4040 Eagan Outlets Pkwy� 1
1 I
•�_• •�00
EAGAN
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810
(651) 675-5675 1 FAX: (651) 675-5694
Plan Submittal: eplansOcitvofeapan.com
U 1y. 7;
----------------
I
---------------I For Office Use
Permit #:
Permit Fee: /
I I
I I
1 Staff: I
IPayment Recvd: _Yes _No
I I
Plans:Electronic Paper I
----------------- J
2021 COMMERCIAL BUILDING PERMIT APPLICATION
Date: Dec 13 2021 site Address: 4040 Eagan Outlets Parkway Eagan MN 55122
Tenant Name: Sola Salons Studio (Tenant is: New / V( Existing) Suite #:
Former Tenant:
Name: Patrick Elgin Phone: 651.964.8317
Address/ City/ zip: PO Box 270876 St Paul MN 55127
IApplicant is: Vor Owner Contractor
Type of�Work
Description of work: New Ground up commercial building
Construction Cost: 2,400,000.00
Name: Patrick Elgin
I Address: PO Box 270876
State: MN Zip: 55127
Contact: Barbara Rounds
Name: Distyle Desing Architects
er
Address: 1501 Flag Ave North
State: MPIs Zip: 55427
Contact Person: Michael Knisely
License #: PO Box 270876
City: St Paul
Phone: 612.919.34754 Barbara Phone
Email: SolaSalonstwincities.west@gmail.com
Registration #: 26926
City: MPIs
Phone: 763.591.0996
Email: mknisely@distyledesign.com
Licensed plumber installing new sewer/water service: Wenzel Plumbing Phone #. 952.881.1557 I
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at
www.citvofeagan.com/subscribe.
CALL BEFORE YOU DIG. Contact Gopher State One Call at (651) 454-0002 or www.aoaherstateonecall.ora for protection against underground utility
damage. Contact Gopher State One Call 48 hours before you intend to dig to receive locates of underground utilities.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
Digitally signed by Patrick Elgin
Patrick Elgin Patrick Elgin 06002022.02.0115:35:44
X x
Applicant's Printed Name Applicant's Signature
SUB TYPES FOR OFFICE USE ONLY Site Address:. L10 —
Foundation _ Public Facility
(tqkl
_ Antennae Tenant: f�
Commercial/ Industrial Accessory Building
��A
_ Miscellaneous
L-�7EApartments
Greenhouse/ Tent
Permit #:
WORK TYPES
New _ Interior Improvement
Fire Repair Demolish Building*
Addition _ Exterior Improvement
Water Damage _ Demolish Interior
_ Alteration _ Repair
Retaining Wall _ Demolish Foundation
*Demolition of entire building - give PCA handout to applicant
DESCRIPTION
Valuation ; dam Occupancy
MCES System
Plan Review Code Edition
I oZ-6 SAC Units r A
(25%_ 1000/6-2 Zoning
City Water
Census Code Stories
Booster Pump
# of Units Square Feet
% V'1S PRV
# of Buildings t Length
Fire Sprinklers
Type of Construction g Width
REQUIRED INSPECTIONS
Footings Zf New Building _ Deck _ Addition
Drain Tile
Foundation >: Foundation Before Backfill
Retaining Wall
Vapor Barrier
)�
Erosion Control
Framing 30 Minutes 1 Hour
x Steel Reinforcement
Insulation
Street/Curb Cut Inspection
Sheetrock
Other:
Roof: iX Insulation & Water%{ Final
Meter Size:
_Decking _Ice
Siding: _Stucco Lath _Stone Lath _Brick _ EFIS
Electronic Set of Final Revised Plans
Windows
Fireplace: _Rough In _Air Test _Final X Final / C.O. Required
Pool: _Footings —Air/Gas Tests _Final Final / No C.O. Required
Final C/O Inspection: Schedule Fire Marshal to be present: Yes No
Reviewed By: , Planning New Business to Eagan:
Reviewed By: , Building Inspector
FEES
Base Fee
Plan Review
Surcharge
MCES SAC
City SAC .
