Overlay
0-35 Reconstruct/ Reclaim
The 2018 PCI rankings for the street segments have a weighted average pavement condition
rating of 40, which falls in the "Patch/Repair and/or Overlay" category, as mentioned above.
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Country Home Heights
3
Proposed Improvements
Pavement - The proposed street
improvements shown in Figure 3. The
existing street section for this roadway
consists of 3" bituminous pavement
supported by 6" gravel base. The
existing bituminous surface will be
milled adjacent to the existing curb and
gutter (6'-S' wide) to accommodate a
1% -inch bituminous overlay. The
overlay, combined with the existing
street section, will provide a street
section consistent with current City
standards for residential streets. The
combination of patching and overlay
will not eliminate cracking due to the temperature extremes experienced in Minnesota.
Bituminous overlays will show some continued frost movements and reflective cracking
consistent with the underlying pavement. Routine maintenance will still need to continue under
the City's Pavement Management Program.
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalled, or settled. It is estimated that
approximately 7% of the existing concrete curb
and gutter will have to be replaced. Boulevard
turf will be removed and replaced with seed.
While the contractor who performs the work is
responsible for its establishment (45 days for
--q* seed), adjacent property owners are
encouraged to consistently water the new turf,
where possible, to help ensure its growth.
Utility Adjustment/Replacement Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
ensure quick and easy access by the City for maintenance and other purposes. There are a few
number of manhole structures that require dog house repair/invert repair and new adjusting
rings. These improvements will be financed through the Combined Utility Fund.
Country Home Heights
4
Signage - Traffic and street identification signage within the
project limits have reached the end of their useful life
expectancy and are in need of replacement. Signs have been
reviewed for compliance with the Minnesota Manual on
Uniform Traffic Control Devices (MnMUTCD). Those that are
required by the MnMUTCD will be replaced to improve safety
and night time visibility, and those that are not will be
permanently removed.
Complete Streets — "Complete Streets" is a transportation
and design approach that plans, designs, operates, and
maintains streets in a means to enable safe, convenient and comfortable travel and access for
users of all ages and abilities regardless of their mode of transportation. Complete Streets allow
for safe travel by those walking, bicycling, driving automobiles, riding public transportation, or
delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
The streets in this neighborhood were reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The streets are relatively narrow at 28 feet wide,
have low traffic volumes, limited access points, and trails are available along Pilot Konb Road
and Lone Oak Road (both adjacent to this neighborhood) to connect pedestrians to the City and
regional trail system. Pedestrian curb ramps in the project area at the intersecting sidewalks
will be replaced if necessary to meet current ADA design standards. Given the existing and
proposed elements available for all users, the streets in this neighborhood meet the intent of
the complete streets guidelines.
Country Home Heights
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that no permits will be required for the resurfacing project. Right-of-way permits
will be required form Dakota County for any work within the Pilot Knob Road and Lone Oak
Road right-of-way.
Feasibility and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement (overlaying) is considerably less expensive
than complete reconstruction of this street. The mill and overlay is feasible in that this type of
improvement has been used successfully to extend the life expectancy of numerous other
streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 — 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Cost Estimate
Detailed cost estimates are located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 25%, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Country Home Heights
• Mill & Overlay........................................................................ $ 218,000
• Repair Existing Concrete Curb & Gutter ................................ $ 90,200
• Utility Improvements............................................................. 26,400
Total........................................................................... $ 334,600
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for residential streets. All assessments will be revised
based on final costs. A preliminary assessment roll is included in Appendix B.
Country Home Heights
6
City Special Assessment Policy
Assessment Ratio
Property City
Mill & Overlay- Low -Density Residential (R-1,2,3) 50% 50%
Mill & Overlay — Neighborhood Parks 50% 50%
Repair Existing Concrete Curb & Gutter - 100%
Utility Improvements - 100%
Residential and Neighborhood Park Lots — All residential lots (63 single family lots [1 is
currently vacant]), and Neighborhood Park lots (5 N.P. lots that are equivalent size as R-1 lots),
as shown on Figure 2, having driveway access on to the street to be improved are proposed to
be assessed. The City's Assessment Policy states that 50% of the mill and overlay costs are
assessable for local residential streets, based on a standard 32 -foot width. The estimated cost
per residential and neighborhood park unit, based on the City's Assessment Policy, is $1,560/
lot and is calculated as follows:
Mill & Overlay - Residential & Neighborhood Park Properties
o 15,112' Residential Frontage / 15,538' Total Frontage = 97.3%
o $218,000 (Mill & Overlay Costs) x 50%x 97.3% = $106,057 (Total R-1 & N.P.
Assessment)
o $106,057 / 68 lots = $1,559.66, rounded to $1,560 / R-1 & N.P. Lot
The remaining frontage within the project area (426' or 2.7%) is considered non- assessable
under the City's Assessment Policy.
Assessment Financing Options
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2019 rate is not yet
available, however, it is expected to be comparable and based on City policy will be determined
by the City Council in the spring. The following payment schedule is an example of a residential
lot assessment of $1,560 with an estimated 4.5% interest for the assessed amounts, and
assumes 14 months interest for the first year:
F
1st Year
5th Year
Principal / Year Interest / Year Cost / Year
$312 $82 394
$312 $14$326
Bonds may be issued to finance the improvements.
Country Home Heights
7
Revenue Source
A summary of revenue sources is listed below:
The Major Street Fund will finance the estimated street related project deficit of $202,120.
The Combined Utility Fund will finance the estimated $26,400 utility improvements.
Project Schedule
Present Feasibility Report to City Council/
OrderPublic Hearing.......................................................................................... Jan. 2, 2019
Informational Meeting..................................................................................... Jan. 28, 2019
Public Hearing....................................................................................................Feb. 5, 2019
Approve Plans and Specifications....................................................................Feb. 19, 2019
BidDate........................................................................................................ March 28, 2019
AwardContract.................................................................................................April 2, 2019
Start Construction............................................................................................. May 1, 2019
Project Completion.......................................................................................... August, 2019
FinalCost Report........................................................................................September, 2019
Final Assessment Hearing...................................................................................... Fall, 2019
First Payment Due with Property Tax Statement ........................................... May 15, 2020
Country Home Heights
8
Project Cost Property Assessment
City Contribution
Mill and Overlay (Including Signage)
$ 218,000 $ 106,080
$ 111,920
Repair Existing Curb & Gutter
$ 90,200 -
$ 90,200
Utility Improvements
$ 26,400 -
$ 26,400
Totals
$ 334,600 ! $ 106,080 (32%)
$ 228,520 (68%)
The Major Street Fund will finance the estimated street related project deficit of $202,120.
The Combined Utility Fund will finance the estimated $26,400 utility improvements.
Project Schedule
Present Feasibility Report to City Council/
OrderPublic Hearing.......................................................................................... Jan. 2, 2019
Informational Meeting..................................................................................... Jan. 28, 2019
Public Hearing....................................................................................................Feb. 5, 2019
Approve Plans and Specifications....................................................................Feb. 19, 2019
BidDate........................................................................................................ March 28, 2019
AwardContract.................................................................................................April 2, 2019
Start Construction............................................................................................. May 1, 2019
Project Completion.......................................................................................... August, 2019
FinalCost Report........................................................................................September, 2019
Final Assessment Hearing...................................................................................... Fall, 2019
First Payment Due with Property Tax Statement ........................................... May 15, 2020
Country Home Heights
8
Fs
Item No. I Item
Appendix A
Preliminary Cost Estimate
)ject 1309 Country Home
Unit
Part I - Bituminous Street Overlay
2021.501
Mobilization
2104.505
Remove Bituminous Pavement
2232.501
Mill Bituminous Pavement (1- 1/4" depth, 6' Width)
2357.502
Bituminous Material for Tack Coat
2360.501
SP WEA340B Wearing Course Mixture (Overlay)
2360.501
SP WEA340B Wearing Course Mixture (Patch)
2504.602
Adjust Gate Valve Box
2504.602
Repair Gate Valve Mid Section
2504.602
Repair Gate Valve Top Section w/Cover
2506.602
Adjust Frame and Ring Casting (Manhole)
2506.602
Adjust Manhole Casting - Riser Adjustment
2506.602
Remove & Replace Frame & Ring Casting (27")
2563.601
Traffic Control
SP -1
Signage Remove and Replace
Subtotal
5% Contingency
Subtotal
25% Indirect Costs
Part I - Bituminous Street Overlay
Unit Price Qty Estimated Cost
LS
$
6,000.00
1
$
6,000.00
SY
$
6.00
178
$
1,068.00
SY
$
1.30
11675
$
15,177.50
GAL
$
2.75
1404
$
3,861.00
TON
$
52.00
2005
$
104,260.00
TON
$
100.00
53
$
5,300.00
EA
$
250.00
10
$
2,500.00
EA
$
500.00
1
$
500.00
EA
$
425.00
2
$
850.00
EA
$
700.00
24
$
16,800.00
EA
$
250.00
6
$
1,500.00
EA
$
1,250.00
2
$
2,500.00
LS
$
4,000.00
1
$
4,000.00
LS
$
1,750.00
1
$
1,750.00
$ 166,066.50
$ 8,303.33
$ 174,369.83
$ 43,592.46
$ 217,962.28
Item No. Item Unit Unit Price Qty Estimated Cost
Part II - Repair Existing Curb & Gutter
2104.501
Remove Concrete Curb and Gutter
LF
$
10.00
1510
$
15,100.00
2104.505
Remove Concrete Driveway /Valley Gutter
SY
$
14.00
50
$
700.00
2211.501
Aggregate Base, CI.5 (100% Crushed)
TON
$
25.00
5
$
125.00
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
53
$
5,300.00
2504.602
Irrigation Repair
EA
$
160.00
15
$
2,400.00
2506.602
Adjust Frame & Ring Casting (CB) HDPE Rings
EA
$
550.00
33
$
18,150.00
2506.602
Repair/ Grout CB or MH Invert/ Doghouses
EA
$
400.00
5
$
2,000.00
2506.602
Install 2 x 3 CB Erosion Barrier Shroud
EA
$
150.00
3
$
450.00
2531.501
Concrete Curb and Gutter, B618
LF
$
23.00
1510
$
34,730.00
2531.507
Concrete Valley Gutter - High Early
SY
$
75.00
50
$
3,750.00
2540.602
Repair Underground Electric Fence
EA
$
85.00
5
$
425.00
2540.602
Repair Landscaping
EA
$
200.00
5
$
1,000.00
2572.503
Application of Water for Turf Establishment
GAL
$
0.15
8640
$
1,296.00
2573.530
Storm Drain Inlet Protection
EA
$
175.00
2
$
350.00
2575.550
Boulevard Topsoil Borrow -MnDOT3877-2F
CY
$
80.00
21
$
1,680.00
2575.609
Seeding (MnDOT 270 w/Type 5 Hydromulch)
SY
$
7.50
192
$
1,440.00
Subtotal $ 88,896.00
5% Contingency
Subtotal
25% Indirect Costs
Part II - Repair Existing Curb & Gutter
Country Home Heights
9
$ 4,444.80
$ 93,340.80
$ 23,335.20
$ 116,676.00
Part I - Bituminous Street Overlay
Part 11 - Repair Existing Curb & Gutter
Project 1309 Total Cost
Country Home Heights
10
$ 217,962.28
$ 116,676.00
$ 334,638.28
Appendix B
Preliminary Assessment
City Project #1309 Country Home Heights
Country Home Heights
11
Rainier Ln
Egan Ave
Burnside Ave
R-1 ResidentialP.I.N.
I
Lot Equivalent
# of
Lots
Unit Assessment
Lot Equivalent ,
i
Total
2980 Pilot Knob Rd
101830005151
1
1
$
1,560
$
1,560
2988 Pilot Knob Rd
101830001051
1
1
$
1,560
$
1,560
1390 Rainier Ln
101830001041
1
1
$
1,560
$
1,560
1391 Rainier Ln
101830005152
1 1
1
$
1,560
$
1,560
1383 Rainier Ln
101830005161
1
1
$
1,560
$
11560
1384 Rainier Ln
101830001030
1
1
$
1,560
$
1,560
1
Subtotal
6
6
1,560
2969
$
9,360
Country Home Heights
11
Inland Rd
Egan Ave
Burnside Ave
R-1 Residential
P.I.N.
R-1
Residential
P.I.N.
Lot Equivalent ,
Lots
Unit Assessment
101830005120
Total
2995
Burnside
Ave
101830001020
1
1
$
1,560
$
1,560
2998
Burnside
Ave
101830002010
1
1
$
1,560
$
1,560
2990
Burnside
Ave
101830002030
1
1
$
1,560
$
1,560
2984
Burnside
Ave
101830002050
1
1
$
1,560
$
1,560
2976
Burnside
Ave
101830002070
1
1
$
1,560
$
1,560
2969
Burnside
Ave
101830004030
1
1
$
1,560
$
1,560
2970
Burnside
Ave
101830002090
1
1
1 $
1,560
$
1,560
2950
Burnside
Ave
101830003030
1
1
$
1,560
$
1,560
2930
Burnside
Ave
101830003020
1
1
$
1,560
$
1,560
2910
Burnside
Ave
101830003010
1
1
$
1,560
$
1,560 ;
Subtotal
30
30
$
15,600
Country Home Heights
11
Inland Rd
Egan Ave
R-1 Residential
P.I.N.
Lot Equivalent
Lots of
Unit Assessment
Unit Assessment
Total
2969 Inland Rd
101830005120
1
1
$
1,560
$
1,560
2947 Inland Rd
101830005100
1 I
1
$
1,560
$
1,560
2960 Inland Rd
101830004023
1
1
$
1,560
$
1,560
2943 Inland Rd
101830005080
1
1
$
1,560
$
1,560
2940 Inland Rd
101830004022 i
1
1
$
1,560
$
1,560
1
Subtotal
5
5
$
1,560
$
7,800
Country Home Heights
11
Egan Ave
R-1 Residential
P.I.N.
Lot Equivalent i
Lots
Unit Assessment
Total
2885 Egan
Ave
101830005040
1
1
$
1,560
$
11560
2891 Egan
Ave
101830005051
1 1
1
$
1,560
$
1,560
2903 Egan
Ave
101830005060
1
1
$
1,560
$
1,560
2898 Egan
Ave
101830006030
1
1
$
1,560
$
1,560
2905 Egan
Ave
101830006050
1
1
$
1,560
$
1,560
Country Home Heights
11
2909 Egan Ave
101830006070
1
1
$
1,560
$
1,560
2945 Egan Ave
101830002081
1
1
$
1,560
$
1,560
2935 Egan Ave
101830003050
1
1
$
1,560
$
1,560
2950 Egan Ave
101830003051
1
1
$
1,560
$
1,560
2960 Egan Ave
101830003061
1
1
$
1,560
$
1,560
2970 Egan Ave
101830003070
1
1
$
1,560
$
1,560
2975 Egan Ave
101830002060
1
1
$
1,560
$
1,560
2980 Egan Ave
101830003082
1
1
$
1,560
$
1,560
2985 Egan Ave
101830002040
1
1
$
1,560
$
1,560
2995 Egan Ave
101830002020
1
1
$
1,560
$
1,560
2990 Egan Ave
101830003081
1
1
$
1,560
$
1,560
2860 Pilot Knob Rd
101830005020
1
1
$
1,560
$
1,560
Subtotal
17
17
$
26,520
Country Home Heights
12
Fairlawn PI
R-1 Residential
P.I.N.
Lot Equivalent
Lots
Unit Assessment
i
Total
2899 Fairlawn PI
101830006080
1
1
$
1,560
I $
1,560
2894 Fairlawn PI
101830007140
1
1
$
1,560
$
1,560
2890 Fairlawn PI
104330001010
1
1
$
1,560
$
1,560
2893 Fairlawn PI
101830006060
1
1
$
1,560
$
11560
2875 Fairlawn PI
101830006040
1
1
$
1,560
$
1,560
2866 Fairlawn PI
101830007110
1
1
$
1,560
$
1,560
2805 Beam Ln
Subtotal
6
6
$
1,560
$
9,360
Country Home Heights
12
Beam Ln
R-1 Residential
P.I.N.
Lot Equivalent
Lots of
Unit Assessment
Total
2844 Beam Ln
1 101830007090
1
1
$
1,560
$
1,560
2832 Beam Ln
101830007070
1
1
$
1,560
$
1,560
2831 Beam Ln
101830008070
1
1
$
1,560
$
1,560
2816 Beam Ln
101830007050
1
1
$
1,560
$
11560
2811 Beam Ln
101830008060
1
1
$
1,560
$
11560
2810 Beam Ln
101830007030
1
1
$
1,560
$
1,560
2805 Beam Ln
101830008040
1
1
$
1,560
$
1,560
2804 Beam Ln
101830007010
1
1
$
1,560
$
1,560
Subtotal
8
8
$
12,480
Country Home Heights
12
Vilas Ln
R-1 Residential
P.I.N.
Lot Equivalent
L
Lots is
Unit Assessment
Total I
2858 Vilas Ln
101830008110
1
1
$
1,560
$
1,560
2848 Vilas Ln
101830008090
1
1
$
1,560
$
1,560
2838 Vilas Ln
101830008050
1
1
$
1,560
$
1,560
2830 Vilas Ln
101830008030
1
1
$
1,560
$
1,560
2804 Vilas Ln
101982501010
1
1
$
1,560
$
11560
2825 Vilas Ln
101830009020
1
1
$
1,560
$
1,560
2829 Vilas Ln
101830009040
1
1
$
1,560
$
1,560
Country Home Heights
12
2835 Vilas Ln
101830009050
1
1
$
1,560
$
1,560
2841 Vilas Ln
101830009060
1
1
$
1,560
$
1,560
2857 Vilas Ln
101830009080
1
1
$
1,560
$
1,560
vacant
101982501020
1
1
$
1,560
$
1,560
101830008120
Subtotal
11
11
1,560
$
$
17,160
Total R-1 Lots 68 68 $ 106,080
R-1 & Neigh. Park Frontage 15,112 97.3%
Non -Assessable Frontage 426 2.7%
Total Frontage 15538 100.0%
Country Home Heights
13
Neighborhood Parks
Neighborhood Parks
I P.I.N.
Lot Equivalent
# of
Lots
Unit Assessment
Total
City of Eagan
101830008080
1
1
$
1,560$
1,560
City of Eagan
101830008100
1
1
$
1,560
$
1,560
City of Eagan
101830008120
1
1
$
1,560
$
1,560
City of Eagan
101830006010
1
1
$
1,560
$
1,560
City of Eagan
101830006020
1
1
$
1,560
$
1,560
Subtotal
5
5
i
$
7,800
Total R-1 Lots 68 68 $ 106,080
R-1 & Neigh. Park Frontage 15,112 97.3%
Non -Assessable Frontage 426 2.7%
Total Frontage 15538 100.0%
Country Home Heights
13
2019 Street Revitalization - Project 1309
Country Home Heights
� f
— MENDOYA HEIGHTS I
Country Home Heights
Project 1309 -- -� -
_ I j Lone O k (Ca�y�{tl,:,�"ij
r
r � '. 43
r_ O �®
.N � y •e .��kul "7 '.�r� .1wd
-• I w 'RR??++ ------- Lie
i t
aY •� .�� � yyy'''
,t 1
r
28 ®� � �— 3 i'�f �+; Y ODL RDyYankee®Doodle Ad (Co Rd 28)1
� � :ta � ..,.i�•;� •' l -mom
Town et.t.r10
D
.r
_ ply '2
or,
`<
Silver Bell R14
a�
wto —
s a
tro ,nom.,
ortWew Parkd "
�nx 7s• 5 oqd Dr p`� •+`R » `p
pp /
4f h.
h.
Diffle� a ?o dg DIFFLEY R
--a7 —^ 30 v 1 ✓ 8
K M �' q lt.r Nim rK<� 'A� R .H a.. �, a �.•
Lem
NYN --X•-p tl3i
Document Path: L:IUSERSIPUBWORKS{Engin eering\Projects12019 Street Improvements11309 - Country Home Heights11309 Location.mxd
Date: 12/12/2018
FIG 1
�� E� 2019 Street Revitalization - Project 1309
„ �, J
Country Home Heights
Document Path: L:IUSERSIPUBWORKS1EngineeringlProjects12019 Street Improvements11309 - Country Home Heights11309.mxd Date: 12/18/2018
FIG 2
2019 Street Revitalization - Project 1309
Country Home Heights
Typical Street Sections
60' ROW —
28' F -F
Zf F,77777 --
PAVEMENT SECTION
3" BASE COURSE CONCRETE
6" CLASS 5 AGG BASE CURRBB AND GUTTER
COMPACTED SUBGRADE
EXIST. TYPICAL SECTION
COUNTRY HOME HEIGHTS
60' ROW
I
28' F -F
1.25" EDGE MILL
6'-8' WIDE (TYP.)
1.5" TYPE 2360 BITUMINOUS OVERLAY
-��,17777
B618 CONCRETE
BITUMINOUS TACK COAT CURB AND GUTTER
3" BITUMINOUS SURFACE
6" CLASS 5 AGG BASE
COMPACTED SUBGRADE
PROPOSED TYPICAL SECTION
COUNTRY HOME HEIGHTS
Document Path: L:IUSERSIPUBWORKS1EngineeringlProjects12019 Street Improvements11309 - Country Home Heights11309 Fig 3.mxd
Date: 12/26/2018
FIG 3
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
L. Project 1312, Ridgeview Acres/ Jon Croft Acres
Street Improvements
Action To Be Considered:
Receive the Draft Feasibility Report for Project 1312 (Ridgeview Acres/ Jon Croft Acres -
Street Improvements) and schedule a public hearing to be held on February 5, 2019.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation the streets in Ridgeview Acres/ Jon Croft Acres, a
residential neighborhood in northwest Eagan, located east of Blackhawk Road and
south of Blue Cross Road.
A structural mill and overlay of these streets is programmed for 2019 in the City of
Eagan’s 5-Year CIP (2019-2023).
A draft Feasibility Report has been prepared and is being presented to the Council
for their consideration of scheduling a public hearing for Tuesday, February 5, 2019.
An informational neighborhood meeting will be held with the adjacent property
owners prior to the formal public hearing to review and discuss the proposed
improvements.
Attachments (1)
CL-1 Draft Feasibility Report
EAGAN
Report for
Ridgeview Acres -Jon Croft Acres
Neighborhood Street Revitalization
City Project No. 1312
January 2, 2019
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Jan. 2, 2019
Re: Ridgeview Acres -Jon Croft Acres Street Revitalization
City Project No.: 1312
Attached is the feasibility report for the Ridgeview Acres -Jon Croft Acres Street Revitalization,
City Project No. 1312. The report presents and discusses the proposed improvements and
includes a cost estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Date:
Reviewed By:
Department of Public Works Date:
Reviewed By:
Finance Department Date:
Aaron Nelson
Reg. No. 45795
EAGAN
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Jan. 2, 2019
Re: Ridgeview Acres -Jon Croft Acres Street Revitalization
City Project No.: 1312
Attached is the feasibility report for the Ridgeview Acres -Jon Croft Acres Street Revitalization,
City Project No. 1312. The report presents and discusses the proposed improvements and
includes a cost estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Date:
Reviewed By:
Department of Public Works Date:
Reviewed By:
Finance Department Date:
Aaron Nelson
Reg. No. 45795
TABLE OF CONTENTS
ExecutiveSummary..................................................................................................... 1
Introduction/History.......................................................................................................2
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
StreetPavement Evaluation.........................................................................................3
ProposedImprovements..............................................................................................4
Easements/Permits......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................6
Assessments................................................................................................................6
Assessment Financing Options.....................................................................................7
RevenueSource...........................................................................................................8
ProjectSchedule..........................................................................................................8
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
- 2 Street Improvement/Assessment Area Map
- 3 Typical Section — Mill & Overlay
Executive Summary
Background
Project Details
• Roadway resurfacing (Full width mill &
Ridgeview Acres -Jon
38/100
Recommended
Project Name
Croft Acres
Project #
1312
Street Area
15,926 Sq. Yds.
Street Length
4,656 Feet
Scope o Sanitary/Storm sewer
Constructed
1975
Crestridge Lane
o Water gate valves
Knoll Ridge Drive
Overlayed
1999
Crack Sealed
-
Streets Included
Kyllo Lane
Monterey Lane
Seal Coated
2004, 2011
Absolute Location
SE % of Section 17
Relative Location
South of Yankee Doodle Road
Township 27, Range 23
East of Blackhawk Road
Project Details
• Roadway resurfacing (Full width mill &
PCI Rating
38/100
Recommended
Resurface
1-1/2" overlay)
• Replacement of damaged curb & gutter
Improvement
$ 11,800
Curb Removal
24%
• Adjustment/Replacement of:
Scope o Sanitary/Storm sewer
o Utility castings
o Water gate valves
o Street signage
Residential Lots
52 (R-1)
• Utility Improvements
Cost Estimate/ Revenue
Property
City
Mill & Overlay w/ Signage $ 172,000
$ 83,200
$ 88,800
Repair Existing Concrete Curb & Gutter $ 127,700
-
$ 127,700
Utility Improvements $ 11,800
-
$ 11,800
Total $ 311,500
$ 83,200 (27%)
$ 228,300 (73%)
Ridgeview Acres - Jon Croft Acres
1
Jan. 2, 2018
Neighborhood Street Revitalization
Ridgeview Acres — Jon Croft Acres
Eagan, Minnesota
Introduction/ History
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 4,656 feet of residential streets in the Ridgeview Acres —Jon Croft Acres neighborhood in
westcentral Eagan has been identified for 2019 street revitalization improvements. Figure 1,
located in Appendix C, illustrates the project location. The streets were originally constructed
in 1975, and were overlayed in 1999.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the roads located within the project area, which are currently in the 20 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the streets were seal coated in 2004 and 2011.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
Ridgeview Acres - Jon Croft Acres
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scope
This project will provide resurfacing (edge mill and overlay) for approximately 4,656 feet of
roadway. Figure 2 in Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves, utility improvements, and replacement of street signage.
Area to Be Included
Properties included in the project lie within the SE %, Section 17, lying South of Yankee Doodle
Road, East of Blackhawk Road, in Township 27, Range 23, in the City of Eagan, Dakota County,
Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI
Recommended Improvement
56-100
Routine Maintenance/Crack Seal/Seal Coat
36-55
Patch/Repair and/or Overlay
0-35
Reconstruct/ Reclaim
The 2018 PCI rankings for the street segments have a weighted average pavement condition
rating of 38, which falls in the "Patch/Repair and/or Overlay" category, as mentioned above.
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Ridgeview Acres - Jon Croft Acres
3
Prosed Improvements
Pavement - The proposed street
improvements shown in Figure 3. The
y
existing street section for this roadway
consists of 3-1/2" bituminous pavement
supported by 6" gravel base. The
existing bituminous surface will be
�► �
milled across its entire width to
1'
_
accommodate a 1% -inch bituminous
overlay. The overlay, combined with the
r %'
existing street section, will provide a
street section consistent with current
'
City standards for residential streets.
The combination of patching and
overlay will not eliminate cracking due
to the temperature extremes experienced
in Minnesota. Bituminous overlays will show some
continued frost movements and reflective
cracking consistent with the underlying pavement.
Routine maintenance will still need to continue under the City's Pavement Management
Program.
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalled, or settled. It is estimated that
approximately 24% of the existing concrete
curb and gutter will have to be replaced.
Boulevard turf will be removed and replaced
with seed. While the contractor who performs
the work is responsible for its establishment
(45 days for seed), adjacent property owners
are encouraged to consistently water the new
turf, where possible, to help ensure its growth.
Utility Adjustment/Replacement — Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
ensure quick and easy access by the City for maintenance and other purposes. There are a few
manhole structures that require doghouse/invert repairs due to deterioration. These manholes
will be financed through the Combined Utility Fund.
Ridgeview Acres - Jon Croft Acres
4
Signage - Traffic and street identification signage within the
project limits have reached the end of their useful life
expectancy and are in need of replacement. Signs have been
reviewed for compliance with the Minnesota Manual on
Uniform Traffic Control Devices (MnMUTCD). Those that are
required by the MnMUTCD will be replaced to improve safety
and night time visibility, and those that are not will be
permanently removed.
i
�y r
Street Lights — The street lights in the project area (maintained by Dakota Electric Association)
are in good condition and provide adequate coverage. No modifications to the existing street
lights are proposed.
Complete Streets — "Complete Streets" is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
The streets in this neighborhood were reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The streets are relatively narrow at 32 feet wide,
have low traffic volumes, limited access points, and a sidewalk is available on Blackhawk Road
(adjacent to this neighborhood) to connect pedestrians to the City and regional trail system.
Pedestrian curb ramps in the project area at the intersecting sidewalks will be replaced if
necessary to meet current ADA design standards. Given the existing and proposed elements
Ridgeview Acres - Jon Croft Acres
5
available for all users, the streets in this neighborhood meet the intent of the complete streets
guidelines.
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that no permits will be required for the resurfacing project.
Feasibility and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement (resurfacing) is considerably less
expensive than complete reconstruction of this street. The mill and overlay is feasible in that
this type of improvement has been used successfully to extend the life expectancy of numerous
other streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 — 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Cost Estimate
Detailed cost estimates are located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 25%, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Ridgeview Acres — Jon Croft Acres
• Mill & Overlay........................................................................ $ 172,000
• Repair Existing Concrete Curb & Gutter......... I ...................... $ 127,700
• Utility Improvements............................................................. 11,800
Total........................................................................... $311,500
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for residential streets. All assessments will be revised
based on final costs. A preliminary assessment roll is included in Appendix B.
Ridgeview Acres - Jon Croft Acres
6
City Special Assessment Policy
Assessment Ratio
Property City
Mill & Overlay - Low -Density Residential (R-1,2,3) 50% 50%
Repair Existing Concrete Curb & Gutter - 100%
Utility Improvements - 100%
Residential Lots — All residential lots (52 single family homes) as shown on Figure 2, having
driveway access on to the street to be improved are proposed to be assessed. The City's
Assessment Policy states that 50% of the mill and overlay costs are assessable for local
residential streets, based on a standard 32 -foot width. The estimated cost per residential unit,
based on the City's Assessment Policy, is $1,600/ lot and is calculated as follows:
Mill & Overlay - Residential Properties
o 9,025' Residential Frontage / 9,312' Total Frontage = 96.9%
o $172,000 (Mill & Overlay Costs) x 50% x 96.9% =$83,334 (Total R-1 Assessment)
o $83,334 / 52 lots = $1,602.58, rounded to $1,600 / single-family lot
The remaining frontage within the project area (287' or 3.1%) is considered non- assessable
under the City's Assessment Policy.
Assessment Financing Options
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2019 rate is not yet
available, however, it is expected to be comparable and based on City policy will be determined
by the City Council in the spring. The following payment schedule is an example of a residential
lot assessment of $1,600 with an estimated 4.5% interest for the assessed amounts, and
assumes 14 months interest for the first year:
Principal / Year Interest / Year V Cost /Year
1` Year $320 $84 $404
5th Year $320 $14 $334
Bonds may be issued to finance the improvements.
Ridgeview Acres - Jon Croft Acres
7
Revenue Source
A summary of revenue sources is listed below:
The Major Street Fund will finance the estimated street related project deficit of $216,500.
The Combined Utility Fund will finance the estimated $11,800 utility improvements.
Proiect Schedule
Present Feasibility Report to City Council/
OrderPublic Hearing.......................................................................................... Jan. 2, 2019
Project Cost
Property Assessment
City Contribution
Mill and Overlay (Including Signage)
$ 172,000
$ 83,200
$ 88,800
Repair Existing Curb & Gutter
$ 127,700
-
$ 127,700
Utility Improvements
$ 11,800
-
$ 11,800
Totals
$ 311,500
$ 83,200
$ 228,300
The Major Street Fund will finance the estimated street related project deficit of $216,500.
The Combined Utility Fund will finance the estimated $11,800 utility improvements.
Proiect Schedule
Present Feasibility Report to City Council/
OrderPublic Hearing.......................................................................................... Jan. 2, 2019
Informational Meeting.....................................................................................
Jan. 28, 2019
PublicHearing....................................................................................................Feb.
5, 2019
Approve Plans and Specifications....................................................................Feb.
19, 2019
BidDate........................................................................................................
March 28, 2019
AwardContract.................................................................................................April
2, 2019
Start Construction............................................................................................. May 1, 2019
ProjectCompletion.......................................................................................... August, 2019
Final Cost Report........................................................................................September, 2019
Final Assessment Hearing......................................................................................
Fall, 2019
First Payment Due with Property Tax Statement
........................................... May 15, 2020
Ridgeview Acres - Jon Croft Acres
8
Appendix A
Preliminary Cost Estimate
City Project 1312 Ridgeview Acres/ Jon Croft Acres
Item No.
Item
Unit I
2104.505
Unit Price
Est Qty
I
Estimated Cost
Part 1 - Bituminous Street Overlay
2360.501
SP WEA340B Wearing Course Mixture (Patch)
2504.602
Irrigation Repair
2506.602
Adjust Frame & Ring Casting (CB) HDPE Rings
2021.501
Mobilization
LS
$
6,000.00
1
$
6,000.00
2104.505
Remove Bituminous Pavement
SY
$
6.00
20
$
120.00
2232.501
Mill Bituminous Pavement - Full Width (1-1/4" Depth)
SY
$
2.00
15520
$
31,040.00
2357.502
Bituminous Material for Tack Coat
GAL
$
2.75
1010
$
2,777.50
2360.501
SP WEA340B Wearing Course Mixture (Overlay)
TON
$
52.00
1440
$
74,880.00
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
10
$
1,000.00
2504.602
Adjust Gate Valve Box
EA
$
250.00
2
$
500.00
2504.602
Repair Gate Valve Mid Section
EA
$
500.00
1
$
500.00
2504.602
Repair Gate Valve Top Section w/Cover
EA
$
425.00
1
$
425.00
2506.602
Adjust Frame and Ring Casting (Manhole)
EA
$
700.00
10
$
7,000.00
2506.602
Remove & Replace Frame & Ring Casting (27")
EA
$
1,250.00
1
$
1,250.00
2563.601
Traffic Control
LS
$
4,000.00
1
$
4,000.00
SP -1
Signage Remove and Replace
LS
$
1,550.00
1
$
1,550.00
Subtotal $ 131,042.50
5% Contingency
Subtotal
25% Indirect Costs
Part I - Bituminous Street Overlay
$ 6,552.13
$ 137,594.63
$ 34,398.66
$ 171,993.28
Item No. ' Item ` Unit Unit Price Est Qty Estimated Cost
i
Part II - Repair Existing Curb & Gutter
2104.501
Remove Concrete Curb and Gutter
2104.505
Remove Concrete Driveway /Valley Gutter
2105.501
Common Excavation
2211.501
Aggregate Base, Cl. 5 (100% Crushed)
2360.501
SP WEA340B Wearing Course Mixture (Patch)
2504.602
Irrigation Repair
2506.602
Adjust Frame & Ring Casting (CB) HDPE Rings
2506.602
Remove & Replace Casting 3067V (Catch Basin)
2506.602
Repair/ Grout CB or MH Invert/ Doghouses
2506.602
Install 2 x 3 CB Erosion Barrier Shroud
2531.501
Concrete Curb and Gutter, D412
2531.507
Concrete Valley Gutter - High Early
2540.602
Repair Underground Electric Fence
2540.602
Repair Landscaping
2572.503
Application of Water for Turf Establishment
2573.530
Storm Drain Inlet Protection
2575.550
Boulevard Topsoil Borrow- MnDOT 3877-21'
2575.609
Seeding (MnDOT 270 w/Type 5 Hydromulch)
Subtotal
LF
$
10.00
2430
$
24,300.00
SY
$
14.00
32
$
448.00
CY
$
35.00
10
$
350.00
TON
$
25.00
20
$
500.00
TON
$
100.00
70
$
7,000.00
EA
$
160.00
5
$
800.00
EA
$
550.00
7
$
3,850.00
EA
$
900.00
3
$
2,700.00
EA
$
400.00
6
$
2,400.00
EA
$
150.00
2
$
300.00
LF
$
20.00
2430
$
48,600.00
SY
$
75.00
32
$
2,400.00
EA
$
85.00
5
$
425.00
EA
$
200.00
2
$
400.00
GAL
$
0.15
22275
$
3,341.25
EA
$
175.00
2
$
350.00
CY
$
80.00
55
$
4,400.00
SY
$
7.50
495
$
3,712.50
Ridgeview Acres - Jon Croft Acres
9
$ 106,276.75
5% Contingency
$
5,313.84
Subtotal
$
111,590.59
25% Indirect Costs
$
27,897.65
Part II - Repair Existing Curb & Gutter
$
139,488.23
Part I - Bituminous Street Overlay
$
171,993.28
Part 11 - Repair Existing Curb & Gutter
$
139,488.23
Project 1312 Total Cost
$
311,481.52
Ridgeview Acres - Jon Croft Acres
10
Appendix B
Preliminary Assessment Roll
City Project #1312 Ridgeview Acres -Jon Croft Acres
Ridgeview Acres - Jon Croft Acres
11
Kyllo Ln
R-1 Residential
R-1 Residential
P.I.N.
Lot
Equivalent
# of lots
Unit Assessment
Total
Total
1785 Kyllo Ln
106400004080
1
1
$
1,600
$
1,600
1775 Kyllo Ln
106400004090.
1
1
$
1,600
$
1,600
1770 Kyllo Ln
100170075012
1
1
$
1,600
$
1,600
1765 Kyllo Ln
106400004100
1
1
$
1,600
$
1,600
1760 Kyllo Ln
101860000072 j
1
1
$
1,600
$
1,600
1755 Kyllo Ln
106400004110
1
1
$
1,600
$
1,600
1750 Kyllo Ln
101860000062
1
1
$
1,600
$
1,600
1745 Kyllo Ln
106400004120 !
