EA179888 - Building - Commercial/Industrial - Issued Date 01/20/2023City of Eagan
3830 Pilot Knob Rd
Eagan, MN 55122
(651) 675-5675
www.cityofeagan.com
Site Address: 2975 Holiday Ct
Lot: Block: Additio
PID:
Use: Eagan Specialty Center
Description:
Sub Type: Commercial/Indust6
Work Type: New
Description:
Census Code: -
Zoning:
Square Feet: 36,100
Comments:
Fee Summary:
Valuation: 5,000,000.00
PERMIT
Permit Type: Building
EAGAN Permit Number: EA179888
111111111111 IN 11111111111111111111111111111111
E A 1 7 9 8 8 8*
Date Issued: 1/20/2023
BL - B4se Fee
BL - Plan Review 65%
Surcha ge - Based on Valuation
SAC - ommercial/Industrial
City S C (01 Unit)
SW - S wer Permit Fee
SW - V later Permit
Surcharge - $1.00
Treatm nt Plant - Commercial
Treatm nt Plant (Irrigation)
Total: �
Construction Type: II -B
Occupancy: B
S-1
$24,636.65
0801.4085
$16,013.82
0720.4222
$1,500.00
9001.2195
$29,820.00
9220.2275
$1,668.00
9376.4681
$80.00
6201.4532
$80.00
6101.4507
$1.00
9001.2195
$13,512.00
6101.4684
$1,126.00
6101.4684
$88,437.47
Contractor: - Applicant -
Owner:
Timco Construction
Eagan Mob Partners LLC
14700 28th Ave N #40
33 6th St S
Plymouth MN 55447
Suite 4650
(763) 694-0250
Minneapolis MN 55402
This permit shall be null and void if wor does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read t is application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eaga Ordinances.
Applicant/Permitee: Signature ' Issued BS Signature
23
emailed in ______--------
-----------
For Office Use
Building Permit #: � I
S&W PermitEAGAN #: I gl i 14Jr"•A
Ue ,�ws •i/ I
I Permit Fee: _ 4ID
�10.
I
I ,
E C E I V E Date Received: 02
3830 PILOT KNOB ROAD I EAGAN, MN 55122-181
I
(651) 675-5675 1 FAX: (651) 675-5694 OCT 2 5 202 Date Issued: I
Plan Submittal: buildingins ections cit ofea an.co-------------------------i
COMMERCIAL BUItDWIG PeRVIT APPLICATION
Date: 10.25.22 Site Address: 2975- Highway 55 Eagan, MN 55121 Suite #:
Tenant NamE. � 1�1�^ 'T"'i e Tenant is: 0 New ❑Existing
Former Tenant (if applicable):
Name: Timco Construction Phone: 612-202-8384
Applicant t
Applicant is: ❑ Owner 0 Contractor ❑ Agent Email: pfinn@timeo-eonst.eom
Type of Description of work: New 1 story medical office building
i Work 5,000,000
i Construction Cost:
Company: Timco Construction contact: Patrick Finn
Building Address/city/zip: 2820 Vicksburg Lane North
Contractor Phone: Email: 612-202-8384 pfinn@timco-const.com
License #: Expiration Date:
Company:
Synergy Architecture Studio contact: Patrick Giordana
Architect/ 33 South 6th Street Suite 4560 Minneapolis, MN 55402
Engineer Address/City/Zip:
Phone: 612-383-2701 Email: pgiordana@synergyarchstudio.com
�-
Sewer & Company: JULIAN M. JOHNSON CONSTRUCTION CORP. Contact: Travis Johnson
Water 6191 140th AVENUE N.W. RAMSEY, MN 55303-1021
Contractor Address/City/Zip:
Required for Phone: (763) 323-2900 Email: travis@jmjccorp.com
new construction
and additions
License #: Expiration Date:
1 understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
NOTE: Plans and supporting documents that you submit are considered to be public information Portions of the information
my be classified as non- ublic if ou rovtde s ecific reasons that would permit the City to conclude that they are trade secrets.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the
approved plan in the case of work which requires a review and approval of plans.
