Loading...
4871 Steeplechase Waygst,Ms69,-- - �z3 3`i 30 TL i tjete6z3-Eop� — ) G . , 00 f' Vet5 i_.. (6 6, 00 EAGAN$'2-� ' 3° 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-5675 I TDD: (651) 454-8535 I FAX: (651) 675-5894 buildinginspections@ciitvofeagan.com i{ For Office Use Permit #: I teloJr 8 t I Permit Fee: 12/ 543. 9.34 ' i i �z — /I Date Received:/D' - I Staff: 2020 RESIDENTIAL BIAL-DINGTERAIIT APPLICATION Date: 10-15-2020 Site Address: 4871 Steeplechase Way Unit #: _ Resident/ Owner Name: Chaitanya Anand Phone: 4872 Steeplechase Wa Address / City / Zip: p Applicant is: Owner i Contractor - I CI-00r iti''nn VI Type Of Work Description of work: New Construction 2/ f 7 goL.K i J Construction Cost: Multi -Family Building: (Yes / No ✓ ) Contractor Company: SD Custom Homes Contact: Sean Doyle Address: 750 Main Street Suite 223 City: Mendota Heights State: MN zip: 55118 Phone: 651-994-39% Email: sean@sd-customhomes.com License #: BC637953 Lead Certificate #: If the project is exempt from lead certification, please explain why: New Construction In the last 12 months, Yes ✓ No COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING has the City of Eagan issued a permit for a similar plan based on a master plan? If yes, date and address of master plan: Licensed Plumber: Mechanical Contractor: Sewer & Water Contractor: Fire Suppression Contractor: Servin Plumbing Phone: 320-626-9224 Binder Heating & A/C Phone: 651-457-8781 C J i e2-81 .-f% s / Phone: c� i I _� - N/A Phone. NOTE: Plans and supporting documents that you submit are considered to be public Information. Portions of the Information may be classified as non-public if you provide speclflc reasons that would permit the City to conclude that they are trade secrets. You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeagan.com/subscribe. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that 1 understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. ,Sean Doyle Seam, Po. Applicant's Printed Name Applicant's SignatuYe GO NOT WRITE BELOW THIS LINE SUB TYPES Foundation �y` Single Family �Multi 01 of Plex WORK TYPES New Addition Alteration Replace _ Retaining Wall DESCRIPTION Valuation Plan Review (25%_ 100%) Census Code # of Units # of Buildings Type of Construction Fireplace _ Garage Deck Lower Level _ Interior Improvement Move Building Fire Repair _ Repair REQUIRED INSPECTIONS ' Footings (New Building) �1(, Footings (Deck) Footings (Addition) Foundation Foundation Before Backfill Roof: Ice & ater _Final Framing 30 Minutes 1 Hour Fireplace: 4Rough In V Air Test Insulation /� Sheathing Sheetrock Fire Walls Braced Walls Shower Pan Porch (3-Season) Porch (4-Season) Porch (Screen/Gazebo/Pergola) _ Pool Occupancy Code Edition Zoning Stories Square Feet Length Width eviewed By: Siding Reroof Windows _ Egress Window Exterior Alteration (Single Family) Exterior Alteration (Multi) Miscellaneous Accessory Building Demolish Building* Demolish Interior Demolish Foundation Water Damage *Demolition of entire building — give PCA handout to applicant MCES System d SAC Units City Water Booster Pump PRV Fire Suppression Required Meter Size: Final / C.O. Required Final / No C.O. Required HVAC _ Service Test Gas Line Air Test Pool: _Footings _Air/Gas Tests _Final Drain Tile Siding: _Stucco Lat Windows Retaining Wall: _ Footings _ Backfill Radon Control Fire Suppression: _Rough In _Final Erosion Control Other: .1 -` j , Building Inspector Hood Brick EFIS Final RESIDENTIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC Utility Connection Charge S&W Permit & Surcharge Treatment Plant Radio Meter Read Copies TOTAL 0/41;61P-- I .) / 1 y 4A /Y; : `'i 2)4,g Y950,5 ".'' brr(ric 1C1 X) "---- L,�sS 57, t, = , c /77 157 , ail 6120 'l v .51,,)),C'tiCe ) 4Lo New Construction Energy Code Compliance Certificate Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Date Cert. Posted Mailing Address of the Dwelling or Dwelling Unit 4871 Steeplechase Way City Eagan Name of Residential Contractor SD Custom Homes MN License BC637953 Number THERMAL ENVELOPE RADON CONTROL SYSTEM Insulation Location ° N HLocation o co H 2 s Type: Check All That Apply I ../ Passive (No Fan) Non or Not Applicable 1 Fiberglass, Blown Fiberglass, Batts U v U m ti Foam Open Cell Mineral Fiberboard Rigid, Extruded Polystyrene 1 Rigid, Isocynurate Active (With fan and monitoring I device) (or future location) of Fan: Attic Other Please Describe Here Below Entire Slab 0 ❑ ❑ n Foundation Wall R-10I-I X Perimeter of Slab on Grade 0 • • n n Rim Joist (1st Floor) R-20 .IUU X • [J❑ ❑ Rim Joist (2nd Floor+) ' r U n ❑ ❑ ❑ Wall ' r �� ❑n Ceiling, flat ' r 0A n n Ceiling, vaulted " I X ❑ [l ❑ Bay Windows or cantilevered areas ' I U U in n Floors over unconditioned area r L I I f I. J Describe other insulated areas Building envelope air tightness: , peett, 1k 114 Duct system air tightness: SQo, P ed Windows & Doorsj Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor (excludes skylights and one door) U: s I Not applicable, all ducts located in conditioned space. Solar Heat Gain Coefficient (SHGC): '23 _ R-value MECHANICAL SYSTEMS Make up Alr Select a Type Appliances Heating System Domestic Water Heater Cooling System u ` Not required per mech. code Fuel Type Natural Gas Natural Gas Electric Passive Manufacturer 7i' ?I j� g�s(.c „ �Itt le. �^ / r,,, �' Powered j Model PA, 4t4 e %nr;al I L- L�t� V SS Li R92'V P'S Pe> grfA %o'(.Z Interlocked with exhaust device. Describe: ' Rating or Size Input in BTUS: `c ci1ooO Capacity in f. 5 if Output in Tons: -7 r Other, describe: Efficiency AFUE or HSPF% � !! ,! ,i( �l tc-c.to?( SEER /EER / Location of duct or system: Residential Load Calculation Heating Loss Heating Gain Cooling Load ga, 3►?fa 2., Sr�1 •33 Sca). Cfm's I P " round duct OR MECHANICAL VENTILATION SYSTEM " metal duct Describe any additional source heat pump with gas Select Type Jac or combined back-up f er ai heating or co2ling systems if installed: (e.g. two furnaces rnace): i f V ril c.e- tr` 4- .'or 104," 9eOaet Air e cwgr.,,,to Ili reel or air C.. ffeW` Combustion Air Select a Type Not required per mech. code X Passive Heat Recover Ventilator (HRV) Capacity in cfms: Low: leu High: 70 c Other, describe: Energy Recover Ventilator (ERV) Capacity in cfms: Low: High: Location of duct or system: MECH ROOM Balanced Ventilation capacity In cfms: / iS Location of fan(s), describe: I Bathroom, Hood Fan, Kitchen, Laundry Room 'pi Cfm's Capacity continuous ventilation rate in cfms: 90 't 7 " round duct OR Total ventilation (intermittent + continuous) rate in cfms: 180 " metal duct Builders Associaton of Minnesota version 101014 SD CUSTOM HOMES 750 MAIN STREET, SUITE 223 MENDOTA HEIGHTS, MN 55118 Ventilation, Makeup and Combustion Air Calculations Submittal Form For New Dwellings These blank submittal forms and instructions are available at the City of Chanhassen website and at City Hall. The completed form must be submitted in duplicate at the time of application of a mechanical permit for new construction. Additional forms may be downloaded and printed at: http://www.ci.chanhassen.mn.us/serv/build.html. / Site address � '7) Ct PrE �� LAf_,j'1 Date Contractor A �� (���'�t'''jr(� 1 �aa-�J''-. b-+[f N I) t 1 Completed By J� N/� /`+a tJ Ventilation Quantity (Determine quantity by using Tabie 403.5.2 or Equation R403.5.2) Square feet (Conditioned area Including Basement - finished or unfinished) Number of bedrooms --n� Total required ventilation Continuous ventilation /% 1`� (0 Directions - Determine the total and continuous ventilation rate by either using Table R403.5.2 or equation R403.5.2. The table and equation are below. Table R403.5.2 Total and Continuous Ventilation Rates (in cfm) Number of Bedrooms 1 2 r3 r 4 5 6 Conditioned space (in sq. ft.) Total/ continuous Total/ "—Tot continuous I/ coritinuous Total/ continuous Total/ continuous Total/ continuous 1000-1500 60/40 75/40 90/45 105/53 120/60 135/68 1501-2000 70/40 85/43 10C/50 115/58 130/65 145/73 2001-2500 80/40 95/48 1455 125/63 140/70 155/78 2501-3000 90/45 105/53 11460 1135/68 150/75 165/83 3001-3500 100/50 115/58 1134/65 145/73 160/80 175/88 3501-4000 110/55 125/63 144/70 155/78 1170/85 185/93 14001-4500 120/60 135/68 115(l/75 165/83 180/90 195/98 4501-5000 ' j�0/6. 65 _I 4S47.. 160/80 175/88 190/95 205/103 D001-5500 140/70 155/78 �`170/85 185/93 200/100 215/108 5501-6000 150/75 165/83 180/90 195/98 210/105 225/113 Equation R403.5.2 Lo `dm- V rto `tNi sQ r tiVY1,06) V!% `Ef oV0( (0.02 x square feetof conditioned space) + [15 x (number of bedrooms + 1)] = Total ventilation rate (cfm) 1/14 Total ventilation —The mechanical ventilation system shall provide sufficient outdoor air to equal he total rate avveerage` for each one -hour period according to the above table or equation. For heat recovery ventilators (HRV) and energy recovery ventilators (ERV) the average hourly ventilation capacity must be determined in consideration of any reduction of exhaust or out outdoor air Intake, or both, for defrost or other equipment cycling. Continuous ventilation - A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm, shall be provided, on a continuous rate average for each one -hour period. The portion of the mechanical ventilation system intended to be continuous may have automatic cycling controls providing the average flow rate for each hour is met. G:\SAFETY\JK\Vent-makeup-comb air submittal (2).docx Page 1 of 6 Section B Ventilation Method Balanced, HRV (Heat Recovery Ventilator) or ERV (Energy Recovery Ventilator) — cfm of unit in low must not exceed continuous ventilation rating by more than 100%, Low CFM /60 High CFM /6� (� Directions - Balanced ventilation systems are typically HRV or ERV's. Enter the low and high cfm amounts. Low cfm air flow must be equal to or greater than the required continuous ventilation rate and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section C Ventilation Fan Schedule Description Loc tion Continuous Intermittent Directions - The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether it is used for continuous or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the low cfm air rating and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the continuous ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section D Ventilation Controls Describe operation d cont I of the continuous and in ern' tent ventilation) ( Na j'PL_ I4CS1 T OC a 76 Eau,) ImFAr Directions - Describe the operation of the ventilation system. There should be adequate detail for plan reviewers and inspectors to verify design and installation compliance. Related trades also need adequate detail for placement of controls and proper operation of the building ventilation. if an ERV or HRV Is to be installed, describe how it will be installed. If it will be connected and interfaced with the air handling equipment, please describe such connections as detailed in the manufactures' installation Instructions. if the Installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper operation, such interconnection shall be made and described. Section E f� Make-up air (D i C h7 K cjCJ Passl r ine m t�o�sJ'"�" 501.4.1)v� V Powered (dete mined from ca ulations from Table 501.4.1) lJ Interlocked with exhaust device (determined from calculation from Table S01.4.1) Other, describe: Location of duct or system ventilation make-up air: Determined from make-up air opening table Cfm Size and type (round, rectangular, flex or rigid) (NR means not required) G:\SAFETY\iK\Vent-makeup-comb air submittal (2).docx Page 2 of 6 Directions - In order to determine the makeup air, Table 501.4.1 must be filled out (see below). For most new installations, column A will be appropriate, however, if atmospherically vented appliances or solid fuel appliances are installed, use the appropriate column. For existing dwellings, see IMC 501.4.3. Please note, if the makeup air quantity is negative, no additional makeup air will be required for ventilation, if the value is positive refer to Table 501.3.2 and size the opening. Transfer the cfm, size of opening and type (round, rectangular, flex or rigid) to the last line of section D. The make-up air supply must be installed per 1MC501.4.2.3. eitt CFm Joo Table 501.4.1 PROCEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST EQUIPMENT IN DWELLINGS (Additional combustion air will be required for combustion appliances, see KAIR method for calculations) Multiple atmospherically vented gas or oil appliances or solid fuel appliances Column D One or multiple power vent or direct vent appliances or no combustion appliances —CQumn A `.9 One or multiple fan- assisted appliances and power vent or direct vent appliances Column B One atmospherically vent gas or oil appliance or one solid fuel appliance Column C 1. Use the appropriate column to estimate house Infiltration a) pressure factor (cfm/sf) 0.15 ( 0.09 0.06 0.03 b) conditioned ned floor area (sf) (including unfinished basements) ! �7 If'")' Estimated House Infiltration (cfm): [1a x ibi 513 2. Exhaust Capacity b) clothes dryer (dm) 135 135 135 135 c) 80% of largest exhaust rating (cfm); Kitchen hood a fiy (not Irecirculatingapplicable system or If powered makeup air is electrically interlocked and match to exhaust) 48r) d) 80% of next largest exhaust rating (cfm); bath fan typically (not applicable If recirculating system or if powered makeup air is electrically interlocked and matched to exhaust) Not Applicable Total Exhaust Capacity (cfm); Pa + 2b +2c + 2d) V )5 3. Makeup Air Quantity (cfm) a) total exhaust capacity (from above) i0 b) estimated house infiltration (from above) ��� Makeup Air Quantity (cfm); [3a — 3bJ Of value is negative, no makeup air Is needed).1\L 2,n 4Forrmakeup Air Opening Sizing, refer to Table 501.4.2 i� A. Use this column if there are other than fan -assisted or atmospherically vented gas or oil appliance or If there are no combustion appliances. (Power vent and direct vent appliances may be used.) B. Use this column If there is one fan -assisted appliance per venting system. (Appliances other than atmospherically vented appliances may also be included.) C. Use this column if there is one atmospherically vented (other than fan -assisted) gas or oil appliance per venting system or one solid fuel appliance. D. