01/15/2019 - City Council Regular
AGENDA
EAGAN CITY COUNCIL
EAGAN MUNICIPAL CENTER BUILDING
JANUARY 15, 2019
6:30 P.M.
I. ROLL CALL AND PLEDGE OF ALLEGIANCE
II. ADOPT AGENDA
III. RECOGNITIONS AND PRESENTATIONS
IV. CONSENT AGENDA (Consent items are acted on with one motion unless a request is made for
an item to be pulled for discussion)
A. APPROVE MINUTES
B. PERSONNEL ITEMS
C. APPROVE Check Registers
D. APPROVE Contracts
E. APPROVE Resolution to accept donations from T & K Restaurant Franchise Group, Inc., Target
Corporation, Walmart Community Grants and Eagan Fun Fest Committee
F. APPROVE Temporary On-Sale Liquor Licenses and waive the license fees for Art Works Eagan on
Feb. 8, 2019; March 16, 2019; April 20, 2019; and June 2, 2019 at 3795 Pilot Knob Road
G. APPROVE Final Payment, Contract 18-08, Pond Improvement Projects
H. APPROVE Plans and Specifications for Contract 19-05, Project 1323 - Pond DP-3 Improvements,
and Authorize Advertisement for a Bid Opening
I. RECEIVE Draft Feasibility Report for Street & Utilities Improvements Project 1310, Surrey
Heights Drive, and Schedule Public Hearing for February 19, 2019
J. RECEIVE Draft Feasibility Report for Street & Utilities Rehabilitation Project 1311, Donald
Avenue, and Schedule Public Hearing for February 19, 2019
K. AUTHORIZE Request for Proposals for Technical Specialty Services, Erosion and Sediment
Control
L. APPROVE Extension of approval for a Variance located at 3640 Elrene Road
M. Item removed
N. APPROVE Contract 18-02, Lexington Diffley Skate Park
O. APPROVE Plans and Specifications for Project 19-08, Trapp Farm Park Building Construction and
Related Site Work and Authorize the Advertisement for Bids
V. PUBLIC HEARINGS
A. APPROVE Street Improvement Project 1315, Woodgate 3rd/ Tiberon/ Mallard Park 3rd Additions
B. APPROVE Street Improvement Project 1316, Pinetree Pass 2nd & 4th
C. APPROVE Street Improvement Project 1317, Gardenwood Ponds 4th
D. APPROVE Street Improvement Project 1318, Oak Pond Hills 1st & 2nd
E. APPROVE Street Improvement Project 1319, Majestic Oaks 1st - 3rd
F. APPROVE Street Improvement Project 1320, Southern Lakes West
VI. 2019 CALENDAR YEAR CITY ORGANIZATIONAL BUSINESS
VII. OLD BUSINESS
VIII. NEW BUSINESS
IX. LEGISLATIVE / INTERGOVERNMENTAL AFFAIRS UPDATE
X. ECONOMIC DEVELOPMENT AUTHORITY
A. CALL TO ORDER
B. ADOPT AGENDA
C. CONSENT AGENDA
1. Approve EDA Minutes
D. EDA ORGANIZATIONAL BUSINESS
1. Election of Officers
2. 2019 Meeting Schedule
3. Single Action of EDA and Council Resolutions
E. OLD BUSINESS
F. NEW BUSINESS
G. OTHER BUSINESS
H. ADJOURN
XI. ADMINISTRATIVE AGENDA
A. City Attorney
B. City Council Comments
C. City Administrator
D. Director of Public Works
E. Director of Community Development
XII. VISITORS TO BE HEARD (for those persons not on the agenda)
XIII. ADJOURNMENT
Memo
To: Honorable Mayor and City Council Members
From: City Administrator Osberg
Date: January 11, 2019
Subject: Agenda Information for January 15, 2019 City Council Meeting
ADOPT AGENDA
After approval is given to the January 15, 2019 City Council agenda, the following items
are in order for consideration.
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
CONSENT AGENDA
The following items referred to as consent items require one (1) motion by the City Council. If
the City Council wishes to discuss any of the items in further detail, those items should be
removed from the Consent Agenda and placed under Old or New Business unless the discussion
required is brief.
A. Approve Minutes
Action To Be Considered:
To approve the minutes of January 2, 2019 regular City Council meeting, as presented or
modified.
Attachments: (1)
CA-1 January 2, 2019 City Council Minutes
MINUTES OF A REGULAR MEETING OF THE
EAGAN CITY COUNCIL
Eagan, Minnesota
JANUARY 2, 2019
A Listening Session was held at 6:00 p.m. prior to the regular City Council meeting. Present were Mayor
Maguire, Councilmember Bakken, Fields, Hansen and Tilley.
A regular meeting of the Eagan City Council was held on Wednesday, January 2, 2019 at 6:30 p.m. at the
Eagan Municipal Center. Present were Mayor Maguire, Councilmembers Bakken, Fields, Hansen and
Tilley. Also present were City Administrator Osberg, Assistant City Administrator Miller, Public Works
Director Matthys, Parks and Recreation Director Pimental, Community Development Director
Hutmacher, City Planner Ridley, Finance Director Pepper, Fire Chief Scott, Lieutenant Speakman, City
Clerk Scipioni, City Attorney Dougherty and Executive Assistant Stevenson.
AGENDA
Councilmember Hansen moved, Councilmember Bakken seconded a motion to approve the agenda as
presented. Aye: 5 Nay: 0
RECOGNITIONS AND PRESENTATION
Oath of Office for Mayor Mike Maguire, Council Member Paul Bakken and
Council Member Gary Hansen
City Clerk Scipioni administered the Oath of Office to Mayor Maguire, Councilmember Bakken and
Councilmember Hansen who were re-elected to four-year terms.
Recognize the Retirement of Bob Brown, Park Maintenance Worker for his
20 years of work with the City of Eagan
Parks and Recreation Director Pimental recognized the retirement of Bob Brown, Park Maintenance
Worker, for his 20 years of service to the Eagan community.
CONSENT AGENDA
Councilmember Tilley moved, Councilmember Hansen seconded a motion to approve the consent
agenda as amended: Aye: 5 Nay: 0
A. It was recommended to approve the minutes of December 11, 2018 Special City Council
minutes, and December 18, 2018 regular City Council meeting, as presented or modified.
B. Personnel Items:
1. It was recommended to provide to City Councilmembers the same health insurance benefits
that are offered to full-time City employees, effective January 1, 2019, and to approve the
2019 budget amendment of $5,900 for such health insurance benefits.
City Council Meeting Minutes
January 2, 2019
2 page
2. It was recommended to authorize the hiring of Joe Ellickson for the position of
Communications and Engagement Director.
C. It was recommended to ratify the check register dated December 14 and 21, 2018.
D. It was recommended to approve the ordinary and customary contracts with United Business
Mail, LeadsOnline LLC, Starry Electric, Inc., and Electric Systems of Anoka.
E. It was recommended to adopt a resolution accepting a $1,000 cash donation from Patricia Judge
in honor of her late husband Gregg and direct the funds to revenue account number 1102.2862
for accounting purposes.
F. It was recommended to approve Change Order #6 for Project 18-06, Police Department and City
Hall Renovation.
G. It was recommended to authorize submittal of the City’s Fiscal Year 2019 Community
Development Block Grant (CDBG) application and adopt a resolution approving the funding
application request.
H. It was recommended to approve an On-Sale Liquor and Sunday License for Cielito Lindo
Restaurant, LLP doing business as Cielito Lindo, located at 1891 Silver Bell Road, Suite 1200.
I. It was recommended to receive the draft Feasibility Report for Project 1307 (Lone Oak Circle –
Street Improvements) and schedule a public hearing to be held on February 5, 2019.
J. It was recommended to receive the draft Feasibility Report for Project 1308 (Poppler Lane –
Street Improvements) and schedule a public hearing to be held on February 5, 2019.
K. It was recommended to receive the draft Feasibility Report for Project 1309 (Country Home
Heights – Street Improvements) and schedule a public hearing to be held on February 5, 2019.
L. It was recommended to receive the draft Feasibility Report for Project 1312 (Ridgeview
Acres/Jon Croft Acres – Street Improvements) and schedule a public hearing to be held on
February 5, 2019.
M. It was recommended to receive the draft Feasibility Report for Project 1313 Old Sibley Highway
– Street Improvements) and schedule a public hearing to be held on February 5, 2019.
N. It was recommended to receive the draft Feasibility Report for Project 1314 Meadowland 1st
Addition – Street Improvements) and schedule a public hearing to be held on February 5, 2019.
O. It was recommended to approve the recommendations of the Public Works Committee
regarding various appeals to the Water Meter Replacement/Repair (R/R) Program (City Code
3.05) surcharges for the identified properties in accordance with the related City Ordinance.
P. It was recommended to approve an amendment to the Fee Schedule Appendix for the current
Consulting Engineering Contracts for services to be provided in 2019.
Q. It was recommended to approve a temporary On-Sale Liquor license and waive the license fee
for Trinity School at River Ridge on February 2, 2019 at 601 River Ridge Parkway.
R. It was recommended to authorize a Letter in Opposition to proposed State Environmental
Quality Board (EQB) rules change.
S. It was recommended to approve a Planned Development Amendment to allow modifications to
the approved exterior architecture of the Eagan Promenade Planned Development for the
parcel located at 3380 Denmark Avenue.
PUBLIC HEARINGS
There were no public hearings to be heard.
City Council Meeting Minutes
January 2, 2019
3 page
OLD BUSINESS
There was no old business to be heard.
NEW BUSINESS
Purchase Agreement for the Sale of Lot 1, Block 1, Yankee Plaza 2nd Addition
Located southeast of Duckwood Drive and Federal Drive
City Administrator Osberg introduced the item noting in 2010 the City acquired right-of-way for the
extension of Duckwood Drive and a bridge over Interstate 35E. The action before the Council is to
consider approval of a purchase agreement for the sale of Lot 1, Block 1, Yankee Plaza 2nd Addition
located southeast of Duckwood Drive and Federal Drive.
Community Development Director Hutmacher gave a staff report and provided a site map.
Mayor Maguire opened the public comment. There being no public comment, he turned the discussion
back to the Council.
Councilmember Bakken moved, Councilmember Fields seconded a motion to approve a Purchase
Agreement for the sale of Lot 1, Block 1, Yankee Plaza 2nd Addition located southeast of Duckwood Drive
and Federal Drive. Aye: 5 Nay: 0
Planned Development Amendment – The House Church
City Administrator Osberg introduced the item noting the property is part of the Mission Hills Planned
Development and contains a 15,530 sf church which was constructed in 1986. The proposal before the
Council is consideration of a Planned Development Amendment to allow expansion of a church.
City Planner Ridley gave a staff report and provided a site map.
The applicant was present and available for questions.
Mayor Maguire opened the public comment. There being no public comment, he turned the discussion
back to the Council.
Councilmember Tilley moved, Councilmember Fields seconded a motion to approve a Planned
Development Amendment to allow expansion of a church upon property located at 2024 Rahn Way,
subject to the following conditions: Aye: 5 Nay: 0
1. A Planned Development Amendment Agreement shall be executed, in a form acceptable to the
City Attorney, and recorded against the property with the Dakota County Recorder’s office. The
Agreement shall include the following exhibits:
• Site Plan
• Building Elevations Plan
• Landscape Plan
• Site Lighting Plan
City Council Meeting Minutes
January 2, 2019
4 page
• Signage Plan
2. Building address numbers shall be installed consistent with the provisions of Section 2.78 of City
Code.
3. The trash enclosure shall be a minimum of six feet in height.
4. Screening of rooftop mechanical units shall be provided in accordance with City Code Sec. 11.70,
Subd. 21 .D.12 including:
a. A parapet wall at least 30” in height
b. A physical screen around individual mechanical units
c. Placement of rooftop equipment at least 20 feet from the edge of the building
5. The Building Elevation drawings shall be modified to add some visual relief/interest along the
south and east elevations.
6. A revised Site Lighting Plan shall be provided for the Planned Development Agreement that
achieves a minimum 0.5 fc throughout the parking lots and includes an average to minimum
ratio of not more than 4.0 fc.
7. Prior to issuance of a Building Permit, the applicant shall ensure that the proposed landscape
plan does not interfere with site lighting.
8. All erosion/sediment control plans submitted for development and grading permits shall be
prepared by a designer who has received current Minnesota Department of Transportation
(MNDOT) training, or approved equal training as determined by the City Engineer in designing
stormwater pollution prevention plans. Also, all personnel responsible for the installation of
erosion/sediment control devices, and the establishment of vegetation for the development,
shall have received Erosion/Sediment Control Inspector/Installer certification through the
University of Minnesota, or approved equal training as determined by the City Engineer.
9. This development shall meet the City’s Post Construction Stormwater Management
Requirements (City Code 4.34) for stormwater management and surface water quality, including
Runoff Rate Control and 1.1” Volume Control of the site’s proposed impervious surface area and
any other disturbed soils that are not remediated following an approved Soil Management
Strategy.
10. Prior to receiving City approval to permit land disturbing activity, the property owner shall
provide detailed Soil Management Strategies in the plan set for City review, and acceptance by
the City Engineer, that provide clear assurances that by final grading, prior to installation of any
irrigation, sod, permanent seeding or plant materials, the disturbed areas that are to be
revegetated will have protected and/or restored soil permeability to non-compacted soil
conditions in the top 12” of soil with greater than 5% soil organic matter content and less than
200 psi of soil compaction in the top 12” of topsoil, to comply with City Volume Control
requirements. These graphical details and notes on soil protection/restoration shall be included
in the Stormwater Management Plan and prominently included in all applicable plan sheets (e.g.
Erosion & Sediment Control Plan, Grading & Drainage Plan, Landscape Plan, etc.) and shall
specify estimated quantities of soil ripping area and volume of compost to be imported and
incorporated. Prior to receiving a Certificate of Occupancy for any affected construction, Soil
Management Strategy implementation documentation (e.g. haul tickets, representative on-site
soil samples, compact testing and soil organic content test results) shall be provided to City
Water Resources staff to verify approved soil management strategy compliance.
11. Prior to receiving City approval to permit land disturbing activity, based on the applicant’s
provided soil borings from within the footprint of the two proposed infiltration areas that
indicate restrictive soil layers within 6-feet of the planned bottom of over-excavation, the
applicant shall revise construction plans to ensure that the underlying restrictive soil layers are
City Council Meeting Minutes
January 2, 2019
5 page
excavated through, loosened, and clean, washed sand backfill is placed, to ensure sub-soil
percolation, to the satisfaction of the City Engineer.
12. During infiltration system over-excavation/sub-soil work, the applicant shall ensure that a
Certified Soil Scientist will be present to verify and document that practice area sub-soils are
suitable for a saturated condition infiltration rate of 0.9-inche per hour (based on 0.45-inch per
hour design rate with safety factor) or greater (but less than 8.0-inch per hour). If the sub-soil
infiltration rates are less than 0.9-inch per hour (or greater than 8.0-inch per hour), the applicant
shall immediately notify the City Engineer and revise the volume control practice(s) design and
construction as necessary (e.g. over-excavation/soil-amendment depth, etc.) to ensure volume
control requirements are fully met. Documentation shall be provided to the City within 48-hours
after infiltration testing. The applicant shall ensure that the City Water Resources staff is
provided 24-hour advance notice of the occurrence of infiltration verifications and also provided
notice prior to any excavation and/or soil backfilling within the infiltration practices, to arrange
for inspections.
13. Prior to receiving City approval to permit land disturbing activity, the applicant shall provide
construction details of the proposed infiltration basins for City review/acceptance by the City
Engineer and include in construction plans. Construction details on plan sheets shall include
detailed infiltration basin cross-section(s), construction sequencing/protection/restoration
notes, details for stable inlets/outlets/emergency overflows, details for under-drains with
upturned elbow outlets for both infiltration/filtration basins, unobstructed inspection/
maintenance access areas to inlets/outlets, soil amendment criteria (minimum of 18-inch depth
across entirety of basin bottom), planting details (including live planting at 18-inch on-center
spacing with seeding of all basin bottoms, and seeding of side-slopes), temporary and
permanent erosion-control details, etc., to ensure infiltration practice is properly designed,
constructed, planted, and adequately protected during/after construction to prevent clogging,
and able to be properly maintained (e.g. unobstructed equipment access, etc.) to function as
intended. These graphical details and notes shall be prominently included in all applicable plan
sheets (e.g. Grading Plan, Utility Plan, Landscape Plan, etc.).
14. The applicant shall provide adequately sized pre-treated structure (e.g. 4-foot minimum depth
sump, 5-foot minimum diameter, with floatable skimmer hood, etc.) at, or immediately
upstream of, any stormwater infiltration facility inlet to provide for effective capture and easily-
accessible cleanout of fine-sand sized particles and floatable pollutants. Pre-treatment
structures shall be accessible by appropriate maintenance equipment. Details shall be included
in applicable plan sheet(s) using Eagan Standard Detail Plate E231.
15. Prior to proceeding with land disturbing activity, the Property Owner shall enter into a long-
term stormwater management system maintenance agreement with the City, detailing the
annual inspection and maintenance required to occur to ensure proper operation and
performance of the permanent stormwater management system, in a form acceptable to the
City Attorney.
16. Before the City returns any Stormwater-related Performance Guarantee Fees on the
development site, the applicant shall demonstrate that all stormwater management practices
are performing as intended and shall provide the City Engineer as-built plans that demonstrate
that all constructed stormwater conveyance structures, stormwater management facilities
(sump(s), basins, etc.), including soil loosening & amendment prior to landscaping, conform to
design and/or construction plans, as approved by the City. As-built volumes shall be provided for
the two infiltration basins. Video of final inspection of clean stormsewer catch-basin system and
contributing stormsewer shall be provided to the City Engineer. The applicant shall submit to the
City Council Meeting Minutes
January 2, 2019
6 page
City Engineer certification that the stormwater management facilities have been installed in
accord with the plans and specifications approved. This certification shall be provided by a
Professional Engineer licensed in the State of Minnesota.
17. The building shall be limited to the use of only one water service and meter unless limited by
capacity of the existing service.
18. The applicant shall confirm any tree removal at the time of Building Permit, and work with the
City Forester to provide tree protection during construction any required mitigation.
19. The applicant shall preserve the conservation easement area as undisturbed and the existing
landscaping and berming along the south and southeastern boundary shall remain in place.
LEGISLATIVE / INTERGOVERNMENTAL AFFAIRS UPDATE
There was no legislative/intergovernmental affairs update.
ADMINISTRATIVE AGENDA
There were no administrative agenda items to be heard.
VISITORS TO BE HEARD
There were no visitors to be heard.
ADJOURNMENT
Councilmember Fields moved, Councilmember Tilley seconded a motion to adjourn the meeting at 6:55
p.m. Aye: 5 Nay: 0
_______
Date
______
Mayor
_______
City Clerk
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
CONSENT AGENDA
B. Personnel Items
ITEM 1.
Action To Be Considered:
Accept the resignation/retirement of Tyler Hauge, Full Time Fire Fighter and authorize the
recruitment and replacement of this position.
ITEM 2.
Action To Be Considered:
Approve the hiring of the following part time, recurring, non-benefit eligible employees:
David Wagner Building Attendant I
Robert Weber Custodian I
Colleen Vannicola Fitness Instructor
Cynthia Sullivan Fitness Instructor
Gladys Morales Fitness Instructor
Joseph McGuire Guest Services Representative
Nicole Ganuza Guest Services Representative
Wayne St. Martin Park Laborer
Lindsay Price Recreation Program Assistant
ITEM 3.
Action To Be Considered:
Accept the resignation of Alex Johnson, GIS Technician in Public Works, and authorize the
recruitment and replacement of this position.
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
CONSENT AGENDA
C. Ratify Check Registers
Action To Be Considered:
To ratify the check registers dated December 28, 2018 and January 4, 2019, as presented.
Attachments: (2)
CC-1 Check register dated December 28, 2018
CC-2 Check register dated January 4, 2019
1/3/2019City of Eagan 16:45:01R55CKR2 LOGIS102V
1Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018--
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202883 12/28/2018 148751 CAMPBELL KNUTSON
402.80 20% FORFEITURE PROCEEDS 289679 12242018 9695.219312/27/2018 Due to Local Govt Dakota Co Drug Task Force
402.80
202884 12/28/2018 119693 DAKOTA COUNTY ATTORNEY'S OFFICE (R)
11,144.60 20% FORFEITURE PROCEEDS 289674 12242018 9695.219212/27/2018 Due to County Govt Dakota Co Drug Task Force
11,144.60
202885 12/28/2018 142972 DOUGHERTY, MOLENDA, SOLFEST, HILLS
4,041.18 LEGAL 289385 176191-04768 0601.631112/28/2018 Legal General Legal Service
1,013.46 CORDIVA MEDICAL 289386 176198-37050 9001.2245 J035212/28/2018 Escrow - Private Development F General Fund
72.39 PRIME THERAPEUTICS 289387 176200-38324 9001.2245 J034412/28/2018 Escrow - Private Development F General Fund
772.16 VERIZON ANTENNA - DIFFLEY RD 289388 176201-38803 6003.631112/28/2018 Legal Lexington Antenna Location
94.20 LEGAL 289389 176204-39471 0601.631112/28/2018 Legal General Legal Service
109.90 LIFETIME FITNESS 289390 176205-39593 9001.2246 J039612/28/2018 Escrow-Special Events General Fund
141.30 DUCKWOOD SURPLUS PROPERTY SALE 289391 176215-40728 9337.631112/28/2018 Legal Community Investment
72.39 CENTRAL PARK COMMONS 289392 176196-35543 9001.2245 J024312/28/2018 Escrow - Private Development F General Fund
72.39 PRIME THERAPEUTICS 289393 176199-38250 9001.2245 J034012/28/2018 Escrow - Private Development F General Fund
38.50 FIRE STATION #5 289394 176203-39258 0601.6311 J037712/28/2018 Legal General Legal Service
1,530.46 COSTCO WHOLESALE 289395 176206-39607 9001.2245 J039512/28/2018 Escrow - Private Development F General Fund
193.04 THE HOUSE CHURCH 289396 176207-40143 9001.2245 J041212/28/2018 Escrow - Private Development F General Fund
72.39 RAISING CANE'S 289397 176208-40315 9001.2245 J041612/28/2018 Escrow - Private Development F General Fund
96.52 HAVEN WOODS 289398 176209-40316 9001.2245 J041512/28/2018 Escrow - Private Development F General Fund
844.55 PROWIRE 2ND ADDITION 289399 176211-40415 9001.2245 J041812/28/2018 Escrow - Private Development F General Fund
144.78 EAGAN SENIOR LIVING 289400 176212-40416 9001.2245 J041712/28/2018 Escrow - Private Development F General Fund
1,724.46 LEXINGTON FLATS 289401 176213-40534 9001.2245 J042412/28/2018 Escrow - Private Development F General Fund
96.52 VIKINGS LAKE 3RD ADD 289402 176214-40537 9001.2245 J042112/28/2018 Escrow - Private Development F General Fund
193.04 COUNTRY INN SUITES PARK FLY 289403 176216-40809 9001.2245 J042912/28/2018 Escrow - Private Development F General Fund
241.30 MARKS TOWING 289404 176217-40810 9001.2245 J043012/28/2018 Escrow - Private Development F General Fund
96.52 TCF BANK 289405 176218-40940 9001.2245 J043412/28/2018 Escrow - Private Development F General Fund
47.10 CEDAR GROVE REDEV 289406 176195-26768 9334.671612/28/2018 Project - Legal Cedarvale/Hwy 13 TIF
94.20 CLIFF TARGET ENT SIGNAL IMP 289407 176202-39118 8282.671612/28/2018 Project - Legal P1282 Cliff Lk Rd Intersection
32.50 DIFFLEY RD BRADDOCK TR 289408 176210-40348 8339.671612/28/2018 Project - Legal P 1339 Diffley Rd/ Braddock Tr
661.00 LEGAL 289409 176192-10388 0601.631112/28/2018 Legal General Legal Service
1,494.00 LEGAL 289410 176193-12651 0601.631112/28/2018 Legal General Legal Service
1,833.88 SPRINT - LEXINGTON 289411 176194-23897 6003.631112/28/2018 Legal Lexington Antenna Location
31.40 T MOBILE - DEERWOOD 289412 176197-36298 6001.631112/28/2018 Legal Deerwood Antenna Location
15,855.53
202886 12/28/2018 153600 ELEVATION COATING LLC
72,703.50 LOGO CHANGE 289672 18-21-10242018 6129.6630 P130112/27/2018 Other Improvements Reservior Maintenance/Repair
1/11/2019
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
2Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202886 12/28/2018 153600 ELEVATION COATING LLC Continued...
72,703.50
202887 12/28/2018 138577 HENNEPIN COUNTY ATTORNEY'S OFFICE (R)
20,326.20 20% FORFEITURE PROCEEDS 289676 12242018 9695.219212/27/2018 Due to County Govt Dakota Co Drug Task Force
20,326.20
202888 12/28/2018 100664 MN CHILD SUPPORT
664.51 PAYROLL ENDING 12/22/2018 289381 GARNISHMENT
12/22/2018
9592.203012/28/2018 Ded Pay - Garnishments Benefit Accrual
354.86 PAYROLL ENDING 12/22/2018 289382 GARNISHMENT
12/22/2018-1
9592.203012/28/2018 Ded Pay - Garnishments Benefit Accrual
230.73 PAYROLL ENDING 12/22/2018 289383 GARNISHMENT
12/22/2018-2
9592.203012/28/2018 Ded Pay - Garnishments Benefit Accrual
1,250.10
202889 12/28/2018 125742 NATIONAL DRIVE
2.00 PAYROLL ENDING 12/22/2018 289380 12272018 9592.203712/28/2018 Ded Payable-Teamsters DRIVE Benefit Accrual
2.00
202890 12/28/2018 119683 RAMSEY COUNTY ATTORNEY'S OFFICE (R)
164.80 20% FORFEITURE PROCEEDS 289677 12242018 9695.219212/27/2018 Due to County Govt Dakota Co Drug Task Force
164.80
202891 12/28/2018 119433 SCOTT COUNTY TREASURER (R)
2,794.00 20% FORFEITURE PROCEEDS 289675 12242018 9695.219212/27/2018 Due to County Govt Dakota Co Drug Task Force
2,794.00
202892 12/28/2018 119295 STATE OF MINNESOTA-GENERAL FUND(R)
19,057.30 10% FORFEITURE PROCEEDS 289673 12242018 9695.219112/27/2018 Due to State Govt Dakota Co Drug Task Force
19,057.30
202893 12/28/2018 144548 WASHINGTON COUNTY ATTORNEY'S OFFICE
3,282.20 20% FORFEITURE PROCEEDS 289678 12242018 9695.219212/27/2018 Due to County Govt Dakota Co Drug Task Force
3,282.20
202894 12/28/2018 113476 WISCONSIN SUPPORT COLLECTIONS TRUST FUND
208.15 PAYROLL ENDING 12/22/2018 289384 GARNISHMENT
12/22/2018
9592.203012/28/2018 Ded Pay - Garnishments Benefit Accrual
208.15
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
3Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20180211 12/27/2018 100249 FIT Continued...
114,701.47 PAYROLL ENDING 12/22/2018 289375 12272018 9880.201112/28/2018 Ded Payable - FIT Payroll
114,701.47
20180212 12/27/2018 100250 COMMISIONER OF REVENUE-PAYROLL
34,848.16 PAYROLL ENDING 12/22/2018 289376 12272018 9880.201212/28/2018 Ded Payable - SIT Payroll
34,848.16
20180213 12/27/2018 100252 FICA
30,549.78 PAYROLL ENDING 12/22/2018 289377 12272018 9880.201412/28/2018 Ded Payable - FICA Payroll
30,549.78
20180214 12/27/2018 100253 MEDICARE
12,105.89 PAYROLL ENDING 12/22/2018 289378 12272018 9880.201512/28/2018 Ded Payable - Medicare Payroll
12,105.89
20180335 12/27/2018 100693 EAGAN PAYROLL ACCT
666,403.22 PAYROLL ENDING 12/22/2018 289374 12272018 9001.111512/28/2018 Claim on Cash General Fund
13,905.65 PAYROLL ENDING 12/22/2018 289374 12272018 9197.111512/28/2018 Claim on Cash ETV
68,340.60 PAYROLL ENDING 12/22/2018 289374 12272018 9220.111512/28/2018 Claim on Cash Public Utilities
21,368.56 PAYROLL ENDING 12/22/2018 289374 12272018 9221.111512/28/2018 Claim on Cash Civic Arena
3,538.98 PAYROLL ENDING 12/22/2018 289374 12272018 9222.111512/28/2018 Claim on Cash Cascade Bay
33,966.43 PAYROLL ENDING 12/22/2018 289374 12272018 9223.111512/28/2018 Claim on Cash Central Park/Community Center
4,041.80 PAYROLL ENDING 12/22/2018 289374 12272018 9225.111512/28/2018 Claim on Cash Fiber Infrastructure Fund
93,312.10 PAYROLL ENDING 12/22/2018 289374 12272018 9592.111512/28/2018 Claim on Cash Benefit Accrual
42,655.67 PAYROLL ENDING 12/22/2018 289374 12272018 9592.614412/28/2018 FICA Benefit Accrual
947,533.01
20182526 12/27/2018 115374 MN STATE RETIREMENT SYSTEM-HCSP
26,146.03 HCSP EMPLOYEE CONTRIBUTION 289373 12272018 9592.203412/28/2018 Ded Payable-HCSP Benefit Accrual
26,146.03
20183226 12/27/2018 138969 MN STATE RETIREMENT SYSTEM-MNDCP
7,246.89 MNDCP EMPLOYEE CONTRIBUTIONS 289372 12272018 9592.203212/28/2018 Ded Pay - Great West Def Comp Benefit Accrual
7,246.89
20183564 12/28/2018 121803 US BANK - AUTOPAY
23.27 BECKERGASSTATIONSTRGCPLAN 289413 4835 077913
11/29
1101.647612/28/2018 Conferences/Meetings/Training General/Admn-Police
15.00 MNGFOA - SPEAK EVENT - NOV 289414 4991 073988
11/9
0501.647712/28/2018 Local Meeting Expenses General & Admn-Finance
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
4Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
30.00 GFOA - EDUCATION MATERIALS 289415 4991 034477
11/14
0501.621512/28/2018 Reference Materials General & Admn-Finance
62.00 ERRONEOUS CHARGE TO BE REFUNDE 289416 4991 078120
11/7
9001.225012/28/2018 Escrow Deposits General Fund
480.94 P-BALL EQUIP, PICKLEBALL CENTR 289417 4239 050895
11/30
3001.622712/28/2018 Recreation Equipment/Supplies General/Admn-Recreation
12.86 DOLLAR TREE 289418 8588 099056
11/27
3075.622712/28/2018 Recreation Equipment/Supplies CDBG - Teens
50.64 FSSOLUTIONS DRUG SCREENS 289419 9382 041097
11/8
1001.631812/28/2018 Medical Services - Physical Ex General/Admn-Human Resources
25.71 TJMAXX WORK COMP STOOL 289420 9382 083933
11/13
9593.638912/28/2018 Worker's Comp - Medical/Indemn Workers' Compensation Self-In
215.00 NPELRA MEMBERSHIP RENEWAL 289421 9382 072589
11/26
1001.647912/28/2018 Dues and Subscriptions General/Admn-Human Resources
48.93 OFFICEMAX OFFICE SUPPLIES 289422 9382 061646
11/26
1001.621012/28/2018 Office Supplies General/Admn-Human Resources
32.11 HOME DEPOT OFFICE SUPPLIES 289423 9382 077855
11/26
1001.621012/28/2018 Office Supplies General/Admn-Human Resources
317.85 WALGREENS 30 YEAR AWARDS 289424 9382 087193
12/4
1001.637012/28/2018 General Printing and Binding General/Admn-Human Resources
199.00 EVENTBRIGHT ONBOARDING WEBINAR 289425 9382 018975
11/30
1001.621012/28/2018 Office Supplies General/Admn-Human Resources
17.88 WALMART - LAUNDRY DET.289426 4320 079474
12/5
6827.622012/28/2018 Operating Supplies - General Building Maintenance
24.96 AAA BATTERIES FOR EQUIPMENT 289427 5683 036727
11/29
9701.622012/28/2018 Operating Supplies - General PEG-eligible
249.44-EXPEDIA - HOTEL PICKUP TRUCK 289428 5683 11/6 9701.668012/28/2018 Mobile Equipment PEG-eligible
49.00 PENWELL MAGAZINE SUBSCRIPTION 289429 4872 039862
11/9
0801.647912/28/2018 Dues and Subscriptions General & Admn-Protective Insp
442.18 J. ONDREY UNIFORM 289430 0836 073041
12/4
1107.622412/28/2018 Clothing/Personal Equipment Support Services
2.66 BECKERGASSTATIONSTRGCPLAN 289431 4835 052971
11/29
1101.647612/28/2018 Conferences/Meetings/Training General/Admn-Police
18.98 TARGET 289432 0751 014993
11/12
3078.622712/28/2018 Recreation Equipment/Supplies Senior Citizens
39.15 OFFICE MAX 289433 0751 060181
11/14
3078.622712/28/2018 Recreation Equipment/Supplies Senior Citizens
150.00 MPLS INSTITUTE OF ART 289434 0751 060787
11/15
3078.622712/28/2018 Recreation Equipment/Supplies Senior Citizens
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
5Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
514.06 GAME SHOW BATTLE ROOM 289435 0751 009381
11/19
3078.622712/28/2018 Recreation Equipment/Supplies Senior Citizens
563.00 BURNSVILLE PERFORMING ARTS 289436 0751 032695
11/22
3078.622712/28/2018 Recreation Equipment/Supplies Senior Citizens
111.52 POTBELLY 289437 0751 077053
11/26
3078.622712/28/2018 Recreation Equipment/Supplies Senior Citizens
350.00 JAME J HILL TOUR 289438 0751 054921
11/28
3078.622712/28/2018 Recreation Equipment/Supplies Senior Citizens
738.52 KRG CATERING 289439 0751 069212
12/3
3078.225012/28/2018 Escrow Deposits Senior Citizens
21.96 CUB 289440 1979 072447
11/30
3081.622712/28/2018 Recreation Equipment/Supplies Arts & Humanities Council
35.94 MICHAELS PROGRAM SUPPLIES 289441 1979 057834
11/10
3081.622712/28/2018 Recreation Equipment/Supplies Arts & Humanities Council
16.98 MICHAELS PROGRAM SUPPLIES 289442 1979 099825
11/24
3081.622712/28/2018 Recreation Equipment/Supplies Arts & Humanities Council
100.00 COLOR ME MINE 289443 1979 001300
11/28
3075.622712/28/2018 Recreation Equipment/Supplies CDBG - Teens
7.99 TARGET 289444 0751 000848
11/25
3078.622712/28/2018 Recreation Equipment/Supplies Senior Citizens
27.88 AMAZON - ADVERTISING 289445 7470 000884
11/13
6802.635712/28/2018 Advertising/Publication Banquet Room
33.98 AMAZON - ADVERTISING 289446 7470 044973
11/11
6802.635712/28/2018 Advertising/Publication Banquet Room
149.00 AUDIOBLOCKS - ANNUAL SUBSCR 289447 5683 053343
11/7
9701.631012/28/2018 Professional Services-General PEG-eligible
99.00 VIDEOBLOCKS - ANNUAL SUBSCRIP 289448 5683 017201
11/8
9701.631012/28/2018 Professional Services-General PEG-eligible
32.00 KVM SWITCH CABLE 289449 5683 007957
11/8
9701.622012/28/2018 Operating Supplies - General PEG-eligible
9.99 DROPBOX FOR VIDEO TRANSFER 289450 5683 082331
11/6
9701.631012/28/2018 Professional Services-General PEG-eligible
25.00 JOICASTER LIVESTREAM SERVICE 289451 5683 052294
11/6
9701.631012/28/2018 Professional Services-General PEG-eligible
9.85 USPS POSTAGE BADGES 289452 2881 098054
11/14
9695.634612/28/2018 Postage Dakota Co Drug Task Force
11.99 AMZN USD CABLES 289453 2881 028858
11/15
9695.621012/28/2018 Office Supplies Dakota Co Drug Task Force
119.00 AMZN PRIME MEMBERSHIP 289454 2881 055898 9695.647912/28/2018 Dues and Subscriptions Dakota Co Drug Task Force
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
6Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
11/15
25.40 AMZN IR FLASHLIGHT 289455 2881 064805
11/30
9695.621012/28/2018 Office Supplies Dakota Co Drug Task Force
29.99 SIMPLEINOUT SCH 11/15-12/15/18 289456 2339 083214
11/15
9695.647912/28/2018 Dues and Subscriptions Dakota Co Drug Task Force
46.67 CHUCK& DONS DOG FOOD 289457 4670 074101
11/16
9695.622612/28/2018 Public Safety Supplies Dakota Co Drug Task Force
50.00 PAYPAL USPCA 12 RENEWAL 289458 4670 084759
12/5
9695.622612/28/2018 Public Safety Supplies Dakota Co Drug Task Force
20.00 PAYPAL USPCA 18 MEMBERSHIP 289459 4670 093394
12/5
9695.622612/28/2018 Public Safety Supplies Dakota Co Drug Task Force
240.87 CLEAN N PRESS APPLE VALLEY 289460 0751 061667
11/8
3078.622712/28/2018 Recreation Equipment/Supplies Senior Citizens
1.39 TARGET 289461 0751 091281
11/12
3078.622712/28/2018 Recreation Equipment/Supplies Senior Citizens
9.18 HOCKENBERGS- GENERAL STUDIO SU 289462 3557 012926
11/9
3081.622712/28/2018 Recreation Equipment/Supplies Arts & Humanities Council
174.09 BLICK- OUTREACH SUPPLIES 289463 3557 097168
11/10
3071.622712/28/2018 Recreation Equipment/Supplies MN State Arts Board
10.12 TRIARCO- OUTREACH SUPPLIES 289464 3557 023182
11/12
3071.622712/28/2018 Recreation Equipment/Supplies MN State Arts Board
110.95 ZOGICS- GENERAL STUDIO SUPPLIE 289465 3557 057483
11/21
3081.622712/28/2018 Recreation Equipment/Supplies Arts & Humanities Council
9.72 PINEDA - PERSONAL ACCIDENT 289466 3557 062015
11/27
3081.622712/28/2018 Recreation Equipment/Supplies Arts & Humanities Council
32.08 KOWALSKIS - FOOD FINAL EVENT 289467 3557 047555
12/5
3098.622712/28/2018 Recreation Equipment/Supplies Senior Arts Programming(Aroha)
67.71 FACEBOOK ADS - MARKET.ADULT S 289468 9854 082032
11/30
0901.635712/28/2018 Advertising/Publication Gen & Admin-Communications
29.00 ENVATO - TEMPLATE MONTH SUB.289469 5683 025371
12/5
9701.631012/28/2018 Professional Services-General PEG-eligible
53.95 GOBE - STAR FILTER LENSES 289470 5683 066600
12/3
9701.664012/28/2018 Machinery/Equipment PEG-eligible
53.95-GOBE - STAR FILTER LENSES 289471 5683 066600
12/4
9701.664012/28/2018 Machinery/Equipment PEG-eligible
2.31 COMCAST -ETV LOBBY SERVICE 289472 5683 073246
12/3
9701.647512/28/2018 Miscellaneous PEG-eligible
59.49 AMAZON - REPLACEMENT VACUUM 289473 5683 028645
11/27
9701.622012/28/2018 Operating Supplies - General PEG-eligible
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
7Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
203.94 AMAZON - CAMERA BATTERIES 289474 5683 088714
11/16
9701.622012/28/2018 Operating Supplies - General PEG-eligible
36.43 RADIO SHACK - HDMI ADAPTOR 289475 5683 035072
11/14
9701.622012/28/2018 Operating Supplies - General PEG-eligible
199.00 AMAZON - STUDIO BACKPACK 289476 5683 060477
11/10
9701.622012/28/2018 Operating Supplies - General PEG-eligible
17.70 HOMEDEPOT - STATION SUPPLIES 289477 7344 064897
11/14
1225.623012/28/2018 Repair/Maintenance Supplies-Ge Fire / EMS Equipment
145.79 RAM MOUNTS-PAD MNTING BRACKETS 289478 7302 026603
11/7
1221.667012/28/2018 Other Equipment Administration-Fire
39.00 MRPA - AWARDS LUNCHEON 289479 1995 053004
12/5
3001.647612/28/2018 Conferences/Meetings/Training General/Admn-Recreation
351.36-BESTBUY MONITOR REMODEL CREDIT 289480 5528 11/23 1107.621012/28/2018 Office Supplies Support Services
31.93 NELSON - BRKFST STRAT PLANNING 289481 5528 048662
11/29
1101.647612/28/2018 Conferences/Meetings/Training General/Admn-Police
3.71 MARRIOTT - MTING ST. CLD - COF 289482 5528 089584
11/29
1101.647612/28/2018 Conferences/Meetings/Training General/Admn-Police
10.71 RUSTY TACO LUNCH W/ARCHTCTS 289483 5528 008508
11/9
1101.647712/28/2018 Local Meeting Expenses General/Admn-Police
857.44 HOME DEPOT - WASHER DRYER 289484 7932 005678
11/28
6146.642712/28/2018 Building Operations/Repair-Lab North Plant Building
69.61 BESTBUY CABLES FOR STP MONITOR 289485 7965 072173
11/29
6154.621012/28/2018 Office Supplies South Plant Building
92.95 TOTEBAGFACTORY- OUTREACH SUPPL 289486 3557 058794
11/7
3071.622712/28/2018 Recreation Equipment/Supplies MN State Arts Board
24.38 PAPERMART- OUTREACH SUPPLIES 289487 3557 006664
11/8
3071.622712/28/2018 Recreation Equipment/Supplies MN State Arts Board
106.58 BLICK- PRINTMAKING SUPPLIES 289488 3557 065478
11/9
3081.622712/28/2018 Recreation Equipment/Supplies Arts & Humanities Council
137.61 BLICK- OUTREACH SUPPLIES 289489 3557 093898
11/9
3071.622712/28/2018 Recreation Equipment/Supplies MN State Arts Board
87.76 SAMS CLUB- WINTER SALE SUPPLIE 289490 3557 070968
11/9
3081.622712/28/2018 Recreation Equipment/Supplies Arts & Humanities Council
122.48 OFFICE DEPOT- WINTER SALE SUPP 289491 3557 084283
11/9
3081.622712/28/2018 Recreation Equipment/Supplies Arts & Humanities Council
58.92 TOPPERS-SOCIAL MEDIA MTG 289492 0836 094003
11/15
1101.647712/28/2018 Local Meeting Expenses General/Admn-Police
64.26 BATTERIES PD 289493 0836 064793
11/19
1104.622012/28/2018 Operating Supplies - General Patrolling/Traffic
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
8Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
481.91 WHITE HORSE-STRAT PLAN DIN X19 289494 0836 058212
11/27
1101.647612/28/2018 Conferences/Meetings/Training General/Admn-Police
356.32 COWBOY JACK-STRAT DIN X19 289495 0836 073950
11/29
1101.647612/28/2018 Conferences/Meetings/Training General/Admn-Police
55.98 EVIDENCE SUPPLIES 289496 4975 053903
11/20
1104.622012/28/2018 Operating Supplies - General Patrolling/Traffic
289.95 EVIDENCE SUPPLIES 289497 4975 061145
12/3
1104.622012/28/2018 Operating Supplies - General Patrolling/Traffic
164.20 NEOPLEXONLINE - SQ MARKERS 289498 4975 063572
12/4
1104.622012/28/2018 Operating Supplies - General Patrolling/Traffic
470.10 EXEC CAR RENTAL - DEPOSIT 289499 1958 096173
11/7
1225.647612/28/2018 Conferences/Meetings/Training Fire / EMS Equipment
29.63 HILTON CLEARWATEVCOS CONF MEAL 289500 1958 048466
11/8
1225.647612/28/2018 Conferences/Meetings/Training Fire / EMS Equipment
9.20 SALT CRACK FISH VCOS CONF-MEAL 289501 1958 050808
11/9
1225.647612/28/2018 Conferences/Meetings/Training Fire / EMS Equipment
12.62 SURFSIDE TAP - VCOS CONF-MEAL 289502 1958 005258
11/11
1225.647612/28/2018 Conferences/Meetings/Training Fire / EMS Equipment
647.49 HILTON - VCOS CONF- HOTEL 289503 1958 028561
11/11
1225.647612/28/2018 Conferences/Meetings/Training Fire / EMS Equipment
167.07 AMAZON - IPAD CASES 289504 1958 058597
11/20
1221.623812/28/2018 Communication System Parts Administration-Fire
134.97-AMAZON - RETURN I-PAD CASES 289505 1958 11/29 1221.623812/28/2018 Communication System Parts Administration-Fire
179.98 BESTBUY - IPAD AND PHONE CASE 289506 1958 083646
12/5
1221.623812/28/2018 Communication System Parts Administration-Fire
3,053.04 MARRIOTT - STRAT PLAN HOTEL 289507 4683 065395
12/4
1101.647612/28/2018 Conferences/Meetings/Training General/Admn-Police
43.20 CLANCY'S PIZZA-LUNCH TRAINING 289508 4868 041280
11/14
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
47.25 CLANCY'S PIZZA-LUNCH TRAINING 289509 4868 072862
11/13
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
106.70 OPTICS PLANET-CARBINE SLNGS 289510 4868 010329
11/19
1104.622612/28/2018 Public Safety Supplies Patrolling/Traffic
24.54 GANDER-RANGE SUPPLIES 289511 4868 033145
11/26
1104.622812/28/2018 Ammunition Patrolling/Traffic
30.96 FLEET FARM-RANGE SUPPLIES 289512 4868 027571
11/26
1104.622812/28/2018 Ammunition Patrolling/Traffic
21.82 ELITE K-9-LEASHES 289513 4884 013326
11/7
1104.622612/28/2018 Public Safety Supplies Patrolling/Traffic
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
9Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
29.95 ELITE K-9-LEASHES 289514 4884 093455
11/16
1104.622612/28/2018 Public Safety Supplies Patrolling/Traffic
53.96 DOCKSIDE-TRNG-DINNER X 3 289515 4884 007533
11/15
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
35.62 NELSON BROS-LUNCH TRNG SWAT 289516 4884 029197
11/16
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
36.99 HOLIDAY GAS-TRNG-SQUAD 289517 4884 093729
11/16
1104.623512/28/2018 Fuel, Lubricants, Additives Patrolling/Traffic
70.00 PAYPAL-TRAINING FEES K-9 289518 4884 058743
12/3
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
159.99 SPORTMAN GUIDE-BOOTS SWAT 289519 4934 016346
11/7
1104.622412/28/2018 Clothing/Personal Equipment Patrolling/Traffic
160.98 SPORTMAN GUIDE-SWAT 289520 4934 041303
11/13
1104.622412/28/2018 Clothing/Personal Equipment Patrolling/Traffic
45.00 TERRY FLECK-LEGAL UPDATES K9 289521 4884 011426
11/13
1104.647912/28/2018 Dues and Subscriptions Patrolling/Traffic
483.81 UHAUL-ELECTION TRUCKS 289522 1338 077903
11/7
0401.622512/28/2018 Election Supplies General & Admn-City Clerk
471.06 UHAUL-ELECTION TRUCKS 289523 1338 063386
11/7
0401.622512/28/2018 Election Supplies General & Admn-City Clerk
33.58 WALMART ELECTION SUPPLIES 289524 2601 036339
11/6
0401.647712/28/2018 Local Meeting Expenses General & Admn-City Clerk
18.31 WALMART COUNCIL SUPPLIES 289525 2601 088263
11/6
0101.647712/28/2018 Local Meeting Expenses Legislative/Policy Development
13.22 JW MARRIOTT - NLC BREAKFAST DO 289526 1112 053842
11/9
0201.647612/28/2018 Conferences/Meetings/Training General & Admn-Admn
17.25 PAADIES LAG NLC MEAL OSBERG 289527 1112 002711
11/10
0201.647612/28/2018 Conferences/Meetings/Training General & Admn-Admn
100.00 ULTIMATE EVENTS DEPOSIT 289528 3196 011184
11/6
3079.622712/28/2018 Recreation Equipment/Supplies Special Events
15.75 WALMART- HOLZ SUPPLIES 289529 3196 005850
11/20
3027.622712/28/2018 Recreation Equipment/Supplies Holz Farm
73.71 DOLLAR TREE- HOLZ SUPPLIES 289530 3196 082462
11/23
3027.622712/28/2018 Recreation Equipment/Supplies Holz Farm
66.93 WALMART- HOLZ EVENT SUPPLIES 289531 3196 028395
11/28
3027.622712/28/2018 Recreation Equipment/Supplies Holz Farm
2.14 DOLLAR TREE- HOLZ SUPPLIES 289532 3196 060390
11/28
3027.622712/28/2018 Recreation Equipment/Supplies Holz Farm
225.79 HYVEE- HOLZ SUPPLIES 289533 3196 087995 3027.622712/28/2018 Recreation Equipment/Supplies Holz Farm
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
10Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
11/30
252.54 HOME DEPOT- HOLZ SUPPLIES 289534 3196 048351
11/30
3027.622712/28/2018 Recreation Equipment/Supplies Holz Farm
70.00 PAYPAL- MFMA MEMBERSHIP RENEW 289535 3196 038479
12/3
3061.632812/28/2018 Special Events/Admission Fees Market Fest
150.25 OLD TIME WOODEN NICKEL- MARKET 289536 3196 070436
12/5
3061.622712/28/2018 Recreation Equipment/Supplies Market Fest
97.46 BYERLYS - CC MEAL 289537 2601 044863
11/15
0101.647712/28/2018 Local Meeting Expenses Legislative/Policy Development
8.00 OFFICE DEPOT COUNCIL SUPPLIES 289538 2601 037288
11/15
0101.647712/28/2018 Local Meeting Expenses Legislative/Policy Development
18.05 BYERLYS - CC MEAL 289539 2601 096486
11/20
0101.647712/28/2018 Local Meeting Expenses Legislative/Policy Development
38.99 WALL STREET JOURNAL SUBSCRIPTI 289540 2601 007199
11/21
0501.647912/28/2018 Dues and Subscriptions General & Admn-Finance
55.23 PAPA JOHNS ELECTIONS 289541 2601 077607
11/6
0401.647712/28/2018 Local Meeting Expenses General & Admn-City Clerk
20.00-SUN CTRY REFUND-NLC-FIELDS 289542 2601 11/28 0101.647612/28/2018 Conferences/Meetings/Training Legislative/Policy Development
117.74 KOWALSKI COUNCIL MEAL 289543 2601 009841
11/29
0101.647712/28/2018 Local Meeting Expenses Legislative/Policy Development
21.96 KOWALSKI COUNCIL MEAL 289544 2601 092256
12/4
0101.647712/28/2018 Local Meeting Expenses Legislative/Policy Development
25.00 DELTA BAGGAGE NLC OSBERG 289545 1112 11/7 0201.647612/28/2018 Conferences/Meetings/Training General & Admn-Admn
25.00 DELTA BAGGAGE NLC OSBERG 289546 1112 075149
11/10
0201.647612/28/2018 Conferences/Meetings/Training General & Admn-Admn
66.56 UNITED TAXI-NLC-OSBERG 289547 1112 084556
11/10
0201.647612/28/2018 Conferences/Meetings/Training General & Admn-Admn
253.17 JW MARRIOTT MEALS NLC OSBERG 289548 1112 012751
11/11
0201.647612/28/2018 Conferences/Meetings/Training General & Admn-Admn
120.00 SEC OF ST.NOTARY REN - BRANDEL 289549 1338 017047
11/27
0720.621012/28/2018 Office Supplies General Admin-Planning & Zonin
120.00 SEC OF ST NOTARY REN - HAMMER 289550 1338 019723
12/3
1107.647912/28/2018 Dues and Subscriptions Support Services
450.66 UHAUL-ELECTION TRUCKS 289551 1338 060316
11/7
0401.622512/28/2018 Election Supplies General & Admn-City Clerk
570.40 SEARS FREEZER EVID RM - REMOD 289552 5528 064284
11/26
1107.666012/28/2018 Office Furnishings & Equipment Support Services
351.36 BEST BUY - MONITOR --- REMODEL 289553 5528 001394
11/22
1107.621012/28/2018 Office Supplies Support Services
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
11Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
1,656.10 MARRIOT LODGING FOR STATE CONF 289554 5528 057462
12/1
1101.647612/28/2018 Conferences/Meetings/Training General/Admn-Police
2,000.00 MARRIOT LODGING FOR STATE CONF 289555 5528 084461
12/1
1101.647612/28/2018 Conferences/Meetings/Training General/Admn-Police
144.44 HOME DEPOT SMALL TOOLS 289556 7932 066722
11/7
6131.624012/28/2018 Small Tools Water Customer Service
48.66 HOME DEPOT VALVE REPAIR 289557 7932 070842
11/8
6143.626012/28/2018 Utility System Parts/Supplies Valve Maintenance/Repair
75.00 DCRCHAMBER EVENT- MAGUIRE 289558 2601 017698
11/5
0101.647712/28/2018 Local Meeting Expenses Legislative/Policy Development
1,072.94 JW MARRIOTT - NLC HOTEL OSBERG 289559 2601 058345
11/7
0201.647612/28/2018 Conferences/Meetings/Training General & Admn-Admn
1,430.58 JW MARRIOTT - NLC CONF FIELDS 289560 2601 002710
11/7
0101.647612/28/2018 Conferences/Meetings/Training Legislative/Policy Development
1,430.58 JW MARRIOTT - NLC CONF HANSEN 289561 2601 007865
11/7
0101.647612/28/2018 Conferences/Meetings/Training Legislative/Policy Development
25.00 DCRCHAMBER BREAKFAST-G.HANSEN 289562 2601 013809
11/9
0101.647712/28/2018 Local Meeting Expenses Legislative/Policy Development
.02 JW MARRIOTT - NLC CONF 289563 2601 080711
11/12
0101.647612/28/2018 Conferences/Meetings/Training Legislative/Policy Development
12.75 HYVEE - COUNCIL MEAL 289564 2601 057841
11/13
0101.647712/28/2018 Local Meeting Expenses Legislative/Policy Development
111.38 DAVANNIS COUNCIL MEAL 289565 2601 024839
11/13
0101.647712/28/2018 Local Meeting Expenses Legislative/Policy Development
100.50 USPS - I/I SURCHARGE LETTERS 289566 3987 083444
11/8
6201.634612/28/2018 Postage San Sewer-Administration
37.49 TARGET- CHROME TV STRTS STAGIN 289567 6280 048400
11/7
2201.622012/28/2018 Operating Supplies - General Gen/Adm-Streets
147.15 HACH - REPLACEMET DO PROBE 289568 3540 037849
12/3
6528.623412/28/2018 Field/Other Equipment Repair Basin Mgmt-Water Spl/Studies/M
37.49-TARGET- MERCH RETURN 289569 6280 11/21 2201.622012/28/2018 Operating Supplies - General Gen/Adm-Streets
214.24 WALMART- TV STRTS STAGING 289570 6280 062689
11/24
2201.622012/28/2018 Operating Supplies - General Gen/Adm-Streets
6.70 USPS - FORMER FIRE EMPLOYEE 289571 3993 007445
11/6
1221.634612/28/2018 Postage Administration-Fire
60.00 NRPA-CPRP CERTIFICATION 289572 5412 042965
11/21
3001.647712/28/2018 Local Meeting Expenses General/Admn-Recreation
89.00 VOLGISTICS MONTHLY BILLING 289573 5412 090065
11/21
3001.647512/28/2018 Miscellaneous General/Admn-Recreation
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
12Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
46.34 LITTLE FREE LIBRARY-SLATER ACR 289574 5412 032539
11/26
2852.676212/28/2018 Special Features/Furnishings General Park Site Improvmts
194.95 MIRROR FOR ZAMBONI DOOR 289575 4288 069349
11/26
6603.622212/28/2018 Medical/Rescue/Safety Supplies Building Repair & Maint.
