Loading...
540 Yankee Doodle RdI-IA.61 [Al \ sad e i rci- Qc EAGAN 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-5675 I TDD: (651) 454-8535 I FAX: (651) 675-5694 Plan Submittal: eplansacitvofeagan.com For Office Use Permit #: / ✓ 2O'9 O Permit Fee,^ S/ 2 `-4 °CI Staff: L _ J Payment Recvd: _Yes /No Plans: Electronic Paper 2018 COMMERCIAL BUILDING PERMIT APPLICATION Date: 9/19/18 i1site Address: 540 Yankee Doodle Road Eagan MN 55123 Tenant Name: "'� "d+ �'`^ s-l►odri $ fC S4001.{./ (Tenant is: I New / Existing) Suite #: Former Tenant: I111 folio Name: Johnson Property Services, LLC Phone: 651-303-6317 Address /city /zip: 3432 Denmark Avenue #102 Eagan MN 55123 Applicant is: ✓ Owner 1 Contractor Description of work: New Mini Storage Building Construction Cost -.2 (-) ,,,Sy Name: Johnson Property Services, LLC License #: Address: 3432 Denmark Avenue #102 City: Eagan State: MN Zip: 55123 Phone: 651-303-6317 Contact: Jeff Johnson Email: JohnsonHousingServices@hotmail.com Name: Bruce V. Tunell 18022 Registration #: Address: 1370 Cherry Hill Rd. City: Mendota Heights State: MN Zip: 55118 Phone: (612) 799-4015 Contact Person: Bruce V. Tunell Email: bvtunell@comcast.net Licensed plumber installing new sewer/water service: Phone #: considered to bed urrnrrld' permit the -ityfo cone of the information may be are trade secrets. You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeaoan.com/subscribe. CALL BEFORE YOU DIG. Call Gopher State One CaII at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a p it; t)aet the work will be in accordance with the approved plan in the case of work which requires a review and approval of plan .Jeffrey A. Johnson Applicant's Printed Name _Trail Dedication A11 UB TYPES DO NOT WRITE BELOW THIS LINE _ Foundation Commercial / Industrial Apartments Miscellaneous WORK TYPES New Addition Alteration Replace Salon Owner Change Public Facility Accessory Building Greenhouse / Tent Antennae Interior Improvement Exterior Improvement Repair Water Damage DESCRIPTION Valuation Plan Review (25%_ 100%X ) Census Code # of Units # of Buildings Type of Construction �g REQUIRED INSPECTIONS — Footings )c New Building _ Deck Addition Foundation Foundation Before Backfill Vapor Barrier �/ Framing 30 Minutes �` 1 Hour Insulation Sheetrock Roof: 4Decking >( Insulation Ice & Water Final Siding: _Stucco Lath _Stone Lath _Brick _ EFIS Windows Fireplace: _Rough In _Air Test _Final Pool: _Footings _Air/Gas Tests _Final Occupancy Code Edition Zoning Stories Square Feet Length Width Exterior Alteration —Apartments _ Exterior Alteration —Commercial Exterior Alteration —Public Facility Siding Reroof Windows Fire Repair Demolish Building* Demolish Interior Demolish Foundation Retaining Wall *Demolition of entire building — give PCA handout to applicant MCES System SAC Units City Water Booster Pump PRV Fire Sprinklers Final CIO Inspection: Schedul Reviewed By: Reviewed By: Drain Tile Retaining Wall Erosion Control Steel Reinforcement Street/Curb Cut Inspection Other: Meter Size: Electronic Set of Final Revised Plans X Final / C.O. Required Final / No C.O. Required Fire Marshal to be present: 2CYes No , Planning New Business to Eagan: , Building Inspector yes - FEES Base Fee Surcharge Plan Review — MCES SAC — City SAC s Water Quality 15 I 4, 35 L, Storm Sewer Trunk � l 9 M Sewer Trunk 3z9, Zi 'Water Trunk j 9 85, Street Lateral 4 II9 `tD Street S&W Permit & Surcharge Water Lateral „Treatment Plant 5 167 Stormwater Performance Security —Treatment Plant (Irrigation) 4 q67 Landscape Security — Park Dedication 9 ISfj"i + Other: 4 z384.111 'n Z d o at> � Sod TOTAL: 9-5 `Z? -; 09 Page 2 of 3 MCA USE: Letter Reference: 181119A1 Address ID: 722138 Payment ID: 415537 l Date of Determination: 11/19/18 Determination Expiration: 11/19/20 Greetings! Please see the determination below. Project Name: Project Address: Suite #/Campus: City Name: Applicant: Eagan Self Storage 540 Yankee Doodle Road N/A Eagan Jeff Johnson, Johnson Property Services Courtney Steeves, Kiehm Construction Inc. Special Notes: This determination replaces determination letter 180925B3, sent on September 25, 2018. This is based on the incorrect charge calculation of the original letter. Charge Calculation: Fixture Units: 9 fixture units @ 17 fixture units / SAC = 0.53 Total Charge: 0.53 Credit Calculation: N/A Total Credit: Net SAC: 0.53 — or — 1 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions email me at: Jessica.nve@metc.state.mn.us. Thank you, Jessie Nye Supervisor, ES Revenue Please visit our SAC website by going to: www.metrocouncil.org/SACprogram 390 Robert Strut North cl t.1N J51i:1 6 Phone b51.1 '?.10.7C ? 