suite 160EAGAN
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810
(651) 675-5675 ( FAX: (651) 675-5694
Plan Submittal: eplans@cityofeagan.corn
EIVED
AUG 04 2021
For Office Use
Permit #: 131 )11 cr
Permit Fee: / 113- o(
Staff:
arar
Payment Recvd: ,-Yes _No 1
Plans: t/ Electronic Paper
2021 COMMERCIAL BUILDING PERMIT APPLICATION
Date: 5 f Ll/2 l Site Address: 1278 Town Centre Drive
Tenant Name: 5 e.\\ S pe c es
Name: EREP Eaganl, LLC
(Tenant is: ✓ New / Existing) Suite #: /40 4 1 ('$
Former Tenant: CiCi S Rza 1,,¢Iis Ci+ntss
Phone:
Address / City / Zip: 515 Congress Ave, Suite 1925, Austin TX 78701
Applicant is: Owner ✓ Contractor
Description of work: C6eP'%\5.e.. s AC € �r A w o cµA4.4"w.4-4 g
//
Construction Cost: W Sr 000_
Name: B2 Builders, LLC License #: 1R736051
Address: 11975 Portland Ave, Ste 134 city: Burnsville
State: MN Zip: 55337 Phone: 612-505-6925
Contact: Adam Beesch Email: adam@b2builders.com
Name: 1 Ok Architecture Registration #: 53728
Address: 525 15th Ave. South
City: Hopkins
State: MN Zip: 55343 Phone: 612-799-1427
Contact Person: Chad Haller Email: chad.haller@10karch.com
Licensed plumber installing new_ sewer/water service:
NOTE: Paps and suppodd ' t!tmants that Atu submit aft co iderad to be puWM k t #on Pnrtfonte ofthe J mil' no
' toconclude that.N►e1! are trttl�le si sts,
Phone #:
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at
wInw.citvofeagan.com/Subscribe.
CALL BEFORE YOU DIG. Contact Gopher State One Call at (651) 454-0002 or www.aopherstateonecall.orq for protection against underground utility
damage. Contact Gopher State One Call 48 hours before you intend to dig to receive locates of underground utAitles.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be In
accordance with the approved plan in the case of work which requires a review and approval of plans.
xAdam Beesch
Applicant's Printed Name
Applicant's Signature
Ste, 4-�s
40 /65 -
SUB TYPES
Foundation _ Public Facility
v Commercial / Industrial _ Accessory Building
Apartments Greenhouse / Tent
WORK TYPES
New
Addition
Alteration
DESCRIPTION
Valuation
Plan Review
(25% 100% ✓ )
Census Code
# of Units
# of Buildings
Type of Construction
✓ Interior Improvement
_ Exterior Improvement
Repair
65000
Occupancy
Code Edition
Zoning
Stories
Square Feet
Length
Width
REQUIRED INSPECTIONS
Footings _ New Building _ Deck _ Addition
Foundation Foundation Before Backfill
Vapor Barrier
✓ Framing 30 Minutes ✓ 1 Hour
Insulation
Sheetrock
Roof: _Decking Insulation Ice & Water Final
Siding: _Stucco Lath _Stone Lath _Brick _ EFIS
Windows
Fireplace: _Rough In Air Test _Final
Pool: _Footings _Air/Gas Tests _Final
Final CIO Inspection: Schedule Fire Marshal to be present:
Reviewed By: Erik S.
Reviewed By: Miles Johnson
FOR OFFICE USE ONLY
Site Address: 1278 Town Center
Antennae :� c Tenant: TBD
Miscellaneous
Permit #: 17179
Fire Repair
Water Damage
Retaining Wall
A-3/M
_ Demolish Building*
Demolish Interior
Demolish Foundation
*Demolition of entire building — give PCA handout to applicant
2020 MNBC
MCES System
SAC Units
City Water
Booster Pump
PRV
Fire Sprinklers
0 Demo
Drain Tile
Retaining Wall
Erosion Control
Steel Reinforcement
Street/Curb Cut Inspection
Other: Fire Stopping
Meter Size:
Electronic Set of Final Revised Plans
Final / C.O. Required
✓ Final / No C.O. Required
, Planning
✓ Yes No
New Business to Eagan: TBD
, Building Inspector
FEES
Base Fee
Plan Review
Surcharge
MCES SAC
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant (Irrigation)
Park Dedication (9328.4670)
Trail Dedication (9375.4671)
$ 794.25
$ 516.16
$ 32.50
Landscape Guarantee (9001.2257)
Tree Mitigation (9111.4677)
Tree Performance Security (9111.2257)
Stormwater Performance Security (6501.2257)
TOTAL: $ 1,342.01
�-� .. �w,
�, °,
�._
� `o
REGULATED BACKFLOW ASSEMBLY (RBA) TEST REPORT
24428 Greenway Avenue
Forest Lal<e, MN 55025
(651) 464-2988
NAME OF BUILDING, OWNER/OCCUPANT
CONTACT NAME AND PHONE NUMBER
Goldfish swim school
ADDRESS
CITY
STATE
ZIP CODE
1276 town center drive
Eagan
Mn
55123
APPLICANT COMPANY NAME
CONTRACTOR LICENSE #
CONTACT NAME AND PHONE NUMBER
Commercial Plumbing &heating, Inc.