1
1
$
1,600
$
1,600
1740 Kyllo Ln
101860000050
1
1
$
1,600
$
1,600
1735 Kyllo Ln
106400004130
1
1
$
1,600
$
1,600
1732 Kyllo Ln
101860000041
1
1
$
1,600
$
1,600
1726 Kyllo Ln
101860000031
1
1
$
1,600
$
1,600
1725 Kyllo Ln
106400004140
1
1
$
1,600
$
1,600
1714 Kyllo Ln
101860000021
1
1
$
1,600
$
1,600
Subtotal
Subtotal
14
14
$
22,400
Ridgeview Acres - Jon Croft Acres
11
Monterey Ln
R-1 Residential
PIN
Lot
Equivalent
# of lots
Unit Assessment
Total
1720 Monterey Ln
106400004010
1
1
$
1,600
$
1,600
1725 Monterey Ln
106400003150
1
1
$
1,600
$
1,600
1730 Monterey Ln
106400004020
1
1
$
1,600
$
1,600
1735 Monterey Ln
106400003140
1
1
$
1,600
$
1,600
1740 Monterey Ln
106400004030
1
1
$
1,600
$
1,600
1745 Monterey Ln
106400003130
1
1
$
1,600
$
1,600
j 1750 Monterey Ln
106400004040
1
1
$
1,600
$
1,600
1760 Monterey Ln
' 106400004050
1
1
$
1,600
$
1,600
1765 Monterey Ln
106500003120
1
1
1 $
1,600
$
1,600
1775 Monterey Ln
106400003110
1
1
$
1,600
$
1,600
1770 Monterey Ln
106400004060
1
1
$
1,600
$
1,600
1785 Monterey Ln
106400003100
1
1
$
1,600
$
1,600
I 1780 Monterey Ln
106400004070
1
1
$
1,600
$
1,600
1795 Monterey Ln
' 106400003090
1
1
; $
1,600
$
1,600
Subtotal
14
14$
22,400
Ridgeview Acres - Jon Croft Acres
11
Total R-1 Lots 52 52 $ 83,200
Residential Frontage 9,025 96.9%
Non -Assessable Frontage 287 3.1%
Total Frontage 9,312 100.0%
Ridgeview Acres - Jon Croft Acres
12
Knoll Ridge Dr
R-1 Residential
R-1 Residential
P.I.N
Equivalent ot
# of lots
Unit Assessment
Total
Total
3670 Knoll Ridge Dr
106400001010
1
$
1
$
1,600
$
1,600
3660 Knoll Ridge Dr
106400001020
1
1,600
1
$
1,600
$
1,600
i 3650 Knoll Ridge Dr
106400001030
1
$
1
$
1,600
$
1,600
3640 Knoll Ridge Dr
106400001040
1
1,600
1
$
1,600
$
1,600
3630 Knoll Ridge Dr
106400001050
I 1
1740 Crestridge Ln
1
$
1,600
$
1,600 i
3620 Knoll Ridge Dr
106400001060
1
106400002040
1
$
1,600
$
1,600
3610 Knoll Ridge Dr
106400001070
1
1
1 I
$
1,600
$
1,600 j
1757 Crestridge Ln
Subtotal
7
1
7
1,600
$
$
11,200
Total R-1 Lots 52 52 $ 83,200
Residential Frontage 9,025 96.9%
Non -Assessable Frontage 287 3.1%
Total Frontage 9,312 100.0%
Ridgeview Acres - Jon Croft Acres
12
Crestridge Ln
R-1 Residential
P.I.N
Lot
Equivalent
# of lots
Unit Assessment
Total
1725 Crestridge Ln
106400002010
1
1
$
1,600
$
1,600
1720 Crestridge Ln
106400003010
1
1
$
1,600
$
1,600 i
1730 Crestridge Ln
106400003020
1
1
i $
1,600
$
1,600
1735 Crestridge Ln
106400002020
1
1
$
1,600
$
1,600
1 1745 Crestridge Ln
106400002030
1
1
$
1,600
$
1,600
1740 Crestridge Ln
106400003030
1
1
$
1,600
$
1,600
1751 Crestridge Ln
106400002040
1
1
$
1,600
$
1,600
1750 Crestridge Ln
106400003040
1
1
$
1,600
$
1,600
1757 Crestridge Ln
106400002050
1
1
$
1,600
$
1,600
1760 Crestridge Ln
106400003050
1
1
$
1,600
$
1,600
1765 Crestridge Ln
106400002060
1
1
$
1,600
$
1,600
1770 Crestridge Ln
106400003060
1
1
$
1,600
$
1,600
1775 Crestridge Ln
106400002070
1
1
$
1,600
$
1,600
1780 Crestridge Ln
106400003070
1
1
$
1,600
$
1,600
1785 Crestridge Ln
106400002080
1
1
$
1,600
$
1,600
1790 Crestridge Ln
106400003080
1
1
1 $
1,600
$
1,600
1795 Crestridge Ln
106400002090
1
1
$
1,600
$
1,600
Subtotal
17
17
$
27,200
Total R-1 Lots 52 52 $ 83,200
Residential Frontage 9,025 96.9%
Non -Assessable Frontage 287 3.1%
Total Frontage 9,312 100.0%
Ridgeview Acres - Jon Croft Acres
12
"%4% 0 , 2019 Street Revitalization - Project 1312
Ridgeview Acres & Jon Croft Acres
ter'
Silver Bell R
t
+ r
rttt r v
Y'
t e Diffle� `a
rM
Treat
Plant
coy
M.—
�, r
0O r AC—hoe I
PZ.* b, J
T-
vip, Odparkway !
L; Ridgeview Acres & Jon Croft Acres
Project 1312
DL(ckw d Dr
q y Y
' � r
r U E a
f Icl<
Mw&Vv ake
�, IL FryF lake
oke lA.— oak ca Cwler LLbmry y
i Paha•
YCaswae pw
,.1 cr, a•y /..1
• Arena`
-p6eioci'd Dr r'
� P
:0, i 5
I qq' qfj � taer� Poxd
r
P-1 s xQie rr
I1 k
oxx 1
_ r � xaJtAe+E'a'�st
7Bumar Luke
J � Trvnnt
Mr CartA-
rnka �-t.
Faruk c
A k
Mi
I,•ke {
Parx�a'<r� ��,✓\
.%not flil
Document Path: L:IUSERSIPUBWORKS\Engineering\Projects\2019 Street Improvements\1312 - Ridgeview Acre"on Croft Acres11312 Location.mxd
Date: 12/13/2018
FIG 1
C„ffLske
Y'
t e Diffle� `a
rM
Treat
Plant
coy
M.—
�, r
0O r AC—hoe I
PZ.* b, J
T-
vip, Odparkway !
L; Ridgeview Acres & Jon Croft Acres
Project 1312
DL(ckw d Dr
q y Y
' � r
r U E a
f Icl<
Mw&Vv ake
�, IL FryF lake
oke lA.— oak ca Cwler LLbmry y
i Paha•
YCaswae pw
,.1 cr, a•y /..1
• Arena`
-p6eioci'd Dr r'
� P
:0, i 5
I qq' qfj � taer� Poxd
r
P-1 s xQie rr
I1 k
oxx 1
_ r � xaJtAe+E'a'�st
7Bumar Luke
J � Trvnnt
Mr CartA-
rnka �-t.
Faruk c
A k
Mi
I,•ke {
Parx�a'<r� ��,✓\
.%not flil
Document Path: L:IUSERSIPUBWORKS\Engineering\Projects\2019 Street Improvements\1312 - Ridgeview Acre"on Croft Acres11312 Location.mxd
Date: 12/13/2018
FIG 1
uz � --. 41-4-
2019 Street Revitalization - Project 1312
Ridgeview Acres & Jon Croft Acres
Document Path: L:\USERS%PUBWORKSIEngineeringlProjects12019 Street Improvements11312 - Ridgeview Acres -Jon CroftAcres11312.mxd Date: 12/18/2018
FIG 2
O Eq� 2019 Street Revitalization - Project 1312
Z Ridgeview Acres & Jon Croft Acres
OA o
1.25" FULL WIDTH MILL
�\
Typical Street Sections
60' ROW
32' F -F
PAVEMENT SECTION
3.5" BASE COURSE
6" CLASS 5 AGG BASE
COMPACTED SUBGRADE
D412 CONCRETE
CURB AND GUTTER
EXIST. TYPICAL SECTION
RIDGEVIEW ACRES - JON CROFT ACRES
60' ROW
32' F -F
1.5" TYPE 2360 BITUMINOUS OVERLAY
BITUMINOUS TACK COAT
2" BITUMINOUS SURFACE
6" CLASS 5 AGG BASE
COMPACTED SUBGRADE
D412 CONCRETE
CURB AND GUTTER
PROPOSED TYPICAL SECTION
RIDGEVIEW ACRES - JON CROFT ACRES
Document Path: L:IUSERSIPUBWORKSIEngineering\Projects12019 Street Improvements11312 - RidgeviewAcres-Jon Cro3Acres11312 Fig 3.mxd
Date: 12/12/2018
FIG 3
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
M. Project 1313, Old Sibley Highway
Street Improvements
Action To Be Considered:
Receive the Draft Feasibility Report for Project 1313 Old Sibley Highway - Street
Improvements) and schedule a public hearing to be held on February 5, 2019.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of a portion of Old Sibley Highway, a mixed-use street
in northwest Eagan, located north of Diffley Road and east of Highway 13.
A structural mill and overlay of these streets is programmed for 2019 in the City of
Eagan’s 5-Year CIP (2019-2023).
A draft Feasibility Report has been prepared and is being presented to the Council
for their consideration of scheduling a public hearing for Tuesday, February 5, 2019.
An informational neighborhood meeting will be held with the adjacent property
owners prior to the formal public hearing to review and discuss the proposed
improvements.
Attachments (1)
CM-1 Draft Feasibility Report
� s• r
• r r
••ter
EAGAN•.++
Report for rDDhTQFT�
Old Sibley Highway
Neighborhood Street Revitalization
City Project No. 1313
January 2, 2019
f
�y r.
- J M a •�s�,,,�
�� � ,ire _ � � �, •��
iA
R
01.ri
JF
44
�L�
•••rrrEAGAN
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Jan. 2, 2019
Re: Old Sibley Highway Street Revitalization
City Project No.: 1313
Attached is the feasibility report for the Old Sibley Highway Street Revitalization, City Project
No. 1313. The report presents and discusses the proposed improvements and includes a cost
estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Aaron Nelson
Date: Reg. No. 45795
Reviewed By:
Department of Public Works Date:
Reviewed By:
Finance Department Date:
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Jan. 2, 2019
Re: Old Sibley Highway Street Revitalization
City Project No.: 1313
Attached is the feasibility report for the Old Sibley Highway Street Revitalization, City Project
No. 1313. The report presents and discusses the proposed improvements and includes a cost
estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Aaron Nelson
Date: Reg. No. 45795
Reviewed By:
Department of Public Works Date:
Reviewed By:
Finance Department Date:
TABLE OF CONTENTS
ExecutiveSummary..................................................................................................... 1
Introduction/History.......................................................................................................2
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
StreetPavement Evaluation.........................................................................................3
ProposedImprovements..............................................................................................4
Easements/Permits......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................6
Assessments................................................................................................................6
AssessmentFinancing Options.....................................................................................8
RevenueSource...........................................................................................................8
ProjectSchedule..........................................................................................................9
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
- 2 Street Improvement/Assessment Area Map
- 3 Typical Section — Mill & Overlay
Executive Summary
Background
Project Name
Old Sibley Highway
Project #
i
1313
Street Area
6,777 Sq. Yds. j
Street length
1,782 Feet
84,800
1-1/2" overlay)
Constructed
South section - 1970
• North Section (836' east of O.S.M.H. to
Improvement
Resurface
North section - 1998
South section 1979, 1998
f Reconstructed
& 1-1/2" overlay) I
Old Sibley Highway
1,100
North section — N/A
Streets Included
Utility Improvements
• Adjustment/Replacement of. I
71100 I i
-
o Sanitary/Storm sewer
Crack Sealed
-
2006, 2013
Seal Coated
5 Parcels
SW % of Section 19
East of Highway 13
Absolute Location
Township 27, Range 23
Relative Location
North of Diffley Rd
Project Details
• South Section (Diffley to Old Sibley
PCI Rating
43/100
Memorial Hwy) — overlay (edge mill &
$
84,800
1-1/2" overlay)
Recommended
Overlay &
• North Section (836' east of O.S.M.H. to
Improvement
Resurface
cul-de-sac) — resurfacing (full width mill
Curb Removal i
8%
& 1-1/2" overlay) I
$
1,100
Scope • Replacement of damaged curb & gutter]
-
Utility Improvements
• Adjustment/Replacement of. I
71100 I i
-
o Sanitary/Storm sewer
Residential Units (R-3)
236 units
o Utility castings
Commercial/ Ind. Lots
5 Parcels
o Water gate valves
o Street signage
• Utility Improvements
Cost Estimate/ Revenue
Old Sibley Highway
1
Property
City
Mill & Overlay w/ Signage
$
84,800
$ 48,053
$ 36,747
Repair Existing Concrete Curb & Gutter
$
22,500
-
$ 22,500
j Concrete Entrance Repairs
$
1,100
$ 1,100
-
Utility Improvements
$
71100 I i
-
$ 7,100
Total
$ 115,500
f
$ 49,153 (43%)
$ 66,347 (57%)
Old Sibley Highway
1
January 2, 2019
Neighborhood Street Revitalization
Old Sibley Highway
Eagan, Minnesota
Introduction/ Histo
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 1,782 feet of residential street (Old Sibley Highway) in western Eagan has been identified
for 2019 street revitalization improvements. Figure 1, located in Appendix C, illustrates the
project location. The southern section of the street was originally constructed in 1970, and was
overlayed in 1979 and 1998. The northern section of the street was originally constructed in
1998, and has not yet been overlayed.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the road located within the project area, which is currently in the 21 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the street was seal coated in 2006 and 2013.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Old Sibley Highway
2
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scone
This project will provide an overlay (edge mill and overlay from Diffley Road to Old Sibley
Memorial Highway), and resurfacing (full width mill and overlay) from 836' east of Old Sibley
Memorial Highway to the cul-de-sac (approximately 1,782 total feet of roadway). Figure 2 in
Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves, utility improvements, and replacement of street signage.
Area to Be Included
Properties included in the project lie within the SW %, Section 19, lying East of Highway 13,
North of Diffley Road in Township 27, Range 23, in the City of Eagan, Dakota County,
Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI
Recommended Improvement
56-100
Routine Maintenance/Crack Seal/Seal Coat
36-55
Patch/Repair and/or Overlay
0-35
Reconstruct/ Reclaim
The 2019 PCI rankings for the street segments have a weighted average pavement condition
rating of 43, which falls in the "Patch/Repair and/or Overlay" category, as mentioned above.
Old Sibley Highway
3
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Proposed Improvements
Pavement - The proposed street
improvements shown in Figure 3. The
existing street section for this roadway
consists of 4-1/2" bituminous pavement
supported by 8" gravel base. The
existing bituminous surface in the
southern section will be milled adjacent
to the existing curb and gutter (6'-8'
wide) to accommodate a 1% -inch
bituminous overlay, and the northern
section will be milled across its entire
width to accommodate a 1-1/2"
,I -
overlay. The overlay, combined with the -W
existing street section, will provide a
street section consistent with current City standards for residential streets
The combination of
patching and overlay will not eliminate cracking due to the temperature extremes experienced
in Minnesota. Bituminous overlays will show some continued frost movements and reflective
cracking consistent with the underlying pavement. Routine maintenance will still need to
continue under the City's Pavement Management Program.
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalled, or settled. It is estimated that
approximately 8% of the existing concrete curb
and gutter will have to be replaced. Boulevard
turf will be removed and replaced with seed.
While the contractor who performs the work is
responsible for its establishment (45 days for
seed), adjacent property owners are
encouraged to consistently water the new turf,
where possible, to help ensure its growth.
Utility Adjustment/Replacement — Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
Old Sibley Highway
4
ensure quick and easy access by the City for maintenance and other purposes. There are a few
manhole structures that require doghouse/invert repairs and casting ajsutements due to
deterioration. These improvements will be financed through the Combined Utility Fund.
Signage - Traffic and street identification signage within the
project limits have reached the end of their useful life expectancy
and are in need of replacement. Signs have been reviewed for
compliance with the Minnesota Manual on Uniform Traffic
Control Devices (MnMUTCD). Those that are required by the
MnMUTCD will be replaced to improve safety and night time
visibility, and those that are not will be permanently removed.
Street Lights—The street lights in the project area (maintained
by Dakota Electric Association) are in good condition and provide
adequate coverage. No modifications to the existing street lights
are proposed.
i
Complete Streets — "Complete Streets" is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
The streets in this area were reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The streets are relatively narrow at 30 feet wide,
have low traffic volumes, limited access points, trails internal to the townhome development,
and a trail is located along Diffley Road to connect pedestrians to the City and regional trail
system. Pedestrian curb ramps in the project area at the intersecting sidewalks will be replaced
Old Sibley Highway
5
if necessary to meet current ADA design standards. Given the existing and proposed elements
available for all users, the streets in this neighborhood meet the intent of the complete streets
guidelines.
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that a right-of-way permit from Dakota County will be required to perform the work
within the Diffley Road right-of-way.
Feasibility and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement (resurfacing) is considerably less
expensive than complete reconstruction of this street. The mill and overlay is feasible in that
this type of improvement has been used successfully to extend the life expectancy of numerous
other streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 — 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Cost Estimate
Detailed cost estimates are located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 30%, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Old Sibley Highway
• Mill & Overlay........................................................................ $ 84,800
• Repair Existing Concrete Curb & Gutter ................................ $ 22,500
• Concrete Entrance Repairs .................................................... $ 1,100
• Utility Improvements............................................................. 7,100
Total........................................................................... $115500
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for residential streets. All assessments will be revised
based on final costs. A preliminary assessment roll is included in Appendix B.
Old Sibley Highway
6
City Special Assessment Policy
Mill & Overlay - Low -Density Residential (R-1,2,3)
Mill & Overlay — Commercial/ Industrial
Repair Existing Concrete Curb & Gutter
Utility Improvements
Concrete Entrance Repairs
• Total Front Feet (F.F.) = 3,564 F.F.
• C/I Streets = 880 F.F.
• R-3 Streets = 2249 F.F.
• Unassessable frontage = 435 F.F.
• Total Net Acreage = 10.67 net acres
Assessment Ratio
Property
City
50%
50%
100%
-
-
100%
-
100%
100%
-
Residential Lots —All residential lots (236 townhome units) as shown on Figure 2, having
driveway or private street access on to the street to be improved, are proposed to be assessed.
The City's Assessment Policy states that 50% of the mill and overlay costs are assessable for
local residential streets, based on a standard 32 -foot width. The estimated cost per residential
unit, based on the City's Assessment Policy, is $115/ unit and is calculated as follows:
Mill & Overlay - Residential Properties
o 2,249' Residential Frontage / 3,564' Total Frontage = 63.1%
o $84,800 (Mill & Overlay Costs) x 50% x 63.1% = $26,754 (Total R-3 Assessment)
o $26,754 / 236 units = $113.36, rounded to $115 / townhome unit
Commercial/Industrial Parcels — All commercial/industrial properties (5 total) as shown on
Figure 2, adjacent to, or having access on to the street to be improved, are proposed to be
assessed. The City's Assessment Policy states that 100% of the mill and overlay costs are
assessable for commercial roadways, regardless of width. The estimated cost per net acre,
based on the City's Assessment Policy, is $1,960/ net acre and is calculated as follows:
Mill & Overlay — (C/1)
o 880' C/I Frontage / 3,564' Total Frontage = 24.7% C/I Frontage
o $84,800 (Mill & Overlay Costs) x 100% (Assessment Rate) x 24.7% (C/I frontage) =
$20,946
o $20,946 / 10.67 net acres = $1,963.07, rounded to $1,960 / net acre (C/1)
The remaining frontage within the project area (435' or 12.2%) is considered non- assessable
under the City's Assessment Policy,
Old Sibley Highway
7
Driveway Entrance Replacement — Several properties have driveway entrances with damaged
concrete driveway apron sections that will be repaired. Properties are proposed to be assessed
for the total cost of repairs. The estimated cost of driveway repairs is approximately $1,100 or
$160/ SY and is calculated as follows:
• Total area of concrete driveway apron repair = 6 SY
• Total concrete driveway apron cost = $1,100
• Total cost/SY = $183.33, rounded to $183/ SY
Assessment Financing Options
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners, and 10 years for commercial/ industrial properties. In 2018, the
interest rate was set at 4.5%. The 2018 rate is not yet available, however, it is expected to be
comparable and based on City policy will be determined by the City Council in the spring. The
following payment schedule is an example of a residential lot assessment of $115, and a C/I
assessment of $1,000, with an estimated 4.5% interest for the assessed amounts, and assumes
14 months interest for the first year:
$115 R-3 assessment:
r Principal / Year Interest / Year Cost / Year
wlst Year $23 $6 F$29
5th Year r $23 �$1 F$24
Commercial/ Industrial Per $1,000 assessed:
FPrincipal / Year Interest / Year Cosi/ Year
FSt Year 100 r$53 $153
loth Year 1 $100 $5 f $105
Bonds may be issued to finance the improvements.
Revenue Source
A summary of revenue sources is listed below:
Old Sibley Highway
8
Project Cost
Property Assessment
City Contribution
Mill and Overlay (Including Signage)
$ 84,800
$ 48,053
$ 36,747
Repair Existing Curb & Gutter
$ 22,500
-
$ 22,500
Concrete Entrance Repairs
$ 1,100
$ 1,100
-
Utility Improvements
$ 7,100
-
$ 7,100
Totals
$ 115,500
$ 49,153
$ 66,347
Old Sibley Highway
8
The Major Street Fund will finance the estimated street related project deficit of $59,247.
The Combined Utility Fund will finance the estimated $7,100 utility improvements.
Proiect Schedule
Present Feasibility Report to City Council/
Order Public Hearing..........................................................................................
Jan. 2, 2019
Informational Meeting..................................................................................... Jan. 28, 2019
PublicHearing....................................................................................................Feb. 5, 2019
Approve Plans and Specifications....................................................................Feb. 19, 2019
BidDate........................................................................................................
March 28, 2019
AwardContract.................................................................................................April 2, 2019
Start Construction............................................................................................. May 1, 2019
ProjectCompletion..........................................................................................
August, 2019
Final Cost Report........................................................................................September,
2019
Final Assessment Hearing......................................................................................Fall,
2019
First Payment Due with Property Tax Statement
........................................... May 15, 2020
Old Sibley Highway
9
Appendix A
Preliminary Cost Estimate
City Project 1313 Old Sibley Highway
Item No. Item Unit Unit Price Est City Estimated Cost
Part 1 - Bituminous Street Overlay
2021.501
Mobilization
LS
$
6,000.00
1
$
6,000.00
2104.505
Remove Bituminous Pavement
SY
$
6.00
20
$
120.00
2232.501
Mill Bituminous Pavement (1- 1/4" depth, 6' Width)
SY
$
1.30
1500
$
1,950.00
2232.501
Mill Bituminous Pavement - Full Width (1-1/4" Depth)
SY
$
2.00
3245
$
6,490.00
2357.502
Bituminous Material for Tack Coat
GAL
$
2.75
440
$
1,210.00
2360.501
SP WEA340B Wearing Course Mixture (Overlay)
TON
$
52.00
630
$
32,760.00
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
10
$
1,000.00
2504.602
Adjust Gate Valve Box
EA
$
250.00
4
$
1,000.00
2504.602
Repair Gate Valve Mid Section
EA
$
500.00
1
$
500.00
2504.602
Repair Gate Valve Top Section w/Cover
EA
$
425.00
1
$
425.00
2506.602
Adjust Frame and Ring Casting (Manhole)
EA
$
700.00
8
$
5,600.00
2563.601
Traffic Control
LS
$
4,000.00
1
$
4,000.00
SP -1
Signage Remove and Replace
LS
$
1,035.00
1
$
1,035.00
Subtotal $ 62,090.00
5% Contingency
Subtotal
30% Indirect Costs
Part I - Bituminous Street Overlay
$ 3,104.50
$ 65,194.50
$ 19,558.35
$ 84,752.85
Item No. Item Unit Unit Price Est Qty Estimated Cost
Part II - Repair Existing Curb & Gutter
2104.501
Remove Concrete Curb and Gutter
LF
$
10.00
295
$
2,950.00
2104.505
Remove Concrete Driveway /Valley Gutter
SY
$
14.00
33
$
462.00
2105.501
Common Excavation
CY
$
35.00
10
$
350.00
2211.501
Aggregate Base, CI.5 (100% Crushed)
TON
$
25.00
10
$
250.00
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
14
$
1,400.00
2504.602
Irrigation Repair
EA
$
160.00
2
$
320.00
2506.602
Adjust Frame & Ring Casting (CB) HDPE Rings
EA
$
550.00
8
$
4,400.00
2506.602
Repair/ Grout CB or MH Invert/ Doghouses
EA
$
400.00
2
$
800.00
2506.602
Install 2 x 3 CB Erosion Barrier Shroud
EA
$
150.00
2
$
300.00
2531.501
Concrete Curb and Gutter, B618
LF
$
23.00
295
$
6,785.00
2531.507
Concrete Valley Gutter - High Early
SY
$
75.00
33
$
2,475.00
2572.503
Application of Water for Turf Establishment
GAL
$
0.15
2250
$
337.50
2575.550
Boulevard Topsoil Borrow -MnDOT3877-2F
CY
$
80.00
6
$
480.00
2575.609
Seeding (MnDOT 270 w/Type 5 Hydromulch)
SY
$
7.50
50
$
375.00
Subtotal $ 21,684.50
5% Contingency $ 1,084.23
Subtotal $ 22,768.73
30% Indirect Costs $ 6,830.62
Part II - Repair Existing Curb & Gutter $ 29,599.34
Old Sibley Highway
10
Item No. I Item I Unit Unit Price Est Qty Estimated Cost
Part III - Concrete Entrance Replacement
2104.505 Remove Concrete Driveway/Valley Gutter
SY
$
14.00
6
$
84.00
2104.505 Remove Bituminous Pavement
SY
$
6.00
2
$
12.00
2105.501 Common Excavation
CY
$
35.00
2
$
70.00
2211.501 Aggregate Base, Cl. 5 (100% Crushed)
TON
$
25.00
1
$
25.00
2360.501 SP WEA34CB Wearing Course Mixture (Patch)
TON
$
100.00
1
$
100.00
2531.507 Repair 8" Concrete Driveway Pavement - High Early
SY
$
85.00
6
$
510.00
Subtotal
$
801.00
5% Contingency
$
40.05$
Subtotal
841.05
30% Indirect Costs
$
252.32
Part III - Concrete Entrance Replacement
$
1,093.37
Part I - Bituminous Street Overlay
$
84,752.85
Part II - Repair Existing Curb & Gutter
$
29,599.34
Part III - Concrete Entrance Replacement
$
1,093.37
Project 1313 Total Cost $ 115,445.56
Old Sibley Highway
11
Appendix B
Preliminary Assessment Roll
City Project #1313 Old Sibley Highway
RESIDENTIAL PROPERTIES
Old Sibley Highway
12
Old Sibley HWY
R-1 Residential
i
P.I.N.
# Units
Unit
Assessment
Unit
Assessment
Total
I 4177 Old Sibley HWY
102242701010
1
$
115
$
115
4173 Old Sibley HWY
102242701020
1
$
115
$
115
4169 Old Sibley HWY
102242701030
1
$
115
$
115
4165 Old Sibley HWY
102242701040
1
$
115
$
115
4161 Old Sibley HWY
102242701050
1
$
115
$
115
4157 Old Sibley HWY
102242701060
1
$
115
$
115
4153 Old Sibley HWY
102242701070
1
$
115
$
115
115
Subtotal
7
1
$
$
805
Old Sibley Highway
12
Liberty Ln
R-1 Residential
P.I.N.
# Units
Unit
Assessment
Total
2247 Liberty Ln
102242702010
1
$
115
$
115
2243 Liberty Ln
102242702020
1
$
115
$
115
2239 Liberty Ln
102242702030
1
$
115
$
115
2235 Liberty Ln
102242702040
1
$
115
$
115
2231 Liberty Ln
102242702050
1
$
115
$
115
2229 Liberty Ln
102242702060
1
$
115
$
115
2225 Liberty Ln
102242702070
1
$
115
$
115
2221 Liberty Ln
102242702080
1
$
115
$
115
2217 Liberty Ln
102242702090
1
$
115
$
115
2213 Liberty Ln
102242702100
1
$
115
$
115
2209 Liberty Ln
102242702110
1
$
115 i
$
115
2205 Liberty Ln
102242702120
1
$
115
$
115
2201 Liberty Ln
102242702130
1
$
115
$
115
2197 Liberty Ln
102242702140
1
$
115
$
115
2196 Liberty Ln
102242702150
1
$
115
$
115
2198 Liberty Ln
102242702160
1
$
115
$
115
2200 Liberty Ln
102242702170
1
$
115
$
115
2204 Liberty Ln
102242702180
1
$
115
$
115
2208 Liberty Ln
102242702190
1
$
115
$
115
2212 Liberty Ln
102242702200
1
$
115
$
115
2216 Liberty Ln
102242702210
1
$
115
$
115
2220 Liberty Ln
102242702220
1
$
115
$
115 j
2224 Liberty Ln
102242702230 j
1
$
115
$
115
2228 Liberty Ln
102242702240
1
$
115
$
115
2232 Liberty Ln
102242702250
1
$
115
$
115
2236 Liberty Ln
102242702260
1
$
115
$
115
2240 Liberty Ln
102242702270 i
1
$
115
$
115
2244 Liberty Ln
102242702280
1
$
115 t
$
115
2248 Liberty Ln
1 102242702290 !
1
$
115
$
115
Subtotal
29
$
3,335
Old Sibley Highway
12
Old Sibley Highway
13
Running Brook Rd
Rocky
Rapids Way
R-1 Residential
P.I.N.
# Units
Unit
Assessment
R-1 Residential
P.I.N.
# Units
Unit
Assessment
1
Total
2220
ROCKY
RAPIDS WAY
102242604108
1
$
115
$
115
2208
ROCKY
RAPIDS WAY
102242604102
1
$
115
$
115
2206 ROCKY
RAPIDS WAY
102242604101
1
$
115 I
$
115
2198
ROCKY
RAPIDS WAY
102242604005
1
$
115
$
115
2196
ROCKY
RAPIDS WAY
102242604004
1
$
115
$
115
2200
ROCKY
RAPIDS WAY
102242604006
1
$
115
$
115
2194
ROCKY
RAPIDS WAY
102242604003
1
$
115
$
115
2204
ROCKY
RAPIDS WAY
102242604008
1
$
115
$
115
2190
ROCKY
RAPIDS WAY
102242604001
1
$
115
$
115
2191
ROCKY
RAPIDS WAY
102242603908
1
$
115
$
115
2201
ROCKY
RAPIDS WAY
102242603903
1
$
115
$
115
2199
ROCKY
RAPIDS WAY
102242603904
1
$
115
$
115
2218
ROCKY RAPIDS WAY
102242604107
1
$
115
$
115
2214
ROCKY RAPIDS WAY
102242604105
1
$
115
$
115
2216
ROCKY
RAPIDS WAY
102242604106
1
$
115
$
115
2212
ROCKY
RAPIDS WAY
102242604104
1
$
115
$
115
2210
ROCKY
RAPIDS WAY
102242604103
1
$
115
$
115
2202
ROCKY
RAPIDS WAY
102242604007
1
$
115 j
$
115
2192
ROCKY
RAPIDS WAY
102242604002
1
$
115
$
115
2193
ROCKY
RAPIDS WAY
102242603907
1
$
115
$
115
2195
ROCKY
RAPIDS WAY
102242603906
1
$
115
$
115
2197
ROCKY
RAPIDS WAY
102242603905
1
$
115
$
115
2203
ROCKY
RAPIDS WAY
102242603902
1
$
115
$
115
2205
ROCKY
RAPIDS WAY
102242603901
1
$
115
$
115
Sub
1
$
2,760
Old Sibley Highway
13
Running Brook Rd
R-1 Residential
P.I.N.
# Units
Unit
Assessment
Total
4169 RUNNING BROOK RD
102242604506
1
$
115
$
115
4171 RUNNING BROOK RD
102242604505
1
$
115
$
115
4175 RUNNING BROOK RD
102242604503
1
$
115
$
115
4177 RUNNING BROOK RD
102242604502
1
$
115
$
115
4194 RUNNING BROOK RD
102242604306
1
$
115
$
115
4196 RUNNING BROOK RD
102242604307
1
$
115
$
115
4198 RUNNING BROOK RD
102242604308
1
$
115
$
115
4190 RUNNING BROOK RD
102242604304
1
$
115
$
115
4186 RUNNING BROOK RD
102242604302
1
$
115
$
115
4184 RUNNING BROOK RD
102242604301
1
$
115
$
115
4178 RUNNING BROOK RD
102242604206
1
$
115
$
115
4172 RUNNING BROOK RD
102242604203
1
$
115
$
115
4185 RUNNING BROOK RD
102242604406
1
$
115
$
115
4180 RUNNING BROOK RD
102242604207
1
$
115
$
115
4183 RUNNING BROOK RD
102242604407
1
$
115
$
115
4192 RUNNING BROOK RD
102242604305
1
$
115
$
115
4188 RUNNING BROOK RD
102242604303
1
$
115 j
$
115
4176 RUNNING BROOK RD
1022426C4205
1
$
115
$
115
4174 RUNNING BROOK RD
102242604204
1
$
115
$
115
4189 RUNNING BROOK RD
102242604404
1
$
115
$
115
Old Sibley Highway
13
4187 RUNNING
BROOK RD
102242604405
1
$
115
$
115
4191 RUNNING
BROOK RD
102242604403
1
$
115
$
115
4170 RUNNING
BROOK RD
102242604202
1
$
115
$
115
4193 RUNNING
BROOK RD
102242604402
1
$
115
$
115
4182 RUNNING
BROOK RD
102242604208
1
$
115
$
115
4181 RUNNING
BROOK RD
102242604408
1
$
115
$
115
4168 RUNNING
BROOK RD !
102242604201
1
$
115
$
115
4195 RUNNING
BROOK RD
102242604401
1
$
115
$
115
4173 RUNNING
BROOK RD
102242604504
1
$
115
$
115
4179 RUNNING
BROOK RD
102242604501 1
1
$
115
$
115
CIR
102242603604
Subtotal 1
30
115
$
$
3,450
Old Sibley Highway
14
Cool Stream Cir
R-1 Residential
P.I.N.
# Units
Unit
Assessment
Total
2174 COOL STREAM
OR
102242603805
1
$
115
$
115
2172 COOL STREAM
CIR
102242603804
1
$
115
$
115
2170 COOL STREAM
CIR
102242603803
1
$
115
$
115
2154 COOL STREAM
CIR
102242603703
1
$
115
$
115
2166 COOL STREAM
CIR
102242603801
1
$
115
$
115
2156 COOL STREAM
CIR
102242603704
1
$
115
$
115
2158 COOL STREAM
CIR
102242603705
1
$
115
$
115
2164 COOL STREAM
CIR
102242603708
1
$
115
$
115
2159 COOL STREAM
CIR
102242603604
1
$
115
$
115 1
2185 COOL STREAM
CIR
102242603403
1
$
115
$
115
2161 COOL STREAM
CIR
102242603603
1
$
115
$
115
2167 COOL STREAM
CIR
102242603506
1
$
115
$
115
2151 COOL STREAM
CIR
102242603608
1
$
115
$
115
2163 COOL STREAM
CIR
102242603602
1
$
115
1 $
115
2175 COOL STREAM
CIR
102242603502 !
1
$
115
$
115
2173 COOL STREAM
CIR
102242603503
1
$
115
$
115
2165 COOL STREAM
CIR
102242603601
1
$
115
$
115
2171 COOL STREAM
CIR
102242603504
1
$
115
$
115
2176 COOL STREAM
CIR
102242603806
1
$
115
$
115
2178 COOL STREAM
CIR
102242603807
1
$
115
$
115
2180 COOL STREAM
CIR
102242603808
1
$
115
$
115
2152 COOL STREAM
CIR
102242603702
1
$
115
$
115
2168 COOL STREAM
CIR
102242603802
1
$
115
$
115
2160 COOL STREAM
CIR
102242603706
1
$
115
$
115
2150 COOL STREAM
CIR
102242603701
1
$
115
$
115
2162 COOL STREAM
CIR
102242603707
1
$
115
! $
115
2179 COOL STREAM
CIR
102242603406
1
$
115
$
115
2181 COOL STREAM
CIR
102242603405
1
$
115
$
115
2189 COOL STREAM
CIR
102242603401
1
$
115
$
115
2157 COOL STREAM
CIR
102242603605
1
$
115 +
$
115 E
2183 COOL STREAM
CIR
102242603404
1
$
115
$
115
2187 COOL STREAM
CIR
102242603402
1
$
115
$
115
2155 COOL STREAM
CIR
102242603606
1
$
115
$
115
2153 COOL STREAM
CIR
102242603607
1
$
115
$
115
2177 COOL STREAM
CIR
102242603501
1
$
115
$
115
2169 COOL STREAM
CIR
102242603505
1
$
115
$
115
Subtotal
36
$
4,140 1
Old Sibley Highway
14
F--
White Water Way
R-1 Residential 4
P.I.N.
# Units
Unit
Assessment
Total
2222 WHITE WATER WAY
102242604606
1
$
115
$
115
2216 WHITE WATER WAY
102242604603
1
$
115
$
115
2214 WHITE WATER WAY
102242604602
1
$
115
$
115
2212 WHITE WATER WAY
102242604601
1
$
115
$
115
2238 WHITE WATER WAY
102242604708
1
$
115
$
115
2234 WHITE WATER WAY
102242604706
1
$
115
$
115
2232 WHITE WATER WAY
102242604705
1
$
115
$
115
2230 WHITE WATER WAY
102242604704
1
$
115
$
115
2228 WHITE WATER WAY
102242604703
1
$
115$
$
115
2217 WHITE WATER WAY
102242604803
1
$
115
$
115
2215 WHITE WATER WAY
102242604804
1
$
115
$
115
2213 WHITE WATER WAY
102242604805
1
$
115
$
115
2221 WHITE WATER WAY
102242604801
1
$
115
$
115
2220 WHITE WATER WAY
102242604605
1
$
115
$
115
2218 WHITE WATER WAY
102242604604
1
$
115 i
$
115
2236 WHITE WATER WAY
102242604707
1
$
115
$
115
2226 WHITE WATER WAY
102242604702
1
$
115
$
115
2224 WHITE WATER WAY
102242604701
1
$
115
$
115
2219 WHITE WATER WAY
102242604802
1
$
115
$
115
2211 WHITE WATERWAY
102242604806
1
$
115
$
115
2180 WATER LILLY LN
Subtotal
20$
$
115
$
2,300
F--
Water Lilly Ln
R-1 Residential
P.I.N.