25.00 DELTA - BAGGAGE FEE - CONF 289576 4288 042691
11/6
6716.647612/28/2018 Conferences/Meetings/Training General Administration
25.00 DELTA - BAGGAGE FEE - CONF 289577 4288 068786
11/9
6716.647612/28/2018 Conferences/Meetings/Training General Administration
14.99-SEAR'S CREDIT 289578 5528 11/22 1107.666012/28/2018 Office Furnishings & Equipment Support Services
4,246.36 SEARS - 4 FRIDGES EVID AND LR 289579 5528 074292
11/22
1107.666012/28/2018 Office Furnishings & Equipment Support Services
25.00 STI INC. - GPS TRACKER 289580 5528 061211
11/26
1105.645712/28/2018 Machinery & Equipment-Rental Investigation/Crime Prevention
250.00 GLOCK ARMORER COURSE ROCHE 289581 0977 014339
12/3
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
100.00 MNCORRECTIONSASSNJUVCNF110 113 289582 0977 015750
12/3
1105.647612/28/2018 Conferences/Meetings/Training Investigation/Crime Prevention
20.73 DOOLITTLESWOODFREUOFTRNGLUNCH 289583 7519 056502
12/3
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
21.73 DOOLITTLESWOODFREUOFTRNGLUNCH 289584 7527 012536
12/3
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
33.80 COWBOYJACKSUOFTRNGLUNCH2X 289585 4835 053862
11/6
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
6.00-KAHLER REFUND 289586 7470 11/21 6801.647612/28/2018 Conferences/Meetings/Training General & Administrative
105.14 GOTPRINT - DECALS 289587 7470 007576
11/28
6801.635712/28/2018 Advertising/Publication General & Administrative
13.89 289588 1696 030533
12/1
6801.622012/28/2018 Operating Supplies - General General & Administrative
74.97 BEST BUY - CABLES 289589 1696 098685
12/4
6801.622012/28/2018 Operating Supplies - General General & Administrative
53.02 AG PARTNER COOP FUEL FOR SQUAD 289590 2281 083956
11/26
1224.623512/28/2018 Fuel, Lubricants, Additives Engineer
57.70 AMAZON -CASE FOR NEW IPAD CITY 289591 2281 092626
11/14
1221.667012/28/2018 Other Equipment Administration-Fire
139.25-BESTBUY - RETURN IPAD CASE 289592 2281 11/8-1 1221.667012/28/2018 Other Equipment Administration-Fire
139.25 BESTBUY - IPAD CASE RETURNED 289593 2281 088871
11/7
1221.667012/28/2018 Other Equipment Administration-Fire
19.95 CC CHARGES 289594 0088 024377
12/3
0301.656912/28/2018 Maintenance Contracts IT-Gen & Admn
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
13Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
201.87 TRIPLE CROWN- SAFETY JACKETS 289595 6280 025827
11/12
2201.622212/28/2018 Medical/Rescue/Safety Supplies Gen/Adm-Streets
13.99 HYVEE-CHAPLAIN MEETING 289596 4819 093854
11/13
1101.647712/28/2018 Local Meeting Expenses General/Admn-Police
139.98 CABELAS-PARTIAL ORDER-SWAT CLO 289597 4934 080122
11/15
1104.622412/28/2018 Clothing/Personal Equipment Patrolling/Traffic
11.95 SQUAD REMOTE BATTERY 289598 4683 061939
11/14
1104.622012/28/2018 Operating Supplies - General Patrolling/Traffic
150.00 IACP 2019 MEMBERSHIP DUES 289599 4683 040506
11/14
1101.647912/28/2018 Dues and Subscriptions General/Admn-Police
14.98 PANERA - CHIEF.ATTORNEY LUNCH 289600 4683 058347
11/30
1101.647712/28/2018 Local Meeting Expenses General/Admn-Police
157.00 MN CHIEF'S 2019 MEMBERSHIP DUE 289601 4683 057033
12/3
1101.647912/28/2018 Dues and Subscriptions General/Admn-Police
2,550.00 CORNERHOUSE FORENSICSTRNG 289602 0977 086258
11/14
1105.647612/28/2018 Conferences/Meetings/Training Investigation/Crime Prevention
85.00 MANKATOSTUNIVJOBFAIRREG2X 289603 0977 021086
11/6
1101.631012/28/2018 Professional Services-General General/Admn-Police
150.00 MNSHERIFFSASSNGUNLAWSCOLLINS 289604 0977 072020
11/26
1105.647612/28/2018 Conferences/Meetings/Training Investigation/Crime Prevention
20.87 COURTYARDMARRIOTTSTRGCPLNBRKFS 289605 0977 079279
11/29
1101.647612/28/2018 Conferences/Meetings/Training General/Admn-Police
75.00 BCADMTRECERTBOUGHTON 289606 0977 099315
12/4
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
300.00 STCLOUDSTUNIVJOBFAIRREG2X 289607 0977 054792
12/4
1101.631012/28/2018 Professional Services-General General/Admn-Police
165.00 JPNIXONCONSMONEYLAUNDMEYER 289608 0977 056410
12/5
1105.647612/28/2018 Conferences/Meetings/Training Investigation/Crime Prevention
250.00 GLOCK ARMORER COURSE CLAUSEN 289609 0977 091771
12/3
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
250.00 GLOCK ARMORER COURSE PETERSON 289610 0977 025048
12/3
1104.647612/28/2018 Conferences/Meetings/Training Patrolling/Traffic
68.54 BOCCE EQUIPMENT DICK SPORTS 289611 4239 035450
12/1
3077.622712/28/2018 Recreation Equipment/Supplies Non-Traditional Sports
56.23 FOOTBALL EQUIPMENT DICK SPORTS 289612 4239 088835
12/1
3077.622712/28/2018 Recreation Equipment/Supplies Non-Traditional Sports
56.23 FOOTBALL EQUIPMENT DICK SPORTS 289613 4239 084750
12/1
3077.622712/28/2018 Recreation Equipment/Supplies Non-Traditional Sports
186.47 WIFFLEBALL EQUIPMENT 289614 4239 042124 3077.622712/28/2018 Recreation Equipment/Supplies Non-Traditional Sports
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
14Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
11/30
216.79-RETURN...NBS TICKET SCANNER 289615 1171 12/4 3079.622712/28/2018 Recreation Equipment/Supplies Special Events
409.00 KOAMTAC TICKET SCANNER 289616 1171 083017
11/29
3079.622712/28/2018 Recreation Equipment/Supplies Special Events
270.99 NOTHINGBUTSAVINGS TICKET SCAN 289617 1171 095401
11/21
3079.622712/28/2018 Recreation Equipment/Supplies Special Events
12.48 FACEBOOK - ADVERTISING 289618 9493 010771
12/5
3081.635712/28/2018 Advertising/Publication Arts & Humanities Council
190.00 IACP - MEMBERSHIP RENEW 289619 2642 000846
11/26
1101.647912/28/2018 Dues and Subscriptions General/Admn-Police
157.00 MCPA MEMBERSHIP DUES 2019 289620 2642 047162
12/3
1101.647912/28/2018 Dues and Subscriptions General/Admn-Police
3.45 CUB FOODS-SFST SUPPLIES 289621 2642 098714
12/5
1104.622612/28/2018 Public Safety Supplies Patrolling/Traffic
366.05 SAFARILAND-HOLSTERS 289622 4934 055044
11/17
1104.622412/28/2018 Clothing/Personal Equipment Patrolling/Traffic
257.10 SAFARILAND-HOLSTERS 289623 4934 014060
11/16
1104.622412/28/2018 Clothing/Personal Equipment Patrolling/Traffic
152.49-SPORTMAN GUIDE-RETURN 289624 4934 11/16 1104.622412/28/2018 Clothing/Personal Equipment Patrolling/Traffic
28.53 INGRAM PUBLISHING-BOOK 289625 4934 088939
11/29
1105.621112/28/2018 Office Printed Material/Forms Investigation/Crime Prevention
31.43 MULATE'S - CONFERENCE FOOD 289626 4288 061645
11/9
6716.647612/28/2018 Conferences/Meetings/Training General Administration
11.50 CONFERENCE FOOD 289627 4288 039321
11/7
6716.647612/28/2018 Conferences/Meetings/Training General Administration
19.79 EMBASSY SUITES CONFERENCE FOOD 289628 4288 023095
11/10
6716.647612/28/2018 Conferences/Meetings/Training General Administration
25.59 OLS NAWLINS COOKERY -CONF FOOD 289629 4288 026342
11/10
6716.647612/28/2018 Conferences/Meetings/Training General Administration
29.85 CAB TO ARENA FROM AIRPORT 289630 4288 072282
11/10
6716.647612/28/2018 Conferences/Meetings/Training General Administration
36.00 URBER TO CONF FROM AIRPORT 289631 4288 097491
11/10
6716.647612/28/2018 Conferences/Meetings/Training General Administration
21.36 WALMART - BDAY SUPPLIES 289632 6884 073721
11/17
6609.685512/28/2018 Merchandise for Resale Concession Sales/Vending
632.01 COURTYARD MARRIOTT -HOTEL CONF 289633 4288 040668
11/11
6716.647612/28/2018 Conferences/Meetings/Training General Administration
50.00-COURTYARD MARRIOTT - HOTEL DIS 289634 4288 11/13 6716.647612/28/2018 Conferences/Meetings/Training General Administration
36.19 UBER - CONFERNCE TRAVEL 289635 4288 070977 6716.647612/28/2018 Conferences/Meetings/Training General Administration
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
15Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
11/7
35.88 SUPPLIES FOR WELL 3 LIGHTS 289636 7965 013695
11/5
6148.623312/28/2018 Building Repair Supplies North Well Field
85.82 STP P.M SUPPLIES 289637 7965 068676
11/19
6155.623012/28/2018 Repair/Maintenance Supplies-Ge South Plant Production
40.00 KEY BOARD STP 289638 7965 055870
11/29
6154.623312/28/2018 Building Repair Supplies South Plant Building
30.50 NTP ADMIN BATHROOM 289638 7965 055870
11/29
6146.623012/28/2018 Repair/Maintenance Supplies-Ge North Plant Building
31.92 HOME DEPOT-WHEELS SHELF FIRE 289639 7790 016118
12/4
3001.622712/28/2018 Recreation Equipment/Supplies General/Admn-Recreation
50.00 MEN'S VB AWARDS BWW GIFT CARD 289640 4239 081793
12/4
3041.622712/28/2018 Recreation Equipment/Supplies Adult Volleyball-Men
50.00 WOMEN'S VB AWARDS BWW GIFT CAR 289640 4239 081793
12/4
3042.622712/28/2018 Recreation Equipment/Supplies Adult Volleyball-Women
100.00 CO-REC VB AWARDS BWW GIFT CARD 289640 4239 081793
12/4
3043.622712/28/2018 Recreation Equipment/Supplies Adult Volleyball-Co-Rec
250.00 MEN'S B-BALL AWARD BWW GIFT CA 289640 4239 081793
12/4
3076.622712/28/2018 Recreation Equipment/Supplies Adult Basketball-Men
46.83 CUB FOODS - WATER/SUPPLIES 289641 4872 035800
11/26
0720.647712/28/2018 Local Meeting Expenses General Admin-Planning & Zonin
18.94 CASHREGISTERSTORE-TUBING HILL 289642 5486 017255
11/9
3001.621012/28/2018 Office Supplies General/Admn-Recreation
126.84 AMAZON HOCKEY NET REPAIR 289643 2511 093585
11/16
3119.625212/28/2018 Parks & Play Area Supplies Rink Amenity Mtn/Setup
1,500.00 HYVEE - G.C. FITNESS PROMO 289644 8676 032523
11/28
6801.635712/28/2018 Advertising/Publication General & Administrative
39.00 MRPA - ANNUAL GENERAL MEETING 289645 8676 064106
11/13
3001.647712/28/2018 Local Meeting Expenses General/Admn-Recreation
231.56 AMAZON - PRINTING CARTRIDGES 289646 8676 022400
11/14
6801.621212/28/2018 Office Small Equipment General & Administrative
669.53 PLASTIC PRINTERS - CARDS 289647 8676 008585
11/29
3001.621012/28/2018 Office Supplies General/Admn-Recreation
234.95 PERFORMGROUP - COSTUMES 289648 1423 089006
11/16
6611.622012/28/2018 Operating Supplies - General Learn To Skate
95.00 FROSTY BLADES 289649 1423 017581
11/27
6611.622012/28/2018 Operating Supplies - General Learn To Skate
49.61 WALMART - BIRTHDAY SUPPLIES 289650 3330 030006
11/16
6609.685512/28/2018 Merchandise for Resale Concession Sales/Vending
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
16Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
47.94 AMAZON -COSTUMES FOR TEAM COMP 289651 3330 081631
11/16
6611.622012/28/2018 Operating Supplies - General Learn To Skate
14.05 NEW ORLEANS CC CONFERENCE FOOD 289652 4288 065487
11/8
6701.647612/28/2018 Conferences/Meetings/Training Season Pass
10.19 NEW ORLEANS CC CONFERENCE FOOD 289653 4288 016808
11/9
6716.647612/28/2018 Conferences/Meetings/Training General Administration
3.03 NEW ORLEANS CC-CONFERENCE FOOD 289654 4288 099436
11/10
6716.647612/28/2018 Conferences/Meetings/Training General Administration
18.49 THE CORP BAR - CONFERENCE FOOD 289655 4288 079071
11/9
6716.647612/28/2018 Conferences/Meetings/Training General Administration
19.38 SIGNS.COM CMF - PHASE2 289656 7643 024329
11/7
5501.666012/28/2018 Office Furnishings & Equipment CMF expansion phase II
21.60 MCDONALDS - MTG EXPENSES 289657 0290 044422
11/20
3202.647712/28/2018 Local Meeting Expenses Training and Meetings
90.46 CUB FOODS - COFFEE 289658 1696 045496
11/9
6831.685512/28/2018 Merchandise for Resale Food and Beverage
38.98 AMAZON - BATTERIES 289659 1696 044179
11/13
6801.622012/28/2018 Operating Supplies - General General & Administrative
65.98 AMAZON - BATTERIES 289660 1696 059062
11/14
6805.622012/28/2018 Operating Supplies - General Birthday Parties
43.87 TOPPERS PIZZA - EVENT 289661 1696 083700
11/20
6831.685512/28/2018 Merchandise for Resale Food and Beverage
113.22 PARTY CITY - SUPPLIES 289662 1696 065898
11/29
6805.622012/28/2018 Operating Supplies - General Birthday Parties
88.66 GOTPRINT.RACKCARDS 289663 4406 097661
11/17
6801.635712/28/2018 Advertising/Publication General & Administrative
321.35 KOHLS.FITBIT.MARKETING 289664 4406 073164
11/19
6801.635712/28/2018 Advertising/Publication General & Administrative
107.11 KOHLS.FITBIT.MARKETING 289665 4406 052981
11/19
6801.635712/28/2018 Advertising/Publication General & Administrative
597.00 EXPRESSO.SOFTWARE.RENEWAL 289666 4406 035208
11/27
6807.653512/28/2018 Other Contractual Services Fitness Center
597.00 EXPRESSO.SOFTWARE.RENEWAL 289666 4406 035208
11/27
6807.653512/28/2018 Other Contractual Services Fitness Center
597.00-EXPRESSO.SOFTWARE.RENEWAL 289666 4406 035208
11/27
6807.653512/28/2018 Other Contractual Services Fitness Center
28.49-KOHLS.CREDIT.FOR.SALESTAX 289667 4406 073164
12/5
6801.635712/28/2018 Advertising/Publication General & Administrative
20.00 ECONOMIC DEV ASSOC - EVENT 289668 4872 085270 0720.647712/28/2018 Local Meeting Expenses General Admin-Planning & Zonin
1/3/2019City of Eagan 16:45:01R55CKR2LOGIS102V
17Page -Council Check Register by GL
Check Register w GL Date & Summary
12/28/201812/22/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20183564 12/28/2018 121803 US BANK - AUTOPAY Continued...
11/20
32.37 SAVOY'S - APC WORKSHOP FOOD 289669 4872 099927
11/27
0720.647712/28/2018 Local Meeting Expenses General Admin-Planning & Zonin
13.42 COWBOY JACKS-FM ASSOC. MEETING 289670 2406 012562
11/14
1228.647612/28/2018 Conferences/Meetings/Training Inspection and Prevention
824.55 PROMTIONAL ITEMS CUPS AND MUG 289671 5528 057552
11/16
1107.622012/28/2018 Operating Supplies - General Support Services
45,916.87
20184227 12/27/2018 100892 ICMA RETIREMENT TRUST
43,202.23 ICMA EMPLOYEE CONTRIBUTIONS 289371 12272018 9592.203112/28/2018 Ded Pay - ICMA Benefit Accrual
43,202.23
20185109 12/26/2018 100283 BERKLEY ADMINISTRATORS
3,167.00 WC ADMIN FEE 289368 122618 9593.638712/26/2018 Worker's Comp - Administration Workers' Compensation Self-In
3,167.00
20185680 12/27/2018 147907 SELECT ACCOUNT
4,289.03 FLEX REIMBURSEMENT 289369 12272018 9592.221512/27/2018 Flex Plan Withholding Payable Benefit Accrual
4,289.03
20188030 12/27/2018 100694 PUBLIC EMPLOYEE RETIREMENT
76.96 PAYROLL ENDING 12/22/2018 289379 12272018 9592.614612/28/2018 PERA - DCP Benefit Accrual
70,682.46 PAYROLL ENDING 12/22/2018 289379 12272018 9592.201312/28/2018 Ded Payable - PERA Benefit Accrual
41,066.01 PAYROLL ENDING 12/22/2018 289379 12272018 9592.614212/28/2018 PERA - Coordinated Benefit Accrual
52,522.50 PAYROLL ENDING 12/22/2018 289379 12272018 9592.614312/28/2018 PERA - Police Benefit Accrual
164,347.93
20188549 12/24/2018 151185 HEALTHPARTNERS INC
3,059.25 DENTAL CLAIMS REIMBURSEMENT 289370 12242018 9594.615812/24/2018 Dental Insurance Dental Self-insurance
3,059.25
1,584,304.72 Grand Total Payment Instrument Totals
Checks 1,538,387.85
EFT Payments 45,916.87
Total Payments 1,584,304.72
1/3/2019City of Eagan 16:45:08R55CKS2LOGIS100
1Page -Council Check SummaryNote: Payment amount may not reflect the actual amount due to data sequencing and/or data selection.
12/28/201812/22/2018 -
Company Amount
717,688.7009001GENERAL FUND
14,526.3309197ETV
145,241.5409220PUBLIC UTILITIES
22,012.3709221CIVIC ARENA
4,407.1009222CASCADE BAY
37,403.8709223CENTRAL PARK /COMMUNITY CENTER
4,041.8009225FIBER INFRASTRUCTURE FUND
46.3409328PARK SYS DEV AND R&R
47.1009334CEDARVALE/HWY 13 TIF
141.3009337COMMUNITY INVESTMENT
19.3809355MAINTENANCE FACILITY EXPANSION
126.7009372REVOLVING SAF-CONSTRUCTION
382,660.1309592BENEFIT ACCRUAL
3,192.7109593WORKERS' COMPENSATION SELF-INS
3,059.2509594Dental Self-insurance
57,484.8009695DAK CO DRUG TASK FORCE
192,205.3009880PAYROLL
Report Totals 1,584,304.72
1/4/2019City of Eagan 8:22:13R55CKR2 LOGIS102V
1Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018--
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202895 1/4/2019 152114 3 GUYS SEWING
22.00 NEW LOGO-WINTER JACKETS 289691 5816 2010.622412/31/2018 Clothing/Personal Equipment General Engineering
22.00
202896 1/4/2019 100584 ADVANCED GRAPHIX INC
10.00 SQUAD 8 REPAIR 289680 200916 1104.642512/31/2018 Mobile Equipment Repair Labor Patrolling/Traffic
10.00
202897 1/4/2019 146970 AITKIN, ANDY
55.98 CLOTHING ALLOW ANDY AITKIN 289692 120918 2201.211512/31/2018 Clothing Allowance Gen/Adm-Streets
55.98
202898 1/4/2019 151172 ALADTEC INC.
4,980.00 SCHEDULING SOFTWARE 2019 289900 2018-12682 1221.62701/3/2019 Computer Software Administration-Fire
4,980.00
202899 1/4/2019 146622 ALLIANCE FOR INNOVATION
3,980.00 ALLIANCE FOR INNOVATION DUES 289910 268815 0201.64791/3/2019 Dues and Subscriptions General & Admn-Admn
3,980.00
202900 1/4/2019 114884 ANSELMENT, DANIELLE
17.44 MILEAGE-TRAINING-ANSELMENT 289693 110618 1104.635312/31/2018 Personal Auto/Parking Patrolling/Traffic
17.44
202901 1/4/2019 142987 APPLE CHEVROLET BUICK NORTHFIELD
170.63 SHADE FOR REAR OF UNIT 1111 289681 60746 3511.668012/31/2018 Mobile Equipment Equip Rev Fd-Dept 11
168.23 UNIT 1111R 289943 60395 9001.141512/31/2018 Inventory - Parts General Fund
338.86
202902 1/4/2019 100360 APPLE FORD LINCOLN APPLE VALLEY
343.64 PO2018-89 289935 440673 9001.141512/31/2018 Inventory - Parts General Fund
55.89 UNIT 1103 289936 AICB954922 9001.141512/31/2018 Inventory - Parts General Fund
572.46 PO2018-90 289937 444051 9001.141512/31/2018 Inventory - Parts General Fund
237.82 UNIT 1109 289938 444480 9001.141512/31/2018 Inventory - Parts General Fund
99.35 UNIT 11033 289939 445452 9001.141512/31/2018 Inventory - Parts General Fund
147.32 UNIT 1127 289940 445688 9001.141512/31/2018 Inventory - Parts General Fund
10.46 UNIT 319 289941 445798 9001.141512/31/2018 Inventory - Parts General Fund
365.35 UNIT 1133 289942 445816 9001.141512/31/2018 Inventory - Parts General Fund
119.00- OVRPMNT INV A1JP907425 289954 A1JP907245-CR 9591.638612/31/2018 Insurance Deductible Risk Management
1,713.29
1/11/2019
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
2Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202903 1/4/2019 144673 ARCADE ELECTRIC Continued...
315.60 BLOWERS WIRED PUMPHOUSE 289682 10476 6719.653512/31/2018 Other Contractual Services Building Maintenance
1,349.95 ELECTRICAL FOR TREADMILL 289683 10477 6603.663012/31/2018 Other Improvements Building Repair & Maint.
554.16 ELECTRICAL REPAIR 289684 10517 3313.653512/31/2018 Other Contractual Services Fire Buildings
3,612.92 ELECTRICAL REPAIR 289685 10516 3314.653512/31/2018 Other Contractual Services Central Maintenance
1,351.24 ELECTRICAL REPAIR 289686 10518 3314.653512/31/2018 Other Contractual Services Central Maintenance
11,885.00 ECC OUTDOOR BLDG LED'S 289687 10528 6834.653512/31/2018 Other Contractual Services Capital Replacement
19,068.87
202904 1/4/2019 121083 ASPEN MILLS
264.60 EXPLORER PATCHES 289688 228774 1228.622412/31/2018 Clothing/Personal Equipment Inspection and Prevention
264.60
202905 1/4/2019 140466 ASPENWALL TREE SERVICE INC.
1,500.00 BUR OAKS PARK REMOVAL 289689 18-0327 3220.654512/31/2018 Tree Removal Tree Removal
1,075.00 MOONSHINE REMOVAL 289690 18-0329 3220.654512/31/2018 Tree Removal Tree Removal
1,525.00 CAPONI PARK REMOVAL 289694 18-0326 3220.654512/31/2018 Tree Removal Tree Removal
1,200.00 THRESHER FIELDS REMOVAL 289695 18-0328 3220.654512/31/2018 Tree Removal Tree Removal
5,300.00
202906 1/4/2019 151832 AT&T
950.00 18-Z-107 TRACKING 289705 296833 9695.658912/31/2018 Forfeiture Expenditures Dakota Co Drug Task Force
950.00
202907 1/4/2019 100487 BARR ENGINEERING CO
90.00 ENGINEERING SERVICES 289696 23191139.19-6 6541.6712 P132212/31/2018 Project - Engineering Capital Proj-Renew&Repl-cr1126
90.00 ENGINEERING SERVICES 289696 23191139.19-6 6541.6712 P130212/31/2018 Project - Engineering Capital Proj-Renew&Repl-cr1126
180.00 ENGINEERING SERVICES 289696 23191139.19-6 6541.6712 P130312/31/2018 Project - Engineering Capital Proj-Renew&Repl-cr1126
1,958.81 ENGINEERING SERVICES 289696 23191139.19-6 6541.6712 P130412/31/2018 Project - Engineering Capital Proj-Renew&Repl-cr1126
90.00 ENGINEERING SERVICES 289696 23191139.19-6 6541.6712 P130612/31/2018 Project - Engineering Capital Proj-Renew&Repl-cr1126
4,317.08 ENGINEERING SERVICES 289697 23191139.18-14 6541.6712 P127212/31/2018 Project - Engineering Capital Proj-Renew&Repl-cr1126
1,278.76 ENGINEERING SERVICES 289697 23191139.18-14 6541.6712 P127112/31/2018 Project - Engineering Capital Proj-Renew&Repl-cr1126
1,032.14 ENGINEERING SERVICES 289697 23191139.18-14 6541.6712 P127012/31/2018 Project - Engineering Capital Proj-Renew&Repl-cr1126
3,212.80 ENGINEERING SERVICES 289697 23191139.18-14 6541.6712 P126912/31/2018 Project - Engineering Capital Proj-Renew&Repl-cr1126
4,306.00 BARR ENG, SITE DVLP 30%289698 23191361.00-16 5040.631012/31/2018 Professional Services-General Site Development
16,555.59
202908 1/4/2019 100397 BATTERIES PLUS
159.92 UPS BATTERIES 289699 P9324557 6148.626012/31/2018 Utility System Parts/Supplies North Well Field
159.92
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
3Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202909 1/4/2019 150924 BKJ LAND CO.Continued...
1,130.00 CEDARPONDPARK SHORERESTORE 289700 1818-5 6542.675912/31/2018 General Landscaping/Furnishing Capital Proj-WQ dedictn-cr1127
5,653.10 CEDAR POND STORM REPAIRS 289700 1818-5 6438.643212/31/2018 Utility System Repair-Labor Storm Main Maintenance/Repair
15,048.00 CEDARPONDCIP 289700 1818-5 2813.675312/31/2018 Grading Cedar Pond Park
21,831.10
202910 1/4/2019 153567 BLACKINTON CO INC, V H
12.00 BOLKS UNIFORM REPAIR 289701 2929140 1105.622412/31/2018 Clothing/Personal Equipment Investigation/Crime Prevention
12.00
202911 1/4/2019 102077 BOLKS, STEPHANIE
30.00 BOLKS TRAINING 289706 112818 1105.647612/31/2018 Conferences/Meetings/Training Investigation/Crime Prevention
20.00 UNIFORM BOLKS 289707 120318 1105.622412/31/2018 Clothing/Personal Equipment Investigation/Crime Prevention
50.00
202912 1/4/2019 131767 BOLTON & MENK INC.
9,464.00 PROF SERVICES 11/3-11/30/18 289702 0226845 8311.671312/31/2018 Project - Outside Engineering P 1311 Donald Avenue
4,003.50 PROF SERVICES 11/3-11/30/18 289703 0226846 8310.671312/31/2018 Project - Outside Engineering P 1310 Surry Heights Drive
13,467.50
202913 1/4/2019 100024 BRAUN INTERTEC
9,283.00 BRAUN INTERTEC, TESTING 289704 B155103 5041.631012/31/2018 Professional Services-General Phase 1-PD,Garage,&Traing room
9,283.00
202914 1/4/2019 128578 CDW GOVERNMENT INC.
59.69 CPU POWER SUPPLY-01 289708 QHT4967 1101.666012/31/2018 Office Furnishings & Equipment General/Admn-Police
12.96 EQUIPMENT FOR RWAARA 289709 QLD5112 0301.666012/31/2018 Office Furnishings & Equipment IT-Gen & Admn
72.65
202915 1/4/2019 151299 CINTAS
60.52 RUGS 289710 4013900635 3314.656912/31/2018 Maintenance Contracts Central Maintenance
50.20 RUGS 289711 4013900567 3315.656912/31/2018 Maintenance Contracts City Hall
34.20 ECC RUGS 289712 4014225206 6827.656912/31/2018 Maintenance Contracts Building Maintenance
49.50 RUGS 289713 4013900639 6146.653512/31/2018 Other Contractual Services North Plant Building
194.42
202916 1/4/2019 147895 CJ SPRAY
61.36 HYDRANT PAINTING 289714 3123520 6144.623012/31/2018 Repair/Maintenance Supplies-Ge Hydrant Maintenance/Repair
61.36
202917 1/4/2019 100040 CONT SAFETY EQUIP
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
4Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202917 1/4/2019 100040 CONT SAFETY EQUIP Continued...
171.00 PPE SAFETY GLOVES 289715 449178 6238.622212/31/2018 Medical/Rescue/Safety Supplies Sewer Main Maintenance
375.00 PPE LIFE JACKETS 289716 449177 6438.622212/31/2018 Medical/Rescue/Safety Supplies Storm Main Maintenance/Repair
83.66 CLOTHING ALLOWANCE - HOLTZ 289890 449108 6201.211512/31/2018 Clothing Allowance San Sewer-Administration
629.66
202918 1/4/2019 150880 CORE & MAIN LP
2,849.70 WOODLANDS LS REPAIR 289717 J845412 6439.626012/31/2018 Utility System Parts/Supplies Lift Station Maintenanc/Repair
2,849.70
202919 1/4/2019 152118 CORNERSTONE COPY BURNSVILLE
397.50 PRINTING 289718 173797 3071.635712/31/2018 Advertising/Publication MN State Arts Board
397.50
202920 1/4/2019 152916 CORNERSTONE PARKING GROUP
158.82 CINTAS FLOOR MATS 289719 1650 9116.622312/31/2018 Building/Cleaning Supplies Cedar Grove Parking Garage
469.19 VERSATILE INV #13546 REPAIRS 289719 1650 9116.653512/31/2018 Other Contractual Services Cedar Grove Parking Garage
628.01
202921 1/4/2019 153516 DAK CTY DRUGTASKFORCE-CHRISTOPHER MELTON
10,730.00 BUY FUND REPLENISH 289901 010219 9695.1030.61/3/2019 Buy Fund-Drug Task Force Dakota Co Drug Task Force
10,730.00
202922 1/4/2019 100338 DAK CTY RECORDER
56.00 FS 5 PLAT RECORDING FEE 289720 3279762 - PLAT 9337.631012/31/2018 Professional Services-General Community Investment
56.00
202923 1/4/2019 128852 DAK CTY REGIONAL CHAMBER OF COMMERCE
1,250.00 2019 MEMBERSHIP & DIRECTORY 289911 69258 0201.65351/3/2019 Other Contractual Services General & Admn-Admn
1,250.00
202924 1/4/2019 100048 DAK CTY TECHNICAL COLLEGE
300.00 MASON TRAINING 289721 356779 1104.647612/31/2018 Conferences/Meetings/Training Patrolling/Traffic
300.00
202925 1/4/2019 120622 DAKOTA COMMUNICATIONS CENTER
113,426.00 DCC MONTHLY FEE-JAN2019 289912 EA2019-01 1108.63301/3/2019 DCC Fees Communications
113,426.00
202926 1/4/2019 133868 DAKOTA COUNTY FINANCIAL SERVICES
1,215.31 SPERRY TOWER ELECT COST 289723 00033164 6154.640912/31/2018 Electricity-Wells/Booster Stat South Plant Building
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
5Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202926 1/4/2019 133868 DAKOTA COUNTY FINANCIAL SERVICES Continued...
2,659.62 PD RADIO USER FEE-DEC18 289724 00033163 1108.656912/31/2018 Maintenance Contracts Communications
2,169.69 PD RADIO USER FEE-DEC18 289724 00033163 1221.653512/31/2018 Other Contractual Services Administration-Fire
2,659.62 PD RADIO USER FEE-NOV18 289725 00033162 1108.656912/31/2018 Maintenance Contracts Communications
2,169.69 FIRE RADIO USER FEE-NOV18 289725 00033162 1221.653512/31/2018 Other Contractual Services Administration-Fire
10,873.93
202927 1/4/2019 145515 DAKOTA COUNTY TREASURER-AUDITOR
13.30 RECYCLING 289726 6/7/2018 3304.653912/31/2018 Waste Removal/Sanitation Servi Bldg/Facilities Maintenance
30.00 RECYCLING 289727 11/15/2018 3304.653912/31/2018 Waste Removal/Sanitation Servi Bldg/Facilities Maintenance
43.30
202928 1/4/2019 100447 DALCO
2,809.38 CUSTODIAL SUPPLIES 289722 3400662 6827.622312/31/2018 Building/Cleaning Supplies Building Maintenance
2,809.38
202929 1/4/2019 102523 DLT SOLUTIONS, INC.
5,159.75 AUTOCAD RENEWALS 289913 4721759A 0301.65691/3/2019 Maintenance Contracts IT-Gen & Admn
5,159.75
202930 1/4/2019 100969 DRIVER & VEHICLE SERVICES
22.00 INV TABS-VIN 4766/VIN 5927 289902 120518 1104.64801/3/2019 Licenses, Permits and Taxes Patrolling/Traffic
22.00
202931 1/4/2019 126333 DUNN & SEMINGTON PRINTING DESIGN
480.00 DASHER BOARDS FOR YOUTH 289728 34863 6601.622012/31/2018 Operating Supplies - General General/Administrative-Arena
480.00
202932 1/4/2019 152878 DYNAMIC EMPLOYMENT GROUP LLC
750.00 OFFICER WELLNESS TRAINING 289729 1554 1104.632012/31/2018 Instructors Patrolling/Traffic
750.00
202933 1/4/2019 150747 EAGAN KICK-START ROTARY CLUB
205.00 ROTARY, 2019 1ST QTR 289914 458 0201.64771/3/2019 Local Meeting Expenses General & Admn-Admn
205.00 Q1 2019 ROTARY DUES 289915 449 3001.64771/3/2019 Local Meeting Expenses General/Admn-Recreation
410.00
202934 1/4/2019 101048 EHLERS & ASSOCIATES, INC.
780.00 CORVIDA/MIF NOV 2018 289730 78836 9001.2245 J035212/31/2018 Escrow - Private Development F General Fund
780.00
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
6Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202935 1/4/2019 101006 EMERGENCY AUTO TECHNOLOGIES Continued...
608.20 SQUAD PARTS 289731 DL121918-26 1104.623112/31/2018 Mobile Equipment Repair Parts Patrolling/Traffic
608.20
202936 1/4/2019 104486 ENOS, LLOYD
65.10 ENOS UNIFORM 289735 120518 1107.622412/31/2018 Clothing/Personal Equipment Support Services
65.10
202937 1/4/2019 151785 EVERBRIDGE INC.
6,300.00 2019 - NIXLE TEXTING PLATFORM 289916 M40523 0901.65351/3/2019 Other Contractual Services Gen & Admin-Communications
6,300.00
202938 1/4/2019 100062 FACTORY MOTOR PARTS CO
70.83 DEF FLUID 289732 1-5804446 2244.623512/31/2018 Fuel, Lubricants, Additives Street Equipment Repair/Mtn
23.61 DEF FLUID 289732 1-5804446 3128.623512/31/2018 Fuel, Lubricants, Additives Vehicle Maintenance
94.44
202939 1/4/2019 100451 FASTENAL COMPANY
36.74 BRINE MAKER REPAIR 289733 MNTC1224970 2240.625612/31/2018 Snow Removal/Ice Control Suppl Street Plowing/Sanding
3.50 EQUIPMENT FOR BEAN BAGS BOARDS 289734 MNTC1224925 3001.622712/31/2018 Recreation Equipment/Supplies General/Admn-Recreation
20.98 BLACK UV RES CABLE TIES STOCK 289736 MNTC1224820 6146.62301/3/2019 Repair/Maintenance Supplies-Ge North Plant Building
637.32 SS SUPPLIES AIR LINE FILTER CE 289737 MNTC1224980 6147.62601/3/2019 Utility System Parts/Supplies North Plant Production
9.24 HYDRANT REPAIR 289738 MNTC1224860 6144.62601/3/2019 Utility System Parts/Supplies Hydrant Maintenance/Repair
707.78
202940 1/4/2019 122976 FIRE SAFETY USA INC.
2,405.00 MISC TRUCK PARTS 289739 118640 1224.62311/3/2019 Mobile Equipment Repair Parts Engineer
2,405.00
202941 1/4/2019 143971 FLEETPRIDE
186.56 PPE SEWER GLOVES 289740 16512673 6239.62221/3/2019 Medical/Rescue/Safety Supplies Lift Station Maintenanc/Repair
50.74 UNIT 312 289741 16787465 9001.14151/3/2019 Inventory - Parts General Fund
69.33 PPE SAFETY GLOVES 289742 16680199 6144.62221/3/2019 Medical/Rescue/Safety Supplies Hydrant Maintenance/Repair
306.63
202942 1/4/2019 101972 FRANCOIS, RICHARD
159.95 CLOTHING ALLOWANCE - FRANCOIS 289743 120818 6101.21151/3/2019 Clothing Allowance Water -Administration
159.95
202943 1/4/2019 147955 GALLS LLC
3.05 FARNHAM UNFIORM 289744 011482014 1104.622412/31/2018 Clothing/Personal Equipment Patrolling/Traffic
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
7Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202943 1/4/2019 147955 GALLS LLC Continued...
9.00 TENNESSEN UNIFORM 289745 011501520 1104.622412/31/2018 Clothing/Personal Equipment Patrolling/Traffic
390.00 HAT BANDS 289746 011501681 1104.622412/31/2018 Clothing/Personal Equipment Patrolling/Traffic
165.50 TOCKO UNIFORM 289747 011541034 1104.622412/31/2018 Clothing/Personal Equipment Patrolling/Traffic
240.00 WEGNER UNIFORM 289748 011550646 1104.622412/31/2018 Clothing/Personal Equipment Patrolling/Traffic
61.65 TOCKO UNIFORM 289749 011551943 1104.622412/31/2018 Clothing/Personal Equipment Patrolling/Traffic
61.65 TOCKO UNIFORM 289750 011551945 1104.622412/31/2018 Clothing/Personal Equipment Patrolling/Traffic
492.00 PD PATCHES 289751 011565483 1104.622412/31/2018 Clothing/Personal Equipment Patrolling/Traffic
15.15 BOLLUYT UNIFORMS 289784 011513431 1104.622412/31/2018 Clothing/Personal Equipment Patrolling/Traffic
32.40 ELENZ UNIFORM 289894 011597477 1104.622412/31/2018 Clothing/Personal Equipment Patrolling/Traffic
1,470.40
202944 1/4/2019 100578 GENUINE PARTS COMPANY
1,864.90 INVENTORY AND RO'S 289895 14302615-103118 9001.141512/31/2018 Inventory - Parts General Fund
6.29 FIRE 289895 14302615-103118 1224.623012/31/2018 Repair/Maintenance Supplies-Ge Engineer
130.32 FIRE DEF 289895 14302615-103118 1224.623512/31/2018 Fuel, Lubricants, Additives Engineer
104.08 POLICE PARTS 289895 14302615-103118 1104.623112/31/2018 Mobile Equipment Repair Parts Patrolling/Traffic
17.84 PARKS PARTS 289895 14302615-103118 3118.625212/31/2018 Parks & Play Area Supplies Athletic Field Mtn/Setup
15.10 PARKS PARTS 289895 14302615-103118 3129.623112/31/2018 Mobile Equipment Repair Parts Shop Mtn/General Repairs
246.29 SHOP SUPPLIES 289895 14302615-103118 2401.624012/31/2018 Small Tools Gen/Adm-Central Services
42.28 STREETS PARTS 289895 14302615-103118 2244.623112/31/2018 Mobile Equipment Repair Parts Street Equipment Repair/Mtn
18.48 UTILITIES 289895 14302615-103118 6146.626012/31/2018 Utility System Parts/Supplies North Plant Building
186.03 UTILITIES PARTS 289895 14302615-103118 6232.623112/31/2018 Mobile Equipment Repair Parts Equipment Maintenance/Repair
111.90 SMALL TOOLS 289896 14302615-113018 2401.624112/31/2018 Shop Materials Gen/Adm-Central Services
130.59 PARKS PARTS 289896 14302615-113018 3128.623112/31/2018 Mobile Equipment Repair Parts Vehicle Maintenance
1,538.50 INV PARTS 289896 14302615-113018 9001.141512/31/2018 Inventory - Parts General Fund
12.70 STREETS PARTS 289896 14302615-113018 2244.623112/31/2018 Mobile Equipment Repair Parts Street Equipment Repair/Mtn
33.70 FIRE 289896 14302615-113018 1224.623012/31/2018 Repair/Maintenance Supplies-Ge Engineer
398.93 FIRE DEF 289896 14302615-113018 1224.623512/31/2018 Fuel, Lubricants, Additives Engineer
7.30 FIRE PARTS 289896 14302615-113018 1224.623112/31/2018 Mobile Equipment Repair Parts Engineer
10.18 PARKS TOOLS 289896 14302615-113018 3127.624012/31/2018 Small Tools Equipment Maintenance/Repair
21.82 PARKS PARTS 289896 14302615-113018 3127.623112/31/2018 Mobile Equipment Repair Parts Equipment Maintenance/Repair
78.17 SHOOP TOOLS 289896 14302615-113018 2401.624012/31/2018 Small Tools Gen/Adm-Central Services
45.57 PARKS PARTS 289896 14302615-113018 3119.625212/31/2018 Parks & Play Area Supplies Rink Amenity Mtn/Setup
5,020.97
202945 1/4/2019 144566 GERLACH OUTDOOR POWER EQUIPMENT INC.
3,080.00 OUTBACK BRUSH CUTTER 289897 166312 3222.667012/31/2018 Other Equipment Equipment Mtn
3,080.00
202946 1/4/2019 148199 GOLDEN ESSENCE HEALING ARTS
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
8Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202946 1/4/2019 148199 GOLDEN ESSENCE HEALING ARTS Continued...
250.00 GOLDEN ESSENCE RENTAL-10/18 289752 132 3092.645612/31/2018 Building Rental CDBG - Seniors
150.00 GOLDEN ESSENCE RENTAL-9/18 289753 131 3092.645612/31/2018 Building Rental CDBG - Seniors
400.00
202947 1/4/2019 101127 GOODPOINTE TECHNOLOGY CORPORATION
5,970.00 AVL-2019 289917 3873 0301.65691/3/2019 Maintenance Contracts IT-Gen & Admn
5,970.00
202948 1/4/2019 146240 GOODYEAR COMMERCIAL TIRE
2,326.57 UNIT 1210 289898 124-1091977 9001.141512/31/2018 Inventory - Parts General Fund
2,326.57
202949 1/4/2019 100990 GRAINGER
282.66 TEMP HYDRANT METERS 289754 9029330058 6163.626012/31/2018 Utility System Parts/Supplies Meter Maintenance/Repair
66.50 PR STATIONS 289755 9029282325 6152.626012/31/2018 Utility System Parts/Supplies PRS Inspection/Maint/Repair
325.28 BRINE PUMP MOTOR 289756 9031453369 2240.625612/31/2018 Snow Removal/Ice Control Suppl Street Plowing/Sanding
34.72 BRINE PUMP SUPPLIES 289757 9031217152 2240.625612/31/2018 Snow Removal/Ice Control Suppl Street Plowing/Sanding
43.60 MISC REPAIR SUPPLIES 289758 9020590288 1225.623012/31/2018 Repair/Maintenance Supplies-Ge Fire / EMS Equipment
222.94 MISC CLEANING SUPPLIES 289759 9025330516 1225.624412/31/2018 Chemicals & Chemical Products Fire / EMS Equipment
399.00 PR STATIONS 289760 9036655745 6152.626012/31/2018 Utility System Parts/Supplies PRS Inspection/Maint/Repair
99.51 CONSTRUCTION METERS 289761 9038203106 6163.626012/31/2018 Utility System Parts/Supplies Meter Maintenance/Repair
344.85 ICE CLEATS FOR PPE 289762 9038700069 6131.622212/31/2018 Medical/Rescue/Safety Supplies Water Customer Service
344.85 ICE CLEATS FOR PPE 289763 9040546856 6131.622212/31/2018 Medical/Rescue/Safety Supplies Water Customer Service
452.20-PR STATIONS RETURN 289764 9040546864 6152.626012/31/2018 Utility System Parts/Supplies PRS Inspection/Maint/Repair
68.97 PPE ICE CLEATS 289785 9029205102 6131.622212/31/2018 Medical/Rescue/Safety Supplies Water Customer Service
156.04 TEMP HYDRANT METERS 289899 9029330041 6163.626012/31/2018 Utility System Parts/Supplies Meter Maintenance/Repair
1,936.72
202950 1/4/2019 148750 GRIFFIN, NICHOLAS
19.99 CLOTHING ALLOWANCE - GRIFFIN 289768 121018 6101.211512/31/2018 Clothing Allowance Water -Administration
19.99
202951 1/4/2019 146028 HALL CO., W.L.
362.50 WALL REPAIR 289765 4731 6827.653512/31/2018 Other Contractual Services Building Maintenance
362.50
202952 1/4/2019 145495 HAMMER, JENNIFER
140.00 HAMMER UNIFORM 289769 121118 1107.622412/31/2018 Clothing/Personal Equipment Support Services
140.00
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
9Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202953 1/4/2019 100085 HARDWARE HANK Continued...
2.49 GENERATOR PARTS 289766 1788934 6232.623112/31/2018 Mobile Equipment Repair Parts Equipment Maintenance/Repair
16.47 STP HIGH SERV PUMP PARTS 289767 1801859 6155.623012/31/2018 Repair/Maintenance Supplies-Ge South Plant Production
7.47 HARDWARE HANK-BOLTS FOR TRUCK 289770 1799813 1224.623112/31/2018 Mobile Equipment Repair Parts Engineer
23.89 FUEL/OIL 289771 1804919 3222.623512/31/2018 Fuel, Lubricants, Additives Equipment Mtn
22.99 SAFETY SUPPLY 289772 1803522 3201.622212/31/2018 Medical/Rescue/Safety Supplies Administrative/General
73.31
202954 1/4/2019 100267 HAYES ELECTRIC
188.00 BLDG REPAIR LABOR 289773 4271-122918 3106.642712/31/2018 Building Operations/Repair-Lab Structure Care & Maintenance
188.00
202955 1/4/2019 150980 HD SUPPLY CONSTRUCTION AND INDUSTRIAL
47.77-CREDIT 289774 10009701535 3108.625212/31/2018 Parks & Play Area Supplies Park Improvements
10.49 STREET SIGN INSTALL 289775 50009291518 2242.625712/31/2018 Signs & Striping Material Signs-Installation & Mtn
10.49-STREET SIGN INSTALL 289776 10009739926 2242.625712/31/2018 Signs & Striping Material Signs-Installation & Mtn
53.98 STREET SIGN INSTALL 289777 50009413085 2242.625712/31/2018 Signs & Striping Material Signs-Installation & Mtn
6.21
202956 1/4/2019 138631 HEALTHEAST MEDICAL TRANSPORTATION
85.00 BLOOD DRAW SUSPECT 289783 18-53081 9115.631012/31/2018 Professional Services-General DWI Forfeiture
85.00
202957 1/4/2019 151175 HELLO BOOKING INC.
2,375.00 STAGE DOWN PAYMENT 289893 080919-DOWN
PAYMENT
3079.63201/3/2019 Instructors Special Events
2,500.00 CHRIS KROEZE DOWN PMNT 289893 080919-DOWN
PAYMENT
3079.63201/3/2019 Instructors Special Events
4,875.00
202958 1/4/2019 113918 HILLYARD
1,949.76-GYM RE-SURFACING SUPPLIES 289778 800355430 6827.653512/31/2018 Other Contractual Services Building Maintenance
476.62 CUSTODIAL SUPPLIES 289779 603038940 6827.622312/31/2018 Building/Cleaning Supplies Building Maintenance
529.24 EQUIPMENT REPAIR 289780 603080085 6827.623012/31/2018 Repair/Maintenance Supplies-Ge Building Maintenance
930.00 VACUUMS 289781 603088472 6827.664012/31/2018 Machinery/Equipment Building Maintenance
720.29 CUSTODIAL SUPPLIES 289782 603264776 6827.622312/31/2018 Building/Cleaning Supplies Building Maintenance
706.39
202959 1/4/2019 100297 HOLIDAY COMMERCIAL
5.36 CAR WASHES 289786 1400-006-317-66
9-120818
1221.635412/31/2018 Car Washes Administration-Fire
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
10Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202959 1/4/2019 100297 HOLIDAY COMMERCIAL Continued...
145.00 SQUAD CAR WASH 289790 1400-006-311-45
8-120818
1104.635412/31/2018 Car Washes Patrolling/Traffic
150.36
202960 1/4/2019 138907 HOLMIN HEATING & COOLING
360.00 HVAC CONTRACT 289787 700993 3314.656912/31/2018 Maintenance Contracts Central Maintenance
360.00
202961 1/4/2019 101708 HONSA LIGHTING SALES & SVC. INC.
521.80 RECYCLING 289788 86928 6827.653912/31/2018 Waste Removal/Sanitation Servi Building Maintenance
521.80
202962 1/4/2019 100089 HOSE CONVEYORS INC
183.07 BRINE BUILDING PARTS 289789 00078189 2240.625612/31/2018 Snow Removal/Ice Control Suppl Street Plowing/Sanding
183.07
202963 1/4/2019 100090 HOTSY EQUIPMENT OF MINNESOTA
285.98 HOTSY SOAP 289791 61850 2401.624112/31/2018 Shop Materials Gen/Adm-Central Services
285.98
202964 1/4/2019 145222 HOWIES HOCKEY TAPE
157.28 PRO SHOP RESALE 289792 38746 6623.685512/31/2018 Merchandise for Resale Pro Shop Sales
157.28
202965 1/4/2019 108125 HTCIA
75.00 HTCIA SUBSCRIPTION INV 289918 7156 1105.64791/3/2019 Dues and Subscriptions Investigation/Crime Prevention
75.00
202966 1/4/2019 149714 HYDROCORP
5,365.00 CROSS CONNECTION CONTROL PROG 289919 0050644-IN 6131.63101/3/2019 Professional Services-General Water Customer Service
5,365.00
202967 1/4/2019 102585 ICMA
1,400.00 2019 ICMA MEMBERSHIP 289920 140166
OSBERG-2019
0201.64791/3/2019 Dues and Subscriptions General & Admn-Admn
1,400.00
202968 1/4/2019 115944 INTEREUM, INC.
1,203.52 STAGING ROOM WORK SURFACES 289793 152537 6501.666012/31/2018 Office Furnishings & Equipment G/A - Water Quality
947.43 STAGING ROOM INSTALL SERVICES 289793 152537 6501.653512/31/2018 Other Contractual Services G/A - Water Quality
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
11Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202968 1/4/2019 115944 INTEREUM, INC.Continued...
2,281.17 INTERUM OFFICE SUPPLIES 289794 152538 6801.667012/31/2018 Other Equipment General & Administrative
4,432.12
202969 1/4/2019 100508 J R'S APPLIANCE DISPOSAL INC
53.75 EQUIPMENT FOR BEAN BAGS BOARDS 289795 96742 3001.622712/31/2018 Recreation Equipment/Supplies General/Admn-Recreation
53.75
202970 1/4/2019 100378 JOHNSON FIRE & SAFETY INC, J N
117.90 ICE PATCHING EQUIPMENT 289797 SOI.158533 6604.653512/31/2018 Other Contractual Services Ice Maintenance
117.90
202971 1/4/2019 153563 JOHNSON FITNESS AND WELLNESS
1,250.00 FITNESS EQUIP INSTALL/REPAIR 289796 2-011712 1104.623212/31/2018 Small Equipment Repair Parts Patrolling/Traffic
1,250.00
202972 1/4/2019 101730 JONAS, KATY
59.40 JONAS UNIFORM-SHOES 289799 120418 1107.622412/31/2018 Clothing/Personal Equipment Support Services
59.40
202973 1/4/2019 140758 KENDELL DOORS & HARDWARE INC.
496.61 DOOR REPAIR 289798 IN000102 6827.653512/31/2018 Other Contractual Services Building Maintenance
2,766.00 DOOR OPENER-QUARRY PARK 289800 S1070847 3107.623312/31/2018 Building Repair Supplies Building/Structure Constr
3,262.61
202974 1/4/2019 138660 KNOLL, MARGARET
15.00 CLERICAL TRAINING 289801 121218 1107.647612/31/2018 Conferences/Meetings/Training Support Services
14.17 MILEAGE- TRAINING-KNOLL 289801 121218 1107.635312/31/2018 Personal Auto/Parking Support Services
29.17
202975 1/4/2019 127571 KOEHLE, JESSICA
102.61 ICE SAW SHARPENING 289802 120618 6501.623412/31/2018 Field/Other Equipment Repair G/A - Water Quality
43.33 LAKE MEETING REFRESHMENTS 289802 120618 6538.647712/31/2018 Local Meeting Expenses Pub Information/Education
145.94
202976 1/4/2019 109662 LAKEVILLE PARK & REC
40.00 WHO HIKE SUPPLIES 289803 125675 3079.622712/31/2018 Recreation Equipment/Supplies Special Events
40.00
202977 1/4/2019 100644 LANGUAGE LINE SERVICES
320.52 LANGUAGE LINE MONTHLY-NOV18 289804 4458493 1104.631012/31/2018 Professional Services-General Patrolling/Traffic
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
12Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202977 1/4/2019 100644 LANGUAGE LINE SERVICES Continued...
320.52
202978 1/4/2019 100692 LEAGUE OF MINN CITIES
99.00 LMC LEG CONF - HANSEN 289921 285469 0101.64771/3/2019 Local Meeting Expenses Legislative/Policy Development
99.00
202979 1/4/2019 101622 LEHMAN'S GARAGE INC
1,943.58 TRUCK 204 BODY WORK 289805 3249 6101.642512/31/2018 Mobile Equipment Repair Labor Water -Administration
1,943.58
202980 1/4/2019 139061 LEXISNEXIS RISK DATA MANAGEMENT INC
1,312.50 COPLOGIC-NOV 18 289809 805944-20181130 9335.627012/31/2018 Computer Software Equipment Revolving
7,875.00 LEXIS NEXIS-ONLINE 12/18-5/19 289810 805944-20190531
P
9335.627012/31/2018 Computer Software Equipment Revolving
9,187.50
202981 1/4/2019 146268 LIFE SUPPORT INNOVATIONS
993.30 AED BATTERIES 289806 1605 1225.622212/31/2018 Medical/Rescue/Safety Supplies Fire / EMS Equipment
993.30
202982 1/4/2019 100367 LYN-MAR TYPESETTING PRINTING
40.00 CITY OF EAGAN NOTE CARDS 289807 39859 0201.621012/31/2018 Office Supplies General & Admn-Admn
40.00 CITY OF EAGAN NOTE CARDS 289807 39859 0501.621012/31/2018 Office Supplies General & Admn-Finance
40.00 CITY OF EAGAN NOTE CARDS 289807 39859 1001.621012/31/2018 Office Supplies General/Admn-Human Resources
40.00 CITY OF EAGAN NOTE CARDS 289807 39859 3001.621012/31/2018 Office Supplies General/Admn-Recreation
160.00
202983 1/4/2019 138012 MACHTEMES, AARON
9.41 MACHTEMES TRAINING 289811 110618 1104.647612/31/2018 Conferences/Meetings/Training Patrolling/Traffic
9.41
202984 1/4/2019 100118 MARKS TOWING
75.00 SQUAD TOW 289808 503443 1104.653812/31/2018 Towing Charges Patrolling/Traffic
264.00 UNIT 124 TOW 289812 502801 9001.141512/31/2018 Inventory - Parts General Fund
339.00
202986 1/4/2019 151095 MENARDS-BURNSVILLE
20.45 EQUIPMENT FOR BEAN BAGS BOARDS 289813 93000 3001.622712/31/2018 Recreation Equipment/Supplies General/Admn-Recreation
233.23 CORN HOLE SUPPLIES 289818 92021 3001.622712/31/2018 Recreation Equipment/Supplies General/Admn-Recreation
253.68
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
13Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202986 1/4/2019 151095 MENARDS-BURNSVILLE Continued...
202987 1/4/2019 138889 METRO CHIEF FIRE OFFICERS ASSOCIATION
100.00 METRO FIRE CHIEF 289922 2019SCOTT 1221.64771/3/2019 Local Meeting Expenses Administration-Fire
100.00
202988 1/4/2019 100710 METRO COUNCIL ENVIRONMENTAL SVCS
466,215.50 WASTE WATER TREATMENT - JAN 19 289923 0001089829 6201.65751/3/2019 MCES Disposal Charges San Sewer-Administration
466,215.50
202989 1/4/2019 148978 MIDSOTA MANUFACTURING INC
16,130.28 NEW TRAILER-VIN 0212 289891 86526 6160.668012/31/2018 Mobile Equipment Main Maintenance/Repair
1,544.25-TRAILER TRADE-IN VIN 0755 289892 86526-TRADE 6160.668012/31/2018 Mobile Equipment Main Maintenance/Repair
14,586.03
202990 1/4/2019 102753 MINNCOR INDUSTRIES
65.00 S GILBERG BUSINESS CARDS 289814 SOI-076065 6101.621012/31/2018 Office Supplies Water -Administration
65.00 J EATON BUSINESS CARDS 289814 SOI-076065 6101.621012/31/2018 Office Supplies Water -Administration
130.00
202991 1/4/2019 152885 MINNESOTA VALLEY TESTING LABORATORIES
662.00 YEARLY SOLIDS TEST 289815 953665 6149.632312/31/2018 Testing Services Water Sampling/Testing
662.00
202992 1/4/2019 145397 MN CENTER FOR FISCAL EXCELLENCE
175.00 2019 DUES 289924 2019 0501.64791/3/2019 Dues and Subscriptions General & Admn-Finance
175.00
202993 1/4/2019 101881 MN CITY COUNTY MGMT ASSOC.
75.00 MCMA, WINTER CONFERENCE 289925 020119-MILLER 0201.64771/3/2019 Local Meeting Expenses General & Admn-Admn
75.00
202994 1/4/2019 121807 MN CLAY COMPANY USA
28.50 PROGRAM SUPPLIES 289816 107918 3081.622712/31/2018 Recreation Equipment/Supplies Arts & Humanities Council
28.50
202995 1/4/2019 100682 MN DEPT OF HEALTH
315.00 ANNUAL DUES 2019 289903 FBL-10272-5320-
2019
6609.64801/3/2019 Licenses, Permits and Taxes Concession Sales/Vending
315.00
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
14Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
202996 1/4/2019 100682 MN DEPT OF HEALTH Continued...
95.00 MN DEPT HEALTH -HOLZ FARM 289926 FBL-15201-5320-
2019
3027.64801/3/2019 Licenses, Permits and Taxes Holz Farm
95.00
202997 1/4/2019 151514 MODULAR SPACE CORPORATION
474.00 STORAGE FOR RENOVATION 289819 502666872 5045.622012/31/2018 Operating Supplies - General Temporary Office/Moving Expens
474.00
202998 1/4/2019 104647 MPPOA
260.00 2019-LDF FOR COMMAND STAFF 289927 2019 1101.64791/3/2019 Dues and Subscriptions General/Admn-Police
260.00
202999 1/4/2019 104647 MPPOA
250.00 2019-MPPOA FOR COMMAND STAFF 289928 2019 DUES 1101.64791/3/2019 Dues and Subscriptions General/Admn-Police
250.00
203000 1/4/2019 100659 NC PERS GROUP LIFE-MN
848.00 PAYROLL ENDING 12/22/18 289944 LIFE INS/PERA
12/22/18
9592.202112/31/2018 Ded Payable - Insurance Benefit Accrual
848.00
203001 1/4/2019 100454 NORTHERN AIR CORP
6,584.00 BOILER REPAIR 289820 155673 6827.653512/31/2018 Other Contractual Services Building Maintenance
6,584.00
203002 1/4/2019 139304 NUSS TRUCK EQUIPMENT
107.86 UNIT 120 289821 7126282P 9001.141512/31/2018 Inventory - Parts General Fund
107.86
203003 1/4/2019 108599 OFFICE DEPOT, INC.
77.95 OFFICE EQUIPMENT 289822 245932621001 6801.621212/31/2018 Office Small Equipment General & Administrative
36.06 MISC OFFICE SUPPLIES 289823 245423673001 1221.621012/31/2018 Office Supplies Administration-Fire
18.99-RIDLEY CALENDAR RETURN 289824 246725593001 0720.621012/31/2018 Office Supplies General Admin-Planning & Zonin
27.58 CLERICAL EQUIPMENT 289825 246199102001 1107.621212/31/2018 Office Small Equipment Support Services
192.92 PD OFFICE SUPPLIES 289826 246199384001 1107.621012/31/2018 Office Supplies Support Services
4.17 OFFICE SUPPLIES 289827 248061589001 0201.621012/31/2018 Office Supplies General & Admn-Admn
4.17 OFFICE SUPPLIES 289827 248061589001 0501.621012/31/2018 Office Supplies General & Admn-Finance
4.17 OFFICE SUPPLIES 289827 248061589001 3001.621012/31/2018 Office Supplies General/Admn-Recreation
28.65 THUMB DRIVES 289827 248061589001 0901.621012/31/2018 Office Supplies Gen & Admin-Communications
7.79 OFFICE SUPPLIES 289827 248061589001 0820.621012/31/2018 Office Supplies General/Admn-Housing
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
15Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
203003 1/4/2019 108599 OFFICE DEPOT, INC.Continued...
7.79 OFFICE SUPPLIES 289827 248061589001 2010.621012/31/2018 Office Supplies General Engineering
7.77 OFFICE SUPPLIES 289827 248061589001 0720.621012/31/2018 Office Supplies General Admin-Planning & Zonin
186.48 FACILITY SUPPLIES 289828 250521348001 3071.622012/31/2018 Operating Supplies - General MN State Arts Board
7.88 PD OFFICE SUPPLIES 289829 246199384002 1107.621012/31/2018 Office Supplies Support Services
14.56 PD OFFICE SUPPLIES 289830 22614597601 1107.621012/31/2018 Office Supplies Support Services
588.95
203004 1/4/2019 109423 OFFICE TEAM
1,080.00 OFFICE TEMP HELP 289831 52055689 6101.631012/31/2018 Professional Services-General Water -Administration
432.00 OFFICE TEMP HELP 289832 52070681 6101.631012/31/2018 Professional Services-General Water -Administration
897.75 OFFICE TEMP HELP 289833 52473985 6101.653512/31/2018 Other Contractual Services Water -Administration
432.00 OFFICE TEMP HELP 289834 52517684 6101.653512/31/2018 Other Contractual Services Water -Administration
2,841.75
203005 1/4/2019 113081 OVERHEAD DOOR CO. OF THE NORTHLAND
58.00 GARAGE DOOR PARTS 289835 108981 6146.623312/31/2018 Building Repair Supplies North Plant Building
58.00
203006 1/4/2019 138504 PAPCO INC.
156.75 PARTS FOR CARPET CLEANER 289836 209663 6602.623012/31/2018 Repair/Maintenance Supplies-Ge Equipment Repair & Maint.
156.75
203007 1/4/2019 115253 PELLICCI ACE HARDWARE
4.99 SPRAY PAINT 289837 18130/E 1225.623012/31/2018 Repair/Maintenance Supplies-Ge Fire / EMS Equipment
4.99
203008 1/4/2019 101722 PETERSON,SCOTT
60.00 DCBO MTGS 9/18-12/18 289842 12-18-18 0812.647712/31/2018 Local Meeting Expenses Conferences/Training-Prot Insp
60.00
203009 1/4/2019 100310 POSTMASTER
4,700.00 POST EXPER.EAGANJAN/FEB19 289904 121918 0902.63461/3/2019 Postage Experience Eagan Newsletter
4,700.00
203010 1/4/2019 153556 PURAIR
572.00 O2 CANISTERS 289838 114002 1104.622612/31/2018 Public Safety Supplies Patrolling/Traffic
572.00
203011 1/4/2019 100361 R & R SPECIALTIES INC
82.50 BLADES SHARPENED 289839 0066689-IN 6602.623012/31/2018 Repair/Maintenance Supplies-Ge Equipment Repair & Maint.
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
16Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
203011 1/4/2019 100361 R & R SPECIALTIES INC Continued...