11 Y bb1 ;11 .g5Q4 nietrocouncll or,) M ETROPOLITAN COUNCIL ill i j Yf —_ N = Co ""® !e s�riteee ¢Se 6Ee�6�1 `3i^s A at ��V ^� ue!dJoo!dlSJ!d NW 'ue6e3 A2 dit < z o"v lm ii6 ;11,1 E 99 ? ,/'d- o e6eJoiSbla ue6e3 1 E 1 1 d3 4 1 1 1 1 1 1 1 1 1 1 1 A uJII.U.1M1 ii� Y Q Y Q 1 i <-.«< 58 br8 m'68_' bS - b a itt § b b b .d I e3 .d .d - b I 1 t b ELI, 1 IT 1 b Al 4 4 i erg :12MB '.2. a illiii713 nci., . �' ® o�f: 4©' e _ s • �4e c) 4 70, Z/ EAGAN 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-5675 I TDD: (651) 454-8535 I FAX: (651) 675-5694 buildinginspections ut7.citvofeagan.com For Office Use Permit#: I cSI P3 Permit Fee: 1 1 oC / - ° 6 Date Received: Staff: L 2020 SEWER AND WATER CONNECTION AND AVAILABILITY CHARGES EXISTING COMMERCIAL PROPERTY Date: 10-21-2020 Property Owner: Johnson Preoperty Services, LLC Address: 3432 Denmark Avenue #102 Phoneu. Number: 651-303-6317 Plumber: Salaba Mech 952-486-92 SEWER Sewer Service Sewer lateral charge Sewer trunk City SAC @ $119.40/unit MCES SAC @ $2,485/unit Receipt #: , Date: Contact Name: Jon Salaba Permit Fee, including State Surcharge $65.00 TOTAL: FOR OFFICE USE ONLY required CiPtyV R-O-w Permit County R-©-W Permit Plumbing Permit WATER Water Service Water lateral charge Water trunk Water supply storage Receipt #: Date: Treatment Plant @ $967.00/unit Permit Fee, Including State Surcharge $65.00 `Plumbing Permit Required — water meter to be acquired with building permit TOTAL: J SEWER & WATER Sewer Service Water Service Sewer lateral charge Water lateral charge Sewer trunk Water trunk City SAC MCES SAC Receipt # , Date Water supply & storage Receipt # , Date Treatment plant Permit Fee, including State Surcharge $129.00 *Plumbing Permit Required — water meter to be acquired with building permit TOTAL: Number of SAC units is determined by the Metropolitan Council Environmental Services (651) 602-1000. You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeagan.com/subscribe. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org Cc: City of Eagan Finance Department 3830 PILOT KNOB ROAD I EAGAN, MN 55122-181 (651) 675-5675 I TDD: (651) 454-8535 I FAX: (651) •- 75-5694 Email:buildinoinspectionsAcityofeagan corn Plan Submittal:: l ar: %: iiypfeagan.,corn RECEIVED JUN 16 2020 BY: 2020 COMMERCIAL MECHANICAL PERMIT APPLICATION ❑ Please submit two (2) sets of paper plans with all commercial applications as well as an electronic set of the submittal, submitted via email, CD or flash drive Date: 1 —/0' 202o Site Address: $1D ke °DOL Ki) For Office Use ,� %� Permit #: /"' / �iJ Permit Fee:` 3/11- 10 , O v Staff: Payment Recvd: Yes — I LPlans: Electronic Paper Z.ZNo-1 Tenant: Owner Contractor Type of Work Permit Type Name: Address / City / Zip: _'3I3 oZ 1)t rn wf Name: $e kwl CwIS /`kc�ia.1 Address: B3 1iJ . '26 Itk. $+-• Suite #: Phone: 6 51- 3 (33 - (°317 I0 2,,,.f� A r9 t License #: meY-12 43`io City: VA,R.,M tvui �roN State: VA VI Zip' sSba`t Phone: 957.- 4i)b - 9 2'8% Contact: JCS, 54'c A. Email: %( New Replacement Description of work: NOTE: Roof mounted and ground mounted mechanical equipment is required to be screened by City Code. Please contact the Mechanical Inspector for information on permitted screening methods. COMMERCIAL V New Construction Interior Improvement Install Piping Processed Gas Exterior HVAC Unit Under/Above grour. Tank ( Install / Remove) h Sa1�LOa rt�f4tL, Ccs�1 Additional Alteration Demolition COMMERCIAL FEES $60.00 Permit Fee Minimum $75.00 Underground tank removal, includes Stet Surcharge Surcharge = Contract Value x $0.0005 If the project valuation is over $1 million, please call or Surcharge = $ TOTAL FEE You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www,cityofeagan.corn/subscribe. I hereby