EA180320 - Building - Single Fam - Issued Date 01/10/2023City of Eagan
3830 Pilot Knob Rd
Eagan, MN 55122
(651) 675-5675
www.cityofeagan.com
PERMIT
Permit Type: Building
' ' Permit Number: EA180320
A EAGAN
iiiiiiiiiiiiiiiiiiiiiillillillillillillilliim
^� *EA 180320*
Site Address: 4607 Beacon Hill Ct
Lot: 4 Block: l Addition: Beacon Hill
PID: 10-13500-01-040
Use:
Description:
Sub Type: Single Fam
Work Type: Solar
Description:
Census Code: 434 - Residential Additions, Alterations
Zoning: PD
Square Feet: 0
Date Issued: 1/10/2023
I I I II III III 1 1�1111111111111 II I III III I III
p p r, p r, 4 q
Construction Type: V -B
Occupancy: IRC -1
Comments: Improvements to the home may require smoke detectors in all bedrooms.
Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota
State Building Code).
Fee Summary: BL - Plan Review - Fixed $40.00 0720.4222
Valuation: 31,800.00 BL- Solar/Wind Energy $94.00 0801.4085
Surcharge -Fixed $1.00 9001.2195
Total:
$135.00
Contractor: - Applicant - Owner:
Cedar Creek Energy Corporation Sona R Mehring
10361 Jamestown St NE 4607 Beacon Hill Ct
Blaine MN 55449 Eagan MN 55123
(763)450-9767
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature srued B .Signature
F For O—ffl—c a use
Building Permit #: �
t1% a 0 00 j I
% ®® �,m �® I S&WPermit
#: {
N
EAGA
Permit Fee:
ECEIVE '
Date Received:
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I I
(651) 675-56751 FAX: (651) 675-5694 f �,� 2022 1 Date Issued:
buildinainspections _cityofeaQan.com 0 1----------------------j
RESIDENTIAL BUIEDTWG—PERMIT APPLICATION
Date: 11 /18/2022 Site Address: 4607 Ereaion Hill Ct Y Unit #:
Applicant is: ❑ Owner 1;6 Contractor A Pr>1� e w.
Name:
Homeowner Address: City: 4607 Beacon Hill Ct Eagan
State: MN Zi : 55122 phone: 651-335-94 Email: MN:-
Description of work: Installation of a 19.200kW DC, 13.920kW AC roof mounted solar array
Type of 31,800.00
Work Construction Cost:
Type of building: Single Family ❑ Townhome, of units ❑ Twin Home
Company:
Cedar Creek Energy contact: John Nyhlen
Building Address: 10361 Jamestown St NE City:Blaine
Contractor State: MZip. Phone: Email.. MN Zip: 55449 7634509767 permits@cedarcreekenergy.com
License M BC638279 Expiration Date: 3/31/2094
Sewer &_ Company: Contact:
Water
Contractor Address: city:
M
Required for State: Zip: Phone: P Email:
new-construdtion
License #: Ex 'ration Date.
I understand that Plumbing, Mechanical, and Fire Suppression work require separate applications.
NOTE: flans and supporting documents that you submit are considered to be public Information. Portions of the
information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they
are trade secrets.
CALL BEFORE YOU DIG. Contact Gopher State One Call at (651) 454-0002 or www.cooherstateonecall.ora for protection against underground utility
damage. Contact Gopher State One Call 48 hours before you Intend to dig to receive locates of underground utilities.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
Digitally signed by John Nyhlen
John N yh l e mpate: 2022.11.18 06:38:00
XJohn Nyhlen X J 06100'
Applicant's Printed Name Applicant's Signature
REQUIRED INSPECTIONS
Site Address: 4607 Beacon Hill Ct
Permit #:
SUB TYPES
Foundation: Before Backfill Poured Wall
Roof: _Ice & Water _Final
XFraming: 1 Hour XResidential Alteration
Single Family
_ Fireplace
_ Lower Level
Braced Wall Sheathing (prior to house wrap)
01 of _ Plex
_ Foundation
_ Porch
Firewalls
_
_ Deck
_ Garage
_ Pool
Fireplace: _Rough In _Air Test _Final
WORK TYPES
HVAC: Rough In Final
Final/No C.O. Required
New
_ Repair
_ Siding
_ Retaining Wall
Addition
_ Fire Repair
_ Reroof
_ Move Building
_
Alteration
_ Water Damage
_ Windows
_ Demolish Building*
Replace
_ Egress Window
IK Solar
*Demolition of entire building — give PCA
handout to applicant
DESCRIPTION
Calculated Valuation
3 ( Jew
Occupancy ACZ
MCES System
Plan Review
1325% 100%
Code Edition O,Ir,J✓ac. 2o%10
SAC Units
Census Code
Zoning Tv
City Water
# of Units
Stories
Booster Pump
# of Buildings
Square Feet
PRV
Type of Construction
Fire Suppression Required
Separate Stormwater Management Permit Required
REQUIRED INSPECTIONS
Footings: New Addition Deck
Siding: _Stucco Lath _Stone Lath _Brick
Foundation: Before Backfill Poured Wall
Roof: _Ice & Water _Final
XFraming: 1 Hour XResidential Alteration
Erosion Control
Braced Wall Framing/Blocking
Pool: _Footings —Air/Gas Tests _Final
Braced Wall Sheathing (prior to house wrap)
Retaining Wall: _Footings _Backfill _Final
Interior Braced Wall Panel(s)
Fire Suppression: _Rough In _Final
Firewalls
Windows
Insulation
Other:
Fireplace: _Rough In _Air Test _Final
HVAC: Rough In Final
Final/No C.O. Required
Radon Control
p
Final/C.O. Required
_
Reviewed By: C
, Building Inspector
FEES
Calculated Valuation 3 1 1 V
Base Fee
Plan Review
State Surcharge
Met Council SAC
City SAC
Treatment Plant
Water Supply & Storage
S&W Permit & Surcharge
Meter
Radio Read
Other:
TOTAL $ 0.00