Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1265 Town Centre Dr
EAGAN 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-5675 I TDD: (651) 454-8535 I FAX: (651) 675-5694 Plan Submittal: eplans a(�.citvofeagan.com For Office Use Permit#: Will 1 Permit Fee:15) 2- CPS, 1-8 Staff: r- Payment Recvd: _Yes _No Plans: _ Electronic _ Paper 2021 COMMERCIAL BUILDING PERMIT APPLICATION Date: 01/29/2021 Site Address: 1265 Town Centre Drive, Eagan, Minnesota 55121 Tenant Name: Associated Bank (Tenant is: ✓ New / Existing) Suite #: Former Tenant: Property Owner Name: TAMMY M. LEEMON Phone: (920) 256-0268 433 MAIN ST. GREEN BAY, WI. 54301 Address / City / Zip: Applicant is: ✓ Owner Contractor Type of Work Description of work: New Construction - Office Bank Construction Cost: 1,704,603 Contractor Name: RYAN COMPANIES License#: Address: 533 SOUTH THIRD ST. SUITE 100 City: MINNEAPOLIS State: MN Zip: 55415 Phone: (612) 492-4204 Contact: CHAD LOCKWOOD Email: CHAD.LOCKWOOD@RYANCOMPANIES.COM Architect/Engineer = Name: RINKA + Architecture Inc. 48491 Registration #: Address: 756. N Milwaukee Street Milwaukee City: State: WI Zip: 53202 Phone: (414) 431-8101 Contact Person: JOHN FOX Email: JFOX@RINKA.COM Licensed plumber installing new sewer/water service: TBD Phone #: NOTE: Plans and supporting documents that pporti g you submit are considered to be public infom►ation. Portions of the information may classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrete-, You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeagan.comisubscribe. CALL BEFORE YOU DIG. Call Gopher State One CaII at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Pr X JOHN FOX Applicants Printed Name X Applicants Signature DO NOT WRITE BELOW THIS LINE SUB TYPES Foundation Commercial / Industrial Apartments Miscellaneous WORK TYPES New Addition Alteration Replace Salon Owner Change DESCRIPTION Valuation Plan Review (25%_ 100%_) Census Code # of Units # of Buildings Type of Construction Public Facility Accessory Building Greenhouse / Tent Antennae Interior Improvement Exterior Improvement Repair Water Damage 1 Occupancy Code Edition Zoning Stories Square Feet Length Width RE¢UIRED INSPCTIONS V — Footings New Building _ Deck Addition —7 Foundation Foundation Before Backfill Vapor Barrier Framing 30 Minutes `*/ 1 Hour Insulation Sheetrock Roof:ecking ✓Insulation _Ice & Water Final Siding: _Stucco Lath _Stone Lath _Brick_ EFIS Windows Fireplace: _Rough In _Air Test _Final Pool: _Footings _Air/Gas Tests _Final Exterior Alteration -Apartments Exterior Alteration -Commercial Exterior Alteration -Public Facility Siding Reroof Windows Fire Repair _ Demolish Building* _ Demolish Interior Demolish Foundation Retaining Wall *Demolition of entire building - give PCA handout to applicant 13 MCES System 1 ,1 iozo 1•1i4 L SAC Units b per �G7xc City Water 1 Booster Pump 2 $3 i PRV Fire Sprinklers Drain Tile Retaining Wall Erosion Control Steel Reinforcement Street/Curb Cut Inspection Other: Meter Size: Electronic Set of Final Revised Plans Final / C.O. Required Final / No C.O. Required Final CIO Inspection: Schedule Fire Marshal to be present: .O Yes No Reviewed By: , Planning New Business to Eagan: Reviewed By: /�� %�. , Building Inspector FEES Base Fee Surcharge Plan Review MCES SAC City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication Trail Dedication 4 4 4776. Water Quality Storm Sewer Trunk 782. Sewer Trunk s7o Y, a Water Trunk Street Lateral Street Water Lateral Stormwater Performance Security Landscape Security Other: cy TOTAL: 3 d S, 2 6 3_ Page 2 of 3 I(Q MCES USE: Letter Reference: 210209B4 Address ID: 744404 Payment ID: 443595 Date of Determination: 02/09/21 Determination Expiration: 02/09/23 Greetings! Please see the determination below. Project Name: Associated Bank Project Address: 1265 Town Centre Drive Suite #/Campus: N/A City Name: Eagan Applicant: Nate Swanson, Ryan Companies Special Notes: Please be aware that the demolition credit is being taken ahead of the actual building demolition and no other credit will be available. All demolitions must be reported within one month of the end of the calendar year during which the demolition permit was issued, in order for the prior use to be eligible for any credit on the property. The demolition must be properly reported on the MCES SAC-D Demolition Declaration