783 Summerbrooke Ct eL 1560407 - rOZ.O O 1/111
S�g6 - /00 ' For Office Use II .?, • , �
, /Q 3o,p .gjs Permit#:
E AG N
gas
Permit Fee:/Of
RECEIVED 740.17Date Received: /
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810
(651)675-5675 I TDD:(651)454-8535 I FAX:(651)675-5694 JUL 1 0 2019 Staff:
buildinginspections(acitvofeaaan.com L
LO / b b�l
2019 RESIDENTIAL BUILDING PERMIT APPLICATION
Date: 7 9'/9 Site Address: 7 3 SJ1/21,M1te440k COUgir Unit#:
Name:Youngfield Homes dba Country Joe Homes Phone: 952-469-4066
Resident/ 22260 Dodd Blvd, Lakeville, MN 55044
Owner Address/City/Zip:
Applicant is: Owner ✓ Contractor L6 �i t l
d I , �n1
fD' IL(2�
Description of work: •
New Single Family Home J
Type of Work q Q'
Construction Cost: 42: y 10 . 13( Multi-Family Building:(Yes /No ✓ )
Company:Youngfield Homes/Country Joe Homes Contact: Steve Sauber
Contractor
Address: 22260 Dodd Blvd City: Lakeville
State: MN Zip: 55044 Phone: 952-380-8120 Email: ssauber@countryjoehomes.com
License#: BC627670 Lead Certificate#:
If the project is exempt from lead certification, please explain why:
New Construction
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
gi Yes No If yes,date and address of master plan: .1—? 7l!l 9� Stfivoiees k6 &Ara.
Licensed Plumber: Air Mechanical Inc Phone: 763-746-3767
Mechanical Contractor:Air Mechanical Inc Phone: 763-746-3753
Sewer&Water Contractor: Giles Brothers Excavating Phone: 612-366-4995
Fire Suppression Contractor: Phone:
NOTE:Plans and supporting documents that you submit are considered to be public information. Portions of the information maybe
classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets.
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's
website at www.citvofeagan.comisubscribe.
Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180
days of permit issuance.
CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you
intend to dig to receive locates of underground utilities. www.gopherstateonecall.org
I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of
XSteve Sauber
Applicant's Printed Name Applicant's Signature
• �03 Somo,e r bro k cJ /6ZS �
R
DO NOT WRITE BELOW THIS LINE
SUB TYPES
Foundation _ Fireplace _ Porch(3-Season) _ Exterior Alteration(Single Family)
v Single Family _ Garage _ Porch(4-Season) _ Exterior Alteration(Multi)
Multi _ Deck _ Porch(Screen/Gazebo/Pergola) _ Miscellaneous
01 of_Plex Lower Level Pool Accessory Building
WORK TYPES
?c,New _ Interior Improvement _ Siding — Demolish Building*
Addition — Move Building — Reroof _ Demolish Interior
Alteration _ Fire Repair _ Windows _ Demolish Foundation
Replace _ Repair _ Egress Window _ Water Damage
Retaining Wall *Demolition of entire building—give PCA handout to applicant
5
DESCRIPTION 3Valuation Occupancy I)4
ti ' MCES System
Plan Review Code Edition 1', \1``..7/ SAC Units
(25% 100% ) Zoning ;, City Water
Census Code StoriesBooster Pump
#of Units Square Feet i �_ PRV
#of Buildings Length s Fire Suppression Required
i
Type of Construction 1 { , Width I
li REQUIRED INSPECTIONS
ik Footings(New Building) Meter Size:
Footings(Deck) y Final I C.O. Required
Footings(Addition) I' Final/No C.O. Required
X Foundation Foundation Before Backfill HVAC Service Test Gas Line Air Test Hood
I Roof: Ice&4ater Final Pool: Footings Air/Gas Tests Final
Framing 30 Minutes1 Hour Drain Tile
)( Fireplace: )(Rough In Air Test yr Final Siding: Stucco Lath Stone Lath Brick EFTS
7Insulation Windows
Sheathing Retaining Wall: Footings Backfill Final
Sheetrock Radon Control
Fire Walls ! Fire Suppression: Rough In Final
Braced Walls Erosion Control
\[ Shower Pan Other:
J� f- I By: , Building Inspector
RESIDENTIAL FEES
Base Fee6/61i ( 1'' f` : .- ){, >`i- -7
Surcharge —
w.� N.
r� ,N4 71 r
Plan Review .1 1 _t ',ai ,` • l/ �I 7��i ��3
MCES SAC / 1 r /
City SAC / L�' \I 1 - ) /70i,, ) l
Utility Connection Charge /
S&W Permit&Surcharge 61- S,' X 7L), 'I/
_
65a k, I
Treatment Plant
Copies 1) / .._
.�
TOTAL N..j r
1r o pi
New Construction Energy Code Compliance Certificate
Per R401.3 Certificate.A building certificate shall be posted on or in the electrical distribution Date Certificate Posted
panel. 6/12/2019._eID U tLURWAI IAS'
Mailing Address of the Dwelling or Dwelling Unit City -rumnim/nieVl W UWi.III 111
783 Summerbrooke Ct Eagan HEATING,COOLING&PLUMBING
Name of Residential Contractor MN License Number "Creating Custom Comfort"Since 1985
Country Joe Homes BC627670
THERMAL ENVELOPE RADON CONTROL SYSTEM
Type:Check All That Apply X Passive(No Fan)
o a) Active(With fan and monometer or
na other system monitoring device)
�
a) Location(or future location)of Fan:
T
o G. A =0 4) o -p E
NN -0 V -0 a) 7
Q m m cu ,_ N 'a C
Tu: N OQz . . L O
Insulation Location 0 co m 0 O - w N o o 2) Trp f_3
EE
175 -3
m
2 . z LT: ii: i b: ix Other Please Describe Here
Below Entire Slab X
Foundation Wall R-15 X
Perimeter of Slab on Grade x
Rim Joist(1st Floor) R-2o X
Rim Joist(2nd Floor+) R-20 X
Wall R-21 X
Ceiling,flat R-49 X
Ceiling,vaulted R-49 X
Bay Windows or cantilevered areas
Floors over unconditioned area R-30 X _
Describe other insulated areas
Building envelope air tightness: Duct system air tightness:
Windows&Doors Heating or Cooling Ducts Outside Conditioned Spaces
Average U-Factor(excludes skylights and one door)U: 0.29 X Not applicable,all ducts located in conditioned space
Solar Heat Gain Coefficient(SHGC): 0.28 R-8 R-value
MECHANICAL SYSTEMS Make-up Air Select a Type
Appliances Heating System Domestic Water Cooling System
Heater X Not required per mech.code
Fuel Type Natural gas Electric Electric Passive
Manufacturer BRYANT Westinghouse BRYANT Powered
Interlocked with exhaust device.
Model 912SC48100 WEG100C2X045 BA13NA042 Describe:
Input in 100,000 Capacity 100 Output 3.5 Other,describe:
BTUS: in Gallons: in Tons:
Rating or Size
AFUE or 92% SEER 13 Location of duct or system:
HSPF% IEER
Efficiency
Heating Loss Heating Gain Cooling Load
Residential Load Calculatii 81,724 26,879 37,316 Cfm's
"round duct OR
I MECHANICAL VENTILATION SYSTEM "metal duct
Describe any additional or combined heating or cooling systems if installed:(e.g.two furnaces or air Combustion Air Select a Type
source heat pump with gas back-up furnace): X Not required per mech.code
Select Type RENEW AIRE EV-200(BALANCED) Passive
Heat Recover Ventilator(HRV) Capacity in cfms: Low: High: Other,describe:
X Energy Recover Ventilator(ERV)Capacity in cfms: Low: 100 High: 200 Location of duct or system:
Balanced Ventilation capacity in cfms: FLEX MECH ROOM
Location of fan(s),describe: I Cfm's
Capacity continuous ventilation rate in cfms: "FLEX OR
Total ventilation(intermittent+continuous)rate in cfms: "metal duct
Builders Associaton of Minnesota version 101014
l
HVAC Load Calculations
for
Country Joe Homes
783 Summerbrooke Ct
Eagan, MN 55123
Prepared By:
Samantha Lykke
Air Mechanical
16411 Aberdeen St NE
Ham Lake, MN 55304
Wednesday,June 12,2019
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D.
Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc.
Air Mechanical Inc.
Ham Lake,MN 55304 Page 2
Project Report
eneral Project Information 1
Project Title:
Project Date: Wednesday, June 12, 2019
Client Name: Country Joe Homes
Client Address: 783 Summerbrooke Ct
Client City: Eagan, MN 55123
Company Name: Air Mechanical
Company Representative: Samantha Lykke
Company Address: 16411 Aberdeen St NE
Company City: Ham Lake, MN 55304
esign_Data
Reference City: Minneapolis, Minnesota
Building Orientation: Front door faces South
Daily Temperature Range: Medium
Latitude: 44 Degrees
Elevation: 834 ft.
Altitude Factor: 0.970
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter: -15 -12.38 n/a 30% 72 29.40
Summer: 88 73 50% 50% 74 37
Check Figures _
Total Building Supply CFM: 1,193 CFM Per Square ft.: 0.260
Square ft. of Room Area: 4,582 Square ft. Per Ton: 1,473
Volume (ft3)of Cond. Space: 38,137
[Building Loads — 1
Total Heating Required Including Ventilation Air: 81,724 Btuh 81.724 MBH
Total Sensible Gain: 26,879 Btuh 72 %
Total Latent Gain: 10,437 Btuh 28 %
Total Cooling Required Including Ventilation Air: 37,316 Btuh 3.11 Tons (Based On Sensible + Latent)
Notesu R
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:1Users\SlykkelDesktop1783 Summerbrooke Ct.rh9 Wednesday, June 12, 2019, 1:43 PM
Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc.
Air Mechanical Inc.
Ham Lake.MN 55304 Page 3
Miscellaneous Report
System 1 Outdoor Outdoor Outdoor Indoor Indoor Grains
Input Data _ Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter: -15 -12.38 100% 30% 72 29.40
Summer: 88 73 50% 50% 74 37.40
Duct Sizing Inputs
Main Trunk Runouts
Calculate: Yes Yes
Use Schedule: Yes Yes
Roughness Factor: 0.00300 0.01000
Pressure Drop: 0.1000 in.wg./100 ft. 0.1000 in.wg./100 ft.
Minimum Velocity: 650 ft./min 450 ft./min
Maximum Velocity: 900 ft./min 750 ft./min
Minimum Height: 0 in. 0 in.
Maximum Height: 0 in. 0 in.
Outside Air Data
Winter Summer
Infiltration Specified: 0.370 AC/hr 0.190 AC/hr
181 CFM 93 CFM
Infiltration Actual: 0.452 AC/hr 0.322 AC/hr
Above Grade Volume: X 29,374 Cu.ft. X 29,374 Cu.ft.
13,290 Cu.ft./hr 9,468 Cu.ft./hr
X 0.0167 X 0.0167
Total Building Infiltration: 221 CFM 158 CFM
Total Building Ventilation: 95 CFM 95 CFM
---System 1---
Infiltration &Ventilation Sensible Gain Multiplier: 14.94 = (1.10 X 0.970 X 14.00 Summer Temp. Difference)
Infiltration &Ventilation Latent Gain Multiplier: 24.67 = (0.68 X 0.970 X 37.40 Grains Difference)
Infiltration &Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference)
Winter Infiltration Specified: 0.370 AC/hr(181 CFM), Construction: Average
Summer Infiltration Specified: 0.190 AC/hr(93 CFM), Construction: Average
C:\Users\Slykke\Desktop\783 Summerbrooke Ct.rh9 Wednesday, June 12, 2019, 1:43 PM
Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc.
Air Mechanical Inc. •
Ham Lake,MN 55304 Page 4
Duct Size Preview
Room or Source Minimurr Maximum Rough Design SP Duct Duct Htg Clg Act. Duct
Duct Name Velocity, Velocity Factor L/10C Loss Velocity Length Flow Flow Flow Size
System 1
Supply Runouts
Zone 1
1-Lower Level Built-In 450 750 0 0.1 560.2 232 229 3--5
2-Mian Level Built-In 450 750 0 0.1 545.8 396 536 5--6
3-Upper Level Built-In 450 750 0 0.1 544.7 348 428 4--6
Other Ducts in System 1
Supply Main Trunk Built-In 650 900 0 0.1 842 976 1,193 12x17
Summary
System 1
Heating Flow: 976
Cooling Flow: 1193
C:1Users\Slykke\Desktop1783 Summerbrooke Ct.rh9 Wednesday, June 12, 2019, 1:43 PM
Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc.
Air Mechanical Inc. 1111
Ham Lake.MN 55304 Page 5
Detailed Room Loads - Room 1 - Lower Level (Average Load Procedure)
I General
Calculation Mode: Htg. &clg. Occurrences: 1
Room Length: 1,481.0 ft. System Number: 1
Room Width: 1.0 ft. Zone Number: 1
Area: 1,481.0 sq.ft. Supply Air: 229 CFM
Ceiling Height: 8.0 ft. Supply Air Changes: 1.2 AC/hr
Volume: 11,848.0 cu.ft. Req. Vent. Clg: 0 CFM
Number of Registers: 3 Actual Winter Vent.: 23 CFM
Runout Air: 76 CFM Percent of Supply.: 10
Runout Duct Size: 5 in. Actual Summer Vent.: 18 CFM
Runout Air Velocity: 560 ft./min. Percent of Supply: 8 %
Runout Air Velocity: 560 ft./min. Actual Winter Infil.: 25 CFM
Actual Loss: 0.252 in.wg./100 ft. Actual Summer Infil.: 18 CFM
Item Area -U- Htg Sen Clg Lat Sen
Description Quantity Value HTM Loss HTM Gain Gain
N -Wall-15B0-10sf-8 50 X 8 400 0.050 4.4 1,740 0.0 0 0
E -Wall-15B0-10sf-8 46 X 8 368 0.050 4.4 1,601 0.0 0 0
S -Wall-12F-Obw 50 X 8 293 0.065 5.7 1,657 0.6 0 183
W-Wall-15B0-10sf-8 46 X 8 368 0.050 4.4 1,601 0.0 0 0
S-GIs-4a shgc-0.28 0%S 17.5 0.290 25.2 442 16.8 0 294
S-GIs-4agdoor shgc-0.28 0%S 42 0.290 25.2 1,060 16.8 0 706
S-GIs-4a shgc-0.28 0%S (2) 25 0.290 25.2 630 16.8 0 420
S-GIs-4a shgc-0.28 0%S 22.5 0.290 25.2 568 16.8 0 378
Floor-21A-20 1 X 1481 1481 0.027 2.3 3,479 0.0 0 0
Subtotals for Structure: 12,778 0 1,981
Infil.: Win.: 24.9, Sum.: 17.8 400 5.790 2,316 0.665 438 266
Ductwork: 972 0
AED Excursion: 191
People: 200 lat/per, 230 sen/per: 1 200 230
Equipment: 900 1,200
Li.ghting;.........._.. 300 1,023
Room Totals: 16,066 1,538 4,891
C:1Users\Slykke\Desktop1783 Summerbrooke Ct.rh9 Wednesday, June 12, 2019, 1:43 PM
Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc.