acknowledge that this information is complete accurate, that the work will be in conformance with the ordinances and codes of the City of Eagan: that I understand this is not a permit, but only an a; :ciication for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires <; eview and approval of plans. x Jo'i,cAkety, C. Sea calk,x l e— IL Applicant's Printed Name Contract Value $ of oc 0J 060 x .015 _ $ Permit Fee = $ Surcharge Appli nt's Signature FOR OFFICE USE Re red Inspections: Underground Rough In Reviewed By: P Air Test 67 Gas Service Test , In -floor Heat Final HVAC Screening Date: 51 `/ / 2—v CEnvelopeOMcheck Software Compliance Version COMcheckWebCertificate irdt Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Performance Sim. Specs: Construction Site: Building Area 90.1 (2016) Standard Eagan Yankee Doodle Self Storage Eagan, Minnesota 6a New Construction EnergyPlus 8.1.0.009 (EPW: TBD) Owner/Agent: Floor Area Designer/Contractor: Lindell Engineering Inc 3411 Kilmer Lane N Plymouth, Minnesota 55441 7635429163 1-Warehouse : Nonresidential 65000 Envelope Assemblies (a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. Envelope TBD: All building area types must be assigned to at least one envelope assembly Project Title: Eagan Yankee Doodle Self Storage Report date: 06/16/20 Data filename: Page 1 of 14 COMcheck Software Version COMcheckWeb rit 1 Interior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: 90.1 (2016) Standard Eagan Yankee Doodle Self Storage New Construction Construction Site: Owner/Agent: Designer/Contractor: Lindell Engineering Inc 3411 Kilmer Lane N Plymouth, Minnesota 55441 7635429163 Allowed Interior Lighting Power Proposed Interior Lighting Power Interior Lighting TBD: No lighting fixtures specified Project Title: Eagan Yankee Doodle Self Storage Report date: 06/16/20 Data filename: Page 2 of 14 COMcheck Software Version COMcheckWeb rift 1 Exterior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Exterior Lighting Zone Construction Site: 90.1 (2016) Standard Eagan Yankee Doodle Self Storage New Construction 0 (Unspecified) Owner/Agent: Designer/Contractor: Lindell Engineering Inc 3411 Kilmer Lane N Plymouth, Minnesota 55441 7635429163 Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts / Wattage (B X C) Total Tradable Watts (a) = 0 Total Allowed Watts = 0 Total Allowed Supplemental Watts (b) = 350 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces. (b) A supplemental allowance equal to 350 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces. Proposed Exterior Lighting Power Exterior Lighting TBD: Exterior lighting zone not specified (see project screen) Project Title: Eagan Yankee Doodle Self Storage Report date: 06/16/20 Data filename: Page 3 of 14 inft 1 COMcheck Software Version COMcheckWeb Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: 90.1 (2016) Standard Eagan Yankee Doodle Self Storage Eagan, Minnesota 6a New Construction Owner/Agent: Designer/Contractor: Lindell Engineering Inc 3411 Kilmer Lane N Plymouth, Minnesota 55441 7635429163 Mechanical Systems List QuantitySystem Type & Description 1 AH-1 (Single Zone w/ PerimeterSystem): Heating: 1 each - Central Furnace (AH-1), Gas, Capacity = 132 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Packaged Terminal Unit (C-1), Capacity = 42 kBtu/h, Air -Cooled Condenser Proposed Efficiency = 14.00 EER, Required Efficiency: 9.50 EER 1 AH-2 (Single Zone w/ PerimeterSystem): Heating: 1 each - Central Furnace, Gas, Capacity = 132 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Packaged Terminal Unit, Capacity = 42 kBtu/h, Air -Cooled Condenser Proposed Efficiency = 14.00 EER, Required Efficiency: 9.50 EER 1 AH-3 (Single Zone w/ PerimeterSystem): Heating: 1 each - Central Furnace, Gas, Capacity = 132 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Packaged Terminal Unit, Capacity = 42 kBtu/h, Air -Cooled Condenser Proposed Efficiency = 14.00 EER, Required Efficiency: 9.50 EER 1 AH-4 (Single Zone w/ PerimeterSystem): Heating: 1 each - Central Furnace, Gas, Capacity = 132 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Packaged Terminal Unit, Capacity = 42 kBtu/h, Air -Cooled Condenser Proposed Efficiency = 14.00 EER, Required Efficiency: 9.50 EER 1 RTU-1 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 240 kBtu/h Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec Cooling: 1 each - Other, Capacity = 90 kBtu/h, Air -Cooled Condenser, Air Economizer No minimum efficiency requirement applies 1 RTU-2 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 240 kBtu/h Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec Cooling: 1 each - Other, Capacity = 90 kBtu/h, Air -Cooled Condenser, Air Economizer No minimum efficiency requirement applies 1 HVAC System (Single Zone): Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 600 kBtu/h No minimum efficiency requirement applies 1 AC-1 (Single Zone): Project Title: Eagan Yankee Doodle Self Storage Report date: 06/16/20 Data filename: Page 4 of 14 QuantitySystem Type & Description Heating: 1 each - Other (AC-1), Electric, Capacity = 18 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Split System (CU-1), Capacity = 18 kBtu/h, Air -Cooled Condenser Proposed Efficiency = 13.00 SEER, Required Efficiency: 13.00 SEER 1 AC-2 (Single Zone): Heating: 1 each - Other, Electric, Capacity = 18 kBtu/h No minimum efficiency requirement applies Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Project Title: Eagan Yankee Doodle Self Storage Report date: 06/16/20 Data filename: Page 5 of 14 COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 90.1 (2016) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section & Req.ID Plan Review Complies? Comments/Assumptions 4.2.2, 6.4.4.2.1, 6.7.2 [PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. ❑ Complies Requirement will be met. ❑Does Not ❑Not Observable ❑Not Applicable 6.7.2.4 Detailed instructions for HVAC [PR5]1 systems commissioning included on the plans or specifications for projects >=50,000 ft2. ❑ Complies Exception: Warehouses and semiheated spaces. ❑ Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Eagan Yankee Doodle Self Storage Report date: 06/16/20 Data filename: Page 6 of 14 Section & Req.ID Footing / Foundation Inspection Complies? Comments/Assumptions 6.4.3.7 Freeze protection and snow/ice [FO9]3 melting system sensors for future connection to controls. ❑Complies Exception: Requirement does not apply. ❑Does Not ❑ Not Observable ❑ Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Eagan Yankee Doodle Self Storage Report date: 06/16/20 Data filename: Page 7 of 14 Section # & Req.ID Mechanical Rough -In Inspection P Plans Verified Value Field Verified Value Complies? Comments/Assumptions 6.4.1.4, HVAC equipment efficiency Efficiency: Efficiency: ■Complies See the Mechanical Systems list 6.4.1.5 verified. Non-NAECA HVAC ■Does Not for values. [ME1j3 equipment labeled as meeting 90.1. ■ Not Observable ■ Not Applicable 6.4.3.4.1 Stair and elevator shaft vents ■Complies Requirement will be met. [ME3]3 have motorized dampers that ■ Does Not automatically close. •Not Observable •Not Applicable 6.4.3.4.2, Outdoor air and exhaust systems •Complies Requirement will be met. 6.4.3.4.3 have motorized dampers that ■ Does Not [ME4]3 automatically shut when not in use and meet maximum leakage •Not Observable rates. Check gravity dampers a, ■ Not Applicable where allowed. 6.4.3.4.5 !Enclosed parking garage ; •Complies Exception: Requirement [ME39]3 ventilation has automatic ■Does Not does not apply. contaminant detection and; capacity to stage or modulate 4 MI Not Observable `fans to 50% or less of design ','' f■Not Applicable capacity. 6.4.3.4.4 Ventilation fans >0.75 hp have •Complies Requirement will be met. [ME5I3 i automatic controls to shut off fan a • Does Not ;when not required. IN Not Observable ■ Not Applicable 6.4.3.8 Demand control ventilation i■Complies Requirement will be met. [ME6]1 provided for spaces >500 ft2 and 'DDoes Not >25 people/1000 ft2 occupant density and served by systems ■Not Observable with air side economizer, auto ■ Not Applicable modulating outside air damper control, or design airflow >3,000 cfm. 6.5.3.2.1 ;DX cooling systems >= 75 kBtu/h •Complies Requirement will be met. [M 0j2 (>= 65 kBtu/h effective 1/2016) ❑Does Not !and chilled -water and See the Mechanical Systems list ;evaporative cooling fan motor hp •Not Observable ;for values. >= 1/4 designed to vary supply i■Not Applicable fan airflow as a function of load ;and comply with operational requirements. 