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or oil appliances and solid fuel appliances. i?;fp4 IV:75X (1(ii G:\SAFETY\JK\Vent-makeup-comb air submittal (2).docx Page 3 of 6 Makeup Air Opening Table for New and Existing Dwelling Table 501.4.2 One or multiple power vent, direct vent appliances, or no combustion appliances Column A One or multiple fan- assisted appliances and power vent or direct vent appliances Column B One atmospherically vented gas or oil appliance or one solid fuel appliance Column C Multiple atmospherically vented gas or oil appliances or solid fuel appliances Column D Duct diameter Passive opening 1-36 1-22 1-15 1-9 3 Passive opening 37-66 23-41 16-28 10-17 4 Passive opening 67-109 42-66 29-46 18-28 5 Passive opening 110-163 67-100 47-69 29-42 6 Passive opening 164-232 101-143 70-99 43-61 7 Passive opening 233-317 144-195 100-135 62-83 8 Passive opening w/motorized damper 318-419 196-258 136-179 84-110 9 Passive opening w/motorized damper 420- 539 259- 332 180- 230 111-142 10 Passive opening w/motorized damper 540 - 679 333 - 419 231- 290 143 -179 11 Powered makeup air >679 >419 >290 >179 NA Notes: A. An equivalent length of 100 feet of round smooth metal duct is assumed. Subtract 40 feet for the exterior hood and ten feet for each 90- degree elbow to determine the remaining length of straight duct allowable. B. If flexible duct is used, Increase the duct diameter by one inch. Flexible duct shall be stretched with minimal sags, Compressed duct shall not be accepted. C. Barometric dampers are prohibited in passive makeup air openings when any atmospherically vented appliance Is Installed. D. Powered makeup air shall be electrically interlocked with the largest exhaust system. Sections F Combustion air Not required per mechanical code (No atmospheric or power vented appliances) Passive (see IFGC Appendix E, Worksheet E-1) Other, describe: Size and type Explanation - If no atmospheric or power vented appliances are installed, check the appropriate box, not required. If a power vented or atmospherically vented appliance installed, use IFGC Appendix E, Worksheet E-1 (see below). Please enter size and type. Combustion air vent supplies must communicate with the appliance or appliances that require the combustion air. Section F calculations follow on the next 2 pages. G:\SAFETY\ik\Vent-makeup-comb air submittal (2).docx Page 4 of 6 Directions - The Minnesota Fuel Gas Code method to calculate to size of a required combustion air opening, is called the Known Air Infiltration Rate Method. For new construction, 4b of step 4 is required to be filled out. IFGC Appendix E, Worksheet E•1, 1346.6012 j � �\ Residential Combustion Air Calculation Method �-} W. il., %/ )!� ri` C(4 L RO0 y (for Furnace, Boiler, and/or Water Heater In the Same Space) �t 11 �'�') t I J Step 1: Complete vented combustion appliance information. Furnace/Boiler: �Vf n'tLL Draft Hood _ Fan Assisted X,Direct Vent Input: Btu/hr or Power Vent Water Heater: 1©d _ Draft Hood Fan Assisted _Direct Vent input Btu/hr (OM J or Power Vent Step 2: Calculate the volume of the Combustion Appliance Space (CAS) containing combustion appliances. The CAS Includes all spaces connected to one another by code compliant openings. - CAS volume: ft3 LxWxH L(IX Wg H ID Step 3: Determine Air Changes per Hour (ACH)1 Default ACH values have been incorporated Into Table E-1 for use with Method 4b (KAIR Method). If the year of construction or ACH is not known, use method 4a (Standard Method). Step 4: Determine Required Volume for Combustion Air. (DO NOT COUNT DIRECT VENT APPLIANCES) 4a. Standard Method /%%j x Total Btu/hr input of all combustion appliances input: "" (V1O B r ft3 Use Standard Method column in Table E-1 to find Total Required TRV: 1i116 3 q ft Volume (TRV) If CAS Volume (from Step 2) Is greater than TRV then no outdoor openings are needed. If CAS Volume (from Step 2) is less than TRV then•go to STEP 5. 4b. Known Air Infiltration Rate (KAIR) Method (DO NOT COUNT DIRECT VENT APPLIANCES) Total Bt ut of all fan -assisted and power vent appliances Input: /hr Use Fan -Assisted Applianc mn in Table E-1 to find RVFA: ft3 Required Volume Fan Assisted (RV Total Btu/hr input of all Natural draft appliances Input: Btu/hr Use Natural draft Appliances column in Table E-1 d R ft3 Required Volume Natural draft appliances DA) Total Required Volume - VFA+RVNDA TRV= + = TRV If CAS Vol rom Step 2) Is greater than TRV then no outdoor openings are needed. If C lume (from Step 2) Is less than TRV then go to STEP 5. Step 5: Calculate the ratio of available interior volume to the total required volume. (�+�( ^/ `r rt,� Ratio = CAS Volume (from Step 2) divided by TRV (from Step 4a or Step 4b) Ratio = 1!�`� / cJ yt(O = . ' [,J4 Step 6: Calculate Reduction Factor (RE). Q!�d RF = 1 minus Ratio RF=1- . (P I = ,fS`h Step 7: Calculate single outdoor opening as If all combustion air is from outside. ,t Total Btu/hr Input of all Combustion Appliances In the same CAS Input: (i I J Btu/hr (EXCEPT DIRECT VENT) / Combustion Air Opening Area (CAOA): j (JU . tu/hr per in' CAOA = Total Btu/hr divided by 3000 e1t a / 3000 Btu/hr per in2 = 35r 3,/ in2 Step 8: Calculate Minimum CAOA. � Minimum CAOA = CAOA multiplied by RF Minimum CAOA = 5g,i13 Pie = 797 I In' Step 9: Calculate Combustion Air Opening Diameter (CAOD) CAOD =1,13 multiplied by the square root of Minimum CAOA CAOD = 1.13 V Minimum CAOA = In. diameter go up one Inch In size If using flex duct 1 If desired, ACH can be determined using ASHRAE calculation or blower door test. Follow procedures in Section G304. G:\SAFETYUK\Vent-makeup-comb air submittal (2).docx Page 5 of 6 IFGC Appendix E, Table E-1 Residential Combustion air (Required Interior Volume Based on Input Rating of Appliance) Input Rating (Btu/hr) 5,000 10,000 15,000 20,000 Standard Method 250 500 750 Known Air Infiltration Rate (KAIR) Method (cu ft) Fan Assisted or Power Vent Natural Draft 1994 to present 375 750 1,125 188 375 563 750 Pre-1994 1994 to present 525 1,050 1,575 263 525 788 Pre-1994 25,000 1,250 -,•••• 1,875 938 L, LVU 2,625 l,UJU 1,313 30,000 1,500 2,250 1,125 3,150 1,575 35,000 1,750 2,625 1,313 3,675 1,838 40,000 2,000 3,000 1,500 4,200 2,100 45,000 2,250 3,375 1,688 4,725 2,363 50,000 2,500 3,750 1,675 5,250 2,625 55,000 2,750 4,125 2,063 5,775 2,888 60,000 3,000 4,500 2,250 6,300 3,150 65,000 3,250 4,875 2,438 6,825 3,413 70,000 3,500 5,250 2,625 7,350 3,675 75,000 3,750 5,625 2,813 7,875 3,938 80,000 4,000 6,000 3,000 8,400 4,200 85,000 4,250 6,375 3,188 8,925 4,463 90,000 4,500 6,750 3,375 9,450 4,725 95,000 4,750 7,125 3,563 9,975 4,988 100,000 5,000 7,500 3,750 10,500 5,250 105,000 5,250 7,875 3,938 11,025 5,513 110,000 5,500 8,250 4,125 11,550 5,775 115,000 5,750 8.625 4,313 12,075 6,038 120,000 6,000 9,000 4,500 12,600 6,300 125,000 6,250' 9,375 4,688 13,125 6,563 130,000 6,500 9,750 4,875 13,650 6,825 135,000 6,750 10,125 5,063 14,175 7,088 140,000 7,000 10,500 5,250 14,700 7,350 145,000 7,250 10,875 5,438 15,225 7,613 150,000 7,500 11,250 5,625 15,750 7,875 155,000 7,750 11625 5 813 16,275 8,138 160,000 8,000 12,000 6,000 16,800 8,400 165,000 8,250 12,375 6,188 17,325 8,663 170,000 8,500 _ 12,750 6,375 17,850 8,925 175,000 ' 8,750 13,125 6,563 18,375 9,188 180,000 9,000 13,500 6,750 18,900 9,450 185,000 9,250 13,875 6,938 19,425 9,713 190,000 9,500 14,250 7,125 19,950 9,975 195,000 9,750 14,625 7,313 20 475 10,238 200,000 10,000 15 000 7,500 21000 10,500 205,000 10,250 15,375 7,688 21,525 10,783 210,000 10,500 15,750 7,875 22,050 11,025 215,000 10,750 16,125 8,063 22,575 11,288 220,000 11,000 16,500 8,250 23,100 11,550 225,000 11,250 16,875 8,438 23,625 11,813 230,000 11,500 17,250 8,625 24,150 12,075 1. The 1994 date refers to dwellings constructed unde the 1994 Minnesota Energy Code. The default KAIR used in this section of the table Is 0.20 ACH. 2. This section of the table Is to be used for dwellings constructed prior to 1994. The default KAIR used In this section of the table Is 0.40 ACH. G:\SAFETINK\Vent-makeup-comb alr submittal (2).docx Page 6 of 6 Load Short Form Entire House Tony Ledo Phone: 763-229-4252 SD CUSTOM HOMES 750 MAIN STREET, SUITE 223 MENDOTA HEIGHTS, MN 55118 Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Information Outside db (°F) Inside db (°F) Design TD (°F) Daily range Inside humidity (%) Moisture difference (gr/Ib) Htg -15 73 88 30 35 Clg 88 75 13 M 50 31 Method Construction quality Fireplaces Infiltration Simplified Semi -tight 0 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat n/a n/a 0 Btuh 0 °F 0 cfm 0 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Coil n/a AHRI ref n/a Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio n/a O Btuh O Btuh O Btuh O cfm O cfm/Btuh O in H2O 0 ROOM NAME Area (ftz) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) boiler d 1850 13551 1620 0 76 forced air d 3896 50061 23826 1253 1253 Entire House d 5746 63612 25446 1253 1329 Other equip loads 18763 8019 Equip. @ 0.93 RSM 31089 Latent cooling 2419 TrITAI C e7le I onn-117. I 4nnn Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Right -Suite® Universal 2019 19.0.12 RSU16575 G:lbinder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:01 Page 1 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat Load Short Form boiler Tony Ledo Phone:763-2294252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Information Outside db (°F) Inside db (° F) Design TD (°F) Daily range Inside humidity (%) Moisture difference (gr/Ib) Htg -15 80 95 30 45 Clg 88 75 13 M 50 31 Method Construction quality Fireplaces Infiltration Simplified Semi -tight 0 HEATING EQUIPMENT COOLING EQUIPMENT Make IBC Technologies, Inc. Make n/a Trade IBC TECHNOLOGIES Trade n/a Model SL 10-85G3 Cond n/a AHRI ref 10568368 Coil n/a AHRI ref n/a 96 AFUE Efficiency 85000 Btuh Sensible cooling 78000 Btuh Latent cooling O °F Total cooling O cfm Actual air flow 0 cfm/Btuh Air flow factor O in H2O Static pressure Load sensible heat ratio n/a O Btuh O Btuh 0 Btuh 76 cfm 0.047 cfm/Btuh O in H2O 0.43 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) pool 969 7092 0 0 0 multi/stor/mech 881 6460 1620 0 76 boiler d 1850 13551 1620 0 76 Other equip loads 14446 5885 Equip. @ 0.93 RSM 6972 Latent cooling 9881 TCtTAI C 1 oan n-nnne I n I 16853 Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 76 wrightsoft- Right -Suite® Universal201919.0.12 RSU16575 G \binder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:01 Page 2 Load Short Form forced air Tony Ledo Phone:763-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Information Outside db (°F) Inside db (°F) Design TD (°F) Daily range Inside humidity (%) Moisture difference (grub) Htg -15 72 87 30 34 CIg 88 75 13 M 50 31 Method Construction quality Fireplaces Infiltration Simplified Semi -tight 0 HEATING EQUIPMENT Make Lennox Trade LENNOX Model EL296UH090XE48C * AHRI ref 5625719 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 96 AFUE 88000 Btuh 85000 Btuh 64 °F 1253 cfm 0.025 cfm/Btuh 0.50 in H2O COOLING EQUIPMENT Make Lennox Trade LENNOX Cond XC14-042-230A** Coil L*48/60Y9+EL296UH090XE48C* AHRI ref 7571174 Efficiency 13.0 EER, 16 SEER Sensible cooling 29400 Btuh Latent cooling 12600 Btuh Total cooling 42000 Btuh Actual air flow 1253 cfm Air flow factor 0.053 cfm/Btuh Static pressure 0.50 in H2O Load sensible heat ratio 0.82 ROOM NAME Area (ft2) Htg load (Btuh) CIg load (Btuh) Htg AVF (cfm) CIg AVF (cfm) upper level 2264 29596 13589 741 715 main floor 1632 20464 10237 512 538 forced air d 3896 50061 23826 1253 1253 Other equip loads 4317 2134 Equip. @ 0.93 RSM 24117 Latent cooling 5541 TfTAI C nnoa cAo.,o I ..