S&W Permit & Surcharge
7S Landscape Guarantee (9001.2257)
99 Tree Mitigation (9111.4677)
�bc1Z d Tree Performance Security (9111.2257)
2 1, gZ Stormwater Performance Security (6501.2257)
Erosion & Sediment Control Deposit (6501.2257)
Treatment Plant / 2 7 84
d
Treatment Plant (Irrigation) /d(,S
Park Dedication (9328.4670)
Trail Dedication (9375.4671) 1Z 9 S TOTAL: / 3 ---2` Al
MCES USE: Letter Reference: 21122381 Address ID: 751507 Payment ID: 452947
Date of Determination: 12/23/21
Greetings!
Please see the determination below.
Determination Expiration: 12/23/23
Project Name: Sola Salon Studios
Project Address: 4040 Eagan Outlets Parkway
Suite #/Campus: N/A
City Name: Eagan
Applicant: Barbara Rounds, Sola Salon Studios Twin Cities
Special Notes: None
Charge Calculation:
Barber/Salon Spa: 8672 sq. ft. @ 700 sq. ft. / SAC = 12.39
Total Charge: 12.39
Credit Calculation:
None
Total Credit: 0.00
/ -/ _-Y rl ?0",
Net SAC: 12.39 = 12 SAC Due
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the
business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be
made. If you have any questions email me at: toni.ianzig@metc.state.mn.us.
Thank you,
Toni Janzig
SAC Technician
Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram
MEoTROPO TITAN
1-�3q-ze
COMMERCIAL BUILDING PERMIT
SUBMITTAL REQUIREMENTS
Plumbing, Electrical, HVAC/Mechanical and Fire Suppression plans are required to be submitted with their respective
permit applications.
As of February 1, 2021, PDF ONLY submittal is acceptable.
Foundation Only
❑ Scaled Structural Plans
❑ Civil Plans
❑ Certificate of Survey
❑ Code Analysis **
❑ Project Specifications
❑ Special Inspection & Testing Schedule **
❑ Soils Report
❑ Stormwater Management Permit
❑ Meter size must be established — if applicable
❑ Met Council SAC Determination (651) 602-1000
Interior Improvement
❑ Project Narrative, including a description of the
company operation and maximum number of
employees on the primary shift
❑ Scaled Architectural Plans
❑ Code Analysis
❑ Project Specs
❑ Key Plan
❑ Master Exit Plan
❑ Energy Calculations****
❑ Fire Stopping Submittals
❑ Meter size must be established — if applicable
❑ Met Council SAC Determination (651) 602-1000
New Building AND Additions
A pre -construction meeting will be scheduled by the
City after the permit has been issued.
Project Narrative, including a description of the
company operation and maximum number of
employees on the primary shift
Soils Report
® Certificate of Survey
Scaled Structural Plans
Scaled Architectural Plans
o HVAC units required on building elevation/site
plan
Civil Plans
® Landscaping Plans
Code Analysis **
❑ Energy Calculations****
Emergency Response Site Plan ***
Special Inspection & Testing Schedule **
'8 Project Specs
® Master Exit Plan
Stormwater Management Permit
0 Fire Stopping Submittals
❑ Meter Size must be established
❑ Separate PDF copy of the reviewed and approved
Landscape Plan
Met Council SAC Determination (651) 602-1000
* Call MN Department of Health at (651) 2014500 for details regarding food & beverage or lodging facilities.
** Contact Building Inspections for a sample.
*** Permit for new, building or addition will not be processed without Emergency Response Site Plan.
**** Energy Code Compliance Forms are available at www.citvofea-gan.com/permithandouts.
3830 PILOT KNOB ROAD I EAGAN, MN 55122
(651) 675-5675 1 FAX: (651) 675-5694 buildinginspectionsCa�cityofeagan.com
If you have a hearing or speech disability, contact us through your preferred telecommunications relay service.
,.,,
E AGA N
1-�3q-ze
COMMERCIAL BUILDING PERMIT
SUBMITTAL REQUIREMENTS
Plumbing, Electrical, HVAC/Mechanical and Fire Suppression plans are required to be submitted with their respective
permit applications.
As of February 1, 2021, PDF ONLY submittal is acceptable.
Foundation Only
❑ Scaled Structural Plans
❑ Civil Plans
❑ Certificate of Survey
❑ Code Analysis **
❑ Project Specifications
❑ Special Inspection & Testing Schedule **
❑ Soils Report
❑ Stormwater Management Permit
❑ Meter size must be established — if applicable
❑ Met Council SAC Determination (651) 602-1000
Interior Improvement
❑ Project Narrative, including a description of the
company operation and maximum number of
employees on the primary shift
❑ Scaled Architectural Plans
❑ Code Analysis
❑ Project Specs
❑ Key Plan
❑ Master Exit Plan
❑ Energy Calculations****
❑ Fire Stopping Submittals
❑ Meter size must be established — if applicable
❑ Met Council SAC Determination (651) 602-1000
New Building AND Additions
A pre -construction meeting will be scheduled by the
City after the permit has been issued.