# Units
Unit
Assessment
Total
2122 WATER LILLY LN
102242503206
1
$
115
$
115
2126 WATER LILLY LN
102242503204
1
$
115
$
115
2136 WATER LILLY LN
102242503107
1
$
115
$
115
2118 WATER LILLY LN
102242503208
1
$
115
$
115
2138 WATER LILLY LN
102242503106
1
$
115
$
115
2140 WATER LILLY LN
102242503105
1
$
115
$
115
2132 WATER LILLY LN
102242503201
1
$
115
; $
115
2146 WATER LILLY LN
102242503102
1
$
115
$
115
2108 WATER LILLY LN
' 102242503305
1
$
115
$
115
2106 WATER LILLY LN
102242503306
1
$
115
$
115
2150 WATER LILLY LN
102242503008
1
$
115
$
115
2152 WATER LILLY LN
102242503007
1
$
115
$
115
2102 WATER LILLY LN
102242503308
1
$
115
$
115
2154 WATER LILLY LN
102242503006
1
$
115
$
115
2116 WATER LILLY LN
102242503301
1
$
115
$
115
2164 WATER LILLY LN
102242503001
1
$
115
$
115
2160 WATER LILLY LN
102242503003
1
$
115
; $
115
2236 WATER LILLY LN
102242502503
1
$
115
$
115
2234 WATER LILLY LN
102242502504
1
$
115
$
115
2170 WATER LILLY LN
102242502906
1
$
115
$
115
2180 WATER LILLY LN
102242502901
1
$
115
$
115
2232 WATER LILLY LN
102242502505
1
$
115 {
$
115
2230 WATER LILLY LN
102242502506
1
$
115
$
115
Old Sibley Highway
15
2240 WATER LILLY LN
102242502501
1
$
115
$
115
2174 WATER LILLY LN
102242502904
1
$
115
$
115
2244 WATER LILLY LN
102242502405
1
$
115
$
115
2214 WATER LILLY LN
102242502608
1
$
115
$
115
2168 WATER LILLY LN
102242502907
1
$
115
$
115
2224 WATER LILLY LN
102242502603
1
$
115
$
115
2216 WATER LILLY LN
102242502607 !
1
$
115
$
115
2250 WATER LILLY LN
102242502402 I
1
$
115
$
115
2248 WATER LILLY LN
102242502403
1
$
115
$
115
2218 WATER LILLY LN
102242502606
1
$
115
$
115
2228 WATER LILLY LN
102242502601
1
$
115
$
115
2188 WATER LILLY LN
102242502805
1
$
115
$
115
2186 WATER LILLY LN
102242502806
1
$
115
$
115
2190 WATER LILLY LN
102242502804
1
$
115
$
115
2202 WATER LILLY LN
102242502706
1
$
115
$
115
2204 WATER LILLY LN
102242502705
1
$
115
$
115
2196 WATER LILLY LN
102242502801 !
1
$
115
$
115
2206 WATER LILLY LN
102242502704 i
1
$
115
$
115
2124 WATER LILLY LN
i 102242503205
1
$
115
$
115
2134 WATER LILLY LN
102242503108
1
$
115
$
115
2120 WATER LILLY LN
102242503207
1
$
115
$
115
2128 WATER LILLY LN
102242503203
1
$
115
$
115
2130 WATER LILLY LN
i 102242503202
1
$
115
$
115
2142 WATER LILLY LN
102242503104
1
$
115
$
115
2144 WATER LILLY LN
102242503103
1
$
115
$
115
2148 WATER LILLY LN
102242503101
1
$
115
$
115
2104 WATER LILLY LN
102242503307
1
$
115
$
115
2110 WATER LILLY LN
102242503304
1
$
115
$
115
2112 WATER LILLY LN
102242503303
1
$
115
$
115
2156 WATER LILLY LN
102242503005
1
$
115
$
115
2114 WATER LILLY LN
102242503302
1
$
115
$
115
2162 WATER LILLY LN
102242503002
1
$
115
$
115
2158 WATER LILLY LN
102242503004
1
$
115
$
115
2176 WATER LILLY LN
102242502903
1
$
115
$
115
2178 WATER LILLY LN
102242502902
1
$
115
$
115
2238 WATER LILLY LN
102242502502
1
$
115
$
115
2220 WATER LILLY LN
102242502605
1
$
115
$
115
2172 WATER LILLY LN
102242502905
1
$
115
$
115
2166 WATER LILLY LN
102242502908
1
$
115
$
115
2222 WATER LILLY LN
102242502604
1
$
115
$
115
2242 WATER LILLY LN
102242502406
1
$
115
$
115
2246 WATER LILLY LN
102242502404
1
$
115
$
115
2252 WATER LILLY LN
102242502401
1
$
115
$
115
2226 WATER LILLY LN
102242502602 '
1
$
115
$
115
2184 WATER LILLY LN
! 102242502807
1
$
115 ;
$
115
2198 WATER LILLY LN
102242502708
1
$
115 j
$
115
2192 WATER LILLY LN
102242502803
1
$
115
$
115
2182 WATER LILLY LN
102242502808
1
$
115
$
115
2200 WATER LILLY LN
102242502707
1
$
115 ,
$
115
2194 WATER LILLY LN
102242502802
1
$
115 j
$
115
2212 WATER LILLY LN
102242502701
1
$
115
$
115
Old Sibley Highway
16
2210 WATER LILLY LN 102242502702 ' 1 $ 115 $ 115
2208 WATER LILLY LN 102242502703 1 $ 115 $ 115
i Subtotal 76 1 $ 8.740
Total R-3 Lots 236 $ 27,140
Old Sibley Highway
17
Creekside Ct
R-1 Residential
P.I.N.
# Units
Unit
Assessment
Total
2227
CREEKSIDE CT
102242502104
1
$
115
$
115
2225
CREEKSIDE CT
102242502105
1
$
115
$
115
2231
CREEKSIDE CT
102242502102
1
$
115
$
115
2243
CREEKSIDE CT
102242502305
1
$
115
$
115
2245
CREEKSIDE CT
102242502304
1
$
115
$
115
2249
CREEKSIDE CT
102242502302
1
$
115
$
115
2241
CREEKSIDE CT
102242502201
1
$
115
$
115
2239
CREEKSIDE CT
102242502202
1
$
115
$
115
2229
CREEKSIDE CT
102242502103
1
$
115
$
115
2233
CREEKSIDE CT
102242502101
1
$
115
$
115
2237
CREEKSIDE CT
102242502203
1
$
115
$
115
2235
CREEKSIDE CT
102242502204
1
! $
115
$
115
2247
CREEKSIDE CT
102242502303
1
$
115
$
115
2251
CREEKSIDE CT
102242502301
1
$
115
$
115
Subtotal
14
$
1,610
Total R-3 Lots 236 $ 27,140
Old Sibley Highway
17
COMMERCIAL/ INDUSTRIAL PROPERTIES
* net acreage credit for R/W or ponding easement
Total Assessments 1 10.95 1 10.67 1 1 $20,913 ' 6.00 1 $ 1,100 $22,013
TOTAL ASSESSMENT (R-3 + C/I +
Driveway) = $ 49,153
Commercial/
Old Sibley Hyw
Frontage
880
24.7%
Residential
Frontage
2249
Concrete
Concrete
Industrial
P.I.N.
Gross
Net
Unit
Total Street
Entrance
Entrance
Total
Acreage
Acreage
Assessment
Assessment
Area (SY)
Assessment
Assessment
($183/SY)
4145 Old Sibley HWY
105910101010 1
2.01
2.01
$ 1,960
$ 3,940
$ 3,940
4135 Old Sibley HWY
105910101020
2.89
2.89
$ 1,960
$ 5,664
$ 5,664
4125 Old Sibley HWY
105910101030
0.80
0.80
$ 1,960
$ 1,568
$ 1,568
4065 Old Sibley
100190052040
2.63
2.35
$ 1,960
$ 4,606
6.0
$ 1,100
$ 5,706
HWY*
CenterPoint Energy
100190052050
2.62
2.62
$ 1,960
$ 5,135
$ 5,135
Subtotal
10.95
10.67
$20,913
! 6.0
$ 1,100
$22,013
* net acreage credit for R/W or ponding easement
Total Assessments 1 10.95 1 10.67 1 1 $20,913 ' 6.00 1 $ 1,100 $22,013
TOTAL ASSESSMENT (R-3 + C/I +
Driveway) = $ 49,153
Commercial/
Industrial
Frontage
880
24.7%
Residential
Frontage
2249
63.1%
Non -Assessable
Frontage
435
12.2%
Total Frontage
3564
100%
Old Sibley Highway
18
2019 Street Revitalization - Project 1313
Old Sibley Highway
'j Aok
i Cu,
C
Silver Bell R�
ps-.., JI�rrA Y
Old Sibley Highway
Project 1313
1 ®�
Diffle ,
Rre
t
CGffLake
(Go
uktr�A ,
tl-
1
J r
mg
_J - j l
Lake
1
I
- euner Fl+tts .R
�aNaa•I r:ak
Document Path: L:\USERS\PUBWORKS1Engineering\Projecb12919 Street ImprovementM1313 - Old Sibley Highway\1313 Location.mxd Date: 12/13/2018
FIG 1
OF Z.,
�y,,; cZ 2019 Street Revitalization -Project 1313
Old Sibley Highway
lr.
m
Is E- CTrM
'
to
4065
Centerpvint +
y Energy f
x 125
t OO
1 4145 f +!
)
Z . `'� ^?
4- 2'
- AY wl
r` RUGS
La ►�
`4" 14,
J LU
<7� CREEFCSIDE•.OY
_v Project Area Legend
��� lvti�rv�rwW� 7 a
Assesable Protect Area
Assessable_ Class
t,ArL7. :
°�t�r •� ,i .` Zoning
_
R-3 Residential ($115 Per Unit)
1 DIFFLEY Rp
'•l - w _ W-02 • _ _ Business Park I
2019 Street Improvement
Document Path: L:IUSERSIPUBWORKS1Engineering\Projects12019 Street Improvements11313 - Old Sibley Highway11313.mxd Date. 12/20/20181
FIG 2
q� 2019 Street Revitalization
-
Project 1313
z Old Sibley Highway
s �s�
SsH f-9 Typical
OIL Typical Street Sections
60' ROW
32' F -F
PAVEMENT SECTION
4.5" BASE COURSE
8" CLASS 5 AGG BASE
COMPACTED SUBGRADE
EXIST. TYPICAL SECTION
OLD SIBLEY HIGHWAY
60' ROW
r 32' F -F
1.25' FULL WIDTH MILL 1.5" TYPE 2360 BITUMINOUS OVERLAY
B618 CONCRETE
CURB AND GUTTER
t� B618 CONCRETE
BITUMINOUS TACK COAT CURB AND GUTTER
3" BITUMINOUS SURFACE
8" CLASS 5 AGG BASE
COMPACTED SUBGRADE
PROPOSED TYPICAL SECTION
OLD SIBLEY HIGHWAY
Document Path: L:IUSERSIPUBWORKS1Engineering\Projects12019 Street Improvements11313 - Old Sibley Highway11313 Fig 3.mxd
Date: 12/12/2018
FIG 3
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
N. Project 1314, Meadowland 1st Addition
Street Improvements
Action To Be Considered:
Receive the Draft Feasibility Report for Project 1314 Meadowland 1st Addition - Street
Improvements) and schedule a public hearing to be held on February 5, 2019.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of the streets within Meadowland 1st Addition, a
residential neighborhood in southwest Eagan, located south of Diffley Road and
east of Rahn Road.
A structural mill and overlay of these streets is programmed for 2019 in the City of
Eagan’s 5-Year CIP (2019-2023).
A draft Feasibility Report has been prepared an d is being presented to the Council
for their consideration of scheduling a public hearing for Tuesday, February 5, 2019.
An informational neighborhood meeting will be held with the adjacent property
owners prior to the formal public hearing to review and discuss the proposed
improvements.
Attachments (1)
CN-1 Draft Feasibility Report
EAGAN
Report for
Meadowlands 1St Addition
Neighborhood Street Revitalization
City Project No. 1314
January 2, 2019
i6i"
C
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Jan. 19, 2019
Re: Meadowlands 1St Addition Street Revitalization
City Project No.: 1314
Attached is the feasibility report for the Meadowlands 1 St Addition Street Revitalization, City
Project No. 1314. The report presents and discusses the proposed improvements and includes
a cost estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Aaron Nelson
Date: Reg. No. 45795
Reviewed By:
Department of Public Works Date:
Reviewed By:
Finance Department Date:
+ + r rEAGAN
�1
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Jan. 19, 2019
Re: Meadowlands 1St Addition Street Revitalization
City Project No.: 1314
Attached is the feasibility report for the Meadowlands 1 St Addition Street Revitalization, City
Project No. 1314. The report presents and discusses the proposed improvements and includes
a cost estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Aaron Nelson
Date: Reg. No. 45795
Reviewed By:
Department of Public Works Date:
Reviewed By:
Finance Department Date:
TABLE OF CONTENTS
ExecutiveSummary..................................................................................................... 1
Introduction/History.......................................................................................................2
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
StreetPavement Evaluation.........................................................................................3
ProposedImprovements..............................................................................................4
Easements/Permits......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................7
Assessments................................................................................................................7
AssessmentFinancing Options.....................................................................................8
RevenueSource...........................................................................................................8
ProjectSchedule..........................................................................................................9
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
- 2 Street Improvement/Assessment Area Map
- 3 Typical Section — Mill & Overlay
Executive Summary
Background
Project Details
• Roadway resurfacing (Full width mill &
1-1/2" overlay)
• Replacement of damaged curb & gutter
Meadowlands 1St
44/100
Recommended
Improvement
Project Name
Curb Removal
Project #
1314
Scope o Sanitary/Storm sewer
Addition
-
o Utility castings
Street Area
24,350 Sq. Yds.
Street Length
6,452 Feet
146 (R1)
Chipmunk Ct.
Constructed
1980
Badger Ct.
Shale Ln.
Overlayed
1999
Bear Path TH.
Crack Sealed
I -
Streets Included
Beaver Dam Ct.
Timber Wolf Trl S.
Timber Wolf Trl N.
Seal Coated
2007, 2014
Timber Wolf Ct.
NW % of Section 29
South of Diffley Road
Absolute Location
Township 27, Range 23
Relative Location
East of Rahn Road
Project Details
• Roadway resurfacing (Full width mill &
1-1/2" overlay)
• Replacement of damaged curb & gutter
PCI Rating
44/100
Recommended
Improvement
Resurface
Curb Removal
12%
• Adjustment/Replacement of:
Scope o Sanitary/Storm sewer
Utility Improvements $ 29,200
-
o Utility castings
Total $ 358,100
$ 131,400 (37%)
o Water gate valves
o Street signage
Residential Lots
146 (R1)
• Utility Improvements
Cost Estimate/ Revenue
Meadowlands 1St Addition
1
Property
City
Mill & Overlay w/ Signage $ 267,900
$ 131,400
$ 136,500
Repair Existing Concrete Curb & Gutter $ 61,000
-
$ 61,000
Utility Improvements $ 29,200
-
$ 29,200
Total $ 358,100
$ 131,400 (37%)
$ 226,700 (63%)
Meadowlands 1St Addition
1
Jan. 2, 2019
Neighborhood Street Revitalization
Meadowlands 11t Addition
Eagan, Minnesota
Introduction/ History
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 6,452 feet of residential streets in the Meadowlands 1st Addition neighborhood in south
west Eagan has been identified for 2019 street revitalization improvements. Figure 1, located
in Appendix C, illustrates the project location. The streets were originally constructed in 1980,
and were overlayed in 1999.
Based on the data and engineering strategies available at this time, the City's current. PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the roads located within the project area, which are currently in the 20 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the streets were seal coated in 2007 and 2014.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
Meadowlands 1st Addition
2
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scope
This project will provide resurfacing (full width mill and overlay) for approximately 6,452 feet of
roadway. Figure 2 in Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves, utility improvements, and replacement of street signage.
Area to Be Included
Properties included in the project lie within the NW %, Section 29, lying South of Diffley Road,
East Rahn Road, in Township 27, Range 23, in the City of Eagan, Dakota County, Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI
Recommended Improvement
56-100
Routine Maintenance/Crack Seal/Seal Coat
36-55
Patch/Repair and/or Overlay
0-35
Reconstruct/ Reclaim
The 2018 PCI rankings for the street segments have a weighted average pavement condition
rating of 44, which falls in the "Patch/Repair and/or Overlay" category, as mentioned above.
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Meadowlands 11 Addition
Proposed Improvements
Pavement - The proposed street
improvements shown in Figure 3. The
existing street section for this roadway
consists of 4-1/2" bituminous pavement
supported by 6" gravel base. The
existing bituminous surface will be
milled across its entire width to
accommodate a 1% -inch bituminous
overlay. The overlay, combined with the
existing street section, will provide a
street section consistent with current
City standards for residential streets.
The combination of patching and
overlay will not eliminate cracking due
al
._
to the temperature extremes experienced in Minnesota. Bituminous overlays will show some
continued frost movements and reflective cracking consistent with the underlying pavement.
Routine maintenance will still need to continue under the City's Pavement Management
Program.
- r
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalled, or settled. It is estimated that
approximately 12% of the existing concrete
curb and gutter will have to be replaced.
Boulevard turf will be removed and replaced
with seed. While the contractor who performs
the work is responsible for its establishment
(45 days for seed), adjacent property owners
are encouraged to consistently water the new
turf, where possible, to help ensure its growth.
Utility Adjustment/Replacement — Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
ensure quick and easy access by the City for maintenance and other purposes. There are a
number of manhole and catch basin structures that require adjustments, castings to be
replaced, and doghouse/invert repairs due to deterioration. These improvements will be
financed through the Combined Utility Fund.
Meadowlands 15t Addition
4
6
Sidewalk/Path & Pedestrian Ramps — Revisions to the Americans with Disabilities Act (ADA)
requires jurisdictional agencies to provide detectable warnings at all existing pedestrian ramps
of sidewalks and paths with public streets that
are improved, including street surface
improvements. The most common method of In
providing this detectable warning is through the
4:7 .
installation of truncated domes a minimum of
two feet in length across the width of all _
pedestrian ramps. This project provides for the
installation of truncated dome pedestrian ramps l
along the existing trail wherever they currently
do not exist, or are in need of repair.
Signage - Traffic and street identification signage within the
project limits have reached the end of their useful life
expectancy and are in need of replacement. Signs have been
reviewed for compliance with the Minnesota Manual on
Uniform Traffic Control Devices (MnMUTCD). Those that are
required by the MnMUTCD will be replaced to improve safety
and night time visibility, and those that are not will be
permanently removed.
Street Lights — The street lights in the project area (maintained by Dakota Electric Association)
are in good condition and provide adequate coverage. No modifications to the existing street
lights are proposed.
Complete Streets — "Complete Streets" is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Meadowlands 1St Addition
5
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
The streets in this neighborhood were reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The streets are relatively narrow at 32 feet wide,
have low traffic volumes, limited access points, and a trail is available along Rahn Road and
Beaver Dam Road (both adjacent to this neighborhood) to connect pedestrians to the City and
regional trail system. Pedestrian curb ramps in the project area at the intersecting sidewalks
will be replaced if necessary to meet current ADA design standards. Given the existing and
proposed elements available for all users, the streets in this neighborhood meet the intent of
the complete streets guidelines.
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that no permits will be required for the resurfacing project.
Feasibility and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement (resurfacing) is considerably less
expensive than complete reconstruction of this street. The mill and overlay is feasible in that
this type of improvement has been used successfully to extend the life expectancy of numerous
other streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 — 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Meadowlands 11 Addition
6
Cost Estimate
Detailed cost estimates are located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 25%, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Meadowlands V Addition
• Mill & Overlay........................................................................ $ 267,900
• Repair Existing Concrete Curb & Gutter ................................ $ 61,000
• Utility Improvements............................................................. 29,200
Total........................................................................... $ 358,100
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for residential streets. All assessments will be revised
based on final costs. A preliminary assessment roll is included in Appendix B.
City Special Assessment Policy
Assessment Ratio
Property City
Mill & Overlay - Low -Density Residential (R-1,2,3) 50% 50%
Repair Existing Concrete Curb & Gutter - 100%
Utility Improvements - 100%
Residential Lots — All R-1 residential lots (146 single family and twin homes) as shown on Figure
2, having driveway access on to the street to be improved are proposed to be assessed. The
City's Assessment Policy states that 50% of the mill and overlay costs are assessable for local
residential streets, based on a standard 32 -foot width. The estimated cost per residential unit,
based on the City's Assessment Policy, is $900/R-1 lot and is calculated as follows:
Mill & Overlay - Residential Properties
o 12,641' Residential Frontage / 12,904' Total Frontage = 98.0%
o $267,900 (Mill & Overlay Costs) x 50% x 98.0% = $131,271 (Total R-1
Assessment)
O $131,271 / 146 lots = $899.12, rounded to $900 / R-1 residential lot
The remaining frontage within the project area (263' or 2.0%) is considered non- assessable
under the City's Assessment Policy.
Meadowlands 11t Addition
7
Assessment Financing Options
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2019 rate is not yet
available, however, it is expected to be comparable and based on City policy will be determined
by the City Council in the spring. The following payment schedule is an example of a residential
lot assessment of $900 with an estimated 4.5% interest for the assessed amounts, and assumes
14 months interest for the first year:
1st Year
5th Year
Principal / Year I interest/Year j Cost / Year
$180
$180
Bonds may be issued to finance the improvements.
Revenue Source
A summary of revenue sources is listed below:
$47
$8
$227
$188
The Major Street Fund will finance the estimated street related project deficit of $197,500.
The Combined Utility Fund will finance the estimated $29,200 utility improvements.
Meadowlands 15t Addition
8
Project Cost
Property Assessment
City Contribution
Mill and Overlay (Including Signage)
$ 267,900
$ 131,400
$ 136,500
Repair Existing Curb & Gutter
$ 61,000
-
$ 61,000
Utility Improvements
$ 29,200
-
$ 29,200
Totals
$ 358,100
$131,400
$ 226,700
The Major Street Fund will finance the estimated street related project deficit of $197,500.
The Combined Utility Fund will finance the estimated $29,200 utility improvements.
Meadowlands 15t Addition
8
Project Schedule
Present Feasibility Report to City Council/
Order Public Hearing.......................................................................................... Jan. 2, 2019
Informational Meeting..................................................................................... Jan. 28, 2019
Public Hearing....................................................................................................Feb.
5, 2019
Approve Plans and Specifications....................................................................Feb.
19, 2019
BidDate........................................................................................................
March 28, 2019
Award Contract.................................................................................................April
2, 2019
Start Construction.............................................................................................
May 1, 2019
Project Completion..........................................................................................
August, 2019
Final Cost Report........................................................................................September,
2019
Final Assessment Hearing......................................................................................
Fall, 2019
First Payment Due with Property Tax Statement
........................................... May 15, 2020
Meadowlands 1st Addition
9
Appendix A
Preliminary Cost Estimate
City Project 1314 Meadowland 1st Addition
Item No. I Item I Uniti Unit Price I Est Qty I Estimated Cost
Part I - Bituminous Street Overlay
2021.501
Mobilization
LS
$
6,000.00
1
$
6,000.00
2104.505
Remove Bituminous Pavement
SY
$
6.00
50
$
300.00
2232.501
Mill Bituminous Pavement (1- 1/4" depth, 6' Width)
SY
$
1.30
0
$
2232.501
Mill Bituminous Pavement - Full Width (1-1/4" Depth)
SY
$
2.00
24350
$
48,700.00
2357.502
Bituminous Material for Tack Coat
GAL
$
2.75
1585
$
4,358.75
2360.501
SP WEA340B Wearing Course Mixture (Overlay)
TON
$
52.00
2260
$
117,520.00
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
10
$
1,000.00
2504.602
Adjust Gate Valve Box
EA
$
250.00
4
$
1,000.00
2504.602
Repair Gate Valve Mid Section
EA
$
500.00
1
$
500.00
2504.602
Repair Gate Valve Top Section w/Cover
EA
$
425.00
2
$
850.00
2506.602
Adjust Frame and Ring Casting (Manhole)
EA
$
700.00
23
$
16,100.00
2506.602
Adjust Manhole Casting - Riser Adjustment
EA
$
250.00
0
$
4,000.00
2506.602
Remove & Replace Frame & Ring Casting (27")
EA
$
1,250.00
1
$
1,250.00
2563.601
Traffic Control
LS
$
4,000.00
1
$
4,000.00
SP -1
Signage Remove and Replace
LS
$
2,500.00
1
$
2,500.00
Subtotal $ 204,078.75
5% Contingency $ 10,203.94
Subtotal $ 214,282.69
25% Indirect Costs $ 53,570.67
Part I - Bituminous Street Overlay $ 267,853.36
Item No. I Item Unit I Unit Price I Est Qty Estimated Cost
Part If - Repair Existing Curb & Gutter
2101.601
Remove Trail Overgrowth
LS
$
1,500.00
0
$
2104.501
Remove Concrete Curb and Gutter
LF
$
10.00
930
$
9,300.00
2104.503
Remove Bituminous Pavement
SY
$
6.00
0
$
2104.503
Remove Concrete Sidewalk (4")
SF
$
2.50
116
$
290.00
2104.503
Remove Concrete Sidewalk (6")
SF
$
2.50
120
$
300.00
2104.505
Remove Concrete Driveway /Valley Gutter
SY
$
14.00
0
$
2104.523
Salvage Casting
EA
$
125.00
0
$
2105.501
Common Excavation
CY
$
35.00
10
$
350.00
2211.501
Aggregate Base, CI.S (100% Crushed)
TON
$
25.00
30
$
750.00
SP WEA240B Wearing Course Mixture (Trail/Parking Lot
2360.501
Overlay)
TON
$
80.00
0
$
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
40
$
4,000.00
2504.602
Irrigation Repair
EA
$
160.00
10
$
1,600.00
2506.521
Install Casting
EA
$
550.00
0
$
2506.602
Adjust Frame & Ring Casting (CB) HDPE Rings
EA
$
550.00
7
$
3,850.00
2506.602
Remove & Replace Casting 3067V (Catch Basin)
EA
$
900.00
13
$
11,700.00
2506.602
Remove & Replace Casting 3501TB (Catch Basin)
EA
$
900.00
3
$
2,700.00
2506.602
Remove & Replace CBMH Structure w/Cstg (4' Dia.)
EA
$
5,200.00
0
$
2506.602
Remove & Replace CS Structure (2'x 3')
EA
$
3,000.00
0
$
2506.602
Remove & Replace CB Structure w/Cstg (2'x 3')
EA
$
3,500.00
0
$
-
2506.602
Remove & Replace Top Slab 54" Dia (CBMH)
EA
$
1,600.00
0
$
2506.602
Repair/ Grout CB or MH Invert/ Doghouses
EA
$
400.00
10
$
4,000.00
Meadowlands 1St Addition
10
2506.602
Install 2 x 3 CB Erosion Barrier Shroud
EA
$
150.00
2
$
300.00
2521.501
6" Concrete Ped Ramp w/ Wet Cast for Truncated Dome Inset
SF
$
14.00
100
$
1,400.00
2521.501
4" Concrete Sidewalk
SF
$
6.00
16
$
96.00
2521.501
6" Concrete Sidewalk
SF
$
8.00
120
$
960.00
2521.501
6" Concrete Bullnose
SF
$
12.00
0
$
2531.501
Concrete Curb & Gutter B612
LF
$
20.00
0
$
2531.501
Concrete Curb and Gutter, B618
LF
$
23.00
45
$
1,035.00
2531.501
Concrete Curb and Gutter, B624
LF
$
28.00
0
$
2531.501
Concrete Curb and Gutter, D412
LF
$
20.00
885
$
17,700.00
2531.501
Concrete Curb and Gutter, Surmountable
LF
$
23.00
0
$
2531.507
Concrete Valley Gutter- High Early
SY
$
75.00
0
$
2531.507
8" Concrete Driveway Pavement - High Early
SY
$
75.00
0
$
2531.507
Repair 8" Concrete Driveway Pavement - High Early
SY
$
85.00
0
$
2531.618
Truncated Dome Detectable Warning Paver (2x2)
EA
$
80.00
16
$
1,280.00
2531.618
Truncated Dome Detactable Warning Paver (Radius Plate)
EA
$
80.00
0
$
2540.602
Repair Underground Electric Fence
EA
$
85.00
10
$
850.00
2540.602
Repair Landscaping
EA
$
200.00
5
$
1,000.00
2572.503
Application of Water for Turf Establishment
GAL
$
0.15
9450
$
1,417.50
2573.530
Storm Drain Inlet Protection
EA
$
175.00
2
$
350.00
2575.550
Boulevard Topsoil Borrow —MnDOT3877-2F
CY
$
80.00
25
$
2,000.00
2575.609
Seeding (MnDOT 270 w/Type 5 Hydromulch)
SY
$
7.50
200
$
1,500.00
Subtotal
$
68,728.50
5% Contingency
$
3,436.43
Subtotal
$
72,164.93
25% Indirect Costs
$
18,041.23
Part 11- Repair Existing Curb & Gutter
$
90,206.16
Part i - Bituminous Street Overlay $ 267,853.36
Part II - Repair Existing Curb & Gutter $ 90,206.16
Project 1314 Total Cost $ 358,059.52
Meadowlands 1St Addition
11
Appendix B
Prelimary Assessment Roll
City Project #1314 Meadowland 1st Addition
Meadowlands 1St Addition
12
Chipmunk Ct
BadgerCt
R-1 Residential
i P.I.N.
Lot Equivalent ,
# of
Lots
Unit Assessment
;
Unit Assessment
Total
1997 Chipmunk Ct
104805001028
1
1
$
900
$
900
1991 Chipmunk Ct
104805001029
1
1
$
900
$
900
1985 Chipmunk Ct
104805001030
1
1
$
900
$
900
1979 Chipmunk Ct
104805001031
1
1
$
900
$
900
1973 Chipmunk Ct
104805001032
1
1
$
900
$
900
1967 Chipmunk Ct
104805001033
1
1
$
900
$
900
1961 Chipmunk Ct
104805001034
1
1
$
900
$
900
1960 Chipmunk Ct
104805001035
1
1
$
900
$
900
1966 Chipmunk Ct
104805001036
1
1
$
900
$
900
1972 Chipmunk Ct
104805001037
1
1
$
900
$
900 j
1978 Chipmunk Ct
104805001038
1
1
$
900
$
900
1984 Chipmunk Ct
104805001039
1
1
$
900
$
900
1990 Chipmunk Ct
104805001040
1
1
$
900
$
900
1996 Chipmunk Ct
104805001041
1 I
1
$
900
$
900 I
i Subtotal
14
14
$
12,600 i
Meadowlands 1St Addition
12
Shale Ln
BadgerCt
R-1 Residential
R-1 Residential
P.I.N.
Lot Equivalent
Lots
Unit Assessment
Total
Total
1995
Badger Ct
104805001081
1
1
$
900
$
900
1989
Badger Ct
104805001082
1
1
$
900
$
900
1983
Badger Ct
104805001083
1
1
$
900
$
900
1977
Badger Ct
104805001084
1
1
$
900
$
900
1971
Badger Ct
104805001085
1
1
$
900
$
900
1970
Badger Ct
104805001086
1
1
$
900
$
900
1976
Badger Ct
104805001087
1
1
$
900
$
900
1982
Badger Ct
104805001088
1
1
$
900
$
900
1988
Badger Ct
104805001089
1
1
$
900
$
900
1994
Badger Ct
104805001090
1
1
$
900
$
900
Subtotal
10
10
$
9,000
Meadowlands 1St Addition
12
Shale Ln
R-1 Residential
P.I.N.
Lot Equivalent
LoLf of
Unit Assessment
Total
1989 Shale Ln
104805001103
1
1
$
900
$
900
1992 Shale Ln
104805004011
1
1
$
900
$
900
1990 Shale Ln
104805004012
1
1
$
900
$
900
1986 Shale Ln
104805004022
1
1
$
900
$
900
I 1984 Shale Ln
104805004021
1
1
$
900
$
900
1978 Shale Ln
104805004032
1
1
$
900
$
900
1976 Shale Ln
104805004031
1
1
$
900
$
900 i
1968 Shale Ln
104805004041
1
1
$
900
$
900
1966 Shale Ln
104805004042
1
1
$
900
$
—H
900
Meadowlands 1St Addition
12
1962 Shale Ln 104805004051 1 1 1 1 1 $ 900 $ 900
1960 Shale Ln 104805004052 1 1 $ 900 $ 900
Subtotal 11 11 5 9,900
Meadowlands 1St Addition
13
Bear Path Tri
R-1
Residential
P.I.N.
Lot Equivalent
# of
Lots
Unit Assessment
Total
4393
Bear Path Trl
104805001102
1
1
$
900
$
900
4394
Bear Path Trl
104805003170
1
1
$
900
$
900
4389
Bear Path Trl
104805001101
1
1
$
900
$
900
4390
Bear Path Trl
104805003160
1
1
$
900
$
900
4385
Bear Path Trl
104805001100
1 1
1
$
900
$
900
4386
Bear Path Trl
104805003150
1
1
$
900
$
900
4381
Bear Path Trl
104805001099
1
1
$
900
$
900
4382
Bear Path Trl
! 104805003140
1
1
$
900
$
900
4377
Bear Path Trl
104805001098
1
1
$
900
$
900
4378
Bear Path Trl
104805003130
1
1
$
900
$
900
4376
Bear Path Trl
104805003120
1
1
$
900
$
900
4373
Bear Path Trl
104805001097
1
1
$
900
$
900
4374
Bear Path TO
104805003110
1
1
$
900
$
900
4372
Bear Path Trl
104805003100
1
1
$
900
$
900
4368
Bear Path Trl
104805003090
1
1
$
900
$
900
4369
Bear Path Trl
104805001096
1
1
$
900
$
900
4365
Bear Path Trl
104805001095
1
1
$
900
$
900
4358
Bear Path Trl
104805003080
1
1
$
900
$
900
4361
Bear Path Trl
104805001094
1
1
$
900
$
900
4357
Bear Path Trl
104805001093
1
1
$
900
! $
900
4344
Bear Path TO
104805003070
1
1
$
900
$
900
4353
Bear Path Tri
104805001092
1
1
$
900
$
900
4349
Bear Path TO
104805001091
1
1
$
900
$
900
4347
Bear Path Trl
104805001080
1
1
$
900
$
900
4345
Bear Path Trl
104805001079
1
1
$
900
$
900
4341
Bear Path Trl
104805001078
1
1
$
900
$
900
4337
Bear Path Trl
104805001077
1
1
$
900
$
900
4334
Bear Path Trl
104805003060
1
1
$
900
$
900
4333
Bear Path Trl
1 104805001076
1
1
$
900
$
900
4330
Bear Path Trl
104805003050
1
1
$
900
$
900
4329
Bear Path Trl
104805001075
1
1
$
900
$
900
4325
Bear Path Trl
104805001074
1 1
1
$
900
$
900
4326
Bear Path Trl
104805003040
1
1
$
900
$
900
4322
Bear Path Trl
104805003030
1
1
$
900
$
900
4321
Bear Path Trl
104805001073
1
1
$
900
$
900
4318
Bear Path Trl
104805003020
1
1
$
900
$
900
4317
Bear Path TO
104805001072
1
1
$
900
$
900
4313
Bear Path Trl
104805001071
1
1
$
900
$
900
Subtotal
38
38
$
34,200
Meadowlands 1St Addition
13
Meadowlands Is' Addition
14
Timber Wolf TO
Beaver Dam Ct
R-1 Residential
R-1 Residential
P.I.N.
Lot Equivalent
Lots
Unit Assessment
Total
Total
1944
Beaver Dam Ct
104805001070
I 1
1
$
900
$
900
1948
Beaver Dam Ct
104805001069
1
1
$
900
$
900
1952
Beaver Dam Ct
104805001068
1
1
$
900
$
900
1956
Beaver Dam Ct
104805001067 I
1
1
$
900
$
900
1960
Beaver Dam Ct
104805001066
1
1
$
900
$
900
1964
Beaver Dam Ct
104805001065
1
1
$
900
$
900
1965
Beaver Dam Ct
104805001064
1
1
$
900
$
900
1961
Beaver Dam Ct
104805001063
1
1
$
900
$
900
1957
Beaver Dam Ct
104805001062
1
1
$
900
$
900
1953
Beaver Dam Ct
104805001061
1 I
1
$
900
$
900
1949
Beaver Dam Ct
104805001060
1
1
$
900
$
900
1945
Beaver Dam Ct
104805001059
1
1
$
900
$
900
900
$
Subtotal
12
12
1
1
$
10,800
Meadowlands Is' Addition
14
Timber Wolf TO
R-1 Residential
P.I.N.
