2685 Vikings Cir - Building E STEM Test & Balance Report 2019-01-25 Technician: Cell Phone: Email Address: 375 230th Ave, Somerset WI 54025 - Phone: (612) 834-0311 Fax: (414) 377-3349 www.Premierbalancing.com Testing, Adjusting & Balancing Report TABB TECHNICIAN CLIENT Harris Mechanical 909 Montreal Circle St. Paul, MN 55102 ENGINEER Building E STEM Tech Incubator Build. & Garage Eagan, MN 55121 Joe Bremer 612-402-9820 joe@premierbalancing.com PROJECT 2685 Vikings Circle Dunham Associates 50 South Sixth Street Suite 1100 Report Date January 25, 2019 Minneapolis, MN 55402-1540 TABB CERTIFICATION TABB certification of a Supervisor is TABB's statement that the Supervisor is able to supervise testing, adjusting and balancing of building environmental systems to produce the design objectives or optimum system performance. For TABB Certification purposes, a Supervisor is the person who, while employed by a TABB Certified Contractor, is responsible and accountable for overseeing, coordinating and ensuring that projects are performed by TABB Certified Technicians in accordance with TABB standards (including the ICB Code of Conduct and the TAB General Rules). Measurements recorded in this report are in accordance with the SMACNA / TABB HVAC Systems, Testing, Adjusting and Balancing manual. TABB Certified "The Professional's Choice" Page 2 TABB QUALITY ASSURANCE PROGRAM BACKGROUND TABB seeks to ensure the integrity of its certification program by: (a) setting eligibility criteria for TABB Certified Supervisors and TABB Certified Contractors, (b) establishing testing procedures for TABB Certified Supervisors, (c) requiring continuing education and continuous compliance with eligibility criteria for renewal of certification, and (d) periodically reviewing its recognition of technician certification. High quality work on the part of TABB Certified Technicians and TABB Certified Supervisors and TABB Certified Contractors ( TABB Professionals ) is essential to integrity of the TABB Certification Program. TABB offers this TABB Quality Assurance Program to help assure high quality work. By accepting TABB qualification or certification, every TABB Professional accepts the responsibilities or this Program. Quality Assurance Every customer of a TABB Certified Contractor shall be entitled to expect: (1) that testing, adjusting and balancing work by the contractor and its TABB Professionals will meet TABB standards; (2) that testing, adjusting and balancing reports provided to the customer will have been prepared by a TABB Certified Technician, and reviewed by a TABB Certified Supervisor; and (3) that the report(s) will include measurements taken accurately with the date and mode of operation of the systems. TABB 8403 Arlington Boulevard Fairfax, VA 22031 Phone - (703) 299-5646 Fax - (703) 683-7615 TABB Certified "The Professional's Choice" Page 3 INSTRUMENT CALIBRATION REPORT Rotating Measuring Instrument Temperature Measuring Instrument Temperature Measuring Probe Electrical Measuring Instruments Air Pressure Measuring Instrument Air Velocity Measuring Instrument Hydronic Pressure Measuring Instrument 0 to 300 psi HM70 Vaisala M4820017 11/21/18 HMP75 Vaisala M5040569 11/21/18 INSTRUMENT MODEL MANUFACTURER SERIAL NUMBER CALIBRATION DATE PLT-5000 Check-Line B15985012P 11/28/18 117 Fluke 18561871 11/28/18 322 Fluke 17830473 11/28/18 ADM-870C Shortridge M11441 11/29/18 ADM-870C Shortridge M11441 11/29/18 HM-675 Alnor 71751056 11/20/18 TABB Certified "The Professional's Choice" Page 4 Index Project:Building E STEM Tech Incubator Build. & Garage Premier Job Number: Joe Bremer Report Date: Page 6-11 RTU-1 Variable Air Volume 12-13 RTU-2 Variable Air Volume 14-15 FCUs Constant Air Volume 16-22 Exhaust Fans Constant Air Volume 23-27 Heating Pumps Primary Hot Water 1/22/19 