1389 Cleome LaneSUB TYPES
Foundation
Single Family
_ Multi
01 of Plex
FOR OFFICE USE ONLY
Site Address: -Vhx^c-eJ 4 C l+ea-.e W;tclerness W-"-K Permit #: 175g02_
2rd add lit a3 31ocX Z
_ Fireplace _ Porch (3-Season) — Miscellaneous
Garage _ Porch (4-Season) _ Accessory Building
Deck _ Porch (Screen/Gazebo/Pergola)
Lower Level _ Pool
WORK TYPES
New
_ Repair
_ Addition
_ Fire Repair
Alteration
_ Water Damage
Replace
_ Egress Window
DESCRIPTION
Calculated Valuation
Plan Review
(25%_ 100% &)
Census Code
# of Units
# of Buildings
Type of Construction \jA
REQUIRED INSPECTIONS
Footings (New Building)
Footings (Deck)
Footings (Addition)
Foundation cp�_Foundation Before Backfill
p( Roof: t< Ice & Water Final
-- Framing 30 Minutes X 1 Hour
Fireplace: _Rough In Air Test _Final
SC Insulation
X- Sheathing
p< Sheetrock
Fire Walls
N Braced Walls
Siding _ Retaining Wall
— Reroof _ Move Building
Windows _ Demolish Building*
— Solar "Demolition of entire building —give PCA handout to
applicant
Occupancy I,Qe- -1-
MCES System x
Code Edition N1VR.C-Zo-i0
SAC Units I-
Zoning jZ-1
City Water
Stories
Booster Pump
Square Feet
PRV
Length
Fire Suppression Required
Width
Meter Size:
_ Final / C.O. Required
Final / No C.O. Required
X_ HVAC _ Service Test Gas Line Air Test n Hood
Pool: Footings Air/Gas Tests _Final
Drain Tile
X Siding: _Stucco Lath X Stone Lath _Brick _ EFIS
- Windows
Retaining Wall: _ Footings _ Backfill _ Final
�( Radon Control
Fire Suppression: _Rough In _Final
Erosion Control
_ Shower Pan
Reviewed By: S M ii�U
Other:
, Building Inspector
RESIDENTIAL FEES
$�Se +ti+
��lhn"y z) 7 �c I �U z 35,70 °
Calculated Valuation P o3:Q�L ° b'z
l � i cf �3 z
5 .
101I,183 . �q
Base Fee
x 95. '13
= z7,51z. 26
Plan Review
'0.
5'77 x YqL-) `fl
a3,:3)1o. 5?
State Surcharge
ul-� X �ci'li
MCES SAC
City SAC
'a �3, COL. 137
Utility Connection Charge
S&W Permit & Surcharge
Treatment Plant
Radio Read
Other: free- ctde 911t-`}677 -4 a 600
Copies:
TOTAL $ 0.00
ivVw %.vnsLrucuun r-nVryy %,UUU %.vnipnance %.ernncaie
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution Date Certificate Pos
panel.
Mailing Address of the Dwelling or Dwelling Unit
City
1389 Cleome St - Molly Augustine Model
Eagen
Name of Residential Contractor
MN License Number
Highpointe Homes
BC794997
(THERMAL ENVELOPE
RADON CONTROL SYSTEM
Type:
Check All That Apply
X
Passive (No Fan)
a
or other system monitoring
o
N
N
C
N
Location (or future location) of Fan:
CL
9
N
a
_
@
o
U
Q
C
3
n
U
_
N
o
d
°
N
m
D
3
Q
m
m
N
C
�
�
T
Insulation Location
>
°
z`oco
ui
ui
M
o
a
O
LL
w
o
N
}N J
C
°
N
N
0
°.
