Loading...
855 Vikings PkwyEAGAN 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651') 675-5675 J TDD: (651) 454-8535 I FAX: (651) 675-5694 Plan Submittal: eolansOcitvofeaoan.com For Office Use / ,, Permit #: (to7 I -1 lip Permit Fee: /?6 , /b7 v Staff Payment Recvd: _Yes No Plans'✓ Electronic ._ Paper 2021 COMMERCIAL BUILDING PERMIT APPLICATION Date: 2/24/2021 Site.Address: 855 Vikings Parkway Eagan, MN 55121 U t, l c 'i n3 Tenant Name:. TBD (Tenant is: New / Existing) Suite#: 3-4 %Z / 6.0 3 Former Tenant: Name: Venstar LLG Phone: 952-924-0215 Address t City / zip: 7803 Glenroy RD Suite 104 Bloomington, MN 55413 Applicant Is: X Owner Contractor Description of work: New. construction'whkh Includes site preparations for'3 oomrnercial buildir ps with`masonary veneer and steel, stud shell, build oldsby tenants, upgraded site amenities are required, Construction Cost: " (, / 5 (1, t3 5 Name: Shaw -Lundquist Address: 2757 West Service. Road city St. Paul State::, MN zip: 55121 Phone:;651-600-1.530 Contact: Jon Frisb Email: *frith @shawlund • uist.com Name: RSP Architects, Ltd Zip: 55413 Contact Person: Deb Wilson Registration #: 1406 Address: 1220.Marshall Street NE city; Minneapolis Phone: 612-677-7100 Email deb.wilson • : rs • arch.com State: MN License #: 008851 Licensed plumber installing sewer/water service .Phone # You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the city* website at www.citvofeettan.comfriubscrIbe. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.aooherstateonecall,orq 1 hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that l understand this is not a permit, but only an application fora permit, and work is not to start without a permit; that the wort will be in accordance with the approved plan in the case of work which requires a review and approval o/ plans. x • Applicant's Printed ame DO NOT WRITE BELOW THIS LINE /67/ % Gi 055 U-Ki`/I95 4) SUB TYPES _ Foundation Public Facility Exterior Alt ration -Apartments yCommercial / Industrial Apartments Miscellaneous Antennae WORK TYPES New Addition Alteration Replace Salon Owner Change Accessory Building Greenhouse / Tent Interior Improvement Exterior Improvement Repair Water Damage DESCRIPTION Valuation y 759 80 Occupancy Plan Review • e./ Code Edition (25%_ 100% VI) Zoning Census Code Stories # of Units Square Feet # of Buildings t� d Length Type of Construction .1 B Width REQUIRED INSPECTIONS Footings New Building _ Deck _ Addition �c Foundation Foundation Before Backfill Vapor Barrier Framing 30 Minutes C 1 Hour Insulation Sheetrock Roof: yC Decking < Insulation _Ice & Water )' Final Siding: _Stucco Lath _Stone Lath Brick _ EFIS Windows Fireplace: _Rough In _Air Test _Final Pool: _Footings Air/Gas Tests _Final Final C/O Inspection: Schedule Fire Marshal to be present: Exterior Alteration -Commercial Exterior Alteration -Public Facility Siding Reroof Windows Fire Repair Demolish Building` _ Demolish Interior Demolish Foundation Retaining Wall *Demolition of entire building - give PCA handout to applicant sLal 7eZ 6 *)gG MCES System SAC Units City Water ( Booster Pump 9i to8 PRV Fire Sprinklers Reviewed By: Reviewed By: 1 Drain Tile Retaining Wall Erosion Control Steel Reinforcement Street/Curb Cut Inspection Other: Meter Size: Electronic Set of Final Revised Plans Final / C.O. Required Final / No C.O. Required Yes No Planning New Business to Eagan: , Building Inspector FEES Base Fee Surcharge Plan Review MCES SAC City SAC 6,996,E Boy 9 •5. s• 3e 6. S a29.121' go, 1r • S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) . Ar` Park Dedication Trail Dedication •Water Quality Storm Sewer Trunk Sewer Trunk Water Trunk Street Lateral Str et t cti.% Watt, tateral 2< q 68, Stormwater Performance Security 98 el- &I", Landscape Security 2 9 Ss`/,'. Other: li'ede G�ec��twt•b., TOTAL: /06,47 e Page 2 of 3 ' MCES USE: Letter Reference: 20032763 Address ID: 734329 Payment ID: 432138 Date of Determination: 03/27/20 Greetings! Please see the determination below. Project Name: Spec Retail — Building A Project Address: 855 Vikings Parkway Suite #/Campus: Building A City Name: Eagan Applicant: Erin Suarez, Venstar Determination Expiration: 03/27/22 Special Notes: The Council understands this building has speculative retail. At the time the finishing permits are issued, a SAC determination will be required. Charge Calculation: Retail - Speculative: 8603 sq. ft. @ 3050 sq. ft. / SAC = 2.82 Total Charge: 2.82 or 3.00 Credit Calculation: N/A Total Credit: 0 Net SAC: 3.00 = 3 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions email me at: toni.lanzig@metc.state.mn.us. Thank you, Toni Janzig SAC Technician Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram 390 Hobert Street North I St. Paul. t.1N 55101 1805 Phoney 651 .602.1000 I Fax 60 1.0'7? 1550 I TIN r 51 291.0904 I tr<jrq METROPOLITAN