�� I .... Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. R"ig�11lCiGtf{ ° ,. .. RghtSuite®Universa1201919.0.12RSU18575 G:lbinder heatinglSteeplechase Load.rup Cab = MJ8 Front Door faces: S 2020-Nov-27 08:13:01 Page 3 Loads for Multiple Orientations Entire House Tony Ledo Phone: 763-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Int'l Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Dailyrange (°F) Wet bulb (° F) Wind speed (mph) 15.0 Heating -15 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gr/lb) Infiltration: Heating Cooling 73 75 88 13 30 50 35.1 31.3 Front Door Sensible Load (Btuh) Latent Load (Btuh) Total Load (Btuh) Heating AVF (cfm) Cooling AVF (cfm) 40000- 30000 20000- 10000- North 30410 2419 32829 1253 1329 Northeast 34363 2419 36782 1253 1329 East 35870 2419 38289 1253 1329 Southeast 34880 2419 37299 1253 1329 Biking Qientation Cooing Loed NE E SE DrsdicnRotDufa Current Orientation: Front Door faces South Highest Cooling Load: Front Door faces West Southwest 35969 2419 38388 1253 1329 W Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. West 36022 2419 38440 1253 1329 NW Northwest 34077 2419 36496 1253 1329 tr ht ot`t- Right-Suite®U niversal 2019 19.0.12 RSU16575 G:binder heating\Steeplechase Load rup Calc = MJ8 Front Door faces. S 2020-Nov-27 08:13:01 Page 1 Loads for Multiple Orientations forced air Tony Ledo Phone: 763-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Int'l Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Dailyrange (°F) Wet bulb (° F) Wind speed (mph) Heating -15 15.0 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gr/Ib) Infiltration: Heating Cooling 72 75 87 13 30 50 34.0 31.3 Front Door Sensible Load (Btuh) Latent Load (Btuh) Total Load (Btuh) Heating AVF (cfm) Cooling AVF (cfm) 40000- 20000E 10000 North 23438 5541 28978 1253 1253 Northeast 27391 5541 32932 1253 1253 East 28898 5541 34439 1253 1253 Southeast 27908 5541 33448 1253 1253 Bilding Orientation Cooling Load Southwest 28997 5541 34537 1253 1253 West 29049 5541 34590 1253 1253 N E SE S ❑rectimFmrt Dxrfams Current Orientation: Front Door faces South Highest Cooling Load: Front Door faces West W Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wei ►fc' Right-Suite®Universa1201919.0.12RSU16575 Gabinder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S N1N Northwest 27105 5541 32646 1253 1253 2020-Nov-27 08:13:01 Page 2 Loads for Multiple Orientations boiler Tony Ledo Phone: 763-2294252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Int'l Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Dailyrange (°F) Wet bulb (° F) Wind speed (mph) Heating -15 15.0 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gr/lb) Infiltration: Heating Cooling 80 75 95 13 30 50 45.1 31.3 Front Door Sensible Load (Btuh) Latent Load (Btuh) Total Load (Btuh) Heating AVF (cfm) Cooling AVF (cfm) 20000- North 6972 9881 16853 0 76 Northeast 6972 9881 16853 0 76 East 6972 9881 16853 0 76 Southeast 6972 9881 16853 0 76 Btildmg Orientation Cooling Load Southwest 6972 9881 16853 0 76 West 6972 9881 16853 0 76 15000- 10000- 5000- 0' E SE OrEdicnFmrtDxrfams Current Orientation: Front Door faces South Highest Cooling Load: Front Door faces North W Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Northwest 6972 9881 16853 0 76 WR'giK1Fm Right -Suite® Universal 2019 19.0.12 RSU16575 G:\binder heatingtSteeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:01 Page 3 Building Analysis Entire House Tony Ledo Phone:763-2294252 Job: Date: By: Pro'ect Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Desi • n Conditions Location: Minneapolis -St Paul Intl Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Daily range (°F) Wet bulb (° F) Wind speed (mph) Heating -15 15.0 Cooling 88 188 (M ) 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gr/lb) Infiltration: Method Construction quality Fireplaces Heating 73 88 30 35.1 Simplified Semi -tight 0 Cooling 75 13 50 31.3 Heati n • Component Btu h/ft2 Btuh % of load Walls 4.1 21236 25.8 Glazing 23.5 17336 21.0 Doors 30.4 639 0.8 Ceilings 1.8 4353 5.3 Floors 2.1 5163 6.3 Infiltration 4.0 14885 18.1 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation Adjustments 18763 0 22.8 Total 82376 100.0 Walls Ve tia5cn Irfiltt irn Coolin • Component Btu h/ft2 Btuh % of load Walls 0.6 3288 9.8 Glazing 14.9 10973 32.8 Doors 8.9 187 0.6 Ceilings 1.0 2429 7.3 Floors 0.1 169 0.5 Infiltration 0.3 1080 3.2 Ducts 0 0 Ventilation 8019 24.0 Internal gains 7320 21.9 Blower 0 0 Adjustments 0 Total 33465 100.0 Latent Cooling Load = 2419 Btuh Overall U-value = 0.053 Btuh/ft2-°F Data entries checked. Boldlrtalic values have been manually overridden Vlfaws Verttildicn Irter>d Curs vvrighissoft" Right -Suite® Universal 2019 19.0.12 RSU16575 G:lbinder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: 5 2020-Nov-27 08:13:03 Page 1 Building Analysis boiler Tony Ledo Phone: 763-229-4252 Job: Date: By: Pro'ect Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Desi • n Conditions Location: Minneapolis -St Paul Intl Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Daily range (°F) Wet bulb (°F) Wind speed (mph) Heating -15 15.0 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (grub) Infiltration: Method Construction quality Fireplaces Heating 80 95 30 45.1 Simplified Semi -tight 0 Cooling 75 13 50 31.3 Heati n • Component Btu h/ft2 Btuh % of load Walls 3.6 8022 28.7 Glazing 0 0 0 Doors 0 0 0 Ceilings 1.9 414 1.5 Floors 1.9 3515 12.6 Infiltration 4.3 1600 5.7 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation Adjustments 14446 0 51.6 Total 27998 100.0 Verilatim Coolin • Component Btu h/ft2 Btuh % of load Walls 0.2 455 6.1 Glazing 0 0 0 Doors 0 0 0 Ceilings 1.0 213 2.8 Floors 0 0 0 Infiltration 0.1 51 0.7 Ducts 0 0 Ventilation 5885 78.4 Internal gains 900 12.0 Blower 0 0 Adjustments 0 Total 7505 100.0 Latent Cooling Load = 9881 Btuh Overall U-value =0.036 Btuh/ft2-°F WARNING: window to floor area ratio = 0.0% - less than 5%. Boldlnalic values have been manually overridden Right -Suite® Universal 2019 19.0.12 RSU16575 G:lbinder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 2 Building Analysis forced air Tony Ledo Phone: 763-229-4252 Job: Date: By: Pro'ect Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Desi • n Conditions Location: Minneapolis -St Paul Intl Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Daily range (°F) Wet bulb (°F) Wind speed (mph) Heating -15 15.0 Cooling 88 188 (M ) 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gr/lb) Infiltration: Method Construction quality Fireplaces Heating 72 87 30 34.0 Simplified Semi -tight 0 Cooling 75 13 50 31.3 Heatin. Component Btu h/ft2 Btuh % of load Walls 4.5 13214 24.3 Glazing 23.5 17336 31.9 Doors 30.4 639 1.2 Ceilings 1.7 3938 7.2 Floors 2.6 1648 3.0 Infiltration 3.9 13286 24.4 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation Adjustments 4317 0 7.9 Total 54378 100.0 Vatigim Coolin • Component Btu h/ft2 Btuh % of load Walls 1.0 2833 10.9 Glazing 14.9 10973 42.3 Doors 8.9 187 0.7 Ceilings 1.0 2216 8.5 Floors 0.3 169 0.7 Infiltration 0.3 1028 4.0 Ducts 0 0 Ventilation 2134 8.2 Internal gains 6420 24.7 Blower 0 0 Adjustments 0 Total 25960 100.0 Latent Cooling Load = 5541 Btuh Overall U-value =0.064 Btuh/ft2--°F Data entries checked. Gazing Boldfitalic values have been manually overridden VVAIs lkrtila.iicn RightSuite® U niversal 2019 19.0.12 RSU16575 G:thinder heating\Steeplechase Load.rup Cale = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 3 Component Constructions Entire House Tony Ledo Phone: 763-229-4252 Job: Date: By: Pro'ect Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Int'i Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Daily range (°F) Wet bulb (° F) Wind speed (mph) 15.0 Heating -15 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gr/lb) Infiltration: Method Construction quality Fireplaces Heating Cooling 73 75 88 13 30 50 35.1 31.3 Simplified Semi -tight 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Bhh/IN--°F ft'-°F/&uh Biuh&R' Btuh Btuh/R' Btuh Walls 15B-15sfc-8: Bg wall, heavy dry or light damp soil, concrete wall, r-15 n ins, 10" thk e s w all IECC2012 frame zone 6: Frm wall, vnl ext, 1/2" wood shth, r-20 cav ins, n 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud e s w all Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" o.c. stud 12F-0sw: Frm wall, 1/2" wood shth, r-21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Windows Anderson Series 100: 2 glazing, dr low-e outr, argon gas, insulated n vinyl frm mat, dr innr, 1/4" gap, 1/8" thk; NFRC rated (SHGC=0.23); 6.67e ft head ht w all Doors 11 NO: Door, mtl eps core type Ceilings 16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 5/8" gypsum board int fnsh 470 0.042 460 0.042 470 0.042 460 0.042 1860 0.042 724 0.050 611 0.050 517 0.050 784 0.050 2636 0.050 375 0.091 309 0.065 224 0.270 58 0.270 336 0.270 120 0.270 738 0.270 n 21 0.350 15.0 4.31 2027 0 0 15.0 4.31 1984 0.06 26 15.0 4.31 2027 0.09 42 15.0 4.31 1984 0.06 26 15.0 4.31 8022 0.05 95 20.0 4.35 3149 1.02 740 20.0 4.35 2658 1.02 625 20.0 4.35 2249 1.02 529 20.0 4.35 3410 1.02 802 20.0 4.35 11467 1.02 2695 13.0 0 0 0.96 360 21.0 5.65 1747 0.45 138 0 0 0 0 0 23.5 23.5 23.5 23.5 23.5 5262 1362 7893 2819 17336 7.82 24.9 14.2 24.9 14.8 1752 1446 4763 2992 10954 8.7 30.4 639 8.91 187 2482 0.020 50.0 1.75 4353 0.98 2429 wr ph1135? i; .��-.««�,,,:�w,,.„...M,. Right -Su ite®Universa1201919.0.12RSU16575 G:lbinder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces. S 2020-Nov-27 08:13:03 Page 1 Floors 20P-38c: Fir floor, frm fir, 12" thkns, carpet flr fnsh, r-38 cav ins, gar 120 0.030 38.0 2.61 313 0.27 32 ovr 511 0.030 38.0 2.61 1334 0.27 137 all 631 0.030 38.0 2.61 1648 0.27 169 21A-32t: Bg floor, heavy dry or light damp soil, 8' depth, carp 80%0 fir 1850 0.020 0 1.90 3515 0 0 fnsh Wrigthtanft' Right -Suite® U niversal 2019 19.0.12 RSU16575 G:lbinder heatingtSteeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 2 Component Constructions forced air Tony Ledo Phone: 763-229-4252 Job: Date: By: Pro'ect Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Intl Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Daily range (°F) Wet bulb (° F) Wind speed (mph) 15.0 Heating -15 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gr./lb) Infiltration: Method Construction quality Fireplaces Heating Cooling 72 75 87 13 30 50 34.0 31.3 Simplified Semi -tight 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain if'M/R'-'F fr-'F/BM 6M/ft' Btuh Btuh/fr Btuh Walls IECC2012 frame zone 6: Frm wall, vnl ext, 1/2" wood shth, r-20 cav ins, n 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud e s w all Partitions 12F-Osw: Frm wall, 1/2" wood shth, r-21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Windows Anderson Series 100: 2 glazing, clr low-e outr, argon gas, insulated n vinyl frm mat, dr innr, 1/4" gap, 1/8" thk; NFRC rated (SHGC=0.23); 6.67 e ft head ht s w all Doors 11 NO: Door, mti eps core type Ceilings 16B50ad: Attic ceiling, asphalt shingles roof mat, r-50 coil ins, 5/8" gypsum board int fnsh Floors 20P-38c: Fir floor, fret flr, 12" thkns, carpet flr fnsh, r-38 cav ins, gar ovr 724 0.050 611 0.050 517 0.050 784 0.050 2636 0.050 309 0.065 224 0.270 58 0.270 336 0.270 120 0.270 738 0.270 n 21 0.350 2264 0.020 120 0.030 511 0.030 all 631 0.030 20.0 20.0 20.0 20.0 20.0 21.0 4.35 3149 1.02 4.35 2658 1.02 4.35 2249 1.02 4.35 3410 1.02 4.35 11467 1.02 740 625 529 802 2695 5.65 1747 0.45 138 0 23.5 5262 7.82 0 23.5 1362 24.9 0 23.5 7893 14.2 0 23.5 2819 24.9 0 23.5 17336 14.8 8.7 30.4 639 8.91 187 1752 1446 4763 2992 10954 50.0 1.74 3938 0.98 2216 38.0 38.0 38.0 2.61 313 0.27 2.61 1334 0.27 2.61 1648 0.27 32 137 169 _... .» :? r, Right -Su ite®Universa12019 19.0.12 RSU16575 G:tbinder heatingtSteeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 3 Component Constructions boiler Tony Ledo Phone: 763-229-4252 Job: Date: By: Pro"ect Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Int'I Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Daily range (°F) Wet bulb (°F) Wind speed (mph) 15.0 Heating -15 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gr/lb) Infiltration: