689 Marie Ct - Zoning Permits & PlansBefore grading or construction near a wetland or wetland buffer, the owner or contractor must place and maintain appropriate
erosion control practices on the upland side of the wetland buffer. These practices must remain in place until all development
activities that may affect the wetland and the wetland buffer area have been finished and adequate vegetative cover has been
established.
05-11-2022 Erik Slettedahl
proposed landscaping and retaining walls are within a wetland buffer setback. see City Code requirements below
regarding erosion controls. It is the applicant's responsibility to know the location of the wetland buffer area. No work
shall be done within the buffer. 4' total structural wall height maximum.
176325
176325
176325