X Patrick Finn X
Applicant's Printed Name Applicant's Signature
SUB TYPES
Foundation
Commercial/Industrial
Apartments
WORK TYPES
New
Addition
Alteration
FOR OFFICE USE ONLY
Public Facility
Accessory Building
Greenhouse/Tent
Interior Improvement
Exterior Improvement
Retaining Wall
DESCRIPTION
Valuation Code Edition
Plan Review Zoning
Census Code y- Stories
Antennae
Demolish Building*
Demolish Interior
Demolish Foundation
2970 Highway 55 Eagan, MN 55121
Site Address:
Tenant: Davis Healthcare Real Estate
Permit #: ng9li l].
*Demolition of entire building - give PCA handout to applicant
ZOZ� 04 C' MCES System
r� SAC Units
City Water
# of Units Square Feet
h Fire Sprinklers
Type of Construction ! Length
Occupancy Width
REQUIRED INSPECTIONS
Footings_ New Building _ Addition
Retaining Wall
Foundation Foundation Before Backfill
Other:
_ Vapor Barrier
Other:
Framing 30 Minutes 1 Hour
Insulation
Sheetrock
Roof: _Decking Tlnsulation _Ice & Water Final
Final / C.O. Required
Final / No C.O. Required
Siding: _ Lath _Brick _ EFIS
Fireplace: _Rough In _Air Test _Final
Pool: _Footings _Air/Gas Tests _Final
Final C/O Inspection: Schedule Fire Marshal to be present:
Yes No
New Business to Eagan:
`9
/f%n._
Reviewed By: , Building
Inspector
FEES
Base Fee
Surcharge ✓
Plan Review ✓
MCES SAC
City SAC ✓
S&W Permit & Surcharge
/Treatment Plant
`'Treatment Plant (Irrigation)
/Park Dedication (9328.4670)
/
"Trail Dedication (9375.4671)
�f 6�
EI 6 Landscape Guarantee (9001.2257)
y
1,506 Tree Mitiqation (9111.4677)
3 i Tree Performance Security (9111.2257)
i► QQ
2 Get Stormwater Performance Security (6501.2257)
3► b S / Z -�
y i I 6 �L y-7
r TOTAL: $ O.00 -A27 A
T
f` _
EAGAN
Received By: Sarah Brandel
Plan Reviewer: Mike Grannes
Date: 10/28/2022
Project Name: Eagan Specialty Center
Sub Type, Work Type: New Medical Office Building
Address: 2970 Highway 55
PLAN REVIEW MEMO
Permit # 179888
Date Received: 10/26/2022
Contractor:
Timco Construction
Contact:
Patrick Finn
Email:
pfinn@timco-const.com
Phone:
(612) 202-8384
Arch itect/Engineer:
Synergy Architecture Studio
Contact:
Patrick Giordana
Email:
pgiordana@synergyarchstudio.com
Phone:
(612) 383-2701
The plans are located on the J:Drive under the Project Name.
Please review the plans and updated the memo
accordingly.
No additional items needed
Mike Schultz
----------
Planning
Name
Division
Date
Reviewed
Additional Actions
Darrin Bramwell
Fire
11/1/2022
Reviewed, ready to be issu�
No additional items needed �!