M
°_
C
a
z
LL
s
LL
u
w
of
Other Please Describe Here
Below Entire Slab
X
Foundation Wall
R-15
X
Perimeter of Slab on Grade
R-10
X
Rim Joist (1st Floor)
R-21
X
Rim Joist (2nd Floor+)
R-21
X
Wall
R-21
X
Ceiling, flat
R-49
X
Ceiling, vaulted
R-49
X
Bay Windows or cantilevered areas
R-30
X
Floors over unconditioned area
R-30
X
Describe other insulated areas
Building envelope air tightness:
Duct system air tightness:
Windows & Doors
Heating or Cooling Ducts Outside Conditioned Spaces
Average U-Factor (excludes skylights and one door) U:
10.18
t applicable, all ducts located in conditioned space
Solar Heat Gain Coefficient (SHGC):
0.24
TR-value
MECHANICAL SYSTEMS
Make-up Air Select a Type
Appliances
Heating System
Domestic Water
Cooling System
Heater
Not required per mech. code
Fuel Type
Gas
Electric
Electric
Passive
Manufacturer
Bryant
Rheem
Bryant
Powered
Interlocked with exhaust device.
Model
Legacy1915
Bradford White
13 Seer 1139
Describe:
Input in
60000
Capacity
50
Output
2
Other, describe:
Rating or Size
BTUS:
in Gallons:
in Tons:
AFUE or
95.5
toss
SEER
13 SEED
Location of duct or system:
Efficiency
HSPF°/
lEER
Basement Trusses
Heating Loss
Heating Gain
Cooling Load
Residential Load Calculath
41520
13831
18139
Cfm's
" round duct OR
MECHANICAL VENTILATION SYSTEM
" metal duct
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
Combustion Air Select a Type
Not required per mech. code
source heat pump with gas back-up furnace):
6"
Passive
Select Type
Heat Recover Ventilator (HRV) Capacity in cfms:
Low:
High:
Other, describe:
X
Energy Recover Ventilator (ERV) Capacity in cfms:
Low:
160
High:
1110
Location of duct or system:
Balanced Ventilation capacity in cfms:
Location of fan(s), describe: 113athrooms
Cfm's
Capacity continuous ventilation rate in cfms:
180 cfm
X
round duct OR
Total ventilation (intermittent + continuous) rate in cfms:
1160
" metal duct
Builders Associaton of Minnesota version 101014
City Inspection Dept. Copy EAGAN
—
City Forester Copy
Applicant/Builder Copy
INDIVIDUAL RESIDENTIAL LOT
TREE PRESERVATION PLAN SUMMARY
CITY OF EAGAN FORESTRY DIVISION
651-675-5300
(BUILDER, PLEASE READ ATTACHMENTS)
Development WILDERNESS RUN 2ND ADDITION
Lot Number 23 Block Number 2
Address 1389 Cleome Ln
Builder Straight Line Construction LLC / HRHH Companies
Phone Number: 612-499-1758
Contact: Troy O'Connell — Project Manager
Tree Protection Requirements:
X Tree Protection Fencing (Orange Poly Fence) to be installed and
on -site until construction completion
Oak Tree Pruning (Immediately seal wounds during April 1 to July 31)
Therapeutic Pruning Required
Retaining Wall To Be Installed
Other:
Replacement Trees:
Not Required: subject to mitigation if allowable limits are exceeded
X As Follows: Five (5) Category B trees (>= 2.5" caliper deciduous
trees, or >= 6' conifer trees) to be installed. Cash Dedication
Attachments: &uQMsr
X Yes (Referto attache 9JaIPRESTRY DIVISION
No REVIEWED
Additional Notes: BY c
ction Fence Inspection '�IZSl2 uu_
TREE PRESERVATION PLAN -1389 Cleome Ln.docx
Z
O
NQZm
�� rn
O
Y � w
0 Ld
mV)0 E
ZU�
n
Vl O m
w Q
Ozo<
w
0
J
3
W�W�o
OwOW
O U W Iz
2 m
J¢�o N ¢�
�.130Z y aw
0�3
Ilev r. W
gaod snourwajcg
(�57 •a8 'OO) adOzti eONA 10-11d
w
U
O z
lL Q
Z d a (�
'
oa
WV
N Z
Q � UJ
Z
ujLLI
W5W
O
U
1
m m m
E `oAc� o�
E E
ao Or O
m �r UZ
m � p o N V N
m mmo I\V�
v EoJ
v n t m
omoI.
