Loading...
1525 Central Pkwy - Raising Canes Test & Balance Report 2019-09-26PROJECT: Raising Cane's #391 LOCATION: 1525 Central Parkway , Eagan , MN 55121 ARCHITECT: CSRS MECH. ENGINEER: CSRS GEN. CONTRACTOR: Embree Group PROJECT NUMBER: T9577 ORIGINAL VISIT DATE: 9/19/2019 2nd VISIT DATE: 09/26/2019 CERTIFIED TEST ADJUST BALANCE REPORT "THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT EDITION OF THE PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITES, WHICH EXCEED PROJECT TOLERANCES, ARE NOTED IN THE TEST-ADJUST-BALANCE REPORT PROJECT SUMMARY." 5140 River Road, Milford, Ohio 45150 USA Phone: (513) 965-7300 • Fax: (513) 965-7350 www.melinkcorp.com • mail@melinkcorp.com PROJECT:DATE: LOCATION: Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Table of Contents. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Abbreviations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Melink Credentials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Contact Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RTU Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EF Air Distribution Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Exhaust Fan Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MUA/Supply Fan Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Hood Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Building Balance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 9 10 11 2 3 4 5 6 7 TABLE OF CONTENTS Raising Cane's #391 9/19/2019 1525 Central Parkway , Eagan , MN 55121 Table Of Contents 1 Melink Corporation Energy solutions for a brighter tomorrow Page 2 PROJECT: Raising Cane's #391 DATE: 9/19/2019 LOCATION: 1525 Central Parkway , Eagan , MN 55121 AHU - Air Handling Unit AMP - Amperage BP - Building Pressure CFM - Cubic Feet/Minute EF - Exhaust Fan EH - Entry Heater ERU - Energy Recycling Unit ESP - External Static Pressure FLA - Full Load Amperage HP - Horse Power HZ - Hertz KH - Kitchen Hood KW - Kilowatt MUA - Makeup Air Unit Volts - Voltage OA - Outside Air RA - Return Air RPM - Revolutions Per Minute RTU - Roof Top Unit SF - Supply Fan / Safety Factor SP - Static Pressure VAV - Variable Air Volume WC - Water Column ABBREVIATIONS ABBREVIATIONS Melink Corporation Energy solutions for a brighter tomorrow Page 3 PROJECT: Raising Cane's #391 DATE: 9/19/2019 LOCATION: 1525 Central Parkway , Eagan , MN 55121 Values Our core values - integrity, innovation, and service excellence - are the essence of who we are as a company. They serve as the foundation for our words, actions and goals. Our culture starts with the above core values but also promotes professionalism, excellence, and leadership, as well as respect, fairness and charity. Experience For more than 25 years, Melink has been providing independent testing and balancing and installation verification services, thereby reducing operating costs and improving comfort for thousands of buildings. Collectively, Melink staff has over 150 years of experience in testing and balancing, installation verification, kitchen ventilation controls, HVAC design/consulting, HVAC service/installation, LEED building certification, indoor air quality testing, and solar PV installation/application. Certifications