1525 Central Pkwy - Raising Canes Test & Balance Report 2019-09-26PROJECT: Raising Cane's #391
LOCATION: 1525 Central Parkway , Eagan , MN 55121
ARCHITECT: CSRS
MECH. ENGINEER: CSRS
GEN. CONTRACTOR: Embree Group
PROJECT NUMBER: T9577
ORIGINAL VISIT DATE: 9/19/2019
2nd VISIT DATE: 09/26/2019
CERTIFIED TEST ADJUST BALANCE REPORT
"THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND FINAL
ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT EDITION OF THE
PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS.
ANY VARIANCES FROM DESIGN QUANTITES, WHICH EXCEED PROJECT TOLERANCES, ARE NOTED IN THE
TEST-ADJUST-BALANCE REPORT PROJECT SUMMARY."
5140 River Road, Milford, Ohio 45150 USA
Phone: (513) 965-7300 • Fax: (513) 965-7350
www.melinkcorp.com • mail@melinkcorp.com
PROJECT:DATE:
LOCATION:
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table of Contents. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Abbreviations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Melink Credentials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Contact Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RTU Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
EF Air Distribution Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Exhaust Fan Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
MUA/Supply Fan Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Hood Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Building Balance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8
9
10
11
2
3
4
5
6
7
TABLE OF CONTENTS
Raising Cane's #391 9/19/2019
1525 Central Parkway , Eagan , MN 55121
Table Of Contents
1
Melink Corporation
Energy solutions for a brighter tomorrow Page 2
PROJECT: Raising Cane's #391 DATE: 9/19/2019
LOCATION: 1525 Central Parkway , Eagan , MN 55121
AHU - Air Handling Unit
AMP - Amperage
BP - Building Pressure
CFM - Cubic Feet/Minute
EF - Exhaust Fan
EH - Entry Heater
ERU - Energy Recycling Unit
ESP - External Static Pressure
FLA - Full Load Amperage
HP - Horse Power
HZ - Hertz
KH - Kitchen Hood
KW - Kilowatt
MUA - Makeup Air Unit
Volts - Voltage
OA - Outside Air
RA - Return Air
RPM - Revolutions Per Minute
RTU - Roof Top Unit
SF - Supply Fan / Safety Factor
SP - Static Pressure
VAV - Variable Air Volume
WC - Water Column
ABBREVIATIONS
ABBREVIATIONS
Melink Corporation
Energy solutions for a brighter tomorrow Page 3
PROJECT: Raising Cane's #391 DATE: 9/19/2019
LOCATION: 1525 Central Parkway , Eagan , MN 55121
Values
Our core values - integrity, innovation, and service excellence - are the essence of who we
are as a company. They serve as the foundation for our words, actions and goals. Our culture
starts with the above core values but also promotes professionalism, excellence, and
leadership, as well as respect, fairness and charity.
Experience
For more than 25 years, Melink has been providing independent testing and balancing and
installation verification services, thereby reducing operating costs and improving comfort for
thousands of buildings. Collectively, Melink staff has over 150 years of experience in testing
and balancing, installation verification, kitchen ventilation controls, HVAC design/consulting,
HVAC service/installation, LEED building certification, indoor air quality testing, and solar PV
installation/application.