Air Mechanical Inc. le
Ham Lake,MN 55304 Page 6
Detailed Room Loads - Room 2 - Mian LeveljAverage Load Procedure)
General
Calculation Mode: Htg. &clg. Occurrences: 1
Room Length: 1,481.0 ft. System Number: 1
Room Width: 1.0 ft. Zone Number: 1
Area: 1,481.0 sq.ft. Supply Air: 536 CFM
Ceiling Height: 9.0 ft. Supply Air Changes: 2.4 AC/hr
Volume: 13,329.0 cu.ft. Req. Vent. Clg: 0 CFM
Number of Registers: 5 Actual Winter Vent.: 39 CFM
Runout Air: 107 CFM Percent of Supply.: 7
ok
Runout Duct Size: 6 in. Actual Summer Vent.: 43 CFM
Runout Air Velocity: 546 ft./min. Percent of Supply: 8 %
Runout Air Velocity: 546 ft./min. Actual Winter Infil.: 108 CFM
Actual Loss: 0.185 in.wg./100 ft. Actual Summer Infil.: 77 CFM
Item Area -U- Htg Sen CIg Lat Sen
Description Quantity Value HTM Loss HTM Gain Gain
N -Wall-12F-Obw 50 X 9 380.5 0.065 5.7 2,152 0.6 0 237
E-Wall-12F-0bw 46 X 9 404 0.065 5.7 2,285 0.6 0 252
S-Wall-12F-Obw 50 X 9 286.5 0.065 5.7 1,620 0.6 0 179
W-Wall-12F-Obw 46 X 9 380 0.065 5.7 2,149 0.6 0 237
N -Door-11 G 3 X 7 21 0.540 47.0 987 13.5 0 284
N -Door-11 N 3 X 7 21 0.350 30.5 639 8.8 0 184
N -GIs-4a shgc-0.28 100%S (2) 27.5 0.290 25.2 694 9.4 0 258
S-GIs-4a shgc-0.28 0%S (2) 30 0.290 25.2 756 16.8 0 504
S-GIs-4agdoor shgc-0.28 0%S 21 0.290 25.2 530 16.8 0 353
E-GIs-4a shgc-0.28 0%S 10 0.290 25.2 252 30.2 0 302
S-GIs-4a shgc-0.28 0%S (3) 49.5 0.290 25.2 1,248 16.8 0 831
S-GIs-4a shgc-0.28 0%S (3) 63 0.290 25.2 1,590 16.8 0 1,059
W-GIs-4a shgc-0.28 0%S (2) 8 0.290 25.2 202 30.3 0 242
W-GIs-4a shgc-0.28 0%S 26 0.290 25.2 _ 656 30.2 0 786
Subtotals for Structure: 15,760 0 5,708
Infil.: Win.: 107.8, Sum.: 76.8 1,728 5.790 10,005 0.664 1,894 1,147
Ductwork: 1,659 0
AED Excursion: 447
People: 200 lat/per, 230 sen/per: 1 200 230
Equipment: 1,200 2,200
Lighting: 500 1,705
Room
,705Room Totals: 27,424 3,294 11,437
C:\Users\Slykke\Desktop1783 Summerbrooke Ct.rh9 Wednesday, June 12, 2019, 1:43 PM
Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc.
Air Mechanical Inc. 1111
Ham Lake,MN 55304Page 7
Detailed Room Loads - Room 3 -Upper Level (Average Load Procedure)
General -
Calculation Mode: Htg. &clg. Occurrences: 1
Room Length: 1,620.0 ft. System Number: 1
Room Width: 1.0 ft. Zone Number: 1
Area: 1,620.0 sq.ft. Supply Air: 428 CFM
Ceiling Height: 8.0 ft. Supply Air Changes: 2.0 AC/hr
Volume: 12,960.0 cu.ft. Req. Vent. Clg: 0 CFM
Number of Registers: 4 Actual Winter Vent.: 34 CFM
Runout Air: 107 CFM Percent of Supply.: 8 %
Runout Duct Size: 6 in. Actual Summer Vent.: 34 CFM
Runout Air Velocity: 545 ft/min. Percent of Supply: 8 %
Runout Air Velocity: 545 ft./min. Actual Winter Infil.: 89 CFM 1
Actual Loss: 0.185 in.wg./100 ft. Actual Summer Infil.: 63 CFM
Item Area -U- Htg Sen Clg Lat Sen
Description _ Quantity Value HTM Loss HTM Gain Gain
N -Wall-12F-Obw 50 X 8 333.8 0.065 5.7 1,887 0.6 0 208
E-Wall-12F-0bw 39 X 8 297 0.065 5.7 1,680 0.6 0 185
S-Wall-12F-Obw 50 X 8 339 0.065 5.7 1,917 0.6 0 212
W-Wall-12F-0bw 39 X 8 312 0.065 5.7 1,764 0.6 0 195
N -GIs-4a shgc-0.28 100%S (4) 60 0.290 25.2 1,512 9.3 0 560
N -GIs-4a shgc-0.28 100%S 6.2 0.290 25.2 158 9.4 0 59
E -GIs-4a shgc-0.28 0%S 15 0.290 25.2 378 30.2 0 453
S-GIs-4a shgc-0.28 0%S (3) 45 0.290 25.2 1,134 16.8 0 756
S-GIs-4a shgc-0.28 0%S 16 0.290 25.2 404 16.8 0 269
UP-Ceil-16B-44 1620 X 1 1620 0.022 1.9 3,101 1.1 0 1,746
Floor-20P-30 1 X 139 139 0.035 3.0 423 0.3 0 44
Subtotals for Structure: 14,358 0 4,687
Infil.: Win.: 88.8, Sum.: 63.3 1,424 5.790 8,245 0.664 1,561 945
Ductwork: 1,455 0
AED Excursion: 357
People: 200 lat/per, 230 sen/per: 4 800 920
Equipment: 900 1,200
Lighting: 300 1,023
Room Totals: 24,058 3,261 9,132
C:1Users\Slykke\Desktop1783 Summerbrooke Ct.rh9 Wednesday, June 12, 2019, 1:43 PM
Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc.
Air Mechanical Inc. •
Ham Lake,MN 55304 Page 8
rSystem '1 Room Load Summary
Htg Min Run Run CIg CIg Min Act
Room Area Sens Htg Duct Duct Sens Lat CIg Sys
No Name SF Btuh CFM Size Vel Btuh Btuh CFM CFM
---Zone 1---
1 Lower Level 1,481 16,066 232 3-5 560 4,891 1,538 229 229
2 Mian Level 1,481 27,424 396 5-6 546 11,437 3,294 536 536
3 Upper Level 1,620 24,058 348 4-6 545 9,132 3,261 428 428
Ventilation 8,821 1,419 2,344
Humidification 51355
System 1 total _ 4,582 81,724 976 26.,879 10,437 1,193 1,193
System 1 Main Trunk Size: 12x17 in.
Velocity: 842 ft./min
Loss per 100 ft.: 0.100 in.wg
toolingSystemSummary _.—41111111111111- __...__
__,,„,i e'`-., - - -_ ensible/Latent Sensible Latent To
Tons ; Split Btuh Btuh Btuh.