Method Construction quality Fireplaces Heating Cooling 80 75 95 13 30 50 45.1 31.3 Simplified Semi -tight 0 Construction descriptions Walls 15B-15sfc-8: Bg wall, heavy dry or light damp soil, concrete wall, r-15 ins, 10" thk Partitions 12C-0sw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" o.c. stud Windows (none) Doors (none) Ceilings 16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 cell ins, 5/8" gypsum board int fnsh Floors 21A-32t: Bg floor, heavy dry or light damp soil, 8' depth, carp 80% fir fnsh Or Area U-value Insul R Htg HTM Loss CIg HTM Gain n e $ w all ft' 131uhrir-°F 470 0.042 460 0.042 470 0.042 460 0.042 1860 0.042 375 0.091 218 0.020 1850 0.020 f'-'FBhh Bttlr/M Btuh Btuh/R' Btuh 15.0 4.31 2027 0 15.0 4.31 1984 0.06 15.0 4.31 2027 0.09 15.0 4.31 1984 0.06 15.0 4.31 8022 0.05 0 26 42 26 95 13.0 0 0 0.96 360 50.0 1.90 414 0.98 213 0 1.90 3515 0 0 wr trtscvfCt` _.,. Right-Suite®Universa1201919.0.12RSU16575 G:lbinder heating1Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 4 Component Constructions pool Tony Ledo Phone: 763-229-4252 Job: Date: By: Pro'ect Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Int'I Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Dailyrange (°F) Wet bulb (° F) Wind speed (mph) 15.0 Heating -15 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (grub) Infiltration: Method Construction quality Fireplaces Heating Cooling 80 75 95 13 30 50 45.1 31.3 Simplified Semi -tight 0 Construction descriptions Walls 15B-15sfc-8: Bg wall, heavy dry or light damp soil, concrete wall, r-15 ins, 10" thk Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 21A-32t: Bg floor, heavy dry or light damp soil, 8' depth, carp 80% flr fnsh Or Area U-value ft' Btuhift2-°F n e s w all 470 0.042 225 0.042 95 0.042 225 0.042 1015 0.042 Insul R Htg HTM Loss Clg HTM Gain ft'-'F/13tuh Btuhlw Btuh Btuh/t8 Btuh 15.0 4.31 2027 0 0 15.0 4.31 970 0 0 15.0 4.31 410 0 0 15.0 4.31 970 0 0 15.0 4.31 4378 0 0 969 0.020 0 1.90 1841 0 0 w -_._. Right -Su 'tee Universal 2019 19.0.12 RSU16575 G:\binder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 5 Component Constructions multi/stor/mech Tony Ledo Phone: 763-229-4252 Job: Date: By: Pro'ect Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Intl Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Daily range (°F) Wet bulb (° F) Wind speed (mph) 15.0 Heating -15 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gap) Infiltration: Method Construction quality Fireplaces Heating Cooling 80 75 95 13 30 50 45.1 31.3 Simplified Semi -tight 0 Construction descriptions Walls 15B-15sfc-8: Bg wall, heavy dry or light damp soil, concrete wall, r-15 ins, 10" thk Partitions 12C-0sw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" o.c. stud Windows (none) Doors (none) Ceilings 16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 coil ins, 5/8" gypsum board int fnsh Floors 21A-32t: Bg floor, heavy dry or light damp soil, 8' depth, carp 80% flr fnsh Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fl BM/F-T f'-"F/Bhh 8h9ftF Btuh BWNM Btuh e 235 0.042 s 375 0.042 w 235 0.042 all 845 0.042 375 0.091 218 0.020 881 0.020 15.0 4.31 1014 0.11 26 15.0 4.31 1617 0.11 42 15.0 4.31 1014 0.11 26 15.0 4.31 3644 0.11 95 13.0 0 0 0.96 360 50.0 1.90 414 0.98 213 0 1.90 1674 0 0 Irk /- , rig t ft' Right -Suites Universal 2019 19.0.12 RSU16575 G:lbinder heating\Steeplechase Load.rup Calc = MJB Front Door faces: S 2020-Nov-27 08:13:03 Page 6 Component Constructions upper level Tony Ledo Phone: 783-229-4252 Job: Date: By: Pro'ect Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Int'l Am, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Daily range (°F) Wet bulb (° F) Wind speed (mph) 15.0 Heating -15 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (grub) Infiltration: Method Construction quality Fireplaces Heating Cooling 72 75 87 13 30 50 34.0 31.3 Simplified Semi -tight 0 Construction descriptions Or Area U-value fl' Bhhfft'-°F Walls 1ECC2012 frame zone 6: Frm wall, vnl ext, 1/2" wood shth, r-20 cav ins, n 5/8" gypsum board int fish, 2"x6" wood frm, 16" o.c. stud e $ w all Partitions (none) Windows Anderson Series 100: 2 glazing, dr low-e outr, argon gas, insulated n vinyl frm mat, dr innr, 1/4" gap, 1/8" thk; NFRC rated (SHGC=0.23); 6.67 e ft head ht s w all Doors (none) Ceilings 16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 cell ins, 5/8" gypsum board int fnsh Floors 20P-38c: Fir floor, frm flr, 12" thkns, carpet flr fish, r-38 cav ins, gar ovr Insul R Htg HTM Loss Clg HTM Gain ft'-'F/Btih Bhh/It' Bluh Stunt' Btuh 341 0.050 20.0 4.35 1483 1.02 349 386 0.050 20.0 4.35 1679 1.02 395 271 0.050 20.0 4.35 1179 1.02 277 390 0.050 20.0 4.35 1697 1.02 399 1388 0.050 20.0 4.35 6038 1.02 1419 137 0.270 0 23.5 3218 7.82 1072 58 0.270 0 23.5 1362 24.9 1446 207 0.270 0 23.5 4862 14.2 2934 54 0.270 0 23.5 1268 24.9 1347 456 0.270 0 23.5 10711 14.9 6799 2264 0.020 120 0.030 511 0.030 all 631 0.030 50.0 1.74 3938 0.98 2216 38.0 2.61 313 0.27 32 38.0 2.61 1334 0.27 137 38.0 2.61 1648 0.27 169 - WrQF7l Right -Suite® U niversal 2019 19.0.12 RSU16575 G:\binder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 7 Component Constructions main floor Tony Ledo Phone: 763-229-4252 Job: Date: By: Pro'ect Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Int'I Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Daily range (°F) Wet bulb (° F) Wind speed (mph) 15.0 Heating -15 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gr/lb) Infiltration: Method Construction quality Fireplaces Heating Cooling 72 75 87 13 30 50 34.0 31.3 Simplified Semi -tight 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain 6' Btuhm'-°F fr-°FiBhh Btuhlll` Btuh BUMP Btuh Walls IECC2012 frame zone 6: Frm wall, vnl ext, 1/2" wood shth, r-20 cav ins, n 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud e s w all Partitions 12F-0sw: Fm, wall, 1/2" wood shth, r-21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Windows Anderson Series 100: 2 glazing, clr low-e outr, argon gas, insulated n vinyl frm mat, clr innr, 1/4" gap, 1/8" thk; NFRC rated (SHGC=0.23); 6.67 s ft head ht w all Doors 11 NO: Door, mtl eps core type Ceilings (none) Floors (none) 383 0.050 225 0.050 246 0.050 394 0.050 1248 0.050 309 0.065 87 0.270 129 0.270 66 0.270 282 0.270 n 21 0.350 20.0 4.35 1666 1.02 392 20.0 4.35 979 1.02 230 20.0 4.35 1070 1.02 252 20.0 4.35 1714 1.02 403 20.0 4.35 5429 1.02 1276 21.0 5.65 1747 0.45 138 O 23.5 2044 7.82 680 O 23.5 3030 14.2 1829 O 23.5 1550 24.9 1646 O 23.5 6624 14.7 4155 8.7 30.4 639 8.91 187 aar •.»>«-.•-..,„-n�,.....,. Right -Su ite6Universa1201919.0.12RSU16575 G:lbinder heatingtSteeplechase Load. nip Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 8 Project Summary Entire House Tony Ledo Phone: 763-229-4252 Job: Date: By: Project information For: Notes: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Desi • n Information Weather: Winter Design Conditions Outside db Inside db Design TD Heating Summary Structure Ducts Central vent (630 cfm) Humidification Piping Equipment load Infiltration Method Construction quality Fireplaces -15 73 88 °F °F °F 63612 Btuh 0 Btuh 18763 Btuh O Btuh O Btuh 82376 Btuh Area (ft2) Heating 5746 Volume On 38131 Air changes/hour 0.25 Equiv. AVF (cfm) 159 Minneapolis -St Paul Intl Arp, MN, US Summer Design Conditions Simplified Semi -tight 0 Cooling 477T 36193 0.13 78 Heating Equipment Summary Make Trade Model AHRI ref n/a n/a n/a n/a Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat n/a 0 Btuh O °F O cfm 0 cfm/Btuh O in H2O n/a Outside db Inside db Design TD Daily range Relative humidity Moisture difference 88 °F 75 °F 13 °F M 50 % 31 gr/lb Sensible Cooling Equipment Load Sizing Structure Ducts Central vent (630 cfm) Blower Use manufacturer's data Rate/swing multiplier Equipment sensible load 25446 Btuh 0 Btuh 8019 Btuh 0 Btuh n 0.93 31089 Btuh Latent Cooling Equipment Load Sizing Structure 2419 Btuh Ducts 0 Btuh Central vent (630 cfm) 13003 Btuh Equipment latent load 2419 Btuh Equipment Total Load (Sen+Lat) 33507 Btuh Req. total capacity at 0.70 SHR 3.7 ton Cooling Equipment Summary Make n/a Trade n/a Cond n/a Coil n/a AHRI ref n/a Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wrighto1't-° Right -Suite® U niversal 2019 19.0.12 RSU16575 G:\binder heatinglSteeplechase Load.rup Calc = MJ8 Front Door faces: S n/a 0 Btuh 0 Btuh 0 Btuh O cfm O cfm/Btuh 0 in H2O 0 2020-Nov-27 08:13:03 Page 1 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat Outside db Inside db Design TD Project Summary boiler Tony Ledo Phone: 763-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Notes: Desi • n Information Weather: Minneapolis -St Paul Int'I Arp, MN, US Winter Design Conditions -15 °F 80 °F 95 °F Summer Design Conditions Outside db Inside db Design TD Daily range Relative humidity Moisture difference 88 °F 75 °F 13 °F M 50 % 31 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 13551 Btuh Structure 1620 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (SER=70% 475 cfm) 14446 Btuh Central vent (SER=10% 475 cfm) 5885 Btuh Heat recovery Heat recovery Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 27998 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 6972 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Semi -tight Fireplaces 0 Structure 77 Btuh Ducts 0 Btuh Central vent (475 cfm) 9804 Btuh 2 Heating Cooling Heat recovery Area (ft) 1850 881 Equipment latent load 9881 Btuh Volume ft' Air changes/hour 0.26 0.13 Equipment Total Load (Sen+Lat) 16853 Btuh Equiv. AVF (cfm) 16 4 Req. total capacity at 0.70 SHR 0.8 ton Heating Equipment Summary Cooling Equipment Summary Make IBC Technologies Inc. Make n/a Trade IBC TECHNOLOGIES Trade n/a Model SL 10-85G3 Cond n/a AHRI ref 10568368 Coil n/a AHRI ref n/a 96 AFUE Efficiency n/a 85000 Btuh Sensible cooling 0 Btuh 78000 Btuh Latent cooling 0 Btuh 0 °F Total cooling 0 Btuh 0 cfm Actual air flow 76 cfm 0 cfm/Btuh Air flow factor 0.047 cfm/Btuh 0 in H2O Static pressure 0 in H2O Load sensible heat ratio 0.43 Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ' welohterecaft' Right-Su ite®Universal201919.0.12 RSU16575 G:lbinder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 2 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat Project Summary forced air Tony Ledo Phone:763-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Notes: Desi • n Information Weather: Minneapolis -St Paul Intl Arp, MN, US Winter Design Conditions Outside db Inside db Design TD -15 °F 72 °F 87 °F Summer Design Conditions Outside db Inside db Design TD Daily range Relative humidity Moisture difference 88 °F 75 °F 13 °F M 50 % 31 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 50061 Btuh Structure 23826 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (SER=70% 155 cfm) 4317 Btuh Central vent (SER=O% 155 cfm) 2134 Btuh Heat recovery Heat recovery Humidification 0 Btuh Blower 0 Btuh Piping P 9 0 Btuh Equipment load 54378 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 24117 Btuh Method Simplified Latent CoolingEquipment Load Sizing Construction quality Semi -tight Fireplaces 0 Structure 2341 Btuh Ducts 0 Btuh Central vent (155 cfm) 3199 Btuh Heating Cooling Heat recovery Area (ft2) 3896 3896 Equipment latent load 5541 Btuh Volume (ft3) 34431 34431 Air changes/hour 0.25 0.13 Equipment Total Load (Sen+Lat) 29657 Btuh Equiv. AVF (cfm) 143 75 Req. total capacity at 0.70 SHR 2.9 ton Heating Equipment Summary Cooling Equipment Summary Make Lennox Make Lennox Trade LENNOX Trade LENNOX Model EL296UH090XE48C-* Cond XC14-042-230A** AHRI ref 5625719 Coil L*48/60Y9+EL296UH090XE48C* AHRI ref 7571174 96 AFUE Efficiency 13.0 EER, 16 SEER 88000 Btuh Sensible cooling 29400 Btuh 85000 Btuh Latent cooling 12600 Btuh 64 °F Total cooling 42000 Btuh 1253 cfm Actual air flow 1253 cfm 0.025 cfm/Btuh Air flow factor 0.053 cfm/Btuh 0.50 in H2O Static pressure 0.50 in H2O Load sensible heat ratio 0.82 Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. w ^L•-° ' Right -Suite® Universal 2019 19.0.12 RSU16575 G:lbinder heatinglSteeplechase Load.rup Cato = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 3 AED Assessment Entire House Tony Ledo Phone: 763-229-4252 Job: Date: By: Project information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Intl Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Drybulb (°F) Daily range (°F) Wet bulb (° F) Wind speed (mph) Heating -95 15.0 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gr/lb) Infiltration: Heating Cooling 73 75 88 13 30 50 35.1 31.3 Test for Adequate Exposure Diversity .' Hourly Fbirly Gazing Load 13 14 15 16 17 18 HvdC9' Average /®M 19 20 Maximum hourly glazing load exceeds average by 30.1%. House does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 19 Btuh (PFG - 1.3*AFG) Boldlrtalic values have been manually overridden Right -Suite® Universal 2019 19.0.12 RSU16575 G:lbinder heatinglSteeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 1 AED Assessment boiler Tony Ledo Phone: 763-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Intl Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Dry bulb (°F) Daily range (°F) Wet bulb (° F) Wind speed (mph) Heating -15 15.0 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (grllb) Infiltration: Heating Cooling 80 75 95 13 30 50 45.1 31.3 Test for Adequate Exposure Diversity F-burly Gazing Load 9 11 12 13 14 Has dDv .B 17 Maximum hourly glazing load exceeds average by 0.0%. Zone has adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 0 Btuh Boldlttalic values have been manually overridden 19 wrightsaft- Rght-Suite® U niversal 2019 19.0.12 RSU16575 G:lbinder heatinglSteeplechase Load.rup Cale = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 2 AED Assessment forced air Tony Ledo Phone: 763-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Conditions Location: Minneapolis -St Paul Intl Arp, MN, US Elevation: 837 ft Latitude: 45°N Outdoor: Drybulb (°F) Daily range (°F) Wet bulb (° F) Wind speed (mph) Heating -15 15.0 Cooling 88 18 (M ) 72 7.5 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Moisture difference (gdlb) Infiltration: Heating Cooling 72 75 87 13 30 50 34.0 31.3 Test for Adequate Exposure Diversity ,• Hourly F-biuiy Gazing Load 11 12 13 thrdOw ✓ Average 141 15 }..