Melink has individuals on staff with the following certifications: • NEBB Certified TAB Professionals • NEBB Certified TAB Technicians • Professional Engineers (PE) • LEED Accredited Professionals (LEED AP) • North American Board of Certified Energy Practitioners (NABCEP) • Project Management Professionals (PMP) • Certified Project Managers (CPM) • Six Sigma Certified (SSWB, SSGB, SSBB) Affiliations Melink is proud to be associated with the following organizations: • The National Environmental Balancing Bureau (NEBB) • The American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) • The U.S. Green Building Council (USGBC) • The Professional Retail Store Maintenance Association (PRSM) • The Restaurant Facility Management Association (RFMA) • The Association of Energy Engineers (AEE) • The American Solar Energy Society (ASES) • The Solar Energy Industries Association (SEIA) • The North American Association of Food Equipment Manufacturers (NAFEM) MELINK CREDENTIALS About Melink Melink Corporation Energy solutions for a brighter tomorrow Page 4 PROJECT: Raising Cane's #391 DATE: 09/26/2019 LOCATION: 1525 Central Parkway , Eagan , MN 55121 PROJECT MANAGER: Phone: E-mail: SUPERINTENDENT: Phone: E-mail: MECH. CONTRACTOR: Phone: E-mail: MELINK TECHNICIAN: Phone: E-mail: 2nd VISIT TECHNICIAN: Phone: E-mail: STRATEGIC ACCOUNT MANAGER: Phone: E-mail: mheriott@melinkcorp.com jsandford@melinkcorp.com Ryan Malikowski (513) 965-6073 rmalikowski@melinkcorp.com Matt Heriott (513) 965-7025 afrizzell@embreegroup.com Summit Mechanical N/A n/a Jon Sandford / Jabari Johnson (513) 965-6062 TEST AND BALANCE CONTACT INFORMATION Shane Farmer 512-819-4715 shanef@emreegroup.com Andrew Frizzell 512-848-8654 Melink Corporation Energy solutions for a brighter tomorrow Page 5 PROJECT: Raising Cane's #391 DATE: 09/26/2019 LOCATION: 1525 Central Parkway , Eagan , MN 55121 0.98'' 60. Hz 3308 3308 555 17 % 5.7 5.7 5.6 0.41''0.88''0.56'' 209 209 209 AX54 N/A 734 838 230/3 6.00 1.15 1VL34 x 7/8" 6" x 1" LGH102H4BS3Y 5619C06565 8.5 US Motor 2 8.5 1.00'' 2 230/3 N/A Lennox 3400 3300 3300 550 17 % N/A 0.56'' 60. Hz 3273 3273 578 18 % 5.8 5.8 5.8 0.32''0.78''0.25'' 731 829 209 209 209 1VL34 x 7/8" 6" x 1" AX54 N/A 2 230/3 6.00 1.15 N/A Lennox LGH102H4BS3Y 5619C06543 8.5 US Motor 17 % N/A 8.5 1.00'' 2 208/3 Supply CFM Return CFM Outside Air CFM Outside Air Ratio % RTU-1 Dining/Lobby 3400 3400 3400 Actual Volts Final Operating Amps Ret/Suction/Discharge External S.P. Motor Hertz Motor Sheave Fan Sheave Belt(s) Sheave Centerline Test Data RPM - Initial/Final Fan Motor • HP • Volts/Phase • FLA/SF Fan RPM Equip. Data Unit MFR • Model No. • Serial No. • Rated Tons Outside Air Ratio % Model Number Capacity (Tons) External S.P. Fan HP Volts/Phase ROOFTOP UNITS (RTU) DATA Design Data Scheduled CFM (SA) Supply CFM (Load) Return CFM Outside Air CFM 580 RTU-2 Kitchen/Back of house Melink Corporation Energy solutions for a brighter tomorrow Page 6 PROJECT:Raising Cane's #391 DATE:9/19/2019 LOCATION:1525 Central Parkway , Eagan , MN 55121 SYSTEM: 102 % 95 % 98 % 142 EF-1 EXHAUST AIR CFM 300 382 295 E1B Womens RR Ceiling Grille N/A 150 178 CFM CFM CFM E1A Mens RR Ceiling Grille N/A 150 204 153 