6.4.4.1.1 'Insulation exposed to weather ■Complies Requirement will be met. [ME7]3 protected from damage. ■ Does Not Insulation outside of the conditioned space and associated •Not Observable with cooling systems is vapor • Not Applicable retardant. 6.4.4.1.2 ? HVAC ducts and plenums R- R- •Complies Requirement will be met. [MEV]z insulated per Table 6.8.2. Where ■Does Not ducts or plenums are installed in !or under a slab, verification may II Not Observable need to occur during Foundation •Not Applicable Inspection. 6.4.4.1.3 HVAC piping insulation thickness. in. in. •Complies Exception: Requirement [ME9]z Where piping is installed in or ■Does Not does not apply. under a slab, verification may •Not Observable need to occur during Foundation Inspection. ■ Not Applicable 6.4.4.1.4 Thermally ineffective panel •Complies Exception: Requirement [ME41]3 surfaces of sensible heating El Does Not does not apply. panels have insulation >= R-3.5. •Not Observable ■ Not Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Eagan Yankee Doodle Self Storage Data filename: Report date: 06/16/20 Page 8 of 14 Section # 6c Req.ID Mechanical Rough -In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions 6.4.4.2.1 Ducts and plenums having •Complies Requirement will be met. [ME10]2 pressure class ratings are Seal El Does Not Class A construction. •Not Observable •Not Applicable 6.8.1-14, Electrically operated DX-DOAS •Complies Exception: Requirement 6.8.1-15 units meet requirements per ■ Does Not does not apply. [ME110]2 Tables 6.8.1-14 or 6.8.1-15. •Not Observable ■ Not Applicable 6.4.4.2.2 Ductwork operating >3 in. water •Complies Requirement will be met. [ME11]3 column requires air leakage { ■ Does Not testing. ■ Not Observable ■ Not Applicable 6.4.4.2.2 Ductwork operating >3 in. water •Complies Requirement will be met. [ME11]3 column requires air leakage j ■ Does Not testing. ■Not Observable ■ Not Applicable 6.4.4.2.2 Ductwork operating >3 in. water Complies Requirement will be met. [ME11]3 column requires air leakage ■ Does Not testing. ■ Not Observable ■Not Applicable 6.4.4.2.2 Ductwork operating >3 in. water " •Complies Requirement will be met. [ME11]3 column requires air leakage ■Does Not testing. •Not Observable ■Not Applicable 6.4.4.2.2 Ductwork operating >3 in. water :■Complies Requirement will be met. [ME11]3 column requires air leakage b . ' ■ Does Not testing. ■Not Observable ¢. +■Not Applicable 6.4.4.2.2 Ductwork operating >3 in. water •Complies Requirement will be met. [ME11]3 column requires air leakage Does Not testing. ■Not Observable x ' ■Not Applicable 6.4.4.2.2 Ductwork operating >3 in. water •Complies Requirement will be met. [ME11]3 column requires air leakage ?■Does Not testing. ■ Not Observable ■ Not Applicable 6.4.4.2.2 Ductwork operating >3 in. water •Complies Requirement will be met. [ME11]3 column requires air leakage ■Does Not testing. ■Not Observable ■ Not Applicable 6.4.4.2.2 'Ductwork operating >3 in. water •Complies Requirement will be met. [ME11]3 'column requires air leakage ■Does Not testing. ■ Not Observable IN Not Applicable 6.5.2.2.1 Three -pipe hydronic systems •Complies Requirement will be met. [ME50]2 using a common return for hot ',Does Not and chilled water are not used. III Not Observable ■ Not Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Eagan Yankee Doodle Self Storage Data filename: Report date: 06/16/20 Page 9 of 14 Section # & Req.ID Mechanical Rough -In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions 6.5.2.3 Dehumidification controls •Complies Requirement will be met. [ME19]3 provided to prevent reheating, ■Does Not recooling, mixing of hot and cold airstreams or concurrent heating ■Not Observable 'and cooling of the same ■Not Applicable airstream. 6.5.2.4.1 s Humidifiers with airstream ■Complies Exception: Requirement [ME68]3 mounted preheating jackets have IN Does Not does not apply. preheat auto -shutoff value set to activate when humidification is MI Not Observable not required. •Not Applicable 6.5.2.4.2 ;Humidification system dispersion •Complies Exception: Requirement [ME69]3 :tube hot surfaces in the ■Does Not does not apply. 