Premier Test & Balance 1/25/19 2481 Technician:1/25/19 System / Equipment Completion Date 1/25/19 1/25/19 1/25/19 Description TABB Certified "The Professional's Choice" Page 5 Air Handling Unit Test Data Project:Building E STEM Tech Incubator Build. & Garage System:RTU-1 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:50.00 50.00 Motor RPM:1750 1750 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:3 3 Motor Voltage:460 460 460 460 Motor Amperage:57.0 51.2 51.2 51.2 Motor BHP:45.71 44.91 Fan RPM:1064 1074 Fan: Supply Air Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 40x22 6.11 6709 41000 6754 41274 101%6754 41274 Total 41000 41274 101%41274 Minimum Outside Air Remarks:a)BAS minimum outside air damper position setpoint to obtain scheduled outside air CFM: 10% b)Amps were recorded from the VFD display. c)Hertz fan tested at: 60 d)Operational mode fan tested in: 100% Outside Air e) Outside Air %Air Temperature Air Temperature 25.0%63.9 -7.5 Airflow Measurements Area Design Final Reading Served Various Design Return Outside Component Static Pressure (inches of water) In Out Fan Static Pressure:4.67 TSP Roof Performance Data Description Scheduled / Submittal Data Actual Field Measurements System Scheduled Data Model number: RPS130D Serial number: 282857 Manufacturer:Daikin Outlet Total CFM: 4,240 2481 Premier Test & Balance 41,000 Min.Outside Air CFM: 10,250 Technician:1/25/19 Total Design CFM: Pressure Pressure Static Pressure Data -2.34 2.60 Rise / Drop Total (inches) Rise 4.94 Preliminary Reading Air Temperature Actual % 45.0 26.5% Mixed Measured TABB Certified "The Professional's Choice" Page 6 Fan Test Data Project:Building E STEM Tech Incubator Build. & Garage System:RTU-1 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:40.00 40.00 Motor RPM:1750 1750 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:3 3 Motor Voltage:460 460 460 460 Motor Amperage:46.0 36.0 36.0 36.0 Motor BHP:30.48 31.30 Fan RPM:992 1002 Fan: Fan Total Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 50x30 10.42 3936 41000 3878 40396 99%3878 40396 Total 41000 40396 99%40396 Remarks:a)Amps were recorded from the VFD display. b)Hertz fan tested at: c)Operational mode fan tested in: 100% Relief Air d) e) Airflow Measurements Area Design Final Reading Preliminary Reading Served Various Component Static Pressure (inches of water)Pressure Pressure In Out Rise / Drop Total (inches) -1.09 0.23 Rise 1.32 Fan Static Pressure:1.20 Performance Data Description Scheduled / Submittal Data Actual Field Measurements Static Pressure Data Model number: RPS130D Serial number: 282857 Manufacturer:Daikin Outlet Total CFM: NA Total Design CFM:41,000 Roof Premier Test & Balance 2481 Technician:1/25/19 System Scheduled Data TABB Certified "The Professional's Choice" Page 7 VAV Test Report Project:Building E STEM Tech Incubator Build. & Garage System:RTU-1 Premier Job Number: Joe Bremer Completion Date: Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 Flow Hood 1.00 150 150 135 135 90%128 128 2 Flow Hood 1.00 85 85 91 91 107%102 102 3 Flow Hood 1.00 85 85 82 82 96%129 129 4 Flow Hood 1.00 85 85 90 90 106%101 101 5 Flow Hood 1.00 85 85 83 83 98%118 118 6 Flow Hood 1.00 150 150 141 141 94%133 133 7 Flow Hood 1.00 150 150 161 161 107%166 166 Total 790 783 99%877 Remarks:a) b) c) DDC Address:7 Minimum Heating: 600 VAV Inlet Size:10 Minimum Cooling:240 Calibration Factor:1.77 Maximum Heating:600 Maximum Cooling:790 VAV Profile VAV Data Airflow Set points Outside T200 2nd Floor Bathroom 2nd Floor Bathroom 2nd Floor Bathroom 2nd Floor Bathroom Outside J200 Same Corridor as #6 Technician:1/23/19 VAV Number:1-01 Primary Airflow Measurements Area Design Final Reading Preliminary Reading Served Premier Test & Balance 2481 TABB Certified "The Professional's Choice" Page 8 