I Lot Equivalent
Lots
Unit Assessment
Total
1932 Timber Wolf TO S
104805001058
1
1
$
900
$
900
1931 Timber Wolf Tri S
104805002250
1
1
$
900
j $
900
1935 Timber Wolf Trl S
104805002240
1
1
$
900
$
900
1936 Timber Wolf TO S
104805001057
1
1
$
900
$
900
1939 Timber Wolf Trl S
104805002230
1
1
$
900
$
900
1940 Timber Wolf Tri S
104805001056
1
1
$
900
$
900
1943 Timber Wolf Trl S
104805002220
1
1
$
900
$
900
1944 Timber Wolf Tri S
104805001055
1
1
$
900
$
900
1947 Timber Wolf Tri S
104805002210
1
1
$
900
$
900
1948 Timber Wolf TO S
104805001054
1
1
$
900
$
900
1951 Timber Wolf Tri S
104805002200
1
1
$
900
$
900
1952 Timber Wolf Trl S
104805001053
1
1
$
900
$
900
1955 Timber Wolf Trl S
104805002190
1
1
$
900
$
900
1956 Timber Wolf Tri S
104805001052
1
1
$
900
$
900
1959 Timber Wolf Trl S
104805002180
1
1
$
900
$
900
1960 Timber Wolf Trl S
104805001051
1
1
$
900
$
900
1963 Timber Wolf Tri S
104805002170
1
1
$
900
$
900
1964 Timber Wolf Tri S
104805001050
1
1
$
900
$
900
1967 Timber Wolf Trl S
104805002160
1
1
$
900
$
900
1968 Timber Wolf Tri S
104805001049
1
1
$
900
$
900
1971 Timber Wolf Trl S
104805002150
1 1
1
$
900
$
900
1972 Timber Wolf TO S
104805001048
1
1
$
900
$
900
1975 Timber Wolf Trl S
104805002140
1
1
$
900
$
900
1976 Timber Wolf Trl S
104805001047
1
1
$
900
$
900
1978 Timber Wolf Trl S
104805001046
1
1
$
900
$
900
1980 Timber Wolf Tri S
104805001045
1
1
I $
900
$
900
1982 Timber Wolf Trl S
104805001044
1
1
$
900
$
900
1984 Timber Wolf Tri S
104805001043
1
1
$
900
$
900
1983 Timber Wolf Trl N
104805001042
1
1
$
900$
900
1981 Timber Wolf TO N
104805001027
1
1
$
900
$
900
Meadowlands Is' Addition
14
1979 Timber Wolf Trl N
104805001026
1
1
$
900
$
900
1980 Timber Wolf Trl N
104805002130
1
1
$
900
$
900
1975 Timber Wolf Trl N
104805001025
1
1
$
900
$
900
1974 Timber Wolf TO N
104805002120
1
1
$
900
$
900
1971 Timber Wolf Trl N
104805001024
1
1
$
900
$
900
1968 Timber Wolf Trl N
104805002110
1
1
$
900
$
900
1969 Timber Wolf TO N
104805001023
1
1
$
900
$
900
1964 Timber Wolf TO N
104805002100
1
1
$
900
$
900
1965 Timber Wolf Trl N
104805001022
1
1
$
900
$
900
1960 Timber Wolf Trl N
104805002090
1
1
$
900
$
900
1961 Timber Wolf Trl N
104805001021
1
1
$
900
$
900
1954 Timber Wolf Trl N
104805002080
1
1
$
900
$
900
1957 Timber Wolf Trl N
104805001020
1
1
$
900
$
900
1953 Timber Wolf TO N
104805001019
1
1
$
900
$
900
1950 Timber Wolf Trl N
104805002070
1
1
$
900
$
900
1949 Timber Wolf Trl N
104805001018
1
1
$
900
$
900
1944 Timber Wolf TO N
104805002060 '
1
1
$
900
$
900
1945 Timber Wolf Tri N
104805001017
1
1
$
900
$
900
1938 Timber Wolf Trl N
104805002050
1
1
$
900
$
900
1934 Timber Wolf TO N
104805002040
1
1
$
900
$
900
1930 Timber Wolf Trl N
104805002030
1
1
$
900
$
900
1926 Timber Wolf Trl N
104805002020
1
1
$
900
$
900
1922 Timber Wolf Trl N
104805002010
1
1
$
900
$
900
Subtotal
53
53
$
47,700
Total R-1 Lots 146 i 146 1 1 $ 131,400
Residential Frontage 12,641 98.0%
Non -Assessable Frontage 263 2.0%
Total Frontage 12,904 100.0%
Meadowlands 11t Addition
15
Timber Wolf Trl
R-1 Residential
P.I.N.
Lot Equivalent
Lots
Unit Assessment
Total
1941 Timber Wolf Ct
104705001016
1
1
$
900
$
900
1927 Timber Wolf Ct
104805001009
1
1
$
900
$
900
1939 Timber Wolf Ct
104805001015
1
1
$
900
$
900
1937 Timber Wolf Ct
104805001014
1
1
$
900
$
900
1935 Timber Wolf Ct
104805001013
1
1
$
900
$
900
1933 Timber Wolf Ct
104805001012
1
1
$
900
$
900
1931 Timber Wolf Ct
104805001011
1
1
$
900
$
900
1929 Timber Wolf Ct
104805001010
1
1
$
900
$
900
Subtotal
8
8
$
7,200
Total R-1 Lots 146 i 146 1 1 $ 131,400
Residential Frontage 12,641 98.0%
Non -Assessable Frontage 263 2.0%
Total Frontage 12,904 100.0%
Meadowlands 11t Addition
15
2019 Street Revitalization - Project 1314
Meadowland 1st Addition
Document Path: L:(USERSIPUBWORKS1EngineeringlProjecNs 2019 Street Improvements11314 - Meadomand 1 st Addidon11314 Location.mxd Date: 12/13/2018
FIG 1
i
2019 Street Revitalization - Project 1314
Meadowland 1st Addition
r DIFF.L4EWRO
*1 •
LIIFFLEY'RO�
tufa - _ t:�•� _ - _ 'Q"•
!�' CMIPMUNWC'T:,{ er F Ly
CORAL LN •', '�dir _ .. JK.FI
� it
5
nie' .�.�. .:,s
a a �
a wlr• X9.75
-
.. i7�11.�
M
_
�
-r1MeeR •WOLF-rRL V
.»:
?
a O
az n.,,. ] JI
.xi
a•�
SS: -.SII:Sa
Me
�.I air ��� -ax]z � I :
� •-
- _ _ � T�ra7nny � .y
•a7T' :'re .x it
.�
�
// �'.
197.] fi�•;!/O,
�
t¢
9.
ADGE Rr CT,--
I. <ra: .yell �
- -
.1 � yj➢A
:.'s 1 2
Jl.'
'
.r r
9041
-
...
.� • a
v: 7Y iij
j
x]51
H
• I'� L1p
.
�]�
. '1:.. v75
157
uys
• •
r
1�1. 51 1-•
,: 7N
1 I
116i
1181
•ane
_ _
�
_
9 - - n F
�;�wi r sl d9
•19]
� �-
FF�
-
IF
.A- HALE -,iii A`?U11 P9
Project Area Legend
_ �Assesable Project Are
} +— 2019 Street Improvement rw
Document Path: L:IUSERSIPUBWORKS\Engineering\Projects12019 Street Improvements11314 - Meadowland 1 stAddition\1314.mxd Date: 12/18/2018
FIG 2
w
:---Q
2019 Street Revitalization - Project 1314
Meadowland 1 st Addition
Typical Street Sections
60' ROW
32' F -F
i —
PAVEMENT SECTION
4.5" BASE COURSE D412 CONCRETE
6" CLASS 5 AGG BASE CURB AND GUTTER
COMPACTED SUBGRADE
EXIST. TYPICAL SECTION
MEADOWLAND 1 ST ADDITON
60' ROW
32' F -F
1.25' FULL WIDTH MILL 1.5" TYPE 2360 BITUMINOUS OVERLAY
1 ,
D412 CONCRETE
BITUMINOUS TACK COAT CURB AND GUTTER
3" BITUMINOUS SURFACE
6" CLASS 5 AGG BASE
COMPACTED SUBGRADE
PROPOSED TYPICAL SECTION
MEADOWLAND 1 ST ADDITION
M
Document Path: L:IUSERSIPUBWORKS1Engineering\Projects12019 Street Improvements11314 -Meadowland 1stAdd tion11314 Fig 3.mxd Date: 12/26/2018
FIG 3
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
O. Water Meter Replacement/ Repair Program
Surcharge Appeals
Action To Be Considered:
Approve the recommendations of the Public Works Committee regarding various appeals to the
Water Meter Replacement/ Repair (R/R) Program (City Code 3.05) surcharges for the identified
properties in accordance with the related City Ordinance .
Facts:
On May 15, 2012, the City Council adopted an amendment to City Ordinance 3.05
regarding the Rules and Regulations relating to Municipal Utilities that requires all
properties connected to the municipal water utility to permit the city's designated utility
employee onto the property and within the structure for purposes of the inspection,
repair or replacement of the water meter. This action, in essence, implemented the
Water Meter Replacement/Repair (R/R) Program to ensure accurate wat er use
measurement and payment.
Part of the amendment, incorporated a fee schedule that provided for a surcha rge to be
placed against utility billing accounts for those properties that didn't schedule an
inspection within the prescribed time frame.
The Surcharge Fee is $150 per month for Single Family properties and $500 per month
for all others.
In anticipation of appeals, the Council directed the Public Works Committee to review
any appeals and provide their recommendation back to the Council under the Consent
Agenda. Staff has recently heard from property owners who want to appeal a rel ated
surcharge.
At the December 18, 2018, Public Works Committee meeting, the Committee addressed
the following surcharge appeals with the corresponding recommendations for the
Council’s action. As a result of their review, the appeals are recommended to be
granted with related surcharges waived.
o Michele Waisganis, 4604 Penkwe Way: Water Meter Program – Remove $150
surcharge (utility account)
o Chris Miller, 1292 Kolstad Lane: Water Meter Program – Remove $150 surcharge
(utility account)
o Tara Whalen, 1743 Galaxie Court: Water Meter Program – Remove $150
surcharge (utility account)
o Laurie Hardies, 2082 Jade Lane: Water Meter Program – Remove $150 surcharge
(utility account)
o Peter Usset, 3061 Pine Ridge Drive: Water Meter Program – Remove $150
surcharge (utility account)
o Edward Chavez, 1297 Kolstad Lane: Water Meter Program – Remove $150
surcharge (utility account)
Attachments (0)
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
P. 2019 Consulting Engineering Rates
Action To Be Considered:
Approve an amendment to the Fee Schedule Appendix for the current Consulting
Engineering Contracts for services to be provided in 2019.
Facts:
Each year the consulting engineering companies selected to provide general
municipal services to the City of Eagan submit their proposed fee schedule for
the upcoming year.
According to the terms of the contracts, these proposed amendments to the
original contracts must be approved by the City Council before implementation.
The attached spreadsheet indicates the fees the general municipal consultants
(Bolton & Menk; SEH and WSB) have requested for the Council’s approval. All
have elected to raise their 2019 rates for most personnel, generally to match
inflation rates and local industry standard rates.
The consulting engineering companies providing technical specialty services have
also submitted their proposed rates for 2019. Said rates are on file in the
Engineering office for review.
Engineering staff have reviewed the proposed 201 9 rates and found them to be
in order for favorable Council action.
Attachments (1)
CP-1 Consulting Engineering Fees – General Municipal
GENERAL MUNICIPAL ENGINEERING SERVICES
CLASSIFICATION
BOLTON &
MENK INC
SHORT ELLIOTT
HENDRICKSON INC.
(S E H)
WSB &
ASSOCIATES, INC.CITY CITY POSITION
CLASSIFICATION
Senior Principal / Principal $150 - $270 $160 - $255 $166 - $185 $170 Department Head
Principal Engineer / Sr Associate / Senior Proj Manager $140 - $195 $140 - $215 $150 - $185 $150 City Engineer
Proj. Manager / Sr Transportation / Planner / Sr Proj. Specialist $110 - $175 $130 - $200 $132 - $146 $145 Transportation
Engineer
Engineering Specialist / Sr. Project Scientist $100 - $190 $130 - $170 $116 - $146 $135 Assistant
City Engineer
Sr. Landscape Architect / GIS Specialist $85 - $175 $120 - $205 $116 - $146 $145 Planner
Project Engineer/ Architect $80 - $185 $105 - $165 $116 - $146 $135 Assistant
City Engineer
Environmental Scientist / Natural Resources Specialist $60 - $165 $130 - $170 $99 - $143 $95 Water Resource
Specialist
Senior/Lead Technician / Construction Observer $85 - $175 $100 - $160 $93 -$118 $110 Project Coordinator
Engineering Technician $65 - $140 $65 - $110 $57 - $94 $100 Engineering Technician
Admin Tech/ Clerical $45 - $100 $55 - $99 $52 - $92 $70 Engineering Aide
Clerical Technician
Project Surveyor $120 - $150 $110 - $150 $145 - $205 $100 Engineering Technician
Total Station Equipment No Charge $30/hour NA No Charge
GPS Survey Equipment No Charge $30/hour NA No Charge
Mileage No Charge IRS Rate Normally Included IRS Rate
Reproduction, Printing, Duplicating,
Stakes, Field Supplies, Telephone calls Etc.No Charge Various Included Actual Costs
Rev. 12-18-18
2019 COMPARISON
RATES OF CONSULTING ENGINEERING FIRMS
FOR THE CITY OF EAGAN
G:1ENGINEERING/CONSULTING SERVICES/RATES/Rate Schedule'19
Agenda Information Memo
January 2, 2019, Eagan City Council Meeting
CONSENT AGENDA
Q. Approve a Temporary On-Sale Liquor License and waive the license fee for
Trinity School at River Ridge on February 2, 2019 at 601 River Ridge Parkway.
Action To Be Considered:
To approve a temporary on-sale liquor license and waive the license fee for Trinity
School at River Ridge on February 2, 2019 at 601 River Ridge Parkway.
Facts:
Trinity School at River Ridge has requested a temporary on-sale liquor license be
issued to it for its Winter Classic Event. The event will be held within the school.
Trinity School at River Ridge has requested that the $150.00 license fee be
waived.
The organization has met the requirements for a temporary on-sale liquor
license and has submitted the required documentation. The application has been
reviewed by staff and the Police Department and has been found in order for
approval.
Following Council approval, the application will be forwarded to the Department
of Public Safety – Alcohol and Gambling Enforcement Division for final approval.
Attachments: (0)
Agenda Information Memo
January 2, 2019 Eagan City Council Meeting
CONSENT AGENDA
R. Environmental Quality Board Rules Change – Wetland Environmental
Assessment Worksheet
Action To Be Considered:
Authorize a Letter in Opposition to proposed State Environmental Quality Board (EQB)
rules change.
Facts:
The Minnesota Environmental Quality Board (EQB) is made up of nine state
agency heads and eight citizen members that provides coordination and
cooperation among state agencies on environmental issues in Minnesota, and
advises the governor and legislature on environmental legislation and issues.
EQB programs include: environmental review, state water planning and
coordination, and strategic energy and environmental planning. A significant part
of their duties is to review Environmental Assessment Worksheets (EAW)
prepared by state and local agencies when development or public projects reach
a certain threshold of environmental impact.
The EAW is a document designed to lay out the basic facts of a project necessary
to determine if an Environmental Impact Statement (EIS) is required for the
proposed project. In addition to the legal purpose of the EAW in determining the
need for an EIS, the EAW also provides permit information, informs the public
about the project, and helps identify ways to protect the environment. The EAW
is not meant to approve or deny a project, but instead act as a source of
information to guide other approvals and permitting decisions.
Under the State’s continuing ongoing effort to str eamline agency processes, the
MN EQB is proposing a contradictory EAW rule change that significantly reduces
the threshold of wetland impact limits of a project to require preparation of an
EAW document, thereby increasing the number EAW’s (and costs) that will need
to be prepared statewide. This goes against the State’s streamlining goals.
Additionally, the proposed rule change does not increase environmental
protection because it duplicates environmental review efforts already required
by state and federal regulations governing work in wetlands and public waters.
City staff is requesting approval to submit an objection to this rule change. If the
EQB receives 25 or more objections from local agencies, the MN EQB is required
to hold a public hearing on the matter
Attachments (0)
Agenda Information Memo
January 2, 2019, Eagan City Council Meeting
CONSENT AGENDA
S. Planned Development Amendment – TCF Bank Minnesota
Action To Be Considered:
To approve a Planned Development Amendment to allow modifications to the
approved exterior architecture of the Eagan Promenade Planned Development for the
parcel located at 3380 Denmark Avenue.
Required Vote For Approval:
At least three votes
Facts:
Approved in July of 1996, the Final Planned Development for TCF Bank is subject
to a Building Elevation plan with a latest revision date of June 25, 1996. Said
elevation plan called for a reddish-brown brick exterior with beige accents.
TCF Bank is proposing to change the exterior color of the building and the base
of the monument sign as part of a rebranding effort. Additional improvements
include maintenance work on the monument sign to address water intrusion
issues and an interior remodel of the facility.
Phase One of the rebranding effort was completed in October of this year and
included an interior remodel of the bank and staining the existing exterior brick
and architectural stone with a penetrating masonry stain that chemically bonds
with the existing brick and carries a 25-year manufacturer’s warranty.
The applicant received approval to stain the exterior brick from the Eagan
Promenade management company; however, staff was not aware of the activity
until contacted by a sign company regarding modifying building and monument
signage.
The two-tone gray is attractive and provides an updated look to the building.
The applicant is also proposing to add a new freestanding branded color (yellow)
“wayfinding wall” under the existing portico near the entrance to the bank. The
applicant has agreed to review the design for safety purposes as requested by
Eagan PD.
A public hearing was held on December 20, 2018, and the APC did recommend
approval subject to the conditions as listed in the APC minutes.
Issues: None
60-Day Agency Action Deadline: January 18, 2019
Attachments: (4)
CS-1 Location Map
CS-2 Draft December 20, 2018, APC Meeting Minutes
CS-3 Planning Report
CS-4 Report Exhibits
oons ine ar
W
Q
EAGAN
Central
Park s
Z
—
Park
o
Location Map
P
NORTHWOOD PKWY'
P�PpFL��
Project Name: TCF Bank
Request: Planned Development
MARICE DR
Amendment
0
U
Case No.: 10 -PA -08-11-18
Z
Q
4
SafQ
y
Subject
w
Z
Site
a
o
a
z
W
0
O
CL
CL
Map Area Extent
F1
a,
is
7!77--V
i
TOWN CENTRE DR
Lo�Oa
F
MR.rta�
'
p�
v
TOWN
ENTRE DRIVE
a
I
�G�
DRRey Rtl
1
W
O'Leary
1
i
0
Q
<
w
0
>
a
Z
Lake Park
j
.._.._.._
..---------------------------
1
.._.._.._.a_ ..i
N
rip
N
m
" F
Feet
I
E
A
0 500 1,000
Advisory Planning Commission
December 20, 2018
Page 2 of 7
IV. PUBLIC HEARING
New Business
A. TCF Bank
Applicant Name: Dave Nelson, TCF Bank Minnesota
Location: 3380 Denmark Ave; Lot 1, Block 2, Eagan Promenade
Application: Planned Development Amendment
A Planned Development Amendment to modify the color of the building exterior and base of
the monument sign.
File Number: 10-PA-08-11-18
City Planner Ridley introduced this item and highlighted the information presented in the City
Staff report dated December 4, 2018.
Dave Nelson, TCF Bank Property Development, and Eric Lagerquist, Cuningham Group, provided
an overview of the project and were available for questions.
Member Whisnant asked about the architecture of a newer TCF branch in Apple Valley.
Mr. Lagerquist explained that there are 350 branch locations and the rebranding is occurring at
an expedient pace but will take time to complete.
Member Weimert asked if TCF plans to respond to the comments shared by the Eagan Police
Department.
Mr. Lagerquist stated that the safety issue is important to TCF and they will definitely review
the design.
Vice Chair Sagstetter opened the public hearing. There being no public comment, Vice Chair
Sagstetter closed the public hearing and turned the discussion back to the Commission.
Member Weimert moved, Member Whisnant seconded a motion to recommend approval of a
Planned Development Amendment to allow modifications to the finish of the exterior of the
TCF Bank and monument sign for the parcel located at 3380 Denmark Avenue, subject to the
following conditions:
1. The Final Planned Development Agreement shall be executed and recorded against the
property within 90 days of City Council approval.
All voted in favor. Motion carried 4-0.
PLANNING REPORT
CITY OF EAGAN
REPORT DATE: December 4, 2018 CASE: 10-PA-08-11-18
APPLICANT: TCF Bank Minnesota HEARING DATE: December 20, 2018
PROPERTY OWNER: Same APPLICATION DATE: November 20, 2017
REQUEST: Planned Development Amendment PREPARED BY: Michael J. Ridley, AICP
LOCATION: 3380 Denmark Avenue
COMPREHENSIVE PLAN: RC, Retail Commercial
ZONING: PD, Planned Development
SUMMARY OF REQUEST
The applicant is requesting approval of a Planned Development Amendment to allow
modifications to the approved exterior architecture of the Eagan Promenade Planned
Development for the parcel located at 3380 Denmark Avenue, legally described as Lot 1, Block
2, Eagan Promenade.
AUTHORITY FOR REVIEW
Chapter 11, Section 11.50, Subdivision 5 states, in part,
1. The provisions of this chapter may be amended by the majority vote of the council, except
that amendments changing the boundaries of any district or changing the regulations of any
district may only be made by an affirmative vote of two-thirds of all members of the
council.
2. The Council shall not rezone any land or area in any zoning district or make any other
proposed amendment to this chapter without first having referred it to the advisory
planning commission for its consideration and recommendation.
BACKGROUND/HISTORY
Approved and platted in 1996, the Eagan Promenade retail Planned Development consists of a
264,000 SF in-line retail building and several free standing single-occupant buildings. Over the
past 22 years, the center has matured and two single tenant buildings (Blockbuster Video and
Ethan Allen) converted to multi-tenant buildings. Other original users that have come and gone
Planning Report – TCF Bank Minnesota
December 20, 2018
Page 2
include Cattle Company & Don Pablo’s restaurants. The center has continued to enjoy high
occupancy rates throughout the years.
Approved in July of 1996, the Final Planned Development for TCF Bank is subject to a Building
Elevation plan with a latest revision date of June 25, 1996. Said elevation plan called for a
reddish-brown brick exterior with beige accents.
The Final Planned Development Agreement still governs the site.
EXISTING CONDITIONS
Phase One of the rebranding effort was completed in October of this year and included an
interior remodel of the bank and staining the existing exterior brick and architectural stone with
a penetrating masonry stain that chemically bonds with the existing brick and carries a 25-year
manufacturer’s warranty. All the exterior metal trim and synthetic wood elements attached to
the building will be painted to match.
The applicant received approval to stain the exterior brick from the Eagan Promenade
management company; however, staff was not aware of the activity until contacted by a sign
company regarding modifying building and monument signage. Staff reached out to the
applicant and explained a PD Amendment was necessary to modify the exterior of the building
which then generated the amendment being considered with this application.
The 2.6-acre lot contains an existing 4,300 SF building including a multi-lane drive-through
covered by a canopy and a monument sign. The site is accessed via a right-in only from north
bound Denmark Avenue and shared access to Promenade Place at two points to the north. The
subject lot also communicates with the Houlihan’s restaurant lot to the east.
Planning Report – TCF Bank Minnesota
December 20, 2018
Page 3
EVALUATION OF REQUEST
TCF Bank is proposing to change the exterior color of the building and the base of the
monument sign as part of a rebranding effort. Additional improvements include maintenance
work on the monument sign to address water intrusion issues. A more complete description is
contained in the applicant’s narrative.
The two-tone gray is attractive and provides an updated look to the building. The applicant is
also proposing to add a new freestanding branded color (yellow) “wayfinding wall” under the
existing portico near the entrance to the bank.
The contrasting color of the wall feature adds visual interest on the east side of the building;
however, it appears there is space behind the wall creating a possible security risk to customers
and employees exiting the building. Eagan PD suggests the applicant reconsider the design of
the wall to maintain clear sightlines for people entering or exiting the building.
Compatibility with Surrounding Area – The proposed (and completed) modifications to the
building exterior appear compatible with the overall shopping center.
APPLICANT’S NARRATIVE
The narrative explains: “Originally called Twin Cities Federal, TCF Bank has been a homegrown
Minnesota brand for over 50 years… as TCF Bank has grown, the aesthetics of their branches
became very eclectic. As part of their rebranding effort, it was critical for TCF Bank to establish
a way to visually unify their branches…through providing a consistent color and signage
identity.”
SUMMARY/CONCLUSION
As part of a national portfolio rebranding, TCF is proposing to change the exterior color of the
building and the base of the monument sign. Additional improvements include maintenance
work on the monument sign to address water intrusion issues. A redesign of the proposed
wayfinding wall on the east side of the building should be considered.
The two-tone gray is attractive and provides an updated look to the building.
ACTION TO BE CONSIDERED
To recommend approval of a Planned Development Amendment to allow modifications to the
finish of the exterior of the TCF Bank and monument sign for the parcel located at 3380
Denmark Avenue.
If approved, the following condition shall apply:
Planning Report – TCF Bank Minnesota
December 20, 2018
Page 4
1. The Final Planned Development Agreement shall be executed and recorded against the
property within 90 days of City Council approval.
TCF-MN-096-Eagan Promenade - Exterior Options September 19, 2018
Brick stained SW7075 Web Gray, precast & metal trim painted SW7073 Network Gray, and TCF yellow accent wall
Perspective view
Stained brick example at
TCF-LS-002-River Forest
OPTION B
November 19, 2108
Planned Development Agreement Amendment Request
TCF Bank
3380 Denmark Ave
Eagan, MN 55121
PID: 10-22472-02-010
Lot One (1), Block Two (2) Eagan Promenade
What you want to do:
1. Change the exterior color of the existing building to two tones of gray as part
of TCF rebranding throughout their national portfolio of real estate. This will
be accomplished through the following;
a. Application of a penetrating stain to the brick and architectural cast stone
elements. This masonry treatment has a 25 year manufactures warranty.
b. Painting of existing painted metal building trim and synthetic wood
elements.
2. Repair and change of color of the existing monument sign, associated solely
with the TCF Bank;
a. Removal and replacement of the failing EIFS cap with a new metal cap to
match the existing cap profile.
b. Change the color of the brick base and metal cap to match the building’s
new two tones of gray.
c. Replacement of the existing signage panel box with new individual signage
letters, logo and raceway with the banks new logo and text to match the
signage on the bank building.
3. Adding a new free standing branded color wayfinding wall under the existing
portico adjacent to the building’s east entrance and walk up ATM.
4. These changes have been approved by the Eagan Promenade’s property
management company, Mid-America Real Estate, Minnesota, LLC.
Timing and Phasing:
1. The proposed work will take place in two phases.
a. Phase One was completed in October of 2018 as part of the interior
remolding of the bank. Phase One included the staining of the existing
exterior brick and architectural cast stone, along with the painting of all
existing exterior metal trim and synthetic wood elements attached to the
building.
b. Phase Two will be completed in the spring of 2019 once the Planned
November 19, 2108 TCF Bank 3380 Denmark Ave
PID: 10-22472-02-010
2
Development Agreement Amendment is approved by the City of Eagan.
This phase of work will include the modification to the monument sign and
its signage along with the construction of the new branded wayfinding wall
at the east entry.
Existing land uses:
The proposed amendment has no change in the land use of the subject
property. The land use will remain as a 4,600 square foot bank with six drive
thru lanes.
Surrounding land uses:
The surrounding land use is consistent with a Community Shopping Center
(CSC) District. It consists of commercial business, mercantile shops,
restaurants, both fast-food and casual dining, and office. Additionally, a public
utility sub-station occupies one lot and public right-of-ways.
Zoning of subject property and property within 660 feet
The subject property is zoned Planned Development as part of the Eagan
Promenade Planned Development.
The zoning of adjacent properties within 660 feet is a combination of Planned
Development and Community Shopping Center.
• Eight adjacent properties are within the same master Planned Development
as the subject property.
• Ten adjacent properties are within other Planned Developments consisting
of commercial businesses, restaurants, mercantile occupancies and offices.
• Five properties are located in Community Shopping Center (consisting of
commercial business, restaurants and mercantile occupancies.
• One adjacent property is a public utility.
• Additionally, there are public right-of-ways.
What impact does the planned development amendment have on surrounding
property and land uses?
As there is no change to the existing use or zoning of the subject property,
there are no impacts on the surrounding properties and their land use.
November 19, 2108 TCF Bank 3380 Denmark Ave
PID: 10-22472-02-010
3
What impact does the planned development amendment have on subject
property?
The proposed amendment is a change of the exterior color of the existing
building and associated monument sign on the subject property. There is no
change to the land use of the property.
What impact does the planned development amendment have on City services
such as sewer, water, storm water run-off and roads?
There are no changes to the existing parking, drive lanes, impervious surfaces
or building size in this proposed amendment, so there are change or impacts on
the City service.
Does the requested land use proposed by the amendment result in a better u se of
the land?
There is no change to the current land use for the proposed amendment.
Describe the public benefit of the proposed amendment:
Originally called Twin Cities Federal, TCF Bank has been a homegrown
Minnesota brand for over 50 years. Over those 50 years, as TCF Bank has
grown, the aesthetics of their branches became very eclectic. As a part their
rebranding effort, it was critical for TCF Bank to establish a way to visually
unify their branches and give their customers a consistent brand experience.
The best way to accomplish this is through providing a consistent color and
signage identity.
TCF Bank is currently in the process of the rebranding of all their retail
banking locations across the Midwest and Mountain regions. This rebranding
includes a combination of updates to signage, building exterior appearance and
interior remodeling. The rebranding has multiple objectives, but primarily to
visually unify more than 300 locations. One significant objective is to
strengthen the identity of the TCF Bank locations with a single recognizable
building appearance at its multiple locations. This is being accomplished
through the establishment of a new branded identity of building color and
signage for their buildings.
The subject property, TCF Bank, is an original part of the Planned
Development, Eagan Promenade, development in 1996. This planned
development attempted to create a uniform and cohesive appearance of all the
buildings located within the development.
For the proposed changes, the existing brick and architectural cast stone
elements will be treated with a penetrating masonry stain that chemically
November 19, 2108 TCF Bank 3380 Denmark Ave
PID: 10-22472-02-010
4
bonds with the existing brick. Other existing painted metal trim and soffits
will be painted a new coordinating color. The associated monument sign will
also have a change of color to maintain its cohesive relationship to the bank
building, by maintaining the nature of the existing materials and the selection
of neutral and complementary colors consistent with the existing requirements
of the Eagan Promenade Planned Development Agreement. These changes
have been approved by the Eagan Promenade’s management company,
MidAmerica Real Estate. The selection of the complementary colors works to
maintain the cohesiveness of the development, while providing for a
recognizable corporate identity for TCF Bank.
Additionally, the selected colors and existing materials are consistent with
those found on buildings in the adjacent planned developments and the
community shopping center district, which has a diversity of architectural
style, materials and colors.
Agenda Information Memo
January 2, 2019, Eagan City Council Meeting
NEW BUSINESS
A. Purchase Agreement for the sale of Lot 1, Block 1, Yankee Plaza 2nd Addition
located southeast of Duckwood Drive and Federal Drive
Action To Be Considered:
To approve a Purchase Agreement for the sale of Lot 1, Block 1, Yankee Plaza 2nd Addition
located southeast of Duckwood Drive and Federal Drive.
Facts:
In approximately 2010, the City acquired right-of-way for the extension of
Duckwood Drive and a bridge over Interstate 35E.
With road improvements completed, the City platted the approximately 0.8-acre
property to separate right-of-way from developable land, and the City Council
approved a Request for Proposals on May 15, 2018.
The Finance Committee reviewed an offer to purchase at a meeting on July 30,
2018, and directed staff to proceed with an appraisal to confirm property value
and the preparation of a purchase agreement to be presented to the City Council
at a future meeting.
Neighbors within 350 feet of the property have been notified that a purchase
agreement will be considered by the City Council on January 2, 2019, and that
land use approvals will be considered at future Planning Commission and City
Council meetings.
The sale price is $215,000.00. A Repurchase Agreement attached to the
Purchase Agreement allows the City to repurchase the property if construction
of an approximately 5,000 square foot medical office building has not
commenced within nine months of closing.
Pending City approval of the Purchase Agreement, closing is expected to occur in
30 to 60 days.
Issues: None
Attachments: (3)
NBA-1 Location Map
NBA-2 Purchase Agreement
NBA-3 Concept Plan
ASHBURYROADTOWNCENTREDRIVEFEDERALDRIVEDREXEL CTB
L
A
C
K
H
A
WKRDGCIRB O A R D W A L K
BLACKHAWK RIDGE WAYB LACKHAW KBLACKHAWK LAKE CTC.S.A.H.NO.31(PILOTKNOBROAD)CRESTRIDGE DRDRESDEN CTASHBURYCTBLACKHAWKPTLEMIEUX CIR
LAKEVI E WCURVEST.CHARLESPLACECRESTRIDGE LANE
ASHBURYPLACEBLACKHAWKLAKEDRKRESTWOOD LNDREXEL CTSURREYHEI
GHTSD R IV E
BLACKHAWKLAKEDRVIOLET LANE
PARK P L
HUNT DRIVE
FEDERALDRIVEDUCKWOOD DR
ENGLERT RD
L
AKEVIEW
TR
AIL
BLACKHAWKR
IDGEPL DRESDEN WAYCOACH
M
A
NROADPACIFICAVE FEDERAL DRIVEBOARDWALKCOUNTY ROAD NO. 28 (YANKEE DOODLE ROAD)FEDERAL DRIVEBRAUN CT
LAKEDRCOACH
M
A
NROADBLACKHAW K LAKE PLBLACKH A W K R ID G E C T
W A S HINGTONDRIVECOUNTY ROAD NO. 28 (YANKEE DOODLE ROAD)
81ST ST W
CENTURY POINT
B L ACKHAW K HILLS RD CRESTRIDG
E
C
T
COUNTY ROAD NO. 28 (YANKEE DOODLE ROAD)LAKEVIEWCURVEASHBURYPLBALTICAVE
Blackhawk Park
FishLake Park
Park
Location Map
0 1,000500Feet
´
§¨¦35E
§¨¦494
Cliff Rd
Diffley Rd
Yankee Doodle Rd
Lone Oak Rd
Map Area Extent
Project Yankee Plaza 2nd AddnRequest: Purchase AgreementCase No.:
Subject Site
PURCHASE A"KELIIv11�1N I
This Purchase Agreement ("Agreement") is made and entered into as of this day of
2018, by and between the City of Eagan, a Minnesota municipal corporation
("Seller") and Advanced Oral Surgery LLC, a Nebraska limited liability company or its assigns
("Buyer"). For purposes of this Agreement, the term "Effective Date" shall mean the date that
Seller executes this Agreement.
In consideration of the covenants and agreements contained herein, the parties agree as follows;
1. Pro e Subject Yo compliance with the terms and conditions of this Agreement,
Seller shall sell to Buyer and Buyer shall purchase from Seller property legally
described as Lot 1, Block 1, Yankee Place 2"a Addition,
2. Purchase Price• Payment.
A. Purchase Price. The purchase price for the Property shall be Two
Hundred Fifteen Thousand and no/100 Dollars ($215,000.00) ("Purchase
Price") and shall be payable (subject to prorations, reductions and credits
as provided below) by wire transfer, certified or cashier's check at the
Closing. The sum of Ten Thousand and no/100 Dollars ($10,000.00) as
earnest money shall be deposited with the Escrow Agent within five (5)
days of the Effective Date.
3. Title to be Delivered; Commitment; Survey; Environmental Reporting; Title
Objections,
A, Title to be Delivered. At Closing, Seller agrees to convey fee simple title
III the Property subject to the Permitted Exceptions defined herein.
B. Commitment. The Seller shall, within thirty (30} days after full execution
of this agreement, cause to be issued and delivered at Seller's expense to
Buyer a commitment ("Commitment") covering the Property issued by
Dakota County Abstract (the "Escrow Agent") wherein Escrow Agent
agrees to issue to Buyer an Owner's Title Insurance Policy insuring title
subject only to the Permitted Exceptions, in the full amount of the
Purchase Price, with extended coverage and free of standard exceptions.
The Commitment shall have an effective date after the date of this
Agreement.
C. Title Objections. Buyer shall have ten (10) days from 'the
later of the date
it receives the Commitment or :any update or supplement- to the.
Commitment to determine whether title to the Property is marketable and
to give Seller written objections to the marketability of the Property's title
based on matters disclosed in the Commitment, or any update or
supplement thereto. Any exception disclosed in the Commitment (or any
update or supplement thereto) and not olhlected to by Buyer within the;
applicable ten (10) day period shall be deemed a "Permitted Exception"
hereunder. Buyer agrees to accept a. conveyance of the Property subject to
Permitted Exceptions. Seller shall have until thirty (30) days alter it
receives any written objections to cure the same to Buyer's reasonable
satisfaction, and agrees to use its best efforts to do so. if Seller shall fail to
cure Buyer's objections within that time, then Buyer may, at its sole
discretion, either (a) terminate this Agreement without any liability on its
part, or (b) waive such objections in writing and proceed to closing with
the understanding that such uncured objections shall be deemed Permitted
Exceptions at the Closing.
4. Seller's Property Information; Buyer's Inspections.
A. Seller's Property Information. Within ten (10) days of signing Seller shall
deliver all surveys, plans, appraisals, environmental reports and other
information relating to the Property to the Buyer (hereinafter the
"Property Information"),
B. Buyer's Inspections. For sixty (60) days the Buyer, its counsel, agents,
contractors, and other representatives (collectively, `Buyer Parties"),
shall have reasonable access to the Property and all parts thereof, as well
as to all Property Information and other papers and documents of Seller as
they relate to the title, physical condition, development and operation of
the Property. The Buyer shall also have the right, upon prior notice to the
Seller, to enter upon the Property during business hours for inspecting,
surveying, testing, and engineering as it considers appropriate (collectively
the "Inspections"). Buyer shall repair all damage to the Property caused
by such Inspections and, as a condition of entry onto the Property, each of
Buyer's contractors entering onto the Property shall have public liability
insurance in an amount reasonably satisfactory to Buyer and Seller.
S. Control of Pro
A. Control of Property. Until the Closing, Seller shall have the full
responsibility and the entire liability for any and all damages or injury of
any kind whatsoever to the Property. Notwithstanding, in the event that
Buyer undertakes any Inspections upon the Property, it shall be
responsible and liable for any damages or injury that it causes.
6. Representations, Warranties and Covenants of Seller. In order to induce Buyer to
enter into this Agreement and purchase the Property, Seller hereby represents,
warrants and covenants to Buyer:
A. Seller possesses fee simple title interest to the Property.
OA
B. Seller certifies that Seller does not know of any "Wells" on the described
Property within the meaning of Minn. Stat. Section 103I.235. This
representation is intended to satisfy the requirements of the statute.
C. The execution, delivery, and performance of this Agreement has been duly
authorized and approved by the Seller. This Agreement, and such other
agreements and instruments as are contemplated by this Agreement, when
duly executed and delivered by Seller, shall constitute valid and binding
obligationsof Seller and will be enforceable against Seller in accordance
with their respective terms.
D. To Seller's knowledge, there are no unrecorded contracts, leases,
easements or other agreements or interests relating to the Property and on
the Closing Date no person other than Seller will be in possession of any
portion of the Property.