AIR DISTRIBUTION DATA EF-1 Restrooms NO.AREA SERVED TYPE OUTLET SIZE DESIGN PRELIM FINAL Melink Corporation Energy solutions for a brighter tomorrow Page 7 PROJECT: Raising Cane's #391 DATE: 09/26/2019 LOCATION: 1525 Central Parkway , Eagan , MN 55121 N/A 60. Hz 3234 5.6 5.6 5.6 N/A N/A N/A 209 209 209 Direct Drive Direct Drive Direct Drive N/A 56.Hz 44.Hz Westinghouse 3 1755 208/3 8.60 1.15 1 1/2 208/3 N/A Captive-Aire DU180HFA DTP0034 N/A 60. Hz 295 EF-2 KH-1 3040 3040 N/A 0.38'' 1.2 N/A N/A N/A N/A N/A 120 N/A N/A Direct Drive Direct Drive Direct Drive N/A VSC VSC 1/4 1725 120/1 3.40 N/A 120/1 N/A Loren Cook N/A N/A Greenheck Motor Hertz Exhaust CFM EF-1 Restrooms 300 300 N/A 0.38'' 1/15 RPM - Initial/Final Actual Volts Final Operating Amps Ret/Suction/Discharge External S.P. • FLA/SF Motor Sheave Fan Sheave Belt(s) Sheave Centerline Test Data • Serial No. Fan Motor • HP • RPM • Volts/Phase Fan HP Volts/Phase Fan RPM Equip. Data Unit MFR • Model No. EXHAUST FAN (EF) DATA Design Data Scheduled CFM (EA) Exhaust CFM (Load) Model Number External S.P. Melink Corporation Energy solutions for a brighter tomorrow Page 8 PROJECT: Raising Cane's #391 DATE: 9/19/2019 LOCATION: 1525 Central Parkway , Eagan , MN 55121 N/A N/A N/A N/A 60. Hz 2461 2.6 2.6 2.6 N/A 59.Hz 59.Hz 209 209 209 208/3 3.44 1.15 Direct Drive Direct Drive Direct Drive 3714635 N/A Westinghouse 1 1150 0.50'' 1 1/2 208/3 N/A Captive-Aire A2-D.250-20D Ret/Suction/Discharge External S.P. Motor Hertz Make-UP Air CFM MUA-1 KH-1 2430 2430 DTP0016 N/A Sheave Centerline Test Data RPM - Initial/Final Actual Volts Final Operating Amps • RPM • Volts/Phase • FLA/SF Motor Sheave Fan Sheave Belt(s) • Model No. • Serial No. • Rated Tons Fan Motor • HP External S.P. Fan HP Volts/Phase Fan RPM Equip. Data Unit MFR MAKE UP AIR (MUA) UNIT DATA Design Data Scheduled CFM (SA) Make-UP Air CFM (Load) Model Number Capacity (Tons) Melink Corporation Energy solutions for a brighter tomorrow Page 9 PROJECT: Raising Cane's #391 DATE: 09/26/2019 LOCATION: 1525 Central Parkway , Eagan , MN 55121 136 3234 76 % 190 217 143 124 136 146 174 231 2461 -1--2- 123 169 16 16 16 16 16 16 20 -1--2- 16 16 16 16 Wall Canopy Front Perforated 12 156 Captrate Balance Ratio % KH-1 Fryer 2430 3040 80 % Captive-Aire 5424 ND-2 with filter D size E above F G H Exhaust CFM MUA Avg FPM MUA CFM Exh. Avg. FPM A B Correlates C with filter D velocities E below F G H Test Data Filter MFR Filter Height Filter Lengths A B Correlates C Hood MFR • Model No. • Hood Type MUA Open Dir. MUA Open Type MUA Width/Length KITCHEN HOOD (KH) DATA Design Data Make-Up CFM Exhaust CFM Balance Ratio % Equip. Data Melink Corporation Energy solutions for a brighter tomorrow Page 10 PROJECT: Raising Cane's #391 DATE: 09/26/2019 LOCATION: 1525 Central Parkway , Eagan , MN 55121 DESIGN TOTAL +DESIGN TOTAL - FINAL TOTAL +FINAL TOTAL - DESIGN BUILDING BALANCE =CFM FINAL BUILDING BALANCE =CFM FINAL BUILDING PRESSURE =W.C.0.003'' 3,560 3,594 3,340 3,529 220 65 MUA-1 2430 2461 RTU-2 550 555 EF-2 3040 3234 RTU-1 580 578 EF-1 300 295 BUILDING AIR BALANCE TEST RESULTS ( IN CFM ) MAKE-UP AIR EXHAUST AIR Design Final Design Final Melink Corporation Energy solutions for a brighter tomorrow Page 11