188.60 ZAMBONI PARTS 289840 0066724-IN 6602.623012/31/2018 Repair/Maintenance Supplies-Ge Equipment Repair & Maint.
271.10
203012 1/4/2019 110070 RDO EQUIPMENT CO.
778.00 EQUIP PARTS 289841 P44740 3222.623112/31/2018 Mobile Equipment Repair Parts Equipment Mtn
778.00
203013 1/4/2019 147855 REHPOHL, REBECCA
581.69 ART SALE VENDOR 289843 2018 WINTER ART
SALE
3081.2290.112/31/2018 Art House-Pottery Sale taxable Arts & Humanities Council
581.69
203014 1/4/2019 100728 RENT N SAVE
119.95 PORTABLE TOILETS 289844 54433 3111.653912/31/2018 Waste Removal/Sanitation Servi Refuse/Waste Control
119.95
203015 1/4/2019 143285 RHONE, AMY
1,468.68 ART SALE VENDOR PAYMENT 289845 2018 WINTER ART
SALE
3081.2290.112/31/2018 Art House-Pottery Sale taxable Arts & Humanities Council
1,468.68
203016 1/4/2019 148896 RISHEL, THOMAS G
121.45 CLOTHING ALLOWANCE - RISCHEL 289846 121018 6101.211512/31/2018 Clothing Allowance Water -Administration
100.00 LICENSE RENEWAL 289847 120318 6101.648012/31/2018 Licenses, Permits and Taxes Water -Administration
221.45
203017 1/4/2019 102401 RUNDQUIST, BRIAN
39.35 RUNDQUIST MILEAGE/PARKING 289850 120618 1104.635312/31/2018 Personal Auto/Parking Patrolling/Traffic
39.35
203018 1/4/2019 149711 SAFE-FAST INC.
214.08 PPE SAFETY GLOVES 289848 INV209176 6144.622212/31/2018 Medical/Rescue/Safety Supplies Hydrant Maintenance/Repair
214.08
203019 1/4/2019 142107 SCHROEPFER, DESIREE
15.00 SCHROEPFER TRAINING 289851 112718 1105.647612/31/2018 Conferences/Meetings/Training Investigation/Crime Prevention
15.00
203020 1/4/2019 100187 SEH
98.50 DAKCO ENG. PROJECT COSTS 289849 361056 6007.6310 ADAKO12/31/2018 Professional Services-General Sperry Antenna Location
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
17Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
203020 1/4/2019 100187 SEH Continued...
98.50 TMOBILE ENG. PROJECT COSTS 289849 361056 6007.6310 ATMOB12/31/2018 Professional Services-General Sperry Antenna Location
1,229.72 SPRINT CLEARWIRE PL ENG COSTS 289849 361056 6007.6310 ASPRI12/31/2018 Professional Services-General Sperry Antenna Location
617.98 CONVERSATION ABOUT SMALL CELL 289849 361056 6108.631012/31/2018 Professional Services-General Antenna Leases
98.50 METERREADING AMR ENG COSTS 289849 361056 6162.631012/31/2018 Professional Services-General Meter Reading
500.00 360 FOR SPERRY 289849 361056 6129.6712 P115412/31/2018 Project - Engineering Reservior Maintenance/Repair
479.05 PROF SVCS-CLIFF LAKE RD SIGNAL 289852 361170 8282.671312/31/2018 Project - Outside Engineering P1282 Cliff Lk Rd Intersection
456.59 SPRINT TRIBAND ENG. COSTS 289853 361058 6001.6310 ASPRI12/31/2018 Professional Services-General Deerwood Antenna Location
514.29 SPRINT TRIBAND ENG. COSTS 289853 361058 6003.6310 ASPRI12/31/2018 Professional Services-General Lexington Antenna Location
283.57 SPRINT TRIBAND ENG. COSTS 289853 361058 6005.6310 ASPRI12/31/2018 Professional Services-General Safari Antenna Location
4,390.77 CONSTRUCTION ADMIN COSTS 289854 361055 6129.6712 P115412/31/2018 Project - Engineering Reservior Maintenance/Repair
8,767.47
203022 1/4/2019 100191 SHERWIN WILLIAMS
188.47 BEAN BAG TOSS SUPPLIES 289857 1911-9 3001.622712/31/2018 Recreation Equipment/Supplies General/Admn-Recreation
188.47
203023 1/4/2019 146625 SHRED-IT USA
136.94 SHREDDING 289855 8126302396 1101.621012/31/2018 Office Supplies General/Admn-Police
59.28 SHREDDING 289855 8126302396 2201.621012/31/2018 Office Supplies Gen/Adm-Streets
162.92 SHREDDING 289855 8126302396 6801.621012/31/2018 Office Supplies General & Administrative
359.14
203024 1/4/2019 153571 SIOUX SALES COMPANY
38,396.00 PD RIFLES 289862 186924 3511.668012/31/2018 Mobile Equipment Equip Rev Fd-Dept 11
38,396.00
203025 1/4/2019 144292 SITEIMPROVE INC.
5,370.00 WEBCHECKING SOFTWARE FOR 2019 289929 59095 0907.65691/3/2019 Maintenance Contracts Web Page
5,370.00
203026 1/4/2019 108338 SL-SERCO
2,658.29 NOVEMBER METER READS 289858 11076460C 6201.631012/31/2018 Professional Services-General San Sewer-Administration
2,658.28 NOVEMBER METER READS 289858 11076460C 6162.631012/31/2018 Professional Services-General Meter Reading
5,316.57
203027 1/4/2019 151416 SMART DELIVERY SERVICE INC
206.40 INTEROFFICE MAIL 12-14-18 289859 65104 0401.653512/31/2018 Other Contractual Services General & Admn-City Clerk
206.40
203028 1/4/2019 109851 SOFTWARE HOUSE INTERNATIONAL INC.
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
18Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
203028 1/4/2019 109851 SOFTWARE HOUSE INTERNATIONAL INC.Continued...
15,600.00 MS LICENSING 289930 B09166747 0301.65691/3/2019 Maintenance Contracts IT-Gen & Admn
15,600.00
203029 1/4/2019 102392 SPARTAN PROMOTIONAL GROUP, INC.
304.00 A FRAMES 289860 568356 3001.622712/31/2018 Recreation Equipment/Supplies General/Admn-Recreation
548.00 EVENT SUPPLIES - WATER BOTTLES 289861 568365 3079.622712/31/2018 Recreation Equipment/Supplies Special Events
757.33 SPARTAN.WEDDINGCUPS 289863 568333 6825.635712/31/2018 Advertising/Publication Marketing
320.00 EVENT BANNER 289905 568369 3079.62271/3/2019 Recreation Equipment/Supplies Special Events
365.00 TOKENS FOR MARKET FEST 289906 568379 3061.62271/3/2019 Recreation Equipment/Supplies Market Fest
540.00 2018 - COMMISSION TABLE COVERS 289907 568372 3001.62271/3/2019 Recreation Equipment/Supplies General/Admn-Recreation
479.00 PROMOTIONAL MATERIAL 289908 568373 3071.63571/3/2019 Advertising/Publication MN State Arts Board
920.00 PROMOTIONAL MATERIAL 289909 568374 3071.63571/3/2019 Advertising/Publication MN State Arts Board
4,233.33
203030 1/4/2019 153607 STORM COMBATIVES TRAINING & CONSULTATION
700.00 TRAINING-ROSETH-UOF 5/19 289931 0020 1104.64761/3/2019 Conferences/Meetings/Training Patrolling/Traffic
700.00
203031 1/4/2019 100204 STREICHERS INC.
873.76 AMMO PD 289864 11343736 1104.622812/31/2018 Ammunition Patrolling/Traffic
873.76
203032 1/4/2019 101807 SUN BADGE CO.
682.10 BADGES FOR NEW OFFICERS 289865 384700 1104.622412/31/2018 Clothing/Personal Equipment Patrolling/Traffic
682.10
203033 1/4/2019 151851 SYSCO-MINNESOTA INC
32.73 VENDING RESALE 289866 247180591 6629.685512/31/2018 Merchandise for Resale Vending
518.06 ICE CREAM/PRETZELS/CANDY 289875 247227902 6609.685512/31/2018 Merchandise for Resale Concession Sales/Vending
550.79
203034 1/4/2019 142667 TACTICAL PRODUCTS & SERVICES INC.
977.30 BERENS VEST 289876 786 1144.622412/31/2018 Clothing/Personal Equipment Bullet Proof Vests grant
2,543.00 RATZLOFF-FARNHAM VESTS 289877 795 1144.622412/31/2018 Clothing/Personal Equipment Bullet Proof Vests grant
3,520.30
203035 1/4/2019 151217 TARGET SOLUTIONS LEARNING LLC
7,236.50 COMPUTER PROGRAM-TRAINING 2019 289932 TSINV0000002855
7
1221.62701/3/2019 Computer Software Administration-Fire
7,236.50
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
19Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
203035 1/4/2019 151217 TARGET SOLUTIONS LEARNING LLC Continued...
203036 1/4/2019 134135 THOMSON REUTERS
237.04 CLEAR MONTHLY FEE 4 PD 289878 839352499 1105.645712/31/2018 Machinery & Equipment-Rental Investigation/Crime Prevention
237.04
203037 1/4/2019 153509 THOMSON REUTERS
636.00 STAUTE BOOKS 289933 2019 CRIMINAL
HANDBOOK
1104.62151/3/2019 Reference Materials Patrolling/Traffic
636.00
203038 1/4/2019 100107 THYSSENKRUPP ELEVATOR
129.10 ELEVATOR 289867 3004269019 6146.653512/31/2018 Other Contractual Services North Plant Building
129.10
203039 1/4/2019 100543 TOTAL CONTROL SYSTEMS INC
782.20 NTP PROGRAMING ON PS 1 289868 8508 6147.643212/31/2018 Utility System Repair-Labor North Plant Production
3,509.06 YANKEE SERVICE TRANSDUCER REPL 289869 8499 6148.643212/31/2018 Utility System Repair-Labor North Well Field
1,069.30 STP POLY PUP, LINE FILTER 289870 8527 6155.643212/31/2018 Utility System Repair-Labor South Plant Production
5,360.56
203040 1/4/2019 100223 TRI STATE BOBCAT
22.97 CHAINSAW REPAIR 289871 P04067 2272.623112/31/2018 Mobile Equipment Repair Parts Tree Trimming
62.00 CHAINSAW FUEL 289872 P04385 2272.623512/31/2018 Fuel, Lubricants, Additives Tree Trimming
51.00 CHAINSAW REPAIR 289873 P04777 2272.623112/31/2018 Mobile Equipment Repair Parts Tree Trimming
135.97
203041 1/4/2019 100232 UHL CO INC
23,434.00 REPLACE ECC SECURITY CAMERAS 289874 56963 6834.664012/31/2018 Machinery/Equipment Capital Replacement
165.00 FIX HIGH SCHOOL DOOR 289879 11387 6603.653512/31/2018 Other Contractual Services Building Repair & Maint.
23,599.00
203042 1/4/2019 153606 ULTIMATE EVENTS
1,673.91 FARM TO TABLE DOWN PMT 8/23/19 289934 082319-DOWN
PAYMENT
3079.63201/3/2019 Instructors Special Events
1,673.91
203043 1/4/2019 108407 UNIV OF MINNESOTA, CVM
224.02 LOKI 289886 1208356 1104.632512/31/2018 Vet/Kennel Charge/Animal Dispo Patrolling/Traffic
224.02
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
20Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
203044 1/4/2019 100464 VALLEY-RICH COMPANY INC Continued...
4,706.42 MAINBREAK REPAIR 289880 26425 6160.643212/31/2018 Utility System Repair-Labor Main Maintenance/Repair
2,773.88 SERVICE LEAK REPAIR 289881 26418 6130.643212/31/2018 Utility System Repair-Labor Curb Stop Inspctn/Maint/Repair
4,451.12 MAINBREAK REPAIR 289882 26402 6160.643212/31/2018 Utility System Repair-Labor Main Maintenance/Repair
11,931.42
203045 1/4/2019 100706 WAL MART
3.98 COOKIES 289945 005756 3092.622712/31/2018 Recreation Equipment/Supplies CDBG - Seniors
23.91 SUPPLIES 289946 003832 1104.622612/31/2018 Public Safety Supplies Patrolling/Traffic
21.10 SUPPLIES 289947 006384 6146.621012/31/2018 Office Supplies North Plant Building
10.64 SUPPLIES 289948 006381 1104.621212/31/2018 Office Small Equipment Patrolling/Traffic
35.46 DRINKING CLASS SUPPLIES 289949 006566 1104.647612/31/2018 Conferences/Meetings/Training Patrolling/Traffic
13.26 SUPPLIES 289950 003228 1105.621212/31/2018 Office Small Equipment Investigation/Crime Prevention
1.47 SUPPLIES 289951 009002 1105.621212/31/2018 Office Small Equipment Investigation/Crime Prevention
13.58 SUPPLIES 289952 001344 1104.622612/31/2018 Public Safety Supplies Patrolling/Traffic
34.33 SUPPLIES 289953 009496 1104.647612/31/2018 Conferences/Meetings/Training Patrolling/Traffic
157.73
203046 1/4/2019 138027 WATER CONSERVATION SERVICE INC.
731.53 LEAK DETECTION 289883 9050 6160.631012/31/2018 Professional Services-General Main Maintenance/Repair
731.53
203047 1/4/2019 150341 WESTER, NANCY
503.49 ART SALE VENDOR PAYMENT 289887 2018 WINTER ART
SALE
3081.2290.112/31/2018 Art House-Pottery Sale taxable Arts & Humanities Council
503.49
203049 1/4/2019 144293 WHOLESALE ART & FRAMING LLC
818.00 HISTORY LOGO PATCHES STAT 289884 5877 1221.653512/31/2018 Other Contractual Services Administration-Fire
818.00
203050 1/4/2019 104564 WILSON BOHANNAN COMPANY
60.00 PADLOCKS FOR OPERATIONS 289885 0156841-IN 6239.626012/31/2018 Utility System Parts/Supplies Lift Station Maintenanc/Repair
64.83 PADLOCKS FOR WATER 289885 0156841-IN 6146.626012/31/2018 Utility System Parts/Supplies North Plant Building
124.83
203051 1/4/2019 147856 WRIGHT FINE ART, VICKI
964.13 ART SALE VENDOR PAYMENT 289889 1801 3081.2290.112/31/2018 Art House-Pottery Sale taxable Arts & Humanities Council
964.13
20188550 12/31/2018 151185 HEALTHPARTNERS INC
1/4/2019City of Eagan 8:22:13R55CKR2LOGIS102V
21Page -Council Check Register by GL
Check Register w GL Date & Summary
1/4/201912/31/2018 --
Inv No Account No Account Description Business UnitDoc NoCheck #PO #SubledgerSupplier / ExplanationDateAmount
20188550 12/31/2018 151185 HEALTHPARTNERS INC Continued...
5,376.96 DENTAL CLAIMS REIMBURSEMENT 289955 123118 9594.615812/31/2018 Dental Insurance Dental Self-insurance
5,376.96
20195200 1/4/2019 100283 BERKLEY ADMINISTRATORS
25,000.00 WC ADVANCE 289956 010219 9593.16501/4/2019 Worker's Comp Advance to DCA Workers' Compensation Self-In
25,000.00
991,689.49 Grand Total Payment Instrument Totals
Checks 991,689.49
Total Payments 991,689.49
1/4/2019City of Eagan 8:22:22R55CKS2LOGIS100
1Page -Council Check SummaryNote: Payment amount may not reflect the actual amount due to data sequencing and/or data selection.
1/4/201912/31/2018 -
Company Amount
250,257.2509001GENERAL FUND
85.0009115DWI Forfeiture
628.0109116CEDAR GROVE PARKING GARAGE
553,072.9709220PUBLIC UTILITIES
3,563.7709221CIVIC ARENA
315.6009222CASCADE BAY
50,113.2509223CENTRAL PARK /COMMUNITY CENTER
15,048.0009328PARK SYS DEV AND R&R
47,754.1309335EQUIPMENT REVOLVING
56.0009337COMMUNITY INVESTMENT
14,063.0009353POLICE & CITY HALL REMODEL
13,946.5509372REVOLVING SAF-CONSTRUCTION
119.00-09591 RISK MANAGEMENT
848.0009592BENEFIT ACCRUAL
25,000.0009593WORKERS' COMPENSATION SELF-INS
5,376.9609594Dental Self-insurance
11,680.0009695DAK CO DRUG TASK FORCE
Report Totals 991,689.49
Agenda Information Memo
January 15, 2019, Eagan City Council Meeting
CONSENT AGENDA
D. Approve Contracts
Action To Be Considered:
To approve the ordinary and customary contracts listed below.
Facts:
The contracts listed below are in order for Council approval. Following approval,
the contracts will be electronically executed by the Mayor and City Clerk.
Contracts to be approved:
Contracts with Magic Bounce, Inc. for rental of movie screens on July 25, 2019;
August 23, 2019 and Sept. 7, 2019
Vendor Agreement with Dan Schwartz for a performance at Community
Connections
Agreement with Coyote Wild for a performance and the Eagan Food Truck
Festival
Agreement with Ultimate Events for event set-up for the Holz Farm to Table
Dinner
Agreement with Metro Volleyball Officials Association for volleyball officiating
services
Agreement with Baser PL Umpire Association for softball officiating services
Agreement with Jack Shawn – SMOA Officials Association for baseball officiating
services
Agreement with James Benner Sculpture for fabrication and installation of a
public sculpture entitled “Eagan Lone Oak”
Attachments: (0)
The contracts are available from the City Clerk’s Office.
Agenda Information Memo
January 15, 2019, Eagan City Council Meeting
CONSENT AGENDA
E. Approve a resolution to accept donations from T & K Restaurant Franchise
Group, Inc., Target Corporation, Walmart Community Grants and Eagan Fun
Fest Committee
Action To Be Considered:
To approve a resolution to accept donations from T & K Restaurant Franchise Group,
Inc., Target Corporation, Walmart Community Grants and Eagan Fun Fest Committee
Facts:
State Statute requires the Mayor and City Council to accept donations to the City
via a resolution.
The City has received the following donations:
o $2,000 from T & K Restaurant Franchise Group, Inc. for Fire Department
equipment
o $33 from Target Corporation
o $850 from Walmart Community Grants for the Rec on the Go Program
o $1,500 from the Eagan Fun Fest Committee for two memorial benches
Attachments: (1)
CE-1 Resolution
RESOLUTION NO. _______
CITY OF EAGAN
Accept Donations from T & K Restaurant Franchise Group, Inc., Target Corporation,
Walmart Community Grants, and Eagan Fun Fest Committee
WHERAS, the City of Eagan is generally authorized to accept donations of real and
personal property pursuant to Minnesota Statutes Section 465.03 for the benefits of its citizens,
and is specifically authorized to accept gifts; and
WHEREAS, the following entities have offered to contribute the following donations set
forth below to the City:
Name of Donor Donation
T & K Restaurant Franchise Group, Inc. $2,00 for Fire Department equipment
Target Corporation $33
Walmart Community Grants $850 for the Rec on the Go Program
Eagan Fun Fest Committee $1,500 for two memorial benches
WHEREAS, the donations have been contributed to the City for the benefit of its
citizens, as allowed by law; and
WHEREAS, the City Council finds that it is appropriate to accept the donations offered.
NOW, THEREFORE, BE IT RESOLVED that the City Council of Eagan, Dakota
County, Minnesota, hereby accepts the donations described above.
CITY OF EAGAN
CITY COUNCIL
By: _________________________
Its Mayor
Attest: _______________________
Its Clerk
Motion by:
Seconded by:
Those in favor:
Those against:
Date: January 15, 2019
CERTIFICATION
I, Christina M .Scipioni, Clerk of the City of Eagan, Dakota County, Minnesota, do
hereby certify that the foregoing resolution was duly passed and adopted by the City Council of
the City of Eagan, Dakota County, Minnesota, in a regular meeting thereof assembled this 15th
day of January, 2019.
____________________________
Clerk
Agenda Information Memo
January 15, 2019, Eagan City Council Meeting
CONSENT AGENDA
F. Approve Temporary On-Sale Liquor Licenses and waive the license fees for Art
Works Eagan on February 8, 2019; March 16, 2019; April 20, 2019; and June 2,
2019 at 3795 Pilot Knob Road.
Action To Be Considered:
To approve temporary on-sale liquor licenses and waive the license fees for Art Works
Eagan on February 8, 2019; March 16, 2019; April 20, 2019; and June 2, 2019 at 3795
Pilot Knob Road.
Facts:
Art Works Eagan has requested temporary on-sale liquor licenses be issued to
them for the following events:
Friday February 8, 2019 – Comedy Night event with the Eagan Kick-Start
Rotary
Saturday, March 16, 2019 – Art Works’ Annual Fundraiser
Saturday, April 20, 2019 – Seasonal Art Sale and CD Release Party
featuring Tim Cheesebrow
Sunday, June 2, 2019 – Art Exhibit Opening and Salon Performance
Series
The events will be held within the Art Works Eagan building, located at 3795
Pilot Knob Road.
Art Works Eagan has requested that the $150.00 fee per license be waived ($600
total).
The application forms have been submitted and deemed in order by staff.
Following Council approval, the applications will be forwarded to the
Department of Public Safety – Alcohol and Gambling Enforcement Division for
final approval.
Attachments: (0)
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
CONSENT AGENDA
G. Contract 18-08, Ponds FP-1, FP-1.4, FP-1.5, FP-1.6
Water Quality Improvements
Action To Be Considered:
Approve the final payment for Contract 18-08 (Ponds FP-1, FP1.4, FP1.5, FP-1.6 – Water
Quality Improvements) in the amount of $324,671.10 to BKJ Land Company and accept
the improvements for perpetual City maintenance subject to warranty provision s.
Facts:
Contract 18-08, provided for sediment removal and infrastructure maintenance
within multiple storm water basins around O’Neil Pond (FP-1), as identified and
approved in the City’s 5-Year CIP (2018-2022).
On April 3, 2018, the City Council awarded the contract to BKJ Land Company for
the base bid of $324,923.45. With the approval of the final payment, the total
amount paid is 0.1% less than the original contract amount.
These improvements have been completed, inspected by representatives of the
Public Works Department (Water Resources/Engineering Divisions), and found to
be in order for favorable Council action of final payment and acceptance for
perpetual maintenance subject to warranty provisions.
Attachments (1)
CG-1 Payment Summary
Ponds FP-1, FP-1.4, FP-1.5, FP-1.6
Water Quality Improvements
City Contract 18-08
City Project 1272
Original Contract Amount $ 324,923.45
Contract Additions $ -0-
Value Completed to Date $ 324,671.10
Amount Previously Paid $ -0-
Final Payment $ 324,671.10
Amount less than Contract $ 252.35
Percent less than Contract - 0.1%
* Explain if greater than 5%
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
CONSENT AGENDA
H. Contract 19-05, Pond DP-3
Water Quality Improvements
Action To Be Considered:
Approve the plans and specifications for Contract 19-05 (Pond DP-3 – Water Quality
Improvements), and authorize the advertisement for a bid opening to be held at 10:30
a.m., on Thursday, February 28, 2019.
Facts:
Contract 19-05 (Project 1323) provides for the water surface improvements of
Pond DP-3, as programmed for 2019 in the City’s 5-Year Capital Improvement
Program (2019-2023) and authorized by the City Council on June 5, 2018.
The water quality improvements under this contract include the addition of an
iron-enhanced sand filter system and improved City maintenance access to the
pond and its lift station pumps.
All of the construction activity for said improvements has been de signed to occur
within existing public right-of-way, public property or easements.
The plans and specifications are available in the City’s Engineering Office for
review.
Upon approval and authorization, an advertisement will be published in the legal
newspaper informing contractors of the bid opening.
Attachments (0)
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
CONSENT AGENDA
I. Project 1310, Surrey Heights Drive
Street & Utilities Improvements
Action To Be Considered:
Receive the Draft Feasibility Report for Project 1310 (Surrey Heights Drive - Street &
Utilities Improvements) and schedule a public hearing to be held on February 19, 2019.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of Surrey Heights Drive, in the Surrey Heights 1st –
7th Additions/ Surrey Gardens neighborhood, in northwest Eagan located south
of Yankee Doodle Road and west of Federal Drive.
Pavement rehabilitation of this street, water main replacement, and sanitary
sewer modifications are programmed for 2019 in the City of Eagan’s 5-Year CIP
(2019-2023).
A draft Feasibility Report has been prepared and is being presented to the
Council for their consideration of scheduling a public hearing for Tuesday,
February 19, 2019.
An informational neighborhood meeting will be held with the adjacent property
owners prior to the formal public hearing to review and discuss the proposed
improvements.
Attachments (1)
CI-1 Draft Feasibility Report
Report for
Surrey Heights Drive
Street and Utilities Rehabilitation
City Project No. 1310
January 15, 2019
Prepared By
To: Honorable Mayor and City Council
From: Michael Warner, Bolton & Menk, Project Engineer
Date: January 15, 2019
Re: Surrey Heights Drive – Street and Utilities Rehabilitation
City Project No.: 1310
Attached is the feasibility report for the Surrey Heights Drive – Street and Utilities Rehabilitation,
City Project No. 1310. The report presents and discusses the proposed improvements and
includes a cost estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Michael R. Warner
Date: ____________________ Reg. No. 44693
Reviewed By:
Department of Public Works Date: ____________________
Reviewed By:
Finance Department Date: ____________________
TABLE OF CONTENTS
Executive Summary ......................................................................................................... 1
Introduction/History.....................................................................................................2
Scope ............................................................................................................................... .3
Area To Be Included ........................................................................................................ .3
Street Pavement Evaluation ............................................................................................ .3
Proposed Improvements ................................................................................................. .4
Easements/Permits ......................................................................................................... .7
Feasibility/Recommendations ......................................................................................... .7
Cost Estimate ................................................................................................................... .8
Assessments .................................................................................................................... .8
Assessment Financing Options ........................................................................................ .9
Revenue Source .............................................................................................................. .10
Project Schedule ............................................................................................................. .10
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
-2 Existing and Proposed Conditions
-2 Assessment Area Map
- 3 Typical Section – Reconstruction
Surrey Heights Drive
1
Executive Summary
Background
Project Name Surrey Heights Drive Project #1310
Street Area 6,679 Sq. Yds.Street Length 1,768 Feet
Streets Included Surrey Heights Drive
Constructed 1974
Overlayed 1999
Crack Sealed -
Seal Coated 2005, 2012
Absolute Location NE ¼ of Section 16
Township 27, Range 23 Relative Location South of Yankee Doodle Road
West of Federal Drive
Project Details
Scope
·Roadway reconstruction (west ½)
·Full width mill & 1.5” overlay (east ½)
·Curb & gutter replacement
·Drainage improvements
·Watermain replacement and extension
·Sanitary sewer replacement,
realignment at north end
·Adjustment/Replacement of:
o Sanitary/Storm sewer
o Utility castings
o Street signage
·Utility Improvements
PCI Rating 45/100
Recommended
Improvement
Reconstruction -
(west ½)
Mill & Overlay -
(east ½)
Curb Removal 50% (west ½)
20% (east ½)
R-3 Residential Units
R-4 Parcels
168 units
1 parcel
Cost Estimate/ Revenue
Property City
Street $98,600 $51,320 $47,280
Curb and Gutter $39,800 -$39,800
Utilities $660,900 -$660,900
Total $799,300 $ 51,320 (6%)$747,980 (94%)
Surrey Heights Drive
2
January 15, 2019
Street and Utilities Rehabilitation
Surrey Heights Drive
Eagan, Minnesota
Introduction/ History
Pavement Management -As a part of Eagan’s Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five-Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
1,768 feet of Surrey Heights Drive, a residential street in the Surrey Heights (1st – 7th Additions)
and Surrey Gardens neighborhood in central Eagan, has been identified for 2019 street and
utility rehabilitation improvements. Figure 1, located in Appendix C, illustrates the project
location. The street was originally constructed in 1974 and was overlayed in 1999.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the roads located within the project area, which are currently in the 20-year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the streets were seal coated in 2005 and 2012.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Surrey Heights Drive
3
Infrastructure Review -The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
project area. The existing sanitary sewer and storm sewer systems within the street are
generally in good working order and no major repairs are necessary.
The existing water main between Aspen Drive and the west leg of Highlander Drive is 8-inch
diameter Cast Iron Pipe (CIP) in poor condition and has experienced several pipe repairs due to
water main breaks. The pipe is old and brittle and is proposed to be updated to Ductile Iron
Pipe (DIP). Valves and hydrants will be replaced in the area the watermain will be replaced.
Watermain stubbed towards the townhomes will be replaced to the right-of-way line with a
new valve set at the right-of-way line.
Since the watermain within the street is being replaced, the sanitary sewer system was
reviewed to determine is it should be replaced while the street is under construction, or lined
at a later date. Since the sanitary sewer was installed in 1971 and is Vitrified Clay Pipe (VCP),
the City has decided to replace the sanitary sewer in the area the watermain is being replaced
as part of this project. Sewer lines stubbed towards the townhomes will be replaced to the
right-of-way line and a new manhole set at the right-of-way line.
To eventually turn over existing public watermain and sanitary sewer mains under the private
streets to the adjacent property owners, watermain and sanitary sewer is proposed to be
extended from Aspen Drive to Yankee Doodle Road. A new sanitary sewer main is also
proposed along the south side of Yankee Doodle Road, eliminating some of the public sewer
cutting through the Surrey Gardens Apartments property. See Figure 2, in Appendix C, for the
existing and proposed public utilities along Surrey Heights Drive.
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City-maintained
items is included in this project, if needed.
Scope
This project will provide partial replacement of the existing watermain and sanitary sewer,
watermain extension, sanitary sewer extension and realignment, and reconstruction or
mill/overlay of approximately 1,768 feet of roadway. Figure 2 in Appendix C, illustrates the
project limits.
Included in this project are the following improvements; replacement of concrete curb and
gutter and pavement section in watermain/sanitary sewer replacement area, replacement of
damaged curb and gutter in mill/overlay areas, partial replacement of the water system
including watermain, valves, and hydrants, partial replacement of the sanitary sewer system
including pipe and manholes, realignment of the sanitary sewer pipes at the north end of
Surrey Heights Drive
4
Surrey Heights Drive, adjustments and/or replacement to sanitary/storm sewer utility castings,
and replacement of street signage.
Area to Be Included
Properties included in the project lie within the NE ¼, Section 16, lying South of Yankee Doodle
Road, West of Federal Drive, in Township 27, Range 23, in the City of Eagan, Dakota County,
Minnesota.
Street Pavement Evaluation
The City of Eagan’s Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI Recommended Improvement
56 – 100 Routine Maintenance/Crack Seal/Seal Coat
36 - 55 Patch/Repair and/or Overlay
0 - 35 Reconstruct/ Reclaim
The 2018 PCI ranking for Surrey Heights Drive is 45, which falls in the “Patch/Repair and/or
Overlay” category, as mentioned above. The street pavement has reached an age where, based
on the City’s experience, the integrity of the pavement can rapidly decline if no improvements
are performed. Therefore, the 2019 construction season is the optimal time to construct the
bituminous overlay on this street. Any delay of the project may reduce the structural benefit to
the street sections and require more substantial rehabilitation. The northern section that is
being reconstructed is being driven by the need to reconstruct the watermain and sanitary
sewer.
Proposed Improvements
Street Improvements -The proposed street improvements are shown in Figure 2. The existing
street is 36-feet wide with D412 concrete curb and gutter. The street is proposed to be partially
reconstructed in the watermain and sanitary sewer replacement area and a bituminous overlay
in the remaining areas.
In the reconstructed portion, the existing bituminous pavement is proposed to be reclaimed,
and the resultant gravel salvaged and reused. Concrete curb and gutter will be replaced where
the curb conflicts with the watermain or sanitary sewer construction. A new 3.5-inch thick
bituminous pavement is proposed for the full width of the street, supported by the reclaimed
gravel base.
Surrey Heights Drive
5
For the areas without watermain or sanitary
sewer replacement, a mill/overlay of the
street is proposed. The existing street
section for this roadway consists of 2-inch
to 3½-inch bituminous pavement supported
by 8-inch gravel base. The existing
bituminous surface will be milled across the
entire street width to accommodate a 1½-
inch bituminous overlay. The overlay,
combined with the existing street section,
will provide a street section consistent with
current City standards for residential
streets. The combination of patching and
overlay will not eliminate cracking due to
the temperature extremes experienced in Minnesota. Bituminous overlays will show some
continued frost movements and reflective cracking consistent with the underlying pavement.
Routine maintenance will still need to continue under the City’s Pavement Management
Program.
Concrete curb & gutter –In the reconstructed
portion of the project, curb & gutter conflicting
with the watermain replacement (assumed
one side of the street) will be removed and
replaced. Damaged curb & gutter on the
remaining side, and in the mill/overlay area,
will be replaced if severely cracked, spalled, or
settled. It is estimated that approximately 20%
of the concrete curb and gutter in the mill and
overlay area will have to be replaced.
Boulevard turf will be removed and replaced
with seed. While the contractor who performs
the work is responsible for its establishment (45 days for seed), adjacent property owners are
encouraged to consistently water the new turf, where possible, to help ensure its growth.
Watermain Improvements – The existing CIP watermain between
Aspen Drive and the west leg of Highlander Drive, is in poor condition,
has experienced several breaks along the corridor, and is proposed to
be replaced as part of this project. A new 8-inch diameter DIP
watermain is proposed that meets current City standards. The existing
hydrants and valves along the street will also be replaced.
Beginning in 2014, all new hydrants installed in the city were required
to include "Storz" technology. Storz nozzles make it easy for
Surrey Heights Drive
6
firefighters to connect to hydrants with a quick quarter-turn connection, which will allow
firefighters to save time connecting to a hydrant. They also eliminate the need for additional
adapters, cross-threading, hose connection problems, and multiple thread specifications that
may be found throughout the system. All existing city owned and city maintained (public)
hydrants will be updated with the same technology as part of annual street revitalization
projects. All hydrants within the corridor are proposed to be replaced as part of this project.
For the water system improvements to be constructed, a temporary above-ground water
system will be put in place to maintain water service to the adjacent properties. After the new
water system is in place and tested, the temporary system will be removed.
Utility Adjustment/Replacement – Watermain and sanitary sewer systems within the
reconstruction portion of the project will be replaced. The watermain is old, brittle, and has
been repaired several times due to pipe breaks. The sanitary sewer is VCP and will be replaced
since the watermain is being replaced and the street is under construction. Additional
sanitary/storm sewer manholes, catch basins, and gate valves outside of the reconstruction
area will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
ensure quick and easy access by the City for maintenance and other purposes. There are a few
structures that require replacement due to deterioration, or require doghouse/invert repairs.
These structures will be financed through the Combined Utility Fund.
Signage -Traffic and street identification signage within the project limits have reached the end
of their useful life expectancy and are in need of replacement. Signs have been reviewed for
compliance with the Minnesota Manual on Uniform Traffic Control Devices (MnMUTCD). Those
that are required by the MnMUTCD will be replaced to improve safety and night time visibility,
and those that are not will be permanently removed.
Street Lights – The street lights in the project area (maintained by Dakota Electric Association)
are in good condition and provide adequate coverage. No modifications to the existing street
lights are proposed.
Surrey Heights Drive
7
Stormwater and Water Quality Improvements – No water quality improvements are proposed
with this project.
Complete Streets – “Complete Streets” is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
Surrey Heights Drive was reviewed to determine if additional Complete Streets opportunities
are available and/or feasible. The street is fairly wide at 36-feet in width, has relatively low
traffic volumes, 5 side street access points, and a trail is available on Yankee Doodle Road and
Federal Drive to connect pedestrians to the City and regional trail system. Complete Streets
upgrades are not feasible for Surrey Heights Drive as a full reconstruction of the street would
be required. Pedestrian curb ramps will be replaced if necessary to meet current ADA design
standards. Given the existing and proposed elements available for all users, the existing street
meets the intent of the Complete Streets guidelines.
Easement/Permits
All work will be in the public right-of-way. It is anticipated the following permits will be
required:
·Minnesota Department of Health Permit for Watermain Replacement
·Dakota County Right of Way Permit to work in the Yankee Doodle Road right-of-way
Feasibility and Recommendations
The reconstruction portion of the project is necessary to prevent further watermain breaks and
service interruptions. The mill and overlay portion of the project is necessary to maintain and
enhance the structural integrity of the pavement section. Both portions of the project will
create a safer driving surface and increase rideability.
It is cost effective in that the proposed improvement will reduce the roadway maintenance
costs and expenses for repairing watermain breaks. The project is feasible in that this type of
improvement has been used successfully on numerous other streets throughout the City and
the region.
This project is in accordance with the Five-Year Capital Improvement Plan (2019 – 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
Surrey Heights Drive
8
recommended that the project be constructed as proposed in this report potentially in
combination with other similar projects in the area.
Cost Estimate
A detailed cost estimate is located in Appendix A. The estimate is based on anticipated 2019
construction costs and include a 5% contingency and indirect cost of 25%, which include legal,
administration, engineering, and interest. A summary of the costs is as follows:
Surrey Heights Drive
·Street ..........................................................................$ 98,500
·Curb and Gutter ..................................................................$ 39,800
·Utilities ...............................................................................$ 660,900
Total ........................................................................$ 799,300
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan’s Special Assessment
Policy. A portion of Surrey Heights Drive is due for a mill and overlay, but will need to be
reconstructed due to the watermain replacement in the area. Therefore, assessments are
calculated based on items consistent with a typical mill and overlay improvement for residential
streets for all of Surrey Heights Drive. All assessments will be revised based on final costs. A
preliminary assessment roll is included in Appendix B.
·Total Street Frontage = 1,768 centerline feet x 2 = 3,536 F.F.
·R-3 Residential Frontage = 3,212 F.F. (90.8%)
·R-4 Residential Frontage = 324 F.F. (9.2%)
City Special Assessment Policy
Assessment Ratio
Property City
Mill & Overlay – Low-Density Residential (R-1,2,3)50%50%
Mill & Overlay – Low-Density Residential (R-4)75%25%
Utility Improvements -100%
R-3 Residential Units –All R-3 residential units (168 townhome units), as shown on Figure 3,
having private street access onto the street to be improved are proposed to be assessed. The
City’s Assessment Policy states that 50% of the mill and overlay costs are assessable for local
residential streets.
The estimated cost per unit, based on the City’s Assessment Policy, is $265 / R-3 townhome
unit and is calculated as follows:
Surrey Heights Drive
9
Mill & Overlay: R-3 Residential
o 3,212’ Residential Frontage / 3,536’ Total Frontage = 90.8%
o $98,500 (Mill & Overlay Costs) x 50% (assessment rate) x 90.8% (R-3 frontage) =
$44,719 (Total R-3 Assessment)
o $44,719 / 168 units = $266.18, rounded to $265/ R-3 unit
R-4 Residential Lots –All R-4 residential lots (1 total) as shown on Figure 3, that are adjacent to,
or have direct access, to the street to be improved are proposed to be assessed. The City’s
Assessment Policy states that 75% of the mill and overlay costs are assessable for residential
roadways. The estimated cost per front foot, based on the City’s Assessment Policy, is $22.53 /
R-4 F.F. or $6,797 for the one R-4 property and is calculated as follows:
Mill & Overlay: R-4 Residential
o 324’ R-4 residential / 3,536 Total Frontage = 9.2%
o $98,500 (Mill & Overlay Costs) x 75% (assessment rate) x 9.2% (R-4 frontage) =
$6,797 (Total R-4 Assessment), rounded to $6,800
o $6,800 / 324 F.F. =$20.99 / R-4 F.F. or $6,800 for the one R-4 property
Assessment Financing Options
Each property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2019 rate is not yet
available; however, it is expected to be comparable and based on City policy will be determined
by the City Council in the spring. The following payment schedule is an example of a residential
lot assessment of $285 and $7,300 with an estimated 4.5% interest for the assessed amounts,
and assumes 14 months interest for the first year:
$265 (R-3 townhomes)
Principal / Year Interest / Year Cost / Year
1st Year $53 $14 $67
5th Year $53 $2 $55
$6,800 (R-4 apartments)
Principal / Year Interest / Year Cost / Year
1st Year $1,360 $357 $1,717
5th Year $1,360 $61 $1,421
Surrey Heights Drive
10
Revenue Source
A summary of revenue sources is listed below:
Project Cost Property Assessment City Contribution
Street $ 98,600 $ 51,320 $ 47,280
Curb and Gutter $ 39,800 -$ 39,800
Utilities $ 660,900 -$ 660,900
Totals $799,300 $ 51,320 $ 747,980
The Major Street Fund will finance the estimated street related project deficit of $87,080.
The Combined Utility Fund will finance the estimated $660,900 utility improvements.
Project Schedule
Present Feasibility Report to City Council/
Order Public Hearing ............................................................................... January 15, 2019
Informational Meeting ............................................................................ January 29, 2019
Public Hearing ....................................................................................... February 19, 2019
Approve Plans and Specifications ..............................................................March 19, 2019
Bid Date ...................................................................................................... April 25, 2019
Award Contract .............................................................................................. May 7, 2019
Start Construction ..............................................................................................May 2019
Project Completion ........................................................................................August 2019
Final Cost Report ..................................................................................... September 2019
Final Assessment Hearing ................................................................................... Fall 2019
First Payment Due with Property Tax Statement .......................................... May 15, 2020
Est Qty Est Cost Est Qty Est Cost Est Qty Est Cost
2021.501 Mobilization LS 30,000.00$0.33 9,900.00$0.33 9,900.00$0.34 10,200.00$1 30,000.00$
2104.502 Remove Hydrant EA 400.00$0 -$0 -$2 800.00$2 800.00$
2104.502 Remove Gate Valve & Box EA 300.00$0 -$0 -$6 1,800.00$6 1,800.00$
2104.502 Remove MH or Catch Basin EA 500.00$0 -$0 -$7 3,500.00$7 3,500.00$
2104.503 Remove Concrete Curb and Gutter LF 5.00$0 -$0 -$1,200 6,000.00$1,200 6,000.00$
2104.503 Remove Concrete Curb and Gutter (Spot)LF 6.00$0 -$500 3,000.00$0 -$500 3,000.00$
2104.503 Sawing Bituminous Pavement LF 3.00$0 -$0 -$200 600.00$200 600.00$
2104.503 Remove Water Main LF 5.00$0 -$0 -$1,030 5,150.00$1,030 5,150.00$
2104.503 Remove Sewer Pipe (Sanitary)LF 5.00$0 -$0 -$1,015 5,075.00$1,015 5,075.00$
2104.503 Remove Sewer Pipe (Storm)LF 5.00$0 -$0 -$140 700.00$140 700.00$
2104.504 Remove Bituminous Pavement SY 4.00$310 1,240.00$0 -$0 -$310 1,240.00$
2104.504 Remove Bituminous Driveway and Trail SY 12.00$0 -$0 -$360 4,320.00$360 4,320.00$
2104.504 Remove Concrete Driveway /Valley Gutter SY 14.00$0 -$0 -$60 840.00$60 840.00$
2105.507 Subgrade Excavation CY 15.00$0 -$0 -$300 4,500.00$300 4,500.00$
2105.607 Salvage and Reinstall Reclaim Material CY 15.00$0 -$0 -$500 7,500.00$500 7,500.00$
2105.607 Haul Reclaim Material Offsite CY 15.00$0 -$0 -$250 3,750.00$250 3,750.00$
2112.604 Subgrade Preparation SY 2.00$0 -$0 -$4,500 9,000.00$4,500 9,000.00$
2123.610 Street Sweeper (With Pick Up Broom)HR 125.00$0 -$0 -$10 1,250.00$10 1,250.00$
2130.523 Water MGAL 200.00$0 -$0 -$10 2,000.00$10 2,000.00$
2211.509 Aggregate Base, Cl. 5 (100% Crushed)TON 18.00$0 -$0 -$470 8,460.00$470 8,460.00$
2211.509 Aggregate Base, Cl. 5 (100% Crushed) - Trail TON 25.00$0 -$0 -$150 3,750.00$150 3,750.00$
2215.504 Full Depth Reclamation SY 3.00$0 -$0 -$4,500 13,500.00$4,500 13,500.00$
2232.504 Mill Bituminous Surface (1.5")SY 2.00$2,400 4,800.00$0 -$0 -$2,400 4,800.00$
2357.506 Bituminous Material for Tack Coat GAL 2.75$480 1,320.00$0 -$0 -$480 1,320.00$
2360.501 SPWEA330B Wearing Course Mixture (Recon Area)TON 60.00$450 27,000.00$0 -$0 -$450 27,000.00$
2360.501 SPWEB330B Wearing Course Mixture (Recon Area)TON 55.00$0 -$0 -$600 33,000.00$600 33,000.00$
2360.501 SPWEA330B Wearing Course Mixture (Mill/Overlay Area)TON 60.00$225 13,500.00$0 -$0 -$225 13,500.00$
2360.501 SPWEB330B Wearing Course Mixture (Patch Street)TON 100.00$40 4,000.00$0 -$0 -$40 4,000.00$
2360.501 SPWEA230B Wearing Course Mixture (Trail/Street)TON 100.00$0 -$0 -$70 7,000.00$70 7,000.00$
2433.603 Saw and Seal Joint LF 2.50$1,100 2,750.00$0 -$0 -$1,100 2,750.00$
2503.503 8" PVC Pipe Sewer, SDR 35 LF 50.00$0 -$0 -$1,700 85,000.00$1,700 85,000.00$
2503.503 12" RC pipe Sewer Des 3006 Cl V LF 50.00$0 -$0 -$140 7,000.00$140 7,000.00$
2503.602 4' Dia Sanitary Sewer MH Incl Cstg & Rings EA 3,000.00$0 -$0 -$14 42,000.00$14 42,000.00$
2503.603 4" Dia Sanitary Sewer MH Overdepth LF 150.00$0 -$0 -$42 6,300.00$42 6,300.00$
2503.603 Plug Fill & Abandon Pipe Sewer LF 15.00$0 -$0 -$340 5,100.00$340 5,100.00$
2503.608 Ductile Iron Fittings LB 10.00$0 -$0 -$800 8,000.00$800 8,000.00$
2504.601 Temporary Water Service LS 15,000.00$0 -$0 -$1 15,000.00$1 15,000.00$
2504.602 Wet Tap Connection to Existing 20" Water Main Incl GV EA 8,000.00$0 -$0 -$1 8,000.00$1 8,000.00$
2504.602 Connect to Existing Water Main EA 1,500.00$0 -$0 -$5 7,500.00$5 7,500.00$
2504.602 6" Gate Valve & Box EA 1,200.00$0 -$0 -$5 6,000.00$5 6,000.00$
2504.602 8" Gate Valve & Box EA 1,600.00$0 -$0 -$4 6,400.00$4 6,400.00$
2504.602 Hydrant EA 4,500.00$0 -$0 -$2 9,000.00$2 9,000.00$
2504.602 Remove & Replace Hydrant EA 5,000.00$0 -$0 -$1 5,000.00$1 5,000.00$
2504.602 Adjust Valve Box EA 175.00$2 350.00$0 -$0 -$2 350.00$
2504.602 Cross Existing Storm Sewer EA 1,200.00$0 -$0 -$4 4,800.00$4 4,800.00$
2504.602 Irrigation Repair EA 160.00$0 -$5 800.00$0 -$5 800.00$
2504.603 6" Watermain Ductile Iron Cl 52 LF 35.00$0 -$0 -$130 4,550.00$130 4,550.00$
Surrey Heights Drive
Appendix A
Preliminary Cost Estimate
City Project 1310 Surrey Heights Drive Street and Utilities Rehabilitation
Item No.Item Unit Unit Price Total Est Qty Total Est CostStreetCurb & Gutter Utilities
Surrey Heights Drive
11
2504.603 8" Watermain Ductile Iron Cl 52 LF 40.00$0 -$0 -$1,230 49,200.00$1,230 49,200.00$
2506.602 Remove & Replace CBMH Structure w/ Cstg (4' Dia)EA 5,000.00$0 -$0 -$2 10,000.00$2 10,000.00$
2506.602 Remove & Replace CB Structure w/ Cstg (2'x3')EA 5,000.00$0 -$0 -$3 15,000.00$3 15,000.00$
2506.602 Remove & Replace MH Structure w/ Cstg (4' Dia)EA 5,000.00$0 -$0 -$1 5,000.00$1 5,000.00$
2506.602 Remove & Replace Casting 3067V (Catch Basin)EA 900.00$0 -$0 -$4 3,600.00$4 3,600.00$
2506.602 Remove & Replace MH Lid (Storm Sewer)EA 300.00$0 -$0 -$1 300.00$1 300.00$
2506.602 Remove & Replace MH Lid (Sanitary Sewer)EA 300.00$0 -$0 -$1 300.00$1 300.00$
2506.602 Adjust Frame and Ring Casting (Manhole)EA 700.00$7 4,900.00$0 -$0 -$7 4,900.00$
2506.602 Adjust Frame and Ring Casting (CB) HDPE Rings EA 400.00$6 2,400.00$0 -$0 -$6 2,400.00$
2506.602 Connect New Pipe to Existing MH (Sanitary)EA 1,000.00$0 -$0 -$1 1,000.00$1 1,000.00$
2506.602 Connect Existing Pipe to New MH (Sanitary)EA 1,000.00$0 -$0 -$7 7,000.00$7 7,000.00$
2506.602 Connect New Pipe to Existing Structure (Storm)EA 1,000.00$0 -$0 -$2 2,000.00$2 2,000.00$
2506.602 Connect Existing Pipe to New Structure (Storm)EA 1,000.00$0 -$0 -$2 2,000.00$2 2,000.00$
2506.602 Connect to Existing Pipe (Storm)EA 500.00$0 -$0 -$1 500.00$1 500.00$
2506.602 Repair / Grout CB or MH Invert / Doghouses EA 500.00$0 -$0 -$4 2,000.00$4 2,000.00$
2506.602 Reconstruct Invert EA 500.00$0 -$0 -$1 500.00$1 500.00$
2521.518 6" Concrete Ped Ramp SF 14.00$0 -$0 -$410 5,740.00$410 5,740.00$
2531.503 Concrete Curb and Gutter, D412 (Machine)LF 13.00$0 -$0 -$1,200 15,600.00$1,200 15,600.00$
2531.503 Concrete Curb and Gutter, D412 (Spot)LF 20.00$0 -$500 10,000.00$0 -$500 10,000.00$
2531.504 Concrete Valley Gutter - High Early SY 80.00$0 -$0 -$40 3,200.00$40 3,200.00$
2531.602 Truncated Dome Detectable Warning Paver (2x2)EA 80.00$0 -$21 1,680.00$0 -$21 1,680.00$
2540.602 Repair Landscaping EA 200.00$0 -$3 600.00$0 -$3 600.00$
2563.601 Traffic Control LS 4,000.00$0.33 1,320.00$0.33 1,320.00$0.34 1,360.00$1 4,000.00$
2572.506 Application of Water for Turf Establishment GAL 0.15$0 -$1,500 225.00$13,500 2,025.00$15,000 2,250.00$
2573.502 Storm Drain Inlet Protection EA 175.00$0 -$2 297.50$15 2,677.50$17 2,975.00$
2575.507 Boulevard Topsoil Borrow – MnDOT 3877-2F CY 40.00$0 -$37 1,480.00$333 13,320.00$370 14,800.00$
2575.604 Seeding (MnDOT 270 w/Type 5 Hydromulch)SY 5.00$0 -$198 987.50$1,778 8,887.50$1,975 9,875.00$
SP-1 Signage Remove and Replace LS 1,600.00$1 1,600.00$0 -$0 -$1 1,600.00$
75,080.00$30,290.00$503,555.00$608,925.00$
3,754.00$1,514.50$25,177.75$30,446.25$
78,834.00$31,804.50$528,732.75$639,371.25$
19,708.50$7,951.13$132,183.19$159,842.82$
98,542.50$39,755.63$660,915.94$799,214.07$Total Project 1310
Subtotal
5% Contingency
Subtotal
25% Indirect Costs
Surrey Heights Drive
12
Surrey Heights Drive
13
Preliminary Assessment Roll
Surrey Heights Drive Street and Utilities Rehabilitation
City Project No. 1310
R-3 Residential
Property Address PIN Owner Units Unit Assessment Total
SURREY HEIGHTS 1ST ADD
1543 GREENWOOD CT 107300002010 BEHRENS ANITA 1 $ 265 $ 265
1539 GREENWOOD CT 107300002020 JASENOVSKY BRENDA 1 $ 265 $ 265
1541 GREENWOOD CT 107300002030 KELLEY PATRICIA ANN 1 $ 265 $ 265
1545 GREENWOOD CT 107300002040 FEY PATRICK 1 $ 265 $ 265
1537 GREENWOOD CT 107300003010 GANS JAY A & SUSAN 1 $ 265 $ 265
1535 GREENWOOD CT 107300003040 MILLER GREGORY A 1 $ 265 $ 265
1531 GREENWOOD CT 107300003050 BARNES JEFFREY A 1 $ 265 $ 265
1533 GREENWOOD CT 107300003080 RICHTER AMY K 1 $ 265 $ 265
1527 GREENWOOD CT 107300004020 SCHREINER BRANDEN JAMES 1 $ 265 $ 265
1523 GREENWOOD CT 107300004040 THOMPSON CONSTANCE R 1 $ 265 $ 265
1525 GREENWOOD CT 107300004060 JOHNSON DAVID & CATHERINE 1 $ 265 $ 265
1529 GREENWOOD CT 107300004080 ADRIAN JOSEPH R 1 $ 265 $ 265
3466 GREENWOOD CT 107300006010 RICHARDSON BRADLEY A 1 $ 265 $ 265
3462 GREENWOOD CT 107300006020 BUMP WILLIAM E & TAMARA R 1 $ 265 $ 265
3464 GREENWOOD CT 107300006030 MILLER KARI 1 $ 265 $ 265
3468 GREENWOOD CT 107300006040 GHILANI KATHLEEN 1 $ 265 $ 265
3476 GREENWOOD CT 107300007040 ANDERSON-GOBEN LISA M 1 $ 265 $ 265
3472 GREENWOOD CT 107300007050 SIMKHOVICH EUGENE B & ELAINA J 1 $ 265 $ 265
3474 GREENWOOD CT 107300007070 WESLING CAROLYN M 1 $ 265 $ 265
3470 GREENWOOD CT 107300007080 SENBETA MESFIN G 1 $ 265 $ 265
3482 GREENWOOD CT 107300009010 RETCHER DUSTEN P & SAMANTHA 1 $ 265 $ 265
3484 GREENWOOD CT 107300009020 ASSEFA ALEMTSEHAY 1 $ 265 $ 265
3480 GREENWOOD CT 107300009030 HELLERMANN NICOLE M 1 $ 265 $ 265
3478 GREENWOOD CT 107300009040 SEIZ ABRAHAM J & ASHO 1 $ 265 $ 265
3490 GREENWOOD CT 107300010050 COATNEY BRIAN B & KATHRYN 1 $ 265 $ 265
3486 GREENWOOD CT 107300010060 MAGUIRE DANIEL JOHN 1 $ 265 $ 265
3488 GREENWOOD CT 107300010070 JOSLIN SHELLENE K 1 $ 265 $ 265
3492 GREENWOOD CT 107300010080 SHINGLEDECKER LORRAINE C 1 $ 265 $ 265
3494 GREENWOOD CT 107300011050 ALEMU ZINASH MIHRET 1 $ 265 $ 265
3498 GREENWOOD CT 107300011060 VICK CRAIG S & CAROL S 1 $ 265 $ 265
3496 GREENWOOD CT 107300012010 ROSNER RITA M 1 $ 265 $ 265
3500 GREENWOOD CT 107300012020 WERSHING ROBERT E & LUCILLE T 1 $ 265 $ 265
3483 GREENWOOD CT 107300014010 FROYUM ALLEN 1 $ 265 $ 265
3479 GREENWOOD CT 107300014020 ANCRUM NICOLE 1 $ 265 $ 265
3481 GREENWOOD CT 107300014030 FOX RYAN H & JESSICA L 1 $ 265 $ 265
3485 GREENWOOD CT 107300014040 BARSE CHRISTOPHER JON 1 $ 265 $ 265
3477 GREENWOOD CT 107300015040 THACKER TERESITA P 1 $ 265 $ 265
3475 GREENWOOD CT 107300015060 HARSTEIN JACOB A 1 $ 265 $ 265
3471 GREENWOOD CT 107300016010 CHASE ANN 1 $ 265 $ 265
3473 GREENWOOD CT 107300016020 PORTZ MICHAEL B 1 $ 265 $ 265
3463 GREENWOOD CT 107300018010 NGURE LUCY N 1 $ 265 $ 265
3465 GREENWOOD CT 107300018020 GERMAIN BRANDON 1 $ 265 $ 265
3469 GREENWOOD CT 107300018030 ZASTOUPIL JESSICA L 1 $ 265 $ 265
3467 GREENWOOD CT 107300018040 OHERN SHARI S 1 $ 265 $ 265
1524 GREENWOOD CT 107300019050 TENTIS STEVEN & JORI 1 $ 265 $ 265
Surrey Heights Drive
14
1522 GREENWOOD CT 107300019060 WORKNEH HILLINA 1 $ 265 $ 265
1526 GREENWOOD CT 107300019070 BRITTON KENNETH R & RITA S 1 $ 265 $ 265
1528 GREENWOOD CT 107300019080 WESTERN IAN MCLEOD & LANA 1 $ 265 $ 265
1530 GREENWOOD CT 107300020050 AGRANOVICH NINA 1 $ 265 $ 265
1532 GREENWOOD CT 107300020060 DUNBAR FELICIA 1 $ 265 $ 265
1536 GREENWOOD CT 107300020070 CHUNG JANET 1 $ 265 $ 265
1534 GREENWOOD CT 107300020080 SHIELDS CRAIG T 1 $ 265 $ 265
1540 GREENWOOD CT 107300021030 RACHEL CUELLAR 1 $ 265 $ 265
1538 GREENWOOD CT 107300021050 MILLER ALLEN & CHRISTINE 1 $ 265 $ 265
1544 GREENWOOD CT 107300021080 GUMS EBONY C 1 $ 265 $ 265
1542 GREENWOOD CT 107300021081 RENSLOW DIANA C 1 $ 265 $ 265
SURREY HEIGHTS 2ND ADD
1531 WOODVIEW AVE 107300101040 DOAN PAM 1 $ 265 $ 265
1533 WOODVIEW AVE 107300101070 SCHMIT RICHARD & JO ANN 1 $ 265 $ 265
1537 WOODVIEW AVE 107300101080 EDGE VICKY 1 $ 265 $ 265
1535 WOODVIEW AVE 107300101090 BERNAL DAWIT A 1 $ 265 $ 265
1523 WOODVIEW AVE 107300102030 MITCHELL MATTHEW & AMANDA 1 $ 265 $ 265
1529 WOODVIEW AVE 107300102060 MARLIN MICHAEL M 1 $ 265 $ 265
1525 WOODVIEW AVE 107300102070 WOOLWORTH NANCY L 1 $ 265 $ 265
1527 WOODVIEW AVE 107300103020 HAMEN KELLY M 1 $ 265 $ 265
1515 WOODVIEW AVE 107300104020 QUINN JOSEPH 1 $ 265 $ 265
1519 WOODVIEW AVE 107300104040 LARSON DALE C 1 $ 265 $ 265
1507 WOODVIEW AVE 107300105040 WEGENER DIANA 1 $ 265 $ 265
1509 WOODVIEW AVE 107300105070 ANDERSON SANDRA M 1 $ 265 $ 265
1513 WOODVIEW AVE 107300105081 RHINEHART CHARLES & THAO 1 $ 265 $ 265
1499 WOODVIEW AVE 107300106061 RAUSCH MARIE L 1 $ 265 $ 265
1501 WOODVIEW AVE 107300106070 KISROW LORI A 1 $ 265 $ 265
1495 WOODVIEW AVE 107300107020 CLEMENT MICHAEL A 1 $ 265 $ 265
1491 WOODVIEW AVE 107300107030 FLUGAUR NANCY J 1 $ 265 $ 265
1497 WOODVIEW AVE 107300107070 CARLSON ANNETTE J 1 $ 265 $ 265
1493 WOODVIEW AVE 107300107080 MCNEILL SANDRA SUSAN 1 $ 265 $ 265
1485 WOODVIEW AVE 107300109010 BOWSER LEANDER 1 $ 265 $ 265
1483 WOODVIEW AVE 107300109040 ALM DAVID B 1 $ 265 $ 265
1489 WOODVIEW AVE 107300109050 JALLO AKALU S 1 $ 265 $ 265
1487 WOODVIEW AVE 107300109070 BOLAND MICHAEL 1 $ 265 $ 265
1477 WOODVIEW AVE 107300110040 DUONG MY TUYEN T 1 $ 265 $ 265
1481 WOODVIEW AVE 107300110050 MOSER JACQUELINE J 1 $ 265 $ 265
1479 WOODVIEW AVE 107300110060 ROLLEFSON DONALD W TSTE 1 $ 265 $ 265
1475 WOODVIEW AVE 107300110070 FRENCH-AMARA LEANNE R 1 $ 265 $ 265
1482 WOODVIEW AVE 107300112010 DISSANAYAKE VINI 1 $ 265 $ 265
1478 WOODVIEW AVE 107300112020 GILLIAM BENJAMIN VICTOR 1 $ 265 $ 265
1476 WOODVIEW AVE 107300112070 HABTU TIMNIT 1 $ 265 $ 265
1480 WOODVIEW AVE 107300112080 STERN HARLAN 1 $ 265 $ 265
1490 WOODVIEW AVE 107300114010 SASENA MATTHEW I & MARA K 1 $ 265 $ 265
1486 WOODVIEW AVE 107300114020 SORENSON KATHRYN A 1 $ 265 $ 265
1484 WOODVIEW AVE 107300114030 DMITRIYEVA MARGARITA 1 $ 265 $ 265
1488 WOODVIEW AVE 107300114040 BRANDON DAVID C & JEANNE 1 $ 265 $ 265
1496 WOODVIEW AVE 107300116050 KIEKHAFER LORI A 1 $ 265 $ 265
1502 WOODVIEW AVE 107300116060 MEEHAN JOSEPH P & MANDIE J 1 $ 265 $ 265
1504 WOODVIEW AVE 107300116070 ABDELKARIM FAISAL 1 $ 265 $ 265
1498 WOODVIEW AVE 107300116080 MARTIN AMY JOY 1 $ 265 $ 265
Surrey Heights Drive
15
1511 WOODVIEW AVE 107300117020 TAYERLE JOSHUA D & DEBORAH L 1 $ 265 $ 265
1516 WOODVIEW AVE 107300118010 CASSELLS CRANSTON C 1 $ 265 $ 265
1514 WOODVIEW AVE 107300118020 JOSEPH RESHMA 1 $ 265 $ 265
1520 WOODVIEW AVE 107300118040 YAHNKE HEATHER L 1 $ 265 $ 265
1518 WOODVIEW AVE 107300120040 HARIO ELIZABETH M 1 $ 265 $ 265
1505 WOODVIEW AVE 107300121020 GOULD JONATHAN B SR & KELL 1 $ 265 $ 265
1503 WOODVIEW AVE 107300121040 BOGGS-RUCKTAESCHEL MARLENE G 1 $ 265 $ 265
1521 WOODVIEW AVE 107300122010 SLATTERY SEAN P 1 $ 265 $ 265
1517 WOODVIEW AVE 107300122030 JOHNSTON DERRIK ARTHUR & YOLA 1 $ 265 $ 265
SURREY HEIGHTS 3RD ADD
1544 ASPEN DR 107300201030 JACOBSON ROBERT L 1 $ 265 $ 265
1540 ASPEN DR 107300201050 HUEFFMEIER BEVERLY 1 $ 265 $ 265
1538 ASPEN DR 107300201111 MALISZEWSKI STANLEY J & JUDY A T 1 $ 265 $ 265
1542 ASPEN DR 107300201120 ALLIEV RUSTAM R 1 $ 265 $ 265
1533 ASPEN DR 107300202060 MCDONOUGH SEAN DAVID 1 $ 265 $ 265
1537 ASPEN DR 107300202070 PINZKA DAVID W 1 $ 265 $ 265
1531 ASPEN DR 107300202090 PFEFFER MICHON 1 $ 265 $ 265
1535 ASPEN DR 107300203010 PINZKA DAVID W & NANCY K 1 $ 265 $ 265
1529 ASPEN DR 107300204010 STOCKERT COREY R 1 $ 265 $ 265
1527 ASPEN DR 107300204020 HAGGERTY MATTHEW J 1 $ 265 $ 265
1525 ASPEN DR 107300205020 NICHOLS SCOTT L 1 $ 265 $ 265
1523 ASPEN DR 107300206020 GRINBERG EDWARD 1 $ 265 $ 265
1524 ASPEN DR 107300207010 WETTERLING JOAN E 1 $ 265 $ 265
1522 ASPEN DR 107300207020 SANCHEZ ANDREA S 1 $ 265 $ 265
1526 ASPEN DR 107300207051 GIEMZA SHELLY 1 $ 265 $ 265
1528 ASPEN DR 107300207060 WOODSIDE PAULA K TSTE 1 $ 265 $ 265
1536 ASPEN DR 107300209030 CASSELLS CRANSTON C 1 $ 265 $ 265
1532 ASPEN DR 107300209040 MCDONALD GENE J & LINDA C 1 $ 265 $ 265
1530 ASPEN DR 107300209060 STOIK JIM & JENNIFER 1 $ 265 $ 265
1534 ASPEN DR 107300209080 EZELL CAROL L 1 $ 265 $ 265
SURREY HEIGHTS 4TH ADD
3415 HIGHLANDER DR 107300301010 WEST NICHOLAS G 1 $ 265 $ 265
3413 HIGHLANDER DR 107300301020 LARKIN JOHN J 1 $ 265 $ 265
3409 HIGHLANDER DR 107300301030 SOKOLOV YULIYA 1 $ 265 $ 265
3411 HIGHLANDER DR 107300301060 PALUCH KRYSTAL 1 $ 265 $ 265
3421 HIGHLANDER DR 107300304010 KOEGEL NICK 1 $ 265 $ 265
3425 HIGHLANDER DR 107300304020 FORTIN DOUGLAS J & SARAH L 1 $ 265 $ 265
3423 HIGHLANDER DR 107300304030 CHEMINO MICHAEL & TERRY 1 $ 265 $ 265
3419 HIGHLANDER DR 107300304040 EJETA DEGEFA B 1 $ 265 $ 265
3429 HIGHLANDER DR 107300307010 KAMBEITZ TERRANCE J 1 $ 265 $ 265
3433 HIGHLANDER DR 107300307020 NORDSTRAND RONALD & MARY 1 $ 265 $ 265
3431 HIGHLANDER DR 107300307030 SPILLNER DANNY G & JUDY A TRU 1 $ 265 $ 265
3427 HIGHLANDER DR 107300307040 LARSON MICHAEL 1 $ 265 $ 265
3455 HIGHLANDER DR 107300309030 TYSHCHUK VLADIMIR & ANN 1 $ 265 $ 265
3459 HIGHLANDER DR 107300309040 SCHLUNDT THOMAS M & REBECCA S 1 $ 265 $ 265
3457 HIGHLANDER DR 107300309050 NIEVES EVELYN 1 $ 265 $ 265
3453 HIGHLANDER DR 107300309060 NATANZON GENNADIY 1 $ 265 $ 265
SURREY HEIGHTS 5TH ADD
3432 HIGHLANDER DR 107300402010 FRANKLIN NICOLE RAE 1 $ 265 $ 265
3436 HIGHLANDER DR 107300402020 MACHEL RONALD H 1 $ 265 $ 265
3434 HIGHLANDER DR 107300402030 FLEMING CHARLOTTE L 1 $ 265 $ 265
Surrey Heights Drive
16
3430 HIGHLANDER DR 107300402040 WOLFGRAM DAVID M 1 $ 265 $ 265
3424 HIGHLANDER DR 107300405010 PODBERETSKIY ALEKSANDR 1 $ 265 $ 265
3428 HIGHLANDER DR 107300405020 MERGENS KEVIN P 1 $ 265 $ 265
3426 HIGHLANDER DR 107300405030 RHOADS KUANG M 1 $ 265 $ 265
3422 HIGHLANDER DR 107300405040 LARSON JANELLE L 1 $ 265 $ 265
SURREY HEIGHTS 6TH ADD
3451 HIGHLANDER DR 107300501010 PEREZ NIURKA CASTELLANOS 1 $ 265 $ 265
3447 HIGHLANDER DR 107300501020 SCHULER PATRICIA E 1 $ 265 $ 265
3445 HIGHLANDER DR 107300501050 MCBRIDE ANDREW 1 $ 265 $ 265
3449 HIGHLANDER DR 107300501060 WEST MAXINE M 1 $ 265 $ 265
3441 HIGHLANDER DR 107300504010 METOXEN ERIN M 1 $ 265 $ 265
3443 HIGHLANDER DR 107300504020 ASHBY EDWARD L & PAMELA A 1 $ 265 $ 265
3439 HIGHLANDER DR 107300504030 ROMANI ANITA 1 $ 265 $ 265
3437 HIGHLANDER DR 107300504060 BECKER LEANN 1 $ 265 $ 265
SURREY HEIGHTS 7TH ADD
3442 HIGHLANDER DR 107300603010 BERGSTROM TIMOTHY L 1 $ 265 $ 265
3438 HIGHLANDER DR 107300603020 EICH JAMES 1 $ 265 $ 265
3440 HIGHLANDER DR 107300603030 JOHNSON LAUREL E 1 $ 265 $ 265
3444 HIGHLANDER DR 107300603040 SMIEJA MICHAEL 1 $ 265 $ 265
3450 HIGHLANDER DR 107300606010 GURUNG SURYA & REIKO 1 $ 265 $ 265
3446 HIGHLANDER DR 107300606020 DACHEL SUSAN K 1 $ 265 $ 265
3448 HIGHLANDER DR 107300606030 MEKURIA ZELEALEM Z 1 $ 265 $ 265
3452 HIGHLANDER DR 107300606040 EGBERS JOHN J & SUSAN R 1 $ 265 $ 265
3454 HIGHLANDER DR 107300607020 HESPENHEIDE DANIEL J 1 $ 265 $ 265
3458 HIGHLANDER DR 107300607031 HANSELMAN KARA A 1 $ 265 $ 265
3456 HIGHLANDER DR 107300607050 PEDERSEN NATHAN 1 $ 265 $ 265
3460 HIGHLANDER DR 107300607060 GREENE SUE 1 $ 265 $ 265
Total R-3 Residential 168 $ 44,520
R-4 Residential
Property Address PIN Owner Frontage Assessment Rate Total
SURREY GARDENS
3415 FEDERAL DR 107299501010 YANKEE DOODLE ASSOC 324 $ 20.99 $ 6,800
Total R-4 Residential 324 $ 6,800
Summary
R-3 Residential 168 Units $ 44,520
R-4 Residential 1 Parcel $ 6,800
Assessment Total $ 51,320
Assessable Frontage 3,536 100%
Non-Assessable Frontage 0 0%
Total Frontage 3,536 100%
MN Highway 13Interstate 35ECentral P
a
r
k
w
a
y
Federal DriveYankee Doodle Road County Road 28 Pilot Knob RoadSurrey Heights WashingtonDrivePROJECT LOCATION
Ashbury Road
Drive
H:\EAGA\N17117565\CAD\C3D\FIGR-117565-1 Location Plan Figure.dwg 1/9/2019 6:41:32 PMR
Surrey Heights Drive - Street & Utilities Rehabiliation
City of Eagan, MN
Figure 1: Location Plan
January 2019
R
FEETSCALE
0 500 1000
HORZ.