Mike Grannes
Building Inspections
11/16/2022
Reviewed, ready to be issued
No additional items needed
Aaron Nelson
Engineering
11/8/2022
Reviewed, ready to be issued
No additional items needed
Mike Schultz
----------
Planning
1/9/2022
Reviewed, ready to be issued
Reviewed, ready to be issued
No additional items needed
No additional items needed
Landscape Guarantee (9001.2257)
$ 157,500.00
MS
Reviewed, ready to be issued
No additional items needed
❑
No
Tree Mitigation (9111.4677)
Reviewed, ready to be issued
No additional items needed
V1
Yes
❑
Reviewed, ready to be issued
No additional items needed
Indicate below any fees that are to be collected with the building permit
Amount
Staff Initials
V]
Yes
❑
No
Park Dedication (9328.4670)
$ 34,881.00
MS Zoning: PD
61
Yes
❑
No
Trail Dedication (9375.4671)
$ 6,384.00
MS
V1
Yes
❑
No
Landscape Guarantee (9001.2257)
$ 157,500.00
MS
W1
Yes
❑
No
Tree Mitigation (9111.4677)
$ 108,700.00
MS
V1
Yes
❑
No
Tree Performance Security (9111.2257)
$
MS
❑
Yes
61
No
Stormwater Performance Security (6501.2257)
rh
fi —A 32
W1
Yes
❑
No
Sewer & Water Permit Required
� IR
W1
Yes
❑
No
REF Reconciliation between Engineering & Finance
W1
Yes
❑
No
Street/Curb Cut Required
Yes
❑
No
PRV Required
Yes
❑
No
Stormwater Management Permit Required, Deposit due on Stormwater Management Permit: $ 15,600.00
❑
Yes
0
No
Sign Permit
Www+ •ii
EAGAN
ESTAIILISIIEO 1860
November 16, 2022
Davis HIRE
Attn: Mark Davis
33 South 6th Street Suite 4650
Minneapolis, MN 55402
Synergy Architecture Studio
Attn: Patrick Giordana
33 South 6th Street Suite 4660
Minneapolis, MN 55402
Final Subdivision & Final Planned Development— EAGAN MOB
Please be informed that on November 15, 2022, the City Council formally approved the above referenced
subdivision. This plat approval is valid for only 60 days and requires that the final plat be recorded at
Dakota County by January 13, 2022. Please note there is a $75.00 charge for an extension, which must
be requested in writing two weeks prior to expiration.
Following is a list of the items required by the city prior to releasing the mylars for recording at the County.
1) One Digital Copy of the Final Plat in CAD format emailed to planning@cityofeagan.com
2) Official Plat- 1 Mylar copies 22" x 34" (signed by engineer & property owner)
3) Letter of Credit in the amount of $594,066
4) Park Dedication Fee - $34,881.00
5) Trail Dedication Fee - $6,384.00 33 4/ q (X.26) Contract Management Fee - $54,184.00 l0 r•
#�4
7) Cash In -Lieu of Tree Preservation - $108,700.00
8) Performance Guarantee (survival of preserved trees) - $29,320.00
9) New address is 2975 Holiday Court 0 -�
MAYOR I MIKE MAGUIRE COUNCIL MEMBERS I PAUL BAKKEN, CYNDEE FIELDS, GARY HANSEN, MIKE SUPINA CITYOFEAGAN.COM
CITY ADMINISTRATOR I DIANNE MILLER MUNICIPAL CENTER 13830 PILOT KNOB ROAD, EAGAN, MN 55122-1810
MAIN: (651) 675-5000 MAINTENANCE: (651) 675-5300 UTILITIES: (651) 675-5200
IF YOU HAVE A HEARING OR SPEECH DISABILITY, CONTACT US AT (651) 675.5000 THROUGH YOUR PREFERRED TELECOMMUNICATIONS RELAY SERVICE,
All the above listed items must be received by the city before the mylars can be released for final
recording at the County. The city will give you the mylar back to be record at Dakota County along with
any agreements.
NO BUILDING PERMITS will be issued, or public improvement contracts awarded until verification has
been received that this final plat has been dropped off at the County for recording.
Please feel free to contact the Planning Department at 651-675-5685 if you have any questions.
Sincerely,
JVL�e' sty-ta,
Julie Strid / Planning Aide
Items to be included in the Plan Review Memo:
11/16/2022 AN - $35,000 Stormwater performance guarantee was collected with the development
agreement.
01/09/2022 MS - Preliminary, Final PD Agreements, and Final Subdivision recorded.
Performance Guarantee (Refundable) for 64 diameter inches x 200 ($12,800) + tree protection (1
significant tree and 24,225 SF of significant wood lands)($29,320) = $42,120
Landscape Guarantee (Refundable) of $157,500 is based on actual landscape value.