__.._.._._....-.- e n f I ---I 18 19 2) Maximum hourly glazing load exceeds average by 30.1%. Zone does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 19 Btuh (PFG- 1.3*AFG) Bold/italic values have been manually overridden wrbghtsamit* Right -Suite® Universal 2019 19.0. 12 RSU16575 G:\binder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 3 Right-J® Worksheet Entire House Tony Ledo Phone: 763-229-4252 Job: Date: By: 1 2 3 4 5 Room name Exposed wall Room height Room dimensions Room area Entire House 569.5 ft 9.2 ft d 5746.0 f t' boiler 186.0 ft 10.0 ft d 1850.3 ft' Ty Construction number U-value Or (Bt uh/ft'-°F HTM (Btuh/ft') Area ft') or perimeter (ft) Load (Btuh) Area (ft') or perimeter (ft) Load (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 11 w Vwy vw�I R F F` F 158-15efc 8 IECC2012 frame zone Anderson Series 100 158-15fc-8- IECC2012 frame zone Anderson Series 100 IECC2012 frame zone Anderson Series 100 158-1500.8 IECC2012 frame zone _Anderson Series 100 12C-Osw 12F-0sw 11NO 168•5tad 20P-38c 20P-38c 21A-32t 0.059 0.050 0.270 0.059 0.050 0.270 0.059 0.050 0.270 0.059 0.050 0.270 0.091 0.065 0.350 0.020 0.030 0.030 0.020 n a e s w w n 4.31 4.35 23.49 4.31 4.35 23.49 4.35 23.49 4.31 4.35 23.49 0.00 5.65 30.45 1.75 2.61 281 1.90 0.00 1.02 7.82 0.06 1.02 24.94 0:09 1.02 14.18 1.02 24.94 0.98 0.45 8.91 0.98 0.27 0.27 0.00 470 948 224 480 889 58 470 853 336 460 904 120 375 330 21 2482 120 511 1850 470 724 0 460 611 0 470 517 0 460 784 0 375 309 21 2482 120 511' 1850 2027 3149 5262 1984 2658 1362 2027 2249 7893 1964 3410 2819 1747 639 4353 313 1334 3515 740 1752 625 1448 42 529 4763 2e 802 2992 360 138 187 2429 32 137 0 470 0 0 460 0 0 470 0 0 480 0 0 375 0 0 218 0 1850 470 0 0 460 0 0 470 0 0 480 0 0 375 0 0 218 0 0 1850 2027 0 0 1984 0 0 2027 0 0 1984 0 0 0 0 0 414 0 3515 0 0 0 26 0 0 42 0 0 28 0 0 0 0 0 213 0 0 0 6 C) AED excursion 19 0 Envelope loss/gain 48727 17047 1080 0 920 6400 63612 25446 0 0 0 25446 0 0% 63612 25446 1253 1329 12 13 a) Infiltration b) Room ventilation Internal gains: Subtotal (lines 6 to 13) Occupants Appliances/other 230 4 14885 0 14 15 Less external load Less transfer Redistribution Subtotal Duct loads Total room load Air required (chn) 0% 0% 0 0 0 63612 0 11952 869 51 0 0 900 13551 1620 0 0 0 1820 0 13551 1620 0 76 0 1600 0 0% 0 0 0 13551 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wreptltittawrafir Rig ht-Sudeft Universal 2019 19.0.12 RSU16575 Gabinder heating\Steeplechase Load.rup Cak = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 1 Right-J® Worksheet Entire House Tony Ledo Phone: 763-229-4252 Job: Date: By: 1 2 3 4 5 Room name Exposed wall Room height Room dimensions Room area forced air 383.5 ft 8.8 ft d 3895.8 ft. Ty Construction U-value Or HTM Area ft') number (Btuh/ft'-°F (Stuh/ft') or perimeter (ft) Load (Btuh) Area or perimeter Load Heat Cool I Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 11 W ;158-15sfe-8 - - -0.059 n.. - 4.31 0.00 0 0 vy IECC2012 frame zone 0.050 n 4.35 1.02 948 724 C, Anderson Series 100 0.270 n 23.49 7.82 224 0 W 1513-15sic-8 0.059 ' a 4.31 0.06 0 0 IECC2012 frame zone 0.050 e 4.35 1.02 889 611 Anderson Series 100 0.270 e 23.49 24.94 58 0 W 158-15sfc-8 0.059 s 4.31 0.09 0 0 vy IECC2012 frame zone 0.050 s 4.35 1.02 853 517 L-G Anderson Series 100 0.270 s 23.49 14. 18 336 0 W 159-15sfc-8 0.059 w 4.31 0.06 0 0 Uy IECC2012 frame zone 0.050 w 4.35 1.02 904 784 '-G Anderson Series 100 0.270 w 23.49 24.94 120 0 P 12C-Osw 0.091 0.00 0.96 0 0 RI D 12F-Osw 0.065 - 5.65 0.45 330 309 11NO 0.350 n 30.45 8.91 21 21 C 168•50ad 0:020 1.75 0.98 2264 2264 F 20P-38c 0.030 - 2.61 0.27 120 120 F;-_ 209-38c - 0.030 2.61 0.27 511 511 F 21A-32t 0.020 1.90 0.00 0 0 0 3149 5282 2858 1362 2249 7893 3410 2819 1747 639 3938 313 1334 0 0 740 1752 0 625 1446 529 4763 802 2992 0 138 187 2218 32 137 0 8 c) AED excursion 19 12 13 Envelope loss/gain a) Infiltration b) Room ventilation Internal gains: Subtotal (lines 6 to 13) Less external load Less transfer Redistribution Subtotal Duct loads Total room bad Air required (cfm) 36775 16378 1028 0 920 5500 50061 23826 0 0 0 23826 0 50061 23826 1253 1253 14 15 Occupants Appliances/other 230 4 13286 0 0% 0% 0 0 0 50061 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. vr":11- - Rght-Suite®Universa1201919.0.12 RSU16575 G:\binder heating\Steeplechase Load.rup Cab = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 2 Right-J® Worksheet boiler Tony Ledo Phone: 763-229-4252 Job: Date: By: 1 2 3 4 5 Room name Exposed wall Room height Room dimensions Room area boiler 186.0 ft 10.0 ft d 1850.3 ft' pool 101.5 ft 10.0 ft heat only 1.0 x 969.0 ft 969.0 f t' 6 11 Ty W t w W P C F F Construction number 15B-150c-8 IECC2012 frame zone Anderson Series 100 159-1540-8 IECC2012 frame zone Anderson Series 100 158-1 8 IECC2012 frame zone Anderson Series 100 158.15sic43_ IECC2012 frame zone Anderson Series 100 12C.0sw 12F-Osw 11NO 168-SOad 20P-38G 20P-38c 21A-32t U-value Or (Btuh/ft'.- F 0.059 0.050 0.270 0.059 0.050 0.270 0.050 0.270 0.059 0.050 0.270 0.091 0.065 0.350 0.020 0.030 0.030 0.020 n e e s s w n HTM (Btuh/ft') Area ft') or perimeter (it) Load (Btuh) Area (ft') or perimeter (ft) Load (Btuh) Heat Cool Gross N/P/S Heat Cool 4.31 0.00 0.00 4_31 0.00 0.00 4.31 0.00 0.00 4.31 0.00 0.00 (.00 0.00 0.00 1-90 0.00 0_00 1.90 0.00 0.00 0.00 0.06 0.00 0.00 0,09 0.00 0.00 0.06 0.00 0.00 0.98 0.00 0.00 0.98 0.00 0.00 0.00 470 0 0 0 0 470 0 0 0 0 375 0 0 218 0 0 1850 470 0 0 460 0 0 470 0 0 460 0 0 375 0 0 218 0 0 1850 2027 0 0 984 0 0 2027 0 0 1964 0 0 0 0 0 414 3515 0 0 0 26 0 0 42 0 0 28 0 0 360 0 0 213. 0 Gross N/P/S 470 470 O 0 O 0 225 225 O 0 0 0 0 225 0 0 0 0 0 0 0 a 969 0 95 0 0 226 0 0 0 a 0 0 969 Heat Cool 2027 0 0 970. 0 0 410 0 0 70 0 0 0 0 0 a 0 0 1841 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 c) AED excursion 0 Envelope loss/gain 11952 669 6219 12 a) Infiltration b) Room ventilation 1800 0 51 0 873 0 0 0 13 Internal gains: Occupants Appliances/other 230 0 0 900 0 0 0 Subtotal (lines 6 to 13) 13551 1620 7092 0 14 15 Less external bad Less transfer Redistribution Subtotal Duct loads 0% 0% 0 0 0 13551 0 0 0 0 1620 0 -0% 0% 0 0 0 7092 0 0 0 0 0 0 Total room load Air required (cfm) 13551 0 1620 76 7092 0 0 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -t9rf weiglMlemote- Right-Suite® U niversal 2019 19.0.12 RSU16575 G:ibinder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 3 Right-J® Worksheet boiler Tony Ledo Phone:763-229-4252 Job: Date: By: 1 2 3 4 5 Room name Exposed wall Room height Room dimensions Room area multilstor/mech 84.5 ft 10.0 ft heat/cool 37.5 x 23.5 ft 881.3 ft' 6 11 Ty Constriction number U-value Or HTM Area ft') (Btuh/ft'-°F (Btuh/ft') or perimeter (ft) Load (Btuh) Area or perimeter Load Heat Cool Gross N/P/S Heat W 158-l5sfe-8 0,059 r 4.31 0,00 0 0 0 Vy IECC2012 frame zone 0.050 n 0.00 0.00 0 0 0 � C Anderson Series 100 0.270 n 0.00 0.00 0 0 0 W '. 158-15sfc-8 _ 0.059. a 4_31 0.06 --235 '.235. , 1014 IECC2012 frame zone 0.050 e 0.00 0.00 0 0 0 Anderson Series 100 0.270 a 0.00 0.00 0 0 0 W 158 15sic$ 0.059 s 4.31 0.09 375 375 1617 V / lECC2012 frame zone 0.050 s 0.00 0.00 0 0 0 L -G Anderson Series 100 0.270 s 0.00 0.00 0 0 0 W 158.15sfc-8 0.059 w 4.31 0.06 235 235 1014 IECC2012 frame zone 0.050 w 0.00 0.00 0 0 0 Anderson Series 100 0.270 w 0.00 0.00 0 0 0 P 120.0sw 0.091 0,00 0.96 375 375 :0 q 12F-0sw 0.065 - 0.00 0.00 0 0 0 _D 11 N0 0.350 n 0.00 0.00 0 0 0 C 169-508tf 0020 1-90 4.98 218 218 414. F 20P-38c 0.030 - 0.00 0.00 0 0 0 F 20P-36c 0.030 - 0,00 0.00 0 0 -0 F 21A-32t 0.020 - 1.90 0.00 881 881 1874 Cool 0 0 0 0 0 42 0 0 28. 0 0 380 0 0 213 0 0 0 Gross I N/P/S Heat Cool 6 c) AED excursion 0 12 Envelope loss/gain a) Infiltration b) Room ventilation Internal gains: Subtotal (lines 6 to 13) Less external load Less transfer Redistribution Subtotal Duct loads Total room load Air required (cfm) 5733 669 51 0 0 900 6460 1620 0 0 0 6460 O 1620 0 6460 1620 O 76 13 14 15 727 0 Occupants ® 230 Appliances/other 0 -0% 0% 0 0 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -'1 - wrtlptil .�sfk^ Right -Suite® Universal 2019 19.0.12 RSU16575 G:lbinder heating\Steeplechase Load.rup Cato = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 4 Right-J® Worksheet forced air Tony Ledo Phone: 763-229-4252 Job: Date: By: 2 3 4 5 Room name Exposed wall Room height Room dimensions Room area forced air 383.5 ft 8.6 ft d 3895.8 ft' upper level 230.5 ft 8.0 ft heat/cool 1.0 x 2263.5 ft 2263.5 ft' 6 11 Ty Construction number 15&15stc4 IECC2012 frame zone Anderson Series 100 15B-154rc-8 IECC2012 frame zone Anderson Series 100 158-155rc-8' IECC2012 frame zone Anderson Series 100 158-15sfc-8 IECC2012 frame zone Anderson Series 100 12C-Dsw 12F-0sw 11NO t8B-50ad 20P-38c 20P-38c 21A-32t U-value Or (Bt uh/ft'-°F 0.059 0.050 0.270 0.059 0.050 0.270 0.059 0.050 0.270 0.059 0.050 0.270 0.091 0.065 0.350 0.020 0.030 0.030 0.020 n n s e s s w n HTM (Bt uh/ftl Area ft') Load or perimeter (ft) (Btuh) Area (ft') or perimeter (ft) Load (Btuh) Heat Cool 0.00 4.35 23.49 0_00 4.35 23.49 0.00 4.35 23.49 0_00 4.35 23.49 5.65 30.45 174 2.61 2.61 0.00 1.02 7.82 0.00 1.02 24.94 0.00 1.02 14.18 1.02 24.94 0_00 0.45 8.91 0.98 0.27 0.27 0.00 Gross N/P/S Heat Cool Gross N/P/S Heat Cool 0 948 224 869 58 0 853 336 904 120 0 330 21 2264 120 511 0 724 0 0 611 0 517 0 784 0 0 309 21 2284 120 511 0 0 3149 5262 0 2858 1382 2249 7893 3410 2819 1747 639 3938 313 1334 0 Q 0 0 0 0 740 478 341 1483 349 1752 137 0 3218 1072 0 0 40 0 825 444 386 1879 395 1446 58 0 1362 1446 0 0 0 0 0 529 478 271 1179 277 4763 207 0 4862 2934 0 0 0 0 0 802 444 390 1896 399 2992 54 0 _ 1268 1347 0 0 0 0 0 138 0 0 0 0 187 0 0 0 0 2218 2264 2284 3938 2216 32 120 120 313 32 137 511 511 - 1334 137 0 0 0 0 D 6 c) AED excursion 19 -136 Envelope loss/gain 36775 16378 22335 10467 12 a) Infiltration b) Room ventilation 13 Internal gains: Occupants Q 230 Appliances/other Subtotal (lines 6 to 13) i 4 J 13286 0 1028 0 7261 0 562 0 920 5500 2 460 2100 50061 23826 29596 14 15 Less external bad Less transfer Redistribution Subtotal Duct loads 0% 0% 0 0 0 50061 0 0 0 0 23826 0 -0% 0% 0 0 0 29596 0 13589 0 0 0 13589 0 Total room load Air required (cfm) 50061 23826 1253 1253 29596 13589 741 715 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -+}r- rwrrrtiQtsaoroarrR-- Right-Suite® Universal 2019 19.0.12 RSU16575 G:\binder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 5 Right-J® Worksheet forced air Tony Ledo Phone:763-229-4252 Job: Date: By: 1 2 3 4 5 Room name Exposed wall Room height Room dimensions Room area main floor 153.0 ft 10.0 ft heat/cool 1.0 x 1632.3 ft 1632.3 ft' 6 1 Ty W W P L C F F F Construction number 15B-15sfc•8 IECC2012 frame zone Anderson Series 10) 159-15sfc-13 IECC2012 frame zone Anderson Series 10) 158-15sfc-8 IECC2012 frame zo,e Anderson Series 10) 158-15sfc-8 IECC2012 frame zo �e Anderson Series 100 12C-Osw 12F-Osw 11NO 166-50ad 20P-38c 20P-38c 21A-32t U-value Or (Bt uh/ft'-°F 0.050 0.270 0.059 0.050 0.270 0.050 0.270 0.059 0.050 0.270 0.091 0.065 0.350 0.020 0.030 0.030 0.020 n e s w n HTM Area (ft') Load Area (Btuh/ft') or perimeter (ft) (Btuh) or