Form. At the time of the actual building demolition note on your SAC-D form that the credit has already been applied to a new use. The City will be charged no additional SAC units for this project, as determined below. *The rules allow for these 3 net credits where the credit is from SAC paid to MCES to be left site -specific or taken community -wide. If the credit is to be taken community -wide, it must be reported and taken on the SAC -A form at the time the permit is issued for the new use. If the net credit is not taken at that time the net credits automatically stay site -specific. This project is required to be reported with your normal SAC Activity Report if a permit is issued. Charge Calculation: Office: 2473 sq. ft. @ 2650 sq. ft. / SAC = 0.93 Total Charge: 0.93 Credit Calculation: Future Demolition Town Center Professional Building (SAC 11/86) 1260 Yankee Doodle Road = 4.42 Total Credit: 4.42 Net SAC: -3.49* = 0 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions email me at: sara.running(cametc.state.mn.us. Thank you, Sara Running SAC Technician Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram 550 Robert Street North St. Paul. R1N '.3.101 -1305 Phone 651.602.1CCCi Fa.: 651.602_1550 TTY 651_291_(1.904 rnetracouncil.ong METROPOLITAN COUNCIL EAGAN ��;A�S; 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-5675 I FAX: (651) 675-5694 Email: buildinginsoections aC.citvofeagan.com Electronic Plan Submittal: eplans@cityofeagan.com RECEIVED APR 0 6 2021 r cpyita Permit#:-/K0 / t1 I Permit Fee: .../ �� ` 0 6 For Office Use Staff: r Payment Recvd: _Yes Plans: Electronic 2021 COMMERCIAL PLUMBING PERMIT APPLICATION ❑ Please submit one set of paper plans and one set of electronic plans Date: 4/6/2021 site address: 1265 Town Center Drive Tenant: o Paper 1 J Property Owner Contractor Name: Associated Bank Suite #: Name: Voson Plumbing Inc Phone: License #: 60678PM Address: 9110 Grand Ave S City: Bloomington State: MN Zip: 55420 Phone: 952-938-9300 Email: karl@vosonplumbing.com New Construction Addition Modify Space Replacement Repair Rebuild Work in Right -Of -Way Description of work: New Bank - Bathrooms, Roof Drains, Breakroom, Mechanical Room Irrigation System (I yes / _ no) (1 RPZ / _ PVB) I 1 ( • Rain sensors required on irrigation systems • Avg. GPM (2" turbo required unless smaller size allowed by Public Works) Meter Required — Call Utilities at (651) 675-5646 to verity tests passed prior to picking up meter. Domestic: Size & Type 1 Fire: 1 Average GPM High demand devices? _Yes /No COMMERCIAL FEES $60.00 Permit Fee Minimum $60.00 PVB/RPZ Permit (includes State Surcharge) Surcharge = Contract Value x $0.0005 If the project valuation is over $1 million, please call City for Surcharge $ Flushometers LYes _No Contract Value $ _. 7 0 x .015 The following fees may apply when installing a new lawn irrigation system or connecting a new water service. Contact the City's Engineering Department, (651) 675-5646, for required fee amounts. Permit Fee Surcharge TOTAL FEE Water Permit Treatment Plant Meter Fee Radio Read State Surcharge = $ TOTAL FEE You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeaoan.com/subscribe. CALL BEFORE YOU DIG. Contact Gopher State One Call at (651) 454-0002 or www.00pherstateonecall.orq for protection against underground utility damage. Contact Gopher State One Call 48 hours before you intend to dig to receive locates of underground utilities. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. 9` alLt Y o-- x Karl Voss Applicant's Printed Name Applicant's Signature FOR OFFICE USE Required Inspections; r Under Ground Meter Related Items: Approved By Date: f I Rough -In Test as Test „ al PRV Required: _ Yes Meter Size Radio Read ' - Manometer Staff: Water Meter Fees Meter Size'' 3/4" 1" Fee $300.00 $380.00 1-1/2" $1,380.00 2" $1,600.00 3" $2,000.00 4" 6" $3,500.00 $6,500.00 Radio Meter Read $205.00 Additional Information • Radio Meter Reads are required on all new single-family, multi -family and commercial buildings. Boulevard irrigation systems may also require a radio read. • RPZ's must be tested every year and rebuilt every five years. RPZ testing is submitted directly Online at www.oethydrosoft.com. Please call Hydrosoft customer service at (844) 493-7641 or email infoCa�hydrocoroinc.com. • A minimum permit fee is required per address for the following RPZ's: new, rebuild, repair, & remove. • Water meters include copper horn / strainer, remote wire, and touch -pad meter. • To schedule an inspection of the inside water line and backflow preventer, call the City of Eagan Building Inspections Division (651) 675-5675. • To arrange for water turn -on, call City of Eagan Utilities Department at (651) 675-5200. 