VAV Test Report Project:Building E STEM Tech Incubator Build. & Garage System:RTU-1 Premier Job Number: Joe Bremer Completion Date: Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 10 0.55 2017 1100 2002 1092 99%1842 1005 Total 1100 1092 99%1005 Remarks:a) b) c) DDC Address:p 8 Minimum Heating: 750 VAV Inlet Size:10 Minimum Cooling:270 Calibration Factor:2.3 Maximum Heating:750 Maximum Cooling:1100 VAV Profile VAV Data Airflow Set points Area Design Final Reading Preliminary Reading Served VAV Traverse Premier Test & Balance 2481 Technician:1/22/19 VAV Number:1-02 Primary Airflow Measurements TABB Certified "The Professional's Choice" Page 9 VAV Test Report Project:Building E STEM Tech Incubator Build. & Garage System:RTU-1 Premier Job Number: Joe Bremer Completion Date: Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 10 0.55 0 0 544 297 #DIV/0!523 285 Total 0 0 #DIV/0!0 Remarks:a)Balanced per room not per diffuser. b) c) DDC Address:9 Minimum Heating: 200 VAV Inlet Size:10 Minimum Cooling:200 Calibration Factor:2.25 Maximum Heating:300 Maximum Cooling:0 VAV Profile VAV Data Airflow Set points VAV Traverse Technician:1/22/19 VAV Number:1-03 Primary Airflow Measurements Area Design Final Reading Preliminary Reading Served Premier Test & Balance 2481 TABB Certified "The Professional's Choice" Page 10 Series FPVAV Test Report Project:Building E STEM Tech Incubator Build. & Garage System:RTU-1 Premier Job Number: Joe Bremer Completion Date: Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 Flow Hood 1.00 250 250 241 241 96%187 187 2 Flow Hood 1.00 250 250 250 250 100%198 198 Total 500 491 98%385 Size K Factor Velocity CFM Velocity CFM %Velocity CFM Total VAV Primary Air:14 1.07 468 500 462 494 99%965 1032 Remarks:a) b) c) DDC Address:10 Primary Minimum:200 VAV Inlet Size:14 Primary Maximum:500 Calibration Factor:2.05 Primary Airflow Measurement Design Final Reading Preliminary Reading VAV Profile VAV Data Airflow Set points FPVAV Number:1-01 Fan Airflow Measurements Area Design Final Reading Preliminary Reading Served Plaza Level Area B Plaza Level Area B Premier Test & Balance 2481 Technician:1/22/19 TABB Certified "The Professional's Choice" Page 11 Air Handling Unit Test Data Project:Building E STEM Tech Incubator Build. & Garage System:RTU-2 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:20.00 20.00 Motor RPM:1750 1750 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:3 3 Motor Voltage:460 460 460 460 Motor Amperage:23.5 19.0 19.0 19.0 Motor BHP:15.61 16.17 Fan RPM:1217 1276 Fan: Supply Air Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 56x30 11.67 1543 18000 1576 18387 102%1578 18410 Total 18000 18387 102%18410 Minimum Outside Air Remarks:a)Amps were recorded from the VFD display. b)Hertz fan tested at: 60 c)Operational mode fan tested in: 100% Outside Air d)BAS minimum outside air damper position setpoint to obtain scheduled outside air CFM: 18% e) Design Return Outside Mixed Measured Outside Air %Air Temperature Air Temperature Air Temperature Actual % 25.0%71.0 -10.0 50.8 25.0% Airflow Measurements Area Design Final Reading Preliminary Reading Served Various -1.87 1.23 Rise 3.10 Component Static Pressure (inches of water)Pressure Pressure In Out Rise / Drop Total (inches) Fan Static Pressure:3.89 TSP Roof Performance Data Description Scheduled / Submittal Data Actual Field Measurements Static Pressure Data Model number: RPS063D Serial number: 282857 Manufacturer:Daikin Outlet Total CFM: NA Total Design CFM:18,000 Min.Outside Air CFM: 4,500 Premier Test & Balance 2481 Technician:1/25/19 System Scheduled Data TABB Certified "The Professional's Choice" Page 12 Fan Test Data Project:Building E STEM Tech Incubator Build. & Garage System:RTU-2 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:7.50 7.50 Motor RPM:1750 