'airstreams of ducts or air - handling units insulated >= R- • Not Observable 0.5. • Not Applicable 6.5.2.5 Preheat coils controlled to stop •Complies Requirement will be met. [ME70]3 !heat output whenever ■ Does Not { mechanical cooling, including •Not Observable economizer operation, is active. ■Not Applicable 6.5.2.6 'Units that provide ventilation air •Complies Requirement will be met. [ME106]3 to multiple zones and operate in ■Does Not !conjunction with zone heating ;and cooling systems are _ III Not Observable prevented from using heating or IN Not Applicable heat recovery to warm supply air ;above 60°F when representative building loads or outdoor air temperature indicate that most zones demand cooling. 6.5.3.3 Multiple zone VAV systems with ■Complies Exception: Requirement [ME42)3 'DDC of individual zone boxes ■ Does Not does not apply. !have static pressure setpoint reset controls. ■Not Observable See the Mechanical Systems list ■ Not Applicable for values. 6.5.3.3 ;Multiple zone VAV systems with IN Complies Exception: Requirement [ME42]3 DDC of individual zone boxes ■ Does Not does not apply. i have static pressure setpoint reset controls. ' III Not Observable See the Mechanical Systems list ■ Not Applicable for values. 6.5.3.3 !Multiple zone VAV systems with •Complies Exception: Requirement [ME42]3 DDC of individual zone boxes !DDoes Not does not apply. ;have static pressure setpoint reset controls. ■Not Observable See the Mechanical Systems list ■ Not Applicable for values. 6.5.3.3 ;Multiple zone VAV systems with •Complies Exception: Requirement [ME42]3 DDC of individual zone boxes is Does Not does not apply. have static pressure setpoint ■Not Observable reset controls. See the Mechanical Systems list ■ Not Applicable for values. 6.5.3.3 Multiple zone VAV systems with ■Complies Exception: Requirement [ME42]3 'DDC of individual zone boxes ■ Does Not does not apply. have static pressure setpoint 'reset controls. QNot Observable ;See the Mechanical Systems list • Not Applicable for values. 6.5.3.3 Multiple zone VAV systems with •Complies Exception: Requirement [ME42)3 :DDC of individual zone boxes II Does Not does not apply. `have static pressure setpoint reset controls. MI Observable See the Mechanical Systems list ■ Not Applicable for values. 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Eagan Yankee Doodle Self Storage Data filename: Report date: 06/16/20 Page 10 of 14 Section # & Req.ID Mechanical Rough -In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions 6.5.3.3 Multiple zone VAV systems with [ME42]3 DDC of individual zone boxes have static pressure setpoint reset controls. •Complies Exception: Requirement does not apply. See the Mechanical Systems list for values. ■Does Not ■Not Observable ■ Not Applicable 6.5.3.3 Multiple zone VAV systems with [ME42]3 DDC of individual zone boxes have static pressure setpoint reset controls. •Complies Exception: Requirement does not apply. See the Mechanical Systems list for values. ■Does Not ■Not Observable ■ Not Applicable 6.5.3.3 Multiple zone VAV systems with [ME42]3 ,DDC of individual zone boxes have static pressure setpoint reset controls. ' ❑Complies Exception: Requirement does not apply. See the Mechanical Systems list for values. • Does Not ■Not Observable ■ Not Applicable 6.5.4.2 HVAC pumping systems with >= [ME25]3 3 control values designed for variable fluid flow (see section +' details). •Complies Requirement will be met. ■ Does Not ■Not Observable • Not Applicable 6.5.4.3, 'Fluid flow shutdown in pumping 6.5.4.3.1, systems to multiple chillers or 6.5.4.3.2 { boilers when systems are shut [ME26]3 'down. ■Complies Requirement will be met. ■ Does Not •Not Observable ■ Not Applicable 6.5.4.4 Temperature reset by [ME27]3 representative building loads in r pumping systems >10 hp for chiller and boiler systems i >300,000 Btu/h. •Complies Requirement will be met. "'Does Not ■Not Observable ■Not Applicable 6.5.6.1 Exhaust air energy recovery on [ME56]1 systems meeting Tables 6.5.6.1- 1, and 6.5.6.1-2. •Complies Requirement will be met. ■Does