EA179972 - Building - Deck - Issued Date 11/10/202219"91L UV III
City of Eagan
®,
Permit Type:
Building
3830 Pilot Knob Rde��,
EaganMN 55122
,
m
� • ,. , E A AN
.._a ®_e,
Permit Number:
EA179972
(651) 675-5675
111111111111
www.cityofeagan.com
* E R 1 7 9 9
7 2
Date Issued:
11/10/2022
Site Address: 4476
Reindeer Lane
Lot: 8 Block: 4
Addition: Fawn Ridge
PID: 10-25800-04-080
Use:
* 1
0— 2 5 8 0 0— 0 4— 0 8 0*
Description:
Sub Type: Deck Construction Type: V -B
Work Type: New
Description: 2 New Decks
Census Code: 434 - Residential Additions, Alterations Occupancy: IRC -1
Zoning: PD
Square Feet: 0
Comments:
Fee Summary: (BL) Plan Review $76.70 0720.4222
Valuation: 4,680.00 BL - Base Fee $118.00 0801.4085
Surcharge - Based on Valuation $2.50 9001.2195
Total: $197.20
Contractor:
Owner:
Raymel Bradford
4476 Reindeer Ln
Eagan MN 55123
- Applicant -
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature ssued B :,Signature
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810
(651) 675-5675 1 FAX: (651) 675-5694
buildinainsoecdonsD-citvofeaaan.com
��- 11/i®
ECEIVED
OCT 2 8 222
------------
j For Office Use
I I
I Building Permit #:
I I
j S&W Permit #:
I I
I Permit Fee:* c�
I
I I
Date Received: I
I I
I I
I Date Issued:
I ---------------------J
RESIDENTIAL BUILDING PERMIT APPLICATION
Date: 10 - 20 -`og, Site Address: I! L M (a Q e i e' Unit #:
Homeowner Name: `�a.�, ,v,@ �i .r a. �„ Phone: S I - (Oa I - N i? 4(
Contact
f�
I
Information
Address/City2ip�/yyl6o f4e;,� Jga,r LnJ
Applicant is: downer ❑ Contractor Email:
Description of work: Det,„
Type of
p � r
Work
Construction Cost: coo
Type of building: dsingle Family ❑ Townhome, of units ❑ Twin Home
Company: Contact:
Building
Address: City:
Contractor
State: Zip: Phone: Email:
License #: Expiration Date:
Sewer &
Company: Contact:
Water
Contractor
Address: City:
Required for
State: Zip: Phone: Email:
new construction
License #: Expiration Date:
I understand that Plumbing, Mechanical, and Fire Suppression work require separate applications.
NOTE: Plans and supporting documents that you submit are considered to be public Information. Portions of the
information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they
are trade secrets.
CALL BEFORE YOU DIG. Contact Gopher State One Call at (651) 454-0002 or www.aoaherstateonecall.ora for protection against underground utility
damage. Contact Gopher State One Call 48 hours before you intend to dig to receive locates of underground utilities.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and odes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
X iwla "Ood'o I 19ye, &'s x
I_ Ir2l_ _""e
Applicantis Printed Name App irs',%golure
Site Address: 4476 Reindeer Ln Permit #: EA179972
SUB TYPES
Single Family _ Fireplace _
Lower Level
01 of Plex Foundation
Porch
_ _ _ _
Deck _ Garage _
Pool
WORK TYPES
New _ Repair
_ Siding _ Retaining Wall
_ Addition _ Fire Repair
Reroof _ Move Building
Alteration _ Water Damage
_
_ Windows _ Demolish Bullding•
_ Replace _ Egres Window
_ Solar •Demolition of entire building - give PCA
handout to applicant
DESCRIPTION
Calculated Valuation $4,680
1325% Efl00%
Occupancy IRC 1 MCES System
Plan Review
Code Edition 2020 MNRC SAC Units
Census Code
Zoning PD City Water
# of Units
Stories Booster Pump
# of Buildings
Square Feet PRV
Type of Construction VB
Fire Suppression Required
Separate Stormwater Management Permit Required
REQUIRED INSPECTIONS
Footings: New Addition ✓ Deck
Siding: _Stucco Lath _Stone Lath _Brick
Foundation: Before Backfill Poured Wall Roof: & Water
Framing: 1 Hour ✓Residentlal Alteration
_Ice _Final
Erosion Control
T Braced Wall FraminglBlocking
Pool: _Footings Air/Gas Tests _Final
Braced Wall Sheathing (prior to house wrap)
Retaining Wall: _Footings _Backfill _Final
Interior Braced Wall Panol(s)
Fire Suppression: _Rough In _Final
Firewalls
Other.