perimeter Heat Cool Gross I N/P/S 1 Heat Cool f I Gross 0.00 Q 00 0 0 0 j 4.35 383 1666 392 23.49 0 2044 680 0-t°1 0 0 0 4.35 225 979 230 23.49 0 0 0 0.00 p 0 0 4.35 23.49 0.00 4.35 23.49 0.00 5.65 30.45 1:74 2.81 2.61 0.00 0 1.02 470 7.82 87 0.00 0 1.02 225 24.94 0 0.00 1.02 375 14.18 129 O.00 0 1.02 460 24.94 66 0.00 0 0.45 330 8.91 21 0.98 0 0.27 0 0.27 0 0.00 0 246 1070 252 O 3030 1929 O 0 0 394 1714 403 O 1550 1646 O 0 0 309 1747 138 21 639 187 0 0 0' 0 0 0 0 0 0 Load N/P/S Heat Cool 6 c) AED excursion 155 Envelope loss/gain 144401 5911 12 a) Infiltration b) Room ventilation 6025 0 466 0 13 Internal gains: Occupants i 230 Appliances/other 460 3400 Subtotal (lines 6 to 13) 20464 10237 14 15 Less external load Less transfer Redistribution Subtotal Duct loads -0% 0% 0 0 0 20464 0 0 0 0 10237 0 Total room load Air required (cfm) 20464 10237 512 538 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Right -Suite® Universal 2019 19.0.12 RSU16575 G:Sbinder heatingtSteeplecfrase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:03 Page 6 Right-J8® Form J1 Entire House Tony Ledo Phone:763-228-4252 Job: Date: By: 2 3 4 5 Name of Room Running Feet of Exposed Wa Ceiling Ht (Ft) and Gross Wal Area (SqFt) Room Dimensions (Ft) and Floor Plan Area (SqFt) Ceiling Slope (Deg. and Gross Ceiling Area (SqFt) 9.2 ft 0 Entire House 569.5 ft 6305.3 ft' 5746.0 ft' 5746.0 f t' 10.0 ft 0 boiler 186.0 ft 2610.0 ft' 1850.3 ft' 1850.3 ft' Type of Exposure Const., h umber Panel Faces HTM Htg. Area or Length Clg. Heating Btuh S-Clg L-Clg Area or Length Btuh Heating S-Clg L-Clg 6 11 Wall al--G1 az Wan a laz Wan a LGI Yaz Wall a' G laz Wan Wall I Door Ceil Flor Fbr nor 158.1581648 1ECC2012 frame zone Anderson Series 100 15B:15a1U8 1ECC2012 frame zone Anderson Series 100 158-15st-8 IECC2012 frame zone Anderson Series 100 15&156f .8 IECC201 2 frame zone Anderson Series 100 12F-Osw 11NO 188.50ao. 20P-38c 20P-38c 21A-32t n e 3 w w n 4.31 : 4.35 23.49 4.31 4.35 23.49 4.31 4.35 23.49 4.31 4.35 23.49 0.00 5.65 30.45 2.61 2.61 1.90 0.00 470 _ 2027 1.02 948 3149 7.82 224 5262 0.08 460 1984 1.02 669 2658 24.94 58 1362 0.09 470 .- 2027 1.02 853 2249 14.18 338 7893 0.08 460 1984 1.02 904 3410 24.94 120 2819 0.96 375 0 0.45 330 1747 8.91 21 639 0.98 2482 4353 0.27 120 313 0.27 511 1334 0.00 1850 3515 0 740 1752 28 625 1446 529 4763 802 2992 360 138 187 2429 32 137 0 470 0 0 460 0 0 0 0 460 0 0 375 0 0 218 0 0 1850 2027 0 O 0 O 0 1984 28 O 0 O 0 2027 42 O 0 O 0 1984 26 O 0 O 0 O 380 O 0 O 0 414 213 0 _ 0 0 0 3515 0 Infiltration 12 13 14 Subtotals Duct 15 Loads Internal Heating Lead (Btuh) Effect Sensible Load (Btuh) ACH Latent Load (Btuh) 0.25 0.13 WAR 14885 1.00 1080 1619 WAR 1.00 1600 51 T7 a b C d e Occupants at 230 and 200 Btuh Scenario number Defaul Adjustments Custom Appliances Plants 4 920 5200 3000 800 0 0 0 0 900 1800 0 0 0 EHLF & ESGF ELG 16 Ventilation Loads 17 Winter Humidification Load 18 Piping Load 19 Blower Heat Vent Cfm 20 AED Excursion & Latent Moistt.re Migration Load 21 Total Load 630 Sum lines 6 through 12 r t OI Sum lines 13 through 19 63612 25446 2419 0 0 0 18763 8019 13003 0 19 33465 Calculations approved by ACCA to meet all reauirements of Manual J 8th Ed. -r'#+- wras!+c+wcsrt� Right -Suite® Universal 2019 19.0.12 RSU 16575 G:tbinder heafing\Steeplechase Load.nrp Cats = MJ8 Front Door faces: S 13551 1620 77 0 14448 0 0 5885 9804 0 0 7505 9881 2020-Nov-27 08:13:06 Page 1 Right-J8® Form J1 Entire House Tony Ledo Phone: 763-229-4252 Job: Date: By: 2 3 4 5 Name of Room Running Feet of Exposed Wall Ceiling Ht (Ft) and Gross Wall Area (SqFt) Room Dimensions (Ft) and Floor Plan Area (SqFt) Ceiling Slope (Deg.) and Gross Ceiling Area (SqFt) 8.8 ft 0 forced air 383.5 ft 3698.4 ft' 3895.8 ft' 3895.8 ft' 6 Type of Const., Exposure Number Welt V---- a_G laz Wail all laz Wall ff-C laz Wall Wall 1 Door Cant Flor Flor Flor 1513-154fc-8 IECC2012 frame zone Anderson Series 100 158-15sfe 8 IECC2012 frame zone Anderson Series 100 158-150c-8. IECC2012 frame zone Anderson Series 100 15B-15sfc 8 IECC2012 frame zone Anderson Series 100 12C•Osw 12F-0sw 11NO 188.50ad 20P-38c 20P=38c 21A-32t Panel Faces n n e e s w w HTM Htg. 4.31 4.35 23.49 4.31 4.35 23.49 4.31 4.35 23.49 4,31 4.35 23.49 0.00 5.65 30.45 1.75 2.61 2.61 1.90 Area or Length Clg. Heating 0.00 0. "0 1.02 948 3149 7.82 224 5262 0.06 0 0 1.02 669 2658 24.94 58 1362 0.09 0 0 1.02 853 2249 14.18 336 7893 0.06 0 0 1.02 904 3410 24.94 120 2819 0.96 0 0 0.45 330 1747 8.91 21 639 0.98 2264 3938 0.27 120 313 0.27 511 334 0.00 0 0 Btuh S-Clg 740 1752 625 1446 0. 529 4783 802 2992 0 138 187 2210 32 137 0 Area or Length Btuh Heating S-Clg L-Clg 12 Infiltration Heating Load (Btuh) Effect Sensible Load (Btuh) ACH Latent Load (Btuh) 0.25 0.13 WAR 1.00 13286 1028 1541 Internal 13 a b c d e Occupants at 230 and 200 Btuh Scenario number Default Adjustments Custom Appliances Plants 920 4300 1200 800 0 14 Subtotals Duct 15 Loads EHLF & ESGF ELG Sum lines 6 through 12 r 01 r 50061 23826 2341 0 0 16 Ventilation Loads Vent Cfm 830 E Cfm 630 4317 2134 3199 17 Winter Humidification Load 18 Piping Load 19 Blower Heat 20 21 AED Excursion & Latent Moisture Migration Load Total Load Gal/Day 0 Sum lines 13 through 19 54378 0 19 25960 5541 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. vtirr4Q/ntara?-1. R" Right -Suite® Universal 2019 19.0.12 RSU16575 G:lbinder heatingtSteeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:06 Page 2 Right-J8® Form J1 boiler Tony Ledo Phone: 763-229-4252 Job: Date: By: 1 2 4 5 Name of Room Running Feet of Exposed Wall Ceiling Ht (Ft) and Gross Wall Area (SqFt) Room Dimensions (Ft) and Floor Plan Area (SqFt) Ceiling Slope (Deg. and Gross Ceiling Area (SqFt) 10.0 ft 0 boiler 186.0 ft 2610.0 ft' 1850.3 ft' 1850.3 ft' 10.0 ft 1.Ox969.0ft 0 pool 101.5 ft 1390.0 f t' 969.0 f t' 969.0 ft' Type of Exposure Const., Number Panel Faces HIM Htg. Clg. Area or Length Btuh Heating S-Clg L-Clg Area or Length Btuh Heating S-Clg L-Clg 6 11 Waif all laz Wall Wall laz Wall a�-GI az Wall Wall _...G1 az Wall Wall l Door Ce8 Flor Flor Flor 158-15sfc 8 IECC2012 frame zone Anderson Series 100 IECC2012 frame zone Anderson Series 100 158-15sfc-13 IECC2012 frame zone Anderson Series 100 15&15sb8 IECC2012 frame zone Anderson Series 100 12C-0sw- 12F-0sw 11NO 168.50ad 20P-38c 2tP-38c 21A-32t n e_ e s s w n 431 0.00 0.00 0.00 0.00 4,31 0.00 0.00 4.31. 0.00 0.00 0.00 0.00 0.00 1-90 0.00 0.00 1.90 0.00 0.00 0.00 0.08 0.00 0.00 0.09 0.00 0.00 0.06 0.00 0.00 0.98 0.00 0.00 098 0.00 O.OD 0.00 470,', 0 0 460 0 0 470 0 0 480 0 0 375 0 0 218. 0 0 1850 2027 0 0 1984 0 0 2027. 0 0 1984 0 0 a 0 0 414 0 0 3515 0 0 0 0 42 0 0 26 0 0 380 0 0 213 0 a 0 470 0 0 0 0 0 0 225. 0 0 0 0 0 0 0 969 2027. 0 0 970 0 0 410 0 0 970 0 0 0 0 0 0 0 0. 1841 0 0 0 a 0 0 0. 0 0 0 0 0 0 0 0 0 0 0 0 12 Infiltration Heating Load (Btuh) Effect Sensible Load (Btuh) ACH Latent Load (Btuh) 0.26 0.13 WAR 1800 WAR 1.00 51 0.55 873 Internal 13 a b C d e Occupants at 230 and 200 Btuh Scenario number Default Adjustments Custom Appliances Plants 900 1800 0 0 1800 0 14 Subtotals Duct 15 Loads EHLF 8 ESGF ELG Sum lines 8 through 12 r t 01 13551 1620 7092 0 0 0 0 16 Ventilation Loads Vent Ctm 17 Winter Humidification Load 18 Piping Load 475 E Cfm 475 Gal/Day 14446 5885 9804 19 Blower Heat 20 AED Excursion 8 Latent Moisture Migration Load 0 i 0 0 21 Total Load Sum lines 13through 19 27998 7505 9881 7092 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ��+ rsrrsytlttt---- 'rt "`"^"""� RightSuite®Universal201919.0.12R5U16575 G:lbinder heatinglSteeplechase Load.rup Calc = MJB Front Door faces: S 2020-Nov-27 08:13:08 Page 3 Right-J8® Form J1 boiler Tony Ledo Phone: 763-229-4252 Job: Date: By: 1 2 3 4 5 Name of Room Running Feet of Exposed Wall Ceiling Ht (Ft) and Gross Wall Area (SqFt) Room Dimensions (Ft) and Floor Plan Area (SqFt) Ceiling Slope (Deg. and Gross Ceiling Area (SqFt) Type of Exposure Const., Number Panel Faces HTM Htg. Cig. 10.0 ft 37.5 x 23.5 ft 0^ Area or Length mult/stor/mech 84.5 ft 1220.0 ft' 881.3 ft' 881.3 ft' Btuh Heating S-Clg L-Clg Area or Length Btuh Heating S-Clg L-Clg 6 12 13 Wall all laz Wall Wall laz Wall a laz Wall y al--[ laz Wall Wall I Door Cell Flor Flor Flor 15B-15sfc-8 IECC2012 frame zone Anderson Series 100 IECC2012 frame zone Anderson Series 100 158-150c.8 IECC2012 frame zone Anderson Series 100 15B-15&ta8 IECC2012 frame zone Anderson Series 100 12Gosw 12F-0sw 11NO 166.50ad 20P-38c 20P-38c 21A-32t Infiltration Heating Load (Btuh) Internal h n e e s w w Sensible Load (Btuh) Latent Load (Btuh) a b c d e Occupants at 230 and 200 Btuh Scenario number Default Adjustments Custom Appliances Plants Effect ACH 4.31 0.00 0.00 0.00 0.00 4.31 0.00 0.00 4:31 0.00 0.00 0.00'` 0.00 0.00 1.90 0.00 0.00 1.90 0.01" 0.00 0.00 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.98 0.OD 0.00 0.00 0.26 0.13 0; 0 0 235:` 0 0 375 0 0 235 0 0 375 0 0 218 0 0 881 WAR 0.45 0 0 0 1014 0 0 1817 0 0 1014 0 0 0 0 0 414 0 0 1674 0 0 0 26 0 0 42 0 0 26'` 0 0 360 0 0 218 0 0 0 0 900 14 Subtotals Duct 15 Loads EHLF & ESGF ELG Sum lines 6 through 12 01 0 1620 0 0 16 Ventilation Loads Vent Cfm 475 ECfm 475 17 Winter Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED Excursion & Latent Moisture Migration Load 0 21 Total Load Sum lines 13 through 19 6460 1620 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. �1+ wr4tgfttimictR Right -Suite® Universal 201919.0.12 RSU16575 G:/binder heating/Steeplechase Load.rup Cats = MJ8 Front Door faces: S 2020-Nov-27 08:13:06 Page 4 Right-J8® Form J1 forced air Tony Ledo Phone: 763-229-4252 Job: Date: By: 1 2 3 4 5 Name of Room Running Feet of Exposed Wall Ceiling Ht (Ft) and Gross Wall Area (SqFt) Room Dimensions (Ft) and Floor Plan Area (SqFt) Ceiling Slope (Deg. and Gross Ceiling Area (SqFt) 8.8 ft 0 ° forced air 383.5 ft 3698.4 f t' 3895.8 ft' 3895.8 f t' 8.0 ft 1.0 x 2263.5 ft 0 upper level 230.5 ft 1844.0 ft' 2263.5 fP 2263.5 ft' Type of Exposure Const., Number Panel Faces HTM Htg. Clg. Area or Length Btuh Heating S-Clg L-Clg Area or Length Btuh Heating S-Clg L-Clg 6 11 Walt Wall laz Wall altu az Walt all az VWet a� CI az Walt all r Cell Flor For Flor 158.15sfa8 IECC2012 frame zone Anderson Series 100 15815afc=8 IECC2012 frame zone Anderson Series 100 158-15sfc-8 IECC2012 frame zone Anderson Series 100 158.15sfc8 IECC2012 frame zone Anderson Series 100 12C-osw 12F-0sw 11NO 188.50ad 20P-38c 20P-380 21A-32t n e $ s w w 0.00 4.35 23.49 0.00 4.35 23.49 0.00 4.35 23.49 0.00 4.35 23.49 0.00. 5.65 30.45 1.74 2.61 2.61 0.00 0.00 1.02 7.82 000- 1.02 24.94 0.00 1.02 14 18 0,00 1.02 24.94 0.00 0.45 8.91 0.98.: 0.27 0.27 0.00 948 224 0 689 58 853 336 0 904 120 0 330 21 2264 120 511. 0 3149 5262 0 2658 1362 0. 2249 7893 0 3410 2819 0 1747 639 3938 313 1334 0 0 740 1752 a 625 1446 0 529 4763 0 802 2992 0 138 187 2216 32 137 0 0 478 137 0 444 58 0 478 207 0 444 54 0 0 0 2284 120 0 0 1483 3218 0 1679 1362 0 1179 4862 0 1696 1268 0 0 0 3938 313 0 0 349 1072 395 1446 0 277 2934 0 399 1347 0 0 0 2218 32 137 0 Infiltration 12 Heating Load (Btuh) Sensible Load (Btuh) Latent Load (Btuh) Effect ACH 0.25 0.13 WAR 13286 WAR 1.00 1028 - 0.55 1541 7261 Internal 13 14 Subtotals Duct 15 Loads a b C d e Occupants at 230 and 200 Btuh Scenario number Default Adjustments Custom Appliances Plants EHLF & ESGF ELG Sum lines 6 through 12 01 50061 0 920 800 4300 1200 0 0 23826 2341 0 480 900 1200 29596 13589 0 0 400 16 Ventilation Loads Vent Cfm 155 E Cfm 155 4317 2134 3199 17 Winter Humidification Load Gal/Day 18 Piping Load 19 Blower Heat 0 20 AED Excursion & Latent Moisture Migration Load 19 -136 21 Total Load Sum lines 13 through 19 54378 25960 5541 29596 13589 Calculations approved by ACCA to meet all reauirements of Manual J 8th Ed. " - wPsor,lc nr Right -Suite® Universal 2019 19.0.12 RSU 16575 G:lbinder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:06 Page 5 Right-J8® Form J1 forced air Tony Ledo Phone: 763-229-4252 Job: Date: By: 1 2 3 4 5 Name of Room Running Feet of Exposed Wall Ceiling Ht (Ft) and Gross Wall Area (SqFt) Room Dimensions (Ft) and Floor Plan Area (SqFt) Ceiling Slope (Deg.) and Gross Ceiling Area (SqFt) 10.0 ft 1.0x1632.3ft 0 ° main floor 153.0 ft 1839.0 ft' 1632.3 ft. 1632.3 ft. Type of Exposure Const., Number Panel Faces HTM Htg. Clg Area or Length Btuh Heating S-Clg L-Clg Area or Length Btuh Heating S-Clg L-Clg 6 Wall - all laz Wall L-Gall laz Waft Wall ▪ laz Wail all ▪ laz Well Wall I Door Cell Flor Flor Flor 15S.45sfc-8 n IECC2012 frame zone n Anderson Series 100 n 15B-15sfc-8 e IECC2012 frame zone e Anderson Series 100 e 158.15sfc-6 s IECC2012 frame zone s Anderson Series 100 s 158.15sfe-8: w IECC2012 frame zone w Anderson Series 100 w 12C-Dsw 12F-0sw 11NO n 188 