,w- N
m
oomR`�
O p 3mVIcC O
m
m m O m
N t Cl Oz O m �UJ O O
Ir
w a �mN
F— Iz-
,J :) LL= m �
Z Z wc U 2 a e
N
QU-�m
w QIN Lo 10.
ui 1— Z cn �q6'
Z O m w
a W -\
+
ZU-
Qom
O
y 0
W a m T O A S
CC w
aoUU � ow�x¢
W
co
ip
W
J
n
N
g
N
a
Wa
Z
o�q�.,.
Q
�
89 O
W a
Rw
W\
0
Q
y
d
Z
O
LL
Z
Q
W Z2
U
3 0 N 3
G
L-
���
W",-
❑
,y
O
OvwiO
W�
�¢2
Z
N
'_'
ti
�a2
a
O
aavW�
wQ
d.
azz
oop
3
LiRn
WZ
z_'
m
SUK
®M
6�
Cc p
�Q
ate¢
Za
�O
¢O
2
¢p
SpKj
ZZ
OQ
p�U
NO
II
2z
6
vc
wo
wawx
wpp
gZx
of
e
vc
��
..pa
�zoz
pFzz
aww
Nax
a��
Z¢ti
aw
o
❑
'Z
Z¢a
¢WZm
�aS
UZQ
Kj
W
y W
W
zp�
WOp
wp22K
AWN
NFN
OOC
Q
Lu
J
a
}�o
��w�
Noo
Pi
Z�
�mW
m�oa
-ex
Gt2i1W
mU
n
Vll .= N n V U)
t O °+EAGAN
3830 PILOT KNOB ROAD i EAGAN, MN 55122-1810
(651) 675-5675 i FAX: (651) 675-5694
buildinginspections@cityofeagan.com
-----------------
For Office Use I
I I
Permit#:
I I
I I
Permit Fee: I
I I
I
Date Received: I
I I
Staff:
I
2022 NEW RESIDENTIAL BUILDING PERMIT APPLICATION
Date: 3/28/2022 Site Address: Parcel A Cleome Wilderness Run 2nd add Lot 23 Block 2 Unit #:
Name: TTCP Phone: 6513368767
Resident/
Owner
9531 W 78th Street #135 Eden Prairie, MN 55344
Address / City / Zip:
Applicant is: Owner Contractor Owner Email: mimooreOO@yahoo.com
Type of Work
Description of work: New Construction/residential
$280 000.00 x
Construction Cost: ' Multi -Family Building: (Yes _ / No _)
-
Company: Straight Line Construction LLC contact: Brian Haas
Contractor
Address: 129 N 2nd Street Unit 208 city. Minneapolis
State: MN Zip: 55401 Phone: 6126694227 Email: brian@hrhhcompanies.com
License #: QB771891 Lead Certificate #: BC774856
If the project is exempt from lead certification, please explain why:
Yes, new construction
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
Yes ✓ No If yes, date and address of master plan:
Licensed Plumber: All Pride Plumbing Inc Phone: 6517750545
Mechanical Contractor: Central Heating & Cooling LLC Phone: (612) 369-7906
Sewer & water Contractor: DSM Excavating Phone: 6514801355
Fire Suppression Contractor: Phone:
NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information maybe
classified as non- ublic if ou provide specific reasons that would ermit the Cit to conclude fhat the are trade secrets.
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at
www.citvofeagan.com/subscribe.
CALL BEFORE YOU DIG. Contact Gopher State One Call at (651) 454-0002 or www,gopherstateonecall.oro for protection against underground utility
damage. Contact Gopher State One Call 48 hours before you intend to dig to receive locates of underground utilities.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance
�with, e approved plan /these of work which requires a review and approval of plans.