D
D
D
D >>>>>llllllll>>>>>>>>>>>>>>>>>>>>>>>>>>>>ll
lllll>
>l>>>>>>>>>llllll>>>>>>l l l l l l l l l l l l l l ll
S
S
S
S
S
D D
>>>>>>>>>>>>D
>>>>>>>>>>>>>>>>>>>>>>>>>>>D
>>S >lS
D
SS
>ll>>>>>>>>>l l l l l l l
D
>>>>>>>>lSurrey
H
ei
g
h
t
s
D
ri
v
e
Aspen Drive
Highlander Drive
Greenwood
C
o
u
r
t Federal DriveYankee Doodle Road County Road 28
WoodviewAvenue>>>>1.5" MILL/OVERLAY
FULL DEPTH PAVEMENT
REPLACEMENT
REMOVE AND REPLACE
EXISTING WATERMAIN
AND SANITARY SEWER
EXTEND SANITARY SEWER AND
WATERMAIN FROM ASPEN DRIVE TO
YANKEE DOODLE ROAD>>>>>>>>lll>lllllll>>ll>ll>>ll>>llREALIGN SANITARY SEWER
ABANDON
SANITARY SEWERDISCONNECT
SANITARY SEWER
H:\EAGA\N17117565\CAD\C3D\FIGR-117565-2 Ex and Proposed Conditions Figure.dwg 1/9/2019 7:03:36 PMR
Surrey Heights Drive - Street & Utilities Rehabiliation
City of Eagan, MN
Fig. 2: Ex. & Prop. Conditions
January 2019
R
FEETSCALE
0 100 200
HORZ.
R/W
0.5
:1
R/W
PROPOSED TYPICAL SECTION - WATERMAIN AND SANITARY SEWER REPLACEMENT & EXTENSION AREA
VARIES
18'
VARIES
18'
℄
3.00%
R/WR/W
EXISTING TYPICAL SECTION
VARIES
18'
VARIES
18'
℄
NEW D412 CONCRETE
CURB & GUTTER ON
WEST SIDE
DESIGN - WEST OF CENTERLINE
RECLAIM 9" DEPTH
1.5" TYPE 9.5 WEARING COURSE (3,B) [SPWEA330B]
BITUMINOUS TACK COAT (2357)
2" TYPE 12.5 WEARING COURSE (3,B) [SPWEB330B]
6" (MIN.) SALVAGED RECLAIMED MATERIAL
6" TOPSOIL MIN
BITUMINOUS PAVEMENT (AVE. 3")
EXISTING D412
CONCRETE CURB
& GUTTER
R/WR/W
PROPOSED TYPICAL SECTION - MILL AND OVERLAY AREA
VARIES
18'
VARIES
18'
℄
3.00%
DESIGN
FULL WIDTH MILL, 1.5"DEPTH
1.5" TYPE 9.5 WEARING COURSE (3,B) [SPWEA330B]
BITUMINOUS TACK COAT (2357)
2" TYPE 12.5 WEARING COURSE (3,B) [SPWEB330B] PATCHING AS NEEDED
PREPARED SUBGRADE
AGGREGATE BASE (AVE. 6")
SPOT REPAIR D412
CONCRETE CURB &
GUTTER ON EAST SIDE
SPOT REPAIR D412
CONCRETE CURB &
GUTTER (BOTH SIDES)H:\EAGA\N17117565\CAD\C3D\FIGR-117565-3 Typical Section Figure.dwg 1/9/2019 7:11:24 PMR
Surrey Heights Drive - Street & Utilities Rehabilitation
City of Eagan, MN
Figure 3: Typical Section
January 2019
Surrey
H
ei
g
h
t
s
D
ri
v
e
Aspen Drive
Highlander Drive
Greenwood
C
o
u
r
t Federal DriveYankee Doodle Road County Road 28
324'WoodviewAvenuePer Front Foot Assessment
Per Unit Assessment
LEGEND
H:\EAGA\N17117565\CAD\C3D\FIGR-117565-4 Assessment Area Figure.dwg 1/9/2019 7:13:43 PMR
Surrey Heights Drive - Street & Utilities Rehabiliation
City of Eagan, MN
Figure 4: Assessment Areas
January 2019
R
FEETSCALE
0 100 200
HORZ.
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
CONSENT AGENDA
J. Project 1311, Donald Avenue
Street & Utilities Rehabilitation
Action To Be Considered:
Receive the Draft Feasibility Report for Project 1311 (Donald Avenue - Street & Utilities
Rehabilitation) and schedule a public hearing to be held on February 19, 2019.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of Donald Avenue, a residential street in the
Letendre Addition neighborhood in northwest Eagan, located north of Yankee
Doodle Road and east of TH 13.
Pavement rehabilitation of this street, water main replacement, and other City
utility modifications are programmed for 2019 in the City of Eagan’s 5-Year CIP
(2019-2023).
A draft Feasibility Report has been prepared and is being presented to the
Council for their consideration of scheduling a public hearing for Tuesday,
February 19, 2019.
An informational neighborhood meeting will be held with the a djacent property
owners prior to the formal public hearing to review and discuss the proposed
improvements.
Attachments (1)
CJ-1 Draft Feasibility Report
Report for
Donald Avenue
Street and Utilities Rehabilitation
City Project No. 1311
January 15, 2019
Prepared By
To: Honorable Mayor and City Council
From: Michael Warner, Bolton & Menk, Project Engineer
Date: January 15, 2019
Re: Donald Avenue – Street and Utilities Rehabilitation
City Project No.: 1311
Attached is the feasibility report for the Donald Avenue – Street and Utilities Rehabilitation, City
Project No. 1311. The report presents and discusses the proposed improvements and includes
a cost estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Michael R. Warner
Date: ____________________ Reg. No. 44693
Reviewed By:
Department of Public Works Date: ____________________
Reviewed By:
Finance Department Date: ____________________
TABLE OF CONTENTS
Executive Summary ......................................................................................................... 1
Introduction/History .................................................................................................... 2
Scope .............................................................................................................................. 3
Area to Be Included ..................................................................................................................... 3
Street Pavement Evaluation ........................................................................................... 3
Proposed Improvements ................................................................................................ 4
Easements/Permits ......................................................................................................... 6
Feasibility/Recommendations ......................................................................................... 7
Cost Estimate .................................................................................................................. 7
Assessments .................................................................................................................... 7
Assessment Financing Options ........................................................................................ 9
Revenue Source .............................................................................................................. 10
Project Schedule ............................................................................................................. 10
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Plan
-2.1 & 2.2 Proposed Conditions
- 3 Typical Section
- 4 Assessment Area
Donald Avenue
1
Executive Summary
Background
Project Name Donald Avenue Project #1311
Street Area 6,167 Sq. Yds.Street Length 1,850 Feet
Streets Included Donald Avenue
Constructed 1973
Reclaimed 1997
Crack Sealed -
Seal Coated 2002, 2009
Absolute Location SW ¼ of Section 9
Township 27, Range 23 Relative Location North of Yankee Doodle Road
East of TH 13
Project Details
Scope
·Roadway reconstruction
·Curb & gutter replacement
·Drainage improvements
·Watermain replacement
·Water and Sewer service replacement
(within the right-of-way)
·Drain Tile installation
·Adjustment/Replacement of:
o Sanitary/Storm sewer
o Utility castings
o Street signage
·Utility Improvements
PCI Rating 24/100
Recommended
Improvement Reconstruction
Curb Removal 100%
R-1 Residential Lots
R-3 Residential Units
R-4 Parcels
30 lots
48 units
1 parcel
Cost Estimate/ Revenue
Property City
Street $ 88,600 $ 41,501 $ 47,099
Curb & Gutter $ 37,400 -$ 37,400
Utilities $992,500 -$992,500
Total $1,118,500 $ 41,501 (4%)$1,076,999 (96%)
Donald Avenue
2
January 15, 2019
Street and Utilities Rehabilitation
Donald Avenue
Eagan, Minnesota
Introduction/ History
Pavement Management -As a part of Eagan’s Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five-Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
1,850 feet of Donald Avenue, a residential street in the Letendre Addition neighborhood in
northwest Eagan, has been identified for 2019 street and utility rehabilitation improvements.
Figure 1, located in Appendix C, illustrates the project location. The street was originally
constructed in 1973 and the pavement was replaced (reclaimed) in 1997.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Timely maintenance work, such as bituminous patching, crack sealing, and seal coating have
occurred at appropriate intervals during the life of the pavement on Donald Avenue. The City
of Eagan's maintenance records indicate that the street was reclaimed and paved in 1997, and
seal coated in 2002 and 2009. Donald Avenue was due for an overlay approximately 2-3 years
ago, but due to the condition of the watermain and the number of patches in the pavement,
the project was delayed until a reconstruction of the street was warranted. Since then, multiple
watermain breaks have occurred, resulting in the need to expedite the watermain replacement
and subsequent reconstruction.
The City has reviewed the current condition of the street and has determined a reconstruction
of the street is necessary. The pavement is nearing the end of its useful life, asphalt stripping is
present, and there are a number of large patches and thin overlays present.
Infrastructure Review -The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
Donald Avenue
3
project area. The existing sanitary sewer within the street is 9-inch diameter Vitrified Clay Pipe
(VCP) and was recently rehabilitated with a Cured in Place Pipe (CIPP) liner. No improvements
were made at that time to the existing sewer services to the adjacent properties.
The existing water main is 6-inch diameter Cast Iron Pipe (CIP) and has experienced several pipe
repairs due to water main breaks. Individual water services are provided to each lot. A minor
amount of storm sewer exists at the low point in Donald Avenue approximately 300-feet north
of Yankee Doodle Road and at the intersection of Letendre Street. See Figures 2.1 & 2.2, in
Appendix C, for the existing public utilities along Donald Avenue.
Several drainage issues are present along the corridor due to flat street grades, an inadequate
storm sewer system, high groundwater table, and low elevation of some of the properties.
Several homes have sump pumps which discharge towards the street and cause nuisance
drainage issues and safety concerns.
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City-maintained
items is included in this project, if needed.
Scope
This project will provide replacement of the existing watermain, water services, sanitary sewer
services, and reconstruction of approximately 1,850 feet of roadway. Figures 2.1 & 2.2 in
Appendix C, illustrates the project limits.
Included in this project are the following improvements: full replacement of concrete curb and
gutter and pavement section, full replacement of the water system including watermain, water
services, valves, and hydrants, adjustments and/or replacement to sanitary/storm sewer utility
castings, extension of sump pump discharge/drain tile pipe, and replacement of street signage.
Area to Be Included
Properties included in the project lie within the SW ¼, Section 9, lying North of Yankee Doodle
Road, East of TH 13, in Township 27, Range 23, in the City of Eagan, Dakota County, Minnesota.
Street Pavement Evaluation
The City of Eagan’s Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
Donald Avenue
4
PCI Recommended Improvement
56 – 100 Routine Maintenance/Crack Seal/Seal Coat
36 - 55 Patch/Repair and/or Overlay
0 - 35 Reconstruct/ Reclaim
The 2018 PCI ranking for Donald Avenue is 24, which falls in the “Reconstruct/Reclaim”
category, as mentioned above. In addition to the need to replace the watermain, the street
pavement has reached a condition where, based on the City’s experience, the integrity of the
pavement has failed and can no longer be repaired or maintained cost-effectively. Therefore,
the 2019 construction season is the optimal time to reconstruct this street.
Proposed Improvements
Street Improvements -The proposed
street improvements are shown in
Figure 3. The existing street is 32-feet
wide with D412 concrete curb and
gutter. The street is proposed to be fully
reconstructed to the same width with
B618 concrete curb and gutter, 3.5-
inches of bituminous pavement, and 6-
inches of class 5 gravel base to meet
current City standards. Due to the poor
soils and high groundwater table
present in the area, a 12-inch thick layer
of sand is also proposed.
Watermain Improvements – The existing watermain is in poor
condition, has experienced several breaks along the corridor, and is
proposed to be replaced as part of this project. A new 6-inch diameter
Ductile Iron Pipe (DIP) is proposed that meets current City standards.
The existing hydrants and valves along the street will also be replaced.
One hydrant is proposed to be added to meet hydrant coverage
requirements.
Beginning in 2014, all new hydrants installed in the city were required
to include "Storz" technology. Storz nozzles make it easy for
firefighters to connect to hydrants with a quick quarter-turn
connection, which will allow firefighters to save time connecting to a
hydrant. They also eliminate the need for additional adapters, cross-threading, hose
connection problems, and multiple thread specifications that may be found throughout the
system. All existing city owned and city maintained (public) hydrants will be updated with the
Donald Avenue
5
same technology as part of annual street revitalization projects. Newer hydrants can be
retrofitted with a coupler or new hydrant head to accommodate the Storz nozzle. Older style
hydrants will need to be completely replaced. Since the existing hydrants will all be replaced as
part of the project, the Storz nozzle will be included with the new hydrants.
The existing water service to each property along the corridor is proposed to be replaced up to
the property line. For the water system improvements to be constructed, a temporary above-
ground water system will be put in place to maintain water service to the adjacent properties.
After the new water system is in place and tested, the temporary system will be removed.
Sanitary Sewer Improvements – The existing sanitary sewer main along Donald Avenue was
recently lined and is in good condition. At the time of the lining, no work was performed to the
sanitary sewer services to each property. Since the street is proposed for reconstruction and
there is additional underground utility work to be completed as part of this project, the sanitary
sewer services are also proposed to be rehabilitated. The rehabilitation is proposed to be a
combination of internal pipe rehabilitation techniques near the main and replacement of the
service up to the property line. The existing sanitary manholes are in good condition and will be
adjusted to match the new pavement.
Storm Sewer Improvements – The existing storm sewer structures at the low point of Donald
Avenue are in good condition but need minor repair work. With the replacement of the
watermain, it is more effective to replace the structures versus salvage, repair, and reinstall
them. Additional catch basins are also proposed to be added at the low point to assist in getting
the surface water off the roadway. Therefore, it is recommended to replace the structures and
pipe within the street at the low point. The existing storm sewer structures at Letendre Street
are in good condition so only the castings and rings are proposed to be replaced.
To address the sump pump drainage that spills onto the roadway from the adjacent properties,
a 6-inch perforated PVC pipe is proposed along Donald Avenue. A 4-inch service pipe will be
provided for each property along Donald Avenue, with a cap provided at the surface for access
and connection. Property owners could discharge their sump pumps directly to this service
pipe. Details for how the connection could be made and whether an agreement is needed
between the property owner and the City will be determined during design phase of the
project. If needed, a sump pump service could be provided to the Bayberry Place Apartments
from the storm sewer system at the Donald Avenue low point.
Sidewalk/Path & Pedestrian Ramps – Revisions
to the Americans with Disabilities Act (ADA)
requires jurisdictional agencies to provide
detectable warnings at all existing pedestrian
ramps of sidewalks and paths with public streets
that are improved, including street surface
improvements. The most common method of
providing this detectable warning is through the
Donald Avenue
6
installation of truncated domes a minimum of two feet in length across the width of all
pedestrian ramps. The existing pedestrian ramps at Yankee Doodle and Donald Avenue are
currently up to standards, but will be replaced with the project due to the replacement of the
adjacent curb and gutter.
Signage -Traffic and street identification signage within the project limits have reached the end
of their useful life expectancy and are in need of replacement. Signs have been reviewed for
compliance with the Minnesota Manual on Uniform Traffic Control Devices (MnMUTCD). Those
that are required by the MnMUTCD will be replaced to improve safety and night time visibility,
and those that are not will be permanently removed.
Street Lights – The street lights (maintained by Xcel Electric) in the project area are only at the
intersections, are in good condition, and provide adequate coverage. No modifications to the
existing street lights are proposed.
Stormwater and Water Quality Improvements – No water quality improvements are proposed
with this project.
Complete Streets – “Complete Streets” is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
Donald Avenue was reviewed to determine if additional Complete Streets opportunities are
available and/or feasible. The street is relatively narrow at 32-feet wide, has low traffic
volumes, limited access points, and a trail is available on Yankee Doodle Road to connect
pedestrians to the City and regional trail system. Pedestrian curb ramps at Yankee Doodle Road
currently meet ADA design standards, but will be replaced due to the replacement of the
adjacent curb and gutter. Given the existing and proposed elements available for all users,
Donald Avenue meets the intent of the complete streets guidelines.
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated although a
right of entry may be required to replace the sewer and water services to the property line. It is
anticipated the following permits will be required:
·Minnesota Department of Health Permit for Watermain Replacement
Donald Avenue
7
·Dakota County Right of Way Permit for work within the Yankee Doodle Right of Way
·NPDES Construction Stormwater Permit
Feasibility and Recommendations
The rehabilitation project is necessary to prevent further watermain breaks and service
interruptions, address the drainage issues, reduce the continued maintenance on the roadway,
create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement will reduce the roadway maintenance
costs and expenses for repairing watermain breaks. The project is feasible in that this type of
improvement has been used successfully on numerous other streets throughout the City and
the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 – 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report potentially in
combination with other similar projects in the area.
Cost Estimate
A detailed cost estimate is located in Appendix A. The estimate is based on anticipated 2019
construction costs and include a 5% contingency and indirect cost of 25%, which include legal,
administration, engineering, and interest. A summary of the costs is as follows:
Donald Avenue
·Street ..........................................................................$ 88,600
·Curb and Gutter ..................................................................$ 37,400
·Utilities ...............................................................................$992,500
Total ........................................................................$1,118,500
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan’s Special Assessment
Policy. Donald Avenue is scheduled for a full reconstruction due to the amount of utility
rehabilitation and repairs needed, although the street should be due for a mill and overlay
based on the age of the street. Therefore, assessments are calculated based on items
consistent with a typical mill and overlay improvement for residential streets. All assessments
will be revised based on final costs. A preliminary assessment roll is included in Appendix B.
·Total Street Frontage = 1,850 centerline feet x 2 = 3,700 F.F.
·R-1 Residential Frontage = 2,859 F.F. (77.3%)
·R-3 Residential Frontage = 88 F.F. (2.4%)
Donald Avenue
8
·R-4 Residential Frontage = 349 F.F. (9.4%)
·Un-assessable Frontage = 404 F.F. (10.9%)
City Special Assessment Policy
Assessment Ratio
Property City
Mill & Overlay – Low-Density Residential (R-1,2,3)50%50%
Mill & Overlay – Low-Density Residential (R-4)75%25%
Utility Improvements -100%
R-1 Residential Lots –All R-1 residential lots (30 single family lots) as shown on Figure 4, having
driveway access onto the street to be improved are proposed to be assessed. The City’s
Assessment Policy states that 50% of the mill and overlay costs are assessable for local
residential streets, based on a standard 32-foot width. 1730 Letendre St., 3290 Heritage Ln.
and 3296 Heritage Ln. are included in the assessable area, even though their front yard has
frontage on a different street, as their highest and best use would be to subdivide each lot to
create a separate lot with front yard frontage onto Donald Avenue. This approach is consistent
with the approach used with the previous street improvements and assessments performed
with Proj. 714 in 1997.
The estimated cost per lot, based on the City’s Assessment Policy, is $1,140 /R-1 single family
lot and is calculated as follows:
Mill & Overlay: R-1 Residential
o 2,859’ R-1 Frontage / 3,700’ Total Frontage = 77.3%
o $88,600 (Mill & Overlay Costs) x 50% (assessment rate) x 77.3% (R-1 frontage) =
$34,244 (Total R-1 Assessment)
o $34,244 / 30 lots = $1,141, rounded to $1,140 / R-1 lot
R-3 Residential Lots –All R-3 residential units (48 townhome units), as shown on Figure 4,
having private street access onto the street to be improved are proposed to be assessed. The
City’s Assessment Policy states that 50% of the mill and overlay costs are assessable for local
residential streets, based on a standard 32-foot width.
The estimated cost per unit, based on the City’s Assessment Policy, is $22 / R-3 townhome unit
and is calculated as follows:
Mill & Overlay: R-3 Residential
o 88’ Residential Frontage / 3,700’ Total Frontage = 2.4%
o $88,600 (Mill & Overlay Costs) x 50% (assessment rate) x 2.4% (R-3 frontage) =
$1,063 (Total R-3 Assessment)
o $1,063 / 48 units = $22.15, rounded to $22 / R-3 unit
Donald Avenue
9
R-4 Residential Lots –All R-4 residential parcels (1 total) as shown on Figure 4, that are
adjacent to, or have direct access, to the street to be improved are proposed to be assessed.
The City’s Assessment Policy states that 75% of the mill and overlay costs are assessable for
residential roadways, based on a standard 32-foot width. The estimated cost per front foot,
based on the City’s Assessment Policy, is $17.89 / R-4 F.F. or $5,481 for the one R-4 parcel and
is calculated as follows:
Mill & Overlay: R-4 Residential
o 349’ R-4 residential / 3,700’ Total Frontage = 9.4%
o $88,600 (Mill & Overlay Costs) x 75% (assessment rate) x 9.4% (R-4 frontage) =
$6,246 (Total R-4 Assessment) rounded to $6,245
o $6,245 / 349 F.F. =$17.89 / R-4 F.F. or $6,245 for the one R-4 parcel
The remaining frontage within the project area (404’ or 10.9%) is considered non-assessable
under the City’s Assessment Policy.
Assessment Financing Options
Each property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2019 rate is not yet
available; however, it is expected to be comparable and based on City policy. It will be
determined by the City Council in the spring. The following payment schedule is an example of
a residential lot assessment of $1,100 and $5,481 with an estimated 4.5% interest for the
assessed amounts, and assumes 14 months interest for the first year.
$1,140 (R-1 single family homes)
Principal / Year Interest / Year Cost / Year
1st Year $228 $60 $288
5th Year $228 $10 $238
$6,245 (R-4 apartments)
Principal / Year Interest / Year Cost / Year
1st Year $1,249 $328 $1,577
5th Year $1,249 $56 $1,305
The $22 townhome assessments will be due in full within 30 days after the council adopts the
assessment roll.
Donald Avenue
10
Revenue Source
A summary of revenue sources is listed below:
Project Cost Property Assessment City Contribution
Street $ 88,600 $ 41,501 $ 47,099
Curb & Gutter $ 37,400 -$ 37,400
Utilities $992,500 -$992,500
Totals $1,118,500 $ 41,501 $1,076,999
The Major Street Fund will finance the estimated street related project deficit of $84,499.
The Combined Utility Fund will finance the estimated $1,176,999 utility improvements.
Project Schedule
Present Feasibility Report to City Council/
Order Public Hearing ............................................................................... January 15, 2019
Informational Meeting ............................................................................ January 29, 2019
Public Hearing ....................................................................................... February 19, 2019
Approve Plans and Specifications ..............................................................March 19, 2019
Bid Date ...................................................................................................... April 25, 2019
Award Contract .............................................................................................. May 7, 2019
Start Construction ..............................................................................................May 2019
Project Completion ........................................................................................August 2019
Final Cost Report ..................................................................................... September 2019
Final Assessment Hearing ................................................................................... Fall 2019
First Payment Due with Property Tax Statement .......................................... May 15, 2020
Est Qty Est Cost Est Qty Est Cost Est Qty Est Cost
2021.501 Mobilization LS 35,000.00$0.33 11,550.00$0.33 11,550.00$0.34 11,900.00$1 35,000.00$
2104.502 Salvage Mailbox Assembly EA 50.00$0 -$0 -$23 1,150.00$23 1,150.00$
2104.502 Remove Hydrant EA 400.00$0 -$0 -$5 2,000.00$5 2,000.00$
2104.502 Remove Gate Valve & Box EA 300.00$0 -$0 -$3 900.00$3 900.00$
2104.502 Remove Curb Stop & Box EA 100.00$0 -$0 -$27 2,700.00$27 2,700.00$
2104.502 Remove Manhole or Catch Basin EA 500.00$0 -$0 -$2 1,000.00$2 1,000.00$
2104.503 Remove Concrete Curb and Gutter LF 5.00$0 -$740 3,700.00$2,960 14,800.00$3,700 18,500.00$
2104.503 Sawing Concrete Pavement LF 5.00$0 -$2 10.00$18 90.00$20 100.00$
2104.503 Sawing Bituminous Pavement LF 3.00$0 -$22 66.00$198 594.00$220 660.00$
2104.503 Remove Water Main LF 5.00$0 -$0 -$2,000 10,000.00$2,000 10,000.00$
2104.503 Remove Water Service Pipe LF 1.00$0 -$0 -$850 850.00$850 850.00$
2104.503 Remove Sanitary Service Pipe LF 1.00$0 -$0 -$800 800.00$800 800.00$
2104.503 Remove Drain Tile LF 2.00$0 -$0 -$200 400.00$200 400.00$
2104.503 Remove Sewer Pipe (Storm)LF 10.00$0 -$0 -$33 330.00$33 330.00$
2104.504 Remove Bituminous Pavement SY 4.00$3,100 12,400.00$0 -$3,100 12,400.00$6,200 24,800.00$
2104.504 Remove Bituminous Driveway and Trail SY 12.00$0 -$35 420.00$315 3,780.00$350 4,200.00$
2104.504 Remove Concrete Driveway /Valley Gutter SY 14.00$0 -$5 63.00$41 567.00$45 630.00$
2105.507 Common Excavation CY 15.00$0 -$0 -$3,700 55,500.00$3,700 55,500.00$
2105.507 Select Granular Borrow CY 15.00$0 -$0 -$2,500 37,500.00$2,500 37,500.00$
2123.610 Street Sweeper (With Pick Up Broom)HR 125.00$0 -$0 -$12 1,500.00$12 1,500.00$
2130.523 Water MGAL 200.00$0 -$0 -$15 3,000.00$15 3,000.00$
2211.509 Aggregate Base, Cl. 5 100% Crushed Limestone TON 18.00$0 -$0 -$2,700 48,600.00$2,700 48,600.00$
2357.506 Bituminous Material for Tack Coat GAL 2.75$440 1,210.00$0 -$0 -$440 1,210.00$
2360.501 SPWEA230B Wearing Course Mixture (Trail/Driveway)SY 25.00$0 -$35 875.00$315 7,875.00$350 8,750.00$
2360.501 SPWEA330B Wearing Course Mixture TON 60.00$620 37,200.00$0 -$0 -$620 37,200.00$
2360.501 SPWEB330B Wearing Course Mixture TON 55.00$0 -$0 -$820 45,100.00$820 45,100.00$
2433.603 Saw and Seal Joint LF 2.50$0 -$0 -$1,500 3,750.00$1,500 3,750.00$
2502.602 6" x 4" PVC Wye, Including Riser Pipe and Cap EA 500.00$0 -$0 -$30 15,000.00$30 15,000.00$
2502.602 Connect Drain Pipe to Structure EA 300.00$0 -$0 -$5 1,500.00$5 1,500.00$
2502.602 Connect to Existing Drain Tile EA 200.00$0 -$0 -$4 800.00$4 800.00$
2502.602 Connect Existing Pipe to New Structure EA 750.00$0 -$0 -$1 750.00$1 750.00$
2502.603 6" PVC Sump Pump Drain Pipe LF 10.00$0 -$0 -$3,000 30,000.00$3,000 30,000.00$
2502.603 4" Perforated HDPE Edge Drain LF 10.00$0 -$0 -$800 8,000.00$800 8,000.00$
2503.503 15" RC Pipe Sewer Des 3005 Cl V LF 50.00$0 -$0 -$53 2,650.00$53 2,650.00$
2503.602 Inline Service Top Hat EA 2,500.00$0 -$0 -$29 72,500.00$29 72,500.00$
2503.602 Reconnect Sanitary Sewer Service EA 200.00$0 -$0 -$29 5,800.00$29 5,800.00$
2503.602 Connect New Sanitary Service to Main EA 1,000.00$0 -$0 -$1 1,000.00$1 1,000.00$
2503.603 4" PVC Sanitary Service Pipe LF 25.00$0 -$0 -$830 20,750.00$830 20,750.00$
2503.608 Ductile Iron Fittings LB 10.00$0 -$0 -$400 4,000.00$400 4,000.00$
2504.601 Temporary Water Service LS 30,000.00$0 -$0 -$1 30,000.00$1 30,000.00$
2504.602 1" Corporation Stop EA 225.00$0 -$0 -$30 6,750.00$30 6,750.00$
2504.602 1" Curb Stop & Box EA 300.00$0 -$0 -$30 9,000.00$30 9,000.00$
2504.602 Connect to Existing Water Service EA 200.00$0 -$0 -$27 5,400.00$27 5,400.00$
2504.602 Connect to Existing Water Main EA 1,500.00$0 -$0 -$3 4,500.00$3 4,500.00$
2504.602 6" Gate Valve & Box EA 1,200.00$0 -$0 -$8 9,600.00$8 9,600.00$
2504.602 Hydrant EA 4,500.00$0 -$0 -$6 27,000.00$6 27,000.00$
2504.602 Irrigation Repair EA 160.00$0 -$6 960.00$0 -$6 960.00$
Appendix A
Preliminary Cost Estimate
City Project 1311 Donald Avenue Street and Utilities Rehabilitation
Item No.Item Unit Unit Price Total Est Qty Total Est CostStreetCurb & Gutter Utilities
Donald Avenue
Donald Avenue
11
2504.603 6" Watermain Ductile Iron Cl 52 LF 40.00$0 -$0 -$2,000 80,000.00$2,000 80,000.00$
2504.603 1" Type K Copper Water Service LF 25.00$0 -$0 -$900 22,500.00$900 22,500.00$
2506.602 2' X 3' Storm Sewer CB Incl Casting (Detail 232)EA 2,500.00$0 -$0 -$2 5,000.00$2 5,000.00$
2506.602 4' Dia Storm Sewer CBMH Incl Casting (Detail 230)EA 3,000.00$0 -$0 -$2 6,000.00$2 6,000.00$
2506.602 Remove & Replace Casting 3067V (Catch Basin)EA 900.00$0 -$0 -$2 1,800.00$2 1,800.00$
2506.602 Adjust Frame and Ring Casting (Manhole)EA 700.00$4 2,800.00$0 -$0 -$4 2,800.00$
2506.602 Remove & Replace Frame & Ring Casting (27")EA 1,250.00$0 -$0 -$1 1,250.00$1 1,250.00$
2521.518 6" Concrete Ped Ramp SF 14.00$0 -$0 -$160 2,240.00$160 2,240.00$
2531.503 Concrete Curb and Gutter, B618 LF 13.00$0 -$0 -$3,700 48,100.00$3,700 48,100.00$
2531.504 Concrete Valley Gutter - High Early SY 80.00$0 -$0 -$40 3,200.00$40 3,200.00$
2531.504 6" Concrete Driveway Pavement - High Early SY 80.00$0 -$0 -$15 1,200.00$15 1,200.00$
2531.602 Truncated Dome Detectable Warning Paver (2x2)EA 80.00$0 -$0 -$10 800.00$10 800.00$
2540.602 Repair Underground Electric Fence EA 85.00$0 -$2 170.00$0 -$2 170.00$
2540.602 Repair Landscaping EA 200.00$0 -$9 1,800.00$0 -$9 1,800.00$
2540.602 Temporary Mailbox EA 50.00$0 -$0 -$27 1,350.00$27 1,350.00$
2540.602 Install Mailbox Assembly EA 100.00$0 -$0 -$23 2,300.00$23 2,300.00$
2563.601 Traffic Control LS 4,000.00$0.33 1,320.00$0.33 1,320.00$0.34 1,360.00$1 4,000.00$
2572.506 Application of Water for Turf Establishment GAL 0.15$0 -$4,500 675.00$40,500 6,075.00$45,000 6,750.00$
2573.502 Storm Drain Inlet Protection EA 175.00$0 -$7 1,225.00$0 -$7 1,225.00$
2575.507 Boulevard Topsoil Borrow – MnDOT 3877-2F CY 40.00$0 -$89 3,560.00$801 32,040.00$890 35,600.00$
2575.604 Seeding (MnDOT 270 w/Type 5 Hydromulch)SY 5.00$0 -$420 2,100.00$3,780 18,900.00$4,200 21,000.00$
SP-1 Signage Remove and Replace LS 1,000.00$1 1,000.00$0 -$0 -$1 1,000.00$
67,480.00$28,494.00$756,201.00$852,175.00$
3,374.00$1,424.70$37,810.05$42,608.75$
70,854.00$29,918.70$794,011.05$894,783.75$
17,713.50$7,479.68$198,502.76$223,695.94$
88,567.50$37,398.38$992,513.81$1,118,479.69$Total Project 1311
Subtotal
5% Contingency
Subtotal
25% Indirect Costs
Donald Avenue
12
Donald Avenue
13
Appendix B
Preliminary Assessment Roll
City Project No. 1311 Donald Avenue Street and Utilities Rehabilitation
R-1 Residential
Property Address PIN Owner No. Lot Equivalents Unit Assessment Total
GIGUERE ADDITION
3340 DONALD AVE 102990001010 RICHIE JAMES A & COLLEEN 1 $1,140 $1,140
3344 DONALD AVE 102990001020 ANDERSON JOHN O 1 $1,140 $1,140
3348 DONALD AVE 102990001030 MURTINGER BONITA A 1 $1,140 $1,140
HELEN KENNEDY ADDITION
3299 DONALD AVE 103237501020 MCARDLE RILEY 1 $1,140 $1,140
ROBERT KARATZ ADDITION
3280 DONALD AVE 104130001010 FOURNIER KAREN J 1 $1,140 $1,140
3284 DONALD AVE 104130001020 NIZNIK MARK EDWARD 1 $1,140 $1,140
3290 DONALD AVE 104130001030 BROCKMAN PETER M & KAY M 1 $1,140 $1,140
3294 DONALD AVE 104130001040 DO LONG 1 $1,140 $1,140
3298 DONALD AVE 104130001050 BUZICKY JOSHUA PAUL 1 $1,140 $1,140
3302 DONALD AVE 104130001060 BLACK DANIEL 1 $1,140 $1,140
3306 DONALD AVE 104130001070 PAGGEN ROBERT & DEBRA 1 $1,140 $1,140
3310 DONALD AVE 104130001080 SUDDUTH JAMES S 1 $1,140 $1,140
3314 DONALD AVE 104130001090 LEIVERMANN JOHN X & ALESHIA C 1 $1,140 $1,140
3318 DONALD AVE 104130001100 LADUKE DERRICK & THERESA 1 $1,140 $1,140
LETENDRE ADDITION
3383 DONALD AVE 104490001011 ANJELO ABAYNEH 1 $1,140 $1,140
3389 DONALD AVE 104490001012 BARRY KENT 1 $1,140 $1,140
3377 DONALD AVE 104490001030 DAVIS ALAN J 1 $1,140 $1,140
3371 DONALD AVE 104490001043 HALL KERWIN & EDYTHE 1 $1,140 $1,140
3365 DONALD AVE 104490001050 HEINLE MALCOLM J 1 $1,140 $1,140
3359 DONALD AVE 104490001052 LEGG FRANK J & GLENICE E 1 $1,140 $1,140
3351 DONALD AVE 104490001060 KEGLER ANDY 1 $1,140 $1,140
3345 DONALD AVE 104490001071 HUSKEY DAVID L 1 $1,140 $1,140
3325 DONALD AVE 104490001081 BARTH SCHAAN P & RACHEL T 1 $1,140 $1,140
3319 DONALD AVE 104490001090 MCELHENEY JUDY K 1 $1,140 $1,140
3315 DONALD AVE 104490001105 GIGUERE NICHOLAS D & LAUREN 1 $1,140 $1,140
3311 DONALD AVE 104490001112 EHLERS NATHAN & EMILY M 1 $1,140 $1,140
3305 DONALD AVE 104490001122 STANISLOWSKI ROBERT 1 $1,140 $1,140
3296 HERITAGE LANE 104490001140 DAVID & JILLIAN SIDLER 1 $1,140 $1,140
3290 HERITAGE LANE 104490001150 RODGER E & DARLENE M SLATER 1 $1,140 $1,140
1730 LETENDRE ST 104490001160 KAEDER PATRICIA A TSTE 1 $1,140 $1,140
TOTAL 30 $34,200
R-3 Residential
Property Address PIN Owner
No. Lot
Equivalents
Unit
Assessment Total
ROBERT KARATZ ADDITION
3300 RIVER BLUFF DR 104130005073 MILAN STEVEN T 1 $22.00 $22.00
3302 RIVER BLUFF DR 104130005074 WINGE STEVEN C 1 $22.00 $22.00
3304 RIVER BLUFF DR 104130005075 WINGE STEVEN C 1 $22.00 $22.00
3306 RIVER BLUFF DR 104130005076 ROHRICHT LORI A 1 $22.00 $22.00
Donald Avenue
14
3308 RIVER BLUFF DR 104130005077 GITAR KELLY 1 $22.00 $22.00
3310 RIVER BLUFF DR 104130005078 BUR DANIEL E 1 $22.00 $22.00
3312 RIVER BLUFF DR 104130005079 KALLEMEYN VICTORIA 1 $22.00 $22.00
3314 RIVER BLUFF DR 104130005080 WINTER MELISSA V 1 $22.00 $22.00
3316 RIVER BLUFF DR 104130005081 REIMAGINE SOUTHWEST LLC 1 $22.00 $22.00
3318 RIVER BLUFF DR 104130005082 BLEECKER TERRY & LINDA D 1 $22.00 $22.00
3320 RIVER BLUFF DR 104130005083 PECORE KARI L 1 $22.00 $22.00
3322 RIVER BLUFF DR 104130005084 FRANKLIN TIWANDA 1 $22.00 $22.00
1661 RIVER BLUFF CT 104130005085 RANDOLPH KIRSTEN 1 $22.00 $22.00
1659 RIVER BLUFF CT 104130005086 PARROTT CHRISTINA 1 $22.00 $22.00
1657 RIVER BLUFF CT 104130005087 GIERKE MICHAEL & ELIZABETH 1 $22.00 $22.00
1655 RIVER BLUFF CT 104130005088 LOOMIS KENNETH J II 1 $22.00 $22.00
1653 RIVER BLUFF CT 104130005089 MELZAREK PENNY J 1 $22.00 $22.00
1651 RIVER BLUFF CT 104130005090 RUSTAD SHIRLEY 1 $22.00 $22.00
1649 RIVER BLUFF CT 104130005091 COUPER DANIEL P 1 $22.00 $22.00
1647 RIVER BLUFF CT 104130005092 BURGGRAFF JENICE 1 $22.00 $22.00
1645 RIVER BLUFF CT 104130005093 NICHOLLS ASHLEY J 1 $22.00 $22.00
1643 RIVER BLUFF CT 104130005094 KURIAN MOHAN 1 $22.00 $22.00
1641 RIVER BLUFF CT 104130005095 LANE JACQUELINE L 1 $22.00 $22.00
1639 RIVER BLUFF CT 104130005096 DETERS ANDREW 1 $22.00 $22.00
1626 RIVER BLUFF CT 104130005097 LOMBARD KRISTA LEE 1 $22.00 $22.00
1628 RIVER BLUFF CT 104130005098 CORNIEA THOMAS 1 $22.00 $22.00
1630 RIVER BLUFF CT 104130005099 GEISTER GARY A & JOANNE J 1 $22.00 $22.00
1632 RIVER BLUFF CT 104130005100 VANKEMPEN-GRIEME VICKIE L 1 $22.00 $22.00
1634 RIVER BLUFF CT 104130005101 LINDGREN HEATHER 1 $22.00 $22.00
1636 RIVER BLUFF CT 104130005102 ISMAIL AHMED NASIR 1 $22.00 $22.00
1638 RIVER BLUFF CT 104130005103 ALTMANN TIMOTHY J 1 $22.00 $22.00
1640 RIVER BLUFF CT 104130005104 BOE KATHIE J & BRUCE R 1 $22.00 $22.00
1642 RIVER BLUFF CT 104130005105 KUBESH TYLER 1 $22.00 $22.00
1644 RIVER BLUFF CT 104130005106 LATHAM BRIANNA K 1 $22.00 $22.00
1646 RIVER BLUFF CT 104130005107 HANSEN MARK HENRY 1 $22.00 $22.00
1648 RIVER BLUFF CT 104130005108 SHUPE SARA L 1 $22.00 $22.00
1650 RIVER BLUFF CT 104130005109 CEDAR BLUFF TOWNHOME CONDO ASSN INC 1 $22.00 $22.00
1652 RIVER BLUFF CT 104130005110 ACHAME ABABAYE ABEBE 1 $22.00 $22.00
1654 RIVER BLUFF CT 104130005111 DADA OLUSOLA O 1 $22.00 $22.00
1656 RIVER BLUFF CT 104130005112 FEEKES STACY L 1 $22.00 $22.00
1658 RIVER BLUFF CT 104130005113 EMERSON LORIE 1 $22.00 $22.00
1660 RIVER BLUFF CT 104130005114 BIERLY LEIF F & ANGELA C 1 $22.00 $22.00
3323 RIVER BLUFF DR 104130005115 BERKLAND BERNT 1 $22.00 $22.00
3321 RIVER BLUFF DR 104130005116 THOMPSON TERESA 1 $22.00 $22.00
3319 RIVER BLUFF DR 104130005117 NUTA SUE 1 $22.00 $22.00
3317 RIVER BLUFF DR 104130005118 HERRICK KAITLYN 1 $22.00 $22.00
3315 RIVER BLUFF DR 104130005119 MATTSON JAMES 1 $22.00 $22.00
3313 RIVER BLUFF DR 104130005120 CHAVEZ JORGE 1 $22.00 $22.00
TOTAL 48 $1,056.00
Donald Avenue
15
R-4 Residential
Property Address PIN Owner Frontage Assessment Rate Total
ROBERT KARATZ ADDITION
3395 YANKEE DOODLE LN 104130001121 BH APARTMENTS LLC 349 $17.89 $6,245.00
TOTAL 349 $6,245.00
Summary
R-1 Residential 30 Lots $ 34,200
R-3 Residential 48 Units $ 1,056
R-4 Residential 1 Parcel $ 6,245
Assessment Total $ 41,501
Assessable R-1 Frontage 2,859 77.3%
Assessable R-3 Frontage 88 2.4%
Assessable R-4 Frontage 349 9.4%
Non-Assessable Frontage 404 10.9%
Total Frontage 3,700 100%
Donald AvenueHeritage LaneLetendre Street
Yankee Doodle Road County Road 28MN Highway 13Pilot Knob RoadInterstate 35ECentral Pa
r
k
w
a
y
Coachman RoadFour Oaks Road
Terminal DrivePROJECT LOCATION
H:\EAGA\N17117564\CAD\C3D\FIGR-117564-1 Location Plan Figure.dwg 1/10/2019 7:57:11 AMR
Donald Avenue - Street and Utilities Rehabilitation
City of Eagan, MN
Figure 1: Location Plan
January 2019
RFEETSCALE
0 500 1000
HORZ.
S
S
S
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>llllllllllllllllllH
3319
3325
3345
3344
3348
3340
3389
3383
3377
3371
3365
3359
3351
3395
1640
Donald AvenueYankee Doodle Road
River Bluff Drive
Donald Court
>
>ll>ll>l>
l>
l>
l>
>
l>
l>
>>lllllllllllllll
llllllllllllllREMOVE AND REPLACE
WATERMAIN (TYP.)
FULL STREET RECONSTRUCTION
REMOVE AND REPLACE
STORM SEWER
REMOVE AND REPLACE
WATER AND SEWER
SERVICE LINES (TYP.)
EXISTING
SANITARY
SEWER
EXISTING STORM
SEWER >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>SUMP PUMP
DISCHARGE/DRAIN
TILE PIPE (TYP.)
Bayberry Place
Apartments
H:\EAGA\N17117564\CAD\C3D\FIGR-117564-2 Existing & Proposed Conditions Figure.dwg 1/10/2019 7:41:58 AMR
Donald Avenue - Street and Utilities Rehabilitation
City of Eagan, MN
Figure 2.1: Proposed Conditions
January 2019
R
FEETSCALE
0 50 100
HORZ.
S
S
S
S >>>>>>>>
>
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>lllllllllllllll l l l l l l l
llllllllllllllll 1730 3280
3284
3290
3294
3298
3302
3305
3311
3315
3319
3306
3310
3314
3318
Letendre Street
Donald AvenueRiver Bluff Drivell>ll>ll>ll>>ll>ll>>ll>ll>l>ll>>ll>l>lllllllllllllllllllllllllllREMOVE AND REPLACE
WATERMAIN (TYP.)
FULL STREET
RECONSTRUCTION
REMOVE AND REPLACE
WATER AND SEWER
SERVICE LINES (TYP.)>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>EXISTING SANITARY
SEWER (TYP.)
EXISTING STORM
SEWER (TYP.)
SUMP PUMP
DISCHARGE/DRAIN
TILE PIPE (TYP.)
3290
3296
3299 l>
INSTALL SEWER AND
WATER SERVICES TO
POTENTIAL LOT SPLIT
H:\EAGA\N17117564\CAD\C3D\FIGR-117564-2 Existing & Proposed Conditions Figure.dwg 1/10/2019 7:47:34 AMR
Donald Avenue - Street and Utilities Rehabilitation
City of Eagan, MN
Figure 2.2: Proposed Conditions
January 2019
R
FEETSCALE
0 50 100
HORZ.
R/W
0.5:1R/W
PROPOSED TYPICAL SECTION
30'
16'
30'
16'
℄
3.00%
R/WR/W
EXISTING TYPICAL SECTION
30'
16'
30'
16'
℄
NEW B618
CONCRETE CURB
& GUTTER
DESIGN
1.5" TYPE 9.5 WEARING COURSE (3,B) [SPWEA330B]
6" TOPSOIL MIN
BITUMINOUS PAVEMENT (AVE. 3")
EXISTING D412
CONCRETE CURB
& GUTTER
4" PERFORATED PE DRAIN TILE
(50' EACH WAY FROM LOW
POINT AT 3371/3377 DONALD
AVENUE)
AGGREGATE BASE (AVE. 6")
12" SELECT GRANULAR BORROW MODIFIED
(50' EACH WAY FROM LOW POINT AT
3371/3377 DONALD AVENUE)
BITUMINOUS TACK COAT (2357)
2" TYPE 12.5 WEARING COURSE (3,B) [SPWEB330B]
6" AGGREGATE BASE CLASS 5 100% CRUSHED LIMESTONE
12" SELECT GRANULAR BORROW
6" PERF PVC SUMP PUMP
DISCHARGE/DRAIN TILE PIPE
4" PVC SUMP PUMP
DISCHARGE SERVICE TO
EACH PROPERTY
H:\EAGA\N17117564\CAD\C3D\FIGR-117564-3 Typical Section Figure.dwg 1/10/2019 7:49:17 AMR
Donald Avenue - Street and Utilities Rehabilitation
City of Eagan, MN
Figure 3: Typical Section
January 2019
Letendre Street
Yankee Doodle Road Donald AvenueRiver Bluff
D
r
i
v
e
Donald Court
R-3
88'299'349'R-4105'ASSESSMENT AREA
Heritage LaneCounty Road 28
1730
3280
3284
3290
3294
3298
3302
3305
3311
3315
3319
3325
3345
3306
3310
3314
3318
3344
3348
3340
3389
3383
3377
3371
3365
3359
3351
3395
3299
3296
3290
H:\EAGA\N17117564\CAD\C3D\FIGR-117564-4 Assessment Figure.dwg 1/10/2019 7:56:04 AMR
Donald Avenue - Street and Utilities Rehabilitation
City of Eagan, MN
Figure 4: Assessment Area
January 2019
R
FEETSCALE
0 125 250
HORZ.
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
CONSENT AGENDA
K. Technical Specialty Services
Erosion and Sediment Control
Action To Be Considered:
Authorize the advertisement of a Request for Proposals for Technical Specialty Services,
Erosion and Sediment Control, to be received on February 8, 2019.
Facts:
The City routinely engages consultants (e.g., architects, engineers, planners) with
specialized expertise. Before contracting a consultant, staff typically request proposals.
A request for proposals (RFP) defines the scope of services and asks for parties’
qualifications and descriptions of services and fees.
Despite development agreements, grading and building permits, legal requirements,
etc., some developers and operators fail to implement and maintain erosion and
sediment control (ESC) standards, according to City Code §4.34 Stormwater
Management Regulations.
City staff routinely works with the developers/contractors to achieve compliance, but
many situations every year lead to §4.34 enforcement procedures. Often, a verbal
notice of violation transitions to a written notice that specifies a compliance deadline.
Per §4.34, Subp. J. 2.: Said notice shall further advise that, should the violator fail to
abate or restore the property within the established deadline, the work will be done by a
designated governmental agency or a third party contractor and the expense thereof
shall be charged to the violator.