Melinda Wisgerhof
ADDRESS
CITY
STATE
ZIP CODE
EMAIL
24428 Greenway Ave
Forest Lake
MN
55025
mwisgerhof@cpandh.com
TESTER NAME
TESTER CERTIFICATION #
PHONE
Clint Pream
BF065696
651-464-2988
TEST EQUIPMENT MANUFACTURER
TEST EQUIPMENT MODEL#
TEST EQUIPMENT SERIAL#
TESTING EQUIPMENT CALIBRATION DATE
Mid -West
845
11150355
2/2/22
Static ��ne Pressure'`64 .psi TYPE OF WORK ANDIFEE INFORMATION` Icheck one)
X
X
Install _Relocate _Remove _Replace and SN# of Replaced Device
Rebuild Test
BACKFLOW ASSEMBLY DETAIL INFORMATION
Type (check one): X Reduced Pressure Principal or Pressure Principal Fire Protection Reduced Pressure Detector Fire Protection
Double Check Valve Double Check Detector Fire Protection Pressure Vacuum Breaker Spill Resistant Pressure Vacuum Breaker
Manufacturer:Wilkins Model #975x12 Serial #ACf6418 Size:2" (inches)
System ServicedP001 fill Location in bldg.Pool mechanical room Floor# Room #
TEST RESULTS: ' Q Pass ❑Fail (COMPLETE APPLICABLE ASSEMBLY TYPE SECTION BELOW)
Reduced Pressure Principal or Reduced Pressure Detector Fire Protection (RP) —TEST RESULTS
Pressure Differential
Check Valve #2
Shutoff Valve #2
Check Valve #1
Relief Valve
Initial
Closed Tight X
X
Closed Tight_Yes_No
Closed Tight x Yes _No �j 0g
3.7
Opened psid
Test
_Yes _No
pressure Drop Across Check Valve #1 psid
Final
Closed Tight
Test
Closed Tight _Yes _No
Closed TightYes_No
_Yes _No
pressure Drop Across Check Valve #1 psid
Opened psid
Doluble Check Valve or:Double Check Detector Fire Protection"IDC) —TEST RESULTS
Check Valve #1
Check Valve #2
Shutoff Valve #2
Initial Test
Closed Tight _Yes _No psid
Closed Tight _Yes _No psid
Closed Tight Yes No
Final Test
Closed Tight Yes_No psid
Closed Tight _Yes _No psid
Closed Tight Yes No
Pressure Vacuum Breaker IPVB) or Spill. Resistant Vacuum Breaker (SRVB) —TEST RESULTS
Air Inlet Valve
Check Valve
Shutoff #2
Initial Test
Failed to Open YES NO
Closed Tight YES NO
Closed Tight YES NO
Opened at psid
Pressure Drop Across Check Valve #1
Final Test
Opened at psid
Closed Tight YES NO
Closed Tight YES NO
Pressure Drop Across Check Valve #1
Describe parts and repairs when needed:
CERTIFICATION: I hereby certify the foregoing information rovided by me to be correct at the tested device is functioning in compliance with
State of Minnesota Plumbing Code, Chapter 4714.
TESTER'S SIGNATURE: TEST DATE: 4/27/2022
r�=s�cr�°rr��: r�a►�r r�YYr
REGULATED BACKFLOW ASSEMBLY IRBA) TEST REPORT
24428 Greenway Avenue
Forest Lake, MN 55025
(651) 464-2988
NAME OF BUILDING, OWNER/OCCUPANT
CONTACT NAME AND PHONE NUMBER
Goldfish swim school
ADDRESS
CITY
STATE
155123
ZIP CODE
1276 town center drive
Eagan
Mn
APPLICANT COMPANY NAME
CONTRACTOR LICENSE #
CONTACT NAME AND PHONE NUMBER
Commercial Plumbing & heating, Inc.