E. Except for this Agreement, Seller has not entered, and shall not enter, into
any other contracts for the sale or transfer of the Property.
F. To Seller's knowledge, there are no judgments existing against Seller in
any court of competent jurisdiction which constitute or might be construed
to constitute a lien of any nature upon the Property and Seller has not
received any notice or notices, either orally or in writing, nor has
knowledge of any action, suit or proceeding pending or threatened against
or affecting the Property relating to or arising out of the operation,
ownership, custody or control of the Property in any court or before any
federal, state, county or municipal department, commission, board, bureau
or agency or other governmental instrumentality.
G. Seller has not received any written notice of, and to Seller's knowledge
there is not any, action, litigation, investigation or proceeding of any kind
pending or threatened against the Property, or any part thereof.
H. There are no individual sewage treatment systems located on the Property.
7. Closing Date. The Closing shall occur no later than ninety (90) days after
signatures. The Closing shall take place at the offices of the Escrow Agent or at
such other place as Seller and Buyer may agree.
8. Seller's Obligations at Closing. At or prior to the Closing Date, Seller shall:
A. Execute and deliver to Buyer a Limited Warranty Deed.
B. Deliver to Buyer and Escrow Agent a standard affidavit of Seller
in form and content sufficient to allow Escrow Agent to delete the
standard exceptions contained in Buyer's Owners Title Insurance
Policy relative to (i) parties in possession, (ii) liens for labor,
materials or services, and (iii) unrecorded easements or other
instruments.
C. A repurchase agreement substantially in the form as set forth on
Exhibit "A." Such extension should not be unreasonably withheld.
D. Deliver to Buyer such other documents as may be reasonably
necessary to effectuate the transfer contemplated in this Purchase
Agreement.
9. Buyer's Obligations at Closing. At or prior to the Closing Date, the Buyer shall,
subject to the terms, conditions and provisions hereof, and the performance by
Seller of its obligations as set forth herein:
A. Deliver the Purchase Price to Seller pursuant to Section 2 above.
B. A repurchase agreement substantially in the form as set forth on Exhibit
"A
10. Closing Costs for the Closings. The following costs and expenses shall be paid as
follows in connection with the Closing:
A. Seller shall pay:
All fees to record all of the documents necessary to permit Seller to
convey fee simple title to the Property to Buyer (other than the fee
to record the Deed);
2. Any state, county or municipal deed tax, excise tax or transfer fee
imposed on the conveyance;
3. One-half (1/2) of any closing fee charged by Escrow Agent or any
title company closing this transaction; and
4. Seller's attorneys' fees and costs.
B. Buyer shall pay the following in connection with the closing:
1. The fee necessary to record the Deed;
2. The premium for any Owner's Title Insurance Policy requested by
Buyer;
3. One-half (112) of the closing fees charged by Escrow Agent or any
title company closing of this transaction; and
4
A
4. Buyer's attorneys' fees and costs.
C. The terms of this Section 10 shall survive the closing of the transaction
contemplated herein.
11. Prorations. The following prorations shall be made as of the Closing Date:
A. Real Estate Taxes. The property is currently tax exempt for real estate tax
purposes.
B. Special Assessments. There are no pending or levied special assessments
C. Event of Repurchase. In the event that Seller needs to exercise its right to
repurchase the Property as allowed under the Repurchase Agreement, all
prorations and closing costs shall be allocated in accordance with the
provisions of this Section 11. This provision shall survive the Closing and
the delivery of the deed.
12. Brokerage. Buyer has engaged the services of JBL Companies, CRES, Inc.
Buyer represents and warrants that it will pay any fees associated with the
services of JBL Companies in connection with the purchase contemplated by this
Agreement. If Seller has engaged the services of a broker, Seller shall pay any
commission(s) related thereto.
13. Remedies.
A. Seller Default. If Seller defaults in the performance of this Agreement,
and such default remains uncured after 30 days written notice to Seller of
the default, Buyer may cancel this Agreement by delivering written notice
of such default to Seller ("Buyer's Default Notice") in which event Seller
shall have the opportunity to cure such default within thirty (30) days after
receipt of Buyer's Default Notice, and if Seller fails to timely cure such
default after receipt of Buyer's Default Notice, then this Agreement shall
be deemed canceled without further action between the parties and the
earnest money shall be returned to Buyer.
B. Buyer Default. If Buyer defaults in the performance of this Agreement,
and such default remains uncured after thirty (30) days written notice to
Buyer of the default, Seller may either seek an action for specific
performance or cancel this Agreement by delivering written notice of such
default to Buyer ("Seller's Default Notice") in which event Buyer shall
have the opportunity to cure such default within thirty (30) days after
receipt of Seller's Default Notice, and if Buyer fails to timely cure such
default after receipt of Seller's Default Notice, then this Agreement shall
be deemed canceled without further action between the parties and the
earnest money shall be returned to Buyer.
14
Time for Acceptance. This Agreement, when duly executed by al
hereto, shall be binding upon the parties hereto, their heirs, i
successors and assigns.
15. Possession. Seller shall deliver possession of the Property to Buyer on the
Closing Date.
lb. Damage to the Property. In the event of loss or damage to the Property prior to
Closing, Buyer, in its sole discretion, shall have the option of enforcing the
obligations hereunder or cancelling this Agreement. If Buyer elects to cancel this
Agreement, then each party shall be relieved of all further obligations or liabilities
hereunder. If Buyer elects not to cancel this Agreement, Seller shall assign to
Buyer all of Seller's right, title and interest in and to all insurance proceeds
payable for such loss, damage or destruction and shall pay to Buyer the amount of
any insurance deductible.
17. Miscellaneous. The following general provisions govern this Agreement.
A. No Waivers. The waiver by either party hereto of any condition or the
breach of any term, covenant or condition herein shall not be deemed to be
a waiver of any other condition or of any subsequent breach of the same or
any other term, covenant, or condition herein contained. Buyer, in its sole
discretion may waive any right conferred upon Buyer by this Agreement;
provided that such waiver shall only be made by Buyer giving Seller
written notice specifically describing the right waived.
B. Time of Essence. Time is of the essence in this Agreement.
C. Governing Law. This Agreement is made and executed under and in all
respects to be governed and construed by the laws of the State of
Minnesota and the parties hereto hereby agree and consent and submit
themselves to any court of competent jurisdiction situated in the State of
Minnesota.
D. Notices. All notices and demands given or required to be given by any
party hereto to any other party shall be deemed to have been properly
given if and when delivered in person, the next business day after being
sent by reputable overnight commercial courier (e.g. U.S. or Federal
Express) or three (3) business days after having been deposited in any U.S.
Postal Service and sent by U.S. mail, postage prepaid, addressed as
follows (or sent to such other address as any party shall specify to the
other party pursuant to the provisions of this Section):
IN
To Seller: City of Eagan
Attn: Dave Osberg, City Administrator
3830 Pilot Knob Road
Eagan, MN 55122
With a copy to: Dougherty, Molenda, Solfest, Hills
& Bauer P.A.
Attn: Robert B. Bauer
14985 Glazier Avenue, Suite 525
Apple Valley, MN 55124
To Buyer: Advanced Oral Surgery, LLC
Attn: Ton a , Mgabc -Nut MN
Mf =Y► PAPA As
LWIaLLE. mo 55du�f
With a copy to: JBL Companies
Attn: Jeffrey B. Larson
3440 Federal Drive, Suite 250
Eagan, MN 55122
E. Successors and Assi . This Agreement shall be binding upon and insure
to the benefit of the successors and assigns of each of the parties hereto.
Seller shall not be permitted to assign its rights and obligations under this
Agreement.
F. Invalidi . If for any reason any term or provision of this Agreement shall
be declared void and unenforceable by any court of law or equity it shall
only affect such particular item or provision of this Agreement and the
balance of this Agreement shall remain in full force and effect and shall be
binding upon the parties hereto_
G. Complete Agreement. All understandings and agreements heretofore had
between the parties are merged into this Agreement which, together with
the Settlement Agreement and the exhibits thereto, fully and completely
express their agreement. This Agreement may be changed only in writing
signed by both of the parties hereto and shall apply to and bind the
successors and assigns of each of the parties hereto and shall not merge
with the deed delivered to Buyer at closing.
H. Counterparts. This Agreement may be executed in one or more
counterparts each of which when so executed and delivered shall be an
original, but together shall constitute one and the same instrument.
1. Calculation of Time Periods. Unless otherwise specifically provided
herein, in computing any period of time described in this Agreement, the
day of the act or event after which the designated period of time begins to
7
dun is not to be included and the last day of the period so computed is to
be included, unless such last day is a Saturday, Sunday or legal holiday
under the laws of the State of Minnesota, in which event the period shall
run until the end of the next day which is neither a Saturday, Sunday or
legal holiday. The final day of such period shall be deemed to end at 5:00
p.m., Minnesota time.
J. Survival. All of the warranties, covenants, and representations made
herein by either Seller or Buyer shall survive closing and the delivery of
the Deed to Buyer, or the earlier termination of this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and
year first written above.
(Signature pages to follow.)
0
Purchase Agreement
(Signature page of Seller)
SELLER:
CITY OF EAGAN, a Minnesota
municipal corporation
By:
Mike Maguire
Its: Mayor
By:
Christina M. Scipioni
Its: Clerk
Purchase Agreement
(Signature page of Buy=er)
Advanced Oral Survery, LLC,
a Nebraska limited liability company
E- F to?
-whq7rb mr� I M.
10
Exhibit "A"
REPURCHASE AGREEMENT
This Agreement is made and entered into effective as of the� y of W&A W, 8,
by and between the City of Eagan, a Minnesota municipal corporation (the "Seller") and
Advanced Oral Surgery LLC, a Nebraska limited Iiability company (the "Buyer").
WHEREAS, the Seller and Buyer have entered into a Purchase Agreement dated
2018 (the "Contract") relating to the sale and purchase of a certain tract or
parcel of land situated in Dakota County, Minnesota, described as follows:
Lot 1, Bloch 1, Yankee Place 2nd Addition
(the "Property"); and
WHEREAS, contemporaneously herewith the Seller has conveyed to Buyer the Property.
NOW, THEREFORE, in further consideration of this conveyance and in furtherance of
the understanding between the parties, Buyer hereby grants to the Seller the following option to
repurchase the Property;
Section 1. REPURCHASE: If Buyer has not commenced construction of an
approximately 5,000 square foot medical office building constructed primarily with a brick
veneer facade within nine (9) months of the date of closing (the "Construction Commencement
Deadline"), then the Seller shall have the option of repurchasing the Property for a purchase
price of Two Hundred Fifteen Thousand and no1100 Dollars ($215,000.00) less the amount of
any liens on the Property resulting from action by the Buyer unless the Construction
Commencement Deadline is extended by mutual agreement of the parties. "Commenced
Construction" shall mean the installation of footings and foundation for the construction of a
medical office building. The Seller may exercise this option to repurchase by giving written
notice to Buyer within thirty (30) days after the Construction Commencement Deadline. Upon
receiving the repurchase price in cash from the Seller (which amount must be paid within thirty
(30) days after the notice of option exercise is given), Buyer shall convey to the Seller by limited
warranty deed the Property free and clear of any liens and encumbrances placed or suffered
thereon by Buyer, which liens and encumbrances shall be paid off by Buyer on or before closing.
Section 2. RELEASE: If written notice of option exercise is not timely given to Buyer
or if Buyer has Commenced Construction within the required period, this option to repurchase
shall terminate absolutely and the Seller shal l upon Buyer's request, execute and deliver to Buyer
a release of this repurchase right in recordable form.
Section 3. NOTICE: All notices, demands and requires required or permitted to be given
under this Agreement must be in writing and shall be deemed to have been properly given or
served either by personal delivery or by depositing the same in the United States Mail, addressed
to the Seller or to Buyer, as the case may be, prepaid and registered or certified mail, return
receipt requested, at the following addresses:
If to Seller: City of Eagan
Attn: Dave Osberg, City Administrator
3830 Pilot Knob Road
Eagan, Minnesota 55122
with a copy to: Dougherty, MoIenda, Solfest, Hills & Bauer P.A.
14985 Glazier Avenue, Suite 525
Apple Valley, Minnesota 55124
Attn: Robert B. Bauer
If to Buyer: Advanced Oral Surgery, LLC
Attn: T04ATH lel (g &E
11319 YMPA�l A Ave _
LAV4VILLS NO 55,0gN_
Rejection or other refusal to accept or the inability to deliver because of changed address
of which no notice was given shall be deemed to be receipt of the notice, demand or request.
Either party shall have the right from time to time and at any time upon at least ten (10) days'
written notice thereof, to change their respective addresses and each shall have the right to
specify as its address any other address within the United States of America.
Section 4. MISCELLANEOUS. The provisions of this Agreement are intended in each
instance to be binding upon and inure to the benefit of the signatories hereto, to the successors
and assigns of Buyer who become owners of the Property and to the successors and assigns of
the Seller to whom the right, title and interest herein is specif tally assigned. Either party may
record this instrument in the appropriate real estate records.
IN WITNESS WHEREOF, the parties have caused this instrument to be executed as of
the date and year first above written.
[Signature pages to follow.]
2
Repurchase Agreement
Seller's Signature Page
City of Eagan, a Minnesota munici
Lo
M.
STATE OF MINNESOTA)
)SS.
COUNTY OF DAKOTA )
Mike Maguire
Its: Mayor
`stina M. Scipioni
Clerk
The foregoing ins ent was acknowledged before me, a tart' public, this day of
201 8, byMike Maguire and Christina M. Scipioni, Nyor and Clerk of the City
of Eagan, a MinnesotgAunicipal corporation, on behalf of the municipakporporation.
Notary Public
Repurebase Agreement
Buyer's Signature Page
Advanced Oral Surgery, LLC,
a Nebraska limited liability w
Its:
STATE OF )
}ss_
COL]NTY OF _
The foregoing instrument w eknowledged be or a this _ day of ,
2417, by the of Advanced
Oral Surgery, LLC, a Ne bra a limited liability company, on ehalf of the limited liability
company.
THIS INSTRUMENT DRAFTED BY:
Notary Public
Dougherty, Molenda, Solfest, Hills & Bauer P.A.
14985 Glazier Avenue, Suite 525
Apple Valley, MN 55124
(952)432-3136
9
Advanced Oral Surgery
Egan, MN SITE PLAN NTS 12.12.18
FOUNDarchitects 402-617-6984NORTH
Advanced Oral Surgery
Egan, MN VIEW FROM FEDERAL DR. 12.12.18
FOUNDarchitects 402-617-6984
Advanced Oral Surgery
Egan, MN VIEW FROM FEDERAL DR. 12.12.18
FOUNDarchitects 402-617-6984
F E D E R A L D R IV E
I 3 5 E B E Y O N D ORAL SURGERY
BUILDING
DUCKWOOD DRI
VE
Agenda Information Memo
January 2, 2019, Eagan City Council Meeting
NEW BUSINESS
B. Planned Development Amendment – The House Church
Action To Be Considered:
To approve (or direct preparation of Findings of Fact for Denial) a Planned Development
Amendment to allow expansion of a church upon property located at 2024 Rahn Way,
subject to the conditions listed in the APC minutes.
Required Vote For Approval:
Planned Development Amendment – At least three votes
Facts:
The property is part of the Mission Hills Planned Development (1985) and
contains a 15,530 sf church which was constructed in 1986.
The proposal adds approximately 18,000 sf to the building, and expands parking
around all sides of the building. The applicant has agreed to provide right-of-way
in the NW corner for a future westward extension of Rahn Way.
Access will continue to be from Rahn Way, with an added driveway access to
Rahncliff Road utilizing an existing private access easement at the southeast end
of the parking lot.
Existing berming and mature landscaping in a 30’ easement along the southern
perimeter of the site will remain undisturbed. Two new infiltration basins for
stormwater runoff will be constructed.
Churches are a permitted use in Public Facilities zoning district, and with some
minor modifications, the proposal is consistent with typical PF zoning standards.
The existing building is primarily ribbed metal panels with burnished block. The
building addition is proposed to be primarily precast panels in a black aggregate
finish and phenolic resin panels with the appearance of wood. Stone veneer is
utilized at the entrances, which have glass doors and walls. Updates will be
made to the existing building using some of the same materials.
The City Code has no specific materials standards for PF zoning, and the
conditions of approval call for added visual interest (e.g. changes in texture,
color, materials, etc.) on the south and west elevations.
A public hearing was held on December 20, 2018, and the Advisory Planning
Commission did recommend approval.
Issues:
None
120-Day Agency Action Deadline:
January 19, 2018
Attachments: (4)
NBB-1 Location Map
NBB-2 Draft December 20, 2018 APC Minutes
NBB-3 Planning Report
NBB-4 Report Exhibits
CLIFF DR
IVE
SAFARICTNERIN DR
BERKSHIRE CTSAFARI TR
NARVIK
D
R
BERKSHIRESAFARI
CI
RSTORLAND RD
ROY A LED RSLATER CTVIBURNUM TRAIL
CLIFFVIEWDRIVE
NICOLS ROADRIDGE
WIN
D
TRAIL
MARILYN AVE STATE TRUNK HWY.
NO.
77S K Y V IE W C T
S A FARITR
JAMES ST
PIN OAK DR PIN OAK DR
RAHN WAY
COVINGTON LN
SAFARI TRPARKCENTER
DRWALNUTLNROYALE WAYSLATER ROADWOODS CTSHALE LANE
COVINGTON LN
ERIN DRIVE
SAFARIHE IG HTS
T
RSCOTTTRAILSTATE HWY. NO. 77 (CEDAR AVE.)CLIFFLAKEROAD
P LAZADRIVECOUNTY STATE AID HIGHWAY NO. 32 ( CLIFF ROAD )
T
A
MP
E
R
E
C
R
FOX RI D GECTBERKSHIREWAYKINGS RD
ROYALE DRIVECLIFFVIEWDRIVEOAK WAYROYA
LEINTERSTAT E HWY. NO. 35ERAHNCLIFF ROADSAFA
RI
TRAI
LSAFARI PASSNANCY CR
HIGHCROFTCTSHALE LANE
RAHNCLIFFCT
RUSTEN ROADVI ENNALANEERI
NDRIVE
STORLAND CTPONDVIEWDR BEECHER DR
FLORAD
R
SLAT
E
R
ROADVIENNA LANE
ROYALEDRKINGSRDROYALETRJAMES COURTCLIFFLAKERD.SCOTTT
R
AIL
NICOLS ROADRUSTEN ROADBLACKHAWK ROADWEST
W
I
N
DT
RA
I
L
KARIS WAY
SENJA CT
DRIVE
STATE T.H. NO. 77GALAXIE AVESLATERROADBLACKHAWK ROADKINGSRDJAMESS
TRAHN ROADCLIFFHILLLA
N
E
CLIFFLAKERD.ROYALE PLNARVIKCTCOURT
COVIN G TONLNSAFARICTSNICOLS ROADWARRICKCTMETCAFDRIVE ERIN LANEINTERSTATE HWY. NO. 35ERAHNCLIFF C TMeadowland Park
SlaterAcres Park
HighlineTrail Park
KettlePark
Rahn Park
Park
RahnAthleticPark
Lebanon HillsRegional Park
Location Map
0 1,000500Feet
´
§¨¦35E
§¨¦494
Cliff Rd
Diffley Rd
Yanke e Doodle Rd
Lone Oak Rd
Map Area Extent
Project Name: The Hou se C hurchRequest: Planned Develo pment A mendmentCase No.: 31-PA-03-05-18
Subject Site
Advisory Planning Commission
December 20, 2018
Page 3 of 7
B. The House Church
Applicant Name: Jamey VanGelder, The House Church
Location: 2024 Rahn Rd; Lot 1, Block 1, Rahn Road
Application: Planned Development Amendment
A Planned Development Amendment to allow expansion of the church building and parking lot.
File Number: 31-PA-03-05-18
Planner Dudziak introduced this item and highlighted the information presented in the City
Staff report dated December 13, 2018.
Pastor Jamey VanGelder, applicant, provided a brief summary of the growth The House Church
has experienced which is driving the need for additional space.
Peter Lacey, the project architect, summarized the design of the sanctuary, the building
expansion generally and the mix of surfaces to add visual interest to the building exterior. He
stated that adding a 30” parapet to the existing building would result in structural issues and
present a financial hardship.
Planner Dudziak clarified that the planning report referenced a 30” parapet for the new
structure while suggesting screening of the existing rooftop mechanical can occur by other
means.
Vice Chair Sagstetter opened the public hearing. There being no public comment, Vice Chair
Sagstetter closed the public hearing and turned the discussion back to the Commission.
Vice Chair Sagstetter stated that it appears the applicant is already planning to address the
concerns raised regarding the visual interest on the south and west façades.
Member Weimert moved, Member Whisnant seconded a motion to recommend approval of a
Planned Development Amendment to allow expansion of the church upon property located at
2024 Rahn Way, legally described as Lot 1, Block 1, Rahn Ridge, subject to the following
conditions:
1. A Planned Development Amendment Agreement shall be executed, in a form acceptable
to the City Attorney, and recorded against the property with the Dakota County
Recorder’s office. The Agreement shall include the following exhibits:
• Site Plan
• Building Elevations Plan
• Landscape Plan
• Site Lighting Plan
• Signage Plan
Advisory Planning Commission
December 20, 2018
Page 4 of 7
2. Building address numbers shall be installed consistent with the provisions of Section
2.78 of City Code.
3. The trash enclosure shall be a minimum of six feet in height.
4. Screening of rooftop mechanical units shall be provided in accordance with City Code
Sec. 11.70, Subd. 21 .D.12 including:
a. A parapet wall at least 30” in height
b. A physical screen around individual mechanical units
c. Placement of rooftop equipment at least 20 feet from the edge of the building.
5. The Building Elevation drawings shall be modified to add some visual relief/interest
along the south and east elevations.
6. A revised Site Lighting Plan shall be provided for the Planned Development Agreement
that achieves a minimum 0.5 fc throughout the parking lots and includes an average to
minimum ratio of not more than 4.0 fc.
7. Prior to issuance of a Building Permit, the applicant shall ensure that the proposed
landscape plan does not interfere with site lighting.
8. All erosion/ sediment control plans submitted for development and grading permits
shall be prepared by a designer who has received current Minnesota Department of
Transportation (MNDOT) training, or approved equal training as determined by the City
Engineer in designing stormwater pollution prevention plans. Also, all personnel
responsible for the installation of erosion/ sediment control devices, and the
establishment of vegetation for the development, shall have received Erosion/Sediment
Control Inspector/Installer certification through the University of Minnesota, or
approved equal training as determined by the City Engineer.
9. This development shall meet the City’s Post Construction Stormwater Management
Requirements (City Code §4.34) for stormwater management and surface water quality,
including Runoff Rate Control and 1.1” Volume Control of the site’s proposed
impervious surface area and any other disturbed soils that are not remediated following
an approved Soil Management Strategy.
10. Prior to receiving city approval to permit land disturbing activity, the property owner
shall provide detailed Soil Management Strategies in the plan set for City review, and
acceptance by the City Engineer, that provide clear assurances that by final grading,
prior to installation of any irrigation, sod, permanent seeding or plant materials, the
disturbed areas that are to be revegetated will have protected and/or restored soil
permeability to non-compacted soil conditions in the top 12” of soil with greater than
5% soil organic matter content and less than 200 psi of soil compaction in the top 12” of
topsoil, to comply with City Volume Control requirements. These graphical details and
Advisory Planning Commission
December 20, 2018
Page 5 of 7
notes on soil protection/restoration shall be included in the Stormwater Management
Plan and prominently included in all applicable plan sheets (e.g. Erosion & Sediment
Control Plan, Grading & Drainage Plan, Landscape Plan, etc.) and shall specify estimated
quantities of soil ripping area and volume of compost to be imported and incorporated.
Prior to receiving a Certificate of Occupancy for any affected construction, Soil
Management Strategy implementation documentation (e.g. haul tickets, representative
on-site soil samples, compaction testing and soil organic content test results) shall be
provided to City Water Resources staff to verify approved soil management strategy
compliance.
11. Prior to receiving city approval to permit land disturbing activity, based on the
applicant’s provided soil borings from within the footprint of the two proposed
infiltration areas that indicate restrictive soil layers within 6-feet of the planned bottom
of over-excavation, the applicant shall revise construction plans to ensure that the
underlying restrictive soil layers are excavated through, loosened, and clean, washed
sand backfill is placed, to ensure sub-soil percolation, to the satisfaction of the City
Engineer.
12. During infiltration system over-excavation/sub-soil work, the applicant shall ensure that
a Certified Soil Scientist will be present to verify and document that practice area sub-
soils are suitable for a saturated condition infiltration rate of 0.9-inch per hour (based
on 0.45-inch per hour design rate with safety factor) or greater (but less than 8.0-inch
per hour). If the sub-soil infiltration rates are less than 0.9-inch per hour (or greater than
8.0-inch per hour), the applicant shall immediately notify the City Engineer and revise
the volume control practice(s) design and construction as necessary (e.g. over-
excavation/soil-amendment depth, etc.) to ensure volume control requirements are
fully met. Documentation shall be provided to the City within 48-hours after infiltration
testing. The applicant shall ensure that the City Water Resources staff is provided 24-
hour advance notice of the occurrence of infiltration verifications and also provided
notice prior to any excavation and/or soil backfilling within the infiltration practices, to
arrange for inspections.
13. Prior to receiving city approval to permit land disturbing activity, the applicant shall
provide construction details of the proposed infiltration basins for City
review/acceptance by the City Engineer and include in construction plans. Construction
details on plan sheets shall include detailed infiltration basin cross-section(s),
construction sequencing/protection/restoration notes, details for stable
inlets/outlets/emergency overflows, details for under-drains with upturned elbow
outlets for both infiltration/filtration basins, unobstructed inspection/maintenance
access areas to inlets/outlets, soil amendment criteria (minimum of 18-inch depth
across entirety of basin bottom), planting details (including live planting at 18-inch on-
center spacing with seeding of all basin bottoms, and seeding of side-slopes), temporary
and permanent erosion-control details, etc., to ensure infiltration practice is properly
designed, constructed, planted, and adequately protected during / after construction to
Advisory Planning Commission
December 20, 2018
Page 6 of 7
prevent clogging, and able to be properly maintained (e.g. unobstructed equipment
access, etc.) to function as intended. These graphical details and notes shall be
prominently included in all applicable plan sheets (e.g. Grading Plan, Utility Plan,
Landscape Plan, etc.).
14. The applicant shall provide adequately sized pre-treatment structure (e.g. 4-foot
minimum depth sump, 5-foot minimum diameter, with floatable skimmer hood, etc.) at,
or immediately upstream of, any stormwater infiltration facility inlet to provide for
effective capture and easily-accessible cleanout of fine-sand sized particles and floatable
pollutants. Pre-treatment structures shall be accessible by appropriate maintenance
equipment. Details shall be included in applicable plan sheet(s) using Eagan Standard
Detail Plate E231.
15. Prior to proceeding with land disturbing activity, the Property Owner shall enter into a
long-term stormwater management system maintenance agreement with the City,
detailing the annual inspection and maintenance required to occur to ensure proper
operation and performance of the permanent stormwater management system, in a
form acceptable to the City Attorney.
16. Before the city returns any Stormwater-related Performance Guarantee Fees on the
development site, the applicant shall demonstrate that all stormwater management
practices are performing as intended and shall provide the City Engineer as-built plans
that demonstrate that all constructed stormwater conveyance structures, stormwater
management facilities (sump(s), basins, etc.), including soil loosening & amendment
prior to landscaping, conform to design and/or construction plans, as approved by the
City. As-built volumes shall be provided for the two infiltration basins. Video of final
inspection of clean stormsewer catch-basin system and contributing stormsewer shall
be provided to the City Engineer. The applicant shall submit to the City Engineer
certification that the stormwater management facilities have been installed in accord
with the plans and specifications approved. This certification shall be provided by a
Professional Engineer licensed in the State of Minnesota.
17. The building shall be limited to the use of only one water service and meter unless
limited by capacity of the existing service.
18. The applicant shall confirm any tree removal at the time of Building Permit, and work
with the City Forester to provide tree protection during construction any required
mitigation.
19. The applicant shall preserve the conservation easement area as undisturbed and the
existing landscaping and berming along the south and southeastern boundary shall
remain in place.
All voted in favor. Motion carried 4-0.
PLANNING REPORT
CITY OF EAGAN
REPORT DATE: December 13, 2018 CASE: 31-PA-03-05-18
APPLICANT: The House Church HEARING DATE: December 20, 2018
PROPERTY OWNER: The House Church APPLICATION DATE: November 20, 2018
REQUEST: Planned Development Amendment PREPARED BY: Pamela Dudziak
LOCATION: 2024 Rahn Way
COMPREHENSIVE PLAN: QP, Quasi-Public
ZONING: PD, Planned Development
SUMMARY OF REQUEST
The applicant is requesting approval of a Planned Development Amendment to allow
expansion of the church upon property located at 2024 Rahn Way, legally described as Lot 1,
Block 1, Rahn Ridge.
AUTHORITY FOR REVIEW
Chapter 11, Section 11.50, Subdivision 5 states, in part,
1. The provisions of this chapter may be amended by the majority vote of the council, except
that amendments changing the boundaries of any district or changing the regulations of
any district may only be made by an affirmative vote of two-thirds of all members of the
council.
2. The Council shall not rezone any land or area in any zoning district or make any other
proposed amendment to this chapter without first having referred it to the advisory
planning commission for its consideration and recommendation.
BACKGROUND/HISTORY
The property is part of the Mission Hills South Planned Development and was platted in 1985.
A church was constructed on the property in 1986. The Planned Development for the church
contemplated a full build-out of the property with a larger church complex; however, no Final
Planned Development Agreement was executed.
Planning Report – The House Church
December 20, 2018
Page 2
Berming and landscaping was added along the southern portion of the property with the
construction of the adjacent Staybridge Suites hotel in 1999. Also in 1999, a Planned
Development Amendment was approved to add a child daycare to the church. This
amendment is documented in a Final Planned Development Agreement for the church and
daycare.
In 2012, a Preliminary Subdivision and Planned Development Amendment were approved
allowing the property to be split into two lots and allow a second building to be constructed on
the new lot on the southern portion of the site. The subdivision was never completed, and the
Preliminary Subdivision approval expired. A Planned Development Amendment was executed
and recorded and remains in effect.
EXISTING CONDITIONS
An existing church building is located on the northwestern portion of the property with parking
to the north and east. Access to the site is from Rahn Way to the north, and indirectly to
Rahncliff Road to the east via private easement across adjacent property.
The site generally slopes to the northwest, with elevations ranging from 932 to 910. Mature
trees are located along the northwest, west, and south sides of the parcel. A 30’ easement for
the berm and landscaping lies along the south and southeast boundaries of the site, and the
easement area will remain undisturbed. The majority of the southern and northwestern
portions of the site will be disturbed in preparation for the proposed building and parking lot
expansions.
SURROUNDING USES
The following existing uses, zoning, and comprehensive guide plan designations surround the
subject property:
Existing Use Zoning Land Use Designation
North Fraser PD, Planned
Development
SA-RC, Special Area Retail Commercial
South Residential
Twinhomes
PD, Planned
Development
SA-LD, Special Area - Low Density
East Office
Hotel
PD, Planned
Development
SA-O/S, Special Area - Office/Service
SA-RC, Special Area Retail Commercial
West Driver’s Training
Center
PF, Public Facilities QP, Quasi-Public
Planning Report – The House Church
December 20, 2018
Page 3
EVALUATION OF REQUEST
Compatibility with Surrounding Area – The church use is compatible with the surrounding
public, commercial and residential uses. The berm and mature landscaping along the south
and southeastern boundary of the property provide a buffer to the adjacent residential
development to the south.
Public Benefit – The applicant’s narrative indicates that The House Church was founded 12
years ago and has been growing since then. Five years ago The House Church purchased this
property, and with continued growth is “quickly outgrowing the existing building.” The
proposed addition provides for a new sanctuary to accommodate the attendance for weekend
services, host meetings and conferences, and increase classroom space for adult and children’s
programming. With the PD Amendment, “the church will be able to build out the property to
its full capacity and grow to its full potential.”
Airport Compatibility - This property is not within the Airport Noise Policy Contours.
Site Plan – The applicant’s narrative states the objective is to provide a new sanctuary,
gathering space, parking lot and remodel the existing building to better meet the growing
congregational needs. The proposed church expansion is to the south west of the existing
building. Parking is expanded to the east and south of the building. Existing parking in the
northwest corner of the site is replaced by an infiltration basin. A second infiltration basin is
proposed south of the parking lot. The existing access from Rahn Way remains, and the plan
utilizes the private access easement to Rahncliff Road with a new driveway at the southeast
corner of the expanded parking lot.
Bulk Standards – The comparable zoning district for this use is PF, Public Facilities, within which
churches are a permitted use. Therefore, in evaluating this proposal, the PF zoning standards
are applied.
Setbacks – The PF zoning district requires structure setbacks of 2’ for each 1’ of building
height, with a minimum required setback of 30’ and a maximum required setback of 50’.
PF zoning does not limit structure height.
The proposed building is 28’6”’ at the highest point. The first floor elevation of the
addition is two feet higher than the existing building, and the addition is 26’6” in height.
Two feet of setback for each one foot of building height is 57 feet. Thus, the 50 foot
maximum structure setback applies on all sides of the building. The proposed site plan
provides more than 50 feet of setback on all sides, and is acceptable.
Building Coverage and Green Space – The PF zoning district has no maximum standard for
building coverage or green space ratios. Building coverage is proposed to increase from
5.5% to 11.9%. This remains well below typical commercial maximum standards which vary
Planning Report – The House Church
December 20, 2018
Page 4
from 20%-35%. Green space is proposed to decrease from 68.2% to 45.5%. This remains
above typical commercial minimum standards 30%.
Building Address Numbers – Building address numbers should be installed consistent with the
provisions of Section 2.78 of City Code.
Building Elevations/Architecture –
The existing church building was
constructed in 1985. The exterior
finish is primarily ribbed metal
panels with burnished block and
glass on the lower portion of the
building. There is no screening of
existing rooftop mechanical units.
The applicant is proposing for the addition to be primarily precast panels in a black aggregate
finish with 1” reveals, and phenolic resin panels in a wood “pine effect finish.” Stone veneer is
proposed at the two building entrances which have glass doors and glass walls. Windows are
concentrated near the entrances, and there are no windows on the south and east elevations
of the proposed new addition. The phenolic resin panels are proposed to replace existing
ribbed metal panels above the building entrances. Rooftop mechanical units will be screened
with prefinished metal louver panels constructed around individual units. Additional screening
of existing units will be provided with the addition of a rainscreen metal panel.
General architectural standards in the zoning ordinance for all new buildings apply:
a) The building must be harmonious with the adjacent buildings, topography and natural
surroundings,
b) exterior vertical surfaces shall have an equally attractive or the same finish, and
c) any building façade exceeding 40 feet shall be designed with multiple planes, multiple
sections of coordinating materials or both to add visual interest every 40 feet.
Planning Report – The House Church
December 20, 2018
Page 5
The architectural design of the proposed addition appears to be harmonious with the existing
and surrounding area. The horizontal roof lines in multiple layers and sections are integrated
between the existing and new building sections. Incorporating some of the materials proposed
for the new addition onto existing building sections also provides cohesiveness between the
old and new portions of the building. However, the proposed building design appears to fall
short of each elevation having the same finish and providing visual interest every 40 feet on
the new addition. The south and east elevations of the addition provide expanses of the pre-
cast with no windows, color changes, or other materials to provide vertical or horizontal
breaks. Some visual relief and interest should be provided along the south and east elevations.
While the zoning ordinance does not have specific standards regarding exterior finish materials
for Public Facilities uses, within Planned Development zoning, the acceptability of the proposed
materials and architecture are a policy matter for City officials. The existing building predates
current city code standards, and would not meet typical current standards for a commercial
building. The proposed materials would be considered Class III (precast panels with aggregate
finish), Class II (stone veneer), and Class I (glass). The phenolic resin panels are not specifically
classified in the ordinance. Based on the product specifications, they would be considered
either a Class III (as a manufactured “system”), or Class II (a durable low maintenance
manufactured material that replicates the appearance of a natural material).
Trash Storage – The existing church has no enclosure for trash storage. With this expansion, a
trash enclosure is proposed to be constructed at the south end of the west parking lot. Public
Facilities zoning standards allow the trash enclosure to be detached. The enclosure is
proposed to be burnished block to match the existing block on the building, with a wood
composite gate. The enclosure should be revised to a minimum of six feet in height, 5 feet 4
inches is proposed. With the exception of height, the design and materials of the enclosure
appear to meet City Code standards.
Mechanical Equipment – The existing building provides no screening of rooftop mechanical
units. With a building expansion that exceeds the size of the existing building, the mechanical
screening ordinance applies. Thus, the building should include a parapet wall at least 30” in
height and a physical screen around mechanical equipment to fully screen the equipment.
Also, all rooftop equipment should be placed at least 20 feet from the edge of the building.
The proposed new addition includes a parapet. The parapet varies a bit in height, but appears
to meet the 30” standard on average; some of the taller sections are 36”-42”. Added screening
panels are both integrated into the building architecture and placed around individual
mechanical units such that both existing and new rooftop mechanical equipment will be fully
screened.
Parking – The parking ordinance requires one parking stall for each 3.5 seats in the main
assembly hall. The plans show 992 seats in the main sanctuary. At one stall for each 3.5 seats,
284 parking stalls are required, and 284 stalls are proposed. Proposed parking satisfies the
Planning Report – The House Church
December 20, 2018
Page 6
dimensional standards in the City Code with 24’ wide two-way drive aisles, 9’ x 19’ stalls and 5’
setbacks from adjacent property, 20’ setback from right-of-way.
The City Code requires parking islands to create orderly circulation and break up expanses of
pavement. A minimum 5% of the parking lot should be in landscaped islands. The Site Plan
identifies 2,940 s.f. of islands, and 59,200 s.f. of parking area, satisfying the 5% standard.
Landscaping – Most existing landscaping around the building will remain, as will the existing
vegetation along the southern perimeter of the property. The proposed Landscape Plan adds a
variety of trees and foundation plants around the new building addition and within the new
and reconstructed parking areas. Three evergreen trees are proposed in the lawn area south
of the new building, which will soften views of the building wall all year around. Shade trees
and perennial grasses are proposed in parking islands. Parking is screened from Rahn Way with
shrubs and perennial grasses along the north side of the property.