This RFP would enable the City to retain contracted general and specialized ESC services,
as needed. Contracted services would improve protection of our infrastructure and
surface water quality, lower City costs, increase compliance, and provide ESC expertise
while supporting development. These services would also be available for in-house
projects.
ESC services may include: supplying materials; implementing and maintaining practices;
addressing eroded sediment from lands and surface waters; settling suspended
materials in waters; dewatering sediment storage systems; and removing sediment from
public rights-of-way and stormwater infrastructure.
Attachments (0)
Agenda Information Memo
January 15, 2019, Eagan City Council Meeting
CONSENT AGENDA
L. Approve extension of Variance – Raarup
Actions To Be Considered:
To approve a one-year extension of Variance approval allowing construction of a 1,500
s.f. accessory structure upon property located at 3640 Elrene Road.
Facts:
On January 16, 2018, the City Council approved a Variance allowing a 1,500 s.f.
accessory structure in conjunction with construction of a new single-family home
on the property.
City ordinance states that a Variance becomes null and void if not implemented
and utilized within one year of approval. City ordinance also provides that the
accessory structure cannot be built before the principal building.
The applicant has submitted a written request for extension of the Variance
approval, indicating they still intend to use the Variance, and that they are still
working on the custom design for the residence so construction of the principal
building has not yet begun.
With the extension, the new expiration date will be January 16, 2020.
Issues: None
Attachments: (2)
CL-1 Location Map
CL-2 Extension Request Letter
FROMME CT
T HAMESCIR
PROMONTORY
PL
RI
DGEWOODDRS O UTHHILLS DR.
SOUTHHILLS CTSOUTH HILLS
STONEWOOD RD
ELRENE ROADWINDTREEDR.WINDTREECIRSTONEWO O D R D
S
T
O
NEWOODCT
BRENTWOODLN
RIDGEWOOD DRWINDTREEDRW IN D T R E E K N O L L
WESCOTT ROAD
BECKER ROAD
ELRENEROADDODDROADH ID D E N M E A D OWTR
BRIDGEWATERDRMILLRUNMILL RUN CIR
ELRENEROADMILLRUNLNBRIDLERID
GEMIL L R U N PATHBRI
DLE RDG RDB
R
ID
L
E
R
D
G
R
D WORC H EST ER DRBAYBERRYLNSOUTHHILLSLN.
Q
U
AILRIDGERD
HUNTERSOVLKBRIDGE
WATER D RB R I D L E R I D G ERDBRIDLE RDG RDSADDLE WOODDRIVE
BRIDLERIDGERDBRIDLE RDG CIR
BRIDLE RDG RD CHATHAMR
D
STONEBR I DGEDRNNORT
HB
RIDGECT FAIRHAVENRDSTONEBRIDGE DR N
BROC K T O NCURVEB
R
O
C
K
T
O
N CIR WORCHESTERDRIVEW O RCHESTER CIRLINDENLNLIN
D
ENCTGREATOAKSPLWOODL
A
N
D
TRAIL
ARBOR CT
G
REAT O AKSLN
EL
RENE ROADTRAIL CT
TRAILS END RDTRAILS END RD
IVY CTIVY L A N E
WOODLANDTR
AILSUNWOODTRAIL
RIDGEWOO
D
D
R
WOODLAND COURT
WESCOTT
HI
L
L
S DR.
CT
RD
CAMP
T
O
NC
T
WESCOTTSQUARE
MIKE COLLINS DRKNOLLWOODCTNORTH RIDGE DRSUNCREST CT
WESCOTTHIL
L
S
D
R
SUNW O O D C TELRENEROADG R E A T O A K S C IR
EL
RENEC T
SOUTH HILLS WAY
W INDTREE CTROLLINGHILLS DR
KUTOFFCTGREAT OAKS TRAIL
OVERLOOK PL
WESCOTT ROAD
BI
G
TI
MBE
RTRAILOVERLOOK CTHY
LANDCT WOODCL
I
FF CTG OVERNCIRCLEWILD ROSE CT
THORWOOD CTWOLFBERRY CTEL
RENE ROADELRENEROADELRENE ROADBASSW
OOD LANETANGLEW OODCTC O .R D .N O .28(Y A N K E E DOODLE RD.)
CO. HWY. NO. 28 (YANKEE DOODLE RD.)BRIARWOODLN.BETTY LN
S
T
A
T
E
T
R
U
N
K
H
WY
.
N
O1
4
9
Bur Oaks Park
BridleRidge Park
ThresherFields Park
MuellerFarm Park
WescottCommons Park
WescottStationPark
WanderingWalk Park
Location Map
0 1,000500Feet
´
§¨¦35E
§¨¦494
Cliff Rd
Diffley Rd
Yanke e Doodle Rd
Lone Oak Rd
Map Area Extent
Project Name: Raarup - 3640 Elrene Rd.Request: VarianceCase No.: 13-VA-08-11-17
Subject Site
Pam Dudziak
From:Thor Raarup <thorraarup@gmail.com>
Sent:Monday, December 31, 2018 12:12 PM
To:Pam Dudziak
Cc:Paula Jean; Doyle Sean; G Raarup Thor
Subject:Variance Extension Request
Pam -
I am writing to request an extension of the Variance that was approved at the
January 16, 2018 meeting of the Eagan City Council allowing the construction of a
1,500 sf accessory structure at 3640 Elrene Road. We still intend to use the Variance
and construct the 1,500 square foot accessory structure in conjunction with
construction of a single-family home on the property. The reason for extension
request is that we have not yet initiated construction. We do continue to work with
SD Custom homes on a satisfactory plan for construction of the home. We will
provide the $75 Variance extension fee.
Please let me know if you have any questions.
Thank you,
Thor Raarup
651-747-7926
1240 Deerwood Drive
Eagan, MN 55123
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
CONSENT AGENDA
N. Approve Final Payment for Contract 18-02, Lexington Diffley Skate Park
Action To Be Considered:
Approve the final payment for Contract 18-02 (Lexington Diffley Skate Park Construction)
in the amount of $13,853.83 to Global Specialties Contractors, Inc. and accept the park
improvement project for perpetual City maintenance subject to warranty provisions.
Facts:
Contract 18-02 provides for the construction of Lexington Diffley Skate Park,
approved as part of the Parks and Recreation CIP for 2018.
The total amount to be paid would be 9.5% above the original approved contract
amount. The additional amount paid was due to unforeseen additional frost-
susceptible soil removal.
Contract 18-02 work has been completed, inspected by consultant and City Park
staff, and found to be in order for favorable Council action for final payment.
Attachments: (1)
CN-1 Pay Summary
Global Specialty Contractors, Inc.
3120 Terminal Dr
Eagan, MN 55121
Phone 651-406-81.12 Far 651-406-8242
Bili To: City of Eagan
3830 Pilot Knob Road
Eagan, MN 55121
Terms: Net 30
Finance Charge of 1.5% (18% Annum) on
Overdue Accounts
*V01PENt MBER
218204-4 FINAL
WOPEDATE
December 30, 2018
City Project No: 1279
line-Schd Description of Work
Pian
UnitspCrevious
Current
Quantity
Unit Price
ExtensionQuantityuantity
Lexington-DIffley Skate Park Project
1
LS
1
0
$
262,117.00
$
262,117.00
$
Testing Through Pay Estimate #2
1
LS
1
0
$
6,169.75
$
6,169.75
Testing Through Completion
1
LS
1
0
$
1,629.20
$
1,629.20
,change Order #1
1
LS
1
0
$
7,160.72
$
7,160.72
$
$
-
Remit to: Global Specialty Contractors, Inc
3120 Teminal Drive
Eagan, MN 55121
Thank you for your business!
Subtotal $ 277,076.67
(-) Less Retainage $ -
(-) Less Previous Billed $ 263,222.84
Total Current Invoice Amount $ 13,853.83
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
CONSENT AGENDA
O. Approve Plans and Specifications for Project 19-08, Trapp Farm Park Building
Construction and Related Site Work and Authorize the Advertisement for
Bids
Action To Be Considered:
Approve the plans and specifications for Trapp Farm Building construction, related site
work and authorize the advertisement for a bid opening to be held at 2:00 pm on
Tuesday February 12, 2019.
Facts:
The Trapp Farm building construction provides for construction of a new
shelter building and related site work as part of the Park and Recreation 2019
Capital Improvement Plan list.
All of the construction activity for said improvements has been designed to
occur within existing public right-of-way, public property or easements.
A public meeting was held on November 19, 2018 to discuss the details of the
building plans
The plans and concepts were presented to City Council by Advisory Parks and
Recreation Commission during the September 11, 2018 Special Meeting as
part of the CIP presentation.
The 2019-2023 Park CIP was approved by City Council on September 17, 2018
Upon approval and authorization, an advertisement will be published in the
legal newspaper, as well as additional publications, informing contractors of
the bid.
Attachments: (0)
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
PUBLIC HEARING
A. Project 1315, Woodgate 3rd / Tiberon / Mallard Park 3rd Additions
Street Improvements
Action To Be Considered:
Close the public hearing and approve Project 1315 (Woodgate 3rd / Tiberon / Mallard
Park 3rd Additions - Street Improvements) as presented, and authorize the preparation
of detailed plans and specifications.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of Woodgate 3rd/ Tiberon / Mallard Park 3rd
Additions, residential streets, in southwest Eagan located west of Johnny Cake
Ridge Road and south of Diffley Road.
A structural mill and overlay of these streets is programmed for 2019 in the City
of Eagan’s 5-Year CIP (2019-2023).
On December 18, 2018, the draft Feasibility Report was presented to the City
Council and a public hearing was scheduled for T uesday, January 15, 2019.
An informational neighborhood meeting was held on January 7 for the adjacent
property owners to discuss the proposed improvements. Of the 135 properties
to be assessed under this improvement, 1 resident representing 1 property
attended the meeting.
All notices have been published in the legal newspaper and sent to all affected
property owners informing them of this public hearing.
Attachments (2)
PHA-1 Feasibility Report
PHA-2 Neighborhood Meeting Minutes
Report for
Woodgate 3rd— Tiberon — Mallard Park 3rd
Additions
Neighborhood Street Revitalization
City Project No. 1315
December 18, 2018
Rk�
.1
EAGAN
Report for
Woodgate 3rd— Tiberon — Mallard Park 3rd
Additions
Neighborhood Street Revitalization
City Project No. 1315
December 18, 2018
Rk�
.1
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Dec. 18, 2018
Re: Woodgate 3"d - Tiberon - Mallard Park 31d Additions Street Revitalization
City Project No.: 1315
Attached is the feasibility report for the Woodgate 3rd - Tiberon - Mallard Park 3"d Additions
Street Revitalization, City Project No. 1315. The report presents and discusses the proposed
improvements and includes a cost estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
Reviewed By:
0""VU
7641-
partment of Public Works
Reviewed By:
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Date: ///E)//
/
r
(Nil
Finan ,` epartment Date:
�Y}
Aaron Nelson
. No. 45795
EAGAN
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Dec. 18, 2018
Re: Woodgate 3"d - Tiberon - Mallard Park 31d Additions Street Revitalization
City Project No.: 1315
Attached is the feasibility report for the Woodgate 3rd - Tiberon - Mallard Park 3"d Additions
Street Revitalization, City Project No. 1315. The report presents and discusses the proposed
improvements and includes a cost estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
Reviewed By:
0""VU
7641-
partment of Public Works
Reviewed By:
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Date: ///E)//
/
r
(Nil
Finan ,` epartment Date:
�Y}
Aaron Nelson
. No. 45795
TABLE OF CONTENTS
ExecutiveSummary..................................................................................................... 1
Introduction/History......................................................................................................2
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
StreetPavement Evaluation.........................................................................................3
ProposedImprovements..............................................................................................4
Easements/Perm its......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................7
Assessments................................................................................................................7
AssessmentFinancing Options.....................................................................................8
RevenueSource...........................................................................................................8
ProjectSchedule..........................................................................................................9
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix 8
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
2 Street Improvement/Assessment Area Map
- 3 Typical Section — Mill & Overlay
Executive Summary
Background
Project Details
• Roadway resurfacing (full width mill &
1-1/2" overlay)
• Replacement of damaged curb & gutter
Woodgate 3rd-Tiberon-
55/100
Recommended
Improvement
Project Name
Mallard Park 3rd
Project #
1315
Scope o Sanitary/Storm sewer
Additions
-
$ 16,800
Street Area
12,873 Sq. Yds.
Street Length
3,130 Feet
o Water gate valves
Mallard Ct.
i Constructed
1976, 1978
R-3 Residential Units
Nestling Cir.
0 Utility Improvements
Teal Cv.
Reconstructed
1999
Streets Included
Woodgate Ct.
Crack Sealed
-
Woodgate Ln.
I
Woodgate Pt.
Seal Coated
2004/2011 and 2008/2013
E % of Section 29, and
West of Johnny Cake Ridge Road
Absolute Location
W / of Section 28 I
Relative Location
South of Diffley Road
Township 27, Range 23
Project Details
• Roadway resurfacing (full width mill &
1-1/2" overlay)
• Replacement of damaged curb & gutter
PCI Rating
55/100
Recommended
Improvement
Resurface
Curb Removal
25%
• Adjustment/Replacement of:
Scope o Sanitary/Storm sewer
Utility Improvements $ 16,800
-
$ 16,800
Total $ 265,300
o Utility castings
$ 187,090 (70.5%)
o Water gate valves
R-1 Residential Lots
37
o Street signage
R-3 Residential Units
98
0 Utility Improvements
Cost Estimate/ Revenue
Woodgate 3rd—Tiberon—Mallard Park 3rd Additions
1
Property
City
Mill & Overlay w/ Signage $ 157,200
$ 78,210
$ 78,990
Repair Existing Concrete Curb & Gutter $ 91,300
-
$ 91,300
Utility Improvements $ 16,800
-
$ 16,800
Total $ 265,300
$ 78,210 (29.5%)
$ 187,090 (70.5%)
Woodgate 3rd—Tiberon—Mallard Park 3rd Additions
1
Dec. 18, 2018
Neighborhood Street Revitalization
Woodgate 3rd-Tiberon-Mallard Park 3rd Additions
Eagan, Minnesota
Introduction/ History
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 3,130 feet of residential streets in the Woodgate 3rd-Tiberon-Mallard Park 3rd Additions
neighborhood in south-west Eagan has been identified for 2019 street revitalization
improvements. Figure 1, located in Appendix C, illustrates the project location. The streets
were originally constructed in 1976 and 1978, and were overlayed in 1999.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the roads located within the project area, which are currently in the 20 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the street sections in this area were seal coated in
2004/2011 and 2008/2013.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Woodgate 3rd—Tiberon—Mallard Park 3rd Additions
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scope
This project will provide resurfacing (full width mill and overlay) for approximately 3,130 feet of
roadway. Figure 2 in Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves, utility improvements, and replacement of street signage.
Area to Be Included
Properties included in the project lie within the E % of Section 29, and the W % of Section 28,
lying South of Diffley Road, West of Johnny Cake Ridge Road, in Township 27, Range 23, in the
City of Eagan, Dakota County, Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI Recommended Improvement
56-100 Routine Maintenance/Crack Seal/Seal Coat
36-55 Patch/Repair and/or Overlay
0-35 Reconstruct/ Reclaim
The 2018 PCI rankings for the street segments have a weighted average pavement condition
rating of 55, which falls in the "Patch/Repair and/or Overlay" category, as mentioned above.
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Woodgate 3rd—Tiberon—Mallard Park 3rd Additions
3
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Proposed Improvements
Pavement - The proposed street
improvements shown in Figure 3. The
existing street section for this roadway
consists of 2" to 3-1/2" bituminous
pavement supported by 8" gravel base.
The existing bituminous surface will be
milled across the entire street width to
accommodate a 1% -inch bituminous
overlay. The overlay, combined with the
existing street section, will provide a
street section consistent with current
City standards for residential streets.
The combination of patching and
overlay will not eliminate cracking due
to the temperature extremes experienced in Minnesota. Bituminous overlays will show some
continued frost movements and reflective cracking consistent with the underlying pavement.
Routine maintenance will still need to continue under the City's Pavement Management
Program.
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalled, or settled. It is estimated that
approximately 25% of the existing concrete
curb and gutter will have to be replaced.
Boulevard turf will be removed and replaced
with seed. While the contractor who performs
the work is responsible for its establishment
(45 days for seed), adjacent property owners
are encouraged to consistently water the new
turf, where possible, to help ensure its growth.
Utility Adjustment/Replacement —Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
ensure quick and easy access by the City for maintenance and other purposes. There are a few
catch basin castings and a manhole top slab that require replacement, and a manhole structure
requires doghouse/invert repairs due to deterioration. These improvements will be financed
through the Combined Utility Fund.
Woodgate 3,a Tiberon—Mallard Park 3'd Additions
4
ly .
Sidewalk/Path & Pedestrian Ramps — An existing sidewalk is located along Johnny Cake Ridge
Road, and the Highline Trail crosses Woodgate Lane. Revisions to the Americans with
Disabilities Act (ADA) requires jurisdictional
agencies to provide detectable warnings at all
existing pedestrian ramps of sidewalks and paths
with public streets that are improved, including
street surface improvements. The most common
method of providing this detectable warning is
through the installation of truncated domes a
minimum of two feet in length across the width
of all pedestrian ramps. This project provides for
the installation of truncated dome pedestrian ramps along the existing trail wherever they are
damaged or currently do not exist.
Signage - Traffic and street identification signage within
the project limits have reached the end of their useful life
expectancy and are in need of replacement. Signs have
been reviewed for compliance with the Minnesota Manual
on Uniform Traffic Control Devices (MnMUTCD). Those
that are required by the MnMUTCD will be replaced to
improve safety and night time visibility, and those that are
not will be permanently removed.
Street Lights—The street lights in the project area
(maintained by Dakota Electric Association) are in good
condition and provide adequate coverage. No
modifications to the existing street lights are proposed.
Stormwater and Water Quality improvements — A stormwater/ water quality pond
improvement project (sediment removal in Pond BP -10) in this area has been identified in the
2019-2023 CIP, and is proposed for construction in 2019. Timing will be determined based on
Woodgate 3rd Tiberon—Mallard Park 31 Additions
5
the scope of the improvements, required permits and public comment periods, soil testing
results, and the desirable time of year to construct the improvements. These improvements
will be performed through separate contract. Because this work will not be assessed, but will
be financed through the City's existing Storm Water Utility Fund 1126 — Storm Drainage System
Renewal and Replacement, preliminary cost estimates are not included in this report.
Complete Streets — "Complete Streets" is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
The streets in this neighborhood were reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The streets are relatively narrow at 32 feet wide,
have low traffic volumes, limited access points, and a sidewalk is along Johnny Cake Ridge Road,
and trails are located adjacent to the project area to connect pedestrians to the City and
regional trail system. Pedestrian curb ramps in the project area at the intersecting sidewalks
will be replaced if necessary to meet current ADA design standards. Given the existing and
proposed elements available for all users, the streets in this neighborhood meet the intent of
the complete streets guidelines.
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that no permits will be required for the resurfacing project.
Feasibilitv and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement (resurfacing) is considerably less
expensive than complete reconstruction of this street. The mill and overlay is feasible in that
this type of improvement has been used successfully to extend the life expectancy of numerous
other streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 — 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
Woodgate 3ra Tiberon—Mallard Park 3r11 Additions
6
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Cost Estimate
Detailed cost estimates are located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 25%, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Woodgate 3rd-Tiberon-Mallard Park 3rd Additions
Mill& Overlay........................................................................
Repair Existing Concrete Curb & Gutter ................................
Utility Improvements.............................................................
Total...........................................................................
$ 157,200
$ 91,300
16,800
$ 265,300
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for residential streets. All assessments will be revised
based on final costs. A preliminary assessment roll is included in Appendix B.
City Special Assessment Policy
Assessment Ratio
Property City
Mill & Overlay - Low -Density Residential (R-1,2,3) 50% 50%
Repair Existing Concrete Curb & Gutter - 100%
Utility Improvements 100%
Residential Lots—All residential lots (37 R-1 single family homes, and 98 R-3 town home units)
as shown on Figure 2, having driveway access on to the street to be improved are proposed to
be assessed. The City's Assessment Policy states that 50% of the mill and overlay costs are
assessable for local residential streets, based on a standard 32 -foot width. 100% of the street
frontage is assessable, including outlots that are used as green space, as they are owned by the
development.
Following past practice, higher density residential properties (R-3) are assessed at a rate of 75%
of single family properties, so each unit is equivalent to 0.75 residential units.
The estimated cost per ERU, based on the City's Assessment Policy, is $710 /ERU and is
calculated as follows:
Mill & Overlay: R-1 & R-3 Residential
1 R-1 lot = 1 Equivalent Residential Unit (ERU)
1 R-3 unit = 0.75 ERU
Woodgate 3rd—Tiberon—Mallard Park 3rd Additions
7
TOTAL NUMBER OF ERU'S = (37 x 1.0 ERU) R-1 + (98 x 0.75 ERU) R-3 =110.5 ERU's
o 6,260' R1/R3 Frontage/ 6,260' Total Frontage= 100%
o $157,200 (Mill & Overlay Costs) x 50% x.100% = $78,600 (Total R1/R3
Assessment)
o $78,600/110.5 ERU's = $711.31, rounded to $710/ ERU
R-1= $710 x 1.00 = $710/ lot ................................ (37 lots)
R-3 = $710 x 0.75 = $532.50, rounded to $530 / unit (98 units)
Assessment Financing Options
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2019 rate is not yet
available, however, it is expected to be comparable and based on City policy will be determined
by the City Council in the spring. The following payment schedules are examples of residential
lot assessments of $710 and $530, with an estimated 4.5% interest for the assessed amounts,
and assumes 14 months interest for the first year:
$710 (R-1 single family homes)
Principal / Year interest/Year Cost/ Year
� 11 Year I $142 $37 179
5th Year $142 $6 $148--
$530 (11-3 multi -family units)
Principal /Year Interest /Year Cost /Year
1st Year I $106 $28 I $134
F Year r$106 $5 $111
Bonds may be issued to finance the improvements.
Revenue Source
A summary of revenue sources is listed below:
The Major Street Fund will finance the estimated street related project deficit of $170,290.
The Combined Utility Fund will finance the estimated $16,800 utility improvements.
Woodgate 31—Tiberon—Mallard Park 3rd Additions
8
Project Cost Property Assessment , City Contribution
Mill and Overlay (Including Signage)
$ 157,200 $ 78,210
$ 78,990
Repair Existing Curb & Gutter
$ 91,300 -
$ 91,300
Utility Improvements
$ 16,800 -
$ 16,800
Totals
$ 265,300 $ 78,210
$ 187,090
The Major Street Fund will finance the estimated street related project deficit of $170,290.
The Combined Utility Fund will finance the estimated $16,800 utility improvements.
Woodgate 31—Tiberon—Mallard Park 3rd Additions
8
Proiect Schedule
Present Feasibility Report to City Council/
OrderPublic Hearing.......................................................................................
Dec. 18, 2018
Informational Meeting.......................................................................................
Jan. 7, 2019
PublicHearing.................................................................................................. Jan. 15, 2019
Approve Plans and Specifications....................................................................Feb.
19, 2019
BidDate........................................................................................................
March 28, 2019
AwardContract.................................................................................................April
i
2, 2019
StartConstruction............................................................................................. May 1, 2019
ProjectCompletion.......................................................................................... August, 2019
FinalCost Report........................................................................................September,
2019
Final Assessment Hearing......................................................................................
Fall, 2019
First Payment Due with Property Tax Statement ...........................................
May 15, 2020
Woodgate 31d—Tiberon—Mallard Park 3rd Additions
9
Item No.
Appendix A
Preliminary Cost Estimate
City Project 1315 Woodgate 3rd/ Tiberon/ Mallard Park 3rd Additions
Item
Part I - Bituminous Street Overlay
2021,501
Mobilization
2104.505
Remove Bituminous Pavement
2232.501
Mill Bituminous Pavement- Full Width (1-1/4" Depth)
2357.502
Bituminous Material for Tack Coat
2360.501
SP WEA340B Wearing Course Mixture (overlay)
2360.501
SP WEA940B Wearing Course Mixture (Patch)
2504.602
Adjust Gate Valve Box
2504,602
Repair Gate Valve Mid Section
2504.602
Repair Gate Valve Top Section w/Cover
2506.602
Adjust Frame and Ring Casting (Manhole)
2563.601
Traffic Control
SP -1
Signage Remove and Replace
Subtotal
5% Contingency
Subtotal
25% Indirect Costs
Part I - Bituminous Street Overlay
Item No. I Item
Part II - Repair Existing Curb & Gutter
2104.501 Remove Concrete Curb and Gutter
2104.503 Remove Bituminous Pavement
2104.503 Remove Concrete Sidewalk (4")
2105.501 Common Excavation
2211.501 Aggregate Base, Cl. 5 (100% Crushed)
2360.501 SP WEA340B Wearing Course Mixture (Patch)
2504.602 Irrigation Repair
2506.602 Remove & Replace Casting 3067V (Catch Basin)
2506.602 Remove & Replace Casting 3501TB (Catch Basin)
2506.602 Remove & Replace Top Slab 54" Dia (CBMH)
2506.602 Repair/ Grout CB or MH Invert/ Doghouses
2506.602 Install 2 x 3 CB Erosion Barrier Shroud
2521.501 6" Concrete Ped Ramp w/ Wet Cast for Truncated Dome Inset
2531.501 Concrete Curb and Gutter, D412
2531.507 Concrete Valley Gutter- High Early
2531.618 Truncated Dome Detectable Warning Paver (2x2)
2540.602 Repair Underground Electric Fence
2540.602 Repair Landscaping
2572.503 Application ofWaterfor Turf Establishment
2573.530 Storm Drain Inlet Protection
2575.550 Boulevard Topsoil Borrow- MnDOT3877-2F
2575.609 Seeding (MnDOT 270 w/Type 5 Hydromulch)
Subtotal
Unit I Unit Price I Est City I Estimated Cost
LS
$
6,000.00
1
5
6,000.00
SY
$
6.00
30
$
180.00
SY
$
2.00
13270
$
26,54D.00
GAL
$
2.75
860
$
2,365.00
TON
$
52.00
1230
$
63,960.00
TON
$
100.00
10
$
1,000.00
EA
$
250.00
2
$
500.00
EA
S
500.00
1
$
500.00
EA
$
425.00
1
$
425.00
EA
$
700.00
19
$
13,300.00
LS
$
4,000.00
1
$
4,000.00
LS
$
970.00
1
$
970.00
$ 119,740.00
$ 5,987.00
$ 125,727.00
$ 31,431.75
$ 157,158.75
Unit Unit Price Est Qty I Estimated Cost
LF
$
10.00
1475
$
14,750.00
SY
$
6.00
70
$
420.00
SF
$
2.50
100
$
250.00
CY
$
35.00
30
$
1,050.00
TON
$
25.00
30
$
750.00
TON
$
100.00
60
$
6,000.00
EA
$
160.00
8
$
1,280.00
EA
$
900.00
9
$
8,100.00
EA
$
900.00
3
$
2,700.00
EA
$
1,600.00
1
$
1,600.00
EA
$
400.00
1
$
400.00
EA
$
150.00
2
$
300.00
SF
$
14.00
100
$
1,400.00
LF
$
20.00
1475
$
29,500.00
SY
$
75.00
36
$
2,700.00
SF
$
80.00
32
$
2,560.00
EA
$
85.00
5
$
425.00
EA
$
200.00
2
$
400.00
GAL
$
0.15
14625
$
2,193.75
EA
$
175.00
2
$
350.00
CY
$
80.00
35
$
2,800.00
SY
$
7.50
325
$
2,437.50
Woodgate 3rd-Tiberon-Mallard Park 3rd Additions
10
$ 82,366.25
5% Contingency
Subtotal
25% Indirect Costs
Part II - Repair Existing Curb & Gutter
Part I - Bituminous Street Overlay
Part II - Repair Existing Curb & Gutter
Project 1315 Total Cost
Woodgate 31—Tiberon—Mallard Park 3rd Additions
11
4,118.31
86,484.56
21,621.14
$ 108,105.70
$ 157,158.75
$ 108,105.70
$ 265,264.45
Appendix B
Preliminary Assessment Roll
City Project #1315 Woodgate 3rd - Tiiberon-Mallard Park 3rd Additions
Woodgate 3rd-Tiberon-Mallard Park 3'd Additions
12
Woodgate LN
R-1 Residential
P.I.N.
# Lots
Lot Equivalent
Unit
Assessment
Total
1749 Woodgate LN
10 76400 010 41
1
1
$
71D
$
710
1745 Woodgate LN
10 76400 010 51
1
1
$
710
i $
710 i
1746 Woodgate LN
10 84602 033 90
1
0.75
$
530
$
530
1744 Woodgate LN
10 84602 034 00
1
0.75
$
530
$
530
1737 Woodgate LN
10 76400 010 60
1
1
$
710
$
710
1735 Woodgate LN
10 76400 010 70
1
1
$
710
$
710
1738 Woodgate LN
10 84602 030 20
1
0.75
$
530
$
530
1736 Woodgate LN
10 34602 030 10
1
0.75
$
530
$
530
1732 Woodgate LN
30 84602 023 10
1
0.75
$
530
$
530
1730 Woodgate LN
10 84602 023 20
1
0.75
$
530
$
530
1726 Woodgate LN
10 84602 013 40
1
0.75
$
530
$
530
1724 Woodgate LN
30 84602 013 30
0.75
$
530
$
530
1721 Woodgate LN
10 76400 01150
1
1
$
710
$
710
1715 Woodgate LN
10 76400 01160
1
1
$
710
$
710
1709 Woodgate LN
10 76400 01170
1
1
$
710
$
710
1720 Woodgate LN
10 84602 013 20
1
0.75
$
530
$
530
1716 Woodgate LN
10 84602 012 90
1
0.75
$
530
$
530
1712 Woodgate LN
10 84602 012 80
1
0.75
$
530
$
530
1708 Woodgate LN
10 84602 012 50
1
0.75
$
530
$
530
1704 Woodgate LN
10 84602 012 40
1
0.75
$
530
$
530
1700 Woodgate LN
10 84602 012 10
1
0.75
$
530
$
530
1698 Woodgate LN
10 84602 012 00
1
0.75
$
530
$
530
1696 Woodgate LN
10 84602 01190
1
0.75
$
530
$
530
1701 Woodgate LN
10 76400 012 50
1
1
$
710
$
710
1699 Woodgate LN
10 76400 012 60
1
1
$
710
$
710
1722 Woodgate LN
10 8460 2013 10
1
0.75
$
530
$
530
1718 Woodgate LN
10 84602 013 00
1
0.75
$
530
$
530
1714 Woodgate LN
10 84602 012 70
1
0.75
$
530
$
530
1710 Woodgate LN
10 84602 012 60
1
0.75
$
530
$
530
1706 Woodgate LN
10 84602 012 30
1
0.75
$
530
$
530
1702 Woodgate LN
10 84602 012 20
1
0.75
$
530
$
530
Subtotal
31
25.5
$
18,050
Woodgate 3rd-Tiberon-Mallard Park 3'd Additions
12
Woodgate CT
R-1 Residential
P.I.N.
# Lots
Lot Equivalent
Unit
Assessment
Total
4440 Woodgate CT
10 84602 033 70
1
0.75
$
530
$
530
4444 Woodgate CT
10 84602 033 60
1
0.75
$
530
$
530
4448 Woodgate CT
10 84602 033 30
1
0.75
$
530
$
530
4452 Woodgate CT
10 84602 033 20
1
0.75
$
530
$
530
4456 Woodgate CT
10 84602 032 90
1
0.75
$
530
$
530
4460 Woodgate CT
10 84602 032 80
1
0.75
$
530
$
530
4464 Woodgate CT
10 84602 032 50
1
0.75
$
530
$
530
4477 Woodgate CT
10 84602 032 30
1
0.75
$
530 1
$
530
Woodgate 3rd-Tiberon-Mallard Park 3'd Additions
12
4473 Woodgate CT
10 84602 032 20
1
0,75
$
530
$
530
4469 Woodgate CT
10 84602 03190
1
0,75
$
530
$
530
4465 Woodgate CT
10 84602 03180
1
0.75
$
530
$
530
4461 Woodgate CT
10 84602 03150
1
0.75
$
530
$
530
4457 Woodgate CT
10 84602 03140
1
0.75
$
530
$
530
4453 Woodgate CT
10 84602 03110
1
0.75
$
530
$
530
4449 Woodgate CT
10 84602 03100
1
0.75
$
530
$
530
4445 Woodgate CT
10 84602 030 70
1
0.75
$
530
$
530
4441 Woodgate CT
10 84602 030 60
1
0.75
$
530
$
530
4437 Woodgate CT
10 84602 030 30 j
1
0,75
$
530
$
530
4439 Woodgate CT
10 84602 030 40
1
0.75
$
530
$
530
4443 Woodgate CT
10 84602 030 50
1
0,75
$
530
$
530
4447 Woodgate Cr
10 84602 030 80 1
1
0.75
$
530
$
530
4451 Woodgate CT
10 84602 030 90
1
0.75
$
530
$
530
4455 Woodgate Cr
10 84602 03120
1
0.75
1 $
530
$
530
4459 Woodgate CT
10 84602 03130
1
0.75
$
530
$
530
4463 Woodgate CT
10 84602 03160
1
0.75
$
530
$
530
4467 Woodgate CT
10 84602 03170
1
0.75
$
530
$
530
4471 Woodgate CT
10 84602 032 00
1
0,75
$
530
$
530
4475 Woodgate CT
1084602 032 10
1
0.75
$
530
$
530
4479 Woodgate CT
10 84602 032 40
1
0.75
$
530
$
530
4466 Woodgate CT
10 84602 032 60
1
0.75
$
530
$
530
4462 Woodgate CT
10 84602 032 70
1
0.75
$
530
$
530
4458 Woodgate Cr
10 84602 033 00
1
0,75
$
530
$
530
4454 Woodgate CT
10 84602 033 10
1
0.75
$
530
$
530
4450 Woodgate CT
10 84602 033 40
1
0,75
$
530
$
530
4446 Woodgate CT
10 84602 033 50
1
0.75
$
530
$
530
4442 Woodgate CT
10 84602 033 80
1
0.75
$
530
$
530
Subtotal
36
27
$
19,080
Woodgate 3rtl Tiberon—Mallard Park 3rd Additions
13
Woodgate PT
R-1 Residential
P.I.N.
# Lots
Lot Equivalent
Unit
Assessment
Total
4434 Woodgate PT
10 76400 010 80
1
1
$
710
$
710
4430 Woodgate PT
10 47250 010 20
1
1
$
710
$
710
4426 Woodgate PT
10 76400 010 90
1
1
$
710
$
710
4422 Woodgate PT
10 76400 01100
1
1
$
710
$
710
4425 Woodgate PT
10 76400 01110
1
1
$
710
$
710
4427 Woodgate PT
10 76400 01120
1
1
$
710
$
710
4429 Woodgate PT
10 76400 01130
1
1
$
710
$
710
4433 Woodgate PT
10 76400 01140
1
1
$
710
$
710
4440 Woodgate PT
10 84602 022 90
1
0.75
$
530
$
530
4444 Woodgate PT
10 84602 022 80
1
0,75
$
530
$
530
4448 Woodgate PT
10 84602 022 50
1
0,75
$
530
$
530
4452 Woodgate PT
10 84602 022 40
1
0.75
$
530
$
530
4456 Woodgate PT
10 84602 022 10
1
0.75
$
530
$
530
4460 Woodgate PT
10 84602 022 00
1
0.75
$
530
$
530
4464 Woodgate PT
10 84602 02170
1 1
0.75
$
530
$
530
4468 Woodgate PT
10 84602 02160
1
0.75
$
530
$
530
4472 Woodgate PT
10 84602 02130
1
0.75
$
530
$
530
4476 Woodgate PT
10 84602 02120
1
0.75
$
530
$
530
Woodgate 3rtl Tiberon—Mallard Park 3rd Additions
13
4480 Woodgate PT
10 84602 020 90
1
0.75
$
530
$
530
4484 Woodgate PT
10 84602 020 80
1
0.75
$
530$
Total
530
4488 Woodgate PT
10 84602 020 50
1
0.75
$
530
$
530
4492 Woodgate PT
10 84602 020 40
1
0.75
$
530
$
530
4496 Woodgate PT
10 84602 02010
1
0.75
$
530
$
530
4457 Woodgate PT
10 84602 01430
1
0.75
$
530
$
530
4451 Woodgate PT
10 84602 014 20
1
0.75
$
530
$
530
4447 Woodgate PT
10 84602 013 90
1
0.75
$
530
$
530
4443Woodgate PT
30 84602 013 80
1
0.75
$
530
$
530
l 4439 Woodgate PT
j 10 84602 013 50
1
0.75
$
530
$
530
4441 Woodgate PT
10 84602 013 60
1
0.75
$
530
$
530
4445 Woodgate PT
10 84602 013 70
1
0.75
$
530
$
530
4449 Woodgate PT
10 84602 014 00
1
035
$
530
$
530
4455 Woodgate PT
10 84602 01410
1
0.75
$
530
$ 530
4459 Woodgate PT
10 84602 014 40
1
0.75
$
530
$
530
4498 Woodgate PT
10 84602 020 20
1
0.75
$
530
$
530
4494 Woodgate PT
10 84602 020 30
1
0.75
$
530
$
530
4490 Woodgate PT
10 84602 020 60
1
0.75
$
530
$
530
4486 Woodgate PT
10 84602 020 70
1
0.75
$
530
$
530
4482 Woodgate PT
10 84602 02100
1
0.75
$
530
$
530
j 4478 Woodgate PT
10 84602 02110
1
0.75
$
530
$
530
4474 Woodgate PT
10 84602 02140
1
0.75
$
530
$
530
4470 Woodgate PT
10 84602 02150
1
0.75
$
530
$
530
4466 Woodgate PT
10 84602 02.180
1
0.75
$
530
$
530
4462 Woodgate PT
10 84602 02190
1
035
$
530
$
530
4458 Woodgate PT
10 84602 022 20
1
0.75
$
530
$
530
4454 Woodgate PT
10 84602 022 30
1
0.75
$
530
$
530
4450 Woodgate PT
10 84602 022 60
1
0.75
$
530
$
530
4446 Woodgate PT
10 84602 022 70
1
0.75
$
530
$
530
4442 Woodgate PT
10 84602 023 00
1
0.75
$
530
$
530
Subtotal
48
38
$
26,880
Woodgate 3ra Tiberon—Mallard Park 3rd Additions
14
Mallard Cr
R-1 Residential
P.I.N.
# Lots
Lot Equivalent
Unit
Assessment
Total
4432 Mallard CT
10 76400 01180
1
1
$
710
$
710
4428 Mallard CT
10 76400 01190
1
1
$
710
$
710
4424 Mallard CT
10 76400 012 00
1
1
$
710
$
710
4420 Mallard CT
10 76400 012 10
1
1
i $
710
$
710
4423 Mallard CT
10 76400 012 20
1
1
$
710
$
710
4427 Mallard Cr
10 76400 012 30
1
1
$
710
$
710
! 4431 Mallard CT
10 76400 012 40
1
1
$
710
$
710
Subtotal
7
7
1
$
4,970
Woodgate 3ra Tiberon—Mallard Park 3rd Additions
14
Total Lot
Total
Equivalent Total ERU's Assessment
135 110.5 $ 78,210
Assessable Frontage 6,260 100%
Non -Assessable Frontage - 0%
Total Frontage 6,260 100%
Woodgate 3rd Tiberon—Mallard Park 3rd Additions
15
Nestling CIR
R-1 Residential
P.I.N.
# Lots
Lot Equivalent
Unit
Assessment
Total
4379 Nestling CIR
10 47252 025 60
1
1
$
710
$
710
4377 Nestling CIR
30 47252 025 50 1
1
1
$
710
$
710
4373 Nestling CIR
10 47252 025 40
1
1
$
710
$
710
4369 Nestling CIR
10 47252 025 30
1
1
$
710
$
710
4365 Nestling CIR
10 47252 025 20
1
1
$
710
$
710
4361 Nestling CIR
10 47252 025 10
1
1 1
$
710
$
710
4357 Nestling CIR
10 47252 025 00
1
1
$
710
$
710
Subtotal
7
7 1
4,970
Total Lot
Total
Equivalent Total ERU's Assessment
135 110.5 $ 78,210
Assessable Frontage 6,260 100%
Non -Assessable Frontage - 0%
Total Frontage 6,260 100%
Woodgate 3rd Tiberon—Mallard Park 3rd Additions
15
Teal CV
R-1 Residential
P.I.N. I
# Lots
Lot Equivalent
+ Unit
I Assessment
Total
4349 Teal CV
10 47252 024 90
1
1
$
710
$
710
j 4345 Teal CV
10 47252 024 80
1
1
$
710
$
710
I 4341 Teal CV
10 47252 024 70
1
1
$
710
$
710
4337 Teal CV
10 47252 024 60
1
1
$
710
$
710
4333 Teal CV
10 47252 024 50
1
1
$
710
$
710
4329 Teal CV
10 47252 024 40
1
1
$
710
$
710
Subtotal
6
6
$
4,260
Total Lot
Total
Equivalent Total ERU's Assessment
135 110.5 $ 78,210
Assessable Frontage 6,260 100%
Non -Assessable Frontage - 0%
Total Frontage 6,260 100%
Woodgate 3rd Tiberon—Mallard Park 3rd Additions
15
',O4 9 2019 Street Revitalization - Project 1315
Z Woodgate 3rd, Tiberon
tp o
& Mallard Park 3rd Additions
..,aeRau�uorwnrtaicnpnaampwmJectawriaWaotlmPm"Mamatl315-WeodgaM3rd-Tiberon-Mallard Park 3rdAddtlone1.315Looatlon.mxd Date: 12/1212018
Z p F ,4
•'�,'-z 2019 Street Revitalization - Project 1315
Woodgate 3rd, Tiberon & Mallard Park 3rd Additions
I
All"
00
i 3 r.1 ,fr j41•tA
�rt. ua7^ �4tii
n
• is
zoo /977 �91,i 11
j
— h6.1,�^•• .�FQ�. �T45 N7y •. 9t77 . w7� � AES.' ___ •�' I
' �I .I�]ij 3. I�. - h ►1it` 4ASI �� "- Jj: 4� I'
_
Vr.}
. '•� 13; .. - .;.mss . _-'"�bi5" a ,$ �' •� ;& S ,:�.
. �':: i �Y' . iS'- i�o':7� Haj". i ``S� r'>i• �•• EWo'. ..
.. -�hh� � P �•, rip 'lasi' i.)ar :��: c"i,zn• Irrla ! o _ �7 � ,, -
r :#1 6. AAI! 'S.:fi rA I'1ei69 ase'.:-..'
mly
C), .a a, �ee'a
P4�y
iI J P
_ 14 •• g` '�r6 'S+, .,� so aaea .. .�.asap :"v�•�5d'a.� `.-_� 5
7)'
?octE, 14V
Wc�.a.��pi. yet vee,• 4¢se a. �•7 ,�g �. �.,,n
21
nA MS .
-_ - iivi; '«: +`lips . • ro?a °4
Project Area Legend
. .
Or'�liP� d�}-. µie e+114 vane. .,
alJg 3T; % •4� ?9pA �P2 �Assesable Project Area
2019 Street Improvement
Zoning
R-1 (37 Lots - $710,00 Per Lot)
R-3 (98 Units - $530 00 Per Unit)
Document PeM: LUISERSIPUBMRKS%Eriglneering%Prc*ots=9 Street Improvements\1315 - wbodgate 3rd-Tberongward Park 3rd AddWonet1315.mud Date: 1211 ZT018
FIG 2
%OF Eq
% 7 2019 Street Revitalization - Project 1315
0 Woodgate 3rd, Tiberon & Mallard Park 3rd Additions
Typical Street Sections
60' ROW
32' F -F
PAVEMENT SECTION
3.5" BASE COURSE
8" CLASS 5 AGG BASE
COMPACTED SUBGRADE
D412 CONCRETE
CURB AND GUTTER
PROPOSED TYPICAL SECTION
WOODGATE 3RD, TIBERON,
MALLARD PARK 3RD
Downerd Path: L:IUSERSIPUBVMRKSIEngineerin&rojects12019 Street Improvements113' 5 - Woodgate 3rd-Tberon�Mallard Park 3rd Addifions17315 Fig 3.mxd Date: 12/12/2018
FIG 3
EXIST. TYPICAL SECTION
WOODGATE 3RD, TIBERON,
MALLARD PARK 3RD
60' ROW
32` F F
1.25" FULL 1MDTH MILL
1.5" TYPE 2360 BITUMINOUS OVERLAY
I I
7.
L
i 0412 CONCRETE
L BITUMINOUS TACK COAT CURB AND GUTTER
2" BITUMINOUS SURFACE
Ll
6" CLASS 5 AGG BASE
COMPACTED SUBGRADE
PROPOSED TYPICAL SECTION
WOODGATE 3RD, TIBERON,
MALLARD PARK 3RD
Downerd Path: L:IUSERSIPUBVMRKSIEngineerin&rojects12019 Street Improvements113' 5 - Woodgate 3rd-Tberon�Mallard Park 3rd Addifions17315 Fig 3.mxd Date: 12/12/2018
FIG 3
Woodgate 3rd / Tiberon / Mallard Park 3rd
Neighborhood Street Revitalization
City Project No. 1315
Informational Meeting – 6:30 P.M. Monday, Jan. 7, 2019
Eagan Room
Attendance
Aaron Nelson, Assistant City Engineer, 1 resident representing the townhome association was
in attendance (see attached sign-in sheet).
Presentation of Project Details
Nelson welcomed the resident and presented project information, including details such as
construction, costs, schedule and assessments. A short ETV video on the street improvement
process was also shown.
Questions/ Comments
STREET CONDITION
1. When was the last time the streets were overlayed? The streets were most recently
overlayed 20 years ago (1999).
CONSTRUCTION/PHASING
2. Will the road be open during construction? Will access be maintained to driveways? All
roads will be open to traffic during construction. We do not anticipate any road closures
during the work; however, some phases will require short term lane closures and the
contractor will use traffic control devices or flagmen to help direct traffic. Access to
driveways should be maintained throughout construction. If curb needs to be replaced at a
driveway, residents can park in front of their homes while the concrete cures.
3. How long will the construction last? The 2019 project will include 12 separate project
areas. The contractor will have flexibility to determine how they phase each area, but
construction is anticipated to begin in the first area early May (weather dependent). The
size and scope of the improvements in this neighborhood will likely result in approximately
a 3 to 4 week construction timeframe. The City will mail more detailed construction specific
information as construction nears.
4. Will residents be able to park on the streets during construction? What happens if they
do? The contractor’s working hours are 7 am to 7 pm, and people will be asked not to park
on the street while the contractor is working in the neighborhood. If somebody does park
on the street, and it’s in the way for construction, the contractor usually knocks on doors
until they find the owner. If the owner cannot be found, the vehicle may be towed to a
location out of the way. More construction specific information, including parking, will be
mailed to all residents in the project area in mid-April.
ASSESSMENTS
5. How are assessments calculated? With residential properties, the city shares the cost of all
work performed between the curbs 50/50 with the adjacent property owners. Any work in
the curbs and boulevard, and the utility improvements, is paid 100% by the city. The
property owner’s portion is split evenly among all lots in the neighborhood. The
assessment for each townhome unit is 75% of that of a single family home.
6. How and when will the final assessment amounts be determined? A letter will be mailed
to all properties this fall after construction is complete. The letter will include the final
assessment amounts associated with each property. It will also invite property owners to
another public hearing that specifically addresses the final costs. At the close of this
meeting and the City Council’s corresponding approval of the final assessment costs, there
is a 30 day window in which payments can be made without interest. Payment during this
30-day period should be made at city hall. After the 30-day period, any remaining portion
of the assessment will be forwarded to Dakota County for collection as part of the property
taxes. 4.5% to 5% interest is anticipated to be charged annually until paid in full. The 2018
interest rate was 4.5%, and the 2019 rate will be determined early 2019.
The meeting adjourned at 7:10 p.m.
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
PUBLIC HEARING
B. Project 1316, Pinetree Pass 2nd, 4th & 6th
Street Improvements
Action To Be Considered:
Close the public hearing and approve Project 1316 (Pinetree Pass 2nd, 4th & 6th - Street
Improvements) as presented with the following conditions:
1) Remove OR Keep the 25 mile per hour (mph) speed limit designation on Summit
Pass;
2) Include an Alternate Bid for Storm Sewer Improvements for 1492 Pinetree Pass ;
and authorize the preparation of detailed plans and specifications.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of Pinetree Pass 2nd, 4th & 6th, residential streets, in
southern Eagan located south of Cliff Road and west of Pilot Knob Road.
A structural mill and overlay of these streets is programmed for 2019 in the City of
Eagan’s 5-Year CIP (2019-2023).
On December 18, 2018, the draft Feasibility Report was presented to the City
Council and a public hearing was scheduled for Tuesday, January 15, 2019.
An informational neighborhood meeting was held on January 7 for the adjacent
property owners to discuss the proposed improvements. Of the 135 properties to
be assessed under this improvement, 7 residents representing 6 properties
attended the meeting.
The proposed speed limit designation change is in accordance with City Council
direction as a result of the workshop held on May 12, 2015, where Mr. Howard
Preston shared details of the City of Eagan Roadway Safety Plan development,
including misperceptions about speed limit signs. Staff is aware of a petition to
keep the 25 mph speed limit signs that will likely be submitted to the City Council
and is apparently signed by representatives of all 18 properties on Summit Pass.
The difference in the cost of the improvements dependent upon the speed limit
designation is less than $500.
City staff has been working with the residents of 1492 Pinetree Pass for the past
couple of years to address significant on-site drainage concerns. While the
residents have followed staff guidance and completed nearly $30,000 of on-site
drainage and landscaping improvements in an attempt to address the concerns,
drainage issues remain as a result of more significant rainfall events. Storm sewer
improvements are proposed within the public right-of-way that could provide some
relief to the drainage issues. Including these improvements as an alternate bid for
the project will allow staff to evaluate the cost/benefit of the improvements
towards the resolution of the overall issues. The improvements are estimated to
cost $20,000.
All notices have been published in the legal newspaper and sent to all affected
property owners informing them of this public hearing.
Attachments (3)
PHB-1 Feasibility Report
PHB-2 Neighborhood Meeting Minutes
PHB-3 Correspondence
EAGAN
Report for
Pinetree Pass 2" d, 4t" & 6 t
Neighborhood Street Revitalization
City Project No. 1316
December 18, 2018
r k. %%,
kire*
aseS,
"P'',
�
V-A
W
EAGAN
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Dec. 18, 2018
Re: Pinetree Pass 2"d, 4'" & e Street Revitalization
City Project No.: 1316
Attached is the feasibility report for the Pinetree Pass 2nd, 4th & 61h Street Revitalization, City
Project No. 1316. The report presents and discusses the proposed improvements and includes
a cost estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
Reviewed By:
Department of Public Works
Reviewed By:
Finan c partment
V i
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Nelson
Date: la I i4 Reg. No. 45795
Date: /// 0/q
Date:
TABLE OF CONTENTS
ExecutiveSummary ..................................................................................................... 1
Introduction/History......................................................................................................Z
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
StreetPavement Evaluation.........................................................................................3
ProposedImprovements..............................................................................................4
Easements/Permits......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................7
Assessments................................................................................................................7
AssessmentFinancing Options.....................................................................................8
RevenueSource...........................................................................................................9
ProjectSchedule.........................................................................................................10
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roil
Appendix C
Figures - 1 Location Map
2 Street Improvement/Assessment Area Map
3 Typical Section — Mill & Overlay
Executive Summary
Background
Project Name
Pinetree Pass 2"d, 4th & 6th
Project #
1316
Street Area
24,476 Sq. Yds.
Street Length
7,891 Feet
Repair Existing Concrete Curb & Gutter
Pinetree Curve
Constructed
1998, 1999, 2000, 2001
& Sidewalk Repairs
I Pinetree Pass
Utility Improvements
I $ 40,000
-
Pinetree Trail
Reconstructed
-
Streets Included
Stonecliffe Drive '
Crack Sealed
-
Summit Pass
Seal Coated
2005, 2007, 2013
Thomas Lane I
Sherwood Way
Absolute Location
E % of Section 33
Relative
South of Cliff Road
Township 27, Range 23
Location
West of Pilot Knob Road
Project Details
• Roadway overlay (edge mill & 1-1/2" PCI Rating 54/100
overlay) Recommended Overlay
• Replacement of damaged curb & gutter Improvement
Adjustment/Replacement of: Curb Removal 6%
Scope o Sanitary/Storm sewer
o Utility castings
o Water gate valves Residential Lots 132
o Street signage Neighborhood Park Lots 3
• Utility Improvements
Cost Estimate/ Revenue
Pinetree Pass 2"d, 4th & 6th
1
I Total
Property
City
Mill & Overlay w/ Signage
$272 , 200
$ 129,074
$ 143,126
Repair Existing Concrete Curb & Gutter
$ 161,100
-
$ 161,100
& Sidewalk Repairs
Utility Improvements
I $ 40,000
-
$ 40,000
Total
$ 473,300
$ 129,074 (27.3%)
$ 344,226 (72.7%)
f
Pinetree Pass 2"d, 4th & 6th
1
December 18, 2018
Neighborhood Street Revitalization
Pinetree Pass 2nd, 4th & 6th
Eagan, Minnesota
Introduction/ History
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 7,891 feet of residential streets in Pinetree Pass 2nd, 41h & 611 neighborhood in southern
Eagan has been identified for 2019 street revitalization improvements. Figure 1, located in
Appendix C, illustrates the project location. The streets were originally constructed in 1998,
1999, 2000 and 2001.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the roads located within the project area, which are currently in the 18-20 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the streets were seal coated in 2005, 2007 and 2013.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
Pinetree Pass 2nd, 4th & 6th
2
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scope
This project will provide Overlaying (edge mill and overlay) for approximately 7,891 feet of
roadway. Figure 2 in Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves, utility improvements, and replacement of street signage.
Area to Be Included
Properties included in the project lie within the E % , Section 33, lying South of Cliff Road, West
of Pilot Knob Road, in Township 27, Range 23, in the City of Eagan, Dakota County, Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI Recommended Improvement
56-100 Routine Maintenance/Crack Seal/Seal Coat
36-55 Patch/Repair and/or Overlay
0-35 Reconstruct/ Reclaim
The 2018 PCI rankings for the street segments have a weighted average pavement condition
rating of 54, which fails in the "Patch/Repair and/or Overlay" category, as mentioned above.
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Pinetree Pass 2"d, 4th & 6th
3
Proposed Improvements
Pavement - The proposed street
improvements shown in Figure 3. The
existing street section for this roadway
consists of 3-1/2" bituminous pavement
supported by 6" gravel base. The
existing bituminous surface will be
milled adjacent to the existing curb and
gutter (6'-8' wide) to accommodate a
136 -inch bituminous overlay. The
overlay, combined with the existing
street section, will provide a street
section consistent with current City
standards for residential streets. The
combination of patching and overlay
will not eliminate cracking due to the temperature extremes experienced in Minnesota.
Bituminous overlays will show some continued frost movements and reflective cracking
consistent with the underlying pavement. Routine maintenance will still need to continue under
the City's Pavement Management Program.
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalled, or settled. It is estimated that
x approximately 6% of the existing concrete curb
w:s and gutter will have to be replaced. Boulevard
turf will be removed and replaced with seed.
While the contractor who performs the work is
responsible for its establishment (45 days for
seed), adjacent property owners are
encouraged to consistently water the new turf,
A where possible, to help ensure its growth.
Utility Adjustment/Replacement —Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
ensure quick and easy access by the City for maintenance and other purposes. There are a
number of catch basin adjusting rings and a few catch basins that require replacement due to
deterioration, and several inverts/doghouses in need of repair. These improvements will be
financed through the Combined Utility Fund.
Pinetree Pass 2"d, 4th & 6th
4
Sidewalk/Path & Pedestrian Ramps — A 6 foot wide concrete sidewalk is located in the
boulevard of Stonecliffe Drive, Summit Pass, and Pinetree Curve. Revisions to the Americans
with Disabilities Act (ADA) requires jurisdictional
agencies to provide detectable warnings at all
existing pedestrian ramps of sidewalks and paths
with public streets that are improved, including
street surface improvements. The most common }.
method of providing this detectable warning is
through the installation of truncated domes a
minimum of two feet in length across the width
of all pedestrian ramps. This project provides for
the installation of truncated dome pedestrian ramps along the existing sidewalk wherever they
currently do not exist, or are in need of repair. Any concrete sidewalk or driveway apron panels
in need of repair/replacement will also be performed as part of this project. Any sidewalk
related improvements will be paid by the Major Street Fund. A bituminous overlay of the
Walden Heights park parking lot, and surrounding trails, will be performed under separate
contract later in the year.
Signage - Traffic and street identification signage within the
project limits have reached the end of their useful life expectancy '' r
and are in need of replacement. Signs have been reviewed for
compliance with the Minnesota Manual on Uniform Traffic Control 2 -
Devices (MnMUTCD). Those that are required by the MnMUTCD
will be replaced to improve safety and night time visibility, and
those that are not will be permanently removed.
Street lights — The street lights in the project area (maintained by
Dakota Electric Association) are in good condition and provide
adequate coverage. No modifications to the existing street lights are proposed.
Pinetree Pass 2"d, 4th & 6 t
5
1
_
Sidewalk/Path & Pedestrian Ramps — A 6 foot wide concrete sidewalk is located in the
boulevard of Stonecliffe Drive, Summit Pass, and Pinetree Curve. Revisions to the Americans
with Disabilities Act (ADA) requires jurisdictional
agencies to provide detectable warnings at all
existing pedestrian ramps of sidewalks and paths
with public streets that are improved, including
street surface improvements. The most common }.
method of providing this detectable warning is
through the installation of truncated domes a
minimum of two feet in length across the width
of all pedestrian ramps. This project provides for
the installation of truncated dome pedestrian ramps along the existing sidewalk wherever they
currently do not exist, or are in need of repair. Any concrete sidewalk or driveway apron panels
in need of repair/replacement will also be performed as part of this project. Any sidewalk
related improvements will be paid by the Major Street Fund. A bituminous overlay of the
Walden Heights park parking lot, and surrounding trails, will be performed under separate
contract later in the year.
Signage - Traffic and street identification signage within the
project limits have reached the end of their useful life expectancy '' r
and are in need of replacement. Signs have been reviewed for
compliance with the Minnesota Manual on Uniform Traffic Control 2 -
Devices (MnMUTCD). Those that are required by the MnMUTCD
will be replaced to improve safety and night time visibility, and
those that are not will be permanently removed.
Street lights — The street lights in the project area (maintained by
Dakota Electric Association) are in good condition and provide
adequate coverage. No modifications to the existing street lights are proposed.
Pinetree Pass 2"d, 4th & 6 t
5
Stormwater and Water Quality Improvements Two stormwater/ water quality pond
improvement projects in this area have been identified in the 2019-2023 CIP and are proposed
for construction in 2019. Timing will be determined based on the scope of the improvements,
required permits and public comment periods, soil testing results, and the desirable time of
year to construct the improvements. These improvements will be performed under separate
contract. The work proposed includes basin expansions and sediment removal on BLP -6 and
BLP -57. Because this work will not be assessed, but will be financed through the City's existing
Storm Water Utility Fund 1126 —Storm Drainage System Renewal and Replacement,
preliminary cost estimates are not included in this report.
Complete Streets— "Complete Streets" is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
The streets in this neighborhood were reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The streets are relatively narrow at 28 to 32 feet
wide, have low traffic volumes, limited access points, and sidewalks are available on Stonecliffe
Drive, Summit Pass, and Pinetree Curve. Trails are also located along Cliff Road, and near
Walden Heights park to connect pedestrians to the City and regional trail system.
Pedestrian curb ramps in the project area at the intersecting sidewalks will be replaced if
necessary to meet current ADA design standards, and broken sidewalk and adjacent driveway
apron panels will be replaced as needed. Given the existing and proposed elements available
for all users, the streets in this neighborhood meet the intent of the complete streets
guidelines.