Not •Not Observable • Not Applicable 6.5.6.2 Condenser heat recovery system [ME31]3 :that can heat water to 85 2F or `_ ` provide 60% of peak heat rejection is installed for preheating of service hot water. ■Complies Requirement will be met. • Does Not •Not Observable ■ Not Applicable pp cable 6.5.7.2.1 Kitchen hoods >5,000 cfm have ? [ME32]? :make up air >=50% of exhaust {❑Does 1 air volume. j x ;❑Not •Complies Exception: Requirement does not apply. Not IN Not Observable Applicable 6.5.7.2.4 ;Approved field test used to [ME49]3 evaluate design air flow rates R<: and demonstrate proper capture and containment of kitchen exhaust systems. ■Complies Exception: Requirement does not apply. ■ Does Not ❑Not Observable ■ Not Applicable 6.5.8.1 Unenclosed spaces that are [ME34]2 heated use only radiant heat. _ •Complies Requirement will be met. ■ Does Not ■Not Observable ■ Not Applicable 6.5.9 Hot gas bypass limited to: <=240 [ME35]1 kBtu/h - 15% >240 kBtu/h - 10% •Complies Requirement will be met. ■ Does Not ■ Not Observable ■ Not Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Eagan Yankee Doodle Self Storage Data filename: Report date: 06/16/20 Page 11 of 14 Section # & Re .ID Mechanical Rough -In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions 6.5.9 Hot gas bypass limited to: <=240 •Complies Requirement will be met. [ME35]1 kBtu/h - 15% >240 kBtu/h - 10% In Does Not • Not Observable •Not Applicable 6.5.9 Hot gas bypass limited to: <=240 •Complies Requirement will be met. [ME35]1 kBtu/h - 15% >240 kBtu/h - 10% ■ Does Not •Not Observable ■ Not Applicable 6.5.9 Hot gas bypass limited to: <=240 •Complies ;Requirement will be met. [ME35]1 ; kBtu/h - 15% >240 kBtu/h - 10% ■ Does Not •Not Observable ■ Not Applicable 6.5.9 Hot gas bypass limited to: <=240. •Complies Requirement will be met. [ME35]1 kBtu/h - 15% >240 kBtu/h - 10% ■ Does Not ■ Not Observable ■ Not Applicable 6.4.3.9 Heating for vestibules and air •Complies Requirement will be met. [ME63]2 curtains with integral heating ■Does Not include automatic controls that ■Not Observable shut off the heating system when ■ Not Applicable outdoor air temperatures > 45F. pp ccable Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <= 60F and cooling setpoint >= 80F. 6.5.10 Doors separating conditioned ■Complies 'Requirement will be met. [ME73]3 'space from the outdoors have ■ Does Not controls that disable/reset •Not Observable heating and cooling system when ■Not Applicable {'' pplicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Eagan Yankee Doodle Self Storage Report date: 06/16/20 Data filename: Page 12 of 14 (EL9]2 Section & Req.ID Rough -In Electrical Inspection Complies? Comments/Assumptions 10.4.1 Electric motors meet requirements where applicable. ❑Complies Requirement will be met. ❑Does Not :Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Eagan Yankee Doodle Self Storage Report date: 06/16/20 Data filename: Page 13 of 14 Section # & Req.ID Final Inspection Complies? Comments/Assumptions 6.4.3.1.2 Thermostatic controls have a 5 °F [F13]3 deadband. •Complies Requirement will be met. • Does Not II Not Observable • Not Applicable 6.4.3.2 Temperature controls have setpoint [F120]3 overlap restrictions. •Complies Requirement will be met. • Does Not • Not Observable • Not Applicable 6.4.3.3.1 HVAC systems equipped with at least ! [FI21]3 one automatic shutdown control. •Complies Requirement will be met. ■ Does Not ■ Not Observable ■Not Applicable 6.4.3.3.2 ; Setback controls allow automatic [FI22]3 :restart and temporary operation as required for maintenance.IS ■Complies Requirement will be met. • Does Not Not Observable ❑Not Applicable 6.4.3.12 Air economizer has a fault detection [F1200]3 i and diagnostics (FDD) system (see details for configuration and operational requirements). •Complies Requirement will be met. ■ Does Not ❑Not Observable ■ Not Applicable 6.4.3.12 ;Air economizer has a fault detection [F1200]3 ; and diagnostics (FDD) system (see details for configuration and operational requirements). •Complies Requirement will be met. ■ Does Not Not Observable ■Not Applicable 6.4.3.6 ;When humidification and [FI6]3 dehumidification are provided to a