Loading...
EA179888 - Building - Commercial/Industrial - Issued Date 01/20/2023City of Eagan 3830 Pilot Knob Rd Eagan, MN 55122 (651) 675-5675 www.cityofeagan.com Site Address: 2975 Holiday Ct Lot: Block: Additio PID: Use: Eagan Specialty Center Description: Sub Type: Commercial/Indust6 Work Type: New Description: Census Code: - Zoning: Square Feet: 36,100 Comments: Fee Summary: Valuation: 5,000,000.00 PERMIT Permit Type: Building EAGAN Permit Number: EA179888 111111111111 IN 11111111111111111111111111111111 E A 1 7 9 8 8 8* Date Issued: 1/20/2023 BL - B4se Fee BL - Plan Review 65% Surcha ge - Based on Valuation SAC - ommercial/Industrial City S C (01 Unit) SW - S wer Permit Fee SW - V later Permit Surcharge - $1.00 Treatm nt Plant - Commercial Treatm nt Plant (Irrigation) Total: � Construction Type: II -B Occupancy: B S-1 $24,636.65 0801.4085 $16,013.82 0720.4222 $1,500.00 9001.2195 $29,820.00 9220.2275 $1,668.00 9376.4681 $80.00 6201.4532 $80.00 6101.4507 $1.00 9001.2195 $13,512.00 6101.4684 $1,126.00 6101.4684 $88,437.47 Contractor: - Applicant - Owner: Timco Construction Eagan Mob Partners LLC 14700 28th Ave N #40 33 6th St S Plymouth MN 55447 Suite 4650 (763) 694-0250 Minneapolis MN 55402 This permit shall be null and void if wor does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read t is application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eaga Ordinances. Applicant/Permitee: Signature ' Issued BS Signature 23 emailed in ______-------- ----------- For Office Use Building Permit #: � I S&W PermitEAGAN #: I gl i 14Jr"•A Ue ,�ws •i/ I I Permit Fee: _ 4ID �10. I I , E C E I V E Date Received: 02 3830 PILOT KNOB ROAD I EAGAN, MN 55122-181 I (651) 675-5675 1 FAX: (651) 675-5694 OCT 2 5 202 Date Issued: I Plan Submittal: buildingins ections cit ofea an.co-------------------------i COMMERCIAL BUItDWIG PeRVIT APPLICATION Date: 10.25.22 Site Address: 2975- Highway 55 Eagan, MN 55121 Suite #: Tenant NamE. � 1�1�^ 'T"'i e Tenant is: 0 New ❑Existing Former Tenant (if applicable): Name: Timco Construction Phone: 612-202-8384 Applicant t Applicant is: ❑ Owner 0 Contractor ❑ Agent Email: pfinn@timeo-eonst.eom Type of Description of work: New 1 story medical office building i Work 5,000,000 i Construction Cost: Company: Timco Construction contact: Patrick Finn Building Address/city/zip: 2820 Vicksburg Lane North Contractor Phone: Email: 612-202-8384 pfinn@timco-const.com License #: Expiration Date: Company: Synergy Architecture Studio contact: Patrick Giordana Architect/ 33 South 6th Street Suite 4560 Minneapolis, MN 55402 Engineer Address/City/Zip: Phone: 612-383-2701 Email: pgiordana@synergyarchstudio.com �- Sewer & Company: JULIAN M. JOHNSON CONSTRUCTION CORP. Contact: Travis Johnson Water 6191 140th AVENUE N.W. RAMSEY, MN 55303-1021 Contractor Address/City/Zip: Required for Phone: (763) 323-2900 Email: travis@jmjccorp.com new construction and additions License #: Expiration Date: 1 understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. NOTE: Plans and supporting documents that you submit are considered to be public information Portions of the information my be classified as non- ublic if ou rovtde s ecific reasons that would permit the City to conclude that they are trade secrets. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. X Patrick Finn X Applicant's Printed Name Applicant's Signature SUB TYPES Foundation Commercial/Industrial Apartments WORK TYPES New Addition Alteration FOR OFFICE USE ONLY Public Facility Accessory Building Greenhouse/Tent Interior Improvement Exterior Improvement Retaining Wall DESCRIPTION Valuation Code Edition Plan Review Zoning Census Code y- Stories Antennae Demolish Building* Demolish Interior Demolish Foundation 2970 Highway 55 Eagan, MN 55121 Site Address: Tenant: Davis Healthcare Real Estate Permit #: ng9li l]. *Demolition of entire building - give PCA handout to applicant ZOZ� 04 C' MCES System r� SAC Units City Water # of Units Square Feet h Fire Sprinklers Type of Construction ! Length Occupancy Width REQUIRED INSPECTIONS Footings_ New Building _ Addition Retaining Wall Foundation Foundation Before Backfill Other: _ Vapor Barrier Other: Framing 30 Minutes 1 Hour Insulation Sheetrock Roof: _Decking Tlnsulation _Ice & Water Final Final / C.O. Required Final / No C.O. Required Siding: _ Lath _Brick _ EFIS Fireplace: _Rough In _Air Test _Final Pool: _Footings _Air/Gas Tests _Final Final C/O Inspection: Schedule Fire Marshal to be present: Yes No New Business to Eagan: `9 /f%n._ Reviewed By: , Building Inspector FEES Base Fee Surcharge ✓ Plan Review ✓ MCES SAC City SAC ✓ S&W Permit & Surcharge /Treatment Plant `'Treatment Plant (Irrigation) /Park Dedication (9328.4670) / "Trail Dedication (9375.4671) �f 6� EI 6 Landscape Guarantee (9001.2257) y 1,506 Tree Mitiqation (9111.4677) 3 i Tree Performance Security (9111.2257) i► QQ 2 Get Stormwater Performance Security (6501.2257) 3► b S / Z -� y i I 6 �L y-7 r TOTAL: $ O.00 -A27 A T f` _ EAGAN Received By: Sarah Brandel Plan Reviewer: Mike Grannes Date: 10/28/2022 Project Name: Eagan Specialty Center Sub Type, Work Type: New Medical Office Building Address: 2970 Highway 55 PLAN REVIEW MEMO Permit # 179888 Date Received: 10/26/2022 Contractor: Timco Construction Contact: Patrick Finn Email: pfinn@timco-const.com Phone: (612) 202-8384 Arch itect/Engineer: Synergy Architecture Studio Contact: Patrick Giordana Email: pgiordana@synergyarchstudio.com Phone: (612) 383-2701 The plans are located on the J:Drive under the Project Name. Please review the plans and updated the memo accordingly. No additional items needed Mike Schultz ---------- Planning Name Division Date Reviewed Additional Actions Darrin Bramwell Fire 11/1/2022 Reviewed, ready to be issu� No additional items needed �! Mike Grannes Building Inspections 11/16/2022 Reviewed, ready to be issued No additional items needed Aaron Nelson Engineering 11/8/2022 Reviewed, ready to be issued No additional items needed Mike Schultz ---------- Planning 1/9/2022 Reviewed, ready to be issued Reviewed, ready to be issued No additional items needed No additional items needed Landscape Guarantee (9001.2257) $ 157,500.00 MS Reviewed, ready to be issued No additional items needed ❑ No Tree Mitigation (9111.4677) Reviewed, ready to be issued No additional items needed V1 Yes ❑ Reviewed, ready to be issued No additional items needed Indicate below any fees that are to be collected with the building permit Amount Staff Initials V] Yes ❑ No Park Dedication (9328.4670) $ 34,881.00 MS Zoning: PD 61 Yes ❑ No Trail Dedication (9375.4671) $ 6,384.00 MS V1 Yes ❑ No Landscape Guarantee (9001.2257) $ 157,500.00 MS W1 Yes ❑ No Tree Mitigation (9111.4677) $ 108,700.00 MS V1 Yes ❑ No Tree Performance Security (9111.2257) $ MS ❑ Yes 61 No Stormwater Performance Security (6501.2257) rh fi —A 32 W1 Yes ❑ No Sewer & Water Permit Required � IR W1 Yes ❑ No REF Reconciliation between Engineering & Finance W1 Yes ❑ No Street/Curb Cut Required Yes ❑ No PRV Required Yes ❑ No Stormwater Management Permit Required, Deposit due on Stormwater Management Permit: $ 15,600.00 ❑ Yes 0 No Sign Permit Www+ •ii EAGAN ESTAIILISIIEO 1860 November 16, 2022 Davis HIRE Attn: Mark Davis 33 South 6th Street Suite 4650 Minneapolis, MN 55402 Synergy Architecture Studio Attn: Patrick Giordana 33 South 6th Street Suite 4660 Minneapolis, MN 55402 Final Subdivision & Final Planned Development— EAGAN MOB Please be informed that on November 15, 2022, the City Council formally approved the above referenced subdivision. This plat approval is valid for only 60 days and requires that the final plat be recorded at Dakota County by January 13, 2022. Please note there is a $75.00 charge for an extension, which must be requested in writing two weeks prior to expiration. Following is a list of the items required by the city prior to releasing the mylars for recording at the County. 1) One Digital Copy of the Final Plat in CAD format emailed to planning@cityofeagan.com 2) Official Plat- 1 Mylar copies 22" x 34" (signed by engineer & property owner) 3) Letter of Credit in the amount of $594,066 4) Park Dedication Fee - $34,881.00 5) Trail Dedication Fee - $6,384.00 33 4/ q (X.26) Contract Management Fee - $54,184.00 l0 r• #�4 7) Cash In -Lieu of Tree Preservation - $108,700.00 8) Performance Guarantee (survival of preserved trees) - $29,320.00 9) New address is 2975 Holiday Court 0 -� MAYOR I MIKE MAGUIRE COUNCIL MEMBERS I PAUL BAKKEN, CYNDEE FIELDS, GARY HANSEN, MIKE SUPINA CITYOFEAGAN.COM CITY ADMINISTRATOR I DIANNE MILLER MUNICIPAL CENTER 13830 PILOT KNOB ROAD, EAGAN, MN 55122-1810 MAIN: (651) 675-5000 MAINTENANCE: (651) 675-5300 UTILITIES: (651) 675-5200 IF YOU HAVE A HEARING OR SPEECH DISABILITY, CONTACT US AT (651) 675.5000 THROUGH YOUR PREFERRED TELECOMMUNICATIONS RELAY SERVICE, All the above listed items must be received by the city before the mylars can be released for final recording at the County. The city will give you the mylar back to be record at Dakota County along with any agreements. NO BUILDING PERMITS will be issued, or public improvement contracts awarded until verification has been received that this final plat has been dropped off at the County for recording. Please feel free to contact the Planning Department at 651-675-5685 if you have any questions. Sincerely, JVL�e' sty-ta, Julie Strid / Planning Aide Items to be included in the Plan Review Memo: 11/16/2022 AN - $35,000 Stormwater performance guarantee was collected with the development agreement. 01/09/2022 MS - Preliminary, Final PD Agreements, and Final Subdivision recorded. Performance Guarantee (Refundable) for 64 diameter inches x 200 ($12,800) + tree protection (1 significant tree and 24,225 SF of significant wood lands)($29,320) = $42,120 Landscape Guarantee (Refundable) of $157,500 is based on actual landscape value.