1750 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:3 3 Motor Voltage:460 460 460 460 Motor Amperage:10.0 8.2 8.2 8.2 Motor BHP:6.36 6.15 Fan RPM:677 687 Fan: Fan Total Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 56x30 11.67 1543 18000 1587 18515 103%1556 18153 Total 18000 18515 103%18153 Remarks:a)Amps were recorded from the VFD display. b)Hertz fan tested at: 60 c)Operational mode fan tested in: 100% Relief Air d) e) Served Various -1.02 0.23 Rise 1.25 Airflow Measurements Area Design Final Reading Preliminary Reading Performance Data Description Scheduled / Submittal Data Actual Field Measurements Static Pressure Data Component Static Pressure (inches of water)Pressure Pressure In Out Rise / Drop Total (inches) Manufacturer:Daikin Outlet Total CFM: NA Total Design CFM:18,000 Roof Fan Static Pressure:1.20 Technician:1/25/19 System Scheduled Data Model number: RPS063D Serial number: 282857 Premier Test & Balance 2481 TABB Certified "The Professional's Choice" Page 13 Fan Test Data Project:Building E STEM Tech Incubator Build. & Garage System:FCU-01 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:Frac Frac Motor RPM:1750 1750 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:1 1 Motor Voltage:115 120 Fan: Fan Total Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 17x17 2.01 162 325 173 347 107%173 347 Total 325 347 107%347 Remarks:a) b) c) d) e) Served T200 ____________Rise #VALUE! Airflow Measurements Area Design Final Reading Preliminary Reading Performance Data Description Scheduled / Submittal Data Actual Field Measurements Static Pressure Data Component Static Pressure (inches of water)Pressure Pressure In Out Rise / Drop Total (inches) Manufacturer:Denso Outlet Total CFM: 325 Total Design CFM:324 2nd Floor Area A Fan Static Pressure:0.16 Technician:1/23/19 System Scheduled Data Model number: CM12 Premier Test & Balance 2481 TABB Certified "The Professional's Choice" Page 14 Fan Test Data Project:Building E STEM Tech Incubator Build. & Garage System:FCU-02 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:Frac Frac Motor RPM:1750 1750 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:1 1 Motor Voltage:115 120 Fan: Fan Total Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 17x9 1.06 306 325 328 349 107%328 349 Total 325 349 107%349 Remarks:a) b) c) d) e) Served Plaza Level Area B -0.09 0.05 Rise 0.14 Airflow Measurements Area Design Final Reading Preliminary Reading Performance Data Description Scheduled / Submittal Data Actual Field Measurements Static Pressure Data Component Static Pressure (inches of water)Pressure Pressure In Out Rise / Drop Total (inches) Manufacturer:Denso Outlet Total CFM: 325 Total Design CFM:324 Plaza Level Area B Fan Static Pressure:0.16 Technician:1/23/19 System Scheduled Data Model number: CM12 Premier Test & Balance 2481 TABB Certified "The Professional's Choice" Page 15 Fan Test Data Project:Building E STEM Tech Incubator Build. & Garage System:EF-1 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:0.75 0.75 Motor RPM:2800 2053 Motor Hertz:60.0 44.0 Motor Service Factor:1.15 1.15 Motor Phase:1 1 Motor Voltage:115 120 Motor Amperage:9.3 6.6 Motor BHP:0.53 0.55 2088 2054 Fan: Fan Total Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 16x16 1.78 759 1350 821 1460 108%821 1460 Total 1350 1460 108%1460 Remarks:a) b) c) d) e) Served Various -1.23 0.10 Rise 1.33 Airflow Measurements Area Design Final Reading Preliminary Reading Performance Data Description Scheduled / Submittal Data Actual Field Measurements Static Pressure Data Component Static Pressure (inches of water)Pressure Pressure In Out Rise / Drop Total (inches) Manufacturer:Cook Outlet Total CFM: 1,250 Total Design CFM:1,350 Roof Fan Static Pressure:1.50 Technician:1/23/19 System Scheduled Data Model number: 120-ACE-D VF Serial number: 297SH75317-00/0000701 Premier Test & Balance 2481 TABB Certified "The Professional's Choice" Page 16 Air Outlet Test Report Project:Building E STEM Tech Incubator Build. & Garage System:EF-1 Premier Job Number: Joe Bremer Completion Date: Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 9x11 0.69 436 300 475 327 109% #VALUE! 