Melinda Wisgerhof
ADDRESS
CITY
STATE
ININ
ZIP CODE
EMAIL
24428 Greenway Ave
Forest Lake
55025
mwisgerhof@cpandh.com
TESTER NAME
TESTER CERTIFICATION #
IBF065696
PHONE
Clint Pream
651-464-2988
TEST EQUIPMENT MANUFACTURER
TEST EQUIPMENT MODEL#
TEST EQUIPMENT SERIAL#
TESTING EQUIPMENT CALIBRATION DATE
Mid -West
845
11150355
2/2/22
StatiPLmePressuxer62 Psi TYPE OF WORK AND FEE INFORMATION (check one)
X
X
Install _Relocate _Remove _Replace and SN# of Replaced Device
Rebuild Test
BACKFLOW ASSEMBLY DETAIL' INFORMATION
Type (check one): X Reduced Pressure Principal or Pressure Principal Fire Protection Reduced Pressure Detector Fire Protection
Double Check Valve Double Check Detector Fire Protection Pressure Vacuum Breaker Spill Resistant Pressure Vacuum Breaker
Manufacturer:Wilkins Model #975XI2 Serial #Cfa5136 Size:1 /2" (inches)
System ServicedBoiler feed Location in bldg.Pool mechanical room Floor # Room #
TEST RESULTS:
0 Pass ❑Fail
(COMPLETE APPLICABLE ASSEMBLY TYPE SECTION BELOW)
Reduced' Pressure Principal or Reduced Pressure Detector Fire Protection (RP) — TEST RESULTS
Pressure Differential
Check Valve #2
Shutoff Valve #2
Check Valve #1
Relief Valve
Initial
Closed Tight X Yes No
Closed TightX Yes No
Closed Tight X Yes _No e a
Pressure Drop Across Check Valve #1
Opened 3•6 psid
Test
psid
Final
Closed Tight
Closed Tight_Yes_No
Closed Tight _Yes No
Opened psid
Test
_Yes _No
Pressure Drop Across Check Valve #1 psid
Double Check Valve
or Double Check Detector Fire Protection(DC) - TEST RESULTS
Check Valve #1
Check Valve #2
Shutoff Valve #2
Initial Test
Closed Tight _Yes _No psid
Closed Tight _Yes _No psid
Closed Tight Yes No
Final Test
Closed Tight Yes_No psid
Closed Tight _Yes _No psid
Closed Tight Yes No
Pressure Vacuum Breaker`(PVB) or Spill Resistant Vacuum Breaker (SRVB) — TEST RESULTS
Air Inlet Valve
Check Valve
Shutoff #2
Initial Test
Failed to Open YES NO
Closed Tight YES NO
Closed Tight YES NO
Opened at psid
Pressure Drop Across Check Valve #1
Final Test
Opened at psid
Closed Tight YES NO
Closed Tight YES NO
Pressure Drop Across Check Valve #1
Describe parts and repairs when needed:
CERTIFICATION: I hereby certify the foregoing informationprovided by me to be correct at the tested device is functioning in compliance with
State of Minnesota Plumbing Code, Chapter 4714.
TESTER'S SIGNATURE: TEST DATE: 4/27/2022
Report Name:
Inspection Results Grid Permit Inspection Results Page: 1
Printed: 4/28/2022City of Eagan
EA173349 - 1278 Town Centre Dr 160
Sub Type: Commercial
Work Type: Alteration
Description: 2 RPZs
Insp. Date Inspection Type Inspected By Result
04/28/2022 Final Arlen Madsen Partial Inspection
Notes:
Manometer ok
2 Rpzs tested send test report
Corrections:
1 Pipe relief on 1/2 RPZ
2 Will need hot water for final
3 Fix air gap on pool back flush
4 Label all piping
5 large 1017 mixing on gang showers
And small 1069 provide information this configuration meet 408.3
03/11/2022 Rough In Donald Harmsen Partial Inspection
Bathrooms approved.
03/11/2022 Air Test Donald Harmsen Partial Inspection
Bathrooms approved.
02/24/2022 Underground Scott Peterson Pass
02/15/2022 Underground Donald Harmsen Partial Inspection
Deep underground.