Insulation
Fireplace: _Rough In Air Test Final
Final/No C.O. Required
Radon Control
Flnal/C.O. Required
Reviewed By:
. Building Inspector
FEES
2 of the same decks being installed on rear
Calculated Valuation
elevation of home.
Base Fee
Plan Review
State Surcharge
Met Council SAC
City SAC
Treatment Plant
Water Supply & Storage
S&W Permit & Surcharge
Meter
Radio Read
Other:
TOTAL $ 0.00
13x12= 156sf
156sf x $15 = $2,340
$2,340 x 2 decks = $4,680
Required Information for Deck Permits
Dimensions of deck: Both decks are 13' 1" x 12'
Size of posts: &'X (e
Footing diameter. Diamond Pier 50 / 50"
If sizes vary, leave blank and indicate individual sizes on plans.
Site Address: yq-76 gej,.1jee. L4
❑ Height of deck from ground: � If
❑ Spacing of posts: 8 ft
0
Size of beam(s): (2) _2.X(0 ❑
*Example: 2 — T x 12°
Cantilever on beam(s):
Size of joists: ax 10 1
Species of lumber for framing:,,,
Dimensions of floorboards: rj
Pattern of floorboards: Q¢ , ra M S o; S 4 3
I.e: perpendicular (90 der .'to-jo'Ists,730/45/or-80 degrees to joists
Stair width., 4'
Stair length: 11,101,
will the deck be built around a cantilevered area? (Le., a bay with a patio door
Footing depth:
•42' minimum for trad'itlonal concrete footing. Specify if using engineered footings
(Le., Diamond Pler) and provide Installation Instructions.
Drop or flush beam(s): Both
❑ Spacing of joists:
❑ Floorboard � C..,,,,�„,� �r<<J�J
❑ Stair stringer spacing:
1�
What type of floor framing will the ledger be attached to? p.e., ljolst, floor truss, 2' x 10, eta)
Distance to property lines:
m,:� .:a ❑ Side 1:
v. s
°` ❑ Side 2:
Type of hardware to be used:
Ledger board:
❑ Ledger board connection:
t - ❑ Lateral load connection:
Beam to posts:
;: ❑ Post cap (manufacturer/model)
❑ Through bolts (size)
❑ Other approved type
4 .: Joist to beam:
❑ Joist hanger
❑ Other
❑ Any other hardware used:
See Survey ❑ Rear.
See Survey ❑ Other.
See plan for pattern
If q. Y X LAA SPVa
Yes No
�1 ocrF �ruc�,
See Survey
See Survey
not work on a 6x6 post, ensure correct
el is used and instructions followed
Edited per conversation with Ray
...._:vi'.',;:3P:.vki.4'r1,aili:=�;...<.::::+.;.........-s:B..............,.:.:,....�__.... ..........
::...:.�:... _
Two (2) copies of plans that Include:
REVIEWED FOR
CODE COMPLIANCE
❑ cross section view
❑ Plan view
❑ Stair framing view
EAGAN
❑ Applicable supplemental Information
I'll ""m
BURDING INSPECTIONS
Site plan, drawn to scale on survey or plat map,
including:
❑ Deck dimensions
❑ Distance to property lines
C
v
13' -1 "
31-4 1/8)$
DECK#1
1/8 90=1 I
S -4 1/81)
w
00
w I
Qo
z®.0O
' • `/ T' PROPOS EV
HOUSE /
i�
t `
4 MIA C93t.'s
r
�l
r
t
0'-11 5/16"
t
t
5 •:
s
g19F
*3t'S-1
S-4 1
0 . I
/08.887so,
5
DECK#2
,fie -=r
3
SETBACKS
REVIEWED FOR
CODE COMPLIANCE
EAGAN
Derek Qualle
11/09/2022 11:04:15 AM
BUILDING INSPECTIONS
Installing 2 new
decks - OK
W
z
Q
Q
0
w
z
z
WE