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that a right-of-way permit from Dakota County will be required to perform the work
within the Cliff Road right-of-way.
Feasibility and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
Pinetree Pass 2"d, 4th & 6th
6
It is cost effective in that the proposed improvement (resurfacing) is considerably less
expensive than complete reconstruction of this street. The mill and overlay is feasible in that
this type of improvement has been used successfully to extend the life expectancy of numerous
other streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 — 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Cost Estimate
Detailed cost estimates are located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 25%, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Pinetree Pass 2"d, 4a' & 6th
Mill& Overlay........................................................................ $ 272,200
Repair Existing Concrete Curb & Gutter & Sidewalk Repairs $ 161,100
Utility Improvements............................................................. 40,000
Total........................................................................... $ 473,300
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for residential streets. All assessments will be revised
based on final costs. A preliminary assessment roll is included in Appendix B.
Total Street Frontage = 7,891 centerline feet x 2 =15,782 F.F.
Residential Roadway Frontage = 15,064 F.F. (95.5%)
Neighborhood Park Frontage = 447 F.F. (2.8%)
Un -assessable Frontage = 271 F.F. (1.7%)
An early deterioration credit is proposed for all properties because some of the streets
are being overlayed 1-2 years prior to the anticipated 20 -year pavement life cycle. The
credit equals 5% for every year the overlay is being performed prior to 20, and is
prorated based on the age and length of each street. The early deterioration
adjustment factor is:
o 7,891' feet total (4,689' is 20 years, 706' is 19 years, and 2,496' is 18 years)
o [(4,689' x 100%) + (706' x 95%) + (2,496' x 90%)j / 7,891' = 96.4%
Pinetree Pass 2nd 4th & 6th
7
City Special Assessment Policy
Assessment Ratio
Property city
Mill & Overlay - Low -Density Residential (R-1,2,3) 50% 50%
Repair Existing Concrete Curb & Gutter & sidewalks - 100%
Utility Improvements 100%
Residential Lots — All residential lots (132 single family homes) as shown on Figure 2, having
driveway access on to the street to be improved are proposed to be assessed. The City's
Assessment Policy states that 50% of the mill and overlay costs are assessable for local
residential streets, based on a standard 32 -foot width. The estimated cost per residential unit,
based on the City's Assessment Policy, is $950/ lot and is calculated as follows:
Mill & Overlay - Residential Properties
o 15,064' Residential Frontage/ 15,782' Total Frontage= 95.5%
o Early deterioration credit = 96.4%
o $272,200 (Mill & Overlay Costs) x 50% x 95.5% x 96.4% = $125,296 (Total R-1
Assessment)
o $125,296 / 132 lots= $949.21, rounded to $950/ single-family lot
Neighborhood Parks—All Neighborhood Parks (3 total) as shown on Figure 2, that are adjacent
to, or have direct access, to the street to be improved are proposed to be assessed. The City's
Assessment Policy states that 50% of the mill and overlay costs are assessable for collector
roadways, regardless of width or pavement thickness. The estimated cost per front foot, based
on the City's Assessment Policy, is $8.22 / F.F. and is calculated as follows:
Mill & Overlay — Neighborhood Parks
o 447' Community Park Frontage / 15,782' Total Frontage = 2.8%
o Early deterioration credit = 96.4%
o $272,200 (Mill & Overlay Costs) x 50% (rate) x 2.8% x 96.4% = $3,673.61 (total
Neighborhood Park assessment)
o $3,673.61 / 447 F.F. = $8.22 / Neighborhood Park F.F.
The remaining frontage within the project area (271' or 1.7%) is considered non- assessable
under the City's Assessment Policy.
Assessment Financing Options
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2019 rate is not yet
available, however, it is expected to be comparable and based on City policy will be determined
by the City Council in the spring. The following payment schedule is an example of a residential
Pinetree Pass 2"d, 4th & 6th
8
lot assessment of $950 with an estimated 4.5% interest for the assessed amounts, and assumes
14 months interest for the first year:
15t Year
5th Year
Principal J YearI Interest / Year Cost/ Year
$190 $50 T___.____ $240
$190 F$9 $199
Bonds may be issued to finance the improvements.
Revenue Source
A summary of revenue sources is listed below:
Proiect Cost Prooertv Assessment Citv Contribution
Mill and Overlay (including Signage)
$ 272,200
$ 129,074
$ 143,126
Repair Existing Curb & Gutter &
Sidewalk Repairs
$ 161,100
-
$ 161,100
Utility Improvements
$ 40,000
-
$ 40,000
Totals
$ 473,300
$ 129,074 (27.3%)
$ 344,226 (72.7%)
The Major Street Fund will finance the estimated street related project deficit of $304,226.
The Combined Utility Fund will finance the estimated $40,000 utility improvements.
Pinetree Pass 2"d, 4th & 6th
9
Project Schedule
UrderPublic Hearing....................................................................................... Dec. 18, 2018
InformationalMeeting.......................................................................................
Jan. 7, 2019
PublicHearing.................................................................................................. Jan. 15, 2019
Approve Plans and Specifications....................................................................Feb.
19, 2019
BidDate........................................................................................................
March 28, 2019
AwardContract.................................................................................................April
2, 2019
Start Construction.............................................................................................
May 1, 2019
Project Completion..........................................................................................
August, 2019
FinalCost Report........................................................................................September, 2019
Final Assessment Hearing......................................................................................Fall,
2019
First Payment Due with Property Tax Statement
........................................... May 15, 2020
Pinetree Pass 2nd, 4th & 61h
10
Appendix A
Preliminary Cost Estimate
Subtotal $ 207,412.75
5% Contingency $ 10,370.64
Subtotal $ 217,783.39
25% Indirect Costs $ 54,445.85
Part I - Bituminous Street Overlay $ 272,229.23
Item No. I Item Unit Unit Price Est Qty I Estimated Cost
Part II - Repair Existing Curb & Gutter
City Project 1316 Pinetree Pass 2"d, 41h & 6th
Item No.
Item
2104.501
Unit
Unit Price
Est Qty
10.00
Estimated Cost
Part I - Bituminous Street Overlay
18,600.00
2104.503
Remove Bituminous Trail Pavement
SF
$
2021.501
Mobilization
LS
$ 6,000.00
1
$
6,000.00
2104.505
Remove Bituminous Pavement
SY
$ 6.00
30
$
180.00
2232.501
Mill Bituminous Pavement (1-1/4" depth, 6' width)
SY
$ 1.30
10705
$
13,916.50
2357.502
Bituminous Material for Tack Coat
GAL
$ 2.75
1575
$
4,331.25
2360.501
SP W EA340B Wearing Course Mixture (Overlay)
TON
$ 52.00
2250
$
117,000.00
2360.501
SP WEA3408 Wearing Course Mixture (Patch)
TON
$ 100.00
70
$
7,000.00
2504.602
Adjust Gate Valve Box
EA
$ 250.00
8
$
2,000.00
2504.602
Repair Gate Valve Mid Section
EA
$ 500.00
3
S
11500.00
2504.602
Repair Gate Valve Top Section w/Cover
EA
$ 425.00
5
$
2,125.00
2506.602
Adjust Frame and Ring Casting (Manhole)
EA
$ 700.00
65
$
45,500.00
2506.602
Remove & Replace Frame & Ring Casting (27")
EA
$ 1,250.00
1
$
1,250.00
2563.601
Traffic Control
LS
$ 4,000.00
1
$
4,000.00
SP -1
Signage Remove and Replace
LS
$ 2,610.00
1
$
2,610.00
Subtotal $ 207,412.75
5% Contingency $ 10,370.64
Subtotal $ 217,783.39
25% Indirect Costs $ 54,445.85
Part I - Bituminous Street Overlay $ 272,229.23
Item No. I Item Unit Unit Price Est Qty I Estimated Cost
Part II - Repair Existing Curb & Gutter
2104.501
Remove Concrete Curb and Gutter
LF
$
10.00
1860
$
18,600.00
2104.503
Remove Bituminous Trail Pavement
SF
$
2.00
70
$
140.00
2104.503
Remove Concrete Sidewalk (6")
SF
$
2.50
2590
$
6,475.00
2105.501
Common Excavation
CY
$
35.00
30
$
i,050.00
2211.501
Aggregate Base, CI.5 (100% Crushed)
TON
$
25.00
30
$
750.00
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
70
$
7,000.00
2504.602
Irrigation Repair
EA
$
160.00
15
$
2,400.00
2506.602
Adjust Frame & Ring Casting (CB) HDPE Rings
EA
$
550.00
38
$
20,900.00
2506.602
Remove & Replace Casting (Catch Basin)
EA
$
900.00
4
$
3,600.00
2506.602
Repair/ Grout CB or MH Invert/ Doghouses
EA
$
400.00
15
$
6,000.00
2506.602
Install 2 x 3 CB Erosion Barrier Shroud
EA
$
150.00
2
$
300.00
2521.501
6" Concrete Ped Ramp w/ Wet Cast for Truncated Dome Inset
SF
$
14.00
445
$
6,230.00
2521.501
6" Concrete Sidewalk
SF
$
8.00
2142
$
17,136.00
2531.501
Concrete Curb and Gutter, 8618
LF
$
23.00
30
$
690.00
2531.501
Concrete Curb and Gutter, Surmountable
LF
$
23.00
1830
$
42,090.00
2531.618
Truncated Dome Detectable Warning Paver (2x2)
EA
$
80.00
100
$
8,000.00
2540.602
Repair Underground Electric Fence
EA
$
85.00
10
$
850-00
2540.602
Repair Landscaping
EA
$
200.00
5
$
1,000.00
2572.503
Application of Water for Turf Establishment
GAL
$
0.15
18000
$
2,700.00
2573.530
Storm Drain Inlet Protection
EA
$
175.00
4
$
700.00
2575.550
Boulevard Topsoil Borrow - MnDOT 3877-2F
CY
$
80.00
45
$
3,600.00
2575.609
Seeding (MnDOT 270 w/Type 5 Hydromulch)
SY
$
7.50
400
$
3,000.00
Subtotal
Pinetree Pass 2nd' 4th & 6th
11
$ 153,211.00
5% Contingency $
7,660.55
Subtotal $
160,871.55
25% Indirect Costs $
40,217.89
Part 11- Repair Existing Curb & Gutter $
201,089.44
Part I - Bituminous Street Overlay
$ 272,229.23
Part II - Repair Existing Curb & Gutter
$ 201,089.44
Project 1316 Total Cost
$ 473,318.67
Pinetree Pass 2nd, 4th & 6th
12
Appendix B
Preliminary Assessment Roll
City Project #1316 Pinetree Pass 2nd, 4th & 6th
Pinetree Pass 2"d, 4th & 5th
13
Stonecliffe Dr
R3 Residential
P.I.N.
# Lots
Lot Equivalent
Unit Assessment
Total
4602 Stonecliffe Dr
I 105766101010
1
1
$
950
$
950
4606 Stonecliffe Dr
105766101020
1
1
$
950
$
950
4610 Stonecliffe Dr
I 105766101030
1
1
$
950
$
950
4614 Stonecliffe Dr
105766101040
1
1
$
950
$
950
4618 Stonecliffe Dr
105766101050
1
1
$
950
$
950
4615 Stonecliffe Dr
105766602010
1
1
$
950
I $
950
4617 Stonecliffe Dr
105766105010
1
1
$
95D
$
950
4621 Stonecliffe Dr
105766105020
1
1
1 $
950
$
950
4622 Stonecliffe Dr
105766102010
1
1
$
950
$
950
4625 Stonecliffe Dr
105766105030
1
1
$
950
$
950
4626 Stonecliffe Dr
105766102020
1
1
$
950
$
950
4629 Stonecliffe Dr
105766105040
1
1
$
950
$
950
4630 Stonecliffe Dr
105766102030
1
1
$
950
$
950
4633 Stonecliffe Dr
105766105050
1
1
$
950
$
950
4634 Stonecliffe or
105766102040
1
1
$
950
$
950
4637 Stonecliffe Dr
105766105060
1
1
$
950
$
95D
4642 Stonecliffe Dr
105766104070
1
1
$
950
$
950
4641 Stonecliffe Dr
105766105070
1
1
$
950
$
950
4646 Stonecliffe Dr
105766104080
1
1
$
950
$
950
4645 Stonecliffe Dr
105766105080
1
1
$
950
$
950
4650 Stonecliffe Dr
105766104090
1
1
$
950
$
950
4654 Stonecliffe Dr
105766201010
1
1
$
950
$
950
4657 Stonecliffe Dr
105766203050
1
1
$
950
$
950
4661 Stonecliffe Dr
105766203040
1
1
$
950
$
950
4658 Stonecliffe Dr
105766202010
1
1
$
950
$
950
4665 Stonecliffe Dr
105766203030
1
1
$
950
i $
950
4662 Stonecliffe Dr
105766202020
1
1
$
950
' $
950
4666 Stonecliffe Dr
105766202030
1
1
$
950
$
950
4669 Stonecliffe Dr
105766203020
1
1 ;
$
950
$
950
4670 Stonecliffe Dr
105766202040
1
1
$
950
$
950
4673 Stonecliffe Dr
105766203010
1
1
$
950
$
950
4674 Stonecliffe Dr
105766202050
1
1
$
950
$
950
Subtotal
32
32
$
30,400
Pinetree Pass 2"d, 4th & 5th
13
Summit Pass
R-1 Residential
P.I.N.
# Lots
Lot Equivalent
unit Assessment
Total
4613 Summit Pass
105766601020
1
1
$
950
$
950
4617 Summit Pass
105766601010
1
1
! $
950
$
950
4618 Summit Pass
105766602020
1
1
$
950
$
950
4621 Summit Pass
105766601030
1
1$
950
$
950
4622 Summit Pass
105766602030
1
1
$
950
$
950
4625 Summit Pass
105766601040
1
1
$
950
$
950
4626 Summit Pass
105766602040
1
1
$
950
$
950
4629 Summit Pass
105766601050
1 j
1
$
950
$
950
Pinetree Pass 2"d, 4th & 5th
13
4630 Summit Pass
105766602050
1
1
$
950
$
950
4633 Summit Pass
105766601060
1
1
$
950
$
950
4637 Summit Pass
105766601070
1
1
$
950
$
950
4634 Summit Pass
105766602060
1
1
$
950
$
950
4641 Summit Pass
105766401010
1
1
$
950
$
950
4638 Summit Pass
105766402010
1
1
$
950
$
950
4645 Summit Pass
105766401020
1
1
$
950
$
950
4642 Summit Pass
105766402020
1
1
1 $
950
$
950
4649 Summit Pass
I 105766401030
1
1
$
950
i $
950
4653 Summit Pass
105766401040
1
1
$
950
$
950
105766303050
Subtotal
18
18
950
$
$
17,100
Pinetree Pass 2"d, 4th & 6th
14
Pinetree Curve
R-1 Residential
P.I.N.
# Lots
Lot Equivalent
Unit Assessment
c
Total
4620 Pinetree Cury
105766301010
1
1
$
950
$
950
4623 Pinetree Cury
105766303010
1
1
$
950
$
950
4624 Pinetree Cury
105766301020
1
1
$
950
$
950
4627 Pinetree Cury
105766303020
1
1
$
950
$
950
4628 Pinetree Cury
105766301030
1
1
$
950
$
950
4632 Pinetree Cury
105766301040
1
1
$
950
$
950
4631 Pinetree Cury
105766303030
1
1
$
950
$
950
4635 Pinetree Cury
105766303040
1
1
$
950
$
950
4639 Pinetree Cury
105766303050
1
1
$
950
$
950
4648 Pinetree Cury
105766302010
1
1
$
950
$
950
4643 Pinetree Cury
105766303060
1
1
$
950
$
950
4652 Pinetree Cury
105766302020
1
1
$
950
$
950
4647 Pinetree Cury
105766303070
1
1
$
950
$
950
4656 Pinetree Cury
105766302030
1 i
1
$
950
$
950
4651 Pinetree Cury
105766303080
1
1
$
950
$
950
4660 Pinetree Cury
105766302040
1
1
$
950
$
950
4664 Pinetree Cury
105766302050
1
1
$
950
$
950
4668 Pinetree Cury
105766302060
1
1
$
950
$
950
4655 Pinetree Cury
105766303090
1
1
$
950
$
950
Subtotal
19
19
$
18,050
Pinetree Pass 2"d, 4th & 6th
14
Thomas Lane
R-1 Residential
P.I.N.
# Lots
tot Equivalent
Unit Assessment
c
Total
1520 Thomas Ln
105766104060
1
1
$
950
$
950
1523 Thomas Ln
105766102050
1
1
$
950
$
950
1516 Thomas Ln
105766104050
1
1
$
950
$
950
1519 Thomas Ln
105766102060
1 I
1
$
950
$
950
1512 Thomas Ln
105766104040
1
1
$
950
$
950
1515 Thomas Ln
105766102070
1
1
$
950
$
950
1508 Thomas Ln
105766104030
1
1
$
950
$
950
1504 Thomas Ln
105766104020
1
1
$
950
$
950
1500 Thomas Ln
105766104010
1
1
' $
950
$
950
1507 Thomas Ln
105766302070
1 I
1
$
950
$
950
1496 Thomas Ln
105766103010
1
1
$
950
1 $
950
Subtotal
11
11
i $
—10,450:�j
Pinetree Pass 2"d, 4th & 6th
14
Pinetree Pass 2"d, 4th & 6th
15
Pinetree Trail
R-1 Residential
P.I.N.
# Lots
Lot Equivalent
Unit
Assessment
Total
1525 Pinetree TRL
105766701010
1
1
$
950
$
950
1520 Pinetree TRL
105766703070
1
1
$
950
$
950
1523 Pinetree TRL
105766701020
1
1
$
950
$
950
1516 Pinetree TRL
105766703060
1
1
$
950
$
950
1519 Pinetree TRL
105766701030
1
1
$
950
$
950
1512 Pinetree TRL
105766703050
1
1
$
950
$
950
1515 Pinetree TRL
105766701040
1
1
$
950
$
950
1508 Pinetree TRL
105766703040
1
1
$
950
$
950
1511 Pinetree TRL
105766701050
1
1
$
950
$
950
1507 Pinetree TRL
105766701060
1
1
$
950
$
950
1503 Pinetree TRL
105766701070
1
1
$
950
$
950
1504 Pinetree TRL
105766703030
1
1
$
950
$
950
1499 Pinetree TRL
105766702010
1
1
$
950
$
950
1500 Pinetree TRL
105766703020
1
1
$
950
$
950
1496 Pinetree TRL
105766703010 !
1
1
$
950
I $
950
1490 Pinetree TRL
108330102010
1
1
$
950
$
950
1491 Pinetree TRL
108330101010
1
1
$
950
$
950
1486 Pinetree TRL
108330102020
1
1
$
950
$
950
1487 Pinetree TRL
108330101020
1
1
$
950
$
950
1483 Pinetree TRL
108330101030
1
1
$
950
$
950
1482 Pinetree TRL
108330102030
1
1
$
950
$
950
1479 Pinetree TRL
108330101040
1
1
$
950
$
950
1475 Pinetree TRL
108330101050
1
1
$
950
$
950
Subtotal
23
23
$
21,850
Pinetree Pass 2"d, 4th & 6th
15
Pinetree Pass
R-1 Residential
P.I.N.
# Lots
Lot Equivalent
Unit
Assessment
Total
1468 Pinetree Pass
108330101060
1
1
$
950
$
950
1472 Pinetree Pass
108330101070
1
1
$
950
$
950
1476 Pinetree Pass
108330101080
1
1
$
950
$
950
1481 Pinetree Pass
108330102040
! 1
1
$
950
$
950
1480 Pinetree Pass
108330101090
1
1
$
950
$
950
1484 Pinetree Pass
108330101100
1
1
$
950
$
950
1485 Pinetree Pass
108330102050
1
1
$
950
$
950
1488 Pinetree Pass
108330101110
1
1
$
950
$
950
1489 Pinetree Pass
108330102060
1
1
$
950
$
950
1493 Pinetree Pass
105766501080
1
1
$
950
$
950
1492 Pinetree Pass
105766502010
1
1
$
950
$
950
i 1497 Pinetree Pass
105766501070
1
1950
$
950
1496 Pinetree Pass
105766502020
1
1
$
950
$
950
1500 Pinetree Pass
105766502030
1
1
$
950
$
950
1501 Pinetree Pass
105766501060
1
1
$
950
$
950
1504 Pinetree Pass
105766502040
1
1
$
950
$
950
a 1505 Pinetree Pass
105766501050
1
1 1
$
950
$
950
1508 Pinetree Pass
105766502050
1
1
$
950
$
950
1509 Pinetree Pass
105766501040
1
1
$
950
$
950
1513 Pinetree Pass
105766501030
1
1
$
950
$
950
Subtotal
20
20
j
$
19,000
Pinetree Pass 2"d, 4th & 6th
15
Total R-1 Lots 132 $ 129,074
Residential Frontage
15,064 95.5%
Sherwood Way
447 2.8%
Non -Assessable Frontage
271 1.7%
Neighborhood Park
P.I.N.
R-1 Residential
7 P.I.N.
# Lots
Lot Equivalent
Unit Assessment
105766100020
Total
1507 Sherwood Way
105766502070
1
1
$
950
$
950
1503 Sherwood Way
105766502080
1
1
$
950
$
950
1499 Sherwood Way
105766502090
1
1
$
950
$
950
1495 Sherwood Way
105766502100
1
1
$
950
$
950
1492 Sherwood Way
I 105766502110
1
1
$
950
$
950
1496 Sherwood Way
105766502120
1
1
$
950
$
950
1500 Sherwood Way
105766502130
1
1
$
950
$
950
1504 Sherwood Way
105766502140
1
1
$
950
$
950
1508 Sherwood Way
105766502150
1
1
$
950
$
950
Subtotal
9
4
$
8,550
Total R-1 Lots 132 $ 129,074
Residential Frontage
15,064 95.5%
Neighborhood Park
447 2.8%
Non -Assessable Frontage
271 1.7%
Neighborhood Park
P.I.N.
Front
Footage
Unit Assessment
Total
Walden Heingts Park - Outlot B
105766100020
278
$ 8.22
$
2,285
Walden Heingts Park - Outlot C
105766100030
74
$ 8.22
$
608
Walden Heingts Park - Outlot D
105766100040
95
$ 8.22
$
781
Subtotal
447
$
3,674
Total R-1 Lots 132 $ 129,074
Residential Frontage
15,064 95.5%
Neighborhood Park Frontage
447 2.8%
Non -Assessable Frontage
271 1.7%
Total Frontage
15,782 100.0%
Pinetree Pass 2"d, 4th & 6th
16
r= r
U� q z 2019 Street Revitalization -Project 1316
Pinetree Pass 2nd, 4th & 6th Additions
+Plant al ``U� Tow WerD z
aty
Z;
4 m
a _� >
L M. ,r
6 hl r klm¢�x` xrl�+raxe r,
o Bbckk—JL �+
Lake
{ SILVES1186LBBDR -e >�..mi _ VVESCOTT RD
ode nay �_
C. N'..
r.^�,+P.bs, `• D
CO.�M _i �..�SNIypl�Ilfg1NRF�dd.
l r .� ` aKw 4
VJ Drd'F�
-S. 1 AIL r,ekzF
e 1 4��p 's s i Mcc+nP
r
A1Y i i ' { rakc F
V......, -mak D
r..t r+ :J: • s R1 I.,ke as
_� �,r` ��:� � �` .,.�� Y► %'r � >, -� 1 DIFFLEY Rm
_ Diffleyr a<.f d 1
�"•� r.. Fire j, Y ' Hrme
,Portd
Lexi P e
�' `u.o4.. ! r $ �� A ♦ ''�] 1.v,w J! irvr,'[Cei Emer 1
Po" ' $4`"e S�
I Pinetree Pass 2nd, 4th & 6th ;
Project 1316
y :hay:
12L944Re Fusr
Th— lxk< �
CkJfflake
4 a! s, tter,r
g Cliff R d (Co d 3a ? I +, ` ClrJRoa
y
CL i P F RI
Ile
� Lake
o"
,...L.. �. i r., de'•0
Like
pekv
1, k
aN 'il aan H.7• =yam J --Lake
Document Path: L:\USERSIPUBWORKS1EngineeringVTojects\2019 Street Improvements11316 - Pinetree Pass 2nd, 4th & 6th Addhions11316 Location.mxd Date: 12/12/2018
FIG 1
/-pF E,9
y.'7. 2019 Street Revitalization - Project 1316
�,i,sxEo • Pinetree Pass 2nd, 4th & 6th Additions
� o
Ipp
r ■ c CLIFF RO e E
_ _ sib •aEtY�r'- � �r�p�4g.� �' . _ '�' _ I. I.
r
y` r
.- � a,v'� ,SF- '• zs � «� #ea�"f' � � slr I 1 .�.'y!� �n� � i+d R� r
#
�16'1" ,.� i_
� :�;Li, «� ws-�
.•�= •�4 .`i rW .... � ..11 Fy-" � '� .0 1 � rl .aw. � irtil 1
.r Y �, reSf 1 I� .� r#� rf � it AlAyf I � � -. k ~ � f r � 1 ➢.
`L6. - r e7,. tib. ':Gtii me. ':� � .•" x- . ..+ a _' �. '.. riA ,f.
�.T
rr �w
:. A...� :' y�` �, .. �—fir . • '� _ a�, ii5i r�J �.
Lu
Pir.' s• 1
• 'r rr. 's' Y' :� wA. • :-_ y rtA � • .,� rill I •
F Ah..
II� �' ti .Ai• .0
V.
V
'7 C •I - ilti, .�{ti.. - .— .
r
'4 rs<O . �v .a... I,.� 7 _ n :.s31 .. �' .:•'cerl Ylnri _
Project Area Legend hR':�'E
f Q Assesabfe Project Area
2019 Street improvement �4.
Zoning :.M� Jr,
:{
. 7 .
Neighborhood Park _�. ; Fir r r,r 441 ~s
' 1
• f
O=Owd Path: L-.MERSIPUDMRKS1ErgneeringU7roocta12019 SVeet ImKovements11316 - Pinetree Pass 2nd, 4th & 6th AddiSons11316.rtnad
Date: 12/12/2018
FIG 2
2019 Street Revitalization -Project 1316
" Pinetree Pass 2nd, 4th & 6th Additions
Typical Street Sections
ROW
28'- 32 F F
i
PAVEMENT_ SECTION
3.5" BASE COURSE 8618 CONCRETE
6" CLASS 5 AGG BASE CURB AND GUTTER
COMPACTED SUBGRADE
EXIST. TYPICAL SECTION
PINE TREE PASS 2nd, 4th & 6th
50-60'
ROW
28'- 32 F -F
1.25" EDGE MILL
6'-8' wide (TYP).
-1.5" TYPE 2360 BITUMINOUS OVERLAY
BBiB CONCRETE
BITUMINOUS TACK COAT CURB AND GUTTER
�- 3.5" BITUMINOUS SURFACE
6" CLASS 5 AGG BASE
COMPACTED SUBGRADE
PROPOSED TYPICAL SECTION
PINE TREE PASS 2nd, 4th & 6th
Document Path: L:IUSERSIPUBWDRKSIEngheeringUProjectst2019 Street hp ovements11316 - Pinahw Pass 2nd, 4th & 6th AdditIons11316 Fig 3.mxd Date: 1212/20
18
FIG 3
Pinetree Pass 2nd, 4th, & 6th Additions
Neighborhood Street Revitalization
City Project No. 1316
Informational Meeting – 7:30 P.M., Monday, Jan. 7, 2019
Eagan Room
Attendance
Aaron Nelson, Assistant City Engineer, John Gorder, City Engineer, Russ Matthys, Public Works
Director and 7 residents (see attached sign-in sheet) were in attendance.
Presentation of Street Improvement Project Details
Nelson welcomed the residents and presented a construction video along with project
information, including details such as construction, costs, schedule and assessments. A speed
limit presentation was also given.
STREET IMPROVEMENT Questions/ Comments
1. Can this project be delayed? If the project is delayed, the risk is the street pavements will
deteriorate at fast rate where the mill & overlay improvement is not effective and a full
replacement of the entire pavement section would be required, and at higher costs. The
proposed mill & overlay is a proactive approach to capture the underlying structural
strength of the existing pavement.
2. Can the City pay more, or place the costs of these improvements on general taxes instead
of special assessments? The City’s Special Assessment Policy, set 25-30 years ago by the
City Council, identifies assessments for a portion of the improvements to benefiting
properties for these types of projects. This policy has been well-received by thousands of
assessed property owners and the City Council. Direction to change the policy and funding
mechanisms for these types of projects would need to come from the Council.
3. The CenturyLink fiber trench within the street is in poor shape. Are they aware, and how
does that fit into the project? Will there be costs to the City/ homeowners? CenturyLink’s
fiber lines within the pavement of the neighborhood, installed in 2015 under agreement
with the City, will be impacted by the City project, and there will likely be temporary loss of
service during the impact. City staff has made CenturyLink aware of this, and is working with
them on appropriate measures by CenturyLink to repair/replace line during City
construction, at no delay or cost to the City or homeowners.
4. What will be our driveway access to street during curb and sidewalk repair? If the
concrete curb & gutter or driveway apron at your house is removed and replaced, there is a
time where you won’t have access to your driveway (about 7 days to allow curing), and
vehicle parking will need to occur on the streets.
5. Have you seen information on hydrocarbons (PAHs)? The City does not use or have coal tar
sealant products in streets.
Proposed Revocation of 25-MPH Speed Limit - Summit Pass
Nelson presented information the background on the 2005 City Council establishment of a 25-
mph speed limit on Summit Pass, why and how speed limits are set by MnDOT throughout the
state, the effectiveness of speed limit signage, and past and current traffic speed/volume
information on Summit Pass.
Matthys mentioned the preparation of a local street safety plan project, undertaken by the MN
Department of Transportation in 2015 using state gas tax funding. The cities of Eagan and St.
Paul participated in the preparation of the plan, and its results were presented to the City
Council in 2015 by Howard Preston (CH2MHill). Results of the project indicated that Eagan’s
streets are safe from a traffic perspective. The presentation from Mr. Preston included a variety
of “myth-buster” items relating to the true effectiveness of traffic control signage and
pavement markings, including stop, warning and speed limit signage.
The Council was supportive of the incorporation of the project data to continue addressing
safety issues in Eagan, including the removal of unwarranted stop signs and warning signs, and
efforts to periodically review, update, and expand documentation of city practices. The Council
suggested that staff ask business representatives and residents to identify signage for
consideration of removal. It’s in this context that the removal of the 25-MPH speed limit on
Summit Pass is proposed, that it be consistent with the 30 MPH speed limit for the rest of the
neighborhood and local residential streets in the City and throughout the state.
1. Residents along Summit Pass strongly feel that the 25-MPH speed limit on Summit Pass is
effective in reducing traffic speeds and cut-through volumes. This was the original
intention of reducing the speed limit there in 2005. State regulations still allow the City to
maintain this street as a 25-MPH zone, and it should remain.
2. All signage in the neighborhood is being replaced along with the street improvements.
The cost to maintain/replace the two 25-MPH signs with new at both ends of Summit Pass
must be minimal (all street signs in the neighborhood are being replaced as part of the
street improvement project). Why not just replace the signs with new, and leave the 25
mph speed limit in place? City staff agrees that the cost to replace the signage is minimal,
but is following the direction of the Council to review and identify potential removals of
ineffective signage with the street improvement projects. The City Council established the
25-MPH zone in 2005, and only they can remove the zone.
The meeting adjourned at 9:45 p.m.
1
Cheryl Stevenson
Subject:FW: PINETREE PASS 2nd, 4th, and 6th, Street Revitalization Project 1316
From: Rick Goetz [mailto:rickgoetz@comcast.net]
Sent: Tuesday, January 01, 2019 4:05 PM
To: Aaron Nelson
Subject: Re: PINETREE PASS 2nd, 4th, and 6th, Street Revitalization Project 1316
Hello Aaron,
Thanks for replying. From what you replied to my neighbor Andrew it appears that you haven’t read any of the
NHTSA and other pieces of research that find that lower speed limits in neighborhoods is preferred and safer
for residents.
It’s to bad that the city and city counsel members show a lack of concern for the safety of citizens of Eagan and
the children in our association neighborhood. This is our neighborhood association and we should be able to
have a speed limit that is what the majority of the residents see as safe for themselves, their families and their
property.
I guess you feel that the city counsel members and your department are more knowledgeable than all the studies
that have been conducted on the topic.
I just calculated the difference in time driving from Cliff Road to the last house going next to steeplechase
entrance 1 mile. https://www.countcalculate.com/cars-and-speed/time-savings-at-increased-speed
If you drive 30 vs 25 you gain 24 seconds getting home less than that if your not the last house. But if you hit a
pedestrian going 30mph the chance of killing them increases from 5% to 45%-9X and at 40mph increases from
5% to 85%-
4
2
17X.
If you go 30 vs 20 you’ll get there 1 minute faster.
Point is, is it worth 9X-17X the chance of a fatality to save 24 - 60 seconds.
I would guess the average person waste 60-90 a day playing with Facebook or other social media. What I don’t
get is that the people feel a need to race through the association like they don’t have to 24 seconds in their day
to spare, guess they forgot about all their Facebook and Instagram post time.
The NHTSA and many many many others, these government agencies have all said faster speeds in
neighborhoods = more death. Read the links I sent you if in doubt that’s why I sent them to you.
I’m from Bismarck ND where Cliff and Pilot knob would be 30 and all city streets are 20 or 25. But they value
their children and use common sense approach. 5% chance death at 25; 45% chance death at 30; 85% chance
death at 40. Do you think the additional risk of death to innocent kids is worth it so people could get home 24
seconds faster than what a much less riskier speed would provide. I would love to see what the jury on a lawsuit
for a child being killed on city street due to city counsel and city planners not weighing the effects of speed and
the exponential risk of deaths due to the higher speeds, especially after a concerned citizen not only brought it
up to their attention but also gave them many many NHTSA and other research reports stating that lower speeds
should be adopted and why.
In your own comments to Andrew the posted speed limit sign isn’t what makes people drive a speed but if the
posted speed limit is 20-25mph and then they’re going 30-40mph or more and one of our kids is hit and killed
the courts and juries will surely punish them for their indiscretions. Most drivers aren’t likely to drive more than
10mph over the limit, so when you post 30mph expect them to hit 40mph which is an 85% risk of death when
they hit someone vs the risks of death at lower posted speeds.
5
3
Make a precedent here and start a policy like other communities around the US to reduce the risk of death due
to excessive speeds posted in residential neighborhoods. It’s just common sense.
Regards,
Rick Goetz
Sent from my iPhone
On Dec 31, 2018, at 1:21 PM, Aaron Nelson <anelson@cityofeagan.com> wrote:
Hi Rick,
Thanks for the email.Andrew vanReeuwijk also sent me an email,so I thought it would be helpful if I
forward you the same information I sent to him see attached).We’d be happy to discuss the proposed
speed limit changes in more detail at the Jan.7 neighborhood meeting at 7:30.I have meetings with
other neighborhoods at 5:30 and 6:30,so if your group gets there a little early,please ask them to wait
in the lobby outside the meeting room until the 6:30 meeting wraps up.Thanks again,and I look
forward to meeting with you and your neighbors on the 7th.Have a Happy New Year!
image001.png>
Aaron Nelson
Assistant City Engineer
3830 Pilot Knob Rd | Eagan, MN 55122
Office: 651-675-5635
https://www.cityofeagan.com
From: Rick Goetz [mailto:rickgoetz@comcast.net]
Sent: Saturday, December 29, 2018 4:12 PM
To: Aaron Nelson
Subject: PINETREE PASS 2nd, 4th, and 6th, Street Revitalization Project 1316
Hello Aaron,
I sent the below email to my fellow Association Members in the Stonecliffe Association in
Eagan.
I will be at the meeting to voice my opposition to raising any speed limit within the association
and demanding that the speed limits all be reduced through our entire association due to the
attached Research and risk of death that the city of eagan wishes to place on our families,
friends, neighbors and kids in our association.
6
4
I feel compelled as a citizen to speak up to protect all from unnecessary risk and harm including
death.
Thank You
Richard Goetz
651-592-2326
Hello Neighbors,
I am assuming if you have picked up your mail today you have received a letter from the city of
Eagan Detailing the Street Revitalization Project 1316 for the Association.
Estimated cost of $950 per home assessment and $8.22 per front foot neighborhood parks.
I took special notice to the 7th bullet point on the Page Titled PINETREE PASS 2nd, 4th, and
6th, Street Revitalization Project 1316 -Summary Sheet Under “Anticipated Project Scope”.
Remove the 25MPH speed limit signs on Summit Pass and re-establish a 30MPH speed limit.
I think all the speed limits in the association should be 20MPH at max, there are kids playing,
pets being walked, people backing in and out of driveways. Do they realize that to some drivers
45MPH is the new 30MPH.
We live on Stonecliffe drive and vehicles regularly are going in excessive of 40MPH when
passing our home winter on ice and summer on dry pavement. Backing out of the driveway is
like taking your life in your hands on Stonecliffe Drive.
I have personally witnessed vehicles over-driving conditions where the vehicles have crossed
lanes and even hit the mail boxes across street from my house crossing the lane. I have also
witnessed in icy conditions multiple times vehicles loosing steering and braking control going
down the hill on stonecliffe in the morning while kids were waiting for the morning bus pickup
at Thomas Lane and Stonecliffe Drive running up onto the curb where the kids had to scramble
to move out of harms way.
Who needs to go faster than 20MPH in the association to get from Cliff Road or Covington Lane
to their driveway? No ONE!
I recommend that you attend the:
Informational Meeting 7:30pm, Monday January 7th, 2019 to discuss and take public input on
the proposed project location 3830 Pilot Knob Road, Eagan, MN 55122 on the 2nd Floor Eagan
Room.
7
5
And
The scheduled Public Hearing at the Eagan Municipal Center 3830 Pilot Knob Road, Eagan, MN
55122on Tuesday, January 15th, 2019 at 6:30pm.
To VOICE YOUR OPINION on speeds within the association that should be common sense
when keeping our kids, pets, backing out of driveways safely and property safe is a major
concern.
Regards,
Rick Goetz
Sent from my iPad
P.S. as the City letter indicates:
If you have any comments or questions, or are unable to attend the informational meeting, please
feel free to contact me (Aaron) directly at 651-675-5635 or
at anelson@cityofeagan.com Information will be posted
at www.cityofeagan.com/constructionprojects throughout the project. That link also includes a
short video titled They’re Fixing My Street that describes the typical construction process
anticipated with this type of improvement. Per, Aaron Nelson, P.E. Assistant City Engineer
Residential Speed and it’s relationship to pedestrian (kids) accidents and deaths.
http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.417.5881&rep=rep1&type=pdf
https://nacto.org/publication/urban-street-design-guide/design-controls/design-speed/
http://www.ncsl.org/research/transportation/transportation-review-speed-limits.aspx#Lowering
https://www.nnw.org/publication/putting-brakes-unsafe-motorists
https://www.nhtsa.gov/DOT/NHTSA/Communication%20%26%20Consumer%20Information/T
raffic%20Tech%20Publications/Associated%20Files/Traffic_Tech_316.pdf
https://one.nhtsa.gov/people/injury/drowsy_driving1/speed_volII_finding/SpeedVolumeIIFindin
gsFinal.pdf
8
6
http://guide.saferoutesinfo.org/enforcement/neighborhood_speed_watch_program.cfm
https://safety.fhwa.dot.gov/speedmgt/ref_mats/fhwasa1304/resources/Pilot%20Test%20of%20H
eed%20the%20Speed.pdf
https://safety.fhwa.dot.gov/speedmgt/ref_mats/fhwasa1304/resources/Speed%20Enforcement%2
0Program%20Guidelines.pdf
https://www.bottlingerlaw.com/blog/dangers-of-speeding-in-a-residential-neighborhood/
Rick
Sent from my iPhone
mime-attachment>
9
1
Cheryl Stevenson
From:Vsu Subramanian <subr0021@gmail.com>
Sent:Saturday, January 12, 2019 4:50 PM
To:Mike Maguire
Cc:Paul Bakken; Cyndee Fields; Gary Hansen; Meg Tilley; todo@usfamily.net
Subject:Speed Limit at Summit Pass, Eagan
Attachments:Summit Pass.png
Mr.Mayor and Eagan City Council Members,
My family & I live on Summit Pass, Eagan.
Summit Pass is a small street of about 0.2 miles long. It starts at higher elevation on the North end and descends down
at the South end where it meets Stonecliffe dr. Please see attached picture.
We recently learnt that the city might be changing the speed limit of the street from 25 miles/hour to 30 miles/hour. I
strongly urge you to reconsider and leave the speed limit at 25 miles/hour ‐ as it has been for over 15 years. There are
several reasons for my request :
1. There are many residents on summit pass with small children, including my own . Our kids play on the driveways
most of the year.
2. There is also a school bus stop at the north end of the street, where lots of kids wait for the bus in the morning
and get dropped off in the evening.
3. The street being such a short distance and a steep decline from the north end to the south end, it is very easy
for vehicles to accelerate & get up to a high speed. The curve of the street makes it hard to see down the decline
(or the incline if the vehicle comes from the south end) and react to any people or obstacles on the street.
Summit Pass is unique due to its short distance and rapid change in elevation. For the safety of the pedestrians on and
around the street , I request you to leave the speed limit of the street at 25 miles/hour. I have spoken to many residents
of summit pass & they all concur.
I am not able to attend the city council meeting on Tuesday, January 15th, as I am traveling that day. Please consider this
as my request in lieu of being there in person.
Thank you for your kind attention to this matter.
Sincerely,
Venkatesan Subramanian
4638 Summit Pass
1
Cheryl Stevenson
From:Parham Alaei <alaei001@umn.edu>
Sent:Sunday, January 13, 2019 7:41 PM
To:Mike Maguire; Paul Bakken; Cyndee Fields; Gary Hansen; Meg Tilley
Subject:Summit Pass Speel Limit
Dear Mayor and members of Eagan City Council,
I will not be able to attend the upcoming council meeting discussing rehabilitation of the streets in Stonecliffe
neighborhood but wanted to share with you my objection to raising the Summit Pass speed limit to 30 MPH.
When in mid 2000s, my neighbors and I raised the issue of speeding cars, the city agreed to decrease the
speed limit to 25 MPH upon much discussion. At that time, we had small children and feared for their safety
while playing outside or going to and from the bus stop. My children have now grown, and I do not have those
specific concerns, but there are other families with small children who have moved here and to the
surrounding streets. So, I now think not only Summit Pass speed limit should be maintained at 25 MPH, but
the entire neighborhood’s speed limit should also be reduced. I do encounter cars driving at unsafe speeds
and sometimes tailgaiting me for going the speed limit. The fact of the matter is that many people drive 5‐10
miles above the posted speed limit, and adding that to the distracted driving habits which we did not
encounter in the 2000s, causes unsafe conditions for children, people walking their dogs, cars backing out of
driveways, etc. So I strongly urge you to re‐consider this and consider lowering speed limit for all the
residential streets in the neighborhood.
Thank You,
Parham Alaei
4626 Summit Pass
From:Sue Huang
To:Mike Maguire; Paul Bakken; Cyndee Fields; Gary Hansen; Meg Tilley
Subject:Summit Pass Speed Limit 25 mph
Date:Tuesday, January 15, 2019 1:25:10 PM
Dear Eagan Mayor and City Council members,
We are Henry, Yunny, Rheya and Sue, lives in 4649 Summit Pass. Due to
Yunny's school program, we cannot attend tonight's meeting to support on
site, but we are with other Summit Pass residents to want to you can
really consider our request to keep our living area much safer and quieter,
and do not raise the speed limit.
Thanks,
Henry, Yunny, Rheya and Sue Huang
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
PUBLIC HEARING
C. Project 1317, Gardenwood Ponds 4th
Street Improvements
Action To Be Considered:
Close the public hearing and approve Project 1317 (Gardenwood Ponds 4th - Street
Improvements) as presented, and authorize the preparation of detailed plans and
specifications.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of Gardenwood Ponds 4th, residential streets, in
eastern Eagan located south of Wescott Road and east of Lexington Avenue.
A structural mill and overlay of these streets is programmed for 2019 in the City
of Eagan’s 5-Year CIP (2019-2023).
On December 18, 2018, the draft Feasibility Report was presented to the City
Council and a public hearing was scheduled for T uesday, January 15, 2019.
An informational neighborhood meeting was held on January 7 for the adjacent
property owners to discuss the proposed improvements. Of the 27 properties
to be assessed under this improvement, one resident representing one property
attended the meeting.
All notices have been published in the legal newspaper and sent to all affected
property owners informing them of this public hearing.
Attachments (2)
PHC-1 Feasibility Report
PHC-2 Neighborhood Meeting Minutes
a
AGA
Report for
Gardenwood Ponds 4th
Neighborhood Street Revitalization
City Project No. 1317
December 18, 2018
•' + EAGAN
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Dec. 18, 2018
Re: Gardenwood Ponds 4th Street Revitalization
City Project No.: 1317
Attached is the feasibility report for the Gardenwood Ponds 4th Street Revitalization, City Project
No. 1317. The report presents and discusses the proposed improvements and includes a cost
estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
Reviewed By:
rv�
partment of Public Works
Reviewed By:
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
Aaron Nelson
Date: : g Reg. No. 45795
Date:
Finan partment Date:
TABLE OF CONTENTS
ExecutiveSummary ..................................................................................................... 1
Introduction/History ......................................................................................................2
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
StreetPavement Evaluation.........................................................................................3
ProposedImprovements..............................................................................................4
Easements/Permits......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................7
Assessments................................................................................................................7
AssessmentFinancing Options.....................................................................................7
RevenueSource...........................................................................................................5
ProjectSchedule..........................................................................................................9
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
- 2 Street Improvement/Assessment Area Map
- 3 Typical Section — Mill & Overlay
Executive Summary
Background
Project Name
Gardenwood Ponds 4t"
Project #
1317
Street Area
5,619 Sq. Yds.
Street Length
l 1,668 Feet
j
Streets Included
Bald Lake Court
Big Timber Trail
Constructed
1999
Reconstructed
- i
Crack Sealed
-
Seal Coated
2003, 2009
Absolute Location
NE % of Section 23
Township 27, Range 23 I
Relative Location
South of Wescott Road
East of Lexington Avenue
Project Details
• Roadway Overlay (edge mill & 1-1/2"
overlay)
PCI Rating
Recommended
44/100
Mill & Overlay w/ Signage $ 71,200
JJ� $ 35,640
Overlay
Replacement of damaged curb & gutter
Improvement
$ 40,300
Curb Removal
17%
Adjustment/Replacement of:
Scope o Sanitary/Storm sewer
35,640 (30.99)
$ 79,660 (69.1%)
o Utility castings
o Watergate valves
I
o Street signage
Residential Lots
27
• Utility Improvements j
Cost Estimate/ Revenue
Gardenwood Ponds 41h
1
Property
City
Mill & Overlay w/ Signage $ 71,200
JJ� $ 35,640
$ 35,560
Repair Existing Concrete Curb & Gutter $ 40,300
I
i
$ 40,300
d Utility Improvements $ 3,800
i -
$ 3,800
Total $ 115,300$
35,640 (30.99)
$ 79,660 (69.1%)
Gardenwood Ponds 41h
1
Dec. 18, 2018
Neighborhood Street Revitalization
Gardenwood Ponds 4th
Eagan, Minnesota
Introduction/ History
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 1,668 feet of residential streets in the Gardenwood Ponds 4th neighborhood in Eastern
Eagan has been identified for 2019 street revitalization improvements. Figure 1, located in
Appendix C, illustrates the project location. The streets were originally constructed in 1999.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the roads located within the project area, which are currently in the 20 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the streets were seal coated in 2003 and 2009.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
Gardenwood Ponds 4th
2
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scope
This project will provide an overlay (edge mill and overlay) for approximately 1,668 feet of
roadway. Figure 2 in Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves, utility improvements, and replacement of street signage.
Area to Be Included
Properties included in the project lie within the NE 4, Section 23, lying South of Wescott Road,
East of Lexington Avenue, in Township 27, Range 23, in the City of Eagan, Dakota County,
Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI Recommended Improvement
56-100 Routine Maintenance/Crack Seal/Seal Coat
36-55 Patch/Repair and/or Overlay
0-35
Reconstruct/ Reclaim j
The 2018 PCI rankings for the street segments have a weighted average pavement condition
rating of 44, which falls in the "Patch/Repair and/or Overlay" category, as mentioned above.
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Gardenwood Ponds 4th
3
Proposed Improvements
Pavement - The proposed street
improvements shown in Figure 3. The
existing street section forth is roadway
consists of 3.5" bituminous pavement
supported by 9" gravel base. The
existing bituminous surface will be
milled adjacent to the existing curb and
gutter (6'-i3' wide) to accommodate a
1i4 -inch bituminous overlay. The
overlay, combined with the existing
street section, will provide a street
section consistent with current City
standards for residential streets. The
combination of patching and overlay
will not eliminate cracking due to the temperature extremes experienced in Minnesota.
Bituminous overlays will show some continued frost movements and reflective cracking
consistent with the underlying pavement. Routine maintenance will still need to continue under
the City's Pavement Management Program.
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalied, or settled. It is estimated that
All)- approximately 17% of the existing concrete
curb and gutter will have to be replaced.
Boulevard turf will be removed and replaced
with seed. While the contractor who performs
the work is responsible for its establishment
-- (45 days for seed), adjacent property owners
- r _ are encouraged to consistently water the new
turf, where possible, to help ensure its growth.
Utility Adjustment/Replacement—Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
ensure quick and easy access by the City for maintenance and other purposes. There are a
number of catch basin structures that require new HDPE adjusting rings due to deterioration.
These improvements will be financed through the Combined Utility Fund.
Gardenwood Ponds 4th
4
Al
7
1 rt-
f'
Sidewalk/Path & Pedestrian Ramps — Revisions to the Americans with Disabilities Act (ADA)
requires jurisdictional agencies to provide detectable warnings at all existing pedestrian ramps
of sidewalks and paths with public streets that
are improved, including street surface
improvements. The most common method of
providing this detectable warning is through the
installation of truncated domes a minimum of
two feet in length across the width of all
pedestrian ramps. The only pedestrian facility in
the area is a trail along Northview Park Road
that crosses Big Timber Trail. All pedestrian
ramps were recently upgraded to current standards, so no improvements are proposed.
Signage - Traffic and street identification signage within the project
limits have reached the end of their useful life expectancy and are
in need of replacement. Signs have been reviewed for compliance
with the Minnesota Manual on Uniform Traffic Control Devices
(MnMUTCD). Those that are required by the MnMUTCD will be
replaced to improve safety and night time visibility, and those that
are not will be permanently removed.
Street Lights — The street lights in the project area (maintained by
Dakota Electric Association) are in good condition and provide
adequate coverage. No modifications to the existing street lights
are proposed.
Stormwater and Water Quality Improvements — Two stormwater/ water quality pond
improvement projects (Alum applications to ponds JP -20.1 and JP -20.3) in this area have been
identified in the 2019-2023 CIP, and are proposed for implementation in 2019. Timing will be
determined based on the scope of the improvements, required permits and public comment
periods, and the desirable time of year to construct the improvements. These improvements
Gardenwood Ponds 4th
5
will be performed through separate contract. Because this work will not be assessed, but will
be financed through the City's existing Storm Water Utility Fund 1126 — Storm Drainage System
Renewal and Replacement, preliminary cost estimates are not included in this report.
Complete Streets — "Complete Streets" is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
The streets in this neighborhood were reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The streets are relatively narrow at 32 feet wide,
have low traffic volumes, limited access points, and a sidewalk is available along Northview Park
Road (adjacent to this neighborhood) to connect pedestrians to the City and regional trail
system. Pedestrian curb ramps in the project area at the intersecting sidewalks will be replaced
if necessary to meet current ADA design standards. Given the existing and proposed elements
available for all users, the streets in this neighborhood meet the intent of the complete streets
guidelines.
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that no permits will be required for the resurfacing project.
Feasibility and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement (resurfacing) is considerably less
expensive than complete reconstruction of this street. The mill and overlay is feasible in that
this type of improvement has been used successfully to extend the life expectancy of numerous
other streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 — 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Gardenwood Ponds 4th
6
Cost Estimate
Detailed cost estimates are located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 30%, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Gardenwood Ponds 4"'
Mill& Overlay........................................................................ $ 71,200
Repair Existing Concrete Curb & Gutter ................................ $ 40,300
Utility Improvements............................................................. 3,80
Total........................................................................... $ 115,300
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for residential streets. All assessments will be revised
based on final costs. A preliminary assessment roll is included in Appendix B.
City Special Assessment Policy
Assessment Ratio
Property City
Mill & Overlay - Low -Density Residential (R-1,2,3) 50% 50%
Repair Existing Concrete Curb & Gutter - 100%
Utility Improvements 100%
Residential Lots — All residential lots (27 single family homes) as shown on Figure 2, having
driveway access on to the street to be improved are proposed to be assessed. The City's
Assessment Policy states that 50% of the mill and overlay costs are assessable for local
residential streets, based on a standard 32 -foot width. The estimated cost per residential unit,
based on the City's Assessment Policy, is $1,320/ lot and is calculated as follows:
Mill & Overlay - Residential Properties
o 3,336' Residential Frontage/ 3,336' Total Frontage =100%
o $71,200 (Mill & Overlay Costs) x 50% x 100% = $35,600 (Total R-1 Assessment)
o $35,600/27 lots= $1,318.52, rounded to $1,320/ single-family lot
Assessment Financine 4otions
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2019 rate is not yet
available, however, it is expected to be comparable and based on City policy will be determined
by the City Council in the spring. The following payment schedule is an example of a residential
Gardenwood Ponds 4th
7
lot assessment of $1,320 with an estimated 4.5% interest for the assessed amounts, and
assumes 14 months interest for the first year:
Principal /Year Interest / Year Cost / Year
1st Year $264 $69 $333
5th Year $264$2
-- $12 76 I — .—
Bonds may be issued to finance the improvements.
Revenue Source
A summary of revenue sources is listed below:
The Major Street Fund will finance the estimated street related project deficit of $75,860.
The Combined Utility Fund will finance the estimated $3,800 utility improvements.
Gardenwood Ponds 4th
8
Project Cost
Property Assessment City Contribution
Mill and Overlay (Including Signage)
$ 71,200
$ 35,640 $ 35,560
Repair Existing Curb & Gutter
$ 40,300
- $ 40,300
Utility Improvements
$ 3,800
- $ 3,800
Totals
$ 115,300
$ 35,640 $ 79,660
The Major Street Fund will finance the estimated street related project deficit of $75,860.
The Combined Utility Fund will finance the estimated $3,800 utility improvements.
Gardenwood Ponds 4th
8
Proiect Schedule
uraer Nuoiic Hearing ..................................................
Informational Meeting ................................................
PublicHearing.............................................................
Approve Plans and Specifications ...............................
BidDate.......................................................................
AwardContract...........................................................
Start Construction........................................................
ProjectCompletion......................................................
FinalCost Report ..........................................................
Final Assessment Hearing ............................................
First Payment Due with Property Tax Statement........
.............................. Dec. 18, 2018
................................. Jan. 7, 2019
............................... Jan. 15, 2019
...............................Feb. 19, 2019
.......................... March 28, 2019
............................... April 2, 2019
............................... May 1, 2019
.............................. August, 2019
.. ......................September, 2019
................................... Fall, 2019
............................ May 15, 2020
Gardenwood Ponds 41n
9
Appendix A
Preliminary Cost Estimate
City Project 1317 Gardenwood Ponds 4th
item No.
Item
J Unit
I
Unit Price
Est Qty
I
Estimated Cost
Part I - Bituminous Street Overlay
21D4.501 Remove Concrete Curb and Gutter
2021.501
Mobilization
LS
$
6,000.00
1
$
6,000.00
2232.501
Mill Bituminous Pavement (1-1/4" depth, 6' width)
SY
$
1.30
2180
$
2,834,00
2232.501
Mill Bituminous Pavement- Full Width (1-1/4" Depth)
SY
$
2.00
450
$
900.00
2357.502
Bituminous Material for Tack Coat
GAL
$
2.75
370
$
1,017.50
2360.501
SP WEA3408 Wearing Course Mixture (Overlay)
TON
$
52.00
530
$
27,560.00
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
8
$
800.00
2504.602
Adjust Gate Valve Box
EA
$
250.00
1
$
250.00
2506.602
Adjust Frame and Ring Casting (Manhole)
EA
$
7D0.00
10
$
7,000.00
2506.602
Adjust Manhole Casting - Riser Adjustment
EA
$
250.00
4
$
1,000.00
2563.601
Traffic Control
LS
$
4,000.00
1
$
4,000.00
SP -1
Signage Remove and Replace
Ls
$
765.00
1
$
765.00
Subtotal
$ 52,126.50
5% Contingency
Subtotal
30% Indirect Costs
Part I - Bituminous Street Overlay
$ 2,606.33
$ 54,732.83
$ 16,419.85
$ 71,152.67
Item No.
I Item
Unit i
Unit Price
I Est Qty
I Estimated Cost
Part II - Repair Existing Curb & Gutter
21D4.501 Remove Concrete Curb and Gutter
LF
$
10.00
650
$
6,500.00
2104.505 Remove Concrete Driveway/Valley Gutter
SY
$
14.00
10
$
140.00
2211.501 Aggregate Base, CI.5 (100% Crushed)
TON
$
25.00
15
$
375.00
2360.501 SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
20
$
2,000.00
2504.602 Irrigation Repair
EA
$
160.00
10
$
1,600.00
2506.602 Adjust Frame & Ring Casting (CB) HDPE Rings
EA
$
550.00
5
$
2,750.00
2531.501 Concrete Curb and Gutter, 8618
LF
$
23.00
5
$
115.01)
2531.501 Concrete Curb and Gutter, Surmountable
LF
$
23.00
650
$
14,950.00
2540.602 Repair Underground Electric Fence
EA
$
85.00
5
$
425.00
2540.602 Repair Landscaping
EA
$
200.00
2
$
400.00
2572.503 Application of Water for Turf Establishment
GAL
$
0.15
5850
$
877.50
2575.550 Boulevard Topsoil Borrow -Mn DOT 3877-2F
CY
$
80.00
15
$
1,200.00
2575.609 Seeding (MnDOT 270 w/Type 5 Hydromulch)
SY
$
7.50
130
$
975.00
Subtotal
$
32,307.50
5% Contingency
$
1,615.38
Subtotal
$
33,922.88
30% Indirect Costs
$
30,176.86
Part II - Repair Existing Curb & Gutter
$
44,099.74
Part 1- Bituminous Street Overlay
$
71,152.67
Part II - Repair Existing Curb & Gutter
$
44,099.74
Project 1317 Total Cost
$
115,252.41
Gardenwood Ponds 4th
10
Appendix B
Preliminary Assessment Roll
City Project #1317 Gardenwood Ponds 4th
Total R-1 Lots 27 $ 35,640
Assessable Frontage 3,336 100%
Non -Assessable Frontage 0%
Total Frontage 3,336 100%
Gardenwood Ponds 4th
11
Big Timber Trl
R-1 Residential
P.I.N.
Lot Equivalent
4 of
Lots
Unit Assessment
Total
3877 Big Tim berTrl
102880302080
1
1
$
1,320
$
1,320
3873 Big Timber Trl
102880302070
Z
1
$
1,320
$
1,320
3869 Big Timber Tri
102880302060
1
1
$
11320
$
1,320
3865 Big Timber Trl
102880302050
1
1
$
1,320
$
1,320
3861 Big Timber Trl
102880302040
1
1
$
1,320
$
1,320
3860 Big Timber TO
102880301160
1
1
$
1,320
$
1,320
3856 Big Timber Tri
102880301170
1
1
$
1,320
$
1,320
3857BigTimberTrl
102880302030
1
1
$
1,320
$
1,320
3852 Big Timber TO
102880301180
1
1
$
1,320
$
1,320
3853 Big Timber Trl
102880302020
1
1
$
1,320
$
1,320
3848 Big Tim berTrl
102880301190
1
1
$
1,320
$
1,320
3849 Big Timber Trl
102880302010
1
1
$
1,320
$
1,320
825 Bald Lake Ct
Subtotal
12
12
$
1,320
$
15,840
Total R-1 Lots 27 $ 35,640
Assessable Frontage 3,336 100%
Non -Assessable Frontage 0%
Total Frontage 3,336 100%
Gardenwood Ponds 4th
11
Bald Lake Ct
Residential
P.I.N.
