3311 Terminal Dr - Zoning Permits & Plans3830 PILOT KNOB ROAD | EAGAN, MN 55122-1810
(651) 675-5685 | FAX: (651) 675-5694 planning @cityofeagan.com
2021 ZONING PERMIT APPLICATION
Please identify improvements on a scaled site plan drawing that shows lot lines, structures, and existing
conditions.
For projects involving significant land disturbance, a Stormwater Management Permit and collection of security
may be required.
Property
Information
Site Address:
Owner Name:
Contact
Name: Phone:
Address: City/State/Zip:
Applicant Signature: Date:
Email address:
Type of Work
Retaining Wall <4 feet
Patio
Sidewalk
Driveway
Sport Court
Fence
Other: _____________________
Description of work:
Planning Setbacks, hard surface coverage, shoreland zoning, bluff zone/setbacks, etc.
Approved / Denied Date: Staff:
Notes:
Revised Plans
Approved: Yes / No Date: Staff:
Engineering Grading, drainage, utility easements, wetlands, erosion control, improvements in the Right-of-Way, etc.
Approved / Denied Date: Staff:
Notes:
Revised Plans
Approved: Yes / No Date: Staff:
Comments
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City’s website at
www.cityofeagan.com/subscribe.
CALL BEFORE YOU DIG. Contact Gopher State One Call at (651) 454-0002 or www.gopherstateonecall.org for protection against underground utility damage.
Contact Gopher State One Call 48 hours before you intend to dig to receive locates of underground utilities.
For Office Use
Permit #: _____________________
Date Received:________________
Staff: ________________________
/s/
/s/Aaron Nelson
172004
LL ....
0 N
@
PROJECT AREA: 6.711 SY
I ,
REMOVE AND
REPLACE 19 LF OF
CURB AND GUTTER
INSTALL CL
LACE 21 LF 0
B AND GUTTE ----
"---REMOVE AND
REPLACE 45 LF OF
CURB AND GUTTER
REMOVE AND
REPLACE 5 LF OF
CURB AND GUTTER
IN EACH LCOATION
/_____.
REMOVE
PLACE 100 SY
DRAIN TILE
, INSTALL 145 LF
OF DRAIN TILE
;;_5, TYPICAL -�
(THIS ROW)
I KEEP AREA BELOW
2% IN ALL DIRECTIONS I
REMOVE AND
REPLACE 36 LF OF
CURB AND GUTTER
r �N
�
GENERAL NOTES:
1.CONTRACTOR IS RESPONSIBLE FOR SEQUENCING WORK TO
ACCOMMODATE ALL PROJECT RESTRICTIONS. NO KNOWN
SPECIAL EVENTS OR RESTRICTED WORKING DAYS ARE
ANTICIPATED. CONTRACTOR SHALL COORDINATE INITIAL
SCHEDULE AND ANY CHANGES TO THE SCHEDULE WITH
BCBS AND THE PROJECT ENGINEER,
1.CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND
IMPLEMENTATION OF THE TRAFFIC CONTROL PLAN.
COORDINATE TRAFFIC CONTROL PLAN WITH BCBS, PROVIDE
NOTIFICATION TO BCBS PRIOR TO INITIAL SETUP AND PRIOR
TO ANY CHANGES TO CLOSURES AND TRAFFIC PATTERNS.
UTILITY NOTES:
1.CONTRACTOR SHALL COORDINATE UTILITY LOCATES WITH
BCBS PRIOR TO EXCAVATION.
2.SPECIAL ATTENTION SHALL BE GIVEN TO UTILITIES.
CONTRACTOR SHALL PERFORM EXCAVATION WITH CAUTION
AND NOTIFY THE ENGINEER OF ANY CONFLICTS WITH
PROPOSED IMPROVEMENTS.
3.IRRIGATION EXISTS ON THE PROJECT SITE. WORK WITH
OWNER'S IRRIGATION CONTRACTOR FOR LOCATION, AND
REPAIRS IF REQUIRED.
SKIP'S SPRINKLERS
MARK LINNEMANN -(612) 366-5674
4.COORDINATE ELECTRIC LOCATIONS THROUGH OWNER'S
ELECTRIC CONTRACTOR.
HUNT ELECTRIC
DANNY BRAATEB -(612) 940-5442
♦
C .2
..... 0 r---0 0 OJ.....N I(.) w --,
"'
0
z => 0 a::: a.
w :::,
(f) z!12 0-�z 0.. ii':
(f) 0
(f) w w Cl ct:
w
>-"'
z
c., z
<(
0 z <( ui�zuO <( (/) mZ >- w w ::;, (/) 0o_,W_j O<( Or-<( (/)
c:;j '-..
'-..
0
u_ C
' CL 0 C u_ CL
' -
�-) c,
'. l ~. I
;;;:1 � - �;
z �--,
-:-; <:::'":;
~1 "'-
I
::::::: :_·, u.:
DATE OF PREPARATION
BY DATE
SURVEYED
DRAWN LSD1 8/9/2021
DESIGNED LSD1 8/9/2021
CHECKED ACJ 8/9/2021
OVERALL SITE PLAN & EROSION CONTROL
0 15 30
PROJECT ID 21 B007.01
C1. 01
Applicant/Contractor is responsible for determining location
of property lines
The owner/applicant is responsible for compliance with
applicable construction codes