Net Required: 3.11 72% /28% 26,879 10,437 37,316
Equipment
-- -- -- --------- -_ ----------- ---------------
Heating System Cooling System
Type: Natural Gas Furnace Standard Air Conditioner
Model:
Indoor Model:
Brand:
Efficiency: 0 AFUE 0 SEER
Sound: 0 0
Capacity: 0 Btuh 0 Btuh
Sensible Capacity: n/a 0 Btuh
Latent Capacity: n/a 0 Btuh
C:1Users\SlykkelDesktop1783 Summerbrooke Ct.rh9 Wednesday, June 12, 2019, 1:43 PM
JIDMCNIIA&ISPAI
711
I /t"V1W'pV inVVeVVentilation, Makeup and Combustion Air
EATING,LOOLING a PEUMBING
Treeing Custom Comfort"Since 198i Calculations Submittal Form For New
16411 ABERDEEN ST NE,HAM LAKE,MN 55304
Dwellings
Site address 783 Summerbrooke Ct Date 6/12/19
Contractor Country Joe Homes Completed By Air Mechanical
Section A
Ventilation Quantity
(Determine quantity by using Table N1104.2 or Equation 11-1)
Square feet(Conditioned area including basement— 4582 Total required ventilation 190
finished or unfinished) — _
Number of bedrooms 5 Continuous ventilation 95
Directions -Determine the total and continuous ventilation rate by either using Table N1104.2 or equation 11-1.
The table and equation are below.
Table N1104.2
Total and Continuous Ventilation Rates (in cfm)
Number of Bedrooms
1 2 3 4 5 6
-
Conditioned space Total/ Total/ Total/ Total/ Total/ Total/
(in sq.ft.) continuous continuous continuous continuous continuous continuous
1000-1500 60/40 75/40 90/45 105/53 120/60 135/68
1501-2000 70/40 85/43 100/50 115/58 130/65 145/73
2001-2500 80/40 95/48 110/55 125/63 140/70 155/78
2501-3000 90/45 105/53 120/60 135/68 150/75 165/83
3001-3500 100/50 115/58 130/65 145/73 160/80 175/88
3501-4000 110/55 125/63 140/70 155/78 170/85 185/93
4001-4500 120/60 135/68 150/75 s 165/83 180/90 195/98
4501-5000 130/65 145/73 160/80 175/88 190/95 205/103
5001-5500 140/70 155/78 170/85 185/93 200/100 215/108
5501-6000 150/75 165/83 180/90 195/98 210/105 225/113
Equation 11-1
(0.02 x square feet of conditioned space) + [15 x(number of bedrooms+ 1)]=Total ventilation rate(cfm)
Total ventilation—The mechanical ventilation system shall provide sufficient outdoor air to equal the total ventilation rate
average,for each one-hour period according to the above table or equation. For heat recovery ventilators(HRV)and
energy recovery ventila-tors (ERV)the average hourly ventilation capacity must be determined in consideration of any
reduction of exhaust or out outdoor air intake, or both, for defrost or other equipment cycling.
Continuous ventilation-A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm, shall be provided,
on a con-tinuous rate average for each one-hour period. The portion of the mechanical ventilation system intended to be
continuous may have automatic cycling controls providing the average flow rate for each hour is met.
1
Section B
Ventilation Method
(Choose either balanced or exhaust)
✓[ alanced,HRV(Heat Recovery Ventilator)or ERV(Energy Eixhaust only(Continuous fan rating in cfm)
Recov-ery Ventilator)—cfm of unit in low must not exceed
continuous venti-lation rating by more than 100%.
Low cfm:
100 High cfm: 200 Continuous fan rating in cfm(capacity must not exceed
continuous ventilation rating by more than 100%)
Directions -Choose the method of ventilation, balanced or exhaust only. Balanced ventilation systems are typically HRV or
ERV's. Enter the low and high cfm amounts. Low cfm air flow must be equal to or greater than the required continuous
ventilation rate and less than 100%greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation
fan must not exceed 80 cfm.)Automatic controls may allow the use of a larger fan that is operated a percentage of each
hour.
Section C
Ventilation Fan
Description Location Continuous Intermittent
RENEW AIRE EV-200 Mech.Room
Directions -The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether it is used for
continuous or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the
low cfm air rating and less than 100%greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the
continuous ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a
percentage of each hour.
Section D
Ventilation Controls
Directions-Describe operation and control of the continuous and intermittent ventilation. There should be adequate detail for plan
reviewers and inspectors to verify design and installation compliance. Related trades also need adequate detail for placement of controls
and proper operation of the building ventilation. If exhaust fans are used for building ventilation,describe the operation and location of any
controls, indicators and legends. If an ERV or HRV is to be installed,describe how it will be installed. If it will be connected and interfaced
with the air handling equipment,please describe such connections as detailed in the manufactures'installation instructions. If the
installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper operation,such
interconnection shall be made and described.
RENEW AIRE
Honeywell
2
Section E
Make-up air
0 Passive (determined from calculations from Table 501.3.1)
Powered(determined from calculations from Table 501.3.1)
0 Interlocked with exhaust device(determined from calculation from Table 501.3.1)
Other,describe: NOT REQUIRED
Location of duct or system ventilation make-up air: Determined from make-up air opening table
Cfm Size and type(round,rectangular,flex or rigid)
Directions -In order to determine the makeup air, Table 501.3.1 must be filled out(see below). For most new
installations, column A will be appropriate, however, if atmospherically vented appliances or solid fuel appliances are
installed, use the appropriate column. For existing dwellings, see IMC 501.3.3. Please note, if the makeup air quantity
is negative, no additional makeup air will be re-quired for ventilation, if the value is positive refer to Table 501.3.2 and
size the opening. Transfer the cfm, size of opening and type (round, rectangular, flex or rigid) to the last line of section D.
The make-up air supply must be installed per IMC 501.3.2.3.
Table 501.3.1
PROCEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST EQUIPMENT IN DWELLINGS
(Additional combustion air will be required for combustion appliances,see KAIR method for calculations)
One or multiple power One or multiple fan- One atmospherically vent Multiple atmospherically
vent or direct vent assisted appliances and gas or oil appliance or vented gas or oil appliances
appliances or no power vent or direct one solid fuel appliance or solid fuel appliances
combustion appliances vent appliances
Column A Column B Column C Column D
1.
0.15 0.09 0.06 0.03
a)pressure factor(cfm/sf)
b)conditioned floor area(sf) 4582
(including unfinished basements)
Estimated House Infiltration(cfm): 687
[la x lb]
2.Exhaust Capacity
a)continuous exhaust-only N/A
ventilation system(cfm);(not
applicable to balanced ventilation
systems such as HRV)
b)clothes dryer(cfm) 135 135 135 135
c)80%of largest exhaust rating(cfm);
Kitchen hood typically(not applicable 240
if recirculating system or if powered
makeup air is electrically interlocked
and match to exhaust)
d)80%of next largest exhaust rating
(cfm); bath fan typically(not Not
applicable if recirculating system or if
powered makeup air is electrically Applicable
interlocked and matched to exhaust)
Total Exhaust Capacity(cfm); 375
[2a+2b+2c+2d]
3.Makeup Air Quantity(cfm)
a)total exhaust capacity(from above) 375
b)estimated house infiltration(from 687
above)
Makeup Air Quantity(cfm);
[3a—3b](if value is negative,no -31 2
makeup air is needed)
4.For makeup Air Opening Sizing,
refer to Table 501.4.2
A. Use this column if there are other than fan-assisted or atmospherically vented gas or oil appliance or if there are no combustion appliances.(Power
vent and direct vent appliances may be used.)
B. Use this column if there is one fan-assisted appliance per venting system.(Appliances other than atmospherically vented appliances may be included.)
C. Use this column if there is one atmospherically vented(other than fan-assisted)gas or oil appliance per venting system or one solid fuel appliance.
D. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or
oil appliances and solid fuel appliances.
