Loading...
EA179160 - Building - Commercial/Industrial - Lovisa - Issued Date 12/01/2022Pi DR_O.1 City of Eagan Permit ape: Building 3830 Pilot Knob Rd �,.; % ;: , Permit Number: EA179160 Eagan, MN 55122 •.__ -_:. EAGAN (618) 308-0152 (651) 675-5675 111111111111 IN 11111111111111111111111111111111 www.cityofeagan.com * E A 1 7 9 1 6 0* Date Issued: 12/1/2022 Site Address: 3965 Eagan Outlets Pkwy 355 Lot: 1 Block: 1 Addition: Paragon Addition PID: 10-56220-01-010 Use: Lovisa * 1 0— 5 6 2 2 0— 0 1— 0 1 0 Description: Sub Type: Commercial/Industrial Construction Type: I1 -B Work Type: Alteration Description: Tenant Interior Finish Census Code: - Occupancy: M Zoning: Square Feet: 886 Comments: Fee Summary: BL - Base Fee $1;356.75 0801.4085 Plan Review $881.89 0720.4222 Valuation: 150,000.00 Surcharge - Based on Valuation $75.00 9001.2195 Total: $2,313.64 Contractor: - Applicant - Owner: Axxys Construction Paragon Outlets Eagan LLC 4101 Nicols Rd, #100 % Simon Property Group Eagan MN 55122 PO Box 6120 (618) 308-0152 Indianapolis IN 46206 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature ssued B : Signature called i►123 ROeIved SEP 2 0 202 •.�. ..moi I EAGAN 04 X%ff W 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-56751 FAX: (651) 675-5694 j "17 III Plan Submittal: buildinainsaections(&cityofeaoan.com ----------------- For ----------------For Offlce Use Permit #: D 9 A 0 I Permit Fee: J I I I I I I Staff: I rPayment Recvd: Yes No I ; �—PlansElectronic _ Paper I 2022 COMMERCIAL BUILDING PERMIT APPLICATION Date: 9/20/22 Site Address: 3965 Eagan Outlets Pkwy. Tenant Name: LOVI SA (Tenant Is: 11( New/ Former Tenant: Existing) ' Suite You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City s website at wHw.citvofeaoan.com/subscribe. CALL BEFORE YOU DIG. Contact Gopher State One Call at (651) 454-0002 or www.aonherstateonecall.cm for protection against underground utility damage. Contact Gopher State One Call 48 hours before you Intend to dig to receive locates of underground utilities. I hereby acknowledge that this Information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approvalo plans.. Digftgy signed by Jeanie Godsey oa n i e DN: an=Joards Godsay, C=Us, XARCVISION: JOANIE GODSEY X Godsey aRCJgo sey email=.IgodseyQa arcv.tbm Date: 2022.092016:14:48 -"W Applicant's Printed Name Applicant's Signature S I M O N Name: Phone: Property Owner 225 WEST WASHINGTON ST. INDIANAPOLIS, IN 46204 Address/City/Zip: Applicant is: Owner Contractor TENANT INTERIOR FINISH Type of Work Description of work: 1 50, 000 Construction Cost: Name: AXXYS CONSTRUCTION GROUP License #: 4101 NICOLS RD SUITE#100 Address: 4101 NICOLS RD SUITE#100 City: EAGAN Contractor State: MN Zip: 55122 Phone: 612-800-7878 Contact. KYLE KAUTHEma;,: kkauth@axxysconstruction.com Name: ARCVISION Registration* 23971 Address: 1950 CRAIG RD STE 300 City. MO Architect/Engineer State: MO Zip: 63146 Phone: 3368301111 JOANIE GODSEY JGODSEY@ARCV.COM Contact Person: Email: Licensed plumber installing new sewertwater service: Phone #: NOTE. Plans and supporting documents that you submit are considered to be public information. Portions of the Information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City s website at wHw.citvofeaoan.com/subscribe. CALL BEFORE YOU DIG. Contact Gopher State One Call at (651) 454-0002 or www.aonherstateonecall.cm for protection against underground utility damage. Contact Gopher State One Call 48 hours before you Intend to dig to receive locates of underground utilities. I hereby acknowledge that this Information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approvalo plans.. Digftgy signed by Jeanie Godsey oa n i e DN: an=Joards Godsay, C=Us, XARCVISION: JOANIE GODSEY X Godsey aRCJgo sey email=.IgodseyQa arcv.tbm Date: 2022.092016:14:48 -"W Applicant's Printed Name Applicant's Signature t*,Vk4-�) gp. 7 SUB TYPES _ Foundation Commercial/Industrial _ Apartments WORK TYPES _ New Addition Alteration FOR OFFICE USE ONLY _ Public Facility Accessory Building Greenhouse/ Tent Interior Improvement Exterior Improvement Repair Antennae Miscellaneous Site Address QQ'r Tenant:�. Loyi&&A Permlt#:l Fire Repair _ Demolish Building* Water Damage _ Demolish Interior Retaining Wall _ Demolish Foundation *Demolition of entire building — give PCA handout to applicant J IFWI MCES System *2v Valuation• DSS o0 Occupancy Plan Review Booster Pump ��- Code Edition (25%-1 009/'61C) Zoning Census Code Meter Size: Stories # of Units —' Square Feet # of Buildings -- Length Type of Construction — Width Antennae Miscellaneous Site Address QQ'r Tenant:�. Loyi&&A Permlt#:l Fire Repair _ Demolish Building* Water Damage _ Demolish Interior Retaining Wall _ Demolish Foundation *Demolition of entire building — give PCA handout to applicant J IFWI MCES System *2v SAC Units Vapor Barrier City Water 4 Framing 30 Minutes ._ 1 Hour Booster Pump ��- �� PRV Sheetrock Fire Sprinklers Roof: _Decking _Insulation _Ice & Water _Final Meter Size: Footings _ New Building _ Deck _ Addition Drain Tile Foundation Foundation Before Backfill Retaining Wall Vapor Barrier Erosion Control 4 Framing 30 Minutes ._ 1 Hour Steel Reinforcement Insulation Street/Curb Cut Inspection Sheetrock Other: Roof: _Decking _Insulation _Ice & Water _Final Meter Size: Siding: _Stucco Lath _Stone Lath _Brick _ EFIS Electronic Set of Final Revised Plans Windows Fireplace: _Rough In Air Test _Final Final / C.O. Required Pool: _Footings Air/Gas Tests _Final Final / No C.O. Required Final C/O Inspection: Schedule File Marshal to be present: ,Yes No Reviewed By:// . Planning New Business to Eagan: Reviewed By: Building Inspector FEES �S Base Fee 04 /356 Landscape Guarantee (9001.2257) Plan Review �i3 f 8� Tree Mitigation (9111.4677) Surcharge r �� Tree Performance Security (9111.2257) MCES SAC Stormwater Performance Security (6501.2257) — City SAC S&W Permit & Surcharge Treatment Plant 0 Treatment Plant (Irrigation) Park Dedication (9328.4670) Trail Dedication (9375.4671) m TOTAL: $ 0.00