Loading...
689 Marie Ct - Zoning Permits & PlansBefore grading or construction near a wetland or wetland buffer, the owner or contractor must place and maintain appropriate erosion control practices on the upland side of the wetland buffer. These practices must remain in place until all development activities that may affect the wetland and the wetland buffer area have been finished and adequate vegetative cover has been established. 05-11-2022 Erik Slettedahl proposed landscaping and retaining walls are within a wetland buffer setback. see City Code requirements below regarding erosion controls. It is the applicant's responsibility to know the location of the wetland buffer area. No work shall be done within the buffer. 4' total structural wall height maximum. 176325 176325 176325