Lot Equivalent
#ofR-1
L
Lots is
Unit Assessment
Total
862 Bald Lake Ct
102880301010
1
1
$
1,320
$
1,320
858 Bald Lake Ct
102880301020
1
1
$
1,320
$
1,320
854 Bald Lake Ct
102880301030
1
1
$
1,320
$
1,320
850 Bald Lake Ct
102880301040
1
1
$
1,320
$
1,320
846 Bald Lake Ct
102880301050
1
1
5
1,320
$
1,320
837 Bald Lake Ct
102880301150
1
1
$
1,320
$
1,320
842 Bald Lake Ct
102880301060
1
1
$
1,320
$
1,320
838 Bald Lake Ct
102880301070
1
1
$
1,320
$
1,320
834 Bald Lake Ct
102880301080
1
1
$
1,320
$
1,320
830 Bald Lake Ct
102880301090
1
1
$
1,320
$
1,320
826 Bald Lake Ct
102880301100
1
1
$
1,320
$
1,320
822 Bald Lake Ct
102880301110
1
1
$
1,320
$
1,320
825 Bald Lake Ct
102880301120
Z
1
$
1,320
$
1,320
829 Bald Lake Ct
102880301130
1
1
$
1,320
$
1,320
833 Bald Lake Ct
102880301140
1
1
$
1,320
$
1,320
Subtotal
15
15
$
19,800
Total R-1 Lots 27 $ 35,640
Assessable Frontage 3,336 100%
Non -Assessable Frontage 0%
Total Frontage 3,336 100%
Gardenwood Ponds 4th
11
/-pF E,q� 2019 Street Revitalization - Project 1317
Gardenwood Ponds 4th Addition
..«���. r...,uacRa�ruorvurtw¢naneemQwroJeaRluulB Si4MIMPM"MN911317- 6vdw"ad Pmde 401317 Lmtin.mxd Date: 12/1712016
FIG 1
OF e
=A� 2019 Street Revitalization - Project 1317
Gardenwood Ponds 4th Addition
--. �ds►ai 38��'. �� '
3gSti $'�9
ag.
st
@! + t3g60 838
�y8.. lop'
$ P3�88 3873
`b
� 3 9�� �T7 r �ti ,�•
744
ss�
Project Area Legend
Assesable Project Area r
,� ��■ 2019 Street Improvement
D=e=nt Path: LIUSERSVPUBMRKS%Engh oeringUlrojects=ig Street ImprovementM1317-Gwdetnvood Ponds 4th11317.m1ad
Date: 12/12/2018
FIG 2
°F Eq0 2019 Street Revitalization - Project 1317
Z Gardenwood Ponds 4th Addition
P O
11
e1.: Typical Street Sections
n 50'0' ROW
Big Timber 32' F -F
Bald Lake Court 28' F -F
9.25' EDGE MILL
61-B' wide (TYPy.
Furl Width Mill
Cul -De -Sae
PAVEMENT SECTION
3.5" BASE COURSE
9" CLASS 5 AGG BASE
COMPACTED SUBGRADE
EXIST. TYPICAL SECTION
GARDENWOOD PONDS 4TH
50'-60' ROW
Blg Timber 32' F -F
Bald Lake Court 28' F -F
1.5" TYPE 2360 BITUMINOUS OVERLAY
MOUNTABLE CONCRETE
CURB AND GUTTER
MOUNTABLE CONCRETE
BITUMINOUS TACK COAT CURB AND GUTTER
3.5" BITUMINOUS SURFACE
9" CLASS 5 AGG BASE
COMPACTED SUBGRADE
PROPOSED TYPICAL SECTION
GARDENWOOD PONDS 4TH
Dowment Peth: L:IUSERSIPUBWORKSIEngineeringlPro eetsvoil3 Street IrnprorementMi317 - Gerdenwood Ponds 4th193?7 FIg 3.mxd Date: 12/12/2018
FIG 3
Gardenwood Ponds 4th Addition
Oak Pond Hills 1st & 2nd Additions
Majestic Oaks 1st – 3rd Additions
Neighborhood Street Revitalization
City Project No’s. 1317, 1318, & 1319
Informational Meeting – 5:30 P.M. Monday, Jan. 7, 2019
Eagan Room
Attendance
This meeting combined 4 project areas (1317, 1318, 1319, and 1320) Aaron Nelson, Assistant
City Engineer, and 5 residents representing 4 single family homes were in attendance (see
attached sign-in sheet). Nobody from the Southern Lakes West neighborhood (1320) attended.
Presentation of Project Details
Nelson welcomed the residents and presented project information, including details such as
construction, costs, schedule and assessments. A short ETV video on the street improvement
process was also shown.
Questions/ Comments
Because the meeting had residents from 3 neighborhoods in attendance, much of the
discussion was about general project and assessment related questions. Any project specific
questions are noted below.
STREET CONDITION
1. Why are the improvements being performed now? The streets appear to be in relatively
good condition. The condition of the streets are currently at the point that if improvements
are not made at this time, the asphalt will deteriorate at a much quicker rate and will likely
require more substantial and expensive improvements in the near future.
2. Will cracks appear through the new asphalt? Since the majority of the asphalt is being left
in place, it is expected that some of the cracks will reflect through the new asphalt, however
the structural integrity of the street will remain. Any cracks will be addressed with routine
maintenance and filled as necessary.
3. (Resident from Proj. 1317) Concerns were stated that Eagan’s Pavement Management
Program differs from some recommendations cited in a publication authored by the Local
Road Research Board and Mn/DOT (SYSTEMS PRESERVATION GUIDE – A planning Process
for Local Government Management of Transportation Networks, Final Report 2016-34A,
dated Nov. 2016). The question from the resident was “why isn’t Eagan following those
recommendations”? Nelson stated that Mn/DOT and the LRRB publish dozens of
publications annually, and he couldn’t comment on their recommendations, or any
differences from Eagan’s program, without first reviewing that document. However, Nelson
said he’d review it and share the information in the meeting minutes.
The document was developed by Mn/DOT staff, representatives from 5 Minnesota Counties
across the state, and engineering consultants, to provide guidance for Counties that do not
have an established pavement management program to determine the appropriate
maintenance technique to perform at the correct time, to cost effectively maintain their
County roadway system. The maintenance techniques described in Systems Preservation
Guide are the same techniques that Eagan utilizes (crack sealing, seal coating, micro-
surfacing, overlays, resurfacing, reclamation, reconstruct, etc.) to maintain its system.
However, because a County roadway network differs from a City roadway network (size of
vehicles, higher traffic speeds and volumes, etc.), some of the maintenance techniques
Eagan uses are slightly modified to fit Eagan’s needs.
4. (Project 1318) Oak Pond Road currently has “tenting” in the existing asphalt that occurs
primarily in the winter. Will this overlay eliminate or make the tenting less significant?
Tenting is usually most apparent in the winter when the streets and base material are
frozen and moisture gets into the cracks in the pavement. The overlay will seal the road
surface and reduce moisture intrusion. Any cracks that reflect through the new layer of
asphalt will be sealed a couple years after the overlay, and that should help control
moisture issues. An Engineering Technician will review the existing conditions to see if any
further maintenance should be performed to address the concern.
CURB CONDITION
5. How much damage to the concrete curb and gutter warrants repairs? It is common for
concrete to crack. If the crack is tight and the curb is still functional, the curb will likely
remain in place. If the crack is separated, heaved, or offset, or large chunks are missing that
make the gutter not function properly, then the curb will likely be repaired.
DRAINAGE
6. (Proj. 1317) The curb and pavement at the end of Bald Lake Court holds a lot of water.
Can it be directed to the storm sewer catch basin on the SW side of the cul-de-sac? A
technician will review the area to see what’s causing the standing water. If it’s a
settlement, new curb will be poured and should improve the situation. If it’s just really flat,
options will be really limited without raising the whole cul-de-sac, which may be outside the
scope of the improvements.
Staff reviewed the area the following area and determined the whole cul-de-sac is really
flat, and water can’t make it around the curb line to the catch basin. Options are being
investigated to see if the grade can be increased, or an additional catch basin added to pick
up that water.
7. (Proj. 1318) Drainage is having a difficult time making it through the intersection of Oak
Pond Road and Oak Pond Circle. Can that be improved? A technician will review the
intersection to determine the cause of the slow drainage. It might need to be re-graded, or
a new valley gutter installed. It will be addressed with the design phase.
CONSTRUCTION/PHASING
8. Will the road be open during construction? Will access be maintained to driveways? All
roads will be open to traffic during construction. We do not anticipate any road closures
during the work, however, some phases will require short term lane closures and the
contractor will use traffic control devices or flagmen to help direct traffic. Access to
driveways should be maintained throughout construction. If curb needs to be replaced at a
driveway, residents can park in front of their homes while the concrete cures.
9. How long will the construction last? How will it be phased? The contractor will have
flexibility to determine how they phase each area, and construction is anticipated to begin
as soon as early May (weather dependent), and needs to be complete by late June or early
July. The size and scope of the improvements in this neighborhood will likely result in
approximately a 3-4 week construction timeframe for each of the neighborhoods. The City
will mail more detailed construction specific information as construction nears.
ASSESSMENTS
10. How are assessments calculated? With residential properties, the city shares the cost of all
work performed between the curbs 50/50 with the adjacent property owners. Any work in
the curbs and boulevard, and the utility improvements, is paid 100% by the city. The
property owner’s portion is split evenly among all lots in the neighborhood.
11. Why are the residents being assessed? Every city finances road rehabilitation differently.
Some communities assess 100% of the costs to those that live in the neighborhood and
benefit most from the streets, where others don’t assess anything and fund the
improvements entirely through property taxes. Eagan has had a consistent policy
throughout its pavement management program history, where the City finances the
majority of the costs through property taxes, and a portion of the costs is assessed to
everyone that lives in the neighborhood. Most cities in the metro area assess a portion of
the costs.
12. (Resident from Proj. 1317) General question about Eagan’s assessment policy. Why is
only 10% (average) assessed on larger roadways, compared to 30-35% in residential
neighborhoods? Eagan’s assessment policy includes assessments for residential properties
if they have “front yard frontage” onto a road being improved, so almost every residential
property in the neighborhood is assessed with an overlay project. On larger roadways
(collector and arterial roads), much of the road frontage is with rear yards of residential
properties, therefore, those properties are not assessed. Those roadways typically have a
lot of unassessable frontage, so the city pays a higher percentage of the cost in those
circumstances.
13. (Proj. 1318) There is city property that fronts Oak Pond Road. Does the City pay for its
frontage, or is it being assessed? The city pays 100% of the costs for city property frontage.
UTILITIES
14. Are any private utility companies planning to upgrade their lines along with the street
improvements (gas, phone, electric, cable, etc.)? Every January city staff holds a meeting
with representatives of all the utility companies to show them what projects we know are
going to occur, and several that will likely occur. They review their utilities to see if any
upgrades are needed at the same time. If they need to replace lines, they can coordinate
improvements, but historically they haven’t replaced facilities with overlay projects.
PRIVATE STREETS
(Proj. 1318) 6 homes have driveways on the private street at the end of Majestic Oaks Pl.
Will the city be working on any private streets? Will the City plow the private street?
Why are those homeowners paying the same assessment as everyone else, and also be
responsible to maintain their own street too? Work is limited to only the public streets.
Eagan has very definitive standards that every development must meet. Some of the
requirements include the construction of all public streets to City standards (28’-32’ wide
with curb & gutter), they are located within dedicated public rights-of-way (50’-60’ wide),
and cul-de-sacs must be installed on dead-end streets to provide adequate and safe access
and allow large City equipment to perform routine maintenance (i.e. snow & ice control,
sweeping, patching, etc.). The private street was constructed below city standards, so the
City would not take over ownership and/or maintenance of the private street.
Every property in the neighborhood is proposed to be assessed the same amount,
regardless of which street they live on, because everyone must drive on the network of
public streets to get to and from their homes. Assessing in this manner is how the city
ensures everyone helps pay for the maintenance of the vast network of public streets
throughout the city.
The meeting adjourned at 6:35 p.m.
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
PUBLIC HEARING
D. Project 1318, Oak Pond Hills 1st & 2nd
Street Improvements
Action To Be Considered:
Close the public hearing and approve Project 1318 (Oak Pond Hills 1st & 2nd - Street
Improvements) as presented, and authorize the preparation of detailed plans and
specifications.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of Oak Pond Hills 1st & 2nd, residential streets, in
south-eastern Eagan located north of Cliff Road and west of Dodd Road.
A structural mill and overlay of these streets is programmed for 2019 in the City
of Eagan’s 5-Year CIP (2019-2023).
On December 18, 2018, the draft Feasibility Report was presented to the City
Council and a public hearing was scheduled for T uesday, January 15, 2019.
An informational neighborhood meeting was held on January 7 for the adjacent
property owners to discuss the proposed improvements. Of the 13 properties
to be assessed under this improvement, 2 residents representing 2 properties
attended the meeting.
All notices have been published in the legal newspaper and sent to all affected
property owners informing them of this public hearing.
Attachments (2)
PHD-1 Feasibility Report
PHD-2 Neighborhood Meeting Minutes
AT PWA
• a 1 I r l
r�rr
• aa� I
EAGAN
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Dec. 18, 2018
Re: Oak Pond Hills 11 & 2nd Street Revitalization
City Project No.: 1318
Attached is the feasibility report for the Oak Pond Hills IS, & 2nd Street Revitalization, City
Project No. 1318. The report presents and discusses the proposed improvements and includes
a cost estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
Reviewed By:
6�
partment of Public Works
Reviewed By:
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
- �L, 4 &, , Aaron Nelson
Date: k tt3 Reg. No. 45705
Date:
Finanlapartment Date. / v r
TABLE OF CONTENTS
ExecutiveSummary..................................................................................................... 1
Introduction/History......................................................................................................2
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
StreetPavement Evaluation.........................................................................................3
ProposedImprovements..............................................................................................4
Easements/Permits......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................6
Assessments
AssessmentFinancing Options.....................................................................................7
RevenueSource.......................................................................................................... .8
ProjectSchedule..........................................................................................................8
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
- 2 Street Improvement/Assessment Area Map
- 3 Typical Section — Mill & Overlay
Executive Summary
Background
i Project Name
Oak Pond Hills 151 & 2nd
Project #
1318
Street Area
4,703 Sq. Yds.
Street Length
1,567 Feet
I
Constructed
1978, 1998
Oak Pond Circle
Reconstructed
-
Streets Included
Oak Pond Road
Crack Sealed
_
Seal Coated I
2005, 2012
Absolute Location
SE % of Section 26
Relative location
North of Cliff Road
Township 27, Range 23
West of Dodd Road
Scope
Project Details
• Roadway overlay(edge mill &1-1/2"
overlay)
• Replacement of damaged curb & gui
• Adjustment/Replacement of:
o Sanitary/Storm sewer
o Utility castings
o Watergate valves
o Street signage
• Utility Improvements
PCI Rating (
49/100
Recommended
Improvement
Over
Curb Removal
8%
Residential Lots i
13
Cost Estimate/ Revenue
Property City
Mill & Overlay w/ Signage $ 66,500 $ 30,095 $ 36,405
Repair Existing Concrete Curb & Gutter $ 14,500 $ 14,500
Utility Improvements $ 3,800 - $ 3,800
Total $ 84,800 $ 30,095 (35.5%) $ 54,705 (64.5%)
Oak Pond Hills 1St & 2nd
1
Dec. 18, 2018
Neighborhood Street Revitalization
Oak Pond Hills 11t & 2nd
Eagan, Minnesota
Introduction/ History
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 1,567 feet of residential streets in the Oak Pond Hills 1St & 2nd neighborhood in south-
eastern Eagan has been identified for 2019 street revitalization improvements. Figure 1,
located in Appendix C, illustrates the project location. The streets were originally constructed
in 1978 and reconstructed 1998.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the roads located within the project area, which are currently in the 21 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the streets were seal coated in 2005 and 2012.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
Oak Pond Hills 1St & 2nd
2
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scope
This project will provide an overlay (edge mill and overlay) for approximately 1,567 feet of
roadway. Figure 2 in Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves, utility improvements, and replacement of street signage.
Area to Be Included
Properties included in the project lie within the SE %, Section 26, lying North of Cliff Road, West
of Dodd Road, in Township 27, Range 23, in the City of Eagan, Dakota County, Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
L_PCI I Recommended Improvement
56-100 Routine Maintenance/Crack Seal/Seal Coat
36-55 Patch/Repair and/or Overlay
0-35 Reconstruct/ Reclaim
The 2018 PCI rankings for the street segments have a weighted average pavement condition
rating of 49, which falls in the "Patch/Repair and/or Overlay" category, as mentioned above.
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Oak Pond Hills 11t & 2nd
3
Proposed improvements
Pavement - The proposed street
improvements shown in Figure 3. The
existing street section for this roadway
consists of 3-1/2" bituminous pavement
supported by 6" gravel base. The
existing bituminous surface will be
milled adjacent to the existing curb and
gutter (6'-8' wide) to accommodate a
1'/: -inch bituminous overlay. The
overlay, combined with the existing
street section, will provide a street
section consistent with current City
standards for residential streets. The
combination of patching and overlay
will not eliminate cracking due to the temperature extremes experienced in Minnesota.
Bituminous overlays will show some continued frost movements and reflective cracking
consistent with the underlying pavement. Routine maintenance will still need to continue under
the City's Pavement Management Program.
M
4
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalled, or settled. It is estimated that
approximately 8% of the existing concrete curb
and gutter will have to be replaced. Boulevard
turf will be removed and replaced with seed.
While the contractor who performs the work is
responsible for its establishment (45 days for
seed), adjacent property owners are
encouraged to consistently water the new turf,
where possible, to help ensure its growth.
Utility Adjustment/Replacement — Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
ensure quick and easy access by the City for maintenance and other purposes. There are a
number of catch basin structures that require new HDPE adjusting rings due to deterioration.
These inprovements will be financed through the Combined Utility Fund.
Oak Pond Hills 11t & 2"d
4
Signage - Traffic and street identification signage within the project
limits have reached the end of their useful life expectancy and are in
need of replacement. Signs have been reviewed for compliance with
the Minnesota Manual on Uniform Traffic Control Devices
(MnMUTCD). Those that are required by the MnMUTCD will be
replaced to improve safety and night time visibility, and those that
are not will be permanently removed.
Street Lights — The only street light in the project area (maintained
by Dakota Electric Association) is at the intersection of Cliff Road and
Oak Park Road, and it is in good condition. No modifications to the
existing street lights are proposed.
Complete Streets — "Complete Streets" is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
The streets in this neighborhood were reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The streets are relatively narrow at 28 feet wide,
have low traffic volumes, limited access points. Given the existing and proposed elements
available for all users, the streets in this neighborhood meet the Intent of the complete streets
guidelines.
Oak Pond Hills 1st & 2"d
5
Easement Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that a right-of-way permit from Dakota County will be required to perform the work
within the Cliff Road right-of-way.
Feasibility and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement (resurfacing) is considerably less
expensive than complete reconstruction of this street. The mill and overlay is feasible in that
this type of improvement has been used successfully to extend the life expectancy of numerous
other streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 — 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Cost Estimate
Detailed cost estimates are located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 309-16, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Oak Pond Hills 11t & 2"d
Mill & Overlay ................................................ $ 66,500
........................
Repair Existing Concrete Curb & Gutter... ............................. $14,500
Utility Improvements............................................................. 3,800
Total........................................................................... $ 84,800
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for residential streets. All assessments will be revised
based on final costs. A preliminary assessment roll is included in Appendix B.
Oak Pond Hills 11 & 2nd
6
City Special Assessment Policy
Assessment Ratio
Property City
Mill & Overlay- Low -Density Residential (R-1,2,3) 50% 50%
Repair Existing Concrete Curb & Gutter 100%
Utility Improvements - 100%
Residential Lots —All residential lots (13 single family homes) as shown on Figure 2, having
driveway access on to the street to be improved are proposed to be assessed. The City's
Assessment Policy states that 50% of the mill and overlay costs are assessable for local
residential streets, based on a standard 32 -foot width. The estimated cost per residential unit,
based on the City's Assessment Policy, is $2,315/ lot and is calculated as follows:
Mill & Overlay - Residential Properties
o 2,837' Residential Frontage/ 3,134' Total Frontage= 90.5%
o $66,500 (Mill & Overlay Costs) x 50% x 90.5% = $30,091 (Total R-1 Assessment)
o $30,091 / 13 lots = $2,314.69, rounded to $2,315 / single-family lot
The remaining frontage within the project area (272' or 8.7%) is considered non- assessable
under the City's Assessment Policy.
Assessment Financing Options
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2019 rate is not yet
available, however, it is expected to be comparable and based on City policy will be determined
by the City Council in the spring. The following payment schedule is an example of a residential
lot assessment of $2,315 with an estimated 4.5% interest for the assessed amounts, and
assumes 14 months interest for the first year:
Principal /Year I Interest/ Year Cost /Year
1st Year I $463 F$ 12 —2 $585
Stn Year$463 $21
$484
Bonds may be issued to finance the improvements.
Oak Pond Hills ill & 2nd
7
Revenue Source
A summary of revenue sources is listed below:
Project Cost j Property Assessment City Contribution
Mill and Overlay (Including Signage) $ 66,500 $ 30,095 $ 36,405
Repair Existing Curb & Gutter $ 14,500 - $ 14,500
Utility Improvements $ 3,800 f - $ 3,800
Totals $ 84,800 $ 30,095
$ 54, 705
The Major Street Fund will finance the estimated street related project deficit of $50,905
The Combined Utility Fund will finance the estimated $3,800 utility improvements.
Prosect Schedule
Present Feasibility Report to City Council/
Order Public Hearing............................................................ . Dec. 18, 2018
..........................
Informational Meeting...........................................................
• ........................... Jan. 7, 2019
PublicHearing ................................................... .
............................................ Jan. 15, 2019
Approve Plans and Specifications....................................................................Feb. 19, 2019
Bid Date ...........................
Award Contract ..............................................
Start Construction........................................................
Project Completion......................................................
Final Cost Report ..........................................................
Final Assessment Hearing ............................................
First Payment Due with Property Tax Statement.........
................................. March 28, 2019
......................................April 2, 2019
..................................... May 1, 2019
.................................... August, 2019
..............................September, 2019
......................................... Fall, 2019
.................................. May 15, 2020
Oak Pond Hills 15Y & 2nd
8
Appendix A
Preliminary Cost Estimate
City Project 1318 Oak Pond Hills 1st & 2nd
i
Item No.7
Item
Part I - Bituminous Street overlay
2021.501
Mobilization
2104.505
Remove Bituminous Pavement
2232.501
Mill Bituminous Pavement (1-1/4" depth, 6' Width)
2232.501
Mill Bituminous Pavement - Full Width (1-1/4" Depth)
2357.502
Bituminous Material for Tack Coat
2360.501
SP WEA3408 Wearing Course Mixture (Overlay)
2360.501
SP WEA3408 Wearing Course Mixture (Patch)
2504.602
Adjust Gate Valve Box
2504.602
Repair Gate Valve Mid Section
2504.602
Repair Gate Valve Top Section w/Cover
2506.602
Adjust Frame and Ring Casting (Manhole)
2506.602
Adjust Manhole Casting - Riser Adjustment
2506.602
Remove & Replace Frame & Ring Casting (27")
2563.601
Traffic Control
SP -1
Signage Remove and Replace
Subtotal
5% Contingency
Subtotal
30% Indirect Costs
Part I - Bituminous Street Overlay
Unit Unit Price Qty i Estimated Cost
LS
$
6,000.00
1
$
6,000.00
SY
$
6.00
0
$
SY
$
1.30
2060
$
2,678.00
SY
$
2.00
400
$
800.00
GAL
$
2.75
310
$
852.50
TON
$
52.00
440
$
22,880.00
TON
$
100.00
8
$
800.00
EA
$
250.00
2
$
500.00
EA
S
500.00
0
$
140.00
EA
$
425.00
$
$
0
EA
$
700.00
14
$
9,800.00
EA
$
250.00
0
$
Aggregate Base, CI.5 (100% Crushed)
EA
$
1,250.00
0
$
125.00
LS
$
4,000.00
1
$
4,000.00
LS
$
405.00
1
$
405.00
$ 48,715.50
$ 2,435.78
$ S1,151.28
$ 15,345.38
$ 66,496.66
Item No. Item
Unit
Unit Price
Qty
Estimated Cost
Part II - Repair Existing Curb & Gutter
2101.601
Remove Trail Overgrowth
LS
$
1,500.00
0
$
2104.501
Remove Concrete Curb and Gutter
LF
$
10.00
235
$
2,350.00
2104.503
Remove Bituminous Trail Pavement
SF
$
200
0
$
2104.503
Remove Concrete Sidewalk (4")
SF
$
2.50
0
$
2104.505
Remove Concrete Driveway /Valley Gutter
SY
$
14.00
10
$
140.00
2104.523
Salvage Casting
EA
$
125.00
0
$
2105.501
Common Excavation
CY
$
35.00
0
$
2211.501
Aggregate Base, CI.5 (100% Crushed)
TON
$
25.00
5
$
125.00
2360.501
SP WEA2408 Wearing Course Mixture (Trail/Parking Lot Overlay)
TON
$
80.00
0
$
2360.501
SP WEA340B Wearing Course Mixture (Patch)
TON
$
100.00
5
$
2504.602
Irrigation Repair
EA
$
160.00
2
$
500.00
2506.521
Install Casting
EA
$
550.00
0
$
320.00
2506.602
Adjust Frame & Ring Casting (CB) HDPE Rings
EA
$
550.00
5
$
2,750.00
2506.602
Remove & Replace Casting (Catch Basin)
EA
$
900.00
0
$
2506.602
Remove & Replace CBMH Structure w/Cstg (4'Dia.)
EA
$
5,20D.00
0
$
2506.602
Remove & Replace CB Structure (2'x 3')
EA
$
3,000.00
0
$
2506.602
Remove & Replace CB Structure w/Cstg (2'x 3')
EA
$
3,500.00
0
$
2506.602
Remove & Replace Top Slab 4' Dia (CBMH)
EA
$
1,600.00
0
$
-
2506.602
Repair/ Grout CB or MH Invert/ Doghouses
EA
$
400.00
0
$
2506.602
Install 2 x 3 CB Erosion Barrier Shroud
EA
$
150.00
0
$
2521.501
6" Concrete Ped Ramp w/ Wet Cast for Truncated Dome Inset
SF
$
14.00
0
$
2521.501
4" Concrete Sidewalk
SF
$
6.00
0 $
Oak Pond Hills Ist & 2nd
9
2521.501
6" Concrete Bullnose
SF
$
12.00
0
$
2531.501
Concrete Curb & Gutter B612
LF
$
20.00
0
$
2531.501
Concrete Curb and Gutter, 8618
LF
$
23.00
235
$
5,405.00
2531.501
Concrete Curb and Gutter, 8624
LF
$
28.00
0
$
2531.501
Concrete Curb and Gutter, D412
LF
$
20.00
0
$
2531.501
Concrete Curb and Gutter, Surmountable
LF
$
23.00
$
2531.507
Concrete Valley Gutter- High Early
SY
$
75.00
10
$
750.00
2531.507
8" Concrete Driveway Pavement- High Early
SY
$
75.00
2531.507
Repair 8" Concrete Driveway Pavement- High Early
SY
$
85.00
0
0
$
$
2531.618
Truncated Dame Detectable Warning Paver (2x2)
EA
$
80.00
0
$
2531.618
Truncated Dome Detactable Warning Paver (Radius Plate)
EA
$
80.00
0
$
2540.602
Repair Underground Electric Fence
EA
$
85.00
2
$
170.00
2540.602
Repair Landscaping
EA
$
200.00
1
$
2572.503
Application of Water for Turf Establishment
GAL
$
0.15
1350
$
200.00
2573.530
Storm Drain Inlet Protection
EA
$
175.00
0
$
202.50
2575.550
Boulevard Topsoil Borrow— MnDCT 3877-2F
Cy
$
80.00
3
$
240.00
2575.609
Seeding (Mn DOT 270 w/Type 5 Hydromulch)
SY
$
7.50
30
$
225.00
Subtotal
$
13,377.50
5% Contingency
Subtotal
$
668.88
30% Indirect Costs
$
14,046.38$
4,213.91
Part 11 - Repair Existing Curb & Gutter
$
18,260 29
Part I - Bituminous Street Overlay $ fi6,496.66
Part II - Repair Existing Curb & Gutter $ 18,260.29
Project 1318 Total Cost $ 84,756.95
Oak Pond Hills 1st & 2nd
10
Appendix B
Preliminary Assessment Roll
City Project # 1318 Oak Pond Hills 1st & 2nd
R-1 Residential
P.I.N.
Oak Pond Road
# Lots i Lot Equivalent
I Unit Assessment
Total
4590 Oak Pond Road
10 53600 02010
1 1
1
$
2,315
4580 Oak Pond Road
10 57100 01010
1
1
$
4575 Oak Pond Road
10 53600 010 10
1
1
$
2,315
4565 Oak Pond Road
10 83565 010 10
1 1
1
$
2,315
$
2,315
4561 Oak Pond Road
10 83565 010 20
1
1 I
1
$
2,315
$
2,315
4570 Oak Pond Road
10 57100 010 20
1 I
1
$
2,315
2,315
$
2,315
4555 Oak Pond Road
10 77750 010 20
1 j
1
$
$
2,315
4524 Oak Pond Road
10 53601020 20
1
1
$
2,315
2,315
$
2,315
4540 Oak Pond Road
10 5360102010
1
1
$
2,315
$
2,315
4545 Oak Pond Cir
10 77750 010 10
1
1
$
$
2,315
4535 Oak Pond Cir
10 53601010 20
1
1
$
2,315
2,315
$
2,315
4529 Oak Pond Cir
10 53601 010 30
1
1
$
$
2,315
4523 Oak Pond Or
10 53601010 40
1
1
$
2,315
2,315
$
2,315
$
2,315
Subtotal
I
13
$
30,095
Total R-1 Lots 13 $ 30,095
Assessable Frontage 2,837 90.5%
Non -Assessable Frontage 297 9.5%
Total Frontage 3,134 100.036
Oak Pond Hills 1st & 2nd
11
,yaP E.q�
2019 Street Revitalization - Project 1318
Q: Oak Pond Hills 1 st & 2nd Additions
�+.n.����.��,-�.r�. �,wcnawunrv�nna�enpnaamywro �zais srpttlmprovemenk11316.Oak Pond Me 1a1i2n&1316 Loca6on.rmd Date: 12/12/2018
FIG 'I
U% Esc 2019 Street Revitalization - Project sect 131 S
p� da Oak Pond Hills 1st & 2nd Additions
�Sacrsn4�
Document Path; L.XMERSW iBMRKSMngineedngUProjerla=I g Street Improvementsh 318 - Oak Paid Mils 1s1 & 2nd11318.nvd Date: 12/12/2018
FIG 2
4° � 2019 Street Revitalization - Project 1318
Z Oak Pond Hills 1st & 2nd Additions
o
�eTypical Street Sections
60' ROW
28' F -F
PAVEMENT SECTION
L� 3-5' BASE COURSE 8618 CONCRETE
6" CLASS 5 AGG BASE CURB AND GUTTER
COMPACTED SUBGRADE
EXIST. TYPICAL SECTION
OAK POND HILLS 1ST & 2ND
_ -- — 60' Row
28' F -F
1.25" EDGE MILL STREETS
8'-8' wide (?`.'P•) \
FULL WILL CUL-DE-SAC
^� 1.5" TYPE 2360 BITUMINOUS OVERLAY
14J
8618 CONCRETE
BITUMINOUS TACK COAT CURB AND GUTTER
3.5" BITUMINOUS SURFACE
6" CLASS 5 AGG BASE
COMPACTED SUBGRADE
PROPOSED TYPICAL SECTION
OAK POND HILLS 1ST & 2ND
Document Path: L:IUSERSWUBWORKS%EnglneeringY3rojects%2019 Street Urmprovements11318 - Oak Pond HII[a 1st & 2nd11318 Fig 3,mxd
Date: 12/12/2018
FIG 3
Gardenwood Ponds 4th Addition
Oak Pond Hills 1st & 2nd Additions
Majestic Oaks 1st – 3rd Additions
Neighborhood Street Revitalization
City Project No’s. 1317, 1318, & 1319
Informational Meeting – 5:30 P.M. Monday, Jan. 7, 2019
Eagan Room
Attendance
This meeting combined 4 project areas (1317, 1318, 1319, and 1320) Aaron Nelson, Assistant
City Engineer, and 5 residents representing 4 single family homes were in attendance (see
attached sign-in sheet). Nobody from the Southern Lakes West neighborhood (1320) attended.
Presentation of Project Details
Nelson welcomed the residents and presented project information, including details such as
construction, costs, schedule and assessments. A short ETV video on the street improvement
process was also shown.
Questions/ Comments
Because the meeting had residents from 3 neighborhoods in attendance, much of the
discussion was about general project and assessment related questions. Any project specific
questions are noted below.
STREET CONDITION
1. Why are the improvements being performed now? The streets appear to be in relatively
good condition. The condition of the streets are currently at the point that if improvements
are not made at this time, the asphalt will deteriorate at a much quicker rate and will likely
require more substantial and expensive improvements in the near future.
2. Will cracks appear through the new asphalt? Since the majority of the asphalt is being left
in place, it is expected that some of the cracks will reflect through the new asphalt, however
the structural integrity of the street will remain. Any cracks will be addressed with routine
maintenance and filled as necessary.
3. (Resident from Proj. 1317) Concerns were stated that Eagan’s Pavement Management
Program differs from some recommendations cited in a publication authored by the Local
Road Research Board and Mn/DOT (SYSTEMS PRESERVATION GUIDE – A planning Process
for Local Government Management of Transportation Networks, Final Report 2016-34A,
dated Nov. 2016). The question from the resident was “why isn’t Eagan following those
recommendations”? Nelson stated that Mn/DOT and the LRRB publish dozens of
publications annually, and he couldn’t comment on their recommendations, or any
differences from Eagan’s program, without first reviewing that document. However, Nelson
said he’d review it and share the information in the meeting minutes.
The document was developed by Mn/DOT staff, representatives from 5 Minnesota Counties
across the state, and engineering consultants, to provide guidance for Counties that do not
have an established pavement management program to determine the appropriate
maintenance technique to perform at the correct time, to cost effectively maintain their
County roadway system. The maintenance techniques described in Systems Preservation
Guide are the same techniques that Eagan utilizes (crack sealing, seal coating, micro-
surfacing, overlays, resurfacing, reclamation, reconstruct, etc.) to maintain its system.
However, because a County roadway network differs from a City roadway network (size of
vehicles, higher traffic speeds and volumes, etc.), some of the maintenance techniques
Eagan uses are slightly modified to fit Eagan’s needs.
4. (Project 1318) Oak Pond Road currently has “tenting” in the existing asphalt that occurs
primarily in the winter. Will this overlay eliminate or make the tenting less significant?
Tenting is usually most apparent in the winter when the streets and base material are
frozen and moisture gets into the cracks in the pavement. The overlay will seal the road
surface and reduce moisture intrusion. Any cracks that reflect through the new layer of
asphalt will be sealed a couple years after the overlay, and that should help control
moisture issues. An Engineering Technician will review the existing conditions to see if any
further maintenance should be performed to address the concern.
CURB CONDITION
5. How much damage to the concrete curb and gutter warrants repairs? It is common for
concrete to crack. If the crack is tight and the curb is still functional, the curb will likely
remain in place. If the crack is separated, heaved, or offset, or large chunks are missing that
make the gutter not function properly, then the curb will likely be repaired.
DRAINAGE
6. (Proj. 1317) The curb and pavement at the end of Bald Lake Court holds a lot of water.
Can it be directed to the storm sewer catch basin on the SW side of the cul-de-sac? A
technician will review the area to see what’s causing the standing water. If it’s a
settlement, new curb will be poured and should improve the situation. If it’s just really flat,
options will be really limited without raising the whole cul-de-sac, which may be outside the
scope of the improvements.
Staff reviewed the area the following area and determined the whole cul-de-sac is really
flat, and water can’t make it around the curb line to the catch basin. Options are being
investigated to see if the grade can be increased, or an additional catch basin added to pick
up that water.
7. (Proj. 1318) Drainage is having a difficult time making it through the intersection of Oak
Pond Road and Oak Pond Circle. Can that be improved? A technician will review the
intersection to determine the cause of the slow drainage. It might need to be re-graded, or
a new valley gutter installed. It will be addressed with the design phase.
CONSTRUCTION/PHASING
8. Will the road be open during construction? Will access be maintained to driveways? All
roads will be open to traffic during construction. We do not anticipate any road closures
during the work, however, some phases will require short term lane closures and the
contractor will use traffic control devices or flagmen to help direct traffic. Access to
driveways should be maintained throughout construction. If curb needs to be replaced at a
driveway, residents can park in front of their homes while the concrete cures.
9. How long will the construction last? How will it be phased? The contractor will have
flexibility to determine how they phase each area, and construction is anticipated to begin
as soon as early May (weather dependent), and needs to be complete by late June or early
July. The size and scope of the improvements in this neighborhood will likely result in
approximately a 3-4 week construction timeframe for each of the neighborhoods. The City
will mail more detailed construction specific information as construction nears.
ASSESSMENTS
10. How are assessments calculated? With residential properties, the city shares the cost of all
work performed between the curbs 50/50 with the adjacent property owners. Any work in
the curbs and boulevard, and the utility improvements, is paid 100% by the city. The
property owner’s portion is split evenly among all lots in the neighborhood.
11. Why are the residents being assessed? Every city finances road rehabilitation differently.
Some communities assess 100% of the costs to those that live in the neighborhood and
benefit most from the streets, where others don’t assess anything and fund the
improvements entirely through property taxes. Eagan has had a consistent policy
throughout its pavement management program history, where the City finances the
majority of the costs through property taxes, and a portion of the costs is assessed to
everyone that lives in the neighborhood. Most cities in the metro area assess a portion of
the costs.
12. (Resident from Proj. 1317) General question about Eagan’s assessment policy. Why is
only 10% (average) assessed on larger roadways, compared to 30-35% in residential
neighborhoods? Eagan’s assessment policy includes assessments for residential properties
if they have “front yard frontage” onto a road being improved, so almost every residential
property in the neighborhood is assessed with an overlay project. On larger roadways
(collector and arterial roads), much of the road frontage is with rear yards of residential
properties, therefore, those properties are not assessed. Those roadways typically have a
lot of unassessable frontage, so the city pays a higher percentage of the cost in those
circumstances.
13. (Proj. 1318) There is city property that fronts Oak Pond Road. Does the City pay for its
frontage, or is it being assessed? The city pays 100% of the costs for city property frontage.
UTILITIES
14. Are any private utility companies planning to upgrade their lines along with the street
improvements (gas, phone, electric, cable, etc.)? Every January city staff holds a meeting
with representatives of all the utility companies to show them what projects we know are
going to occur, and several that will likely occur. They review their utilities to see if any
upgrades are needed at the same time. If they need to replace lines, they can coordinate
improvements, but historically they haven’t replaced facilities with overlay projects.
PRIVATE STREETS
(Proj. 1318) 6 homes have driveways on the private street at the end of Majestic Oaks Pl.
Will the city be working on any private streets? Will the City plow the private street?
Why are those homeowners paying the same assessment as everyone else, and also be
responsible to maintain their own street too? Work is limited to only the public streets.
Eagan has very definitive standards that every development must meet. Some of the
requirements include the construction of all public streets to City standards (28’-32’ wide
with curb & gutter), they are located within dedicated public rights-of-way (50’-60’ wide),
and cul-de-sacs must be installed on dead-end streets to provide adequate and safe access
and allow large City equipment to perform routine maintenance (i.e. snow & ice control,
sweeping, patching, etc.). The private street was constructed below city standards, so the
City would not take over ownership and/or maintenance of the private street.
Every property in the neighborhood is proposed to be assessed the same amount,
regardless of which street they live on, because everyone must drive on the network of
public streets to get to and from their homes. Assessing in this manner is how the city
ensures everyone helps pay for the maintenance of the vast network of public streets
throughout the city.
The meeting adjourned at 6:35 p.m.
S. D. Swazee Sr.
4524 OAK POND ROAD
EAGAN, MN 55123-1988
PHONE (651) 456-5411
FAX (651) 456-5411
sdswazee@gmail.com
January 15, 2019
VIA EMAIL
Eagan City Council
Eagan Municipal Center
3830 Pilot Knob Road
Eagan, MN 55122
Re: Street Maintenance Determination and Assessment Policies
Dear Mayor Maguire and Council Members,
Per City letter concerning upcoming street repairs dated December 27, 2018, and an informational
meeting held January 7, 2019, I am writing to express two concerns.
1. Street Maintenance Determination. It is my understanding that determination of which
streets in the City receive upkeep is based on the Pavement Management Program (PMP) as
promulgated in a City Public Works Department directive last updated in 2000.1 As related in this
document, it is also my understanding that the basic framework for monitoring and determining
which streets are in need of repair is based principally on a timetable approach first established by
the U.S. Army Corps of Engineers (USACE) in the early 1950’s2 and subsequently adopted by the
Minnesota Department of Transportation (MnDOT). Important in this history is the idea these core
timetable guidelines were developed for military facilities which received modest infrastructure
investment before WWII and were supported going forward by the federal government’s ability to
print money. Consequently, the core tenants of the City’s street maintenance and repair policy are
nearly 70 years old and based on a very different economic model.
The above circumstance would be of limited concern if there had not been advancements in paving
technology or questions had not been raised about the economics of the original USACE
methodology. Neither is the case.
A review of advancements in paving technology as documented by the National Asphalt Pavement
Association strongly suggests that since the 1950’s there has been near continuous improvement
1 Pavement Management Program, City of Eagan, Public Works Department, Street Maintenance Division, October
1997, Revised 2000.
2 Technical Manual 5-623, Pavement Management Program, U.S. Army Corps of Engineers, November 1982
Version.
2
taking place in this technology.3 Additionally, in November 2016, MnDOT, it’s Local Road
Research Board (LLRB), and SRF Consulting Group, Inc., released a 321-page report4 which
offers ideas on how communities can balance economic realities with the need to preserve local
road infrastructure.
Bottom line is my concern the City may be using a “that’s the way we have always done it ”
approach to street management to the detriment of this community’s taxpayers. Consequently,
literally millions in unneeded repairs could be taking place which do not fully recognize
advancements in pavement technology or evolving economic modeling.
2. Street Assessment Disparity for Similarly Situated Individuals. Per the City of Eagan
Capital Improvement Plan, 2019-2023,5 there are three basic categories of street surface
improvement which will be taking place in the next five years:
a. Surface/Sealcoat Maintenance. Residents and businesses on these thoroughfares will be
assessed $0 of a $1,474,530 total projected budget or 0% of the total cost.
b. Arterial and Collector Improvements. Residents and businesses on these thoroughfares will
be assessed $1,183,537 of a $12,371,096 total projected budget or 10% of the total cost.
c. Local Street Improvements. Residents and businesses on these thoroughfares will be
assessed $4,131,457 of a $12,073,880 total projected budget or 34% of the total cost.
Although in each case above, Eagan citizens draw equal value from a well maintained and efficient
road network, some are being forced to contribute a proportionally higher amount to that outcome.
In addition, by having categories of improvements whereby some are funded at 100% out of the
Major Street Fund, and others are not, an arbitrary approach has been taken to the maintenance of
City infrastructure and who pays for it. These disparities are of concern.
Requested Action by City Council. In recognition of the need for efficient City operation I am not
challenging the specifics of the determination by the City’s Public Works Department that Oak
Pond Road should undergo maintenance in 2019. However, I am requesting that at some time in
2019 the Council set aside time for thoughtful consideration of the issues offered in this letter. I
personally believe a review of City methodology for managing street repairs is needed, and street
repairs should be paid in full from the Major Street Fund with the property mill rate adjusted
accordingly. Thank you.
Sincerely,
Stephen D. Swazee Sr.
3 http://www.asphaltpavement.org/index.php?option=com_content&task=view&id=21&Itemid=41 , National
Asphalt Pavement Association, accessed January 13, 2019
4 Systems Preservation Guide, A Planning Process for Local Government Management of Transportation Networks,
Final Report 2016-34A, MnDOT, LLRB, SRF Consulting Group, Inc., November 2016
5 5-Year Capital Improvement Plan (CIP), 2019-2023, City of Eagan, May 2018
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
PUBLIC HEARING
E. Project 1319, Majestic Oaks 1st – 3rd
Street Improvements
Action To Be Considered:
Close the public hearing and approve Project 1319 (Majestic Oaks 1st – 3rd - Street
Improvements) as presented, and authorize the preparation of detailed plans and
specifications.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of Majestic Oaks 1st – 3rd, residential streets, in
south-eastern Eagan located north of Cliff Road and west of TH 3.
A structural mill and overlay of these streets is programmed for 2019 in the City
of Eagan’s 5-Year CIP (2019-2023).
On December 18, 2018, the draft Feasibility Report was presented to the City
Council and a public hearing was scheduled for T uesday, January 15, 2019.
An informational neighborhood meeting was held on January 7 for the adjacent
property owners to discuss the proposed improvements. Of the 27 properties
to be assessed under this improvement, 1 resident representing 1 property
attended the meeting.
All notices have been published in the legal newspaper and sent to all affected
property owners informing them of this public hearing.
Attachments (2)
PHE-1 Feasibility Report
PHE-2 Neighborhood Meeting Minutes
Report for
Majestic Oaks 1st- 3rd
Neighborhood Street Revitalization
City Project No. 1319
December 18, 2018
"2, aa. map
s
EAGAN
Report for
Majestic Oaks 1st- 3rd
Neighborhood Street Revitalization
City Project No. 1319
December 18, 2018
"2, aa. map
s
EAGAN
4
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Dec. 18, 2018
Re: Majestic Oaks 1 s�-3ro Street Revitalization
City Project No.: 1319
Attached is the feasibility report for the Majestic Oaks 1 s -3"d Street Revitalization, City Project
No. 1319. The report presents and discusses the proposed improvements and includes a cost
estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minnesota.
M.nx Aaron Nelson
Date: i— Lq h Reg. No. 45795
Reviewed By:
@qIVII '' �
be'nartment of Public Works Date! �JZ /9
Z
Reviewed By:
0�II,'111^1----'I\. -
Finan ej Vepartment Date: f U 1
V 1,
TABLE OF CONTENTS
ExecutiveSummary..................................................................................................... 1
Introduction/History ......................................................................................................2
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
StreetPavement Evaluation.........................................................................................3
ProposedImprovements..............................................................................................4
Easements/Permits......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................6
Assessments................................................................................................................6
AssessmentFinancing Options.....................................................................................7
RevenueSource...........................................................................................................7
ProjectSchedule..........................................................................................................8
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
- 2 Street Improvement/Assessment Area Map
- 3 Typical Section — Mill & Overlay
Executive Summary
Background
Project Name
Majestic Oaks 1St- 3rd
Project #
1319
Street Area
4,245 Sq. Yds.
I Street Length
1,187 Feet
Streets Included
Majestic Oaks Court
Majestic Oaks Place
Constructed
1996, 1999
i Reconstructed
-
Crack Sealed
-
Seal Coated
2003, 2009
Absolute Location f
I
SE'/ of Section 25 I
Township 27, Range 23
Relative Location '
North of Cliff Road
West of TH 3
Project Details
• Roadway overlay (edge mill & 1-1/2" PCI Rating 50/100
overlay) Recommended Overlay
• Replacement of damaged curb & gutter Improvement
• Adjustment/Replacement of: Curb Removal 15%
Scope o Sanitary/Storm sewer
o Utility castings
o Watergate valves
o Street signage Residential Lots 27
• Utility Improvements
Cost Estimate/ Revenue
Majestic Oaks 1St— 3rd
1
Property
City
Mill & Overlay w/ Signage $ 55,800
$ 27,810
$ 27,990
Repair Existing Concrete Curb & Gutter $ 28,700
-
$ 28,700
Utility Improvements $ 3,800
-
$ 3,800
Total $ 88,300
$ 27,810 (31.5%)
$ 60,490 (68.5%)
Majestic Oaks 1St— 3rd
1
Dec. 18, 2018
Neighborhood Street Revitalization
Majestic Oaks 1St — 3rd
Eagan, Minnesota
Introduction/ History
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 1,187 feet of residential streets in the Majestic oaks 11 -3rd neighborhood in south eastern
Eagan has been identified for 2019 street revitalization improvements. Figure 1, located in
Appendix C, illustrates the project location. The streets were originally constructed in 1996 and
1999.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the roads located within the project area, which are currently in the 20 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the streets were seal coated in 2003 and 2009.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
Majestic Oaks 1st 3rd
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scope
This project will provide an overlay (edge mill and overlay) for approximately 1,187 feet of
roadway. Figure 2 in Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves, utility improvements, and replacement of street signage.
Area to Be Included
Properties included in the project lie within the SE %, Section 25, lying North of Cliff Road, West
of TH 3, in Township 27, Range 23, in the City of Eagan, Dakota County, Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI Recommended Improvement
S6-100 Routine Maintenance/Crack Seal/Seal Coat
36-55 Patch/Repair and/or Overlay
0 - 35 Reconstruct/ Reclaim
The 2018 PCI rankings for the street segments have a weighted average pavement condition
rating of 50, which falls in the "Patch/Repair and/or Overlay" category, as mentioned above.
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Majestic Oaks 1st -- 3rd
3
Proposed improvements
Pavement - The proposed street
improvements shown in Figure 3. The
existing street section for this roadway
consists of 3" bituminous pavement
supported by 6" gravel base. The s #
existing bituminous surface will be
milled adjacent to the existing curb and '
gutter (6'-8' wide) to accommodate a
1% -inch bituminous overlay. The
overlay, combined with the existing V
street section, will provide a street
section consistent with current City -
standards for residential streets. The
combination of patching and overlay
will not eliminate cracking due to the temperature extremes experienced in Minnesota.
Bituminous overlays will show some continued frost movements and reflective cracking
consistent with the underlying pavement. Routine maintenance will still need to continue under
the City's Pavement Management Program.
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalled, or settled. It is estimated that
approximately 15% of the existing concrete
curb and gutter will have to be replaced.
Boulevard turf will be removed and replaced
with seed. While the contractor who performs
the work is responsible for its establishment
(45 days for seed), adjacent property owners
are encouraged to consistently water the new
turf, where possible, to help ensure its growth.
Utility Adjustment/Replacement — Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
ensure quick and easy access by the City for maintenance and other purposes. There are a
number of catch basins with deteriorated adjusting rings that require replacement. These
improvements will be financed through the Combined Utility Fund.
Majestic Oaks V— 3rd
4
R
1
� Y L
s
i
}
Signage - Traffic and street identification signage within the project limits have reached the end
of their useful life expectancy and are in need of replacement.
Signs have been reviewed for compliance with the Minnesota - • ;afi
Manual on Uniform Traffic Control Devices (MnMUTCD). Those
that are required by the MnMUTCD will be replaced to improve
safety and night time visibility, and those that are not will be
permanently removed.
Street Lights — The street lights in the project area (maintained by
Dakota Electric Association) are in good condition and provide
adequate coverage. No modifications to the existing street lights
are proposed.
Stormwater and Water Quality Improvements — One stormwater/ water quality pond
improvement project in this area has been identified in the 2019-2023 CIP. Pond LP31.1, north
of the project area, is scheduled for sediment removal. Timing will be determined based on the
scope of the improvements, required permits and public comment periods, soil testing results,
and the desirable time of year to construct the improvements. These improvements will either
be performed in-house or through separate contract. Because this work will not be assessed,
but will be financed through the City's existing Storm Water Utility Fund 1126 — Storm Drainage
System Renewal and Replacement, preliminary cost estimates are not included in this report.
Complete Streets — "Complete Streets" is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
Majestic Oaks 15t — 3rd
5
The streets in this neighborhood were reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The streets are relatively narrow at 28 feet wide,
have low traffic volumes, and only one access point. Given the existing and proposed elements
available for all users, the streets in this neighborhood meet the intent of the complete streets
guidelines.
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that no permits will be required for the resurfacing project.
Feasibility and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement (resurfacing) is considerably less
expensive than complete reconstruction of this street. The mill and overlay is feasible in that
this type of improvement has been used successfully to extend the life expectancy of numerous
other streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 — 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Cost Estimate
Detailed cost estimates are located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 30%, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Majestic Oaks 1St — 3^d
Mill& Overlay........................................................................ $ 55,800
Repair Existing Concrete Curb & Gutter ................................ $ 28,700
Utility Improvements............................................................. S 3,800
Total........................................................................... $ 88,300
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for residential streets. All assessments will be revised
based on final costs. A preliminary assessment roll is included in Appendix B.
Majestic Oaks 1St— 3rd
6
City Special Assessment Policy
Assessment Ratio
Property City
Mill & Overlay- Low -Density Residential (R-1,2,3) 50% 50%
Repair Existing Concrete Curb & Gutter - 100%
Utility Improvements - 100%
Residential Lots — All residential lots (27 single family homes) as shown on Figure 2, having
driveway or private street (access on to the street to be improved are proposed to be assessed.
The City's Assessment Policy states that 50% of the mill and overlay costs are assessable for
local residential streets, based on a standard 32 -foot width. The estimated cost per residential
unit, based on the City's Assessment Policy, is $1,030/ lot and is calculated as follows:
Mill & Overlay - Residential Properties
o 2,374' Residential Frontage/ 2,374' Total Frontage= 100%
o $55,800 (Mill & Overlay Costs) x 50% x 100% = $27,900 (Total R-1 Assessment)
o $27,900/ 27 lots= $1,033.33, rounded to $1,030/ single-family lot
Assessment Financing; Options
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2018 rate is not yet
available, however, it is expected to be comparable and based on City policy will be determined
by the City Council in the spring. The following payment schedule is an example of a residential
lot assessment of $1,030 with an estimated 4.5% interest for the assessed amounts, and
assumes 14 months interest for the first year:
Principal / Year
r 11t Year F$206
th
5 Year 1 $206
Bonds may be issued to finance the improvements.
Revenue Source
A summary of revenue sources is listed below:
F----Interest /Year roost / Year
----- i --
$54
r$9 vr$215
Majestic Oaks 15t — 311
7
Project Cost
Property Assessment City Contribution
Mill and Overlay (Including Signage)
$ 55,800
$ 27,810 $ 27,990
Repair Existing Curb & Gutter
$ 28,700
- $ 28,700
Utility Improvements
$ 3,800
- $ 3,800
Totals
$ 88,300
$ 27,810 $ 60,490
Majestic Oaks 15t — 311
7
The Major Street Fund will finance the estimated street related project deficit of $56,690.
The Combined Utility Fund will finance the estimated $3,800 utility improvements.
Project Schedule
Present Feasibility Report to City Council/
Order Public Hearing.......................................................................................
Dec. 18, 2018
Informational Meeting.......................................................................................
Jan. 7, 2019
PublicHearing..................................................................................................Jan.
15, 2019
Approve Plans and Specifications....................................................................Feb.
19, 2019
BidDate........................................................................................................ March 28, 2019
AwardContract.................................................................................................April 2, 2019
Start Construction.............................................................................................
May 1, 2019
Project Completion..........................................................................................
August, 2019
Final Cost Report ........................................................................................September,
2019
Final Assessment Hearing. .....................................................................................
Fall, 2019
First Payment Due with Property Tax Statement
........................................... May 15, 2020
Majestic Oaks 1St — 3rd
8
Appendix A
Preliminary Cost Estimate
City Project 1319 Majestic Oaks 1st - 3rd
Item No.
Item
Part I - Bituminous Street Overlay
2021.501
Mobilization
2232.501
Mill Bituminous Pavement (1- 1/4" depth, 6' Width)
2357.502
Bituminous Material for Tack Coat
2360.501
SP WEA340B Wearing Course Mixture (Overlay)
2360.501
SP WEA340B Wearing Course Mixture (Patch)
2504.602
Adjust Gate Valve Box
2506.602
Adjust Frame and Ring Casting (Manhole)
2506.602
Adjust Manhole Casting - Riser Adjustment
2563.601
Traffic Control
SP -1
Signage Remove and Replace
Subtotal
5% Contingency
Subtotal
30% Indirect Costs
Part I - Bituminous Street Overlay
Item No. Item
Part II - Repair Existing Curb & Gutter
2104.501
Remove Concrete Curb and Gutter
2104.505
Remove Concrete Driveway /Valley Gutter
2211.501
Aggregate Base, Cl. S (100% Crushed)
2360.501
SP WEA340B Wearing Course Mixture (Patch)
2504.602
Irrigation Repair
2506.602
Adjust Frame & Ring Casting (CB) HDPE Rings
2531.501
Concrete Curb and Gutter, Surmountable
2531.507
Concrete Valley Gutter - High Early
2540.602
Repair Underground Electric Fence
2540.602
Repair Landscaping
2572.503
Application of Water for Turf Establishment
2575.550
Boulevard Topsoil Borrow-MnDOT3877-2F
2575.609
Seeding (MnDOT 270 w/Type 5 Hydromulch)
Subtotal
591. Contingency
Subtotal
30% Indirect Costs
Part II - Repair Existing Curb & Gutter
Part I - Bituminous Street Overlay
Part II - Repair Existing Curb & Gutter
Project 1319 Total Cost
UnitI Unit Price Est
I Estimated Cost
LS
$ 6,000.00
1
$
6,000.00
SY
$
1.30
1745
$
2,268.50
GAL
$
2.75
275
$
756.25
TON
$
52.00
395
$
20,540.00
TON
$
100.00
5
$
500.00
EA
$
250.00
1
$
250.00
EA
$
700.00
8
$
5,600.00
EA
$
250.00
2
$
500.00
LS
$
4,000.00
1
$
4,000.00
LS
$
446.00
1
$
446.00
$ 40,860.75
$ 2,043.04
$ 42,903.79
$ 12,871.14
$ 55,774.92
Unit I Unit Price EstEstimated Cost
Qty I
LF
$
10.00
445
$
4,450.00
SY
$
14.00
13
$
182.00
TON
$
25.00
5
$
125.00
TON
$
100.00
15
$
1,500.00
EA
$
160.00
5
5
800.00
EA
$
550.00
5
$
2,750.00
LF
$
23.00
445
$
10,235.00
SY
$
75.00
13
$
975.00
EA
$
85.00
5
$
425.00
EA
$
200.00
2
$
400.00
GAL
$
0.15
3600
$
540.00
CY
$
80.00
10
$
800.00
SY
$
7.50
80
$
600.00
$ 23,782.00
Majestic Oaks 15t - 3rd
9
$ 1,189.10
$ 24,971.10
$ 7,491.33
$ 32,462.43
$
$
55,774.92
32,462.43
$
88,237.35
Appendix B
Preliminary Assessment Roll
City Project #1319 Majestic Oaks 1st - 3rd
Total R-1 Lots 27 $ 27,810
Assessable Frontage 2,374 100%
Non -Assessable Frontage - 0%
Total Frontage 2,374 100%
Majestic Oaks 1st - 3rd
10
Majestic Oaks CT
R-1 Residential
P.I.N.
#
Lots
Lot Equivalent
Unit Assessment
Total
550 Majestic Oaks CT
104710001010
1
1
$
1,030
$
1,030
546 Majestic Oaks CT
104710001020
1
1
$
1,030
$
1,030
542 Majestic Oaks CT
104710001030
1
1
$
1,030
$
1,030
538 Majestic Oaks CT
104710001040
1
1
$
1,030
$
1,030
555 Majestic Oaks CT
104710002010
1
1
$
1,030
i $
1,030
534 Majestic Oaks CT
104710001050
1
1
$
1,030
$
1,030
530 Majestic Oaks CT
104710001060
1
1
$
1,030
$
1,030
527 Majestic Oaks CT
104710001070
1
1
$
1,030
$
1,030
531 Majestic Oaks CT
104710001080
1
1
$
1,030
$
1,030
535 Majestic Oaks CT
104710001090
1
1
$
1,030
$
1,030
4537 Majestic Oaks PL
Subtotal
10
10
$
1,030
$
10,300
Total R-1 Lots 27 $ 27,810
Assessable Frontage 2,374 100%
Non -Assessable Frontage - 0%
Total Frontage 2,374 100%
Majestic Oaks 1st - 3rd
10
Majestic Oaks PL
R-1 Residential
P.I.N.