3
Makeup Air Opening Table for New and Existing Dwelling
Table 501.3.2
One or multiple power r One or multiple fan- One atmospherically Multiple atmospherically
vent,direct vent assisted appliances and vented gas or oil vented gas or oil Duct
appliances,or no power vent or direct appliance or one solid appliances or solid fuel diameter
combustion appliances vent appliances fuel appliance appliances
Column A Column B Column C Column D
Passive opening 1—36 1—22 1—15 1—9 3
Passive opening 37—66 23—41 16—28 10—17 4
Passive opening 67—109 42—66 29—46 18—28 5
Passive opening 110-163 67—100 47—69 29—42 _ 6
Passive opening 164—232 101—143 70—99 43—61 7
Passive opening 233—317 144—195 100—135 62—83 8
Passive opening 318—419 196—258 136—179 84—110 9
w/motorized damper
Passive opening 420—539 259—332 180—230 111—142 10
w/motorized damper
Passive opening 540—679 333—419 231—290 143—179 11
w/motorized damper
Powered makeup air >679 >419 >290 >179 NA
Notes:
A.An equivalent length of 100 feet of round smooth metal duct is assumed. Subtract 40 feet for the exterior hood and ten feet for each 90-
degree elbow to determine the remaining length of straight duct allowable.
B.If flexible duct is used,increase the duct diameter by one inch. Flexible duct shall be stretched with minimal sags. Compressed duct shall
not be accepted.
C.Barometric dampers are prohibited in passive makeup air openings when any atmospherically vented appliance is installed.
D.Powered makeup air shall be electrically interlocked with the largest exhaust system.
Section F
Combustion
✓0 Not required per mechanical code(No atmospheric or power vented appliances)
0 Passive(see IFGC Appendix E,Worksheet E-1) Size and type 6"INSULATED FLEX
Other,describe:
Explanation - If no atmospheric or power vented appliances are installed, check the appropriate box, not required. If a
power vented or atmospherically vented appliance installed, use IFGC Appendix E, Worksheet E-1 (see below). Please
enter size and type. Combustion air vent supplies must communicate with the appliance or appliances that require the
combustion air.
Section F calculations follow on the next 2 pages.
4
Directions -The Minnesota Fuel Gas Code method to calculate to size of a required combustion air opening, is called the Known Air
Infiltration Rate Method. For new construction,4b of step 4 is required to be filled out.
IFGC Appendix E,Worksheet E-1--Residential Combustion Air Calculation Method(for Furnace,Boiler,and/or Water Heater in the Same Space)
Step 1:Complete vented combustion appliance information.
Furnace/Boiler:
raft Hood OFan Assisted DDirect Vent Input: Btu/hr
or Power Vent
Water Heater:
raft Hood OFan Assisted DDirect Vent Input: Btu/hr
or Power Vent
Step 2:Calculate the volume of the Combustion Appliance Space(CAS)containing combustion appliances.The CAS includes all
spaces connected to one another by code compliant openings.
CAS volume: ft3 L x W x H L W H
Step 3:Determine Air Changes per Hour(ACH)1
Default ACH values have been incorporated into Table El for use with Method 4b(KAIR Method).
If the year of construction or ACH is not known,use method 4a(Standard Method).
Step 4:Determine Required Volume for Combustion Air.(DO NOT COUNT DIRECT VENT APPLIANCES)
4a.Standard Method
Total Btu/hr input of all combustion appliances Input: Btu/hr
Use Standard Method column in Table E-1 to find Total Required TRV: ft3
Volume(TRV)If CAS Volume(from Step 2)is greater than TRV then no outdoor openings are needed.If CAS Volume(from Step 2)is less than
TRV then go to STEP 5.
4b.Known Air Infiltration Rate(KAIR)Method(DO NOT COUNT DIRECT VENT APPLIANCES)
Total Btu/hr input of all fan-assisted and power vent appliances Input: Btu/hr
Use Fan-Assisted Appliances column in Table E-1 to find RVFA: ft3
Required Volume Fan Assisted(RVFA)
Total Btu/hr input of all Natural draft appliances Input: Btu/hr
Use Natural draft Appliances column in Table E-1 to find RVNFA: ft3
Required Volume Natural draft appliances(RVNDA)
Total Required Volume(TRV)=RVFA+RVNDA TRV= 0 + 0 = 0 TRV ft3
If CAS Volume(from Step 2)is greater than TRV then no outdoor openings are needed.If CAS Volume(from Step 2)is less than TRV then go to STEP 5.
Step 5:Calculate the ratio of available interior volume to the total required volume.
Ratio=CAS Volume(from Step 2)divided by TRV(from Step 4a or Step 4b)
Ratio=0 /0 =N/A
Step 6:Calculate Reduction Factor(RF). RF=1 minus Ratio
RF=1 - ° =1
Step 7:Calculate single outdoor opening as if all combustion air is from outside.Total Btu/hr input of all Combustion Appliances in the same CAS
Input: 0 Btu/hr(EXCEPT DIRECT VENT)
Combustion Air Opening Area(CAOA):Total Btu/hr divided by 3000 Btu/hr per in2
CAOA=0 /3000 Btu/hr per in2=0 _ in2
Step 8:Calculate Minimum CAOA: Minimum CAOA=CAOA multiplied by RF
Minimum CAOA=0 x' =0 in2
Step 9:Calculate Combustion Air Opening Diameter(CAOD): CAOD=1.13 multiplied by the square root of Minimum CAOA
CAOD=1.13'J Minimum CAOA= in.diameter go up one inch in size if using flex duct
1 If desired,ACH can be determined using ASHRAE calculation or blower door test.Follow procedures in Section G304.
5
IFGC Appendix E,Table E-1
Residential Combustion air(Required Interior Volume Based on Input Rating of Appliance)
Input Rating Standard Method Known Air Infiltration Rate(KAIR)Method (cu ft)
(Btu/hr)
Fan Assisted or Power Vent Natural Draft
1994 to present Pre-1994 1994 to present Pre-1994
5,000 250 375 188 525 263
10,000 500 750 _ 375 1,050 525
15,000 750 1,125 563 , 1,575 788
20,000 1,000 1,500 750 2,100 , 1,050
25,000 1,250 1,875 938 2,625 1,313
30,000 1,500 2,250 1,125 _3,150 1,575
35,000 1,750 2,625 1,313 3,675 1,838
40,000 2,000 3,000 1,500 4,200 2,100
45,000 2,250 3,375 1,688 _ 4,725 2,363
50,000 2,500 3,750 1,675 5,250 2,625
55,000 2,750 4,125 2,063 5,775 2,888
60,000 3,000 4,500 2,250 6,300 3,150
65,000 3,250 4,875 2,438 6,825 3,413
70,000 3,500 5,250 2,625 7,350 3,675
75,000 3,750 5,625 2,813 7,875 3,938
80,000 4,000 6,000 3,000 _ 8,400 4,200
85,000 4,250 6,375 3,188 8,925 4,463
90,000 4,500 6,750 3,375 9,450 4,725
95,000 4,750 7,125 3,563 _ 9,975 4,988
100,000 5,000 7,500 3,750 10,500 5,250
105,000 5,250 7,875 3,938 _ 11,025 5,513
110,000 5,500 8,250 4,125 11,550 5,775
115,000 5,750 8.625 4,313 12,075 6,038
120,000 6,000 9,000 4,500 12,600 6,300
125,000 6,250 9,375 4,688 13,125 6,563
130,000 6,500 9,750 4,875 _ 13,650 6,825
135,000 6,750 10,125 5,063 14,175 7,088
140,000 7,000 10,500 5,250 14,700 7,350
145,000 7,250 10,875 5,438 15,225 7,613
150,000 7,500 11,250 5,625 15,750 7,875
155,000 7,750 11,625 5,813 _ 16,275 8,138
160,000 8,000 12,000 6,000 16,800 8,400
165,000 8,250 12,375 6,188 _ 17,325 8,663
170,000 8,500 12,750 6,375 17,850 8,925
175,000 8,750 13,125 6,563 18,375 9,188
180,000 9,000 13,500 6,750 18,900 9,450
185,000 9,250 13,875 6,938 19,425 9,713
190,000 9,500 14,250 7,125 _ 19,950 9,975
195,000 9,750 14,625 7,313 20,475 10,238
200,000 10,000 15,000 7,500 21,000 10,500
205,000 10,250 _ 15,375 7,688 21,525 10,783
210,000 10,500 15,750 7,875 22,050 11,025
215,000 10,750 16,125 8,063 22,575 11,288
220,000 11,000 16,500 8,250 23,100 11,550
225,000 11,250 16,875 8,438 23,625 11,813
230,000 11,500 17,250 8,625 24,150 12,075
1. The 1994 date refers to dwellings constructed under the 1994 Minnesota Energy Code.The default KAIR used in this section of the table is
0.20 ACH.
2. This section of the table is to be used for dwellings constructed prior to 1994.The default KAIR used in this section of the table is 0.40 ACH.
