Loading...
E-mail to the contractor to tie it all together, Feb 13, 2020 Sarah Brandel From:Jeffrey Wheeler Sent:Thursday, February 13, 2020 11:27 AM To:Nathaniel Bliss; Derek Phillips (derek@SafeHavenSE.com) Cc:onsolidrock@comcast.net Subject:RE: 752 engineering reveiw Attachments:SKM_C654e20021311400.pdf Good morning Nathaniel: Thanks you for providing the letter from Larson Engineering. There were a couple of items that were not covered from the original correction for the sheathing inspection. 1) the vertical joint in the 3’ wide Type 11, portal frame panel at the rear of the great room. 2) The reduction in the 4’ width of the Type 12 Panel at the relocated at the rear of the exercise room. I spoke to Wayne Larson on the phone today, and have copied him on this E-mail for the record. He has verbally agreed the vertical joint in the 3’ wide, type 11 panel at the rear of the great room is not a problem as long as it on a framing member and fastened as per the perimeter fastening requirements of the original engineered design. He also agreed that the specified 4’, type 12 panel at the rear of the exercise room could be reduced to 3’ in that location. Please see the attachment for the relative locations If anyone has any questions or concerns about the above statements please reply to all. Thanks, Jeff Wheeler Jeffrey Wheeler Building Inspector 3830 Pilot Knob Rd | Eagan, MN 55122 Office: 651-675-5680 https://www.cityofeagan.com From: Nathaniel Bliss <blisshomesmn@gmail.com> Sent: Thursday, February 13, 2020 8:09 AM To: Jeffrey Wheeler <JWheeler@cityofeagan.com> Subject: 752 engineering reveiw 1 Hey Jeff! Here is the letter from Wayne C. Larson Please review Nathaniel Bliss Bliss Homes, LLC LC#BC752347 (507)649-7364 2