50ad - 20P-38c 20P-38c- 21 A-32t 000 4.35 23.49 0.00 4.35 23.49 0.00 4.35 23.49 0.00 4.35 23.49 5.65 30.45 1.74 2.61 2.61 0.00 A:AA 0 0 1.02 470 1666 7.82 87 2044 0.00 0 0 1.02 225 979 24.94 0 0 0.00 0 0 1.02 375 1070 14.18 129 3030 A.AA 0 0 1.02 460 1714 24.94 66 1550 0.00 0 0 0.45 330 1747 8.91 21 639 0.96 0 0 0.27 0 0 0.27 0 0 0.00 0 0 0_ 392 680 a 230 0 0 252 1829 403 1646 a 138 187 Q. 0. a 0 Infiltration 12 Heating Load (Btuh) Sensible Load (Btuh) Latent Load (Btuh) Effect ACH 0.25 0.13 WAR 0.45 6025 466 Internal 13 a b C d e Occupants at 230 and 200 Btuh Scenario number Default Adjustments Custom Appliances Plants 2 460 3400 0 400 0 0 14 Subtotals Sum lines 6 through 12 Duct EHLF & ESGF I 01 0 15 Loads ELG 20464 10237 0 0 16 Ventilation Loads 17 Winter Humidification Load 18 Piping Load 19 20 21 Blower Heat Vent Cfm AED Excursion & Latent Moisture Migration Load Total Load 155 E Cfm I 155 Gal/Day Sum lines 13 through 19 20464 10237 Calculations approved by ACCA to meet all reauirements of Manual J 8th Ed. Right -Suite® Universal 2019 19.0.12 RSU 16575 G:ibinder heating\Steeplechase Load.rup Cats = MJB Front Door faces: S 2020-Nov-27 06:13:06 Page 6 J1 Form - Worksheet A Entire House Tony Ledo Phone: 763-229-4252 Job: Date: By: Supporting Detail Project Name: Steeplechase Load Date: Address: 4871 Steeplechase Way, Eagan, mn Phone: Job ID: Worksheet A Location and Design Conditions Weather Location: Minneapolis -St Paul Intl Arp, MN, US Elevation = 837 Latitude = 45 Indoor Conditions, Heating: DB = 73 °F RH = 30 % Indoor Conditions, Cooling: DB = 75 °F RH = 50 % Table 1 Conditions 99% DB = -15°F 1% DB = 88 °F Grains Difference = 31 gr/lb Daily Range = M Design Temperature Differences HTD = 88 °F CTD = 13 °F Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. A.4W 01 Rght-Suite® U niversal 2019 19.0.12 RSU16575 G:lbinder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:10 Page 1 J1 Form - Worksheet A boiler Tony Ledo Phone: 783-229-4252 Job: Date: By: Supporting Detail Project Name: Steeplechase Load Date: Address: 4871 Steeplechase Way, Eagan, mn Phone: Job ID: Worksheet A Location and Design Conditions Weather Location: Minneapolis -St Paul Intl Arp, MN, US Elevation = 837 Latitude = 45 Indoor Conditions, Heating: DB = 80 °F RH = 30 % Indoor Conditions, Cooling: DB = 75 °F RH = 50 % Table 1 Conditions 99% DB = -15°F 1% DB = 88 °F Grains Difference = 31 gr/lb Daily Range = M Design Temperature Differences HTD = 95 °F CTD = 13 °F Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -. -, Right -Suite® Universa12019 19.0.12 RSU16575 G:lbinder heating\Steeplechase Load.rup Cak = MJ8 Front Door faces: S 2020-Nov-27 08:13:10 Page 2 J1 Form - Worksheet A forced air Tony Ledo Phone: 763-229-4252 Job: Date: By: Supporting Detail Project Name: Steeplechase Load Date: Address: 4871 Steeplechase Way, Eagan, mn Phone: Job ID: Worksheet A Location and Design Conditions Weather Location: Minneapolis -St Paul Intl Arp, MN, US Elevation = 837 Latitude = 45 Indoor Conditions, Heating: DB = 72 °F RH = 30 % Indoor Conditions, Cooling: DB = 75 °F RH = 50 % Table 1 Conditions 99% DB = -15°F 1% DB = 88 °F Grains Difference = 31 gr/lb Daily Range = M Design Temperature Differences HTD = 87 °F CTD = 13 °F Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. rightsol`t' „„g3 Right -Suite® Universal 2019 19.0.12 RSU16575 G:lbinder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:10 Page 3 Manual S Compliance Report boiler Tony Ledo Phone: 763-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Cooling Equipment Design Conditions Outdoor design DB: 87.9°F Outdoor design WB: 72.3°F Indoor design DB: 75.0°F Indoor RH: 50% Sensible gain: 7505 Btuh Latent gain: 9881 Btuh Total gain: 17386 Btuh Estimated airflow: 76 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Manufacturer: Model: Actual airflow: 76 cfm Sensible capacity: 0 Btuh 0% of load Latent capacity: 0 Btuh 0% of load Total capacity: 0 Btuh 0% of load SHR: 0% Entering coil DB: 0°F Entering coil WB: 0°F Heating Equipment Design Conditions Outdoor design DB: -15°F Indoor design DB: 80.0°F Heat loss: 27998 Btuh Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas boiler Manufacturer: IBC Technologies, I Model: SL 10-85G3 Actual airflow: 0 cfm Output capacity: 78000 Btuh 279% of load Meets all requirements of ACCA Manual S. Entering coil DB: 80.0°F �'1�A Right -Suite® Universal 201919.0.12 RSU16575 G:tbinder heatingtSteeplechase Load.rup Calc = MJB Front Door faces: S 2020-Nov-27 08:13:10 Page 1 Manual S Compliance Report forced air Tony Ledo Phone: 783-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Cooling Equipment Design Conditions Outdoor design DB: 87.9°F Outdoor design WB: 72.3°F Indoor design DB: 75.0°F Indoor RH: 50% Sensible gain: 25960 Btuh Latent gain: 5541 Btuh Total gain: 31500 Btuh Estimated airflow: 1253 cfm Entering coil DB: 76.6°F Entering coil WB: 63.8°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split AC Manufacturer: Lennox Model: XC14-042-230A**+L*48/60Y9+EL296UH090XE48C* Actual airflow: 1253 cfm Sensible capacity: 29400 Btuh 113% of load Latent capacity: 12600 Btuh 227% of load Total capacity: 42000 Btuh 133% of load SHR: 70% Heating Equipment Design Conditions Outdoor design DB: -15°F Indoor design DB: 72.0°F Heat loss: 54378 Btuh Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: Lennox Model: EL296UH090XE48C-* Actual airflow: 1253 cfm Output capacity: 85000 Btuh 156% of load Meets all requirements of ACCA Manual S. Entering coil DB: 68.7°F Temp. rise: 50 °F Right -Suite® U niv ersal 2019 19.0.12 RSU16575 G:lbinder heating \ Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:10 Page 2 DHW Report Entire House Tony Ledo Phone:763-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Criteria Occupants Age Number 0-5 0 6-13 2 14-59 2 60+ 0 Not occupied during the day Dishwasher Clothes washer Additional use (gpd) 0 Setpoint (°F) 120 Daily use (gpd) 61 Gas conventional (40 gal, 0.60 EF) Manufacturer Trade name Model AHRI ref. number Tank size (gal) Energy factor Input (MBtuh) 1st hour (gal) Recovery eff. (%) 40 0.60 0.0 60 77 wiright soft*Right-Suite® Universal 2019 19.0.12 RSU16575 G:lhinder heatinglSteeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:10 Page 1 DHW Report boiler Tony Ledo Phone: 763-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Criteria Occupants Age Number 0-5 0 6-13 2 14-59 2 60+ 0 Not occupied during the day Dishwasher Clothes washer Additional use (gpd) Setpoint (°F) 120 Daily use (gpd) 61 0 Gas conventional (40 gal, 0.60 EF) Manufacturer Trade name Model AHRI ref. number Tank size (gal) Energy factor Input (MBtuh) 1st hour (gal) Recovery eff. (%) 40 0.60 0.0 60 77 wigh rlarlgt* Right -Suite® Universa1201919.0.12 RSU16575 G:tbinder heating\Steeplechase Load.rup Cale = MJ8 Front Door faces: S 2020-Nov-27 08:13:10 Page 2 DHW Report forced air Tony Ledo Phone: 763-229-4252 Job: Date: By: Project Information For: Anand Residence, Binder Heating 4871 Steeplechase Way, Eagan, mn Design Criteria Occupants Age Number 0-5 0 6-13 2 14-59 2 60+ 0 Not occupied during the day Dishwasher Clothes washer Additional use (gpd) Setpoint (°F) 120 Daily use (gpd) 61 0 Gas conventional (40 gal, 0.60 EF) Manufacturer Trade name Model AHRI ref. number Tank size (gal) Energy factor Input (MBtuh) 1st hour (gal) Recovery eff. (%) 40 0.60 0.0 60 77 wricghtsoft- Right-Suite®Universa12019 19.0.12 RSU16575 G:lbinder heating\Steeplechase Load.rup Calc = MJ8 Front Door faces: S 2020-Nov-27 08:13:10 Page 3 Residential Plans Examiner Review Form for HVAC System Design (Loads, Equipment, Ducts) Contractor. Mechanical license: Building plan #: Home address (Street or Lot#, Block, Subdivision): Tony Ledo Header Information REQUIRED ATTACHMENTS Manual J1 Form (and supporting worksheets): or MJ1AE Form* (and supporting worksheets): OEM performance data (heating, cooling, blower): Manual D Friction Rate Worksheet: Duct distribution sketch: 4871 Steeplechase Way, boiler Form RPER 1 15 Mar 09 ATTACHED Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ HVAC LOAD CALCULATION (IRC M1401.3) Design Conditions Winter Design Conditions Outdoor temperature: Indoor temperature: Total heat loss: Summer Design Conditions Outdoor temperature: Indoor temperature: Grains difference: Sensible heat gain: Latent heat gain: Total heat gain: -15 °F 80 °F 27998 Btuh 88 °F 75 °F 31 gr/Ib @50% RH 8079 Btuh 10636 Btuh 18715 Btuh Building Construction Information Building Orientation: Front Door faces South North, East, West, South, Northeast, Northwest, Southeast, Southwest Number of bedrooms: Conditioned floor area: Number of occupants: Windows Eave overhang depth: Internal shade: Blinds, drapes, etc. Number of skylights: 0 1850 ft2 0 0 ft none 0 HVAC EQUIPMENT SELECTION (IRC M1401.3) Heating Equipment Data EcFuitmce, puentrt u pe mp, Bdler, etc. Model: Gas boiler IBC Technologies, Inc. SL 10-85G3 Heating output capacity: Tw Btuh Heat mps - capacny at winter design outdoor co Ilion Aux. heating output capacity: 0 Btuh Cooling Equipment Data EquippmenRlot ttype: Ir ondHeat pump, etc. Model: Total cooling capacity: Sensible cooling capacity: Latent cooling capacity: O Btuh O Btuh O Btuh Blower Data Heating cfm: 0 Cooling cfm: 76 Static pressure: 0 in H2O Fan's rated external static pressure for design airflow HVAC DUCT DISTRIBUTION SYSTEM DESIGN (IRC M1601.1) Design airflow: Equipment design ESP: Total device pressure losses: Available static pressure (ASP): 76 cfm 0 in H2O O in H2O O in H2O Longest supply duct: 0 ft Longest return duct: 0 ft Total effective length (TEL): 0 ft Friction rate: 0 in/100ft Friction Rate a ASP • (TEL x CO)1 Duct Materials Used Trunk duct: Branch duct: Sheet metal I declare the load calcunation. equipmentequipment selection and duct design ,..,ere rigorously performed based on the building plan listed above. I understand the claims made on these ill be subject to revie., and verification. Contractor's printed name: Contractor's signature: Date: Reserved for County. To',,n Municipality at Authority having jurisdiction use. *Home qualifies for MJ1AE Form based on Abridged Edition Checklist Right -Suite® Universal 2019 19.0.12 RSU16575 Residential Plans Examiner Review Form for HVAC System Design (Loads, Equipment, Ducts) Contractor: Mechanical license: Building plan #: Home address (Street or Lot#, Block, Subdivision): Tony Ledo Header Information REQUIRED ATTACHMENTS Manual J1 Form (and supporting worksheets): or MJ1AE Form* (and supporting worksheets): OEM performance data (heating, cooling, blower): Manual D Friction Rate Worksheet: Duct distribution sketch: 4871 Steeplechase Way, forced air Form RPER 1 15 Mar 09 ATTACHED Yes ❑ No ❑ Yes ❑ No 0 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ HVAC LOAD CALCULATION (IRC M1401.3) Design Conditions Winter Design Conditions Outdoor temperature: Indoor temperature: Total heat loss: Summer Design Conditions Outdoor temperature: Indoor temperature: Grains difference: Sensible heat gain: Latent heat gain: Total heat gain: -15 °F 72 °F 54378 Btuh Building Construction Information Building Orientation: Front Door faces South North, East, West, South, Northeast, Northwest, Southeast, Southwest Number of bedrooms: Conditioned floor area: Number of occupants: 88 °F 75 °F Windows 31 grub @50% RH Eave overhang depth: 27944 Btuh Internal shade: 5964 Btuh Blinds, drapes, etc. 33908 Btuh Number of skylights: 3 3896 ft2 4 0 ft none 0 eve Depth VU1rIsw HVAC EQUIPMENT SELECTION (IRC M1401.3) Heating Equipment. Data Ec uiipment t pe: Gas furnace u ace, mp, Boller, etc. Model: Lennox EL296UH090XE48C Heating output capacit : udloo7coXd Btuh Heat mps - capa at nter design o Idons Aux. heating output capacity: 0 Btuh Cooling __Equipment Data Ea trtondltlonet, Heat pump, etc. Blower Data Split AC Heating cfm: 1253 Cooling cfm: 1253 Model: Lennox Static pressure: 0.50 in H2O XC14-042-230A'* Fan's rated external static pressure for design Total cooling capacity: Sensible cooling capacity: Latent cooling capacity: O Btuh O Btuh O Btuh airflow HVAC DUCT DISTRIBUTION SYSTEM DESIGN (IRC M1601.1) Design airflow: 1253 cfm Equipment design ESP: 0.50 in H2O Total device pressure losses: 0 in H2O Available static pressure (ASP): 0.50 in H2O Longest supply duct: 0 ft Longest return duct: 0 ft Trunk duct: Total effective length (TEL): 0 ft Frictio Frrato Rale•ASP+tTELx10Di0 in/100ft Branch duct: Duct Materials Used Sheet metal I declare the load cacu'ation. equipment equipment selection and duct design .vere rigorousperformed based on the building plan isted above. I understand the claims made on these 'of ms will be subject to re.ie :v and verification. Contractor's printed name: Contractor's signature: Date: Reserved for County- To An Municipality or Authority having jurisdiction use. •Home qualifies for MJ1AE Form based on Abridged Edition Checklist Right -Suite® Universal 2019 19.0.12 RSU16575 lower level pool multi/stor/mech Job #: Performed for: Anand Residence 4871 Steeplechase Way Eagan, mn Tony Ledo Phone: 763-229-4252 Scale: 1 : 100 Page 1 Right -Suite® Universal 2019 19.0.12 RSU16575 2020-Nov-27 08:13:43 ...er heating\Steeplechase Load.rup main floor main floor garage Job #: Performed for: Anand Residence 4871 Steeplechase Way Eagan, mn Tony Ledo Phone: 763-229-4252 Scale: 1 : 100 Page 2 Right -Suite® Universal 2019 19.0.12 RSU16575 2020-Nov-27 08:13:43 ...er heating\Steeplechase Load.rup upper level upper level L I Job #: Performed for: Anand Residence 4871 Steeplechase Way Eagan, mn Tony Ledo Phone: 763-229-4252 Scale: 1 : 100 Page 3 Faght-Suite® Universal 2019 19.0.12 RSU16575 2020-Nov-27 08:13:43 ...er heating\Steeplechase Load.rup City Inspection Dept. Copy City Forester Copy Applicant/Builder Copy EAGAN INDIVIDUAL RESIDENTIAL LOT TREE PRESERVATION PLAN SUMMARY CITY OF EAGAN FORESTRY DIVISION 651-675-5300 (BUILDER, PLEASE READ ATTACHMENTS) Development Stone Run Lot Number Address Builder 6 Block Number 1 4871 Steeplechase Way SD Custom Homes Phone Number: 651-994-3997 Contact: Sean Tree Protection Requirements: Tree Protection Fencing Installed on Site (Erosion tubes) Oak Tree Pruning (Immediately seal wounds during April 1 to July 31) Therapeutic Pruning Required Retaining Wall To Be Installed X Not Required/Other: No Significant Vegetation on Site Replacement Trees: Not Required As Follows: Two (2) Category A trees (>= 4" caliper deciduous trees per approved Tree Mitigation Plan. One (1) 4.0" Swamp White Oak and one (1) 4.0" Legend linden tree to be installed in front yard following construction. Attachments: X Yes (Refer to attach No Additional Notes: ocu GA .,EQRESTRY DIVISION REVIEWED ojc,. BY ADa' s IN/#1a.L6. DATE l- s v zo v © LANDFORM 2020 CERTIFICATE OF SURVEY FOR: SD CUSTOM HOMES PROPERTY DESCRIPTION Lot 6, Block 1, STONE RUN, Dakota County, Minnesota IP SEEIP FD 1033.4 10 N89°45'06"E 85.40 - ^ DRAINAGE&UTILITY EASEMENT- / 1030 EXISTING�� � 4ING WALL 5 WEN ( 101g3 N. \ ' .4- 30.07 04, 07)4 1 O C!) Ex Building GFE-1017.4 SI S �O� 7p74Bi i r v T L=10.79 R=100.00 =6°11'04" PROPOSED ELEVATIONS Top of Foundation Garage Floor Basement Floor Aprox. Sewer Service Proposed Elev. Existing Elev. Drainage Directions Denotes Found Iron Pipe Denotes Set Iron Pipe Denotes Offset Hub = 1022.8 = 1022.4 = 1013.1 = Verify 1123.4 = x1234 = to O = a N89°4 4871 EEPLECHAS WAY t. Orm•and Seem F•sh•ee reinstated service meekc of land= Ptolessiond Services. LtC. PROPERTY ADDRESS 4671 Steeplechase Way, Eagan, MN 1036 1024 1- "'23.00 I ET Ex. Building TOTAL AREA =12,042 SF. BENCHMARK, Front Offsets MIN. SETBACK REQUIREMENTS Front - 30 Ft. House Side - 10 Ft. Rear - 15 Ft. Garage Side - 5 Ft. • IP FD NORTH 0 30 SCALE IN FEET herehY seats Mat this sway, plan Se report was prepared ay me Or under my (tired supervision and tat 1 am a duly licensed Lard Surveyor' under the lane of the State or Mrnasota Date: 1010712020 • • 105 South Fifth Avenue • • Suite 513 L A N OF ORM • Minneapolis, MN 55401 From Site Fmieh • Web: landform.net jot No. SGf20001 Crawulu. VSURv'5p1101°9 Bp e.1c m D Gs z CO CD 0 CD \ ' LP av rl —. pp 7.13 NM'104 ..E s 411 F WA? g STldPLb1CHASC T A a•..••�. , \ \ ;ge: y" C a«l ..__._I _ %!: m' -e "- j e4v \\ 11 IE'� `� -1 -J▪ w g : p 1 1 a z• Lailys '-' b"L -. _ fn.., .. Y/� L _ws• w•,•Y• J r- -_ 1 1 } g <gI i' ! tcni+ii/� "' tJ ' �+�s�\ I * 1 1 4g= _ IIro. ii P jei/ Cu l lfi s ���v I I :.,s3 at3a q °s/// �Q II1 6' 1 _ n•°CI _g �E 1 Y E a i Tos-_ 1 i -f piyao—__�i •ram _ - ..:� 1. il Parcel a �+ - SJy%14, ! 8 f 1 _ _ _ ;} T? KNOB F ROAD t 1 .t _ 111 .is 1 a. »T i IJA};pT::• COUNTY ROAD WAY MAP Hfl. flii: - _ ��I I If sif. If i.WtSLt•ts'ItY r 1 p �; S.li r'a R( ;Tr PILOT '.�ND'11. -�A^ x.n NO. 'i F! 'as 11 . • •' i _ ' •- 1aw.w N cws Ms 1• x 0,..1133 110 Q• _ f k pe.s BEit ill— r --- f a {E 1 ay Ca &s�3 Ca i Z :a IllIal l ia F>Q;�� 73.7E �Y3' •' :' i'i i: lil l s a F g9t 4 �Y i } sE a 5g Y_ f)��q ;5Il �� 40 i[ 7 tt ?�" 9 a 7s� t � 13og1 r1< .i C 111 s l i Uhf }' a IgiTsR wtippiaL'1[i55lii `i■fl 3 �g i3�p frill ff�7■ �= 9 ill -oli gill !hi 11 11 i } i ix sZ lilt 1C 4 i d9 dgr1, `II 14 ty TA 4JY 124 E' a 3g-� Y e- e R [% ifalii fttl3:I3 ii igt e :g a E�,A S Li o 8 .,toleichuu 1LUaA: 1 0 10* 0* %1;" c5\ v c31 2.0 20 20 go Q0 'ZS 2 m to t U O • z ❑`' ❑ ❑ O ❑ ❑ O ❑ ❑ 0 ❑ ❑ O ❑ ❑ O ❑❑ O ❑❑ O ❑ ❑ 0❑❑ O ❑❑ 0 ❑ ❑ O ❑❑ 0❑❑ O ❑ ❑ O ❑ ❑ ❑ 0❑ ❑ 0 ❑ O ❑❑ O ❑❑ O ❑ ❑ O ❑❑ 0 ❑ ❑ No ❑ 0 ❑ ❑ 0❑ ❑ 0❑ ❑ 0 ❑ ❑ 0❑ ❑ 0 ❑ No No O ❑ ❑ O ❑ ❑ O ❑❑ O ❑ ❑ O ❑❑ 0❑❑ PROPERTY LEGAL: LOT SURVEY CHECKLIST FOR RESIDENTIAL BUILDING PERMIT APPLICATION Lot 6, Block 1, Stone Run LP 584t g 1 SS-eerizc DATE OF SURVEY: 10/7/2020 LATEST REVISION: 11/5/2020 DOCUMENT STANDARDS • Registered Land Surveyor signature and company • Building Permit Applicant • Legal description • Address • North arrow and scale • House type (rambler, walkout, split w/o, split entry, lookout, etc.) • Directional drainage arrows with slope/gradient % • Proposed/existing sewer and water services & invert elevation • Street name • Driveway (grade & width - in R/W and back of curb, 22' max.) • Lot Square Footage • Lot Coverage ELEVATIONS Existing • Property corners • Top of curb at the driveway and property line extensions • Elevations of any existing adjacent homes • Adequate footing depth of structures due to adjacent utility trenches • Waterways (pond, stream, etc.) Proposed • Garage floor • Basement floor • Lowest exposed elevation (walkout/window) • Property corners • Front and rear of home at the foundation • PRV Required PONDING AREA (if applicable) • Easement line • NWL • HWL • Pond # designation • Emergency Overflow Elevation • Pond/Wetland buffer delineation • Shoreland Zoning Overlay District • Conservation Easements DIMENSIONS • Lot lines/Bearings & dimensions • Right-of-way and street width (to back of curb) • Proposed home dimensions including any proposed decks, overhangs greater than 2', porches, etc. (i.e. all structures requiring permanent footings) • Show all easements of record and any City utilities within those easements • Setbacks of proposed structure and sideyard setback of adjacent existing structures • Retaining wall requirements: Reviewed By: Dave Westermayer Date 11 /5/2020 G:/1 Engineering/Forms/Cert. of Survey Checklist Fillable 6-28-19 CERTIFICATE OF SURVEY FOR: SD CUSTOM HOMES © LANDFORM 2020 PROPERTY DESCRIPTION Lot 6, Block 1, STONE RUN, Dakota County, Minnesota 3:1 Maximum Slope3 or fwining Wall Will Be Required IP SET«IP FD 1033.4 10 /Oo, EXISTING JING WALL N89°45'06"E 85.40 DRAINAGE & UTILITY EASEMENT W N 90l t11��B: r— \M 4. 30.07 3 o � S Co I i -/14.6j lo/ 13 of I / o L_ Ex. Building GFE-1017.4 1022.3 32,33 Proposed 2-Story 10'pcw N89°44 4: is 1o14gi i L=10.79 R=100.00 =6°11'04" PROPOSED ELEVATIONS Top of Foundation = 1022.8 Garage Floor = 1022.4 Basement Floor = 1013.1 Aprox. Sewer Service = Verify Proposed Elev. _ Existing Elev. = x123.4 Drainage Directions = Denotes Found Iron Pipe = • Denotes Set Iron Pipe = 0 Denotes Offset Hub = o 1123.4 Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. 4871 EEPLECHAS WAY PROPERTY ADDRESS 4871 Steeplechase Way, Eagan, MN INSTM PERIMETER CONTROL 1036 1024 BENCHMARK, 1030 By Date SET • Ex. Building V‘IF D EAGAN ENUIN kLk1N G L)LY. • IP FD COVERAGE = HOUSE ONLY 20% MAXIMUM TOTAL AREA =12,042 SF. BUILDING AREA = 2,377 SF. TOTAL COVERAGE = 19.7% Front Offsets MIN. SETBACK REQUIREMENTS Front - 30 Ft. House Side - 10 Ft. Rear - 15 Ft. Garage Side - 5 Ft. I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly licensed Land Surveyor under the laws of the State of Minnesota. NORTH 0 30 SCALE IN FEET • • 105 South Fifth Avenue • • Suite 513 LANDF ORM Minneapolis, MN 55401 From Site to Fiei Web: landform-net Larry Huh,! Date: 10/07/2020 License. No. 24332 Revised: 11/5/2020 CITY COMMENTS Job No. SDH20001 Drawing: VSURVSDH001.dwg By: BJC EAGAN GE, 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-5675 I TDD: (651) 454-8535 I FAX: (651) 675-5694 buildinclimections@cibiofeagan.com JAN 0 8 Z021 r For Office Use (n Permit #: l V L" 59 Permit Fee:1.l 1 2J 8. I - Date Received: ) 181 24 Staff: 2021 RESIDENTIAL BUILDING PERMIT APPLICATION J Date: Site Address: Unit #: Resident/ Owner Type of Work Contractor Name: Phone: 952-994-6032 Address city / Zlp: 4871 Steeplechase Way Eagan MN 55122 Applicant Is: Owner ✓ Contractor i-" I ) S' (` U Description of work: Indoor Inground Pool 10 X 3 0 Construction Cost: 60,000 Multi -Family Building: (Yes / No ✓ ) Company: Plan Concrete/ Plan Pool & Patio Contact: Courtney Dobbs Address: 13620 Georgia Drive City: Apple Valley State: MN Zip: 55124 Phone: 952-200-2819 Email: courtneyplan©gmail.com License #: Lead Certificate #: If the project is exempt from lead certification, please explain why: COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? Yes No If yes, date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer & Water Contractor: Phone: Fire Suppression Contractor. Phone: NOTE: Plans and supporting documents that you submit are considered to be public Information. Portions of the Information may be classified as nonpublic ifrmi rovide ecMc reasons that would permit the City to conclude that they are trade secrets. You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeaoan.comisubscribe.. Exterior work authorized by a building permit issued In accordance with the Minnesota State Building Code must be completed within 180 days of permit Issuance. CALL BEFORE YOU DIG. Call Gopher State One Call at (851) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.000herstatsonecali.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to sr ithout a permit; that the work will be in accordance with the approved plan In the case of work which requires a review and approval of plans. xJoseph Plan Applicant's Printed Name x ApplicSignature DO NOT WRITE BELOW THIS LINE SUB TYPES Foundation _ Fireplace Single Family _ Garage Multi _ Deck 01 of _ Plex Lower Level WORK TYPES New Addition Alteration Replace Retaining Wall 47W- DESCRIPTION Valuation Plan Review (25%_ 100% v Census Code �`' # of Units # of Buildings Type of Construction 4 8 4 ( e e,o(Q--dhcks-e� 14(5.13 _ Porch (3-Season) _ Porch (4-Season) _ Porch (Screen/Gazebo/Pergola) Pool Interior Improvement Move Building Fire Repair Repair REQUIRED INSPECTIONS Footings (New Building) Occupancy Code Edition Zoning Stories Square Feet Length Width Footings (Deck) Footings (Addition) Foundation Foundation Before Backfill Roof: _Ice & Water Final Framing 30 Minutes 1 Hour Fireplace: _Rough In _Air Test _Final Insulation Sheathing Sheetrock Fire Walls Braced Walls Shower Pan Reviewed By: RESIDENTIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC Utility Connection Charge S&W Permit & Surcharge Treatment Plant Radio Meter Read Copies TOTAL Siding Reroof Windows Egress Window Exterior Alteration (Single Family) Exterior Alteration (Multi) Miscellaneous Accessory Building Demolish Building* Demolish Interior Demolish Foundation Water Damage *Demolition of entire building - give PCA handout to applicant MCES System SAC Units City Water Booster Pump PRV Fire Suppression Required Meter Size: Final / C.O. Required Final / No C.O. Required HVAC _ Service Test Gas Line Air Test _ Hood Pool: Footings 1Air/Gas Tests "A Final Drain Tile Siding: _Stucco Lath _Stone Lath _Brick _ EFIS Windows Retaining Wall: _ Footings _ Backfill _ Final Radon Control Fire Suppression: _Rough In _Final Erosion Control Other: , Building Inspector evot p,„9--yr-Lt (doo, Page 2 of 3 PERMIT City of Eagan Permit Type:Building Permit Number:EA174718 Date Issued:02/15/2022 Permit Category:ePermit Site Address: 4871 Steeplechase Way Lot:6 Block: 1 Addition: Stone Run PID:10-72580-01-060 Use: Description: Sub Type:Fireplace Work Type:Gas Fireplace (new) Description: Census Code:434 - Residential Additions, Alterations Zoning: Square Feet:0 Occupancy: Construction Type: Comments:Improvements to the home may require smoke detectors in all bedrooms. Chimney / flue must be inspected prior to concealing. Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State Valuation: 3,000.00 Fee Summary:BL - Base Fee $3K $88.50 0801.4085 Surcharge - Based on Valuation $3K $1.50 9001.2195 $90.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Chaitanya Anand 4872 Steeplechase Way Eagan MN 55122 Glowing Hearth And Home Llc 100 Eldorado Dr. Jordan MN 55352 (952) 492-9276 Applicant/Permitee: Signature Issued By: Signature