2 9x11 0.69 218 150 201 138 92% #VALUE! 3 Flow Hood 1.10 91 100 83 91 91%83 91 4 Flow Hood 1.10 68 75 63 69 92%63 69 5 Flow Hood 1.10 68 75 65 72 95%65 72 6 Flow Hood 1.10 68 75 62 68 91%62 68 7 Flow Hood 1.10 68 75 69 76 101%69 76 8 Flow Hood 1.10 68 75 64 70 94%64 70 9 Flow Hood 1.10 68 75 66 73 97%66 73 10 Flow Hood 1.10 91 100 83 91 91%83 91 11 9x7 0.44 343 150 333 146 97%771 337 Total 1250 1221 98%#VALUE! Remarks:a) b) c) d) e) 2nd Floor Bathroom 2nd Floor Bathroom 2nd Floor Bathroom 2nd Floor Bathroom 2nd Floor Bathroom 2nd Floor Bathroom J200 Technician:1/23/19 Airflow Measurements Area Design Final Reading Preliminary Reading Served Next to E001(Grnd Floor) Plaza Level Area B 2nd Floor Bathroom 2nd Floor Bathroom Premier Test & Balance 2481 TABB Certified "The Professional's Choice" Page 17 Fan Test Data Project:Building E STEM Tech Incubator Build. & Garage System:EF-2 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:0.50 0.50 Motor RPM:1725 1351 Motor Hertz:60.0 47.0 Motor Service Factor:1.15 1.15 Motor Phase:1 1 Motor Voltage:115 120 Motor Amperage:8.0 4.3 Motor BHP:0.21 0.28 Fan RPM:1327 1351 Fan: Fan Total Opening No.CFM CFM %CFM 1 1000 1090 109% 1090 Total 1000 1090 109%1090 Remarks:a)Submittal data used to calculate GPM b) c) d) e) Airflow Measurements Area Design Final Reading Preliminary Reading Served Penthouse Component Static Pressure (inches of water)Pressure Pressure In Out Rise / Drop Total (inches) -0.36 0.06 Rise 0.42 Fan Static Pressure:0.50 Performance Data Description Scheduled / Submittal Data Actual Field Measurements Static Pressure Data Model number: 120-ACW Serial number: 297SH7531200/0003301 Manufacturer:Cook Outlet Total CFM: 1,000 Total Design CFM:1,000 Penthouse Premier Test & Balance 2481 Technician:1/23/19 System Scheduled Data TABB Certified "The Professional's Choice" Page 18 Fan Test Data Project:Building E STEM Tech Incubator Build. & Garage System:EF-3 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:0.75 0.75 Motor RPM:1725 1380 Motor Hertz:60.0 48.0 Motor Service Factor:1.15 1.15 Motor Phase:1 1 Motor Voltage:115 120 Motor Amperage:9.6 4.8 Motor BHP:0.37 0.39 Fan RPM:1326 1380 Fan: Fan Total Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 8 0.35 4286 1500 4132 1446 96%877 307 Total 1500 1446 96%307 Remarks:a) b) c) d) e) Served Penthouse -0.05 0.42 Rise 0.47 Airflow Measurements Area Design Final Reading Preliminary Reading Description Scheduled / Submittal Data Actual Field Measurements Static Pressure Data Component Static Pressure (inches of water)Pressure Pressure In Out Rise / Drop Total (inches) Total Design CFM:1,500 Penthouse Fan Static Pressure:0.50 Performance Data System Scheduled Data Model number: SQND-EC Serial number: 297SH75317-00/0004501 Manufacturer:Cook Outlet Total CFM: 1,500 Premier Test & Balance 2481 Technician:1/23/19 TABB Certified "The Professional's Choice" Page 19 Fan Test Data Project:Building E STEM Tech Incubator Build. & Garage System:EF-4 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:0.25 0.25 Motor RPM:1725 1725 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:1 1 Motor Voltage:115 120 Motor Amperage:3.4 1.7 Motor BHP:0.14 0.13 Fan RPM:1557 1570 Fan: Fan Total Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 12x12 1.00 500 500 522 522 104%522 522 Total 500 522 104%522 Remarks:a) b) c) d) e) Served Elevator Shaft Area B -0.36 0.09 Rise 0.45 Airflow Measurements Area Design