U.\ I
x x
Applicant's P I'nte Nam-,' Applicant's Signature
V
TREE PRESERVATION PLAN REVIEW — INDIVIDUAL LOT EAGAN
Date Building Permit Application Received 3/31/22
Development Wilderness Run Second Addition Lot 23 Block 2
Site Address 1389 Cleome Ln
Builder Straight Line Construction LLC Contact Brian Haas
Telephone 612-669-4227 E-mail Brian(ahrhhcompanies.com
Property/Lot Owner Name TTCP
Telephone 651-336-8767 E-mail mlmoore00(cDyahoo.com
Office Plan Review — Date 4/4/22 Notes No Tree Pres Plan filled with Building ap
Information sent 4/4/22. Tree Inventory Received 4/13/22. Initial tree inventory review
includes tree removal over allowable limit. Required Mitigation calculates to 5 Trees.
Trees can be split between lots 1389 & 1393 Cleome Ln. Update 4/25/22 Mitigation will
be provided through cash dedication.
Tree Preservation Data
Total Significant Woodland Area
Total Significant Trees
Woodland To Be Removed
Trees To Be Removed
Allowable Woodland Removal (20%)
Allowable Tree Removal (20%)
Required Mitigation YES (or) NO
Original Plan - 2.5
Revised Plan -
Original Plan
ft
Revised Plan
ft
sq.ft sq.ft
24
sq.ft sq.ft
19
Calculated Mitigation Amounts
Category A 5 Category B Category C
Category A Category B Category C
Site Inspection— Date 4/15/22 Notes Tree removals complete. Home locations staked
Several small trees marked with green ribbon have Critical Root Zone conflicts with Home
stakes. (CRZ encroachments resolved by On -site meeting 4/22/22)
G:\Forestry\TreePreservation\Tree Preservation Plan Review -Individual Lot.docx
Original Tree Preservation Plan Approved —Date 4/22/22
Forwarded to Inspections —Date 4/25/22 By AS
Discussion/Meetings with Builder/Owner - Notes
Revised Tree Preservation Plan Approved — Date By
Forwarded to Inspections — Date
Additional Field Inspections
Date Notes
Date Notes
Date Notes
Date Notes
G:\Forestry\TreePreservation\Tree Preservation Plan Review - Individual Lot.docx
By
AS
Was the approved Tree Preservation Plan followed? YES
If no, was additional mitigation required? YES (or)
Final Site Inspection — Date
Additional Notes and/or aerial photo imag
(or) NO
NO (If yes, describe additional mitigation below)
Notes
(insert aerial image or draw map of site)
G:\Forestry\TreePreservation\Tree Preservation Plan Review - Individual Lot.docx
Tree Preservation Plan
Required Tree Protection
For 1389 & 1393 Cleome Ln
rs-
Mir.
b- ���ittt�fAtt�fx /
'.
EAGAN FORESTRY DIVISION
REVIEWED BY, A. SCHNAIBLE
DATE: 4/22/22
m
LO
I
cn
a�
C6 �U L
¢ O O O O In O O M
F- 00 O
c / O
U
0 0 0 0 m O O
CD
C
O
m
c
O N
w
C 0 r r r r O r r II
U O_
m O
C F_
0 o g
'It It N N N
6 F W
F-
O
O
O
O
LO
O
O
LO
J
�
'
0
W
oa)
L.
N
LL
Z
0
O
E
m
F-
z
�-
LO
Q
II
7
O
O
'0
-0
O
CN
co
N
N
N
O
0_
7
n
N
O
r
0
0
O
v
O
.V..
0
O
,�
O
O
�--
-O
'U
O
d'
-0
O
N
C
-0
N
O
'O
N-
o
/a)
"
E
0
a)
L
O
.