Certifications
Melink has individuals on staff with the following certifications:
• NEBB Certified TAB Professionals
• NEBB Certified TAB Technicians
• Professional Engineers (PE)
• LEED Accredited Professionals (LEED AP)
• North American Board of Certified Energy Practitioners (NABCEP)
• Project Management Professionals (PMP)
• Certified Project Managers (CPM)
• Six Sigma Certified (SSWB, SSGB, SSBB)
Affiliations
Melink is proud to be associated with the following organizations:
• The National Environmental Balancing Bureau (NEBB)
• The American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE)
• The U.S. Green Building Council (USGBC)
• The Professional Retail Store Maintenance Association (PRSM)
• The Restaurant Facility Management Association (RFMA)
• The Association of Energy Engineers (AEE)
• The American Solar Energy Society (ASES)
• The Solar Energy Industries Association (SEIA)
• The North American Association of Food Equipment Manufacturers (NAFEM)
MELINK CREDENTIALS
About Melink
Melink Corporation
Energy solutions for a brighter tomorrow Page 4
PROJECT: Raising Cane's #391 DATE: 09/26/2019
LOCATION: 1525 Central Parkway , Eagan , MN 55121
PROJECT MANAGER:
Phone:
E-mail:
SUPERINTENDENT:
Phone:
E-mail:
MECH. CONTRACTOR:
Phone:
E-mail:
MELINK TECHNICIAN:
Phone:
E-mail:
2nd VISIT TECHNICIAN:
Phone:
E-mail:
STRATEGIC ACCOUNT MANAGER:
Phone:
E-mail: mheriott@melinkcorp.com
jsandford@melinkcorp.com
Ryan Malikowski
(513) 965-6073
rmalikowski@melinkcorp.com
Matt Heriott
(513) 965-7025
afrizzell@embreegroup.com
Summit Mechanical
N/A
n/a
Jon Sandford / Jabari Johnson
(513) 965-6062
TEST AND BALANCE CONTACT INFORMATION
Shane Farmer
512-819-4715
shanef@emreegroup.com
Andrew Frizzell
512-848-8654
Melink Corporation
Energy solutions for a brighter tomorrow Page 5
PROJECT: Raising Cane's #391 DATE: 09/26/2019
LOCATION: 1525 Central Parkway , Eagan , MN 55121
0.98''
60. Hz
3308
3308
555
17 %
5.7 5.7 5.6
0.41''0.88''0.56''
209 209 209
AX54
N/A
734 838
230/3
6.00 1.15
1VL34 x 7/8"
6" x 1"
LGH102H4BS3Y
5619C06565
8.5
US Motor
2
8.5
1.00''
2
230/3
N/A
Lennox
3400
3300
3300
550
17 %
N/A
0.56''
60. Hz
3273
3273
578
18 %
5.8 5.8 5.8
0.32''0.78''0.25''
731 829
209 209 209
1VL34 x 7/8"
6" x 1"
AX54
N/A
2
230/3
6.00 1.15
N/A
Lennox
LGH102H4BS3Y
5619C06543
8.5
US Motor
17 %
N/A
8.5
1.00''
2
208/3
Supply CFM
Return CFM
Outside Air CFM
Outside Air Ratio %
RTU-1
Dining/Lobby
3400
3400
3400
Actual Volts
Final Operating Amps
Ret/Suction/Discharge
External S.P.
Motor Hertz
Motor Sheave
Fan Sheave
Belt(s)
Sheave Centerline
Test Data
RPM - Initial/Final
Fan Motor
• HP
• Volts/Phase
• FLA/SF
Fan RPM
Equip. Data
Unit MFR
• Model No.
• Serial No.
• Rated Tons
Outside Air Ratio %
Model Number
Capacity (Tons)
External S.P.
Fan HP
Volts/Phase
ROOFTOP UNITS (RTU) DATA
Design Data
Scheduled CFM (SA)
Supply CFM (Load)
Return CFM
Outside Air CFM 580
RTU-2
Kitchen/Back of house
Melink Corporation
Energy solutions for a brighter tomorrow Page 6
PROJECT:Raising Cane's #391 DATE:9/19/2019
LOCATION:1525 Central Parkway , Eagan , MN 55121
SYSTEM:
102 %
95 %
98 %
142
EF-1 EXHAUST AIR CFM 300 382 295
E1B Womens RR Ceiling Grille N/A 150 178
CFM CFM CFM
E1A Mens RR Ceiling Grille N/A 150 204 153
AIR DISTRIBUTION DATA
EF-1 Restrooms
NO.AREA SERVED TYPE OUTLET SIZE
DESIGN PRELIM FINAL
Melink Corporation
Energy solutions for a brighter tomorrow Page 7
PROJECT: Raising Cane's #391 DATE: 09/26/2019
LOCATION: 1525 Central Parkway , Eagan , MN 55121
N/A
60. Hz
3234
5.6 5.6 5.6
N/A N/A N/A
209 209 209
Direct Drive
Direct Drive
Direct Drive
N/A
56.Hz 44.Hz
Westinghouse
3
1755
208/3
8.60 1.15
1 1/2
208/3
N/A
Captive-Aire
DU180HFA
DTP0034
N/A
60. Hz
295
EF-2
KH-1
3040
3040
N/A
0.38''
1.2 N/A N/A
N/A N/A N/A
120 N/A N/A
Direct Drive
Direct Drive
Direct Drive
N/A
VSC VSC
1/4
1725
120/1
3.40 N/A
120/1
N/A
Loren Cook
N/A
N/A
Greenheck
Motor Hertz
Exhaust CFM
EF-1
Restrooms
300
300
N/A
0.38''
1/15
RPM - Initial/Final
Actual Volts
Final Operating Amps
Ret/Suction/Discharge
External S.P.