zone, simultaneous operation is• prohibited. Humidity control prohibits the use of fossil fuel or electricity to produce RH > 30% in the warmest ,zone humidified and RH < 60% in the coldest zone dehumidified. ■Complies Requirement will be met. ■ Does Not Not Observable • Not Applicable 6.7.2.1 Furnished HVAC as -built drawings [F17]3 submitted within 90 days of system )acceptance. •Complies Requirement will be met. IN Does Not ❑Not Observable ■Not Applicable 6.7.2.2 Furnished O&M manuals for HVAC [F18]3 `systems within 90 days of system ,acceptance. •Complies Requirement will be met. ■ Does Not ■ Not Observable ■Not Applicable 6.7.2.3 An air and/or hydronic system [FI9]1 balancing report is provided for HVAC systems serving zones >5,000 ft2 of• conditioned area. •Complies Requirement will be met. •Does Not Not Observable ■ Not Applicable 6.7.2.4 [FI10]1 HVAC control systems have been •Complies Requirement will be met. tested to ensure proper operation, •Does Not calibration and adjustment of controls. IN Not Observable ■ Not Applicable 10.4.3 [F12412 Elevators are designed with the ■Complies Requirement will be met. proper lighting, ventilation power, and •Does Not standby mode. •Not Observable ■Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Eagan Yankee Doodle Self Storage Data filename: Report date: 06/16/20 Page 14 of 14 3830 PILOT KNOB ROAD 1 EAGAN, MN 55122-181' (651) 675-5675 TDD: (651) 454-8535 1 FAX: (651) +575-5694 Email: ouildl ac sb t s cityofeagan_com Plan Submittal: p' ' .: 'cit of _q < fi.com BY. 2020 COMMERCIAL PLUMBING PE APPLICATION ❑ Please submit two (2) sets of paper plans with all commercial applications as well as an electronic set of the submittal, submitted via email, CD or flash drive r . 0 f 2020 For Office Use Permit*: /6",01 Permit Fee:��• ` I� Staff: ✓ Payment Recvd: Yes Date: ip Q Tenant: 20 Site Address: o r I Plans: Electronic Paper 51O YA-ak{Y od /P ZbCJ Property ' I Owner Name: 1 >O �-F in t) .5ON Contractor Type of Work Suite #: Phone: (cS /' 305-c 3/'7 Name: fi/ P m (0,1S 7-44 eh ern. I C License #: /R 0 i.o 1 ,Z Address: 8 3'15- V\/ 21p% ' S city: Ta2 wit ✓W 4 State: ,. Zip: v ,5-0 2. Phone 9 2- 981- 9268 Email: JO VtS4t tCJ A G- J41a! New Construction Addition Modify Space Replacement repair Rebuild Work in Right -Of -Way Description of work: Irrigation System ( / _ no) ( RPZ / _ PVB) • Rain sensors require on irrigation systems • Avg. GPM (2rbo required unless smaller size allowed by Public Works) Meter Required - Call i_ ties at (651) 675-5200 to verity tests passed prior to picking up meter. Domestic: Size & Type Average GPM it) High doinand devices? _Yes „X_No COMMERCIAL FEES $60.00 Permit Fee Minimum $60.00 PVB/RPZ Permit (includes State Surchar ;e) Surcharge = Contract Value x $0.0005 if the project valuation is over $1 million, please call ;_:ay for Surcharge The following fees may apply when installing a •'ew lawn irrigation system or connecting a new water service. Contact the City's Engineering Department, (651) 675-56°°6, for required fee amounts. Fire: 1 Flushometers Yes Contract Value $ qmo x .015 $ Permit Fee $ Surcharge $ TOTAL FEE $ Water Permit $ Treatment Plant $ Meter Fee $ Radio Read $ State Surcharge = $ TOTAL FEE You may subscribe to receive an electronic notification fr:m the City of proposed ordinances by signing up for an email update on th;: City's website at tetigan,t orri. subscribe. CALL BEFORE YOU DIG. Call Gopher State One Call at (65 ) 454-0002 for protection against underground utility damage. I hereby acknowledge that this information is complete and a .rate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I .inceistanl this is not a permit. but only an application for a re mit, and .vori< is not to start without a permit; that the work will be in accordance with the approved clan it the case of work Mich requires a review and approval plans. x e�nc.�V.oar C,- Ja�a`ac` Applicant's Printed Name x Applicants Signature Page 1 of 4 FOR OFFICE USE Approved By: /�V Date4' 17 I Required Inspections: ' Under Ground r Rough -In yAir Test _Gas Test ("Final PRV Required: _ Yes _ No Meter Related Items: Meter Size 3 J % Radio Read Manometer Staff: Sd' Page 2 of 4