Prior to issuance of a Building Permit, the applicant should ensure that the proposed landscape
plan does not interfere with site lighting.
Site Lighting – Site Lighting is proposed to utilize existing pole mounted lights, and the addition
of new pole mounted lights in the parking lot, as well as wall mounted lights around the
building. The proposed LED fixtures match the existing. They are downcast and shielded.
The photometric plans show some areas below 0.5 footcandles (fc), which is lower than our
typical standard for providing safety, security and site circulation. Perimeter light levels are
below 0.5 fc, as compared to the typical standard of 1 fc maximum. Lighting within the parking
lots should be redistributed and perhaps additional light fixtures added to achieve minimum
levels of 0.5 fc throughout. Also, the photometric data did not include an average to minimum
ratio. The ratio is a measure of light uniformity, with higher values indicating greater variation
between the light and dark areas. Typically such ratio should be not more than 4.0 fc.
Increasing illumination in the areas currently below 0.5 fc should help to achieve an acceptable
average to minimum ratio measure. A revised Site Lighting Plan should be provided that
achieves a minimum 0.5 fc throughout the parking lots and includes an averat to minimum
ratio of not more than 4.0 fc.
Wetlands – There are no wetlands on site, therefore, City Code §11.67, wetland
protection and management regulations, does not apply. The constructed stormwater
wetland to the west of the site is on neighboring property.
Stormwater Management/Water Quality – The applicant proposes to add new & fully-
reconstructed impervious surfaces totaling approximately 2.02 acres, with an additional 1.68
acres of disturbed/graded soils (to be revegetated), on the project site. This development will
need to comply with the City’s Post Construction Stormwater Management Requirements (City
Code §4.34) for stormwater management and surface water quality, including Runoff Rate
Planning Report – The House Church
December 20, 2018
Page 7
Control and 1.1” Volume Control. To meet the 1.1” Volume Control requirement for this
development proposal, a minimum of 8,048 cubic feet of effective retention will need to be
provided (if included with an acceptable Soil Management Strategy for any disturbed/graded
areas proposed to be revegetated, to restore soil permeability and soil health). If no Soil
Management Strategy is provided then the entirety of the site’s graded soils (3.7 acres) will
need to be calculated as impervious area.
The applicant proposes to meet City stormwater rate control and volume control requirements
through the on-site construction of two infiltration basins with a total retention volume of
approximately 8,287 cubic feet. For the disturbed areas that are to be revegetated, a Soil
Management Strategy of 12-inch depth loosening and a minimum of 5% soil organic matter
content are proposed for the 1.68 acres of disturbed/graded soils to be revegetated on this
site. Overflow from the stormwater management system would discharge into stormwater
wetland AP-13, in the Cliff Lake watershed.
Eagan Water Resources has reviewed the applicant’s plans, stormwater design summary and
modeling provided for stormwater management and finds the proposed plans to meet City
Code §4.34 Post-Construction Stormwater Management Requirements are acceptable with
conditions to ensure effective pre-treatment for the infiltration basins, proper over-excavation
practices and depths to reach underlying sub-soils that can effectively absorb stormwater (SP-
SM, SM), appropriate infiltration system design, including 18-inch minimum soil media depths,
and construction to allow for effective retention volume and infiltration as intended,
verification of infiltration performance and retention volume capacity, infiltration system
protections during construction through final stabilization, inclusion and successful
incorporation of specified soil management strategies on all disturbed soils that are proposed
to be revegetated to restore soil permeability and soil health, and appropriate revegetation.
Storm Water Drainage – The entire site lies within Drainage District A (as designated in the City
Storm Water Management Plan – 2007). Stormwater flows through a private storm sewer
system at the northwest corner of the site, and is routed via public storm sewer to City Pond
AP-25 on the north side of Cliff Road. Proposed revisions to the storm sewer system include
the addition of new private storm sewer in the proposed parking lot to route runoff to an
infiltration basin on the south side of the site, and the construction of another infiltration basin
at the northwest corner of the site. Any overflow will continue to AP-25 as it previously did.
Utilities – The preliminary utility plan is acceptable, with modification. Sanitary Sewer District
W (as designated in the City’s Comprehensive Sanitary Sewer Plan) serves the entire site. The
existing building is connected to City sewer and water, however, the proposed addition
includes the installation of new water and sewer services, and the extension of a watermain to
bring fire hydrant coverage to the south side of the building. It is unclear from the utility plans
if the existing water service is proposed to be removed; however, the building should be
limited to only one water service and meter unless limited by capacity of the existing service.
Planning Report – The House Church
December 20, 2018
Page 8
Streets/ Access / Pedestrian Circulation – The site has direct access to Rahn Way to the
north, and indirect access to Rahncliff Road via a parking lot connection to the
southeast. An ingress/egress agreement was previously provided to accommodate the
connection to the southeast. Various sidewalks exist and are proposed to provide
pedestrian connectivity to the building throughout the site.
Initial discussions with the applicant indicate they have agreed to provide adequate right-of-
way in the northwest corner of the site to allow the future extension of Rahn Way. Slight
modifications to the stormwater infiltration basin in the northwest corner of the site will be
necessary to accommodate a future street. The applicant should provide a right-of-way,
drainage and utility easement, in a form acceptable to the city attorney, for the future
extension of Rahn Way.
Easements/Permits/Right-of-Way – Public drainage & utility easements currently exist on this
site. With the right-of-way for the future extension of Rahn Way, a 10 foot wide drainage and
utility easement should also be provided adjacent to the right-of-way. The City Attorney will
work with the applicant to acquire the right-of-way and easement in the appropriate manner.
Tree Preservation – The City’s tree preservation ordinance applies to development lots with
any existing building being expanded by ten percent or more, where an approved tree
preservation plan is not on file with the city. While a Tree Inventory of individual trees was not
provided, the tree line edge is identified on the plans. The area proposed for construction is
largely open with little to no significant vegetation. The significant vegetation on the site is
clustered around the southern edges of the site and much of it is within a conservation
easement. These areas are shown to be undisturbed and little impact to existing trees is
anticipated.
The applicant should confirm any tree removal at the time of Building Permit, and work with
the City Forester to provide tree protection during construction any required mitigation. The
conservation easement area should remain undisturbed and the existing landscaping and
berming along the south and southeastern boundary should remain in place.
Financial Obligation – At this time, there are no pending assessments on the parcel. Based
upon a study by City staff of the financial obligations collected in the past and proposed use for
the property, all trunk and lateral utility fees have been previously collected for this property.
Parks and Recreation - The property was platted in 1985 as part of Rahn Ridge Addition, which
included the residential twinhomes to the south and west. In satisfaction of park dedication
requirements at that time, land was dedicated to the City for nearby Kettle Park which lies to
the south, and a trail connection from the public street to the park was provided.
Planning Report – The House Church
December 20, 2018
Page 9
The City implemented a trail dedication policy in February 1990, subsequent to the initial
development. Thus, this property has not previously been subject to trail dedication
requirements, and none is due at this time.
SUMMARY/CONCLUSION
The applicant is requesting approval of a Planned Development Amendment to expand the
church building to provide a new sanctuary to accommodate attendance at weekend services
and host meetings and conferences, and increase classroom space for adult and children’s
programming. The property was initially developed with a church building in 1985.
The proposed expansion adds approximately 18,000 s.f. to the existing 15,530 s.f. building. The
proposal makes use of an existing access easement to Rahncliff Road at southeast corner of the
parking lot, and the applicant has agreed to provide right-of-way for a future extension of Rahn
Way in the northwest corner of the site. The plans provide for required structure setbacks and
parking, on-site stormwater management, and additional landscaping. Existing berming and
mature vegetation along the southern perimeter of the site will remain undisturbed. With
minor revisions to the plans, the proposal appears to comply with typical City Code standards.
ACTION TO BE CONSIDERED
To recommend approval of a Planned Development Amendment to allow expansion of the
church upon property located at 2024 Rahn Way, legally described as Lot 1, Block 1, Rahn
Ridge.
If approved the following conditions shall apply:
1. A Planned Development Amendment Agreement shall be executed, in a form
acceptable to the City Attorney, and recorded against the property with the Dakota
County Recorder’s office. The Agreement shall include the following exhibits:
• Site Plan
• Building Elevations Plan
• Landscape Plan
• Site Lighting Plan
• Signage Plan
2. Building address numbers shall be installed consistent with the provisions of Section
2.78 of City Code.
3. The trash enclosure shall be a minimum of six feet in height.
4. Screening of rooftop mechanical units shall be provided in accordance with City Code
Sec. 11.70, Subd. 21 .D.12 including:
Planning Report – The House Church
December 20, 2018
Page 10
a. A parapet wall at least 30” in height
b. A physical screen around individual mechanical units
c. Placement of rooftop equipment at least 20 feet from the edge of the building.
5. The Building Elevation drawings shall be modified to add some visual relief/interest
along the south and east elevations.
6. A revised Site Lighting Plan shall be provided for the Planned Development Agreement
that achieves a minimum 0.5 fc throughout the parking lots and includes an average to
minimum ratio of not more than 4.0 fc.
7. Prior to issuance of a Building Permit, the applicant shall ensure that the proposed
landscape plan does not interfere with site lighting.
8. All erosion/ sediment control plans submitted for development and grading permits
shall be prepared by a designer who has received current Minnesota Department of
Transportation (MNDOT) training, or approved equal training as determined by the City
Engineer in designing stormwater pollution prevention plans. Also, all personnel
responsible for the installation of erosion/ sediment control devices, and the
establishment of vegetation for the development, shall have received Erosion/Sediment
Control Inspector/Installer certification through the University of Minnesota, or
approved equal training as determined by the City Engineer.
9. This development shall meet the City’s Post Construction Stormwater Management
Requirements (City Code §4.34) for stormwater management and surface water quality,
including Runoff Rate Control and 1.1” Volume Control of the site’s proposed
impervious surface area and any other disturbed soils that are not remediated following
an approved Soil Management Strategy.
10. Prior to receiving city approval to permit land disturbing activity, the property owner
shall provide detailed Soil Management Strategies in the plan set for City review, and
acceptance by the City Engineer, that provide clear assurances that by final grading,
prior to installation of any irrigation, sod, permanent seeding or plant materials, the
disturbed areas that are to be revegetated will have protected and/or restored soil
permeability to non-compacted soil conditions in the top 12” of soil with greater than
5% soil organic matter content and less than 200 psi of soil compaction in the top 12” of
topsoil, to comply with City Volume Control requirements. These graphical details and
notes on soil protection/restoration shall be included in the Stormwater Management
Plan and prominently included in all applicable plan sheets (e.g. Erosion & Sediment
Control Plan, Grading & Drainage Plan, Landscape Plan, etc.) and shall specify estimated
quantities of soil ripping area and volume of compost to be imported and incorporated.
Prior to receiving a Certificate of Occupancy for any affected construction, Soil
Management Strategy implementation documentation (e.g. haul tickets, representative
Planning Report – The House Church
December 20, 2018
Page 11
on-site soil samples, compaction testing and soil organic content test results) shall be
provided to City Water Resources staff to verify approved soil management strategy
compliance.
11. Prior to receiving city approval to permit land disturbing activity, based on the
applicant’s provided soil borings from within the footprint of the two proposed
infiltration areas that indicate restrictive soil layers within 6-feet of the planned bottom
of over-excavation, the applicant shall revise construction plans to ensure that the
underlying restrictive soil layers are excavated through, loosened, and clean, washed
sand backfill is placed, to ensure sub-soil percolation, to the satisfaction of the City
Engineer.
12. During infiltration system over-excavation/sub-soil work, the applicant shall ensure that
a Certified Soil Scientist will be present to verify and document that practice area sub-
soils are suitable for a saturated condition infiltration rate of 0.9-inch per hour (based
on 0.45-inch per hour design rate with safety factor) or greater (but less than 8.0-inch
per hour). If the sub-soil infiltration rates are less than 0.9-inch per hour (or greater
than 8.0-inch per hour), the applicant shall immediately notify the City Engineer and
revise the volume control practice(s) design and construction as necessary (e.g. over-
excavation/soil-amendment depth, etc.) to ensure volume control requirements are
fully met. Documentation shall be provided to the City within 48-hours after infiltration
testing. The applicant shall ensure that the City Water Resources staff is provided 24-
hour advance notice of the occurrence of infiltration verifications and also provided
notice prior to any excavation and/or soil backfilling within the infiltration practices, to
arrange for inspections.
13. Prior to receiving city approval to permit land disturbing activity, the applicant shall
provide construction details of the proposed infiltration basins for City
review/acceptance by the City Engineer and include in construction plans. Construction
details on plan sheets shall include detailed infiltration basin cross-section(s),
construction sequencing/protection/restoration notes, details for stable
inlets/outlets/emergency overflows, details for under-drains with upturned elbow
outlets for both infiltration/filtration basins, unobstructed inspection/maintenance
access areas to inlets/outlets, soil amendment criteria (minimum of 18-inch depth
across entirety of basin bottom), planting details (including live planting at 18-inch on-
center spacing with seeding of all basin bottoms, and seeding of side-slopes), temporary
and permanent erosion-control details, etc., to ensure infiltration practice is properly
designed, constructed, planted, and adequately protected during / after construction to
prevent clogging, and able to be properly maintained (e.g. unobstructed equipment
access, etc.) to function as intended. These graphical details and notes shall be
prominently included in all applicable plan sheets (e.g. Grading Plan, Utility Plan,
Landscape Plan, etc.).
Planning Report – The House Church
December 20, 2018
Page 12
14. The applicant shall provide adequately sized pre-treatment structure (e.g. 4-foot
minimum depth sump, 5-foot minimum diameter, with floatable skimmer hood, etc.)
at, or immediately upstream of, any stormwater infiltration facility inlet to provide for
effective capture and easily-accessible cleanout of fine-sand sized particles and
floatable pollutants. Pre-treatment structures shall be accessible by appropriate
maintenance equipment. Details shall be included in applicable plan sheet(s) using
Eagan Standard Detail Plate E231.
15. Prior to proceeding with land disturbing activity, the Property Owner shall enter into a
long-term stormwater management system maintenance agreement with the City,
detailing the annual inspection and maintenance required to occur to ensure proper
operation and performance of the permanent stormwater management system, in a
form acceptable to the City Attorney.
16. Before the city returns any Stormwater-related Performance Guarantee Fees on the
development site, the applicant shall demonstrate that all stormwater management
practices are performing as intended and shall provide the City Engineer as-built plans
that demonstrate that all constructed stormwater conveyance structures, stormwater
management facilities (sump(s), basins, etc.), including soil loosening & amendment
prior to landscaping, conform to design and/or construction plans, as approved by the
City. As-built volumes shall be provided for the two infiltration basins. Video of final
inspection of clean stormsewer catch-basin system and contributing stormsewer shall
be provided to the City Engineer. The applicant shall submit to the City Engineer
certification that the stormwater management facilities have been installed in accord
with the plans and specifications approved. This certification shall be provided by a
Professional Engineer licensed in the State of Minnesota.
17. The building shall be limited to the use of only one water service and meter unless
limited by capacity of the existing service.
18. The applicant shall confirm any tree removal at the time of Building Permit, and work
with the City Forester to provide tree protection during construction any required
mitigation.
19. The applicant shall preserve the conservation easement area as undisturbed and the
existing landscaping and berming along the south and southeastern boundary shall
remain in place.
CLIFF DR
IVE
SAFARICTNERIN DR
BERKSHIRE CTSAFARI T
R
NARVIK
D
R
BERKSHIRESAFARI
C
IR
STORLAND RD
ROY A LED RSLATER CTVIBURNUM TRAIL
CLIFFVIEWDRIVE
NICOLS ROADRIDGE
WIN
D
TRAIL
MARILYN AVE STATE TRUNK
HWY
.
NO
.
77
SKY VIEW CT
S A FARITR
JAMES ST
PIN OAK DR PIN OAK DR
RAHN WAY
COVINGTON LN
SAFARI TRPARKCENTER
DRWALNUTLNROYALE WAYSLATER ROADWOODS CTSHALE LANE
COVINGTON LN
ERIN DRIVE
SAFARIHE IG HTS
T
RSCOTTTRAILSTATE HWY. NO. 77 (CEDAR AVE.)CLIFFLAKEROAD
P LAZADRIVECOUNTY STATE AID HIGHWAY
N
O
.
3
2
(
C
L
I
F
F
R
O
A
D
)
T
AM
P
E
R
E
C
R
FOX RI D GECTBERKSHIREWAYKINGS RD
ROYALE DRIVECLIFFVIEWDRIVEOAK WAYROYA
LEINTERSTATE HWY. NO. 35ERAHNCLIFF ROADSAFA
RI
TRAI
LSAFARI PASSNANCY CR
HIGHCROFTCTSHALE LANE
RAHNCLIFFCT
RUSTEN ROADVI ENNALANEERI
NDRIVE
STORLAND CTPONDVIEWDR BEECHER DR
FLORAD
R
SLAT
E
R
ROADVIENNA
L
A
N
E
ROYALEDRKINGSRDROYALETRJAMES COURTCLIFFLAKERD.SCOTTT
R
AIL
NICOLS ROADRUSTEN ROADBLACKHAWK ROADWEST
W
I
N
DT
RA
I
L
KARIS WAY
SENJA
C
T
DRIVE
STATE T.H. NO. 77GALAXIE AVESLATERROADBLACKHAWK ROADKINGSRDJAMESS
TRAHN ROADCLIFFHILLLA
N
E
CLIFFLAKERD.ROYALE PLNARVIKCTCOURT
COVIN G TONLNSAFARICTSNICOLS ROADWARRICKCTMETCAFDRIVE ERIN LANEINTERSTATE HWY. NO. 35ERAHNCLIFF C TMeadowland Park
SlaterAcres Park
HighlineTrail Park
KettlePark
Rahn Park
Park
RahnAthleticPark
Lebanon HillsRegional Park
Location Map
0 1,000500Feet
´
§¨¦35E
§¨¦494
Cliff Rd
Diffley Rd
Yankee Doodle Rd
Lone Oak Rd
Map Area Extent
Project Name: The House ChurchRequest: Planned Development AmendmentCase No.: 31-PA-03-05-18
Subject Site
Rahn Way
Rahncliff RoadPin Oak Drive
Rahncliff CourtRahncliff RoadPin Oak Drive Rahncliff RoadPin Oak Drive
150 075 Feet ´This map is for reference use only. This is not a survey and is not indtended to be used as one.
Aerial photo-Fall-2017
Project: The House C hurchRequest: Planned D evelopment A mendmentCase N o.: 31-PA-03-05-18
SCHULTZ ENGINEERING& SITE DESIGN18 South Riverside AvenueSuite 230Ph: (320) 339-0669Fx: (866) 633-1830schultzeng@live.comSartell, MN 56377www.schultzengineeringdesign.com12755 Highway 55, Suite 100Minneapolis, MN 55441(763) 545-9196Fax (763) 541-0056www.clark-eng.comMODULAR MASONRYOPENING DIMENSION (MO)MODULAR DIMENSION5. ALL MASONRY IS MODULAR. REFER TO DETAILS FOR BRICK AND CONCRETE MASONRY UNITS (CMU) COURSING TABLE.6. ALL CAST IN PLACE CONCRETE COLUMNS AND WALLS SHALL CONFORM TO THE ABOVE EXPLANATION1. PLAN GRID LINES ARE 4'-0" OC UNLESS OTHERWISE NOTED.2. ARROWS INDICATE DIMENSIONS TO NOMINAL FACE OF MODULAR MATERIALS, TO CENTER LINES AND TO GRID LINES.3. DOTS INDICATE DIMENSIONS TO ACTUAL SURFACE OR FACE OF MATERIALS.4. FLOOR GRID ELEVATIONS ARE GIVEN TO A POINT 3/16" (1/2 MORTAR JOINT) ABOVE ACTUAL FLOOR SLAB. REFER TO DETAILS.3/16"ACTUAL DIM3/16"(1/2JT)(1/2 JOINT=3/16")ACTUAL DIMENSION(1/2 JOINT = 3/16")DIMENSIONMODULAR .DIMENSIONMODULAR.DIMENSIONMODULAR23.2DETAIL SYMBOLDETAIL NUMBERDETAIL SHEET23.2WALL SECTIONSECTION NUMBERSHEET NUMBERELEVATIONDETAIL NUMBERDETAIL SHEET23.2ROOM NUMBERDOOR NUMBERA. INACTIVE DOOR101PLAN NOTEA111B. ACTIVE DOORA BMULTIPLE DOORMETAL FLASHINGSHEET METAL (ELEV)CAST IN PLACECONCRETE (CMU)METAL (MTL)STEEL (STL)CONCRETE MASONARYUNIT (CMU)ROUGH WOODOR LUMBER (WD)PRECAST CONCRETE(PCC)FINISH WOOD ORHARDWOOD (HDWD)FACE BRICK (FB)PLYWOOD(PLY OR PWD)STONEACOUSTIC CLG TILECERAMIC TILE (CT)QUARRY TILE (QT)ASPHALT ORBITUMINOUS (BIT)PLASTER (PLAS)GYPSUM BOARD (GYP)EARTHBATT INSULATION(INS)POROUS FILL GRAVEL OR SANDRIGID INSULATIO(INS)EXISTING CONDITIONSTO REMAIN 9EXG)STRUCTURAL ENGINEERCLARK ENGINEERING CORPORATIONARMSTRONG, TORSETH, SKOLD, AND RYDEEN, INC.8501 GOLDEN VALLEY ROAD, SUITE 300GOLDEN VALLEY, MINNESOTA 55427PHONE: 763-545-3731 FAX: 763-525-3289ARCHITECT/PROJECT MANAGER: PAUL ERICKSONSPECIFICATIONS: JOE ANTONCIVIL ENGINEERS/ LANDSCAPE ARCHITECTSCHULTZ ENGINEERING & SITE DESIGN18 SOUTH RIVERSIDE AVENUE, SUITE 230SCARTELL, MINNESOTA 56377PHONE: 320-339-0669 FAX: 866-633-1830PROJECT ENGINEER: BRIAN SCHULTZ, PEEMAIL: SCHULTZENG@LIVE.COMOWNERTHE HOUSE CHURCH2024 RAHN WAYEAGAN, MN 55122PHONE: 651-454-6892CONTACT:OWNERS REPRESENTATIVE: JENNIFER HASSENFRITZ 952-457-007012755 HIGHWAY 55, SUITE 100MINNEAPOLIS, MINNESOTA 55441PHONE: 763-545-9196 FAX: 763-541-0056PROJECT ENGINEER: TIM LABISSIONERE, PELANDSCAPE ARCHITECTARTEKA OUTDOOR SERVICES593 CITATION DRIVESHAKOPEE, MINNESOTA 55379PHONE: 952-445-0532LANDSCAPE ARCHITECT: VALERIE J RIVERSCONTRACTORCORNERSTONE CONSTRUCTION & MANAGEMENT1185 N CONCORD STREETST PAUL, MINNESOTA 55075PHONE: 651-453-1194 FAX: 651-453-1195DAVE HAUEREMAIL: CCMCORNERSTONE@GMAIL.COMUNIT AUNIT BARMSTRONG TORSETH SKOLD & RYDEEN, INCCONSULTANTSTHE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLANDRAWN BYCHECKED BYISSUED FORISSUE DATESHEET NAMEATS&R PROJECT NOSHEET NUMBER180378501 GOLDEN VALLEY ROADSUITE 300MINNEAPOLIS, MINNESOTA 55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC ARMSTRONG TORSETH SKOLD & RYDEEN, INC. 2016ADDITION TOSIGNATURE / SEAL11/20/18ARCHITECTUREENGINEERINGPLANNINGTECHNOLOGYINTERIOR DESIGNLANDSCAPE ARCHITECTUREA0.0TITLE SHEETPWEPWLCITY SUBMITTALFOR REFERENCEONLYNOT FORCONSTRUCTIONAdditions to:2024 Rahn WayEagan, MN 551221. CROSS-REFERENCE ARCHITECTURAL DRAWINGS WITH, STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS TO ASSURE COORDINATION OF LOCATIONS, SIZES AND MATERIALS.2. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCY TO THE ARCHITECT BEFORE COMMENCING ANY WORK.3. DO NOT SCALE DRAWINGS FOR DIMENSIONS.4. VERIFY LOCATION, SIZE AND WALL THICKNESS REQUIRED TO RECESS MECHANICAL AND ELECTRICAL ITEMS AND MAINTAIN FIRE RATING REQUIREMENTS OF THE WALL (IF REQ) AT THESE BUILT-INS: UNIT HEATERS, CONVECTORS, ELECTRICAL PANELS, FIRE EXTINGUISHERCABINETS, DUCTS, PIPING, AND ALL OTHER SUCH RECESSES 5. MECHANICAL AND ELECTRICAL CONTRACTORS SHALL FURNISH EQUIPMENT REQUIRED FOR ANY CEILING OR WALL ACCESS PANELS. OTHERS SHALL INSTALL OR BUILD IN ALL SUCH ACCESS PANELS UON.6. VERIFY ELEVATION OF ALL FLOOR SLAB DEPRESSIONS REQUIRED TO RECEIVE FLOOR MATERIAL PER FINISH SCHEDULE AND DETAILS.7. ALL WOOD FRAMING AND BLOCKING CONCEALED IN CEILINGS AND PARTITIONS SHALL BE FIRE TREATED - UON.8. CEILING HEIGHT ON ROOM FINISH SCHEDULES AND WALL SECTIONS ARE NOMINAL. REFER TO DOOR AND WINDOW DETAILS FOR ACTUAL HEIGHT.9. REFER TO CIVIL DRAWINGS TO DETERMINE GRADE AND ELEVATIONS AT TOP OF BUILDING SLABS AND FOOTINGSARCHITECTURALA3.1 UNIT A FLOOR PLAN AND SCHEDULESA3.2 UNIT B FLOOR PLAN AND SCHEDULESA4.1 EXTERIOR ELEVATIONSA4.2 EXTERIOR ELEVATIONSA7.1 ROOF PLAN AND DETAILSSTRUCTURALTHE HOUSE CHURCHMATERIAL SYMBOLSNORTHCIVIL/ LANDSCAPECS1 SITE PLANC1 GENERAL NOTES & SPECIFICATIONSC2 STANDARD DETAILSC3 STANDARD CITY DETAILSC4 GRADING PLANC5 SWPPP - NOTESC6 SWPPP - PLAN VIEWC7 SOIL MANAGEMENT PLANC8 UTILITY PLANL1 LANDSCAPE PLANSHEET INDEXGENERAL NOTESLOCATION MAPMODULAR EXPLANATIONKEY PLANLEGENDPROJECT INFORMATIONPROJECT INFORMATIONA0.0 TITLE SHEETNORTHFOR REFERENCEONLYNOT FORCONSTRUCTIONFOR REFERENCEONLYNOT FORCONSTRUCTIONFOR REFERENCEONLYNOT FORCONSTRUCTIONI hereby certify that this plan, specification, orreport was prepared by me or under my directsupervision and that I am a duly licensed Architect under the laws of the State of Minnesota.SignatureTyped or printed nameDateLicense Number1632811/20/18Paul W Erickson, AIA
EXISTINGBUILDINGFFE = 924.10PROPOSED BUILDINGADDITIONMAIN FFE = 926.10STAGE FFE = 928.60PAVEMENTDEMOLITIONLIMITS (TYP)192451622131941972228141536138CS1ARMSTRONGTORSETHSKOLD& RYDEEN,INCCONSULTANTSTHE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLANDRAWN BYCHECKED BYISSUED FORISSUE DATESHEET NAMEATS&R PROJECT NOSHEET NUMBER180378501 GOLDENVALLEYROADSUITE300MINNEAPOLIS,MINNESOTA55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC SCHULTZ ENGINEERING AND SITE DESIGN, PLLC 2018ADDITION TOSIGNATURE / SEAL11/20/18ARCHITECTUREENGINEERINGPLANNINGTECHNOLOGYINTERIORDESIGNLANDSCAPEARCHITECTURE18 South Riverside AvenueSuite 230Sartell, MN 56377Ph: (320) 339-0669Fx: (866) 633-1830schultzeng@live.comwww.schultzengineeringdesign.comSCHULTZ ENGINEERING& SITE DESIGNI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly licensedEngineer under the laws of the stateof MinnesotaBRIAN J. SCHULTZ, PEDATELICENSE NO.11/20/2018 43129SCHULTZ ENG. PROJECT NO180160 30 60 120PAVEMENTDEMOLITIONLIMITS (TYP)PAVEMENTDEMOLITIONLIMITS (TYP)BENCHMARKMATCHEXISTINGPAVEMENT20-FT PARKING SETBACK30-FT BERM EASEMENT50-FT MAX. BLDG SETBACK50-FT MAX. BLDG SETBACK30-FT BERM EASEMENT20-FT PARKING SETBACK5-FT PARKING SETBACK50-FT MAX. BLDG SETBACK5-FT PARKING SETBACK50-FT MAX. BLDG SETBACK50-FT MAX. BLDG SETBACK20-FT PARKING SETBACK50-FT MAX. BLDG SETBACK5-FT PARKING SETBACKSITE PLAN DATATOTAL LOT AREA = 283,140 SFBUILDING AREA: EXISTING = 15,530 SFPROPOSED ADDITION = 18,140 SFTOTAL = 33,670 SF% BUILDING AREA: EXISTING = 5.5% WITH PROPOSED PROJECT = 11.9%IMPERVIOUS SURFACE: EXISTING = 90,100 SFWITH PROPOSED PROJECT = 154,300 SF% IMPERVIOUS SURFACE: EXISTING = 31.8% WITH PROPOSED PROJECT = 54.5%TOTAL PARKING LOT AREA (PROPOSED): 59,200 SFPROPOSED LANDSCAPED ISLANDS/PENINSULAS: 2,940 SF% LANDSCAPED ISLANDS/PENINSULAS: 5.0% PARKING CALCULATIONEXISTING PARKING SPACES = 118 SPACESPROPOSED PARKING SPACES = 166 SPACESTOTAL = 284 SPACESTOTAL ALLOWED CHURCH SANCTUARY SEATING:284 X 3.5 = 994 SEATS24'-2"24'-0"24'-0"24'-0"24'-0"24'-0"24'-0"24'-0"24'-0"24'-0"24'-0"19'-0"8'-0"8'-0"8'-0"8'-0"8'-0"(TYP)9'-2"9'-0"(TYP)9'-0"9'-0"9'-0"19'-0"7'-5"28'-8"27'-0"19'-0"9'-0"(TYP)19'-0"9'-0"(TYP)(TYP)(TYP)19'-0"9'-0"(TYP)(TYP)7'-4"7'-4"9'-2"24'-0"140'-11"19'-0"9'-0"19'-0"9'-0"19'-0"9'-0"9'-0"9'-0"9'-0"19'-0"9'-0"(TYP)(TYP)(TYP)(TYP)9'-0"19'-0"(TYP)(TYP)(TYP)(TYP)(TYP)(TYP)161'-4"265'-6"5'-0"5'-0"15'-9"5'-0"22'-6"5'-0"43'-8"19'-0"9'-0"19'-0"9'-0"(TYP)(TYP)(TYP)(TYP)12'-11"CONCRETESIDEWALK (TYP)CONCRETESIDEWALK (TYP)THICKENED EDGESIDEWALK (TYP)ADA RAMPRAMP LANDINGFLUSH W/ PAVEMENTADA RAMPTHICKENED EDGESIDEWALK (TYP)THICKENED EDGESIDEWALK (TYP)THICKENED EDGESIDEWALK (TYP)THICKENED EDGESIDEWALK (TYP)CONCRETEAPRONMATCHEXISTINGSIDEWALKMATCHEXISTINGSIDEWALKMATCHEXISTINGSIDEWALKMATCHEXISTINGSIDEWALKMATCH EXISTINGCURB & GUTTERADARAMPSIDEWALK FLUSHW/ PAVEMENT3-FT CURB TAPERB612 CURB &GUTTER (TYP)B612 CURB &GUTTER (TYP)B612 CURB &GUTTER (TYP)B612 CURB &GUTTER (TYP)B612 CURB &GUTTER (TYP)B612 CURB &GUTTER (TYP)REPLACE EXISTINGCURB TO PRE-DISTURBEDCONDITIONSB612 CURB &GUTTER (TYP)INFILTRATION BASIN #1INFILTRATION BASIN #2MATCH EXISTINGCURB & GUTTERMATCH EXISTINGCURB & GUTTERMATCH EXISTINGCURB & GUTTERMATCHEXISTINGPAVEMENTMATCHEXISTINGPAVEMENTMATCHEXISTINGPAVEMENTMATCHEXISTINGPAVEMENTMATCHEXISTINGPAVEMENTBITUMINOUSPAVEMENT (TYP)BITUMINOUSPAVEMENT (TYP)MATCHEXISTINGPAVEMENTMATCH EXISTINGCURB & GUTTERMATCH EXISTINGCURB & GUTTERBITUMINOUSPAVEMENT (TYP)BITUMINOUSPAVEMENT (TYP)BITUMINOUSPAVEMENT (TYP)BITUMINOUSPAVEMENT (TYP)BITUMINOUSPAVEMENT (TYP)BITUMINOUSPAVEMENT (TYP)BITUMINOUSPAVEMENT (TYP)TRASH ENCLOSURE(SEE ARCH.)
