EA179888 - Building - Commercial/Industrial - Issued Date 01/20/2023 (2) PERMIT
City of Eagan ® � , , Permit Type: Building
3830 Pilot Knob Rd �-`..' p ,p� EAGAN
Permit Number: EA179888
Eagan,MN 55122 •--- ---
(651)675-5675 , 111111111111 1
www.cityofeagan.com * E A 1 7 9 8 8 8 *
Date Issued: 1/17/2023
Site Address: 2975 Holiday Ct
Lot: Block: Addition:
PID:
Use: Eagan Specialty Center
Description:
Sub Type: Commercial/Industrial Construction Type: II-B
Work Type: New
Description:
Census Code: - Occupancy: B
Zoning: S-1
Square Feet: 36,100
Comments:
Fee Summary: BL-Base Fee $24,636.65 0801.4085
BL-Plan Review 65% $16,013.82 0720.4222
Valuation: 5,000,000.00 Surcharge-Based on Valuation $1,500.00 9001.2195
SAC-Commercial/Industrial $29,820.00 9220.2275
City SAC(01 Unit) $1,668.00 9376.4681
SW- Sewer Permit Fee $80.00 6201.4532
SW-Water Permit $80.00 6101.4507
Surcharge-$1.00 $1.00 9001.2195
Treatment Plant-Commercial $13,512.00 6101.4684
i u i f eL Treatment Plant(Irrigation) $1,126.00 6101.4684
0-y,d etc io $34,881.00 9328.4670
$6,384.00 9375.4671
$157,500.00 9001.2257
$108,700.00 9111.4677
T r ormance Gu atitee $42,-144.W 9111.2257
Total: $438,022.47
M*"000"1000
Contractor: - Applicant - Owner:
Timco Construction Eagan Mob Partners LLC
14700 28th Ave N #40 33 6th St S
Plymouth MN 55447 Suite 4650
(763)694-0250 Minneapolis MN 55402
This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature srued B : Signature
MCES USE:Letter Reference: 221024A6 Address ID:759411 Payment ID:463113
Date of Determination: 10/24/22 Determination Expiration: 10/24/24
Greetings!
Please see the determination below.
Project Name: Eagan Specialty Center
Project Address: 2970 Highway 55
Suite#/Campus: N/A
City Name: Eagan
Applicant: Eric Mayer,Synergy Architecture Studio
Special Notes: Please be aware that the demolition credit is being taken ahead of the actual building demolition and no other
credit will be available. All demolitions must be reported in order for the prior use to be eligible for any credit on the property.
The demolition must be properly reported on the MCES SAC-D Demolition Declaration Form. At the time of the actual building
demolition note on your SAC-D form that the credit has already been applied to a new use.
The Council understands this building has speculative o ice. At the time the finishing permits are issued, a SAC determination
will be required.
Charge Calculation:
Office-Speculative: 34,312 sq.ft. @ 2650 sq.ft./SAC= 12.95
Total Charge: 12.95 or 13.00
Credit Calculation:
Future Demolition
Single Family Home(Grandparent 1911)= 1.00
Total Credit: 1.00
Net SAC: 12.00 = 12 SAC Due
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the
business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be
made. If you have any questions email me at:toni.ianzig@metc.state.mn.us.
Thank you,
Toni Janzig
SAC Technician
Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram
390 Robert Street North St. Paul, MN 55101-1805
Phone 651.602.1000 1 Fax 651.602.1550090. metrocouncil.org METROPOLITAN
At?Equal Opportt�nity Employer C 0 U N C I L