3830 PILOT KNOB ROAD I EAGAN, MN 55122 (651) 675-5675 I FAX: (651) 675-5694 buildinginspectionsaC�citvofeagan.com If you have a hearing or speech disability, contact us through your preferred telecommunications relay service. r EAGAN 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-5675 I FAX: (651) 675-5694 Email: buildinainspections@dtvofeagan.com Electronic Plan Submittal: eplans©cityofeagan.com APR 13 202i For Office Use _ L�- Permit #: 1 b -f I �-G Permit Fee: /( / ` Staff: Payment Recvd: Yes TNo Plans: V �% Electronic V Paper 1 J � 2021 COMMERCIAL MECHANICAL PERMIT APPLICATION LI Please submit one set of paper plans.and one set of electronic plans Date: 4/-17" 'J0?/ Site Address: M65 /e'zur, ( .i -,c 4.-7 1° Tenant: Suite #: owner Name: SS'D'G/Q4 g )i7/ Phone: Address / City�/ Zip: Contractor , �A /''t Name: //<.r h l� l'/P_pleis-//Cd1y/n License #: 111..e, OD .7)19 LI. Address: 757S FcJ//a.,-- ,-t City: Fehy7 /4/0`' State: v'" Zip: S3 V7 Phone: Ci So7'9.1 y� 39'9 Contact: ,./ei vi tVe-a C Email:j(Z.FC:V/2140.../PchoW;Gej,-n-1 eL7 Type of Work New Replacement dditional Alteration Demolition Description of work: NOTE: Roof mounted, and ground mounted mechanical equipment is required to be screened by City Code. Please contact the Mechanical Inspector for information on permitted screening methods. Permit Ty �ll ( COMMERCIAL Construction Interior Improvement nv ., /®q, 'P Q�New ,a• �� Processed r `/ i// f ./-' �!r Install ing ; ; "7� A- P Gas S�O� ii Exterior HVAC Unit Under/Above ground Tank ( Install / Remove) COMMERCIAL FEES $60.00 Permit Fee Minimum Contract Value $ 7-7 / j 009 x .015 $75.00 Underground tank Surcharge = Contract Value If the project valuation is over removal, includes State Surcharge = $ 1/55 -- Permit Fee S� Surcharge = $ x $0.0005 /�C87 $1 million, please call for Surcharge = $ / / / 3 sd TOTAL FEE You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www,citvofeagan.com/subscribe. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is no tart without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. ,- x J,% 2 (/ e-e____- Applicant's Printed Name FOR OFFICE USE Required Inspection Underground _ ough In JrATest ( Gas Service Test in floor Heat -- Final, _41 HVAC Scree ng itade, cant's S' nature Project: System: Associate Bank RTU -1 -� Allan Technician: James Bannie Model number: RN010 Manufacturer: Aaon Total Design CFM: 3720 cfm Fan Static Pressure: 1.3 Date: 8/13/2021 Mechanical Inc. System Scheduled Data Model number: RN010 Manufacturer: Aaon Total Design CFM: 3720 cfm Fan Static Pressure: 1.3 Outlet Total CFM: 3695 Equipment Location: Hanging Inside Performance Data Description Motor HP: Motor RPM: Motor Hertz: Motor Service Factor: Motor Phase: Motor Voltage: Motor Amperage: Motor BHP: Fan RPM: Scheduled / Submittal Data 3 HP 3 Phase 208 Airflow Measurements Opening No. Area Served Size Scheduled Value CFM Final Reading CFM % VAV 1-1 1 Seating 110 105 95% 2 3 VAV 1-2 Teller 110 110 100% Teller 110 110 100% 1 2 VAV 1-3 1 VAV 1-4 1 2 VAV 1-5 1 2 Seating 165 165 100% Teller 165 160 97% Office 435 430 99% Office 360 350 97% Office 360 355 99% Office 360 365 101% Office 360 360 100% VAV 1-6 1 VAV 1-7 Conference Room 550 545 99% 1 2 VAV 1-8 1 VAV 1-9 1 Breakroom 310 310 100% Corridor 100 105 105% Teller 75 80 107% Drive Thru 150 145 97% 3720 3695 99% Project: Associate Bank System: EF -1 Technician: James Bannie Date: 8/13/2021 Allan ..,— Mechanical Inc. System Scheduled Data Model number: SQ -85 -VG Manufacturer: Greenheck Outlet Total CFM: 310 Total Design CFM: 300 cfin Equipment Location: Hanging Inside Fan Static Pressure: .5" Performance Data Description Scheduled / Submittal Data Motor HP: 1/10 Motor RPM: Motor Hertz: Motor Service Factor: Motor Phase: Motor Voltage: 120-1-60 Motor Amperage: Motor BHP: Fan RPM: 1640 Airflow Measurements Opening Area Size Scheduled Value Final Reading No. Served CFM CFM % 1 MENS 6" 75 80 107% 2 WOMENS 6" 75 75 100% 3 Mechanical Room 150 155 103% 310