6
EAGAN
7%4 City Inspection Dept. Copy
City Forester Copy
Applicant/Builder Copy
INDIVIDUAL RESIDENTIAL LOT
TREE PRESERVATION PLAN SUMMARY
CITY OF EAGAN FORESTRY DIVISION
651-675-5300
(BUILDER, PLEASE READ ATTACHMENTS)
Development Summerbrooke
Lot Number 8 Block Number 1
Address 783 Summerbrooke Court
Builder Country Joe Homes
Phone Number: 952-380-8120
Contact: Steve Sauber
Tree Protection Requirements:
Tree Protection Fencing Installed on Site(Orange Poly Fence)
Oak Tree Pruning (Immediately seal wounds during April 1 to July 31)
Therapeutic Pruning Required
Retaining Wall To Be Installed
Other:
Replacement Trees:
Not Required
X As Follows: Five (5) Category A trees (>=4.0" caliper deciduous
trees, or>= 12' conifer trees). Per approved Tree Mitigation Plan,
four(4) Black Hills Spruce trees (already installed in the backyard
area), and one (1) American Sentry Linden (to be installed following
construction).
Attachments: EAGAN FORESTRY DIVISION
X Yes (Refer to a* 'J4E ` : • ! =tails)
No
BY Fmk
Additional Notes:
DATE fr /1
H:lghove12019fileltreepres\Tree Preservation Plan Summerbrooke Lot 8 Sock 1
ADDRESS: 783 SUMMERBROOKE COURT CERTIFICATE OF SURVEY
FOR
COUNTRY JOE HOMES
n T i ,, I
L-U I 1 1
X913.0 x912.1 POND 41135X9o<
STozM HIM=909.5 70.055 X 910.9 X 910.1 I L_V I 78 ti
N1ANr1ot[ ��
- - . , . RIM_914.5i N87°39'58"W _ - 1
--V'77---------------,--- __....,__94.,. ~7120
coir nG'e L'i'i'-'- 171.9
NOTE:ALL BUILDING
o ;s.q rscr.0' at46 9329 9127 DIMENSIONS ARE SHOWN 70
_ OUTSIDE OF FOUNDATION
X916.4 ,t19 915.6 --
92.9 1110 WO���� 92 91.7 --X9110.7 WALL
r.
20. 919.1
3 / SCTBACIC I M[
924.1 (�) L_/3057161G R[T9 NTNG 5-60 6
•1-923.0
X 922.0 4919.8 X919.5
X 920.5
F- LOT p 1-'- BENCH-MARK
8 FIRE HYDRANT AT END OF
C) SUMMERBROOKE CIRCLE,
-j I t BLOCK 1 F- TNH ELEV.-915.99
X975.3 ? I X921.0 I C)
921.7 _.1
X 923.9
1 C 924.1 X 924.0
9X3.1 I f f 924.49 f i
924.3 1 y 190 5911.6 I '^
X924.8 q
X 926.1 J J •crc19, ���;•{{••}}�� z °c z LOT AREA = 9,887 SQ. FT.
E,o i!� '92" s �� 925.)
p I O 00 9255 i 6 0 925.0 ISS 925.0 I O.I p O
cc T.
N T I X 923.3 CD (NI PORCH AREA
= Z2300 Q. T.
11050. FT.
CNI x p 0o SIDEWALK = 30 SO. FT.
T-
I o PROPOSED �5 e I c DRIVEWAY= 834 SO. FT.
p 2-STORY p X 9263
0 x/70 `926.3 ) IMPERVIOUS = 3,214 SQ. FT.
X 931.4 Z x "061,e o I - 32.51 X
4247 X 929.3 f
929.9
1 x 927.1 x927.1
GARAGE 0
O 970.1' ��9253 X9I7A
X 931.5 6 031 01 X 930A X K
930.3
^ 930.3 20,0 930.18 m
P0
n i 0.'00 0� I 930.4 0.0 �J =
�-1 934,4 . 4l'YIF, 925.3
9311 i11,X1 9303 '1.6
I PROPOSED
DRIVEWAY I I
X 933.0 93,.51 5.7% + r I
x 933.0 1 j
X 931.9 X9313 1)929'8 X 929.2
- - - - - J '
(
UTILITY
130X[5
930.5® ®930.2
O
937.2 awe C3
- . - . 69221 �93I.0 `� --2?.0-931.3'' 70�9oV9 9929729 7 x929-1 .
X932.1 _.931.0 _ -_--22•:----, N89° '40'YY 11929.2 x925.7
9317 931.1 CONCRCTI.C7R6 4 Go307
4 N
N C1
SUMMERBROOKE COURT _ _ 1"=20'
tir1:;E g
® DENOTES MAILBOX SETBACKS
O DENOTES IRON PIPE MONUMENT SET FRONT-30'
• DENOTES FOUND IRON PIPE MONUMENT SIDE-ALONG RIGHT OF WAY= 30'SIDE INTERIOR = 10'ON R-1 (R-1 is
DENOTES PROPOSED DRAINAGE DIRECTION lots over 12,000 sf)
SIDE INTERIOR ON R 1-S = 6'
et DENOTES SERVICE LOCATION SIDE ON GARAGE = 5'
In DENOTES WOOD HUB • REAR = 15' PROPOSED TOP OF WALL ELEV. = 933.7
000.0 DENOTES EXISTING ELEVATION NOTE ANY LMNG SPACE!S CONSIDERED PROPOSED GARAGE FLOOR ELEV- = 933.4
THE HOUSE SETBACK, NOT THE GARAGE PROPOSED FLOOR ELEV.. = 915.7
® DENOTES PROPOSED ELEVATION SETBACK
'-..~1'0Yr- DENOTES EXISTING CONTOUR
PROPERTY DESCRIPTION
DENOTES DECIDUOUS TREE LOT 8,BLOCK 1,SUMMERBROOKE,CITY OF
FAGAN,DAKOTA COUNTY.MINNESOTA.
DENOTES EVERGREEN TREE
Bohlen I HEREBY CERTIFY THAT THIS SURVEY WAS PREPARED BY ME OR
DENOTES BITUMINOUS SURFACE UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
Surveying&Associates LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA.
31432 Foliage Avenue 1082 C18T Road E.
DENOTES CONCRETE SURFACE Notaddd,MN 55067 ElnivO1a,MN 56331
DATE: 6-213-2019
Flamm: B A Plton..(962)895-9212 THOMAS J.O'MEARA,LAND SURVEYOR
tommvaeboNensuiveylna.m' F=.11162158643268 MINNESOTA LICENSE NO.46167
DENOTES GRAVEL SURFACE
S:\Projec s\Eagan\summecbrookc\dwg\lot8b181-CERT.dwg 6/28/2019 7:21:35 AM CST
( i - \., , -----„,.77. - T-iiivof...---\- \.. ‘ \ \.‘
\ ., \ •,., .st‘_b,--i-- .-- '''' 41* '\ ____ - - - ---
.-1--,"*.--"/./ . „.„,--- \ \ \ \Z . ,
V . . ...