N
0-
Q
Co
S
<n
U
S
U
U
I-0
Cn
cn
co
I �
� L
O
i O
U
O
N
Q)
W
m
O
O
ro
U
ClLO
lei
> II
o
o� °
0- Crj
U) II
!LI —
c
W
Y— L
o�—
o
� � O
LL C
.y
O m
} E >
� O �
W
z U
Q C L
tp �
a 9 B
��0 � 0
ps er
111 EAGAN
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810
(651) 675-5300 1 waterres(@cityofeagan.com
-------------------------
For Office Use
I Stormwater Management Permit #:
E Building Permit
E I
Escrow Deposit:
I I
I Staff: E
i I
._---_ --, .__ ._--------------a
STORMWATER MANAGEMENT PERMIT
Date:
3/30/2022 Site Address: Parcel A Cleome Wilderness Run 2nd add Lot 23 Block 2
__
Description of Project: New Home COnStrUCtlOn
Area of Land Being Disturbed: Lot Start Date; 4/15/2022 Completion Date: 7/30/2022
❑ Please submit a Land Disturbance and Stormwater Pollution Prevention Plan with this application.
Name; TTCP Phone: 6513368767
Address /City / Zip: ._._,..�..9531 W 78th Street #135 Eden Prairie, MN 55344
.__..�.._..�..__.. _.�.
Property Owner .._...-.,...__._�.._ _._�.................._-. ...._.__-.._...__...
Contact; Melvin Moore Email: mlmoore00@yahoo.com
Applicant is: _— Owner ✓_ Contractor
Name: Stright Line Construction LLC License#; QB771 891
Address:
129 N 2nd Street Unit 208 City: Minneapolis
Contractor
State: MN Zip: Phone: 55401 6126694227
Contact: Brian Haas Email: Brian@hrhhcompanies.com
Erosion and Sediment Control Performance Security
The City requires an escrow deposit to secure performance of erosion and sediment control (ESC) requirements, including proper
installation and maintenance. The security shall pay for any City costs or expenses to bring the site into compliance with the
stormwater management permit, including any engineering, legal, or administrative expenses; inspections; and necessary work by
City contractor(s). The City may extract from the security escrow. The escrow deposit will be released only upon inspection and
written notice of conformance by the City.
The following escrow deposits include two (2) required City inspections, initial and final.
Existing Single -Family Residential Lot (addition, demolition, pool, retaining wall, etc.) $1,300/lot
New Single -Family Construction $3,900/lot
Multi -Family or Commercial Construction (new, addition, demolition) $6,500/acre'
'Maximum of $12,000
Erosion and Sediment Control Reinspection Fee (for as needed City reinspections after the two (2) included) $85/trip
Security Amount: $3900.00
The applicant assumes all responsibilities for installation and maintenance of pollution prevention practices on this site.
Any violations of City Code identified by the City shall be addressed within 48-hours of service of the notification.
The applicant understands that failure to maintain pollution prevention practices within the time allotted by the City
notification, will result in enforcement action to correct site deficiencies that are in violation of Sec. 4.34.
The issuance of this permit constitutes a right -of -entry of the City or its contractors to enter upon the construction site for
the purpose of completing ordinance enforcement and/or completing corrective work.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the
ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and
work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which
requires a review and approval of plans.
The undersigned accepts full responsibility for compliance with the Stormwater Management Ordinance of 1, e City of
Eagan and agrees to comply with the Stormwater Pollution Prevention Plan or equivalent in full.
XBrian Haas X
Applicant's Printed Name Applicant's Signature
Performance Security Release
The following information will determine to whom the escrow deposit will be returned. Security will be returned in the form
of a check.