GRADING NOTES:2. EXISTING TOPOGRAPHICAL INFORMATION WAS OBTAINED FROM A TOPOGRAPHICAL SURVEY PROVIDED BY ADVANCE SURVEYING & ENGINEERING, CO., MINNETONKA, MN (952) 474-7964.3. BENCHMARK: TOP NUT OF HYDRANT LOCATED IN FRONT CHURCH PARKING LOT (SEE PLAN) - ELEV = 925.114. NOTIFY ENGINEER IMMEDIATELY IF ANY INCONSISTENCIES ARE DISCOVERED BETWEEN ACTUAL SITE CONDITIONS AND WHAT IS SHOWN ON THE PLANS, WHICH ARE SIGNIFICANT ENOUGH TO ALTER THE INTENT OF THE DRAWINGS.6. THE CONTRACTOR SHALL CONTACT GOPHER ONE CALL AT (800) 252-1166 FOR A UTILITY LOCATE PRIOR TO THE START OF CONSTRUCTION AND VERIFY LOCATIONS OF UTILITIES BEFORE BEGINNING WORK.7. SEE SHEETS C2 AND C3 FOR STANDARD DETAILS AND STANDARD CITY DETAILS.15. ALL PROPOSED ELEVATIONS ARE TOP OF PAVING OR GUTTER, UNLESS NOTED OTHERWISE. PROPOSED ELEVATIONS ARE INTENDED TO PROVIDE POSITIVE DRAINAGE TOWARDS CATCH BASINS AND/OR OUTLETS. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE THE REQUIRED ELEVATIONS, WHICH WILL PROMOTE POSITIVE DRAINAGE THROUGHOUT THE PROJECT SITE.1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS INCLUDING LOCATIONS, AND RIM AND INVERT ELEVATIONS, OF EXISTING DRAINAGE AND SANITARY STRUCTURES. LOCATION AND SIZE OF EXISTING SANITARY, WATER, AND STORM SEWER STUBS, AND EXISTING GRADES SHALL ALSO BE VERIFIED.13. SPOT ELEVATIONS ARE FLOW LINE AND/OR FINISHED GRADES, UNLESS OTHERWISE INDICATED. TOP OF CURB ELEVATIONS ARE 6" ABOVE THE FLOW LINE SPOT ELEVATION SHOWN ON THE PLANS, UNLESS NOTED OTHERWISE.5. IF REQUIRED BY THE MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY, THE OWNER OR CONTRACTOR SHALL OBTAIN A PLUMBING PERMIT PRIOR TO THE INSTALLATION OF ANY STORM SEWER UTILITIES.12. CONTRACTOR SHALL PERFORM CALCULATIONS TO VERIFY EARTHWORK QUANTITIES. CONTRACTOR'S BID SHALL BE BASED ON EARTHWORK CALCULATIONS COMPLETED BY THE CONTRACTORNOTE: CADD FILES FOR ESTIMATING EARTHWORK QUANTITIES ARE AVAILABLETO CONTRACTORS FOR PREPARING BIDS. IN ORDER TO RECEIVE THE CADD FILES,THE CONTRACTOR WILL NEED TO SIGN A HOLD-HARMLESS AGREEMENT PROVIDEDBY SCHULTZ ENGINEERING & SITE DESIGN, AND AGREE TO PAY A $50 PROCESSINGFEE. THE CADD FILES WILL BE RELEASED UPON RECEIPT OF THE CHECK8. ALL LENGTHS OF STORM SEWER OR CULVERT PIPE SPECIFIED ON THIS PLAN INCLUDE THE LENGTHS OF ANY ASSOCIATED FLARED END SECTIONS.10. FINISHED ELEVATIONS OF LAWN/GREEN AREAS ADJACENT TO BUILDINGS SHALL BE A MINIMUM OF 6" BELOW FINISHED FLOOR OR TOP-OF-BLOCK ELEVATION.14. "EX" DENOTES EXISTING SPOT ELEVATIONS9. TRASH GUARDS SHALL BE INSTALLED ON ALL STORM SEWER END SECTIONS.EXISTINGBUILDINGFFE = 924.10PROPOSED BUILDINGADDITIONMAIN FFE = 926.10STAGE FFE = 928.60EXEXEXEXEXEXEXEXEXTRENCH DRAIN(SEE 11/C2)4 LF6" PVC@ 5.00%CLEANOUTRIM = 925.85INV = 923.6518 LF6" PVC@ 5.00%CB1 (27" ID)RIM = 925.25INV = 922.7588 LF8" PVC@ 1.53%CB2 (27" ID)RIM = 924.15INV = 921.40125 LF15" HDPE@ 0.84%CB3 (48" ID)RIM = 923.60INV = 920.35125 LF15" HDPE@ 0.96%115 LF12" PVC@ 1.00%CB4 (72" ID)RIM = 923.15INV = 919.15SUMP = 915.15CONNECT TO ROOF DRAININV @ BLDG = 920.3020 LF24" HDPE@ 0.75%24" FLAREDEND SECTIONINV = 919.00CB5 (27" ID)RIM = 923.15INV = 920.15SUMP = 916.1520 LF12" HDPE@ 5.75%12" FLAREDEND SECTIONINV = 919.0012" FLAREDEND SECTIONINV = 919.0034 LF12" HDPE@ 1.40%BASIN OUTLETSTRUCTURE(SEE 2/C4)280 LF12" HDPE@ 1.40%CB6 (48" ID)RIM = 918.60INV = 914.60SUMP = 910.6044 LF24" HDPE@ 0.23%24" FLAREDEND SECTIONINV = 914.50CB7 (48" ID)RIM = 918.45INV = 914.60SUMP = 910.6018 LF18" HDPE@ 0.56%18" FLAREDEND SECTIONINV = 914.5012" FLAREDEND SECTIONINV = 914.5060 LF12" HDPE@ 4.00%STMH1 (48" ID)RIM = 918.00INV = 912.10(FIELD VERIFY)CONNECT TO EXISTING12" STORM SEWERINV = 912.10(FIELD VERIFY)INFILTRATION BASIN #2BOTTOM OF BASIN = 913.7BASIN OUTLET = 914.5TOP OF BASIN = 918.0INFILTRATION BASIN #1BOTTOM OF BASIN = 918.2BASIN OUTLET = 919.0TOP OF BASIN = 923.0PAVEMENTDEMOLITIONLIMITS (TYP)926926926 926926926
926924924924924924924922920922920926928930932926922926926926928924918916914914916918918
918C4ARMSTRONGTORSETHSKOLD& RYDEEN,INCCONSULTANTSTHE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLANDRAWN BYCHECKED BYISSUED FORISSUE DATESHEET NAMEATS&R PROJECT NOSHEET NUMBER180378501 GOLDENVALLEYROADSUITE300MINNEAPOLIS,MINNESOTA55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC SCHULTZ ENGINEERING AND SITE DESIGN, PLLC 2018ADDITION TOSIGNATURE / SEAL11/20/18ARCHITECTUREENGINEERINGPLANNINGTECHNOLOGYINTERIORDESIGNLANDSCAPEARCHITECTURE18 South Riverside AvenueSuite 230Sartell, MN 56377Ph: (320) 339-0669Fx: (866) 633-1830schultzeng@live.comwww.schultzengineeringdesign.comSCHULTZ ENGINEERING& SITE DESIGNI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly licensedEngineer under the laws of the stateof MinnesotaBRIAN J. SCHULTZ, PEDATELICENSE NO.11/20/2018 43129SCHULTZ ENG. PROJECT NO180160 30 60 120EXEXPAVEMENTDEMOLITIONLIMITS (TYP)PAVEMENTDEMOLITIONLIMITS (TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)M LIMITS OFDISTURBANCE(TYP)EBENCHMARKPAVEMENTDEMOLITIONLIMITS (TYP)PAVEMENTDEMOLITIONLIMITS (TYP)INFILTRATION BASIN NOTES:1. TRAFFIC FROM CONSTRUCTION EQUIPMENT SHALL BE LIMITED AS MUCH AS POSSIBLE ACROSS INFILTRATION BASIN AREAS, AND BE ONLY LOW IMPACT TRACK EQUIPMENT. BASIN AREAS SHALL BE EXCAVATED WITH A BACKHOE STATIONED OUTSIDE OF THE AREA AS MUCH AS POSSIBLE.2. DURING CONSTRUCTION OF THE ADJACENT PARKING LOT AND BUILDING, THE INFILTRATION BASIN AREA SHALL BE PROTECTED FROM TRAFFIC AND SEDIMENT WITH SILT FENCE. SEE SHEET C6.3. THE BOTTOM OF THE INFILTRATION BASIN SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 24 INCHES WITH THE USE OF APPROPRIATE EQUIPMENT (TILLER, RIPPER, ETC.). AFTER SCARIFICATION, THE BASIN SIDEWALLS AND BOTTOM SHALL BE LINED WITH A MINIMUM OF 4-INCHES OF SAND/COMPOST MIX. SAND/COMPOST MIX SHALL BE PLACED AS LOOSELY AS POSSIBLE.5. ONCE THE INFILTRATION BASINS ARE COMPLETED AND THE SITE HAS BEEN STABILIZED, THE CONTRACTOR SHALL ARRANGE AND PAY FOR TESTING THE INFILTRATION RATES OF THE BOTTOMS OF THE BASINS. THE TEST RESULTS SHALL BE SUBMITTED TO THE CITY AND THE ENGINEER.6. FINAL STABILIZATION OF THE INFILTRATION BASINS SHALL NOT BE COMPLETED UNTIL THE UPSTREAM DRAINAGE AREAS HAVE BEEN STABILIZED.4. ONCE EXCAVATED TO FINAL GRADE INFILTRATION AREAS SHALL BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING CONSTRUCTION ACTIVITY IS REACHING THE INFILTRATION AREA. ALL INFILTRATION AREAS SHALL BE INSPECTED TO ENSURE THAT UNAUTHORIZED EQUIPMENT IS NOT BEING DRIVEN ACROSS THE INFILTRATION AREAS.ELEV= SEE PLAN4:14:1NATIVE SILTYSAND SOILSVARIESNTSBASIN SIDEWALL4" SAND/COMPOST MIXINFILTRATION BASIN (TYPICAL)1NOTES: 1. BASIN BOTTOMSHALL BE SEEDED W/NATIVE SEED MIX AND/OR PLANTINGSBOTTOM OF BASIN4" SAND/COMPOSTMIX2. SAND/COMPOST MIX SHALL CONSIST OF 70% CLEAN SAND &30% COMPOST (MN STORM WATER MANUAL MIX "B"). SANDSHALL CONSIST OF CLEAN CONSTRUCTION SAND, FREE OFDELETERIOUS MATERIALS - AASHTO M-6 OR ASTM C-33 WASHED.COMPOST SHALL CONSIST OF MNDOT 3890 GRADE 2ELEV = 922.50ELEV = 918.528" KEY WALL6" DIA. ORIFICEAT WALL CENTERFLOWOUTLET STRUCTURE (INFILTRATION BASIN #1)6'-6"6"5'-0"FLOW34 LF12" HDPE@1.40%HAALA PS60-72S POND SKIMMERCASTING W/ WEDGE ANCHORS, ORAPPROVED EQUIVALENT (INSTALL PERMANUFACTURER'S REQUIREMENTS ANDSPECIFICATIONSELEV = 923.00ELEV = 922.50280 LF12" HDPE@ 1.40%ELEV = 918.52ELEV = 918.528" PRECAST CONCRETE BASEWATERSTOP GASKET, OR APPROVEDEQUIVALENT W/ NON-SHRINK PATCHINGCOMPOUND, AT PIPE/STRUCTURECONNECTION60" PRECAST CONCRETE BARREL(S)WITH RUBBER GASKET(S) ASTM C443-79PRECAST CONCRETE COVERS, BARRELSECTIONS, AND BASES SHALL MEET THEREQUIREMENTS OF STANDARD MNDOTPLATES 4011 AND 40208" KEY WALL W/REINFORCEMENT6" DIA. ORIFICE ATWALL CENTERELEV = 918.521ELEV = 922.50ELEV = 917.52
EXISTINGBUILDINGFFE = 924.10PROPOSED BUILDINGADDITIONMAIN FFE = 926.10STAGE FFE = 928.60C6ARMSTRONGTORSETHSKOLD& RYDEEN,INCCONSULTANTSTHE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLANDRAWN BYCHECKED BYISSUED FORISSUE DATESHEET NAMEATS&R PROJECT NOSHEET NUMBER180378501 GOLDENVALLEYROADSUITE300MINNEAPOLIS,MINNESOTA55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC SCHULTZ ENGINEERING AND SITE DESIGN, PLLC 2018ADDITION TOSIGNATURE / SEAL11/20/18ARCHITECTUREENGINEERINGPLANNINGTECHNOLOGYINTERIORDESIGNLANDSCAPEARCHITECTURE18 South Riverside AvenueSuite 230Sartell, MN 56377Ph: (320) 339-0669Fx: (866) 633-1830schultzeng@live.comwww.schultzengineeringdesign.comSCHULTZ ENGINEERING& SITE DESIGNI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly licensedEngineer under the laws of the stateof MinnesotaBRIAN J. SCHULTZ, PEDATELICENSE NO.11/20/2018 43129SCHULTZ ENG. PROJECT NO180160 30 60 120TEMPORARY ROCKCONSTRUCTIONENTRANCEPERIMETER SILTFENCE (TYP)PERIMETER SILTFENCE (TYP)PERIMETER SILTFENCE (TYP)PERIMETER SILTFENCE (TYP)PERIMETER SILTFENCE (TYP)PERIMETER SILTFENCE (TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)PAVEMENTDEMOLITIONLIMITS (TYP)PAVEMENTDEMOLITIONLIMITS (TYP)PAVEMENTDEMOLITIONLIMITS (TYP)SILT FENCE UPLANDFROM INFILTRATIONBASIN (TYP)SILT FENCE UPLANDFROM INFILTRATIONBASIN (TYP)SILT FENCE UPLANDFROM INFILTRATIONBASIN (TYP)SILT FENCE UPLANDFROM INFILTRATIONBASIN (TYP)CLASS III RIP RAPOVERLAYING TYPE 4GEOTEXTILE FABRIC (TYP)CLASS III RIP RAPOVERLAYING TYPE 4GEOTEXTILE FABRIC (TYP)CLASS III RIP RAPOVERLAYING TYPE 4GEOTEXTILE FABRIC(TYP)CATEGORY 3EROSION CONTROLBLANKET (TYP)CATEGORY 3EROSION CONTROLBLANKET (TYP)CATEGORY 3EROSION CONTROLBLANKET (TYP)CATEGORY 3EROSION CONTROLBLANKET (TYP)INSTALLCATCH BASINPROTECTION(TYP)INSTALLCATCH BASINPROTECTION(TYP)INSTALLCATCH BASINPROTECTION(TYP)INSTALLCATCH BASINPROTECTION(TYP)INSTALLCATCH BASINPROTECTION(TYP)INSTALLCATCH BASINPROTECTION(TYP)INSTALLCATCH BASINPROTECTION(TYP)CLASS III RIP RAPOVERLAYING TYPE 4GEOTEXTILE FABRIC(TYP)INSTALLCATCH BASINPROTECTION(TYP)INSTALLCATCH BASINPROTECTION(TYP)PAVEMENTDEMOLITIONLIMITS (TYP)PAVEMENTDEMOLITIONLIMITS (TYP)TEMPORARY ROCK CONSTRUCTION ENTRANCENTSNOTE: PLACING FILTER FABRIC UNDER THE ROCK ENTRANCE MAYREDUCE THE AMOUNT OF MAINTENANCE IT WOULD REQUIRE.2. THE ENTRANCE SHALL BE GRADED SUCH THAT POSITIVE DRAINAGE DURING CONSTRUCTION IS PROVIDED.6" CA-1 COARSEAGGREGATE6" BUMP FORKEEPING RUNOFFON SITE1. THE ROCK ENTRANCE SHALL BE CONSTRUCTED PRIOR TO THE START OF GRADING OPERATIONS.3. THE ENTRANCE SHALL BE MAINTAINED IN SUCH A CONDITION SUCH THAT IT PREVENTS MUD TRACKING OFF SITE. ADDITIONAL ROCK OR REPLACEMENT OF THE ENTRANCE MAY BE REQUIRED PERIODICALLY IF MUD STARTS TO TRACK OFF SITE.4. THE ROCK ENTRANCE MAY BE REMOVED JUST PRIOR TO THE PLACEMENT OF AGGREGATE BASE.1STAPLE PLASTICSHEETINGEVERY 5' (TYP)1. BOTTOM OF CONCRETE WASHOUT AREA SHALL BE 10'X10'2. CONTRACTOR SHALL REMOVE WASH LIQUID FROM CONCRETE WASHOUT AREA AND DISPOSE OF PER MPCA REQUIREMENTS WHEN WASHOUT AREA BECOMES HALF FULL.3. CONTRACTOR SHALL SELECT THE MOST OPTIMAL LOCATION FOR THE CONCRETE WASHOUT10 MIL PLASTICSHEETING LINERPLACED WITHINWASHOUT AREACONCRETE WASHOUTNTSCONSTRUCT BERMAROUND ENTIREWASHOUT AREA2SILT FENCE (MACHINE SLICED)TIRE COMPACTION ZONENTS5' MINIMUM LENGTH STEEL T-POST6' MAXIMUM SPACINGPOST NIPPLES FACES AWAY FROMGEOTEXTILE FABRICMACHINE SLICE8" - 12" DEPTHGEOTEXTILE FABRIC3' WIDE3 PLASTIC ZIP TIESAT LEAST 1" APART(50LB TENSILE)LOCATED IN TOP 8"OF STEEL POSTMATERIALS PER MNDOT 3886INSTALLATION PER MNDOT 2573.3C11. USE PROPER EQUIPMENT SUCH THAT THE SOIL ISSLICED, NOT TURNED OVER.AFTER SILT FENCE INSTALLATION, COMPACT THE SOILIMMEDIATELY NEXT TO THE GEOTEXTILE BY DRIVINGOVER IT WITH A TRACTOR TIRE AT LEAST TWICE2. 3EROSION CONTROL BLANKETNTSA CHECK SLOT SHALL BE CONSTRUCTED AT THE TOPOF STEEP SLOPES (4:1 OR STEEPER) WHERE EROSION CONTROLBLANKET IS PLACED AS PER THE FOLLOWING:1. DIG 6" X 6" TRENCH2. LAY BLANKET END INTO TRENCH3. STAPLE BLANKET IN BOTTOM OF TRENCH EVERY 1 FT4. BACKFILL TRENCH WITH SOIL AND COMPACT5. IF SLOPE LENGTH (L) IS GREATER THAN 100 FT DIG A CHECK SLOT 1/3 FROM THE BOTTOM OF THE SLOPE AND STAPLE THE BLANKET IN AS IN THE TOP TRENCH.6"6"1' TO 3'4NTSRIP RAP AT PIPE OUTLETSGEOTEXTILE FABRIC41MNDOT 3733 TYPE 4MINIMUM 6" BEDDING PERMNDOT SPEC. 3601.2B2' (TYP)2' (TYP)NOTES:1. RIP RAP SHALL MEET THE REQUIREMENTS OF MNDOT SPEC. 36012. SEE PLANS FOR CLASS OF RIP RAP3. D=PIPE DIAMETER IN FEET (SEE PLANS)4. OUTLETS ON STEEP SLOPES SHALL BE PROVIDED WITH RIP RAP FROM THE OUTLET TO THE TOE OF THE SLOPE.2'1'5926926926 926926926
926924924924924924924922920922920926928930932926922926926926928924918916914914916918918
918
EXISTINGBUILDINGFFE = 924.10PROPOSED BUILDINGADDITIONMAIN FFE = 926.10STAGE FFE = 928.60926926926 926926926
926924924924924924924922920922920926928930932926922926926926928924918916914914916918918
918C7ARMSTRONGTORSETHSKOLD& RYDEEN,INCCONSULTANTSTHE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLANDRAWN BYCHECKED BYISSUED FORISSUE DATESHEET NAMEATS&R PROJECT NOSHEET NUMBER180378501 GOLDENVALLEYROADSUITE300MINNEAPOLIS,MINNESOTA55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC SCHULTZ ENGINEERING AND SITE DESIGN, PLLC 2018ADDITION TOSIGNATURE / SEAL11/20/18ARCHITECTUREENGINEERINGPLANNINGTECHNOLOGYINTERIORDESIGNLANDSCAPEARCHITECTURE18 South Riverside AvenueSuite 230Sartell, MN 56377Ph: (320) 339-0669Fx: (866) 633-1830schultzeng@live.comwww.schultzengineeringdesign.comSCHULTZ ENGINEERING& SITE DESIGNI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly licensedEngineer under the laws of the stateof MinnesotaBRIAN J. SCHULTZ, PEDATELICENSE NO.11/20/2018 43129SCHULTZ ENG. PROJECT NO180160 30 60 120LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)LIMITS OFDISTURBANCE(TYP)AREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)AREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)INFILTRATIONBASINAREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)AREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)AREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)AREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)INFILTRATIONBASINAREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)AREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)AREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)AREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)AREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)AREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)AREA DESIGNATEDFOR SOIL MANAGEMENT(TYP)SOIL MANAGEMENT NOTES:1. DISTURBED AREA DESIGNATED FOR SOIL MANAGEMENT.SOIL MANAGEMENT PRACTICES INDICATED ON THIS PLAN SHALL BE COMPLETED IN DESIGNATEDAREAS, PER CITY REQUIREMENTS, FOR THE PURPOSES OF REDUCING THE AFFECTS OFCONSTRUCTION TRAFFIC AS IT PERTAINS TO COMPACTION OF UNDERLYING SOILS.THE FOLLOWING SHALL BE COMPLETED IN DESIGNATED SOIL MANAGEMENT AREAS:a. SOIL MANAGEMENT PRACTICES SHALL BE COMPLETED PRIOR TO THE PLACEMENT OF ANYIRRIGATION SYSTEM ITEMS, TREES, SHRUBS, AND/OR SOD/SEEDINGb. PRIOR TO PLACEMENT OF TOPSOIL/COMPOST MIX, UNDERLYING INORGANIC SOILS SHALL BESCARIFIED TO A DEPTH OF 12-INCHES VIA APPROPRIATE METHODS (TILLING, RIPPING, ETC.)c. UPON COMPLETION OF SCARIFICATION, A MINIMUM OF 4-INCHES OF TOPSOIL/COMPOSTMIX SHALL BE LOOSELY PLACED OVER DESIGNATED AREAS. TOPSOIL/COMPOST MIX SHALLCONSIST OF 50% TOPSOIL AND 50% MNDOT 3890 GRADE 2 COMPOST, BY VOLUME.d. TOPSOIL SHALL HAVE A MINIMUM OF 5% ORGANIC CONTENT. ONSITE TOPSOIL SALVAGEDFROM THE PROJECT AREA IS ACCEPTABLE, PROVIDED THAT IT CONTAINS THE MINIMUMORGANIC CONTENT. CONTRACTOR SHALL HAVE THEIR TOPSOIL SOURCE TESTED FORORGANIC CONTENT PRIOR TO PROCEEDING WITH MIXING IN COMPOST, IN ORDER TOVERIFY THAT THE TOPSOIL SOURCE IS ACCEPTABLE. ORGANIC CONTENT TESTS SHALL BEPROVIDED TO THE CITY AND ENGINEER.e. THE TOP 12-INCHES OF SOIL IN COMPLETED DESIGNATED SOIL MANAGEMENT AREAS SHALLHAVE A MAXIMUM OF 200 PSI, WHICH SHALL BE TESTED. TEST RESULTS SHALL BE PROVIDED TOTHE CITY AND ENGINEERf. ALL TESTING INDICATED ABOVE SHALL BE COMPLETED BY AN INDEPENDENT TESTING FIRMg. CONTRACTOR SHALL PROVIDE ALL NECESSARY DOCUMENTATION ASSOCIATED WITH SOILMANAGEMENT IMPLEMENTATION TO CITY WATER RESOURCES STAFF TO VERIFY COMPLIANCEWITH APPROVED SOIL MANAGEMENT STRATEGY. THIS MAY INCLUDE, BUT NOT BE LIMITED TOON-SITE SOIL SAMPLES, COMPACTION TESTING, AND ORGANIC CONTENT TESTS.h. CONTRACTOR SHALL PROVIDE MINIMUM OF 24 NOTICE TO CITY WATER RESOURCESPECIALIST, (651) 675-5335, TO ARRANGE INSPECTION OF SOIL MANAGEMENT PROCESS INORDER TO VERIFY COMPLIANCE WITH APPROVED SOIL MANAGEMENT STRATEGY2. INFILTRATION BASIN (SEE SHEET C4 FOR INFORMATIONREGARDING BASIN CONSTRUCTION).3. AREAS NOT DESIGNATED FOR HARDSCAPE, INFILTRATION BASIN, OR SOIL MANAGEMENT SHALLREMAIN UNDISTURBED.4. CONTRACTOR IS FREE TO LIMIT DISTURBED AREA TO LESS THAN WHAT IS SHOWN ON THIS PLAN, IFPRACTICAL. SOIL MANAGEMENT MAY BE OMITTED IN AREAS THAT REMAIN UNDISTURBEDTHROUGHOUT THE ENTIRE PROJECT.
EXISTINGBUILDINGFFE = 924.10PROPOSED BUILDINGADDITIONMAIN FFE = 926.10STAGE FFE = 928.60C8ARMSTRONGTORSETHSKOLD& RYDEEN,INCCONSULTANTSTHE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLANDRAWN BYCHECKED BYISSUED FORISSUE DATESHEET NAMEATS&R PROJECT NOSHEET NUMBER180378501 GOLDENVALLEYROADSUITE300MINNEAPOLIS,MINNESOTA55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC SCHULTZ ENGINEERING AND SITE DESIGN, PLLC 2018ADDITION TOSIGNATURE / SEAL11/20/18ARCHITECTUREENGINEERINGPLANNINGTECHNOLOGYINTERIORDESIGNLANDSCAPEARCHITECTURE18 South Riverside AvenueSuite 230Sartell, MN 56377Ph: (320) 339-0669Fx: (866) 633-1830schultzeng@live.comwww.schultzengineeringdesign.comSCHULTZ ENGINEERING& SITE DESIGNI hereby certify that this plan,specification or report was preparedby me or under my direct supervisionand that I am a duly licensedEngineer under the laws of the stateof MinnesotaBRIAN J. SCHULTZ, PEDATELICENSE NO.11/20/2018 43129SCHULTZ ENG. PROJECT NO180160 30 60 120PAVEMENTDEMOLITIONLIMITS (TYP)PAVEMENTDEMOLITIONLIMITS (TYP)PAVEMENTDEMOLITIONLIMITS (TYP)6" PVC
@
2.
0
0
%
MI
N
6" PVC SAN. SERVICE(FIELD VERIFY INVERT@ BLDG)6" COMBINED WATER SERVICEW/ 6" GATE VALVE & BOXCLEANOUT6" C900 PVC6" C900 PVC(2) 6" 45° BENDSHYDRANT6" GATE VALVE& BOXEXISTINGHYDRANTCONNECT TO EXISTING6" WATER SERVICECONNECT TO EXISITNGSANITARY MANHOLE(FIELD VERIFY INVERT)PAVEMENTDEMOLITIONLIMITS (TYP)6" X 6" TEE6" C900 PVC6" C900 PVC6" C900 P
V
C 6" 45° BENDPAVEMENTDEMOLITIONLIMITS (TYP)6" C900 PVCPAVEMENTDEMOLITIONLIMITS (TYP)PAVEMENTDEMOLITIONLIMITS (TYP)BENCHMARK6" PVC @ 2.00% MIN6" PVC @2.00% MINCLEANOUT6" 45° BEND2. IF CONFLICTS ARE DISCOVERED WHERE WATER MAIN CROSSES EXISTING SANITARY SEWER, SERVICE LINES, OR STORM SEWER, THE WATER MAIN SHALL BE RAISED OR LOWERED APPROPRIATELY WHILE STILL MAINTAINING A MINIMUM DEPTH OF 8 FEET BELOW FINISHED GRADE.4. INSTALL SANITARY SEWER SERVICE LINE CLEANOUTS AS REQUIRED BY THE MINNESOTA PLUMBING CODE5. SEE SHEET C4 FOR STORM SEWER GRADING, AND SHEETS C2 AND C3 FOR MISCELLANEOUS DETAILS RELATING TO THE PLACEMENT OF THE UTILITIES.SANITARY SEWER AND WATER NOTES1. WATER MAIN AND ANY WATER SERVICE LINES SHALL BE PLACED AT A MINIMUM DEPTH OF 8 FEET BELOW FINISHED GRADE.6. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL EXISTING UTILITIES PRIOR TO ANY CONSTRUCTION.3. INSULATION SHALL BE PLACED AT ALL LOCATIONS WHERE STORM SEWER CROSSES SANITARY SEWER, WATER MAIN, OR ASSOCIATED SERVICES. INSULATION SHALL CONSIST OF AN 8-FT X 8-FT SQUARE OF 3"-THICK RIGID INSULATION. INSULATION SHALL BE PLACED BETWEEN THE STORM SEWER AND PIPE CROSSING WITH THE EDGES OF THE INSULATION PARALLEL TO THE PIPING AS MUCH AS POSSIBLE.OWNER/CONTRACTOR SHALL OBTAIN A PLUMBING PERMIT FROM THEMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PRIOR TO THE INSTALLATIONOF ANY SANITARY SEWER OR WATER UTILITIES. CONSTRUCTION OF SANITARYSEWER OR WATER UTILITIES SHALL NOT COMMENCE UNTIL AFTER THE PLUMBINGPERMIT HAS BEEN OBTAINED, AND ANY AND ALL PERTINENT COMMENTS HAVEBEEN ADDRESSED ON THE PLAN AND IN THE PROJECT SPECIFICATIONS.7. PRIOR TO CONSTRUCTION OF SANITARY SEWER, AND ORDERING ASSOCIATED MATERIALS, THE CONTRACTOR'S PLUMBING DESIGNER SHALL PROVIDE THE ENGINEER WITH THE TOTAL DRAINAGE FIXTURE UNITS (DFUs) FOR THE INTERIOR PLUMBING TO VERIFY THE CORRECT SIZING AND SLOPE OF THE SANITARY SEWER SERVICE6" 45° BEND6" 1114° BEND
9269269269269
2
6
926926
92492
4 92492
4
9249249229209229209269289309329269229269
2
6
92
6
9289
2
4
9
1
8
9
1
6 9149149169189189
1
8
Landscape MaintenanceLandscape Design - BuildIrrigation Design - ServiceOutdoor Serviceswww.artekaoutdoorservices.comPhone 952/445-0532Registrationand that I am a duly Registered Landscape Architectwas prepared by me or under my direct supervisionI hereby certify that this plan, specification, or reportunder the Laws of the State of Minnesota.Date:Reg. No.Sheet No.Sheet TitleDateRevisionsDrawn By1.2.3.4.5.6.ScaleProject NameProject LocationNorth Arrow5/14/18VjR11/16/1811/19/1812/5/18 - City comments12/6/18 - City commentsTHE HOUSE CHURCH2024 RAHN WAYEAGAN, MNLANDSCAPE PLAN1" = 30'L1RC6SL11RD24HM4TAFM33SL21FM5KF3CSKF202SL.BS3SL2CCFM123CSPH33SOTY41SLPROPOSED BUILDINGEXISTING BUILDINGEXISTING PARKINGEXIST. PARKINGPROPOSED PARKINGPROPOSED PARKINGNEW PONDEXIST. PLANTINGAND ROCK EXIST. PLANTINGAND ROCK EXIST. PLANTINGAND ROCK NEW CURB LINEEXIST. LAWNEXIST. LAWNEXIST. LAWNNEW LAWNNEW EDGER& ROCKNEW ROCKNEW ROCKNEW ROCKNEW ROCKNEW ROCKPROPERTY LINEP
R
O
P
E
R
T
Y
L
I
N
E
PROPERTY LINE
PROPERTY LINEEXISTING VEGETATIONEXIST. LAWNNEW ROCKNEW EDGER & ROCKNEW LAWNNEW LAWNNEW LAWNCONC. WALKNEW LAWNLandscape Contractor shall visit the site prior to submitting bid to become familiar with site conditions.PLANTING NOTES:EXIST. TREESTO REMAIN(TYP.)IRRIGATION LIMIT LINENEW TURF SEEDNEW TURF SEEDValerie J. Rivers5/14/1823525NEW SODNEW TURF SEEDEXIST. LAWNHT19DM14LS2BSCC112CS15SDNEW LAWNCH3NEW PONDNEW EDGER& ROCKNEW ROCKNEW ROCKCONC. WALKCONC. WALKCONC. WALKCONC. WALKC
O
N
C
.
W
A
L
K
CONC. WALKCONC. WALK UNDISTURBED AREA12KF12RD12SJEXIST. PLANT BEDNEW EDGER& ROCK22KFRAHN WAY
DNEXIST OFFICEA104EXIST OFFICEA105EXIST OFFICEA106EXIST OFFICEA107EXIST RECEPTIONA102EXIST RESTROOMA111EXIST RESTROOMA112EXIST OFFICEA110EXIST OFFICEA109EXIST OFFICEA108CHECK INA113TODDLERA115EXIST RESTROOMA118EXIST RESTROOMA119EXIST CLOSETA120EXIST CLASSROOMA122EXIST CLASSROOMA123EXIST KITCHENA124EXIST CLASSROOMA125EXIST CLASSROOMA127CLASSROOMA129CLASSROOMA130CLASSROOMA131CLASSROOMA133EXIST CIRCULATIONA121CIRCULATIONA128CIRCULATIONA132EXIST VESTIBULEA100EXIST CIRCULATIONA101EXIST CIRCULATIONA103STORAGEA114YOUTHA116EXIST STAGEA117EXIST CLASSROOMA12624' - 0" 11' - 10"16' - 0"6' - 3"6' - 3"GENERAL NOTES :1. ALL EXPOSED OUTSIDE CMU/GCMU/GLCMU CORNERS TO BE "BULLNOSED".2. ALL INTERIOR CMU TO BE 8" WYTHE UNLESS OTHERWISE NOTED OR DIMENSIONED. EXTEND ALL MASONRY PARTITIONS TO UNDERSIDE OF DECK ABOVE (UON).3. RECESS CONCRETE FLOOR SLAB ON GRADE AS REQUIRED AT WOOD, TILE OR TERRAZZO LOCATIONS TO MATCH FLOOR GRID ELEVATIONS.4. REFER TO SHEET A8.1 FOR INTERIOR & EXTERIOR CJ AND EJT DETAILS.5. BUILDING GRIDS ARE 16' - 0" OC IN EACH DIRECTION.6. REFER TO DETAIL 1/A8.3 FOR TYPICAL TACKBOARD (TB), MARKERBOARD (MB), CHALKBOARD (CB) OR TACKSTRIP (TS) DETAILS.7. ALL STEEL STUD PARTITIONS TO BE TYPE 1 (UON). REFER TO DETAIL 1E/A5.5 PROVIDE HORIZ WOOD BLOCKING (ENTIRE LENGTH OF WALL) AT TB/MB/CB LOCATIONS.8. COORDINATE AND ALIGN CONCRETE SLAB CONTROL JOINTS WITH TERRAZZO OR TILE FLOOR JOINTS.9. REFER TO DETAIL x/Axx FOR FLOOR FINISH TRANSITION DETAILS.ARMSTRONG TORSETH SKOLD & RYDEEN, INCCONSULTANTSTHE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLANDRAWN BYCHECKED BYISSUED FORISSUE DATESHEET NAMEATS&R PROJECT NOSHEET NUMBER180378501 GOLDEN VALLEY ROADSUITE 300MINNEAPOLIS, MINNESOTA 55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC ARMSTRONG TORSETH SKOLD & RYDEEN, INC. 2016ADDITION TOSIGNATURE / SEAL11/20/18ARCHITECTUREENGINEERINGPLANNINGTECHNOLOGYINTERIOR DESIGNLANDSCAPE ARCHITECTUREA3.1UNIT A FLOOR PLANAND SCHEDULESCheckerPWLCITY SUBMITTALFOR REFERENCEONLYNOT FORCONSTRUCTIONNORTHA3.11/8" = 1'-0"1100-0 First Floor Unit AFOR REFERENCEONLYNOT FORCONSTRUCTIONFOR REFERENCEONLYNOT FORCONSTRUCTIONFOR REFERENCEONLYNOT FORCONSTRUCTIONI hereby certify that this plan, specification, orreport was prepared by me or under my directsupervision and that I am a duly licensed Architect under the laws of the State of Minnesota.SignatureTyped or printed nameDateLicense Number1632811/20/18Paul W Erickson, AIA
DNDNDNDN3A4.21A4.22A4.12AA4.22A4.2GATHERINGB101VESTIBULEB100STORAGEB106NURSINGB103RESTROOMB118RESTROOMB119CUSTODIANB117RESTROOMB113CIRCULATIONB110PRAYER ROOMB114VESTIBULEB120STORAGEB115RESTROOMB112STORAGEB111GREEN ROOMB109SANCTUARYB102STAGEB108MECHANICA;B107CIRCULATIONB116COFFEEB101A4A4.112' - 6 1/2" 16' - 4"100' - 0"102' - 6"102' - 6"100' - 0"100' - 0"102' - 6"101' - 0"17' - 5 1/2"2' - 6"3' - 2"9"2' - 6"4' - 0"8' - 0"9"17' - 5 1/2"9"8' - 0"8' - 0"22' - 3 3/4"9' - 8 1/4"96' - 0"116' - 0"5' - 5 5/8"15' - 4 5/8"22' - 9 3/16"52' - 8 9/16"12' - 6 1/2"5' - 0"10' - 8"21' - 11 3/4"9' - 0 11/16"7' - 10 15/16"16' - 9 1/4"7' - 11"9' - 0 5/8"7' - 9 5/8"10' - 5 9/16"2' - 2 7/16"135°135°135°135°135°135°4 5 °45°SOUND CONTROLB104VIDEOB105CAMERAB105BCAMERAB105A2BA4.22222222222222222222222222222222222181015171816148101517181818181818181818181818161481818181818181818181818ADAADAADAADAADAADAADAADA984 SEAT8 WHEELCHAIR SPACES992 TOTALGENERAL NOTES :1. ALL EXPOSED OUTSIDE CMU/GCMU/GLCMU CORNERS TO BE "BULLNOSED".2. ALL INTERIOR CMU TO BE 8" WYTHE UNLESS OTHERWISE NOTED OR DIMENSIONED. EXTEND ALL MASONRY PARTITIONS TO UNDERSIDE OF DECK ABOVE (UON).3. RECESS CONCRETE FLOOR SLAB ON GRADE AS REQUIRED AT WOOD, TILE OR TERRAZZO LOCATIONS TO MATCH FLOOR GRID ELEVATIONS.4. REFER TO SHEET A8.1 FOR INTERIOR & EXTERIOR CJ AND EJT DETAILS.5. BUILDING GRIDS ARE 16' - 0" OC IN EACH DIRECTION.6. REFER TO DETAIL 1/A8.3 FOR TYPICAL TACKBOARD (TB), MARKERBOARD (MB), CHALKBOARD (CB) OR TACKSTRIP (TS) DETAILS.7. ALL STEEL STUD PARTITIONS TO BE TYPE 1 (UON). REFER TO DETAIL 1E/A5.5 PROVIDE HORIZ WOOD BLOCKING (ENTIRE LENGTH OF WALL) AT TB/MB/CB LOCATIONS.8. COORDINATE AND ALIGN CONCRETE SLAB CONTROL JOINTS WITH TERRAZZO OR TILE FLOOR JOINTS.9. REFER TO DETAIL x/Axx FOR FLOOR FINISH TRANSITION DETAILS.4AA4.25AA4.25BA4.24BA4.217' - 4"8' - 8"8' - 8"1' - 4" 14' - 8" 1' - 4"FOR LOCATION REFER TO CIVILARMSTRONG TORSETH SKOLD & RYDEEN, INCCONSULTANTSTHE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLANDRAWN BYCHECKED BYISSUED FORISSUE DATESHEET NAMEATS&R PROJECT NOSHEET NUMBER180378501 GOLDEN VALLEY ROADSUITE 300MINNEAPOLIS, MINNESOTA 55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC ARMSTRONG TORSETH SKOLD & RYDEEN, INC. 2016ADDITION TOSIGNATURE / SEAL11/20/18ARCHITECTUREENGINEERINGPLANNINGTECHNOLOGYINTERIOR DESIGNLANDSCAPE ARCHITECTUREA3.2UNIT B FLOOR PLANAND SCHEDULESCheckerAuthorCITY SUBMITTALFOR REFERENCEONLYNOT FORCONSTRUCTIONA3.21/8" = 1'-0"1100-0 First Floor Unit BNORTHA3.21/8" = 1'-0"294-8 Trash EnclosureNORTHFOR REFERENCEONLYNOT FORCONSTRUCTIONFOR REFERENCEONLYNOT FORCONSTRUCTIONFOR REFERENCEONLYNOT FORCONSTRUCTIONI hereby certify that this plan, specification, orreport was prepared by me or under my directsupervision and that I am a duly licensed Architect under the laws of the State of Minnesota.SignatureTyped or printed nameDateLicense Number1632811/20/18Paul W Erickson, AIA
98-0 First Floor -Existing
98' -0"
100-0 First Floor
100' -0"
126-6 T.O. Precast127' -4"121-2 T.O. Parapet121' -5"117-4 T.O. Parapet118' -0"21' - 5"PFN MTL CAP, TYP (BLACK)PRECAST CONCRETE WITH 1" REVEALS (BLACK WITH EXPOSED AGGREGATE)PROFILED RAINSCREEN METAL PANEL (WHITE)
THIN STONE VENEER (BLUE/BUFF) AL DOOR AND STOREFONT
PHENOLIC RESIN PANELS (PINE EFFECT FINISH)
STL CROSS ON CONC BASE
ILLUMINATED MTL LETTERING AND LOGO
CONC COL AND STL STRUCTURE
ADDITION PFN MTL LOUVER SCREENING TO RTU, TYPPFN MTL OVERFLOW SCUPPER, TYP
WOOD COMPOSITE SCREENING
TO TRANSFORMER
CAN LIGHTING
UNDER CANOPY
LINE OF ROOF BEHIND3' - 6 1/2"100-0 First Floor
100' -0"
126-6 T.O. Precast
127' -4"
121-2 T.O. Parapet
121' -5"
PFN MTL CAP, TYP (BLACK)
PRECAST CONCRETE WITH 1" REVEALS
(BLACK WITH EXPOSED AGGREGATE)
HM MTL DOOR AND FRAME, TYP (PT)THIN STONE VENEER (BLUE/BUFF) AL DOOR AND STOREFONT, TYP
PHENOLIC RESIN PANELS (PINE EFFECT FINISH)
ILLUMINATED MTL
LETTERING AND LOGO
PFN MTL LOUVER
SCREENING TO RTU, TYP
CAN LIGHTING UNDER CANOPY
LINE OF ROOF BEHIND
3' - 3 3/8"98-0 First Floor -Existing
98' -0"
100-0 First Floor
100' -0"
126-6 T.O. Precast
127' -4"
121-2 T.O. Parapet
121' -5"
PFN MTL CAP, TYP (BLACK)PRECAST CONCRETE WITH 1" REVEALS
(BLACK WITH EXPOSED AGGREGATE)
PROFILED RAINSCREEN METAL PANEL (WHITE)
THIN STONE VENEER (BLUE/BUFF)
AL DOOR AND STOREFONT
PHENOLIC RESIN PANELS
(PINE EFFECT FINISH)
STL CROSS ON CONC BASE
PHENOLIC RESIN PANELS
(PINE EFFECT FINISH)
AL WDW, TYP
EXIST CORRUGATED METAL PANEL, TYP
(PT CHARCOAL TO TIE IN TO PRECAST)
EXIST BURNISHED BLOCK, TYP
ADDITION
EXISTING2' - 0"20' - 7 3/16"5' - 4"6' - 0"
WOOD COMPOSITE SCREENING
TO TRANSFORMER
ILLUMINATED MTL LOGO
AND LETTERS, TYP
CAN LIGHTING UNDER CANOPY
LINE OF ROOF BEHIND
PFN MTL LOUVER
SCREENING TO RTU, TYP
2' - 6 1/4"100-0 First Floor
100' -0"
126-6 T.O. Precast
127' -4"
121-2 T.O. Parapet
121' -5"
117-4 T.O. Parapet
118' -0"
114-8 T.O. Parapet
114' -8"
PFN MTL CAP, TYP (BLACK)
PRECAST CONCRETE WITH 1" REVEALS
(BLACK WITH EXPOSED AGGREGATE)
PROFILED RAINSCREEN METAL PANEL (WHITE)
THIN STONE VENEER (BLUE/BUFF) AL DOOR AND STOREFONT
PHENOLIC RESIN PANELS
(PINE EFFECT FINISH)
PFN MTL LOUVER
SCREENING TO RTU, TYP
CAN LIGHTING UNDER CANOPY
LINE OF ROOF BEHIND
EXTERIOR ELEVATION NOTES :1. REFER TO FLOOR PLANS FOR DOOR AND WINDOW TYPES.2. REFER TO SHEET A7.1 FOR LADDER SCHEDULE3. BRICK LEDGE ELEVATION TO BE 99'-4", UNLESS OTHERWISE NOTED.4. VERIFY EXTERIOR LOUVER SIZES AND HEIGHTS WITH MECHANICAL. 5. PROVIDE SPLASHBLOCK BELOW ALL SCUPPERS AT GRADE OR ROOF.ARMSTRONG TORSETH SKOLD & RYDEEN, INCCONSULTANTS
THE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLAN
DRAWN BY
CHECKED BY
ISSUED FOR
ISSUE DATE
SHEET NAME
ATS&R PROJECT NO
SHEET NUMBER
18037
8501 GOLDEN VALLEY ROADSUITE 300MINNEAPOLIS, MINNESOTA 55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC ARMSTRONG TORSETH SKOLD & RYDEEN, INC. 2016
ADDITION TOSIGNATURE / SEAL
11/20/18
ARCHITECTURE ENGINEERINGPLANNINGTECHNOLOGYINTERIOR DESIGN LANDSCAPE ARCHITECTURE
A4.1
EXTERIOR
ELEVATIONS
PWE
PWL
CITY SUBMITTAL
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
A4.1 1/8" = 1'-0"
1 NORTH ELEVATION
A4.1 1/8" = 1'-0"
2 EAST ELEVATION
A4.1 1/8" = 1'-0"
3 NORTHEAST ELEVATION
A4.1 1/8" = 1'-0"
4 NORTHWEST MAIN ENTRY
AL WDW, TYP
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
I hereby certify that this plan, specification, or
report was prepared by me or under my direct
supervision and that I am a duly licensed
Architect under the laws of the State of
Minnesota.