�' \ --
%, --. (.. ... _.... _.
o,
cl2�, , 1 '
.�
7 \.\ \ ,>: ' 1 \ ,\.: , .
\\., -i-4 / 1 --mid
\‘•...evoir4.7*--. ...,,._ AT,-
I 1 sir r►�s AM�� _...:„.„4..."!" \ �
,*.-,-,w,,
F_
„.‘. ---111• ,_,.v.\
. ..,.
-\ 1 S----------/
ci0i_i;i -;
7 '- _- :_\c--.,03\ . &----- L_v•.gI
*-A,)lt.ic_i, --g 0 8 iyiilli -7.
- -N••
WL '-[*�'�.3 ni
7.
!t
,\
i
- i
S •.....+k\ \
—y ' .i\.
MI l�� ' { i (
.11....1111............"--
u,
eifii I .0. -
P' af * * ac 2),,,„„;:,,,.‘
•
*AM (3-) - Air' i ,1
rie
—A �,
.„-,.) , _ ..__, . _
---.-7*--' • - . 1 / . . ' 1111117-r -IPIIIMIA0111111. ;,4Edi-Al.L '-"--0411w----, —'1__ ,,,...M1
..-- - ,......-46,7- -- -Argil '
__tel tAile!A S ;
- ..P.'l *: .- :1".1:'•- •'' •1-=-7----:-,-';---71----'-' 411111,JAW viti..71"."',''••••....j.:t....."--. • IPTIPOir
fik
)i. 4IV. ,, ......,, .,.. .."1",. ...0,41„-,44:-.41;.c.A.)7,-;. ,. ____,: \:,7 ._____
• 11111h,
r
V
, .
..
, ,
„........„„
, ,...,_ (' z . Ramo ,...„,, ,
q ., .
Ey mummi
/ \
ir mow ,8
.Z.------:,_ ' _______ -.....___
/ i) 1 / 77-
___:1 ......, N \ -0 ,,,, -- - ---. - .......„, ,.„ ,-- / i , 1 „it.-I
,\ . I.,. f -.,_.�
\ ,
.440 „s„.1_
MAI% I - -
\ i i 01 . ,.,a: it.\, * 4
......L. dioi; 1
4.1110:411kaht'
,,,i&a,',N,.,.. iiiiit ; -____. -._
- ?ilk, --N inali ''' Ali Ark,11.11111/1 mg iir .
is Ff'111141.11. IL
- litii,- ,i,”"
>/•______,..... .._----__ -..Nigainimpi .., -
1.• ______,„___ > _,\ ,\\ \ .\ \ s ,SUMMERBROOKE 6 .. , ,
- *. -,ma_i----c . 9.3p •
ilk
---- WINIWit....1.1•11111_ 11.W.02.''2111 IN 1111MLIIIIIIIMIret4111111WPAN'tilliffilliS11 i
• .\ V,I1 V.*- .r -"" . ' <,,, 1. 1Wi4
•
,/ ,ik v i c.., .0 ,ik‘.-. \ wit
) ' . lriPtt' -' ". \ Viir- .
\/, / 't
940 .. \2
\. L ' \
•
2 ` ,23 14
--- \ 1 26
/ I; l '• / ) . \
lii .1/112i. - . 1
.,
'75:40 , , : -76L .,,,, \( j \ ,,, i, \ \ ( ( Ii
r,., . \\ \ •' ' \ \ , . ....._._;u , ..._ _.
1 ,: • ' \ 10-- - -( I / L-i,:..,‘. ,-' \, .
_ - ---1 \ IL ' \k9 \ i- '- • , , _____ '
_.---,_--,_.,.:i.-._,_.___,-___! \,,...:-..„,-..-_____,.-,i.,..„-7X X_', = _...._X—93:' • ', L
7;.A-1,:„.w-__,,.,_:_--Tlg
♦ sy.[�•"'r err' ���� ? k� �� �� ..1.....- S NiS _
'.. f
` \ - � -. _ - _\ ` �- ` �` � � - - � � _- ' �
Y �
06-S-
LOT SURVEY CHECKLIST FOR RESIDENTIAL
BUILDING PERMIT APPLICATION
PROPERTY LEGAL: Lot 8, Block 1, Summerbrooke
DATE OF SURVEY: 6-28-19
LATEST REVISION:
a)
a)
c
as
C.)
O z Q DOCUMENT STANDARDS
O 0 0 • Registered Land Surveyor signature and company
O ❑ 0 • Building Permit Applicant
O 0 0 • Legal description
0 0 ❑ • Address
O 0 0 • North arrow and scale
O 0 0 • House type(rambler,walkout, split w/o,split entry, lookout, etc.)
O 0 0 • Directional drainage arrows with slope/gradient%
0 0 ❑ • Proposed/existing sewer and water services&invert elevation
0 0 0 • Street name
O ❑ 0 • Driveway(grade&width-in RNV and back of curb,22'max.)
0 0 0 • Lot Square Footage
O 0 0 • Lot Coverage
ELEVATIONS
Existing
O 0 0 • Property corners
O 0 0 • Top of curb at the driveway and property line extensions
❑ 0 0 • Elevations of any existing adjacent homes
0 0 0 • Adequate footing depth of structures due to adjacent utility trenches
0 0 0 • Waterways(pond, stream,etc.)
Proposed
0 0 0 • Garage floor
O ❑ 0 • Basement floor
O 0 0 • Lowest exposed elevation (walkout/window)
O 0 0 • Property corners
❑ • Front and rear of home at the foundation
Y N • PRV Required
PONDING AREA(if applicable)
O 0 0 • Easement line
O ❑ ❑ • NWL
0 ❑ ❑ • HWL
❑ 0 0 • Pond#designation
❑ 0 0 • Emergency Overflow Elevation
❑ 0 • Pond/Wetland buffer delineation
Y • Shoreland Zoning Overlay District
Y • Conservation Easements
DIMENSIONS
O 0 0 • Lot lines/Bearings&dimensions
O 0 ❑ • Right-of-way and street width(to back of curb)
O 0 0 • Proposed home dimensions including any proposed decks,overhangs greater than 2',porches,etc.
(i.e. all structures requiring permanent footings)
O 0 0 • Show all easements of record and any City utilities within those easements
0 ❑ 0 • Setbacks of proposed structure and sideyard setback of adjacent existing structures
0 ❑ 0 • Retaining wall requirements:
Reviewed By: Dave Westermayer Date 7/22/19
G:/1 Engineering/Forms/Cert.of Survey Checklist Fillable 6-28-19
ADDRESS: 783 SUMMERBROOKE COURT /5-‘e6 - CERTIFICATE OF SURVEY
FOR
3:1 Ma ' Slopes COUNTRY JOEHOMES
or Be A ETER COt4TROL
ERS
PAX
I r1-r I 1
L_\J I I 1
X913.0 X912.1 POND 11.6 46411
X910.1 I ^T x 905
STORM HWL=909.5 70.05 X 910.9 L_\J
MANHOLE •
-- RIM=914.51 N87°39'58"W .. . -
912.6 1, y 2.0
914s NOTE ALL BUILDING
O ` DRAINAGE UT�417'--_- 72.9 9127 f12.9 DIMENSIONS ARE SHOWN TO
rfi , 414.6 O OUTSIDE OF FOUNDATION
X 916.4 921.9 /r 915.6 WALL
X���� 921.9 ��- I _ X 914.2
921.9 1•-•�ow40imam..`_ ' OR"-- - : 914 7 X 918.7
921.2
920.0 919.4
5 SETBACK UNE
924.1 '
' 5
��t �3) ';� i t----EXISTING RETAINING WALL X 919.5
jG �� �`�_"-923.0 X922.0 0919.8
X 920.8 1
``� BENCH-MARK
E. - LOT O I FIRE HYDRANT AT END OF
. SUMMERBROOKE CIRCLE,
-J
I BLOCK 1 - TNH ELEV.=915.99
X 925.3 f I C
923. f 1 X 924.0
-J
IX 923.9
1 :
924.1
X 924.0
925.1 I fx 924.4 , ,
r,
X 924.3 X 14.0
O K 924.6f .
f ,
924.8 Ti
X 926.1 W
f`;',1 q 92 ; LOT AREA = 9,887 SQ. FT.