Final Reading Preliminary Reading Performance Data Description Scheduled / Submittal Data Actual Field Measurements Static Pressure Data Component Static Pressure (inches of water)Pressure Pressure In Out Rise / Drop Total (inches) Manufacturer:Cook Outlet Total CFM: 500 Total Design CFM:500 2nd Floor Area B Fan Static Pressure:0.50 Technician:1/23/19 System Scheduled Data Model number: ACED-EC Serial number: 297SH75317-00/0002001 Premier Test & Balance 2481 TABB Certified "The Professional's Choice" Page 20 Fan Test Data Project:Building E STEM Tech Incubator Build. & Garage System:EF-6 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:0.50 0.50 Motor RPM:2800 2800 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:1 1 Motor Voltage:115 120 Fan: Fan Total Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 16x12 1.33 675 900 687 916 102%687 916 Total 900 916 102%916 Remarks:a) b) c) d) e) Served Plaza Level Next to stairs -0.32 0.14 Rise 0.46 Airflow Measurements Area Design Final Reading Preliminary Reading Performance Data Description Scheduled / Submittal Data Actual Field Measurements Static Pressure Data Component Static Pressure (inches of water)Pressure Pressure In Out Rise / Drop Total (inches) Manufacturer:Cook Outlet Total CFM: 900 Total Design CFM:900 103 Fan Static Pressure:0.50 Technician:1/25/19 System Scheduled Data Model number: SQN-D VF Premier Test & Balance 2481 TABB Certified "The Professional's Choice" Page 21 Fan Test Data Project:Building E STEM Tech Incubator Build. & Garage System:EF-7 Premier Job Number: Joe Bremer Completion Date: Equipment Location: Motor HP:0.50 0.50 Motor RPM:2800 2800 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:1 1 Motor Voltage:115 120 Fan: Fan Total Opening Size K No.Factor Velocity CFM Velocity CFM %Velocity CFM 1 16x12 1.33 675 900 698 931 103%698 931 Total 900 931 103%931 Remarks:a) b) c) d) e) Served E001 -0.37 0.11 Rise 0.48 Airflow Measurements Area Design Final Reading Preliminary Reading Performance Data Description Scheduled / Submittal Data Actual Field Measurements Static Pressure Data Component Static Pressure (inches of water)Pressure Pressure In Out Rise / Drop Total (inches) Manufacturer:Cook Outlet Total CFM: 900 Total Design CFM:900 001 Fan Static Pressure:0.50 Technician:1/25/19 System Scheduled Data Model number: SQN-D VF Premier Test & Balance 2481 TABB Certified "The Professional's Choice" Page 22 Pump Test Data Project:Building E STEM Tech Incubator Build. & Garage System:PHWP-01 Premier Job Number: Joe Bremer Completion Date: Type of service: Equipment Location: Impeller Size: Motor HP:1.50 1.50 Motor RPM:1760 1760 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:3 3 Motor Voltage:460 460 460 460 Motor Amperage:2.1 1.5 1.5 1.5 Motor BHP:1.04 1.09 Pump RPM:1750 1760 Direct Drive Final Readings Station Terminal No.Name GPM GPM %GPM 1 B-01 125.0 #DIV/0!#DIV/0!#DIV/0! Total 125.0 #DIV/0!#DIV/0!#DIV/0! Remarks:a)Tested with only one pump running. b)Submittal data was used to calculate total pump GPM. c)Pump tested with all associated valves 100% open. d)Balanced triple duty valve position (%): 20% Open e) Water flow Measurements Design Final Reading Preliminary Reading 5.625 Performance Data Description Scheduled / Submittal Data Actual Field Measurements Pump Pressure Data Component Pressure Data Pressure Total Head Suction Discharge Rise / Drop Pressure (feet) 15.0 25.0 Rise 23.1 Technician:1/23/19 System Scheduled Data Model number: Series e-80 2.5x2.5x7B Manufacturer:Bell & Gossett Total terminal GPM:125.0 Total Design GPM:100 Primary heating Head Press. (Feet):25 Penthouse Premier Test & Balance 2481 TABB Certified "The Professional's Choice" Page 23 Pump Test Data Project:Building E STEM Tech Incubator Build. & Garage System:PHWP-02 Premier Job Number: Joe Bremer Completion Date: Type of service: Equipment Location: Impeller Size: Motor HP:1.50 1.50 Motor RPM:1760 1760 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:3 3 Motor Voltage:460 460 460 460 Motor Amperage:2.1 1.5 1.5 1.5 Motor BHP:1.04 1.09 Pump RPM:1750 1760 Direct Drive Final Readings Station Terminal No.Name GPM GPM %GPM 1 B-01 125.0 #DIV/0!