Signature
Typed or printed name
Date
License Number
16328
11/20/18
Paul W Erickson, AIA
A 12/04/18
REV
98-0 First Floor -Existing
98' -0"
100-0 First Floor
100' -0"
102-6 Stage102' -6"126-6 T.O. Precast127' -4"117-4 T.O. Parapet118' -0"114-8 T.O. Parapet114' -8"
ADDITION
EXIST CORRUGATED METAL PANEL (PT WHITE TO MATCH ADDITION)
EXIST BURNISHED BLOCK
PFN MTL CAP, TYP (BLACK)PRECAST CONCRETE WITH 1" REVEALS (BLACK WITH EXPOSED AGGREGATE, SEALANT APPLIED TO SOME SQUARES TO PROVIDE VARIATION IN SHEEN)PROFILED RAINSCREEN METAL PANEL (WHITE)
HM MTL DOOR AND FRAME, TYP (PT)
THIN STONE VENEER (BLUE/BUFF)
AL DOOR AND STOREFONT
PHENOLIC RESIN PANELS (PINE EFFECT FINISH)PFN MTL LOUVER SCREENING TO RTU, TYP PFN MTL OVERFLOW SCUPPER, TYP
CAN LIGHTING UNDER CANOPY
LINE OF ROOF BEHINDEXIST CORRUGATED METAL PANEL (PT CHARCOAL TO TIE IN WITH PRECAST)
100-0 First Floor
100' -0"
114-8 T.O. Parapet
114' -8"
AL DOOR AND STOREFONT
PHENOLIC RESIN PANELS (PINE EFFECT FINISH)
CONC COL AND STL STRUCTURE
CAN LIGHTING
UNDER CANOPY
100-0 First Floor
100' -0"
114-8 T.O. Parapet
114' -8"
AL STOREFONT
PHENOLIC RESIN PANELS (PINE EFFECT FINISH)
CONC COL AND STL STRUCTURE
CAN LIGHTING UNDER CANOPY
98-0 First Floor -Existing
98' -0"
100-0 First Floor
100' -0"
102-6 Stage
102' -6"
126-6 T.O. Precast
127' -4"
117-4 T.O. Parapet
118' -0"
114-8 T.O. Parapet
114' -8"
ADDITION PFN MTL CAP, TYP (BLACK)
PRECAST CONCRETE WITH 1" REVEALS (BLACK WITH
EXPOSED AGGREGATE SEALANT APPLIED TO SOME
SQUARES TO PROVIDE VARIATION IN SHEEN)
PROFILED RAINSCREEN METAL PANEL (WHITE)
HM MTL DOOR AND FRAME, TYP (PT)THIN STONE VENEER (BLUE/BUFF) AL DOOR AND STOREFONT
PHENOLIC RESIN PANELS
(PINE EFFECT FINISH)EXIST CORRUGATED METAL PANEL
BURNISHED BLOCK
PFN MTL LOUVER
SCREENING TO RTU, TYP
CAN LIGHTING UNDER
CANOPY
LINE OF ROOF BEHIND
EXTERIOR ELEVATION NOTES :
1. REFER TO FLOOR PLANS FOR DOOR AND WINDOW TYPES.
2. REFER TO SHEET A7.1 FOR LADDER SCHEDULE
3. BRICK LEDGE ELEVATION TO BE 99'-4", UNLESS OTHERWISE NOTED.
4. VERIFY EXTERIOR LOUVER SIZES AND HEIGHTS WITH MECHANICAL.
5. PROVIDE SPLASHBLOCK BELOW ALL SCUPPERS AT GRADE OR ROOF.
91-8 Grade at Enclosure
91' -8"5' - 4"WOOD COMPOSITE GATE
PRFN MTL CAP
BURNISHED BLOCK
TO MATCH EXIST
Level 20
97' -0"
91-8 Grade at Enclosure
91' -8"5' - 4"PRFN MTL CAP
BURNISHED BLOCK
TO MATCH EXIST
Level 20
97' -0"
91-8 Grade at Enclosure
91' -8"5' - 4"PRFN MTL CAP
BURNISHED BLOCK
TO MATCH EXIST
Level 20
97' -0"
91-8 Grade at Enclosure
91' -8"5' - 4"PRFN MTL CAP
BURNISHED BLOCK
TO MATCH EXIST
Level 20
97' -0"
102-6 Stage
102' -6"
126-6 T.O. Precast
127' -4"
117-4 T.O. Parapet
118' -0"
114-8 T.O. Parapet
114' -8"
PFN MTL CAP, TYP (BLACK)PRECAST CONCRETE WITH 1" REVEALS
(BLACK WITH EXPOSED AGGREGATE
SEALANT APPLIED TO SOME SQUARES
TO PROVIDE VARIATION IN SHEEN)PFN MTL LOUVER
SCREENING TO RTU, TYP
HM MTL DOOR AND FRAME, TYP (PT)
LINE OF ROOF BEHIND
100-0 First Floor
100' -0"
114-8 T.O. Parapet
114' -8"
CAN LIGHTING UNDER CANOPY
100-0 First Floor
100' -0"
126-6 T.O. Precast
127' -4"
121-2 T.O. Parapet
121' -5"
117-4 T.O. Parapet
118' -0"
114-8 T.O. Parapet
114' -8"
PFN MTL CAP, TYP (BLACK)
PRECAST CONCRETE WITH 1" REVEALS (BLACK WITH
EXPOSED AGGREGATE SEALANT APPLIED TO SOME
SQUARES TO PROVIDE VARIATION IN SHEEN)
PROFILED RAINSCREEN METAL PANEL (WHITE)AL DOOR AND STOREFONT
PHENOLIC RESIN PANELS (PINE EFFECT FINISH)PFN MTL LOUVER
SCREENING TO RTU, TYP
CAN LIGHTING UNDER CANOPY
ARMSTRONG TORSETH SKOLD & RYDEEN, INCCONSULTANTS
THE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLAN
DRAWN BY
CHECKED BY
ISSUED FOR
ISSUE DATE
SHEET NAME
ATS&R PROJECT NO
SHEET NUMBER
18037
8501 GOLDEN VALLEY ROADSUITE 300MINNEAPOLIS, MINNESOTA 55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC ARMSTRONG TORSETH SKOLD & RYDEEN, INC. 2016
ADDITION TOSIGNATURE / SEAL
11/20/18
ARCHITECTURE ENGINEERINGPLANNINGTECHNOLOGYINTERIOR DESIGN LANDSCAPE ARCHITECTURE
A4.2
EXTERIOR
ELEVATIONS
PWE
PWL
CITY SUBMITTAL
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
A4.2 1/8" = 1'-0"
1 SOUTH ELEVATION
A4.2 1/8" = 1'-0"
2 SOUTHEAST BACK ENTRY
A4.2 1/8" = 1'-0"
2A SOUTHWEST BACK ENTRY
A4.2 1/8" = 1'-0"
3 SOUTHWEST ELEVATION
A4.2 1/8" = 1'-0"
4A ENCLOSURE - NORTH
A4.2 1/8" = 1'-0"
4B ENCLOSURE - EAST
A4.2 1/8" = 1'-0"
5A ENCLOSURE - SOUTH
A4.2 1/8" = 1'-0"
5B ENCLOSURE - WEST
A4.2 1/8" = 1'-0"
2B WEST ELEVATION AT ROOF
A4.2 1/8" = 1'-0"
5 NORTHEAST ELEVATION AT ROOF
A4.2 1/8" = 1'-0"
4 NORTHWEST ELEVATION AT ROOF
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
I hereby certify that this plan, specification, or
report was prepared by me or under my direct
supervision and that I am a duly licensed
Architect under the laws of the State of
Minnesota.
Signature
Typed or printed name
Date
License Number
16328
11/20/18
Paul W Erickson, AIA
A 12/04/18
REV
ARMSTRONG TORSETH SKOLD & RYDEEN, INCCONSULTANTS
THE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLAN
DRAWN BY
CHECKED BY
ISSUED FOR
ISSUE DATE
SHEET NAME
ATS&R PROJECT NO
SHEET NUMBER
18037
8501 GOLDEN VALLEY ROADSUITE 300MINNEAPOLIS, MINNESOTA 55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC ARMSTRONG TORSETH SKOLD & RYDEEN, INC. 2016
ADDITION TOSIGNATURE / SEAL
11/20/18
ARCHITECTURE ENGINEERINGPLANNINGTECHNOLOGYINTERIOR DESIGN LANDSCAPE ARCHITECTURE
A4.3
SIGHT LINE STUDIES
AND EXTERIOR
RENDERINGS
Checker
Author
CITY SUBMITTAL
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
SITE LINE STUDY: NORTHEAST CORNER OF SITE SITE LINE STUDY: SOUTHWEST CORNER OF SITE
MAIN ENTRANCE
REAR ENTRANCE
MAIN ENTRACE
I hereby certify that this plan, specification, or
report was prepared by me or under my direct
supervision and that I am a duly licensed
Architect under the laws of the State of
Minnesota.
Signature
Typed or printed name
Date
License Number
16328
11/20/18
Paul W Erickson, AIA
2BA4.24
A4.2
5
A4.2
OSOS
OS
OS
RTU
RTU
RTU
RTU
RTU RTU
RTU
1
2
+5+5
+5 +5
+13.25+11
+11.5
+5
+5
+5
+5
+11.25
+12
+12
+7
+12
+7
+18
+18
+13.9
+5
+5
+5
+5 +5+5+5+5 +8.9+8.9
+11
+11
+11
+7.5
+7.5
+8
+8
+9
+7
+7 +7
+6
+6
+6
+6
+12.5 +11
+11
1
1
1. TYPICAL ROOFING TO BE FULLY ADHERED EPDM ROOFING OVER 6" ROOF INSULATION AND STEEL DECK. REFER TO ROOF PLAN FOR LOCATION OF TAPERED INSULATION (WHERE OCCURS).2. REFER TO DETAIL ______ FOR TYPICAL ROOF COPING JOINT COVER.3. REFER TO DETAIL _____ FOR TYPICAL PIPE PENETRATION DETAIL.4. REFER TO _____ FOR TYPICAL MECHANICAL ROOF CURB DETAILS. 5. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR LOCATIONS OF PIPE PENETRATIONS AND ROOF CURBS.TAPERED ROOF INS 1/4" PER FOOTSLOPED STRUCTURE OVERFLOW SCUPPER REFER TO DETAILOSTAPERED ROOF INS 1/2" PER FOOT ROOF DRAIN -REFER TO DETAILRD
DRAINAGE SCUPPER
REFER TO DETAIL
SC
ROOF PLAN NOTESSYMBOL KEY+6"NUMBER INDICATES TOTAL THICKNESS OF INSULATION ABOVE STEEL DECK
INDICATES ROOF LADDER -
REFER TO LADDER
SCHEDULE & ROOF PLAN
L1
RDOD ROOF DRAIN AND OVERFLOW ROOF DRAIN
1 INTEGRAL PFN MTL LOUVER SCREENING TO RTU, TYP
2 DAYLIGHTING TUBE, TYP
ROOF PLAN KEY NOTES
ARMSTRONG TORSETH SKOLD & RYDEEN, INCCONSULTANTS
THE HOUSE CHURCH2024 Rahn WayEagan, MN 55122KEYPLAN
DRAWN BY
CHECKED BY
ISSUED FOR
ISSUE DATE
SHEET NAME
ATS&R PROJECT NO
SHEET NUMBER
18037
8501 GOLDEN VALLEY ROADSUITE 300MINNEAPOLIS, MINNESOTA 55427TEL: 763 . 545 . 3731FAX: 763 . 525 . 3289WEB: www.atsr.comC ARMSTRONG TORSETH SKOLD & RYDEEN, INC. 2016
ADDITION TOSIGNATURE / SEAL
11/20/18
ARCHITECTURE ENGINEERINGPLANNINGTECHNOLOGYINTERIOR DESIGN LANDSCAPE ARCHITECTURE
A7.1
ROOF PLAN AND
DETAILS
Checker
Author
CITY SUBMITTAL
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
NOT FOR
CONSTRUCTION
A7.1 1/16" = 1'-0"
1 Roof Plan
I hereby certify that this plan, specification, or
report was prepared by me or under my direct
supervision and that I am a duly licensed
Architect under the laws of the State of
Minnesota.
Signature
Typed or printed name
Date
License Number
16328
11/20/18
Paul W Erickson, AIA
A 12/04/18
REV
'DWH &RPPHQWV&KHFNHG%\6FDOH5HYLVLRQV3DJH0RI'DWH+RXVH&KXUFK([WHULRU'UDZQ%\'DQ%XGNH6\PERO4W\/DEHO$UUDQJHPHQW//)'HVFULSWLRQ/XP/XPHQV/XPLQDLUH6FKHGXOH&DOFXODWLRQ6XPPDU\/DEHO&DOF7\SH8QLWV$YJ0D[0LQ$$6,1*/(359$'8197%=%%6,1*/(359$'8197%=:36,1*/(;725%%%([LVWLQJ3ROH6,1*/(359$'8197%=$$([LVWLQJ3ROH6,1*/(359$'8197%=$YJ0LQ0D[0LQ*URXQGB3ODQDU,OOXPLQDQF)F1$1$AAAAAAWPWPWPWPWPAABBAA-Existing PoleAA-Existing PoleAA-Existing PoleAA-Existing PoleBB-Existing Pole0.0 0.0 0.00.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.10.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.20.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.2 0.2 0.20.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.3 0.3 0.30.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.4 0.5 0.5 0.6 0.6 0.6 0.5 0.4 0.4 0.30.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.5 0.6 0.7 0.7 0.7 0.7 0.6 0.5 0.5 0.4 0.30.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 0.9 0.9 0.7 0.6 0.6 0.5 0.4 0.30.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.1 1.1 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.20.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.6 0.7 0.8 0.9 1.0 1.1 1.1 1.0 1.0 0.9 0.7 0.6 0.5 0.3 0.2 0.10.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.6 0.8 0.9 1.0 1.1 1.1 1.1 1.1 1.0 1.0 0.8 0.7 0.5 0.3 0.2 0.2 0.10.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.5 0.6 0.8 1.0 1.0 1.1 1.1 1.0 1.1 1.0 1.0 0.8 0.7 0.5 0.3 0.2 0.2 0.1 0.10.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.5 0.6 0.8 0.9 1.0 1.1 1.1 1.1 1.1 1.0 0.9 0.8 0.6 0.5 0.3 0.2 0.2 0.1 0.1 0.10.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.1 1.0 0.9 0.8 0.7 0.6 0.5 0.3 0.2 0.2 0.1 0.1 0.1 0.00.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.4 0.5 0.6 0.6 0.7 0.8 0.9 1.0 1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.00.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.5 0.5 0.6 0.6 0.7 0.8 0.8 0.9 0.8 0.7 0.6 0.6 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.5 0.6 0.6 0.6 0.6 0.7 0.7 0.7 0.7 0.6 0.5 0.5 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.5 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.6 0.5 0.5 0.5 0.4 0.4 0.4 0.3 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.4 0.5 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.6 0.6 0.7 0.7 0.8 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.6 0.5 0.5 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.4 0.3 0.3 0.3 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.6 0.7 0.7 0.8 0.8 0.9 1.0 1.0 1.1 1.0 0.9 0.9 0.8 0.8 0.7 0.6 0.5 0.4 0.4 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.3 0.3 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.00.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.6 0.7 0.8 0.9 1.0 1.0 1.2 1.3 1.3 1.3 1.3 1.2 1.0 1.0 0.9 0.9 0.8 0.6 0.5 0.4 0.4 0.3 0.3 0.4 0.4 0.4 0.5 0.5 0.4 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.8 1.0 1.1 1.2 1.3 1.4 1.5 1.5 1.6 1.5 1.4 1.3 1.2 1.2 1.0 0.9 0.7 0.6 0.5 0.4 0.4 0.4 0.4 0.5 0.5 0.6 0.6 0.5 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.6 0.7 0.9 1.1 1.3 1.3 1.4 1.5 1.6 1.7 1.7 1.6 1.5 1.4 1.4 1.3 1.1 0.9 0.8 0.7 0.5 0.5 0.5 0.5 0.6 0.6 0.7 0.7 0.6 0.6 0.6 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.4 0.5 0.6 0.7 0.9 1.1 1.3 1.4 1.5 1.6 1.6 1.7 1.7 1.7 1.6 1.5 1.4 1.3 1.2 1.0 0.8 0.7 0.6 0.6 0.6 0.6 0.7 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.6 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.4 0.5 0.6 0.7 0.9 1.1 1.3 1.4 1.4 1.6 1.7 1.7 1.7 1.7 1.6 1.4 1.4 1.3 1.2 1.0 0.8 0.8 0.7 0.7 0.7 0.8 0.8 0.9 1.0 1.0 0.9 0.9 0.9 0.8 0.7 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.00.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.4 0.4 0.5 0.6 0.8 0.9 1.1 1.3 1.4 1.5 1.6 1.7 1.7 1.7 1.7 1.6 1.5 1.4 1.3 1.2 1.0 0.9 0.8 0.7 0.7 0.7 0.8 0.9 1.0 1.1 1.1 1.1 1.1 1.1 0.9 0.7 0.6 0.5 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.00.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.5 0.6 0.8 0.9 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.7 1.7 1.5 1.4 1.3 1.3 1.2 1.0 0.9 0.8 0.7 0.7 0.8 0.8 0.9 1.1 1.1 1.1 1.1 1.1 1.1 1.0 0.8 0.6 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.00.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.6 0.7 0.8 1.0 1.1 1.1 1.2 1.3 1.5 1.5 1.5 1.5 1.4 1.3 1.2 1.2 1.1 0.9 0.8 0.7 0.7 0.7 0.7 0.8 0.9 1.0 1.1 1.1 1.1 1.1 1.1 0.9 0.8 0.6 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.00.1 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.6 0.7 0.8 0.9 0.9 1.0 1.1 1.2 1.3 1.3 1.2 1.2 1.1 1.1 1.0 0.9 0.8 0.7 0.6 0.6 0.6 0.7 0.7 0.9 1.1 1.1 1.1 1.1 1.1 1.0 0.9 0.8 0.6 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.1 0.1 0.2 0.2 0.3 0.3 0.4 0.5 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0.5 0.6 0.7 0.7 0.8 0.8 0.9 0.9 1.0 1.0 0.8 0.6 0.6 0.6 0.6 0.5 0.4 0.4 0.3 0.5 0.5 0.6 0.7 0.9 1.0 1.1 1.1 1.1 1.1 1.0 0.9 0.8 0.6 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.1 0.2 0.2 0.3 0.4 0.5 0.5 0.6 0.6 0.6 0.6 0.5 0.5 0.4 0.4 0.4 0.5 0.5 0.6 0.6 0.7 0.7 0.7 0.7 0.40.2 0.4 0.5 0.7 0.8 1.0 1.1 1.0 1.0 1.0 1.0 0.9 0.7 0.6 0.5 0.3 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.2 0.2 0.3 0.4 0.5 0.6 0.7 0.7 0.7 0.7 0.7 0.6 0.6 0.5 0.4 0.4 0.4 0.5 0.5 0.6 0.6 0.6 0.5 0.30.2 0.3 0.4 0.6 0.7 0.8 0.9 0.9 0.9 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.2 0.3 0.4 0.5 0.6 0.8 0.8 0.8 0.8 0.9 0.9 0.8 0.7 0.6 0.5 0.4 0.4 0.4 0.5 0.7 0.7 0.5 0.30.1 0.7 0.7 0.7 0.7 0.6 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.2 0.3 0.5 0.6 0.8 0.9 1.0 1.0 1.0 1.0 1.0 0.9 0.8 0.6 0.5 0.4 0.4 0.5 0.9 2.9 2.8 0.40.0 0.4 0.4 0.4 0.4 0.3 0.3 0.2 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.3 0.4 0.5 0.6 0.8 1.0 1.1 1.1 1.1 1.1 1.1 1.0 0.8 0.7 0.6 0.5 0.5 0.9 2.7 11.0 9.70.1 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.3 0.4 0.5 0.7 0.8 1.0 1.1 1.1 1.1 1.2 1.1 1.0 0.8 0.7 0.6 0.5 0.7 3.0 10.7 5.20.1 0.1 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.3 0.5 0.6 0.7 0.8 1.0 1.1 1.2 1.1 1.2 1.2 1.1 0.9 0.7 0.6 0.5 0.6 2.9 9.80.1 0.1 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.3 0.4 0.5 0.7 0.8 1.0 1.1 1.2 1.2 1.2 1.3 1.2 1.0 0.8 0.7 0.5 0.4 0.5 0.20.1 0.2 0.2 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.3 0.4 0.5 0.6 0.8 1.0 1.1 1.1 1.2 1.2 1.3 1.2 1.1 1.0 0.9 0.7 0.4 0.3 0.2 0.20.2 0.2 0.2 0.2 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.2 0.3 0.4 0.6 0.7 0.9 1.0 1.0 1.1 1.1 1.2 1.2 1.2 1.1 1.1 1.0 0.8 0.4 0.3 0.2 0.20.2 0.3 0.3 0.3 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.2 0.2 0.3 0.5 0.6 0.7 0.8 0.8 0.9 1.0 1.0 1.1 1.2 1.2 1.3 1.4 1.5 1.1 0.5 0.4 0.3 0.20.3 0.4 0.4 0.5 0.4 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.1 0.2 0.2 0.3 0.4 0.6 0.6 0.7 0.7 0.8 0.9 1.0 1.1 1.3 1.5 1.8 2.2 2.2 1.3 0.7 0.5 0.2 0.20.3 0.4 0.6 0.7 0.7 0.5 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.1 0.1 0.2 0.3 0.3 0.4 0.5 0.6 0.6 0.7 0.7 0.8 0.9 1.1 1.4 1.9 2.6 3.0 2.3 1.5 0.5 0.5 0.4 0.30.3 0.5 0.8 0.9 0.9 0.8 0.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.1 0.1 0.1 0.2 0.2 0.3 0.4 0.4 0.5 0.5 0.5 0.6 0.7 0.9 1.2 1.7 2.2 2.5 2.4 1.8 1.4 0.8 0.5 0.4 0.30.4 0.6 0.9 1.2 1.3 1.1 0.7 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.1 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.4 0.6 0.8 1.1 1.6 2.1 2.3 2.3 2.4 2.3 1.4 0.6 0.4 0.4 0.40.5 0.7 1.1 1.4 1.8 1.7 1.0 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.4 0.6 0.9 1.3 1.8 2.3 2.3 2.5 3.0 2.4 1.3 0.6 0.5 0.6 2.9 14.5 7.1 3.9 8.4 2.8 0.40.6 1.0 1.3 1.7 2.3 2.4 1.3 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.4 0.6 1.0 1.4 1.8 2.2 2.3 2.7 2.5 1.8 1.1 0.7 0.7 1.1 2.0 1.6 1.2 1.3 0.9 0.5 0.2 0.10.7 1.1 1.6 2.1 2.5 2.8 1.5 0.5 0.2 0.1 0.1 0.0 0.0 0.0 0.00.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.3 0.5 0.7 1.0 1.3 1.7 1.9 2.1 2.1 1.8 1.5 1.1 0.9 0.8 0.9 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.3 0.3 0.3 0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.4 0.5 0.8 1.2 1.8 2.2 2.3 2.4 1.6 0.7 0.3 0.1 0.1 0.0 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.5 0.7 1.0 1.2 1.4 1.6 1.8 1.7 1.5 1.3 1.1 1.0 1.0 1.0 0.9 0.9 0.8 0.6 0.5 0.5 0.4 0.4 0.5 0.5 0.6 0.6 0.7 0.7 0.7 0.6 0.6 0.6 0.6 0.8 1.3 1.9 2.3 2.3 2.2 1.2 0.4 0.1 0.0 0.0 0.0 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.9 1.1 1.4 1.6 1.6 1.6 1.5 1.3 1.2 1.2 1.2 1.1 1.0 0.9 0.8 0.7 0.6 0.6 0.6 0.6 0.7 0.8 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.7 0.9 1.3 1.9 2.3 2.3 2.4 1.7 0.7 0.3 0.1 0.1 0.00.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.9 1.1 1.4 1.5 1.6 1.5 1.4 1.4 1.3 1.4 1.3 1.1 1.1 1.0 0.9 0.8 0.7 0.7 0.8 0.8 0.9 1.0 0.9 0.9 0.9 0.9 0.9 0.8 0.8 0.9 1.3 1.7 2.2 2.6 2.8 1.5 0.6 0.3 0.1 0.10.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.6 0.8 1.0 1.2 1.3 1.4 1.5 1.5 1.4 1.4 1.4 1.4 1.3 1.2 1.1 1.1 1.0 0.9 0.9 0.9 1.0 1.1 1.1 1.1 1.1 1.1 1.1 1.0 0.9 0.9 1.0 1.2 1.5 1.9 2.5 2.6 1.4 0.4 0.2 0.10.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.8 1.0 1.2 1.4 1.5 1.5 1.4 1.5 1.6 1.5 1.4 1.3 1.3 1.2 1.2 1.1 1.0 1.0 1.1 1.2 1.2 1.2 1.2 1.2 1.2 1.1 0.9 0.9 1.0 1.1 1.3 1.6 2.0 1.9 1.2 0.3 0.10.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.9 1.1 1.3 1.5 1.5 1.6 1.6 1.7 1.7 1.6 1.5 1.4 1.3 1.3 1.3 1.2 1.1 1.1 1.2 1.2 1.2 1.1 1.2 1.1 1.0 0.9 0.9 0.9 1.0 1.2 1.4 1.5 1.3 0.8 0.20.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.6 0.8 1.0 1.2 1.4 1.5 1.6 1.7 1.8 1.8 1.7 1.6 1.5 1.5 1.4 1.4 1.3 1.2 1.2 1.3 1.3 1.2 1.2 1.2 1.1 1.0 0.9 0.8 0.9 1.0 1.1 1.2 1.1 0.9 0.60.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.9 1.1 1.3 1.4 1.5 1.6 1.8 1.8 1.8 1.7 1.5 1.5 1.4 1.4 1.3 1.2 1.2 1.3 1.3 1.3 1.2 1.2 1.1 1.0 0.9 0.8 0.8 0.9 0.9 0.9 0.8 0.70.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.6 0.8 1.0 1.1 1.2 1.3 1.4 1.6 1.7 1.7 1.6 1.5 1.4 1.4 1.3 1.2 1.2 1.3 1.3 1.3 1.2 1.2 1.1 1.1 1.0 0.9 0.8 0.7 0.7 0.7 0.7 0.60.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.5 0.6 0.8 1.0 1.1 1.2 1.3 1.4 1.5 1.5 1.4 1.3 1.4 1.3 1.2 1.1 1.1 1.2 1.2 1.1 1.1 1.0 1.0 1.0 0.9 0.8 0.7 0.6 0.6 0.5 0.50.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.6 0.8 1.0 1.1 1.2 1.3 1.4 1.4 1.4 1.3 1.3 1.3 1.1 1.0 1.0 1.0 1.0 0.9 0.9 0.8 0.8 0.8 0.7 0.6 0.6 0.5 0.4 0.40.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.8 0.9 1.1 1.2 1.3 1.3 1.3 1.2 1.3 1.2 1.1 0.9 0.9 0.8 0.8 0.8 0.7 0.7 0.7 0.6 0.6 0.5 0.4 0.4 0.40.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.6 0.8 0.9 1.1 1.1 1.2 1.1 1.1 1.1 1.1 0.9 0.8 0.7 0.7 0.6 0.6 0.6 0.6 0.5 0.5 0.4 0.4 0.3 0.30.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.6 0.7 0.9 0.9 1.0 0.9 0.9 0.9 0.9 0.8 0.7 0.6 0.5 0.5 0.4 0.5 0.5 0.4 0.4 0.3 0.3 0.30.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.6 0.7 0.7 0.8 0.7 0.7 0.7 0.7 0.6 0.5 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.20.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.5 0.6 0.6 0.6 0.6 0.6 0.5 0.5 0.4 0.3 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.20.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.4 0.5 0.5 0.5 0.5 0.4 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.20.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.4 0.4 0.4 0.3 0.3 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.10.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.10.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.10.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.00.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.00.0 0.0 0.00.00.25 fc1 fc0.5 fc
'DWH &RPPHQWV&KHFNHG%\6FDOH5HYLVLRQV3DJH0RI'DWH+RXVH&KXUFK([WHULRU'UDZQ%\'DQ%XGNH%%6,1*/(359$'8197%=/XPLQDLUH6FKHGXOH6\PERO4W\/DEHO$UUDQJHPHQW//)'HVFULSWLRQ/XP/XPHQV&DOFXODWLRQ6XPPDU\/DEHO&DOF7\SH8QLWV$YJ0D[0LQ$YJ0LQ0D[0LQ*URXQGB3ODQDU$$6,1*/(359$'8197%=:36,1*/(;725%%%([LVWLQJ3ROH6,1*/(359$'8197%=$$([LVWLQJ3ROH6,1*/(359$'8197%=,OOXPLQDQF)F1$1$
PROJECT NARRATIVE
The House Church Addition
2024 Rahn Way
Eagan MN 55122
PROJECT TEAM
Applicant: Architect:
The House Church ATS&R Planners/Architects/Engineers
2024 Rahn Way 8501 Golden Valley Road, Ste 300
Eagan, MN 55122 Minneapolis, MN 55427
Contact: Jamey VanGelder Contact: Peter Lacey
Phone: 651-454-6892 Phone: 763-545-3731
Email: jamey.vangelder@ithehouse.org Email: placey@atsr.com
Civil Engineer: Construction Manager:
Schultz Engineering & Site Design Cornerstone Construction Management
16 South Riverside Avenue, Ste 230 1186 N Concord St
Sartell, MN 56377 S. St. Paul, MN 55075
Contact: Brian Schultz Contact: Jenny Hassenfritz
Phone: 320-399-0669 Phone: 952-457-0070
Email: schultzeng@live.com Email: jenny.hassenfritz@ithehouse.org
Landscape Architect: Photo-metrics:
Arteka Landscape Design Electric Production Services & Rouzer
593 Citation Drive 2431 Galpin Court, Ste 140
Shakopee, MN 55379 Chanhassen, MN 55317
Contact: Valerie J. Rivers Contact: Jason Sherman & Matt Welch
Phone: 952-445-0532 Phone: 612-756-1293
Email: valrivers@artekaoutdoorservices.com Email: jason.sherman@electricalproduction.com
PROPOSAL SUMMARY
Objective, Timing and Phasing
The House Church acquired the property and existing church building in 2015 and has since
increased regular attendance to near capacity of the existing sanctuary. The previous property
owners sub-divided the lot to allow for a second building on the property. The proposal
objective is to combine the subdivided property to allow for building a new sanctuary,
gathering space, parking lot and remodel the existing building to better meet the growing
congregational needs.
The project is to start May 2019 and run through January 2020.
Project will consist of two phases. Phase 1 to build a new sanctuary including parking lot
addition. Phase 2 is to remodel the existing sanctuary and offices.
Existing and Surrounding Land Uses
The surrounding land to the east is commercial property, to the south residential property, to
the west the MnDot public facility and north is our existing church building, parking lot and
Rahn Way.
Impact on Subject Property
Proposed parking space sizes are consistent with existing spaces onsite.
Impact on City Services
Sanitary Sewer: This project will include an additional sanitary sewer service, which will serve
the proposed building addition. The service will consist of 6” PVC, and will connect to an
existing sanitary manhole located in the existing parking lot to the north of the existing main
entrance.
Water: New water service for fire suppression will be routed to a proposed riser room in the SE
corner of the proposed building addition. A new hydrant will also be included in the design and
be located in a landscaped island in the new rear parking lot to the southwest of the proposed
southwest building addition corner. New water service and hydrant piping will be 6” DIP.
Storm Water: New HDPE storm sewer will be included in the proposed parking lot to route
drainage to one of two proposed infiltration basins located in the northwest and southern
portions of the property. Soil borings completed, by Chosen Valley Testing (CVT), at the site
indicate that the majority of the underlying soils are dense silty sands and silts, which are not
ideal for infiltration and require shallower infiltration zones spread over greater area. The
proposed infiltration basins have been sized such that they cover sufficient area to infiltrate the
City-required volume produced by 1.1-inches of runoff proposed new and redeveloped
impervious surfacing. Collectively, the proposed infiltration basins have been designed such
that proposed runoff rates from the site do not exceed existing runoff rates.
Proposed Results
The proposal to unify the property will allow for construction of the proposed addition to the
existing facility to all for full utilization the of the property.
PROPOSAL OBJECTIVE
Public Benefit
The prior plan amendment does not fit the needs of The House Church. Amending the existing
plan will allow the church to be able to build out the property to its full capacity and grow to its
full potential.
The House Church had humble beginnings gathering in someone’s house twelve years ago.
Nearly five years ago the church had grown enough to purchase the land that had been home
to other churches. Today the House Church is thriving and growing. Due to this growth they are
quickly outgrowing the existing building.
This building was originally designed to have a large sanctuary built as an addition. The House
Church is ready to make this addition a reality. The addition will allow for space to
accommodate attendance for weekend services, host meetings and conferences, and increase
classroom space for adult and children programming. The House Church has a school of
ministry where they train and equip leaders who are truly invested in seeing the community,
state, nation and world grow in love and mercy.
This new facility will allow The House Church to grow, lead and love the community to the
fullest.
Pam Dudziak
From:
Sent:
To:
Cc:
Subject:
From: Mike Engen
Mike Ridley
Tuesday, December 11, 2018 2:43 PM
Pam Dudziak
Julie Strid
FW: Planned Developmend 31-PA-03-05-18
Sent: Monday, December 10, 2018 6:46 PM
To:APC
Subject: Re: Planned Developmend 31-PA-03-05-18
Additional concerns
1.Increased foot traffic through private property: already had to install a fence, which only
diverted traffic to adjacent yard.
2.Drainage: previous residence had issues with drainage and being a mostly level area, there
needs to be significant thought put into how this will impact water runoff.
3.Noise: current space absorbs much of the noise from air traffic, removing it and expanding
the building will greatly increase the noise pollution.
On Mon, Dec 10, 2018 at 5:58 PM Mike Engen <mike.engen@gmail.com> wrote:
To whom it may concern,
I purchased my current house in large parts because of the green space the church behind my
house maintained. I am deeply concerned that the development of a parking lot over the green
space will greatly reduce the value of my home. I do not believe there is enough of an existing buffer
between the residential area and the House Church if a parking lot is put in place, as my two main
bedrooms have windows facing the parking lot.
I have lived here for 5 years, and if my view is going to change from the green space to a parking lot
I will feel like I'm am being forced to move from my existing house. With the planned development
I'm afraid I will not have enough equity to maintain the same value/quality when I feel the need to
relocate my family.
With great concern,
Michael Engen
2031 Pin Oak Dr
1