Name: Brian Haas
Address /City /Zip:
494 La Grandeur Somerset, WI 54025
Phone: 6126694227 Email: Brian@hrhhcompanies.com
Amount: Permit Number:
FOR OFFICE USE ONLY
SUB TYPE
XStormwater Management Permit
DESCRIPTION
Addition Demolition
X New Retaining Wall
WORK TYPE
Apartments
Multi Family
X Single Family
REQUIRED INSPECTIONS
X Initial Inspection
-X Final Inspection
SECURITY
Erosion and Sediment Control Deposit (6501.2257)
Other:
Pool
Other:
$1 Pnn
Total: $3,900
-.y
Reviewed By:
��"'" Brian' Leyendecker , Water Resources
Commercial/Industrial
Public Facility
Date: 4/7/2022
139ol C led mt LN
1�
I
910.4
o=
E
0 0 3
i
w p
a o
o�
o a
co
ui
Utllityo - a
riser
°^ = go`1v
o x
w
x
0
w
o
a U')
Lci
w
o
w
x
0
898.3
C
0,)10,1
w C
-0 I
t-Utility pole
x 907.5
(141.65 plat) x 908.7
x 912.3
9 x 912.3
x e
CONSTRUCTION
ENTRANCES AT
DRIVEWAYS
PROPOSED SILT
FENCE (Typ.)
EROSION CONTROL ADDENDUM
0 30 60 90
GRAPHIC SCALE IN FEET
-�-STORAGE/MATERIAL
O STORAGE AREA
-Chain-link fence 24
906.2
---PROPOSED DRAINAGE,
UTILITY, INGRESS, EGRESS,
AND DRIVEWAY EASEMENT
SURVEYORS NOTES:
DRAINAGE &
-UTILITY EASEMENT
FOR
GATEWAY HOMES
11,974 s.f. +/-
LOTS 22 & 23 BLOCK 2
WILDERNESS RUN SECOND ADDITION
DAKOTA COUNTY, MN
LOT 23 APPROX. IMPERVIOUS SURFACE AREAS
HOUSE
1,299 s.f
GARAGE
596 s.f.
PORCH
40 s.f.
SIDEWALK/DRIVEWAY
1 614 s f
TOTAL
3,549 s.f. (30q)
13,058 s.f. +/-
LOT 22 APPROX. IMPERVIOUS SURFACE AREAS
HOUSE
1,040 s.f
GARAGE
424 s.f.
PORCH
50 s.f.
SIDEWALK/DRIVEWAY
771 s.f.
DRIVEWAY TO LOT 23
667 s.f.
TOTAL
2,952 s.f. (237.)
CLEOME LANE
THIS DRAWING IS PROVIDED AS AN ADDENDUM TO
CERTIFICATE OF SURVEY DRAWINGS, FILE NO. 22150 &
22151, DATED 0311712022, 7.0 SHOW EROSION CONTROL
MEASURES AS REQUIRED BY CITY OF EAGAN.
BENCHMARK: TOP NUT OF HYDRANT @ S.W. QUADRANT OF
GARDEN TRAIL & CLEOME LANE. ELEVATION = 896.43
Address: 13xx & 13xx Cleome Lane, Eagan, MN
EROSION AND SEDIMENT CONTROL INSPECTION SCHEDULE:
• Every 7 days of exposed soil areas
• Within 24 hours of a half inch rain event
• Every 30 days of areas that are stabilized but
construction activity continues
• Prior to resuming construction following an extended
pause in activity
EROSION AND SEDIMENT CONTROL MAINTENANCE SCHEDULE:
• Within 24 hours, remove any sediment build-up on
perimeter control devices exceeding 1/3 of the device
height or storage capacity.
• Within 24 hours maintain or replace any
non-functioning pollution prevention devices or
practices.
• Within 24 hours or sooner if directed by City staff,
remove any deposited sediment, debris, or trash from
adjacent properties, streets, or sidewalks following
discovery.
• Within 14 days after land disturbing activities have
stopped, temporarily or permanently stabilize exposed
soils.
FINAL STABILIZATION:
Hydroseed "Sunny Delight" (90% Bluegrass, 10% Rye)
I hereby certify that this survey, plan, or
report was prepared by me or under my
direct supervision and that I am a Licensed
Land Surveyor under the laws of the State
of Minnesota.
Date 04 06/2022 ��✓I'
Trace C. McCo�
License No. 44531