• FLA/SF
Motor Sheave
Fan Sheave
Belt(s)
Sheave Centerline
Test Data
• Serial No.
Fan Motor
• HP
• RPM
• Volts/Phase
Fan HP
Volts/Phase
Fan RPM
Equip. Data
Unit MFR
• Model No.
EXHAUST FAN (EF) DATA
Design Data
Scheduled CFM (EA)
Exhaust CFM (Load)
Model Number
External S.P.
Melink Corporation
Energy solutions for a brighter tomorrow Page 8
PROJECT: Raising Cane's #391 DATE: 9/19/2019
LOCATION: 1525 Central Parkway , Eagan , MN 55121
N/A N/A N/A
N/A
60. Hz
2461
2.6 2.6 2.6
N/A
59.Hz 59.Hz
209 209 209
208/3
3.44 1.15
Direct Drive
Direct Drive
Direct Drive
3714635
N/A
Westinghouse
1
1150
0.50''
1 1/2
208/3
N/A
Captive-Aire
A2-D.250-20D
Ret/Suction/Discharge
External S.P.
Motor Hertz
Make-UP Air CFM
MUA-1
KH-1
2430
2430
DTP0016
N/A
Sheave Centerline
Test Data
RPM - Initial/Final
Actual Volts
Final Operating Amps
• RPM
• Volts/Phase
• FLA/SF
Motor Sheave
Fan Sheave
Belt(s)
• Model No.
• Serial No.
• Rated Tons
Fan Motor
• HP
External S.P.
Fan HP
Volts/Phase
Fan RPM
Equip. Data
Unit MFR
MAKE UP AIR (MUA) UNIT DATA
Design Data
Scheduled CFM (SA)
Make-UP Air CFM (Load)
Model Number
Capacity (Tons)
Melink Corporation
Energy solutions for a brighter tomorrow Page 9
PROJECT: Raising Cane's #391 DATE: 09/26/2019
LOCATION: 1525 Central Parkway , Eagan , MN 55121
136
3234
76 %
190
217
143
124 136
146
174
231
2461
-1--2-
123 169
16
16
16
16
16
16
20
-1--2-
16 16
16 16
Wall Canopy
Front
Perforated
12 156
Captrate
Balance Ratio %
KH-1
Fryer
2430
3040
80 %
Captive-Aire
5424 ND-2
with filter D
size E
above F
G
H
Exhaust CFM
MUA Avg FPM
MUA CFM
Exh. Avg. FPM
A
B
Correlates C
with filter D
velocities E
below F
G
H
Test Data
Filter MFR
Filter Height
Filter Lengths
A
B
Correlates C
Hood MFR
• Model No.
• Hood Type
MUA Open Dir.
MUA Open Type
MUA Width/Length
KITCHEN HOOD (KH) DATA
Design Data
Make-Up CFM
Exhaust CFM
Balance Ratio %
Equip. Data
Melink Corporation
Energy solutions for a brighter tomorrow Page 10
PROJECT: Raising Cane's #391 DATE: 09/26/2019
LOCATION: 1525 Central Parkway , Eagan , MN 55121
DESIGN TOTAL +DESIGN TOTAL -
FINAL TOTAL +FINAL TOTAL -
DESIGN BUILDING BALANCE =CFM
FINAL BUILDING BALANCE =CFM
FINAL BUILDING PRESSURE =W.C.0.003''
3,560
3,594
3,340
3,529
220
65
MUA-1 2430 2461
RTU-2 550 555 EF-2 3040 3234
RTU-1 580 578 EF-1 300 295
BUILDING AIR BALANCE
TEST RESULTS
( IN CFM )
MAKE-UP AIR EXHAUST AIR
Design Final Design Final
Melink Corporation
Energy solutions for a brighter tomorrow Page 11