Project Narrative, including a description of the
company operation and maximum number of
employees on the primary shift
Soils Report
® Certificate of Survey
Scaled Structural Plans
Scaled Architectural Plans
o HVAC units required on building elevation/site
plan
Civil Plans
® Landscaping Plans
Code Analysis **
❑ Energy Calculations****
Emergency Response Site Plan ***
Special Inspection & Testing Schedule **
'8 Project Specs
® Master Exit Plan
Stormwater Management Permit
0 Fire Stopping Submittals
❑ Meter Size must be established
❑ Separate PDF copy of the reviewed and approved
Landscape Plan
Met Council SAC Determination (651) 602-1000
* Call MN Department of Health at (651) 2014500 for details regarding food & beverage or lodging facilities.
** Contact Building Inspections for a sample.
*** Permit for new, building or addition will not be processed without Emergency Response Site Plan.
**** Energy Code Compliance Forms are available at www.citvofea-gan.com/permithandouts.
3830 PILOT KNOB ROAD I EAGAN, MN 55122
(651) 675-5675 1 FAX: (651) 675-5694 buildinginspectionsCa�cityofeagan.com
If you have a hearing or speech disability, contact us through your preferred telecommunications relay service.
--------------------------
For Office Use j
00 j 11,
Stormwater Management Permit #: /� ( I
a.. ••.i I J
Building Permit #: 70
EAGAN I
0V
Escrow Deposit:
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I
(651) 675-5300 1 waterresacitvofeaaan.com I Staff:
I I
- - - - - - - - - - - - - - - - - - - - - - - J
STORMWATER MANAGEMENT PERMIT
Date: Site Address: 4040 Eagan Outlets Parkway, Eagan, MN 55122
Description of Project- New Building and surrounding parking lot/impervious
Area of Land Being Disturbed: 1.4 acres Start Date: Completion Date:
❑ Please submit a Land Disturbance and Stormwater Pollution Prevention Plan with this application.
ii ,
Patrick Elgin Name:
Phone: 651.964.8317
Address /City /Zip: PO Box 270876, St. Paul, MN 55127
property
Owner"
Contact: Patrick Elgin Email: pat.elgin@gmail. corn
Applicant is: Owner Contractor
Name: Patrick Elgin License#:
PO Box 270876 St. Paul
Address: City:
COnteidtot
MN 55127 651.964.8317
" State: Zip: Phone:
Patrick Elgin Contact:
Email: pat. elgin@gmail. corn
Erosion and Sediment Control Performance Security
The City requires an escrow deposit to secure performance of erosion and sediment control (ESC) requirements, including proper
installation and maintenance. The security shall pay for any City costs or expenses to bring the site into compliance with the
stormwater management permit, including any engineering, legal, or administrative expenses; inspections; and necessary work by
City contractor(s). The City may extract from the security escrow. The escrow deposit will be released only upon inspection and
written notice of conformance by the City.
The following escrow deposits include two (2) required City inspections, initial and final.
Existing Single -Family Residential Lot (addition, demolition, pool, retaining wall, etc.) $1,000/lot
New Single -Family Construction $3,000/lot
Multi -Family or Commercial Construction (new, addition, demolition) $5,000/acre"
`Maximum of $12,000
Erosion and Sediment Control Reinspection Fee (for as needed City reinspections after the two (2) included) $85/trip
Security Amount. $6,500
/7s -7-x/
The applicant assumes all responsibilities for installation and maintenance of pollution prevention practices on this site.
Any violations of City Code identified by the City shall be addressed within 48 -hours of service of the notification.
The applicant understands that failure to maintain pollution prevention practices within the time allotted by the City
notification, will result in enforcement action to correct site deficiencies that are in violation of Sec. 4.34.
The issuance of this permit constitutes a right -of -entry of the City or its contractors to enter upon the construction site for
the purpose of completing ordinance enforcement and/or completing corrective work.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the
ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and
work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which
requires a review and approval of plans.
