3643 Widgeon WayEAGAN
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810
(651) 675-5675 I TDD: (651) 454-8535 I FAX: (651) 67
Plan Submittal: eaians a(citvofeagan.com
Date:
2020 COMMERCIAL BUIL
site Address: Denmark Ave / Timbershore L
Tenant Name:
Property Owner
Type of Work
Contractor
Architect/Engineer
ECEIVE0
r I Plans: Q,_ Electrordc
IT APPLICATION
..' .?20/
h LA'c- /glum
is
ne
L'�l �
�
For OMce Usef41
Permit /(%S `� nl
Permit Fee:
Staff:
:is:ssst.aeas s�
I Payment Recvd: Yes yo
J�Paper I
(Tenant is: New / Existing) Suite #:
Former Tenant:
Name: City of Eagan
Address / City / Zip: 3830 Pilot Knob Road
Applicant is:
Owner ✓ Contractor
Phone: 651-675-5000
Description of work: Upgrades to existing building
Construction Cost: $52,184
Name: Ebert, Inc. dba Ebert Construction License #: N/A - Bonded
Address: 23350 County Road 10
state: MN Zip: 55357
Cont.ct: Randy Pavey, PM
Name: Barr Engineering
Address: 4300 Market Pointe Drive, #200
City: Corcoran
Phone: 763-498-7844
Email: rpavey@ebertconst.com
State: MN Zip: 55435
Registration #:
City: Minneapolis
Phone: 952-832-2600
Contact Person: Email:
Licensed plumber installing my sewer/water service: Phone #:
N07E: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be
classified as non-public K you provide specific reasons that would penult the City to conclude that they are trade secret.
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the Clty's
weblike at www.citvofeaaan.com/subscribe.
CALL BEFORE YOU DIG. CaII Gopher State One Call et (651) 454.0002 for protection against underground utility damage. Call 48 hours before you
intend to dig to receive locates of underground utilities. www.govherstateonecali.orq
I hereby acknowledge that this information Is complete and accurate; that the work will be In con ce e ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and worko - - hout a permk; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval
x Randy Pavey, Project Manager
Applicant's Printed Name • • Iicant' Signature
X
DO NOT WRITE BELOW THIS
INE
SUB TYPES
Foundation
?C Commercial / Industrial
Apartments
Miscellaneous
WORK TYPES
New
Addition
Alteration
_ Replace
_ Salon Owner Change
Public Facility
Accessory Building
Greenhouse / Tent
Antennae
Interior Improvement
Exterior Improvement
Repair
Water Damage
DESCRIPTION
Valuation 4 S2, I y. 00
Plan Review
(25%_ 100%Z )
Census Code
# of Units
# of Buildings
Type of Construction
Occupancy
Code Edition
Zoning
Stories
Square Feet
Length
Width
Exterior Alteration -Apart ants
Exterior Alteration-Com ercial
Exterior Alteration -Public Facility
Siding
Reroof
Windows
_ Fire Repair
Demolish Building*
_ Demolish Interior
Demolish Foundation
_ Retaining Wall
6-/
*Demolition of entire building - give PCA handout to applicant
5 1--
-LoZDMIk BL
REQUIRED INSPECTIONS
/V Footings _ New Building _ Deck Addition
Foundation Foundation Before Backfill
Vapor Barrier
X Framing ,)C 30 Minutes 1 Hour
Insulation
Sheetrock
Roof: _Decking _Insulation _Ice & Water _Final
Siding: _Stucco Lath _Stone Lath _Brick EFIS
Windows
Fireplace: _Rough In _Air Test _Final
Pool: _Footings _Air/Gas Tests Final
MCES System
SAC Units
City Water
Booster Pump
PRV
Fire Sprinklers
Drain Tile
Retaining Wall
Erosion Control
,X Steel Reinforcement
Street/Curb Cut Inspection
Other:
Meter Size:
Electronic Set of Final Revised Plans
Final / C.O. Required
)4- Final / No C.O. Required
Final CIO Inspection: Schedule Fire Marshal to be present: Yes X No
Reviewed By: , Planning New Business to Eagan:
Reviewed By: , Building Inspector
FEES
Base Fee
Surcharge
Plan Review
MCES SAC
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant (Irrigation)
Park Dedication
Trail Dedication
Water Quality
Storm Sewer Trunk
Sewer Trunk
Water Trunk
Street Lateral
Street
Water Lateral
Stormwater Performance Security
Landscape Security
Other:
TOTAL:
Page 2 of 3