#
Lots
Lot Equivalent
Unit Assessment
Total
4565 Majestic Oaks PL
104710101010
1
1
$
1,030
$
1,030
4561 Majestic Oaks PL
104710101020
1
1
$
1,030
$
1,030
4557 Majestic Oaks PL
104710101030
1
1
$
1,030
$
1,030
4553 Majestic Oaks PL
104710101040
1
1
$
1,030
$
1,030
4548 Majestic Oaks PL
104710101170
1
1
$
1,030
$
1,030
4549 Majestic Oaks PL
104710101050
1
1
$
1,030
$
1,030
4544 Majestic Oaks PL
104710101160
1
1
$
1,030
$
1,030
4545 Majestic Oaks PL
104710101060
1
1
$
1,030
$
1,030
4540 Majestic Oaks PL
104710101150
1
1
$
1,030
$
1,030
4541 Majestic Oaks PL
104710101070
1
1
$
1,030
$
1,030
4537 Majestic Oaks PL
104710201010
1
1
$
1,030
$
1,030
4536 Majestic Oaks PL
104710101140
1
1
$
1,030
$
1,030
4533 Majestic Oaks PL
104710201020
1
1
$
1,030
$
1,030
4532 Majestic Oaks PL
104710101130
1
1
$
1,030
$
1,030
4529 Majestic Oaks PL
104710101100
1
1
$
1,030
$
1,030
j 4528 Majestic Oaks PL
104710101120
1
1
$
1,030
$
1,030
4525 Majestic Oaks PL
104710101110
1
1
$
1,030
$
1,030
Subtotal
17
17
$
17,510
Total R-1 Lots 27 $ 27,810
Assessable Frontage 2,374 100%
Non -Assessable Frontage - 0%
Total Frontage 2,374 100%
Majestic Oaks 1st - 3rd
10
2019 Street Revitalization Project 1319
c° G; 9
U �. . Z
Majestic Oaks 1st - 3rd Additions
N
brrbara
Cro-n
Park
(ut+det.J�
WESCOTT RD
Bald
late
Art House
`
>V•Oi1lri'ft 1"
(iittdt
Pali '
VrC.arfh:
Lake
�
Pat? rek
�l
Fa,Garr
d
Cli
✓:a
L
CLIFF
110116145
m
4rvYaet
1p 4t
DIFFLEY R6
Fue $te
T i
t"ap0nt lrrlPllrae lhJJky
fri PWA 9!tictrcr'acavl
h
Lex t P —..
Majestic Oaks 1st & 3rd
Yr•r k
Project 1319
I.hase WILDER_
CkikPa"d
R�'vlfrk l'alf"
(iittdt
{Wff1eY
�l
Cli
Road ( Rd. 32) --�
L
CLIFF
110116145
RD
t,9
I a6e
l erwnor HdA
RekumalPari
1'chulzr
Lake
fatr�d Iake
(.anrp
i4,S duM rn
r
n
Parlusc.
Laar
'tib
�y
,~s
f
Document Path: L1USERS}PUBWORKSrHngineeringIProjects@019 Street ImprovemenW319-MajesEc Oaks 1st-3rd11319 LocaOun.msd
3mdC,1
Pond
tea-
..
r
t
t aywm
IDadaPwrli I
Luke -std+
Lila{ Lake
Ito/r
Lane
Aam
Parr i ,
Fitz
•I
r,
Lake c:
gVie
�r—
Made"
(0r_uer
Date: 12/12/2018
FIG 1
0rr",-�k
Project 1319
2019 Street Revitalization
Majestic Oaks 1st - 3rd Additions
LL
CLIFF AD
Document Path: L:%USERSXPUSMRKS1EngineeringIProjects%2019 Street Improvernents113119. Majestic Oaks I st-3rcfi1319.rnxd
Project Area Legend
Assesable Project Area
2019 Street Improvement
Date: 12/12/2018
FIG 2
4SIS
4S29,' 4531
NGEV'AF,-
i i--45-40
WP
uta
ft"21
-
9 456.0
41337.
qp
555
Sio
459.1
SA2
450'
LL
CLIFF AD
Document Path: L:%USERSXPUSMRKS1EngineeringIProjects%2019 Street Improvernents113119. Majestic Oaks I st-3rcfi1319.rnxd
Project Area Legend
Assesable Project Area
2019 Street Improvement
Date: 12/12/2018
FIG 2
2019 Street Revitalization - Project 1319
Majestic Oaks 1st - 3rd Additions
* c
" K Typical Street Sections
50' FOW —�
28' F -F
PAVEMENT SECTION
3" SASE COURSE
6' CLASS 5 AGG SASE
COMPACTED SUAG;+R DE
EXIST. TYPICAL SECTION
MAJESTIC OAKS 1ST - 3RD
MOUNTABLE CONCRETE
CURS AND GUTTER
PROPOSED TYPICAL SECTION
MAJESTIC OAKS 1ST - 3RD
Document Path: L:IUSERSTUBWORKS%EngineedrglProjectsl2O19 Street tmprovements11319-Majestic Oaks tst-3rdN319 FIG 3.mxd Date: 12/12/201 E
FIG 3
Gardenwood Ponds 4th Addition
Oak Pond Hills 1st & 2nd Additions
Majestic Oaks 1st – 3rd Additions
Neighborhood Street Revitalization
City Project No’s. 1317, 1318, & 1319
Informational Meeting – 5:30 P.M. Monday, Jan. 7, 2019
Eagan Room
Attendance
This meeting combined 4 project areas (1317, 1318, 1319, and 1320) Aaron Nelson, Assistant
City Engineer, and 5 residents representing 4 single family homes were in attendance (see
attached sign-in sheet). Nobody from the Southern Lakes West neighborhood (1320) attended.
Presentation of Project Details
Nelson welcomed the residents and presented project information, including details such as
construction, costs, schedule and assessments. A short ETV video on the street improvement
process was also shown.
Questions/ Comments
Because the meeting had residents from 3 neighborhoods in attendance, much of the
discussion was about general project and assessment related questions. Any project specific
questions are noted below.
STREET CONDITION
1. Why are the improvements being performed now? The streets appear to be in relatively
good condition. The condition of the streets are currently at the point that if improvements
are not made at this time, the asphalt will deteriorate at a much quicker rate and will likely
require more substantial and expensive improvements in the near future.
2. Will cracks appear through the new asphalt? Since the majority of the asphalt is being left
in place, it is expected that some of the cracks will reflect through the new asphalt, however
the structural integrity of the street will remain. Any cracks will be addressed with routine
maintenance and filled as necessary.
3. (Resident from Proj. 1317) Concerns were stated that Eagan’s Pavement Management
Program differs from some recommendations cited in a publication authored by the Local
Road Research Board and Mn/DOT (SYSTEMS PRESERVATION GUIDE – A planning Process
for Local Government Management of Transportation Networks, Final Report 2016-34A,
dated Nov. 2016). The question from the resident was “why isn’t Eagan following those
recommendations”? Nelson stated that Mn/DOT and the LRRB publish dozens of
publications annually, and he couldn’t comment on their recommendations, or any
differences from Eagan’s program, without first reviewing that document. However, Nelson
said he’d review it and share the information in the meeting minutes.
The document was developed by Mn/DOT staff, representatives from 5 Minnesota Counties
across the state, and engineering consultants, to provide guidance for Counties that do not
have an established pavement management program to determine the appropriate
maintenance technique to perform at the correct time, to cost effectively maintain their
County roadway system. The maintenance techniques described in Systems Preservation
Guide are the same techniques that Eagan utilizes (crack sealing, seal coating, micro-
surfacing, overlays, resurfacing, reclamation, reconstruct, etc.) to maintain its system.
However, because a County roadway network differs from a City roadway network (size of
vehicles, higher traffic speeds and volumes, etc.), some of the maintenance techniques
Eagan uses are slightly modified to fit Eagan’s needs.
4. (Project 1318) Oak Pond Road currently has “tenting” in the existing asphalt that occurs
primarily in the winter. Will this overlay eliminate or make the tenting less significant?
Tenting is usually most apparent in the winter when the streets and base material are
frozen and moisture gets into the cracks in the pavement. The overlay will seal the road
surface and reduce moisture intrusion. Any cracks that reflect through the new layer of
asphalt will be sealed a couple years after the overlay, and that should help control
moisture issues. An Engineering Technician will review the existing conditions to see if any
further maintenance should be performed to address the concern.
CURB CONDITION
5. How much damage to the concrete curb and gutter warrants repairs? It is common for
concrete to crack. If the crack is tight and the curb is still functional, the curb will likely
remain in place. If the crack is separated, heaved, or offset, or large chunks are missing that
make the gutter not function properly, then the curb will likely be repaired.
DRAINAGE
6. (Proj. 1317) The curb and pavement at the end of Bald Lake Court holds a lot of water.
Can it be directed to the storm sewer catch basin on the SW side of the cul-de-sac? A
technician will review the area to see what’s causing the standing water. If it’s a
settlement, new curb will be poured and should improve the situation. If it’s just really flat,
options will be really limited without raising the whole cul-de-sac, which may be outside the
scope of the improvements.
Staff reviewed the area the following area and determined the whole cul-de-sac is really
flat, and water can’t make it around the curb line to the catch basin. Options are being
investigated to see if the grade can be increased, or an additional catch basin added to pick
up that water.
7. (Proj. 1318) Drainage is having a difficult time making it through the intersection of Oak
Pond Road and Oak Pond Circle. Can that be improved? A technician will review the
intersection to determine the cause of the slow drainage. It might need to be re-graded, or
a new valley gutter installed. It will be addressed with the design phase.
CONSTRUCTION/PHASING
8. Will the road be open during construction? Will access be maintained to driveways? All
roads will be open to traffic during construction. We do not anticipate any road closures
during the work, however, some phases will require short term lane closures and the
contractor will use traffic control devices or flagmen to help direct traffic. Access to
driveways should be maintained throughout construction. If curb needs to be replaced at a
driveway, residents can park in front of their homes while the concrete cures.
9. How long will the construction last? How will it be phased? The contractor will have
flexibility to determine how they phase each area, and construction is anticipated to begin
as soon as early May (weather dependent), and needs to be complete by late June or early
July. The size and scope of the improvements in this neighborhood will likely result in
approximately a 3-4 week construction timeframe for each of the neighborhoods. The City
will mail more detailed construction specific information as construction nears.
ASSESSMENTS
10. How are assessments calculated? With residential properties, the city shares the cost of all
work performed between the curbs 50/50 with the adjacent property owners. Any work in
the curbs and boulevard, and the utility improvements, is paid 100% by the city. The
property owner’s portion is split evenly among all lots in the neighborhood.
11. Why are the residents being assessed? Every city finances road rehabilitation differently.
Some communities assess 100% of the costs to those that live in the neighborhood and
benefit most from the streets, where others don’t assess anything and fund the
improvements entirely through property taxes. Eagan has had a consistent policy
throughout its pavement management program history, where the City finances the
majority of the costs through property taxes, and a portion of the costs is assessed to
everyone that lives in the neighborhood. Most cities in the metro area assess a portion of
the costs.
12. (Resident from Proj. 1317) General question about Eagan’s assessment policy. Why is
only 10% (average) assessed on larger roadways, compared to 30-35% in residential
neighborhoods? Eagan’s assessment policy includes assessments for residential properties
if they have “front yard frontage” onto a road being improved, so almost every residential
property in the neighborhood is assessed with an overlay project. On larger roadways
(collector and arterial roads), much of the road frontage is with rear yards of residential
properties, therefore, those properties are not assessed. Those roadways typically have a
lot of unassessable frontage, so the city pays a higher percentage of the cost in those
circumstances.
13. (Proj. 1318) There is city property that fronts Oak Pond Road. Does the City pay for its
frontage, or is it being assessed? The city pays 100% of the costs for city property frontage.
UTILITIES
14. Are any private utility companies planning to upgrade their lines along with the street
improvements (gas, phone, electric, cable, etc.)? Every January city staff holds a meeting
with representatives of all the utility companies to show them what projects we know are
going to occur, and several that will likely occur. They review their utilities to see if any
upgrades are needed at the same time. If they need to replace lines, they can coordinate
improvements, but historically they haven’t replaced facilities with overlay projects.
PRIVATE STREETS
(Proj. 1318) 6 homes have driveways on the private street at the end of Majestic Oaks Pl.
Will the city be working on any private streets? Will the City plow the private street?
Why are those homeowners paying the same assessment as everyone else, and also be
responsible to maintain their own street too? Work is limited to only the public streets.
Eagan has very definitive standards that every development must meet. Some of the
requirements include the construction of all public streets to City standards (28’-32’ wide
with curb & gutter), they are located within dedicated public rights-of-way (50’-60’ wide),
and cul-de-sacs must be installed on dead-end streets to provide adequate and safe access
and allow large City equipment to perform routine maintenance (i.e. snow & ice control,
sweeping, patching, etc.). The private street was constructed below city standards, so the
City would not take over ownership and/or maintenance of the private street.
Every property in the neighborhood is proposed to be assessed the same amount,
regardless of which street they live on, because everyone must drive on the network of
public streets to get to and from their homes. Assessing in this manner is how the city
ensures everyone helps pay for the maintenance of the vast network of public streets
throughout the city.
The meeting adjourned at 6:35 p.m.
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
PUBLIC HEARING
F. Project 1320, Southern Lakes West
Street Improvements
Action To Be Considered:
Close the public hearing and approve Project 1320 (Southern Lakes West - Street
Improvements) as presented, and authorize the preparation of detailed plans and
specifications.
Facts:
On June 5, 2018, the City Council directed staff to prepare a feasibility report
considering the rehabilitation of Southern Lakes West, residential streets, in
south-eastern Eagan located north of Cliff Road and east of TH 3.
A structural mill and overlay of these streets is programmed for 2019 in the City
of Eagan’s 5-Year CIP (2019-2023).
On December 18, 2018, the draft Feasibility Report was presented to the City
Council and a public hearing was scheduled for T uesday, January 15, 2019.
An informational neighborhood meeting was held on January 7 for the adjacent
property owners to discuss the proposed improvements. Of the 15 properties
to be assessed under this improvement, no one attended the meeting.
All notices have been published in the legal newspaper and sent to all affected
property owners informing them of this public hearing.
Attachments (1)
PHF-1 Feasibility Report
EAGAN
Report for
Southern Lakes West
Neighborhood Street Revitalization
City Project No. 1320
December 18, 2018
• • i
• •; ,
• •. .� A.
E A "A N
...� •.moi
To: Honorable Mayor and City Council
From: Aaron Nelson, Assistant City Engineer
Date: Dec. 18, 2018
Re: Southern Lakes West Street Revitalization
City Project No.: 1320
Attached is the feasibility report for the Southern Lakes West Street Revitalization, City Project
No. 1320. The report presents and discusses the proposed improvements and includes a cost
estimate, preliminary assessment roll and schedule.
We would be pleased to meet with the City Council at your convenience to review and discuss
the contents of this report.
Reviewed By.
A",— ��"
partment of Public Works
Reviewed By:
I hereby certify that this report was prepared by me or
under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of
Minn ta.
nir—I
Aaron Nelson
Date: I a Reg. No. 45795
Date:
Finance r,LL
partment Date:Vn
�°
VI-
TABLE OF CONTENTS
ExecutiveSummary..................................................................................................... 1
Introduction/History .......................................................................................................2
Scope...........................................................................................................................3
AreaTo Be Included.....................................................................................................3
StreetPavement Evaluation.........................................................................................3
ProposedImprovements..............................................................................................4
Easements/Permits......................................................................................................6
Feasibility/Recommendations......................................................................................6
CostEstimate...............................................................................................................6
Assessments................................................................................................................6
AssessmentFinancing Options.....................................................................................7
RevenueSource...........................................................................................................7
ProjectSchedule..........................................................................................................8
LIST OF APPENDICES
Appendix A
Preliminary Cost Estimate
Appendix B
Preliminary Assessment Roll
Appendix C
Figures - 1 Location Map
2 Street Improvement/Assessment Area Map
- 3 Typical Section Mill & Overlay
Executive Summary
Background
Project Name
Southern Lakes West
Project #
1320
Street Area
2,800 Sq. Yds.
Street Length
657 Feet
Streets Included
Alicia Circle
Alicia Drive
Constructed
1999
Reconstructed
-
Crack Sealed
-
Seal Coated
2004, 2012
Absolute Location
SE % of Section 25
Township 27, Range 23
Relative Location
North of Cliff Road
East of TH 3
Project Details
• Roadway overlay (edge mill & 1-1/2"
PCI Rating 43/100
overlay) Recommended Overlay
• Replacement of damaged curb & gutter Improvement
• Adjustment/Replacement of: Curb Removal 24%
Scope o Sanitary/Storm sewer
o Utility castings
o Watergate valves
Residential Lots 15
o Street signage
• Utility Improvements
Cost Estimate/ Revenue
Southern Lakes West
1
Property
City
Mill & Overlay w/ Signage $ 39,500
$ 19,800
$ 19,700
Repair Existing Concrete Curb & Gutter $ 25,500
-
$ 25,500
Utility Improvements $ 3,800
-
$ 3,800
Total $ 68,800
$ 19,800 (28.8%)
$ 49,000 (71.2%)
Southern Lakes West
1
Dec. 18, 2018
Neighborhood Street Revitalization
Southern lakes West
Eagan, Minnesota
Introduction/ History
Pavement Management - As a part of Eagan's Pavement Management Program (PMP), the City
evaluates streets within the community throughout their life cycle and implements appropriate
maintenance strategies. In 1989, a Pavement Management System (PMS) was developed that
allowed the City to evaluate the condition of the existing pavement surface for all the streets on
a routine basis and schedule timely maintenance. A Five Year Capital Improvement Program
(CIP) for street rehabilitation is developed from this information.
The 657 feet of residential streets in the Southern Lakes West neighborhood in south eastern
Eagan has been identified for 2019 street revitalization improvements. Figure 1, located in
Appendix C, illustrates the project location. The streets were originally constructed in 1999.
Based on the data and engineering strategies available at this time, the City's current PMP
incorporates local and ongoing maintenance strategies with seal coating occurring as needed
(approximately 3 years after paving) and a bituminous overlay at approximately 20+ years.
Overlaying the roads located within the project area, which are currently in the 20 year time
frame, will prevent further decay of the pavement surface, thus protecting and extending the
structural life of the street.
Timely maintenance work, such as bituminous patching, crack sealing and seal coating have
occurred at appropriate intervals during the life of the pavement in the area. The City of
Eagan's maintenance records indicate that the streets were seal coated in 2004 and 2012.
The Public Works maintenance program typically includes extensive patching and crack sealing
during the summer prior to the overlay. The Public Works crews, as part of the Preparatory
Pavement Management Plan, removed and replaced deteriorated pavement areas and placed
leveling and maintenance overlays on portions of the streets under consideration, where
necessary. These repairs alone will not substantially extend the life expectancy of the street
section if not combined with the bituminous overlay proposed with this project.
Infrastructure Review - The Public Works Department has also inspected the utility
infrastructure (sanitary sewer, water main, and storm sewer pipes and other structures) in the
project area and determined the underground systems are generally in good working order and
that no major repairs are necessary.
Southern Lakes West
2
To provide a comprehensive review of the project area, the condition and coverage of other
infrastructure items maintained by the City and other public agencies within the public right-of-
way and easements such as street lights, utility boxes, and above ground storm water
ponds/access, and pedestrian features were evaluated. The rehabilitation of City -maintained
items is included in this project, if needed.
Scope
This project will provide an overlay (edge mill and overlay) for approximately 657 feet of
roadway. Figure 2 in Appendix C, illustrates the project limits.
Included in this project are the following improvements; replacement of damaged curb and
gutter, adjustments and/or replacement to sanitary/storm sewer utility castings, water gate
valves, utility improvements, and replacement of street signage.
Area to Be Included
Properties included in the project lie within the SE Y4, Section 25, lying North of Cliff Road, East
of TH 3, in Township 27, Range 23, in the City of Eagan, Dakota County, Minnesota.
Street Pavement Evaluation
The City of Eagan's Pavement Management System allows the City to evaluate the condition of
the existing street surface to help schedule timely maintenance and improvements. The
Pavement Condition Index (PCI) ranks the surface condition for each street. The general
categories that define PCI rankings are as follows:
PCI Recommended Improvement
56-100 Routine Maintenance/Crack Seal/Seal Coat
36-55 Patch/Repair and/or Overlay
0-35 Reconstruct/ Reclaim
The 2018 PCI rankings for the street segments have a weighted average pavement condition
rating of 43, which falls in the "Patch/Repair and/or Overlay" category, as mentioned above.
The street pavement has reached an age where, based on the City's past experience, the
integrity of the pavement can rapidly decline if no improvements are performed. Therefore, the
2019 construction season is the optimal time to construct the bituminous overlay on this street.
Any delay of the project may reduce the structural benefit to the street sections and require
more substantial rehabilitation.
Southern Lakes West
3
Proposed Improvements
Pavement - The proposed street
improvements shown in Figure 3. The
existing street section for this roadway
consists of 3" bituminous pavement
supported by 6" gravel base. The
existing bituminous surface will be
milled adjacent to the existing curb and
gutter (6'-8' wide) to accommodate a
IX -inch bituminous overlay. The
overlay, combined with the existing
street section, will provide a street
section consistent with current City
standards for residential streets. The
combination of patching and overlay
will not eliminate cracking due to the temperature extremes experienced in Minnesota.
Bituminous overlays will show some continued frost movements and reflective cracking
consistent with the underlying pavement. Routine maintenance will still need to continue under
the City's Pavement Management Program.
y
Concrete curb & gutter - Damaged curb &
gutter will be replaced if severely cracked,
spalled, or settled. It is estimated that
approximately 24% of the existing concrete
curb and gutter will have to be replaced.
Boulevard turf will be removed and replaced
with seed. While the contractor who performs
the work is responsible for its establishment
(45 days for seed), adjacent property owners
are encouraged to consistently water the new
turf, where possible, to help ensure its growth.
Utility Adjustment/Replacement — Sanitary/storm sewer manholes, catch basins, and gate
valves will be adjusted, repaired, or replaced based on the condition of castings and supporting
structures. Such repairs to the storm sewer, sanitary sewer, and water main infrastructures
ensure quick and easy access by the City for maintenance and other purposes. There are a
number of catch basin stuctures that require replacement of deteriorated adjusting rings. This
work will be financed through the Combined Utility Fund.
Southern Lakes West
4
h �
F
�4
r
3 �I
Signage - Traffic and street identification signage within the
project limits have reached the end of their useful life
expectancy and are in need of replacement. Signs have been
reviewed for compliance with the Minnesota Manual on
Uniform Traffic Control Devices (MnMUTCD). Those that are
required by the MnMUTCD will be replaced to improve safety
and night time visibility, and those that are not will be
permanently removed.
Street Eights—The street lights in the project area
-Tr
(maintained by Dakota Electric Association) are in good condition and provide adequate
coverage. No modifications to the existing street lights are proposed.
Complete Streets — "Complete Streets" is a transportation and design approach that plans,
designs, operates, and maintains streets in a means to enable safe, convenient and comfortable
travel and access for users of all ages and abilities regardless of their mode of transportation.
Complete Streets allow for safe travel by those walking, bicycling, driving automobiles, riding
public transportation, or delivering goods.
In 2010, the State of Minnesota adopted a Complete Streets policy, which encourages, but does
not require local governments to adopt this policy. The MN Department of Transportation has
published a Complete Streets Guidelines for Local Agencies Resource Guide (Feb. 2013).
The streets in this neighborhood were reviewed to determine if additional Complete Streets
opportunities are available and/or feasible. The streets are relatively narrow at 28 feet wide,
have low traffic volumes, and only access point. Given the existing and proposed elements
available for all users, the streets in this neighborhood meet the intent of the complete streets
guidelines.
Southern Lakes West
Easement/Permits
All work will be in the public right-of-way. No additional easements are anticipated. It is
anticipated that no permits will be required for the resurfacing project.
Feasibility and Recommendations
The mill and overlay project is necessary to maintain and enhance the structural integrity of the
pavement section, create a safer driving surface, and increase rideability.
It is cost effective in that the proposed improvement (resurfacing) is considerably less
expensive than complete reconstruction of this street. The mill and overlay is feasible in that
this type of improvement has been used successfully to extend the life expectancy of numerous
other streets throughout the City and the region.
This project is in accordance with the Five Year Capital Improvement Plan (2019 2023) for the
City of Eagan and the schedule as outlined in the Pavement Management Program. It is
recommended that the project be constructed as proposed in this report in combination with
other similar projects in the area.
Cost Estimate
Detailed cost estimates are Located in Appendix A. The estimates are based on anticipated
2019 construction costs and include a 5% contingency and indirect cost of 30%, which include
legal, administration, engineering, and bond interest. A summary of the costs is as follows:
Southern Lakes West
Mill & Overlay ......................................
Repair Existing Concrete Curb & Gutter ................................
Utility Improvements ........................... .................... I.............
Total...........................................................................
$ 39,500
$ 25,500
3,800
$ 68,800
Assessments
Assessments are proposed to be levied against the benefited properties for the total
improvement with costs allocated in accordance with the City of Eagan's Special Assessment
Policy for a mill and overlay improvement for residential streets. All assessments will be revised
based on final costs. A preliminary assessment roll is included in Appendix B.
City Special Assessment Policy
Assessment Ratio
Property City
Mill & Overlay - Low -Density Residential (R-1,2,3) 50% 50%
Repair Existing Concrete Curb & Gutter - 100%
Utility Improvements - 100%
Southern Lakes West
6
Residential Lots – All residential lots (15 single family homes) as shown on Figure 2, having
driveway access on to the street to be improved are proposed to be assessed. The City's
Assessment Policy states that 50% of the mill and overlay costs are assessable for local
residential streets, based on a standard 32 -foot width. The estimated cost per residential unit,
based on the City's Assessment Policy, is $1,320/ lot and is calculated as follows:
Mill & Overlay - Residential Properties
o 1,314' Residential Frontage / 1,314' Total Frontage = 100%
o $39,500 (Mill & Overlay Costs) x 50% x 100% = $19,750 (Total R-1 Assessment)
o $19,750 /15 lots = $1,316.67, rounded to $1,320 / single-family lot
Assessment Financing Options
The property owner will have the option at the time of the assessment hearing to pay the full
assessment or include the assessment in with their property tax statement. If the assessment is
included with the property tax statement, the assessment and interest will be spread over five
years for residential owners. In 2018, the interest rate was set at 4.5%. The 2019 rate is not yet
available, however, it is expected to be comparable and based on City policy will be determined
by the City Council in the spring. The following payment schedule is an example of a residential
lot assessment of $1,320 with an estimated 4.5% interest for the assessed amounts, and
assumes 14 months interest for the first year:
F
15t Year
5th Year
Principal / Year Interest/Year Cost /Year
j $264
$264
$69 $333
—_ $12 $276
Bonds may be issued to finance the improvements.
Revenue Source
A summary of revenue sources is listed below:
The Major Street Fund will finance the estimated street related project deficit of $45,200.
The Combined Utility Fund will finance the estimated $3,800 utility improvements.
Southern Lakes West
7
Project Cost
Property Assessment
City Contribution
Mill and Overlay (Including Signage)
$ 39,500
$ 19,800
$ 19,700
Repair Existing Curb & Gutter
$ 25,500
-
$ 25,500
Utility Improvements
$ 3,800
-
$ 3,800
Totals
$ 68,800
$ 19,800
$ 49,000
The Major Street Fund will finance the estimated street related project deficit of $45,200.
The Combined Utility Fund will finance the estimated $3,800 utility improvements.
Southern Lakes West
7
Proiect Schedule
G
f
1
Present Feasibility Report to City Council/
C
Order Public Hearing......................................................................................
Dec. 18, 2018
Informational Meeting.......................................................................................
Jan. 7, 2019
PublicHearing..................................................................................................
Jan. 15, 2019
Approve Plans and Specifications....................................................................Feb.
19, 2019
Bid Date.....................................................................................................
...Marc 28 2019
,
Award Contract.................................................................................................April 2, 2019
Start Construction............................................................................................. May 1, 2019
Project Completion..........................................................................................
August, 2019
Final Cost Report........................................................................................September,
2019
Final Assessment Hearing......................................................................................
Fall, 2019
First Payment Due with Property Tax Statement
........................................... May 15, 2020
Southern Lakes West
8
Appendix A
Preliminary Cost Estimate
City Project 1320 Southern Lakes West
Item No.
Item
Part I - Bituminous Street Overlay
2021.501
Mobilization
2232.501
Mill Bituminous Pavement (1- 1/4" depth, 6' Width)
2357.502
Bituminous Material for Tack Coat
2360.501
SP WEA340B Wearing Course Mixture (Overlay)
2360.501
SP WEA3408 Wearing Course Mixture (Patch)
2504.602
Adjust Gate Valve Box
2504.602
Repair Gate Valve Top Section w/Cover
2506.602
Adjust Frame and Ring Casting (Manhole)
2506.602
Adjust Manhole Casting - Riser Adjustment
2563.601
Traffic Control
SP -1
Signage Remove and Replace
Subtotal
5% Contingency
Subtotal
30% Indirect Costs
Part I - Bituminous Street Overlay
Item
Part II - Repair Existing Curb & Gutter
2104.501
Remove Concrete Curb and Gutter
2211.501
Aggregate Base, Cl. 5 (100% Crushed)
2360.501
SP WEA340B Wearing Course Mixture (Patch)
2504.602
Irrigation Repair
2506.602
Adjust Frame & Ring Casting (CB) HOPE Rings
2531.501
Concrete Curb and Gutter, Surmountable
2540.602
Repair Underground Electric Fence
2540.602
Repair Landscaping
2572.503
Application of WaterforTurf Establishment
2573.530
Storm Drain Inlet Protection
2575.550
Boulevard Topsoil Borrow - MnDOT 3877-2F
2575.609
Seeding (MnDOT 270 w/Type 5 Hydromulch)
Subtotal
5% Contingency
Subtotal
3096 Indirect Costs
Part II - Repair Existing Curb & Gutter
Part I - Bituminous Street overlay
Part II - Repair Existing Curb & Gutter
Project 1320 Total Cost
Unit I Unit Price I Est Qty I Estimated Cost
LS
$
61000.00
1
$
6,000.00
SY
$
1.30
1000
$
1,300.00
GAL
$
2.75
180
$
495.00
TON
$
52.00
260
$
13,520.00
TON
$
100.00
2
$
200.00
EA
$
250.00
3
$
750.00
EA
$
425.00
1
$
425.00
EA
$
700.00
2
$
1,400.00
EA
$
250.00
2
$
500.00
LS
$
4,000.00
1
$
4,000.00
IS
$
364.00
1
$
364.00
$ 28,954.00
$ 1,447.70
$ 30,401.70
$ 9,120.51
$ 39,522.21
Southern Lakes West
9
$ 21,413.75
$ 1,070.69
$ 22,484.44
$ 6,745.33
$ 29,229.77
$ 39,522.21
$ 29,229.77
$ 68,751.98
Unit
Unit Price
Est Qty
Estimated Cost
LF
$
10.00
410
$
4,100.00
TON
$
25.00
5
$
125.00
TON
$
100.00
15
$
1,500.00
EA
$
160.00
5
$
800.00
EA
$
550.00
5
$
2,750.00
LF
$
23.00
410
$
9,430.00
EA
$
85.00
5
$
425.00
EA
$
200.00
2
$
400.00
GAL
$
0.15
3375
$
506.25
EA
$
175.00
1
$
175.00
CY
$
80.00
8
$
640.00
SY
$
7.50
75
$
562.50
Southern Lakes West
9
$ 21,413.75
$ 1,070.69
$ 22,484.44
$ 6,745.33
$ 29,229.77
$ 39,522.21
$ 29,229.77
$ 68,751.98
Appendix B
Preliminary Assessment Roll
City Project #1320 Southern Lakes West
Assessable Frontage 1,314 100%
Non -Assessable Frontage 0 0%
Total Frontage 1,314 100%
Southern Lakes West
10
Alicia DR
R-1 Residential
P.I.N.
#
Lots
Lot
Equivalent
Unit Assessment
Total
4513 Alicia Dr
107130001150
1
1
$
1,320
$
1,320
4517 Alicia Dr
107130001140
1
1
$
1,320
$
1,320
4521 Alicia Dr
107130001130
1
1
$
1,320
$
1,320
4525 Alicia Dr
107130001120
1
1
$
1,320
$
1,320
4532 Alicia Dr
107130001110
1
1
$
1,320
$
1,320
4528 Alicia Dr
107130001100
1
1
$
1,320
$
1,320
4524 Alicia Dr
107130001090
1
1
$
1,320
$
1,320
4520 Alicia Dr
107130001080
1
1
$
1,320
$
1,320
4516 Alicia Dr
107130001070
1
1
$
1,320
$
1,320
4510 Alicia Dr
107130001060
1
1
$
1,320
$
1,320 i
4506 Alicia Dr
107130001050
1
1
$
1,320
$
1,320
4502 Alicia Dr
107130001040
1
1
$
1,320
$
1,320 I
4501 Alicia Dr
107130001030
1
1
$
1,320
$
1,320
4505 Alicia Dr
107130001020
1
1
$
1,320
$
1,320
4509 Alicia Dr
107130001010
1
1
$
1,320
$
1,320
Subtotal
15
$
19,800
$
19,800
Assessable Frontage 1,314 100%
Non -Assessable Frontage 0 0%
Total Frontage 1,314 100%
Southern Lakes West
10
°F 2019 Street Revitalization - Project 1320
�
dam ^ ,fie°
Southern Lakes West
�et rs Kso
eYLnke Fmr» � ��
WESCOTT RD WMRaad
W r l+; -SSre L
Bq h va Amdn'�)
1 m.k
Bald
fade '
N wV~
ondPond
y ly
Pond
ArtHoasr, ij4a''Mkrrn Qa
Ynr'Mv4 WwlkYart.
Pnf ri1Cr.)
414tarkr
z
Lake H
0
torrrarr p / lU4k"..4
a
i� C �.
m --
q. A" DI FFLEY
Southern Lakes West �: . 30
Project 1320
t .vl�l �lkf:dt Iwvdm
Lexi P
s�
farrlhllt '3
43 Am m t
t•k4la
14V�^S3/i YJ1A yRA'
91iIs Park
Rar7uaYthF �• 0"')
(wader � Smnk •4ore 1r
i
Cl' Road (0 Rd 32)
Haar
CLIFF RD McDfjsOsh .X do
Holland yaks 4 F'arrp
Lake Pmu
LoLwwn+Ldh
rtcg rrnlProd 0 Flri
C�fcartrdL �.� IN gine Ln.
e
Crmrf
4.
Portage 4a hrddrn
Lake Col reel
ParA
Do entPatti: L.IUSMWU8WORKS%EngineeringWrojeok1201g Streetlmproyam rft%1320-SOWhem Lakes Ween1320Loaron.m><d Date: 12/12/2018
FIG 1
2019 Street Revitalization - Project 1320
C .• it .'
Southern Lakes West
I
!V
kil
y 4509 A
i,Q --�"-,.
4326:, i g ` ► ��
m
45241
i LO
'N
4S32' �n LY ,
Project Area Legend
Assesable Project Area
2019 Street Improvement
Da u mM Path: L:IUSERSIPUBYYCRKSIEnghwdngM Mecic1201g Street ImPMOMnte11320 -Southam Laken M8 51320.mxtl
Date: 12/12/2018
FIG 2
Eq 2019 Street Revitalization - Project 1320
o
Southern Lakes West
Typical Street Sections
50' ROW
I !
1.25" EDGE MILL
6'-8' WIDE (IYP.)�
t
I
�I PAVEMENT SECTION
L-- — 3" BASE COURSE
6" CLASS 5 AGG BASE
COMPACTED SUBGRADE
EXIST. TYPICAL SECTION
SOUTHERN LAKES WEST
50' ROW
28' F -F
1.5" TYPE 2360 BITUMINOUS OVERLAY
MOUNTABLE CONCRETE
CURB AND GUTTER
MOUNTABLE CONCRETE
-- BITUMINOUS TACK COAT CURB AND GUTTER
3" BITUMINOUS SURFACE
61' CLASS 5 AGG BASE
COMPACTED SUBGRADE
PROPOSED TYPICAL SECTION
SOUTHERN LAKES WEST
Document Path: L;IUSERS\PUBWORKS%EngkismingV'rojects1201S Street 4nprovements11320 -Southern Lakes West11320 FIG 3.mxd Date: 12/12/2018
FIG 3
Agenda Information Memo
January 15, 2019 Eagan City Council Meeting
VI. 2019 CALENDAR YEAR CITY ORGANIZATIONAL BUSINESS
Each calendar year, Organizational Business is considered at the second regular City Council
meeting in January. Items to be acted upon are:
A. Acting Mayor
B. Official Legal Newspaper
C. City Depositories
D. City Council Meeting Dates
E. City Council Meeting Procedures
F. Council Standing Committee and Representative Appointments
ACTING MAYOR
Requested Action:
The Mayor is asked to appoint a member of the City Council as Acting Mayor, which must be
ratified by the City Council.
A. Acting Mayor – There is a statutory requirement that a member of the City Council be
appointed as Acting Mayor. All Councilmembers are eligible for this appointment. The
Acting Mayor presides in the absence of Mayor Maguire at Council meetings and all
other activities pertaining to the City of Eagan. Councilmember Cyndee Fields was
Acting Mayor in 2018.
OFFICIAL LEGAL NEWSPAPER
Requested Action:
Designate the St. Paul Pioneer Press as the City of Eagan’s official legal newspaper.
B. Official Legal Newspaper – There is a statutory requirement to designate a legal
newspaper as the official newspaper for the City. The City can only designate a legal
newspaper of general circulation in the City as its official newspaper for publication of
items required by law, and other matters that the Council deems advisable and in the
public interest to be published. The City received proposals from three newspapers: Sun
Thisweek, St. Paul Pioneer Press and Star Tribune, which are attached for review. On
January 11, the Sun Thisweek verbally updated its proposal to $6.00 per column inch.
Currently, Sun Thisweek is the designated official legal newspaper. In the past year, the
St. Paul Pioneer Press has made legal notices available online. Thus, a resident would
not need to pay a subscription to view City notices. Additionally, the St. Paul Pioneer
Press offers the ability to publish legal notices every day of the week, which provides the
City with more flexibility in publishing legal notices within the required deadlines.
Because of these benefits, and the competitive rate proposal, the proposed action is to
designate the St. Paul Pioneer Press as the legal newspaper for 2019.
Attachments: (1)
Proposals from Sun Thisweek, Pioneer Press and Star Tribune newspapers
CITY DEPOSITORIES
Requested Action:
Designate Old National Bank, and US Bank, NA (4M Fund), and US Bank Trust as the City’s
depositories.
C. City Depositories - Minnesota Statutes requires the City designate its depositories each
year. The City currently uses Old National Bank for its demand deposit (checking)
accounts and US Bank Trust for settling investment purchases and maturities. The City
also has funds on deposit with the 4M Fund at US Bank, NA. At this time, no changes are
proposed for 2019.
CITY COUNCIL MEETING DATES
Requested Action:
Approve or modify the 2019 Schedule of City Council meetings as presented noting the
alternate dates.
D. City Council Meetings – The City Council must designate the dates and times of regular
City Council meetings, which have traditionally been the first and third Tuesday of each
month at 6:30 p.m.
A tentative schedule is included, designating the first and third Tuesdays as regular City
Council meeting dates, with the exception of:
Tuesday, January 1 (New Year’s Day)
Tuesday, August 6 (National Night Out)
Tuesday, October 8 (Yom Kipper)
Tuesday, November 5 (School District 196 & 197 Elections)
Staff is proposing:
Wednesday, January 2
Monday, August 5
Monday, October 7
Monday, November 4
A Listening Session will be held at 6:00 p.m. before each regular City Council meeting.
Also included is a list of workshops to be scheduled at 5:30 p.m. the second and fourth
Tuesdays of each month on an as needed basis. The fourth Tuesday is listed as tentative
and might not be used, with the exception of January 22 (Council Retreat). If the
Council prefers an alternate date to the ones proposed on the schedule, this should be
discussed at the meeting.
Attachments: (1)
Schedule of proposed dates for regular City Council meetings and Special City Council
meetings
CITY COUNCIL MEETING PROCEDURES
Requested Action:
To acknowledge Robert’s Rules of Order as the means to conduct official business at all regular
City Council meetings and approve the guidelines for public participation in City Council
meetings.
E. Council Meeting Procedures – The City Council has adopted Robert’s Rules of Order to
govern all business conducted at regular City Council meetings.
Attachment: (1)
Guidelines for public participation in City Council meetings
Requested Action:
Formally ratify the practice that at least two members of the City Council must make the
request of the City Administrator to place an item on an upcoming City Council agenda.
Adding an Item to the Agenda – It has been the past practice of the City Council to
require two members of the City Council to make a request of the City Administrator
that an unscheduled item be added to a City Council meeting agenda. For example, if a
resident has a concern needing a timely response and at least two members of the City
Council would like to discuss the concern, the two Councilmembers could request that
the City Administrator include the concern on the next workshop or regular City Council
meeting. This practice of requiring two members of the City Council to place an item on
an agenda does not usually apply to items of business that are already scheduled to go
through the regular process and procedures such as development proposals, ordinance
amendments, etc. If it is the Council’s understanding that this again be the practice for
2019, formal ratification of the policy is requested.
COUNCIL STANDING COMMITTEE AND REPRESENTATIVE APPOINTMENTS
Requested Action:
Ratify the appointed members of Council standing committees, intergovernmental committees,
Fire Relief Association and other appointments as amended.
F. Council Committee Appointments – Standing committees of the City Council have been
used to examine a specific subject matter at the request of the City Council. The 2019
standing committees are as follows. The Mayor and Council shall determine whether
any changes to these committees should be made.
Standing Committees:
Communications Committee: Councilmember Tilley and Councilmember Hansen
Finance Committee: Mayor Maguire and Councilmember Bakken
Human Resources Committee: Mayor Maguire and Councilmember Fields
Public Works Committee: Councilmember Fields and Councilmember Bakken
Advisory Commission Liaisons:
Advisory Parks and Recreation Commission: - Councilmember Tilley
Advisory Planning Commission – Councilmember Hansen
Airport Relations Committee – Councilmember Fields
Energy and Environment Advisory Commission – Councilmember Bakken
Intergovernmental Committee Appointments:
Caponi Art Park Board – Recreation Supervisor Andersen
DCC 2018-2019 Board - Councilmember Hansen (Councilmember Fields as alternate)
DCC 2018-2019 Executive Board – City Administrator Osberg (Assistant City Administrator Miller as
alternate)
Eagan Convention and Visitors Bureau – Mayor Maguire
Eagan Funfest Board – Director of Parks and Recreation Pimental
LOGIS Board of Directors – Director of Finance Pepper (Assistant City Administrator Miller and
IT Manager Cook as alternates)
MSP Noise Oversight Committee – Assistant City Administrator Miller (Councilmember
Fields as alternates)
Minnesota Valley Transit Authority Board – Councilmember Hansen (Assistant Finance Director
Feldman as alternate)
Monthly Mayor/Manager Breakfasts – Mayor Maguire
Municipal Legislative Commission Board – Mayor Maguire
Other (No appointment by City Council – information only):
LMC & Metro Cities Policy Advisory Committees – Councilmember Hansen
Metro Cities Board of Directors – Councilmember Hansen
Testimony at Legislature – all as needed
Transportation Advisory Board – Councilmember Hansen
Fire Relief Association Board of Trustees – State Statute 424A.04 requires that a relief
association that is directly associated with a municipal fire department must be
managed by a board of trustees consisting of nine members. Six trustees must be
elected from the membership of the relief association and three trustees must be drawn
from the officials of the municipality served by the fire department to which the relief
association is directly associated.
The three municipal trustees must be one elected municipal official and one elected or
appointed municipal official who are designated as municipal representatives by the
municipal governing board annually and the chief of the municipal fire department.
In addition to Fire Chief Scott, the annual designations have been the Mayor and
Director of Finance Pepper.
1
Christina Scipioni
From:Emily <ekunz@pioneerpress.com>
Sent:Tuesday, November 20, 2018 9:49 AM
To:Emily Kunz
Subject:2019 Legal Notice Publications
Hello!
We would love to partner with you in 2019 on your public notice publications.
The Saint Paul Pioneer Press is a Daily Newspaper located in Saint Paul, MN, primarily serving Ramsey, Dakota,
Washington, and Anoka counties and Western Wisconsin.
Our Legal Publication rates for all notices is as follows:
$6.00 per column inch for a one‐time publication
$5.50 per column inch for each additional publication
Our circulation for Sunday full run is 202,580. All notices will be published full run.
Deadline to submit a notice is 12pm the day prior to the day you'd like your notice to run. Friday at 12pm is the deadline
to submit a notice running on Saturday, Sunday, or Monday. All legal notices can be emailed to Emily Kunz at
ekunz@pioneerpress.com AND legals@pioneerpress.com.
Thank you for considering the Saint Paul Pioneer Press as your official legal newspaper for 2019. Please let me know if
you need any additional information.
Thank you,
Emily Kunz
ST. PAUL PIONEER PRESS/TWINCITIES.COM
phone 651.228.5328 • fax 651.228.5308 • mobile 651.335.8442
10 River Park Plaza • St. Paul, MN 55107
1
Christina Scipioni
From:Wescome, Ryan <Ryan.Wescome@startribune.com>
Sent:Thursday, November 15, 2018 3:00 PM
To:Wescome, Ryan
Subject:Inquiry RE 2019 legal publication bid.
Hello,
I wanted to reach out in regards to the process surrounding the 2019 legal publication bidding. I am mainly curious of
the following:
Are you currently in a contract or working solely with another publisher?
If yes, when does the contract end?
When is the due date to have a bid submitted?
When is the meeting to decide on the bid?
Is there a formal document needed or is what below sufficient?
If we are the sole publisher of the legal notices for your city, the rate drops to only $1.31 per line. This rate is
comparable to $11.79 per 9 line column inch but unlike other publications you only pay for the lines you use. Our typical
open rate for legal is $5.61 per line.
Please call or email me directly if you have any questions or would like any more information.
You can find more information on this update below:
Expand your reach and visibility
All notices are published online at Star Tribune.com at no extra charge
Stop paying for unused white space and start paying by the line instead of the column inch
No need to wait, run any day of the week with our daily publications
Notarized affidavits are provided for each noticed published
Full Run Circulation:
Monday 140,910
Tuesday 140,910
Wednesday 178,840
Thursday 178,840
Friday 178,840
Saturday 135,560
Sunday 399,120
*All notices will be published full run
Deadlines:
Two days prior to first publication date at 4pm CST
o Publication Date Deadline
2
Monday Friday 4pm
Tuesday Friday 4pm
Wednesday Monday 4pm
Thursday Tuesday 4pm
Friday Wednesday 4pm
Saturday Thursday 4pm
Sunday Friday 4pm
Proofs of Notice
Will be emailed within 24 hours of receipt.
Affidavits:
Affidavits 24‐48 business hours after last publication date
Billing:
Notices are billed on last run date.
Contact to Place Notices:
Ryan.wescome@startribune.com
Account Coordinator: Ryan Wescome 612‐673‐4166 Ryan.wescome@startribune.com
Ryan will be your regular contact. Hours: 8 am ‐4:30 pm.
Account Executive: Daniel Weicker 612‐673‐4231 Daniel.Weicker@startribune.com
Sales Manager: Michelle Ladyzhynsky 612‐673‐4507 Michelle.Ladyzhynsky@startribune.com
Sincerely,
Ryan Wescome
Sales Representative
(612) 673‐4166
Star Tribune Building | 650 3rd Ave S, Suite #1300 | Minneapolis, MN | 55488
Proposed 2019-2010 City Council & Special City Council Meeting Dates
Wed, Jan 2
Tue, Jan 8
Tue, Jan 15
Tue, Jan 22 (Council Retreat)
Tue, Feb 5
Tue, Feb 12
Tue, Feb 19
Tue, Feb 26 (tentative)
Tue, March 5
Tue, March 12
Tue, March 19
Tue, March 26 (tentative)
Tue, April 2
Tue, April 9
Tue, April 16
Tue, April 23 (tentative)
Tue, May 7
Tue, May 14
Tue, May 21
Tue, May 28 (tentative)
Tue, June 4
Tue, June 11
Tue, June 18
Tue, June 25 (tentative
Tue, July 2
Tue, July 9
Tue, July 16
Tue, July 23 (tentative)
Mon, Aug 5
Tue, Aug 13
Tue, Aug 20
Tue, Aug 27 (tentative)
Tue, Sept 3
Tue, Sept 10
Tue, Sept 17
Tue, Sept 24 (tentative)
Tue, Oct 1
Mon, Oct 7
Tue, Oct 15
Tue, Oct 22 (tentative)
Mon, Nov 4
Tue, Nov 12
Tue, Nov 19
Tue, Nov 26 (tentative)
Tue, Dec 3
Tue, Dec 10
Tue Dec 17
No tentative date due to Christmas holiday
Tue, Jan 7, 2020
Tue, Jan 14, 2020
Tue, Jan 21, 2020
Tue, Jan 28, 2020 (tentative)
__________________________________________________________________
Eagan City Council Meeting Procedures
And Public Participation Guidelines
____________________________________________________________________________________________________________________________________ Welcome to a meeting of the Eagan City Council. In order to ensure that this and future Council meetings can be meaningful for the attending public, the City Council uses a set of rules to govern the conduct of its meetings. These “Rules of Procedure” are for the convenience of those attending the meeting. The City Council follows “Robert’s Rules of Order” for conducting official business. The following is a brief summary of the order of business for a City Council meeting which may be of interest.
COUNCIL MEETING PROCEDURES
Order of Business The schedule for a Council meeting is shown on the Agenda. An agenda is simply a list of business to be considered at a meeting and includes:
• Roll Call & Pledge of Allegiance
• Adopt Agenda/Approve Minutes
• Consent Agenda
• Public Hearings
• Old Business
• New Business
• Legislative/Intergovernmental Affairs Update
• Economic Development Authority
• Administrative Agenda
• Visitors to be Heard (10 minute total time limit)
• Closed Session To find out about specific agenda items, refer to the City Web site at www.cityofeagan.com, or call the Municipal Center at (651) 675-5000. Agendas are available at the entrance to the Council Chambers at the time of meetings.
ROLE OF THE PUBLIC The City Council welcomes the public to all Council meetings, workshops, and hearings and encourages individuals to express opinions during these meetings. To keep the agenda moving smoothly, the Council has adopted basic guidelines for making presentations before the Council. The purpose of these guidelines is:
• To provide for an orderly meeting.
• To provide equal and adequate time for review and consideration of agenda items.
• To provide equal rights to all members of the public who address the Council.
• To provide the City Council with an equal and rational approach to all decisions.
Eagan City Council Meeting Procedures
Page 2
MEETING CONDUCT GUIDELINES The City Council has established the following guidelines for the conduct of City Council meetings: 1. Persons attending a Council meeting may address the Council at the time at which specific items appear on the agenda. 2. When addressing the Council, the presenter shall approach the podium and begin presenting by stating his/her name and address. 3. All persons who speak must address the Mayor. 4. At public hearings, all audience remarks are limited to four (4) minutes and shall be addressed to the Mayor. Each person may speak only once. The Mayor may use discretion whether to allow repeat statements. 5. Presentations concerning items will be heard only upon approval of the Mayor. 6. To help maintain order, applause or other disturbances are discouraged. 7. Petitions should be presented to the City Administrator. 8. Audience members are encouraged to address the Council but can’t make motions or otherwise participate in the meeting.
NON-AGENDA ITEMS Individuals wishing to appear at regular meetings of the City Council relative to items not included on an agenda may speak or make presentations under the sections of the agenda entitled, Visitors to be Heard.* The Visitors to be Heard section at the end of the meeting and the total time limit for all speakers is 10 minutes. No Council action on a visitor’s presentation should be expected at this meeting, since the Council will want to study all proposals or requests before making a decision.
*LISTENING SESSIONS are held prior to each regular City Council meeting (generally beginning at 6:00 p.m. in the
Eagan Room of City Hall), also for the purpose of addressing items not included on the City Council Agenda.
Individuals wishing to address the City Council may speak or make presentations in this less formal meeting
environment.
THE CONSENT AGENDA The Eagan City Council uses a Consent Agenda for routine items needing little or no deliberation. Those items are identified on the agenda and are approved with one vote unless a councilmember or citizen requests that the item be discussed or considered separately.
PUBLIC HEARINGS Certain items on the agenda are identified as Public Hearings. These are formal proceedings giving citizens an opportunity to express their concerns on a specific issue. Some issues on which the Council is required to hold public hearings are the annual budget, public improvement projects, and levying of special assessments. The Council endeavors to complete action on each issue the same night as the hearing. However, there may be circumstances where additional information or action is needed making it desirable to defer action until a later date. Depending on the situation, the hearing may be closed or continued to a future meeting date.
Eagan City Council Meeting Procedures
Page 3
GENERAL HEARING PROCEDURES 1. Mayor opens the hearing. 2. Staff describes the proposal. 3. Formal action is taken to close the hearing. 4. The hearing is closed. 5. Council takes action on the issue or defers decision.
HOW THE COUNCIL VOTES Three members of the Council constitute a quorum. A majority vote is needed to adopt motions and general resolutions. A vote of 3/5 is required for most ordinances. Hearings on preliminary reports for improvements, comprehensive plan revisions, and zoning ordinance changes require a 4/5 vote. Publication of an ordinance in the official newspaper of the City is required before it actually takes effect.
MEETING DATES With few exceptions, the City Council meets at 6:30 p.m. on the first and third Tuesdays of each month in the Council Chambers of the Municipal Center Building located at 3830 Pilot Knob Road. The Council also meets in special session as needed with notice of these meetings posed at the Municipal Center Building and on the City Web site, www.cityofeagan.com. Occasionally meeting dates are changed to avoid conflicts with holidays or other events. The City Web site provides the most up-to-date information on specific meeting dates.
CABLE AND WEBCASTING With few exceptions, the regular City Council meetings are televised live on Eagan-TV channel 16. These meetings are also Webcast, via Webcast Central at www.cityofeagan.com. Cable replay information is available by calling Eagan-TV or on their Web site at www.Eagan-TV.com. Copies of a televised City meeting are available by contacting Eagan-TV at (651) 848-4698. Updated 1-13-14
AGENDA
CITY OF EAGAN
REGULAR MEETING OF THE ECONOMIC DEVELOPMENT AUTHORITY
EAGAN MUNICIPAL CENTER
JANUARY 15, 2019
A. CALL TO ORDER
B. ADOPT AGENDA
C. CONSENT AGENDA
1. Approve EDA Minutes
D. EDA ORGANIZATIONAL BUSINESS
1. Election of Officers
2. 2018 Meeting Schedule
3. Single Action for EDA and Council Resolutions
E. OLD BUSINESS
F. NEW BUSINESS
G. OTHER BUSINESS
H. ADJOURN
Agenda Information Memo
January 15, 2019 Eagan Economic Development Authority Meeting
CONSENT AGENDA
The following items referred to as consent items require one (1) motion by the
Economic Development Authority. If the Economic Development Authority wishes to
discuss any of the items in further detail, those items should be removed from the
Consent Agenda and placed under Old or New Business unless the discussion required is
brief.
1. Approve Minutes
Action To Be Considered:
To approve the minutes of the August 21, 2018 regular Economic Development
Authority meeting as presented or modified.
Attachments: (1)
EDAC1-1 EDA Minutes August 21, 2018
MINUTES OF A MEETING OF THE
EAGAN ECONOMIC DEVELOPMENT AUTHORITY
Eagan, Minnesota
August 21, 2018
A meeting of the Eagan Economic Development Authority was held on Tuesday, August 21, 2018 at the
Eagan Municipal Center. Present were President Maguire, Commissioner Bakken, Commissioner Fields,
Commissioner Hansen, and Commissioner Tilley. Also present were Executive Director Osberg, Director of
Community Development Hutmacher, and City Attorney Dougherty.
CALL TO ORDER
President Maguire called the Economic Development Authority meeting to order.
ADOPT AGENDA
Commissioner Bakken moved, Commissioner Fields seconded a motion to approve the agenda as
presented. Aye: 5 Nay: 0
CONSENT AGENDA
Commissioner Bakken moved, Commissioner Fields seconded a motion to approve the Consent Agenda
as presented. Aye: 5 Nay: 0
1. It was recommended to approve the minutes of January 16, 2018.
2. It was recommended to approve the First Amendment to Parking Ramp Easement and
Operating Agreement with Kanda City Lodging, LLC.
3. It was recommended to approve the First Amendment to Repurchase Agreement for Lot 2,
Block 1, Cedar Grove Parkway 4th Addition.
OLD BUSINESS
There was no Old Business.
NEW BUSINESS
Community Development Director Hutmacher introduced the item noting Commercial Investment
Properties, Co. (CIP) received Council approval for a four-story, 151-unit market rate apartment building
with approximately 8,000 square feet of attached restaurant space. The EDA closed on the sale February
20, 2018. The developer has worked with a restaurant broker to market the site, but has not been able
to secure a restaurant tenant. Hutmacher noted the Finance Committee has met with the developer,
reviewed restaurant marketing efforts, and recommends that the City amend the Repurchase
Agreement to allow the developer additional time to obtain City approvals for an all-residential project.
Commissioner Fields moved, Commissioner Hansen seconded a motion to approve the First Amendment
to Repurchase Agreement for Lot 1, Block 1, The Preserve at Cedar Grove. Aye: 5 Nay: 0
OTHER BUSINESS
There was no Other Business.
ADJOURNMENT
Commissioner Bakken moved, Commissioner Fields seconded a motion to adjourn the meeting. Aye: 5
Nay: 0
Date David M. Osberg, Executive Director
Agenda Information Memo
January 15, 2019, Eagan Economic Development Authority Meeting
EDA ORGANIZATIONAL BUSINESS
1. Election of Officers
Action To Be Considered:
To elect/appoint officers of the Eagan Economic Development Authority
Required Vote For Approval:
Majority of Councilmembers present
Facts:
As part of its annual organizational business, the EDA elects its officers and
appoints its Executive Director and Secretary/Deputy Director.
In 2018, the officers of the Authority were as follows:
President: Mike Maguire
Vice President: Cyndee Fields
Treasurer: Meg Tilley
Executive Director: City Administrator Dave Osberg
Secretary/Deputy Executive Director: Community Development Director Jill
Hutmacher
Attachments: (0)
Agenda Information Memo
January 15, 2019, Eagan Economic Development Authority Meeting
EDA ORGANIZATIONAL BUSINESS
2. 2019 Meeting Schedule
Action To Be Considered:
No action is necessary.
Facts:
Under its bylaws, the Eagan Economic Development Authority’s regular meetings
are scheduled to coincide with the regular meetings of the City Council.
At its meeting of December 1, 2003, the EDA confirmed the meeting schedule
defined in the bylaws and adopted a mechanism by which the Authority may
cancel such meetings as part of the adoption of the City Council agenda if no EDA
business is in order on that date. Staff is recommending that this schedule and
process continue for 2019.
Attachments: (0)
Agenda Information Memo
January 15, 2019, Eagan Economic Development Authority Meeting
EDA ORGANIZATIONAL BUSINESS
3. Single Action for EDA and Council Resolutions
Action To Be Considered:
No action is necessary.
Facts:
In 2004, the City Council adopted a process by which the actions that are
required to be taken by both the City Council and the EDA can be accomplished
through a single motion.
Under this process, the Council meeting remains in session (does not recess)
when the EDA meeting is convened.
For each business item that requires an action by both the EDA and the Council,
two resolutions are included in the background and one motion by the Council,
also hearing the item as the EDA, approves both resolutions.
At the completion of the EDA Business items, the EDA meeting is adjourned and
the remainder of the Council meeting is completed.
Attachments: (0)