E 1 I - 00 51 18.0 X 925.0 X 925.0 18.0 925.0 -_ -- 92S.3
O10.00 Q O HOUSE AREA = 2,230 SQ. FT.
CO (V T, 1 X 925.3 1 I Q N PORCH AREA = 120 SQ. FT.
00 i i p CO SIDEWALK = 30 SQ. FT.
CV o o PROPOSED 925 8 '� o DRIVEWAY = 834 SQ. FT.
Q I N 2-STORY !1 r' p X 926.5
FB/WO t
CD 926.3 'O IMPERVIOUS = 3,214 SQ. FT.
X 931.4 Z X 930.61 X O ` f ( J = 32.51 X
929.8 X 929.5 CO
X X 927.1 X 927.1
1 929.9
GARAGE cl.o
O G 1 930.1`�i- X 927.4
��C 928.3
X 931.8 931.01 N X 930.4 930.3
930.3 20.0 930.1x
iI v
'1 q •
^ Ni
,\, Lo PORCH • - f
pq
i
� 130.3
9304 2000930.4 -928.8
9315 4 I •QO
PROPOSED
I o
DRIVEWAY
X 933.05.7%
i i
X 933.0 `932.51 1
i X 931.9 1 i) 929.8
L X931.5 5 X929.2
J UTILITY
_ _ _ BOXES
930.51-1 N930.2
O O
�� 932.2 CURB -
X 932.4 -- 22.0---�� 931.0 STOP 929.7 929.1
• •X
932.0 "931.5id5ó 929.7
)(932.1 )1)131.8 --- 22.0 -- N89°41'40'1/1/
)(929.2 )(928.7
931.7 931.1 CONCRETE CURB$GUTTER 930:2
N to
N N
SUMMERBROOKE COURT „ _- ,
1 20
CENTERLINE
rrhr
I . EWED
® SETBACKS
DENOTES MAILBOX By A �,A-�
O DENOTES IRON PIPE MONUMENT SET FRONT-30' Date MIA
• DENOTES FOUND IRON PIPE MONUMENT SIDE-ALONG RIGHT OF WAY = 30'
SIDE INTERIOR = 10' ON R-1 (R-1 is E AGAN ENGINEERING DEPT.
DENOTES PROPOSED DRAINAGE DIRECTION lots over 12,000 sf)
SIDE INTERIOR ON R1-S = 6'
0 DENOTES SERVICE LOCATION SIDE ON GARAGE = 5'
O DENOTES WOOD HUB REAR = 15' PROPOSED TOP OF WALL ELEV. = 933.7
000.0 DENOTES EXISTING ELEVATION NOTE: ANY LIVING SPACE IS CONSIDERED PROPOSED GARAGE FLOOR ELEV. = 933.4
THE HOUSE SETBACK, NOT THE GARAGE PROPOSED BASEMENT FLOOR ELEV. = 925.7
(000.0) DENOTES PROPOSED ELEVATION SETBACK
,'+'Ooa DENOTES EXISTING CONTOUR PROPERTY DESCRIPTION
0" DENOTES DECIDUOUS TREE LOT 8,BLOCK 1,SUMMERBROOKE,CITY OF
EAGAN,DAKOTA COUNTY,MINNESOTA.
V': DENOTES EVERGREEN TREE
Bohlen I HEREBY CERTIFY THAT THIS SURVEY WAS PREPARED BY ME OR
DENOTES BITUMINOUS SURFACE Surveying & Associates UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA.
31432 Foliage Avenue 1682 Cliff Road E.
DENOTES CONCRETE SURFACE Northfield,MN 55057 Burnsville,MN 55337 �"r� nM
R DATE: 6-28-2019 Thaw num.m.
Phone:(507)645-7768 Phone:(952)895-9212 THOMAS J.O'MEARA,LAND SURVEYOR
tomeara@bohlensurveying.com Fax:(952)895-9259
DENOTES GRAVEL SURFACE MINNESOTA LICENSE NO.46167
S:\Projects\Eagan\summerbrooke\dwg\lot8blkl-CERT.dwg 6/28/2019 7:21:35 AM CST
3/13/2020 C3maiI-FW:Pan inspection
To:"jtrebil@countryjoehomes.com"<jtrebil@countryjoehomes.com> ,
Subject:Pan inspection +,
To whom It may concern: •
The way we install custom shower pans is that we slope a pre-pan of tile crate pitched toward drain.Next
we Install a waterproof pvc membrane on top of the sloped crete that Is folded upright in the corners and
comes to the top,in the center of the mud curb.The membrane runs roughly 6-10"up the studs behind the
Durock cement board.The membrane is also mechanically adhered to the collar of the three piece shower
drain.The the final portion of the tile crete Is applied sloped at minimum 114"per foot towards drain.After
that cures,we add one more layer of protection by rolling on a topical waterproofing.We use Ardex 8+8,an
acrylic based liquid compound and a Portland and other hydraulic cement based powder.This
waterproofing is roiled on the shower pan,curb,and up the durock 2-3 ft.Our showers have 2
waterproofing systems to prevent any leaks.We stand by our work with a full warranty.Thanks for your
time.
Eric
Ceramic tile manager
VA,
Focal Point Flooring
car
50p( filam-
.
Ct Lpf
(91•
httue://maiL000de arnImsile ........w.td..u..... .1 MIA wwww+ .....�.........�... . • _..
RECEIVED
JUL 2 9 MO
• 4 rti*
I #.
.• 4- ti
Tr
The Insulation and WateroofingProfessionals
completed the work assigned to me on August 21st, 2019 at address 783
Summerbrooke Ct jr 8.61-
I sprayed just under 41 gallons of our GMX tar waterproofing.
x 0 14, /7___:Zat/Itotr:e.)
21025 Edmonton Avenue • Farmington, MN • 55024
Phone: 651.463.9333 • Fax: 651.463.9339 • www.installbuild.com
I'
, 14,
I •;
• 4:
f••
4
t
t.
e
4/44
ttim
REC. JVED
JUL 292020
The Insulation and Waterproofing Professionals
n .A //yet. ��if k1 P
jCJ/ I completed the work assigned to me on August 21st, 2019 at address 783
Summerbrooke Ct. P,U J1T .tZt /.9G '
I 75h4 •1 r` completed the work assigned to me on August 21st, 2019 at address 783
Summerbrooke Ct
I Lid'k L4llco'"pleted the work assigned to me on August 21st, 2019 at address 783
Summerbrooke Ct.
We installed foundation insulation, 3" board on the sides with elevation change and 2" board on the
front and back of home. Emil poly over all of the foundation insulation from top to bottom. Then
we installed exterior and interior drain tile, both connected to sump basket we installed. Rock and
fabric also installed with drain tile to meet code.
X iff4,41/4,
21025 Edmonton Avenue • Farmington, MN • 55024
Phone: 651.463.9333 • Fax: 651.463.9339 • www.installbuid.com