The undersigned accepts full responsibility for compliance with the Stormwater Management Ordinance of the City of
Eagan and agrees to comply with the Stormwater Pollution Prevention Plan or equivalent in full.
X Patrick Elgin X
Applicant's Printed Name Applicant's Signatur
Performance Security Release
The following information will determine to whom the escrow deposit will be returned. Security will be returned in the form
of a check.
Name: Patrick Elgin
Address / City / Zip: PO BOX 270876, St. Paul, MN 55127
Phone: 651.964.8317 Email: pat.elgin@gmail.com
Amount:
Permit Number:
• 1 0 e
i
EAGAN
STORMWATER MANAGEMENT PLAN
REQUIREMENTS
1. Land Disturbance (grading) Plan (4-4.34.E.a)
• Delineation of subject property and all public and private easements,
• Delineation of area(s) to be graded or excavated,
• Annotate location of existing and proposed buildings and impervious surfaces including quantities (sqft).
• Identification of all significant natural features including wetland buffer zones, buffer setbacks, significant trees, steep
slopes (3:1 slope or greater) within the property and waterbodies, stormwater conveyance or treatment features, or any
other unique or sensitive natural features within 100ft of the property's boundaries.
• Identification of onsite drainage patterns using drainage arrows.
• Identification of existing and proposed grading using a maximum of 2ft intervals within the property,
• The location and size of all existing and proposed sanitary sewer, storm sewer, or other utility services.
2. Storm Water Pollution Prevention Plan (SWPPP) (44.34.E.b)
• Delineation of limits of land -disturbing activities and construction.
• Location and types of temporary erosion and sediment control devices including but not limited to sediment control
perimeter devices, erosion control devices, storm drain inlet protection, rock construction entrances, dust control, tree
protective fencing and other pollution prevention requirements set forth in city code §4.34 and MPCA's Construction
Stormwater Permit if the project has an acre or greater of land disturbance.
• Location and types of permanent erosion control devices, including plant & seed list.
• Location of dirt or soil storage and other building material stockpile areas.
• Provide name and contact information of individuals(s) responsible to manage pollution prevention practices.
• Description of inspection schedule to be completed by the responsible party:
o Every 7 -days of exposed soil areas,
o Within 24 -hours of a'/z inch rain event,
o Every 30 -days of areas that are stabilized but construction activity continues
o Prior to resuming construction following an extended pause in activity
• Description of an erosion and sediment control maintenance schedule by the responsible party:
o Within 24 -hours, remove any sediment build-up on perimeter control devices exceeding 1/3 of the device height
or storage capacity.
o Within 24 -hours maintain or replace any non-functioning pollution prevention devices or practices.
o Within 24 -hours remove any deposited sediment, debris, or trash from adjacent properties, streets, or sidewalks
following discovery.
o Within 14 -days after land disturbing activities have ceased, temporarily or permanently stabilize exposed soils.
Permit Termination Conditions
If land disturbance is an acre or greater, the permittee must establish permanent vegetative coverage of all impacted
area excluding paved areas or areas covered by permanent structures. Vegetative coverage must consist of a uniform
perennial vegetation with a density of 80% of the expected final growth. In addition, all temporary pollution prevention
devices must be removed, and any remediation or restoration efforts must be completed prior to final inspection and
release of financial securities.
If land disturbance is less than an acre, the permittee must establish temporary erosion control coverage of all
impacted area excluding paved areas or areas covered by permanent structures. MPCA and MnDOT specifications
must be met dependent of the erosion control product used including application of temporary grass seed at an
approved rate. In addition, adequate perimeter control devices must be installed downstream and any remediation or
restoration efforts must be completed prior to a final inspection and release of financial securities.
All projects, If a permanent stormwater treatment/ volume retention facility was required, the facilities must be
inspected by Water Resource staff and must be determined to be in compliance with proposed specifications and all
requirements identified in §4.34.F through §4.34.1 are met prior to final inspection and the release of stormwater
performance securities.
3830 PILOT KNOB ROAD I EAGAN, MN 55122
(651) 675-5300 1 waterresCa7citvofeagan.com
If you have a hearing or speech disability, contact us through your preferred telecommunications relay service.