#DIV/0!#DIV/0! Total 125.0 #DIV/0!#DIV/0!#DIV/0! Remarks:a)Tested with only one pump running. b)Submittal data was used to calculate total pump GPM. c)Pump tested with all associated valves 100% open. d)Balanced triple duty valve position (%): 20% Open e) Water flow Measurements Design Final Reading Preliminary Reading Performance Data Description Scheduled / Submittal Data Actual Field Measurements Pump Pressure Data Component Pressure Data Pressure Total Head Suction Discharge Rise / Drop Pressure (feet) 15.0 25.0 Rise 23.1 System Scheduled Data Model number: Series e-80 2.5x2.5x7B Manufacturer:Bell & Gossett Total terminal GPM:125.0 Total Design GPM:100 Primary heating Head Press. (Feet):25 Penthouse 5.625 Premier Test & Balance 2481 Technician:________________ TABB Certified "The Professional's Choice" Page 24 Pump Test Data Project:Building E STEM Tech Incubator Build. & Garage System:SHWP-01 Premier Job Number: Joe Bremer Completion Date: Type of service: Equipment Location: Impeller Size: Motor HP:7.50 7.50 Motor RPM:1770 1770 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:3 3 Motor Voltage:460 460 460 460 Motor Amperage:9.6 7.3 7.3 7.3 Motor BHP:5.57 5.70 Pump RPM:1770 1770 Direct Drive Final Readings Station No.GPM GPM %GPM 1 200.0 210.0 105%210.0 Total 200.0 210.0 105%210.0 Remarks:a)Tested with only one pump running. b)Amps were recorded from the VFD display. c)Submittal data was used to calculate total pump GPM. d)Pump tested with all associated valves 100% open. e)Required BAS differential pressure set point to obtain scheduled GPM at all devices (PSI):10 f)Balanced triple duty valve position (%):100% g)Hertz pump tested at:60.0 Water flow Measurements Design Final Reading Preliminary Reading Performance Data Description Scheduled / Submittal Data Actual Field Measurements Pump Pressure Data Component Pressure Data Pressure Total Head Suction Discharge Rise / Drop Pressure (feet) 15.0 45.0 Rise 69.3 System Scheduled Data Model number: Series e-1510 3BD Serial number: SIC-SGR Manufacturer:Bell & Gossett Total terminal GPM:259.3 Total Design GPM:200 Secondary heating Head Press. (Feet):70 Penthouse 8.375 Premier Test & Balance 2481 Technician:1/23/19 TABB Certified "The Professional's Choice" Page 25 Pump Test Data Project:Building E STEM Tech Incubator Build. & Garage System:SHWP-02 Premier Job Number: Joe Bremer Completion Date: Type of service: Equipment Location: Impeller Size: Motor HP:7.50 7.50 Motor RPM:1770 1770 Motor Hertz:60.0 60.0 Motor Service Factor:1.15 1.15 Motor Phase:3 3 Motor Voltage:460 460 460 460 Motor Amperage:9.6 7.3 7.3 7.3 Motor BHP:5.57 5.70 Pump RPM:1770 1770 Direct Drive Final Readings Station No.GPM GPM %GPM 1 200.0 210.0 105%210.0 Total 200.0 210.0 105%210.0 Remarks:a)Tested with only one pump running. b)Amps were recorded from the VFD display. c)Submittal data was used to calculate total pump GPM. d)Pump tested with all associated valves 100% open. e)Required BAS differential pressure set point to obtain scheduled GPM at all devices (PSI):10 f)Balanced triple duty valve position (%):100% g)Hertz pump tested at:60.0 Water flow Measurements Design Final Reading Preliminary Reading Performance Data Description Scheduled / Submittal Data Actual Field Measurements Pump Pressure Data Component Pressure Data Pressure Total Head Suction Discharge Rise / Drop Pressure (feet) 15.0 45.0 Rise 69.3 System Scheduled Data Model number: Series e-1510 