E-mail to the contractor to tie it all together, Feb 13, 2020
Sarah Brandel
From:Jeffrey Wheeler
Sent:Thursday, February 13, 2020 11:27 AM
To:Nathaniel Bliss; Derek Phillips (derek@SafeHavenSE.com)
Cc:onsolidrock@comcast.net
Subject:RE: 752 engineering reveiw
Attachments:SKM_C654e20021311400.pdf
Good morning Nathaniel:
Thanks you for providing the letter from Larson Engineering.
There were a couple of items that were not covered from the original correction for the sheathing inspection.
1) the vertical joint in the 3’ wide Type 11, portal frame panel at the rear of the great room.
2) The reduction in the 4’ width of the Type 12 Panel at the relocated at the rear of the exercise room.
I spoke to Wayne Larson on the phone today, and have copied him on this E-mail for the record.
He has verbally agreed the vertical joint in the 3’ wide, type 11 panel at the rear of the great room is not a problem as
long as it on a framing member and fastened as per the perimeter fastening requirements of the original engineered
design.
He also agreed that the specified 4’, type 12 panel at the rear of the exercise room could be reduced to 3’ in that
location.
Please see the attachment for the relative locations
If anyone has any questions or concerns about the above statements please reply to all.
Thanks,
Jeff Wheeler
Jeffrey Wheeler
Building Inspector
3830 Pilot Knob Rd | Eagan, MN 55122
Office: 651-675-5680
https://www.cityofeagan.com
From: Nathaniel Bliss <blisshomesmn@gmail.com>
Sent: Thursday, February 13, 2020 8:09 AM
To: Jeffrey Wheeler <JWheeler@cityofeagan.com>
Subject: 752 engineering reveiw
1
Hey Jeff!
Here is the letter from Wayne C. Larson
Please review
Nathaniel Bliss
Bliss Homes, LLC
LC#BC752347
(507)649-7364
2