3155 Coachman Rd - unit 3733830 PI1
(651) 67
kui(dinpi
EAGANRECEIVED
KNOB ROAD I EAGAN„ MN 55122-1810 DEC 16 2020
75 TDD: (651) 454-8535 l FAX: (651) 675-5694
itvoreagan.com
For Office Use
Permit Fee 4 z 1. 1 11 m
I 24
Date Received:
Staff:
Permit #: i (0 CO I - I
2020 RESIDENTIAL BUILDING PERMIT APPLICATION
Dot.: 16/2020 site Address: 3155 Coachman Rd unit#: 373
Name: Trevor Foshang Phone: 972-207-3242
Address / City / zip: 274 Jaspers Circle S, Chaska, MN 55318
Applicant Is: Owner 6## Con
-V Pefich044-it Cgs
Description ofwork: Interior Remodel (Framing, Drywall, Paint, Flooring)
Construction Coss: $7500
Company: Handley Enterprises
Address: 12976 S Robert Trl
Multi -Family Building (Yes V. / No
e: MN zip: 55068.
anae#: BC713435
contact: Chris Handley
City: Rosemount
Phone: 612-516-2444 Email: cwhandley@gmail.com
ad
exempt from Lead certification, please explain why:
ci
NAT-F169672-1
COMPLETE TNt$ AREA ONLY IF CONSTRUCTING A NEW aUiLDING
In the las i 2 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
Yes L No If yes, date and address of master plan:
Licensed: lumber: Phone:
You
days of
CALL BJyou Die, Call Gopher 8#aM One Call at (681) 451.0002 for protection against underground Witty damage. Call 48 hours before you
intend td m,.. ; rec etve toosates of underground utilities. ymw; _ ; era 1Lo g
I hereby : - » • . , :that thin information is complete and accurate; that the work will be in cakfonnaarrce with the ordinances and codes of the City of
tend this is not a permit, but only an application for a permit, and work is not to start without a permit: that the work wit be in
approved plan in the case of woe which requires a review and approval of plans.
Chris andley
Phone:
er ContractorPhone::
n Contractor. Phone:
of
signing up for en update on the Ctty's
by a
pit issued In accordance with the Minnesota State Building Code must be a
Appii
Printed Name
&IBS coackyrah 12cA kAy)
DO NOTWRITE BELOW THIS LINE
) 9 I
Foun
Singlef.
Multi
01 of
New
Addlti
Altera
1C Ropt
Rotel
Valuatio
Plan Review
(25% 1100%
Census lode
# of Un
# of Buil 'rigs
Type of Con,truct
Firepittce
Ily Garage
Deck
Piex Lower Level
Interior improvement
Move Building
Fire Repair
Repair
Porch (3-Season) Exterior Alteration (Sirtgie Family)
Porch (4-Season) Exterior Alteration (Multi)
Porch (Screen/Gazebo/Pergola) Miscellaneous
Pool Accessory Building
* Siding
Reroof
Demolish Buildi
Demolish Interior
Windows Demolish Foundation
Egress Window Water Damage
*Demolition of entire building - give PCA hentiout to applicant
Occupancy L4 MCES System
Code Edition SAC Units
Zoning City Water
Stories Booster Pump
Square Feet PRV
Length Fire Suppression Required
Width
FooUngs (P4ew E3uliding)
Foo ngs (Deck)
Footlngs (Addition)
Foundation Foundation Before BackftII
Roof ; ice & Water Final
Framing 430 Minutes 1 Hour
Fire lace: Rough In Air Test Final
Ins tion
Sheathing
Shetrock
Fire'Walls
Braced Walls
Sh er Pan
Review°
By;
FEN) IAL FEES
Bat Fee
Su ,) arge
Pia JRevIew
MCES SAC
City SAC
Utillty Connection Charge
S&W Permit & Surcharge
Treatment Plant
RadLo Meter Read
Coptes
TOTAL
Meter Size:
Final / C.O. Required
Final 1 No C.O. Required
HVAC Service Test Gas Line Air Test Hood
Pool: Footings Air/Gas Tests Final
Drain Tile
Siding: Stucco Lath Stone Lath Brick EFIS
Windows
Retaining Wall: Footings Backfill Final
Radon Control
Fire Suppression: Rough in Final
Erosion Control
Other:
, Building Inspector
Yois
4
6,61 to trf
Page 2 of 3