3380 Central Park Village Dr - RPZ Test Results)W1 7 !S\
REGULATED BACKFLOW ASSEMBLY (RBA) TEST REPORT
24428 Greenway Avenue
Forest Lake, MN 55025
(651) 464-2988
NAME OF BUILD G, OWNER/OCCUPANT
CONTACT NAME AND PHONE NUMBER
1
c- , 2-L L� ' t_
ADDRESS
CITY
S ATE
ZIP CODE
APPLICANT COMPANY NAME
CONTRACTOR LICENSE #
CONTA T NAME AND PHONE NUMBER
Commercial Plumbing & Heating, Inc.
PC643117
Melinda Wisgerhof.
ADDRESS
CITY
STATE
ZIP CODE
EMAIL
24428 Greenway Ave
Forest Lake
MN
55025
mwisgerhof@cpandh.com
TESTER NAME
TESTER CERTIFICATION #
PHONE
Ben Theis
BF064401
612-834-2743
TEST EQUIPMENT MANUFACTURER
TEST EQUIPMENT MODEL#
TEST EQUIPMENT SERIAL#
TESTING EQUIPMENT CALIBRATION DATE
Wilkins
TG-3
6)9150677
3/13/20
TYPE OF WORK AND FEE INFORMATION (check one)
_Install _Relocate _Remove Replace and SN# of Replaced Device r J-%\
Rebuild Test
BACKFLOW ASSEMBLY DETAIL INFORMATION
Type (check one): Reduced Pressure Principal or Pressure Principal Fire Protection _Reduced Pressure Detector Fire Protection
_Double Check Valve_Double Check Detector Fire Protection_Pressure Vacuum Breaker_Spill Resistant Pressure Vacuum Breaker
Manufacturer: \� Model # -( fk N12 5Terial #rgb7 j Size: (inches)
\\� -- V
System Serviced � �(I 1— \J� Location in bldd� P\ng1 ((``LL\nl oor# Room #
TEST RESULTS: Pass ❑Fail (COMPLETE APPLICABLE ASSEMBLY TYPE SECTION BELOW)
Reduced Pressure Principal or Reduced Pressure Detector Fire Protection (RP) — TEST RESULTS
Pressure Differential
Check Valve #2
Shutoff Valve #2
Check Valve #1
Relief Valve
Initial
Closed Tight
Closed Tight
Closed Tight _Yes No
Opened at
Test
_Yes _No
_Yes _No
pressure Drop Across Check Valve #1 psid
_psid
Final
Closed Tight �(
Closed TightlC Yes No
Closed Tight �Yes_No �
4ro .
Opened at
Test
_Yes _No
pressure Drop Across Check Valve #1 psid
_psid
Double Check Valve or Double Check Detector Fire Protection (DC) — TEST RESULTS
Check Valve #1
Check Valve #2
Shutoff Valve #2
Initial Test
Closed Tight _Yes No psid
Closed Tight _Yes No psid
Closed Tight _Yes No
Final Test
Closed Tight _Yes No psid
Closed Tight _Yes No psid
Closed Tight _Yes No
Pressure Vacuum Breaker (PVB) or Soill Resistant Vacuum Breaker (SRVB) — TEST RESULTS
Air Inlet Valve
Checl< Valve
Shutoff #2
Initial Test
Failed to Open _YES NO
Closed Tight YES NO
Closed Tight YES NO
Opened at psid
Pressure Drop Across Check Valve #1
Final Test
Opened at psid
Closed Tight YES NO
Closed Tight YES NO
Pressure Drop Across Check Valve #1
Describe parts and repairs when needed:
CERTIFICATION: I hereby certify the foregoing information provided by me to be correct and that the tested device is functioning in compliance with
State of Minnesota Plumbing Code, Chapter 4714.Y'-�
TESTER'S SIGNATURE: TEST DATE:
24428 Greenway Avenue
Forest Lake, MN 55025
(651) 464-2988
REGULATED BACKFLOW ASSEMBLY (RBA) TEST REPORT
NAME OF BUILD�jG, OWN R/OCCUPANT
CONTACT NAME AND PHONE NUMBER
ADDRESS CITY
s.. { C -
STATE
N/
ZIP CODE
APPLICANT COMPANY NAME
CONTRACTOR LICENSE #
CONTA T NAME AND PHONE NUMBER
Commercial Plumbing & Heating, Inc.
PC643117
Melinda Wisgerhof
ADDRESS
CITY
STATE
ZIP CODE
EMAIL
24428 Greenway Ave
Forest Lake
MN
55025
mwisgerhof@cpandh.com
TESTER NAME
TESTER CERTIFICATION #
PHONE
Ben Theis
BF064401
612-834-2743
TEST EQUIPMENT MANUFACTURER
TEST EQUIPMENT MODEL#
TEST EQUIPMENT SERIAL#
TESTING EQUIPMENT CALIBRATION DATE
Wilkins
TG-3
D9150677
3/13/20
TYPE OF WORK AND FEE INFORMATION (check one)
_Install _Relocate _Remove Replace and SN# of Replaced Device j.
Rebuild Test
BACKFLOW ASSEMBLY DETAIL INFORMATION
Type (check one): LReduced Pressure Principal or Pressure Principal Fire Protection _Reduced Pressure Detector Fire Protection
_Double Check Valve_Double Check Detector Fire Protection_Pressure Vacuum Breaker Spill Resistant Pressure Vacuum Breaker
Manufacturer: \K Na, Model # k P(%)( (V1!:; "'ierial # Size: 3 (inches)
System Serviced V� Location in bldgV--�?n1� L\ni oor # Room #
TEST RESULTS: Pass ❑Fail (COMPLETE APPLICABLE ASSEMBLY TYPE SECTION BELOW)
Reduced Pressure Principal or Reduced Pressure Detector Fire Protection (RP) — TEST RESULTS
Pressure Differential
Check Valve #2
Shutoff Valve #2
Check Valve #1
Relief valve
Initial
Closed Tight
Closed Tight
Closed Tight _Yes No
Opened at
Test
_Yes _No
_Yes _No
Pressure Drop Across Check Valve #1_psid
_psid
Final
Closed Tight es
Closed Tight Yes No
Closed Tight Yes No
40
Opened at
Test
_ _No
Pressure Drop Across Check Valve #1l_psid
_psid
Double Check Valve or Double Check Detector Fire Protection (DC) — TEST RESULTS
Check Valve #1
Check Valve #2
Shutoff Valve #2
Initial Test
Closed Tight _Yes No psid
Closed Tight _Yes No psid
Closed Tight _Yes No
Final Test
Closed Tight _Yes No psid
Closed Tight _Yes No psid
Closed Tight _Yes No
Pressure Vacuum Breaker (PVB) or Spill Resistant Vacuum Breaker (SRVB) — TEST RESULTS
Air Inlet Valve
Check Valve
Shutoff #2
Initial Test
Failed to Open _YES NO
Closed Tight YES NO
Closed Tight YES NO
Opened at psid
Pressure Drop Across Check Valve #1
Final Test
Opened at psid
Closed Tight YES NO
Closed Tight YES NO
Pressure Drop Across Check Valve #1
Describe parts and repairs when needed:
CERTIFICATION: I hereby certify the foregoing information provided by me to be correct and that the tested device is functioning in compliance with
State of Minnesota Plumbing Code, Chapter 4714.
55
,
TESTER'S SIGNATURE: TEST DATE: a "C