3BD Serial number: SIC-SGR Manufacturer:Bell & Gossett Total terminal GPM:259.3 Total Design GPM:200 Secondary heating Head Press. (Feet):70 Penthouse 8.375 Premier Test & Balance 2481 Technician:1/23/19 TABB Certified "The Professional's Choice" Page 26 Balancing Valve Test Data Project:Building E STEM Tech Incubator Build. & Garage System:SHWP-01 & 02 Premier Job Number: Joe Bremer Completion Date: Station Terminal Valve Valve CV No.Name Size Setting Rating Inches GPM Inches GPM %Inches GPM 1 CUH-1 1 40.0 0.95 177 2.4 188 2.5 103%232 2.7 2 CUH-2 1 30.0 1.70 249 5.1 256 5.2 101%192 4.5 3 CUH-3 1 30.0 1.70 249 5.1 233 4.9 97%233 4.9 4 CUH-4 1 30.0 1.70 249 5.1 210 4.7 92%112 3.4 1 UH-1 1 20.0 2.80 274 8.8 298 9.2 104%123 5.9 1 UH-3 1 20.0 2.80 274 8.8 234 8.1 92%143 6.4 2 UH-4 1 20.0 2.80 274 8.8 284 9.0 102%195 7.4 3 UH-5 1 20.0 2.80 274 8.8 299 9.2 104%198 7.5 4 UH-6 1 30.0 1.70 186 4.4 201 4.6 104%266 5.3 5 UH-7 1 20.0 2.80 221 7.9 210 7.7 98%132 6.1 6 UH-8 1 20.0 2.80 221 7.9 243 8.3 105%273 8.8 7 UH-9 1 20.0 2.80 221 7.9 210 7.7 98%74 4.6 8 UH-10 1 30.0 1.70 186 4.4 177 4.3 98%98 3.2 9 UH-11 1 30.0 1.70 186 4.4 201 4.6 104%134 3.7 10 UH-12 1 20.0 2.80 221 7.9 201 7.5 95%201 7.5 11 UH-13 1 50.0 0.50 187 1.3 198 1.3 103%232 1.4 12 UH-14 1.5 30.0 8.30 122 17.4 133 18.2 104%344 29.2 15 UH-15 1 20.0 2.80 221 7.9 213 7.8 98%111 5.6 1 FTR-1 1 40.0 0.95 177 2.4 183 2.4 102%133 2.1 2 FTR-2 1 40.0 0.95 177 2.4 199 2.5 106%123 2.0 3 FTR-3 1 50.0 0.50 160 1.2 173 1.2 104%98 0.9 4 FTR-4 1 50.0 0.50 160 1.2 183 1.3 107%203 1.4 5 FTR-5 1 50.0 0.50 160 1.2 165 1.2 102%111 1.0 1*RTU-01 90.0 99.0 110%99.0 2*RTU-02 25.0 27.0 108%27.0 Total 247.7 259.4 105%251.6 Remarks:a)Water flow station manufacturer: B&G b)* Temperatures used to calculate GPM. c) d) e) Water flow Measurements Design Final Reading Preliminary Reading Premier Test & Balance 2481 Technician:1/23/19 TABB Certified "The Professional's Choice" Page 27 1337931-USTA r 0 -P7j9nS For Office Use r il 6 0AC—Ct-- Permit#: / 0100 i C Permit Fee: / ' 0 E Staff: -�_O� — _ _ RECEIVE') �_______ _ 1 Payment Recvd: Yes No 3830 PILOT KNOB ROAD I EAGAN,MN 55122-1810 (651)675-5675 I TDD:(651)454-8535 I FAX: (651)675-5694 FEB 0 4 2020 Lplans:_Electronic _ Paper PJ buildinginspections@citvofeacian.com 2020 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION Date: 02/04/2020 Site Address: 2685 Vikings Circle, Eagan, MN 55121 Tenant: USIA Suite#: o Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components Phone: Name: Property Owner Address/City/Zip: A.•licant is: Owner Contractor xxaxm»rxxm+.a ' ....m..... .... .........a... .,.. ew..x..mwx+ . mvs«w�.�wwsmmrro:ems.c+mea._.wm..a,a®c.»ws-wrv.- iInstall 19 sprinkler heads to new ceilings - existing system. Type of Work Description of work: 3000 02/13/2020 Construction Cost: Estimated Com•letion Date: Ahern Fire Protection C039 License#: Name: Address: 13705 26th Ave, Suite 110 City_ Plymouth 1. Contractor 612.843.3210 State: MN Zip: 55441 Phone: kinne ahernfire.com Contact: Jan Kinney Email j y@ '_`...." WORK TYPE � FIRE PERMIT TYPE _New Addition I I y_Sprinkler System(#of heads 19 ) —' i _Fire Pump _Standpipe I f Alterations _Remodel Other: Other: ' DESCRIPTION OF WORK: ✓ Commercial Residential Educational _. FEESContract Value$3000 x .01 $60.00 Permit Fee Minimum =$ 60 Permit Fee Surcharge=Contract Value x$0.0005 If the project valuation is over$1 million, please call for Surcharge =$ 1.50 Surcharge $ 61.50 $100.00 Residential New (Includes State Surcharge) TOTAL FE = . .— _$ Fire eer 3/4" Fire Meter-$290.00 =$ TOTAL FEE Radio Read(required with Fire Meters)-$200 "1 You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeana n.comisubscribe. I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. �xJan Kinney x Applicant's Printed Name Appli ant's atu