EAGAN
ECEIVE
3830 PILOT KNOB ROAD I EAGAN, MN 55122-181
(651) 675-5675 1 FAX: (651) 675-5694 MAR 2 5 2022
buildinginsDections(cD-cityofeagan.com 9
2022 FIRE SUPPRESS
------------------
For Office Ups
Permit #
I I
Permit Fee: I
1 I
I Staff: I
�sarsrrss rsrs— si
I Payment Recvd: Yes No
I I
Plans: _ Electronic --Paper I
PERMIT APPLICATION
Date: 342- 21 Site Address: 40+* G
Tenant: -fo &.A SALON LON Suite #:
wA n......r e.,,e..+•. 9 e-mmte4v mos of Arnwinas and specifications. cut sheets on materials and components
A��yuna■uc..w..........p..........�..
�. �..-.-----a- -•-- -r------ -
Name:
Phone:
Property Owner
Address / City / Zip:
Applicant is: Owner Contractor
Type of Work
Description of work:
Construction Cost: Estimated Completion Date:w
Name: 1i%RNAr10*4AL- ftl& i *T
License #: G084'
Address: 3 S 3RA Sr. Ad • IM 4
-city. MEW 8R1 GN 7'bn�
Contractor
State: r4K— Zip: "112, Phone: 6,T%"
J +7-14916 t
Contact: MVE � Email:
•
l
FIRE PERMIT TYPE WORK TYPE
Sprinkler System (# of heads New
—Addition
_ Fire Pump _ Standpipe _ Alterations _ Remodel
Other: _ Other:
DESCRIPTION OF WORK: Commercial Residential
Educational
FEES
QQ
Contract Value $ � 298* X.01
$60.00 Permit Fee Minimum (does not include State Surcharge)
V Permit Fee
= $ 332.9a
Surcharge = Contract Value x $0.0005
If the project valuation is over $1 million, please call for Surcharge
= $ I� • Surcharge
$100.00 Residential New (includes State Surcharge)
= $ 3 +9. 1 TOTAL FEE
=$ Fire Meter
3/4" Fire Meter - $300.00
.300.00
Radio Read (required with Fire Meters) - $205 2.cC.
_ $ 3 TOTAL FEE
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the Cdy s websde at
www.cityofeagan.com/subscribe.
I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances
and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start
without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans.
) PKV& e -LA Itik x Aaezdix-
Applicant's
Printed Name Appli!canYs Signature
175z� D
FOR OFFICE USE
REQUIRED INSPECTIONS
1�' Hydnostatic Flow Alarm Drain Test_keoRough in
Trip Pump Test Central Station Final
Conditions of Issuance:
Permit Reviewed by: Date:
3830 PILOT KNOB ROAD I EAGAN, MN 55122
(651) 675-5675 J FAX: (651) 675-5694 buildinainspections()citvofeaaan.com
If you have a hearing or speech disability, contact us through your preferred telecommunications relay service.
FlI Fleck Z/O 70 �U f�� S&L
From: Barbara Sola Twin Cities <solasalonstwincities.west@gmail.com>
Sent: Thursday, May 12, 2022 1:50 PM r
To: Missy Scherber Sol, S& 6 0 4 S
Cc: Peggy Fleck
Subject: Re: S&W Permit...
Hi Peggy
Missy has this correct. Thank you so much for your help with this matter.
Barbara Rounds
Operations Director
Sola Salon Studios - Twin Cities
Roseville - Woodbury - Maple Grove -
Blaine - Saint Paul - Maplewood -
Robert Street - Eden Prairie - Edina -
Burnsville - Uptown - West End -
EAGAN COMING SOON -
RIVERDALE COMING SOON -
SolaSalonsTwinCities.West@gmail.com
612-919-4754
Follow us on Instagram: @solatwincities
http://www.facebook.com/SolaTwinCities
httpSnrww.solasaIon stud ios.com
On Thu, May 12, 2022 at 1:32 PM Missy Scherber <missv@tscherber.com> wrote:
HI Barbara,
Can you reply all to this email and confirm with Peggy at the City of Eagan that our company is doing the sewer and
water service outside so that she can change the name on the permit. She has to hear that directly from you to make
the switch.
THank you.
Peggy new info is:
T.Scherber Demolition & Excavating
23240 County Road 30
Rogers MN 55374
My Contact below.
. ,.
T.SCHERBER DEMOLITION. EXCAVATING. ROLL OFF WBE, MBE, SBE
"We Do Dirtylobs & Disposol Differently"
OWNER I PRESIDENT
o
3 tii. it (952) '00 5 876
www.tscherber.com
1