EA181283 - NRMP - Stormwater Management Permit - Issued Date 02/08/2023PERMIT
City of Eagan • , , e Permit Type: NRMP
3830 Pilot Knob Rd ,�.; a ®;: ® Permit Number: EA181283
Eagan, MN 55122 -- EAGAN
(651) 675-5300 111111111111
waterres@cityofeagan.com * E R 1 8 1 2 8 3
Date Issued: 2/8/2023
Site Address: 1424 Yankee Doodle Rd
Lot: 1 Block: 1 Addition: Bicentennial 3rd
PID: 10-14002-01-010 11111111111 IN 111111111111111111111111111111111111111111111111111 11111M
Use: Chase Bank * 1 0— 1 4 0 0 2— 0 1— 0 1 0*
Comments: Please call Water Resources at (651) 675-5300 for inspections.
Before construction begins, an inspection is required to verify that the erosion and sediment control measures shown on the
plan have been installed accordingly.
Fee Summary: Erosion & Sediment Control Deposit $6,500.00 6501.2257
Total:
$6,500.00
Contractor: - Applicant - Owner:
Steiner Construction Services, LLC Bas Re Holdings LLC
6497 City West Pkwy 12508 Norway Cir
Eden Prairie MN 55344 Burnsville MN 55337
(952)767-3000
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature
ssued By" Signature
\ 1 I I IE
BAS RE HOLDINGS, LLC 612-490-7254
Name: phone:
AGA N
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810
(651) 675-5300 1 waterres(a citvofeaaan.com
r-------------------------7
I For Office Use R 1
Stormwater Management Permit
1 I
I Building Permit #-. EA178016
EsI
I crow DJ 0 00 j
I I
I Staff:
i --------------------------I
STORMWATER MANAGEMENT PERMIT
Date: 12/20/22 Site Address: 1424 Yankee Doodle Road
Description of Project: New construction of commercial banking center.
Area of land Being Disturbed: 27,234 SF (.63 AC) Start Date: 04/10/23 Completion Date: 10/02/23
0 Please submit a Land Disturbance and Stormwater Pollution Prevention Plan with this application.
BAS RE HOLDINGS, LLC 612-490-7254
Name: phone:
1960 Cliff Lake Rd, Suite 129-503, Eagan, MN 55122
Property Owner
Address city zip:
Contact: Lisa McCormick ESI: Ls. Mccrmck@gmall.com
Applicant Is: _ Owner ✓ Contractor
Steiner Construction N/A
Name: License #
6497 City West Parkway Eden Prairie
Contractor
Address: City:
MN 55344 952-475-5106
State:- Zip: Phone:
Contact: Jim Washleski Email: jwashieski@steineres.com
Erosion and Sediment Control Performance Security
The City requires an escrow deposit to secure performance of erosion and sediment control (ESC) requirements, including proper
Installation and maintenance. The security shall pay for any City costs or expenses to bring the site Into compliance with the
stormwater management permit, including any engineering, legal, or administrative expenses; Inspections; and necessary work by
City contractor(s). The City may extract from the security escrow. The escrow deposit will be released only upon Inspection and
written notice of conformance by the City.
The following escrow deposits Include two (2) required City inspections, initial and final.
Existing Single -Family Residential Lot (addition, demolition, pool, retaining wall, etc.) $1,300/lot
New Single -Family Construction $3,800/lot
Multi -Family or Commercial Construction (new, addition, demolition) $6,500/acre'
`Maximum of $15,600
Erosion and Sediment Control Reinspection Fee (for as needed City reinspection after the two (2) included) $85/trip
Security Amount: $6j500.00
The applicant assumes all responsibilities for installation and maintenance of pollution prevention practices on this site.
Any violations of City Code identified by the City shall be addressed within 48 -hours of service of the notification.
The applicant understands that failure to maintain pollution prevention practices within the time allotted by the City
notification, will result in enforcement action to correct site deficiencies that are In violation of Sec. 4.34.
The Issuance of this permit constitutes a right -of -entry of the City or its contractors to enter upon the construction site for
the purpose of completing ordinance enforcement and/or completing corrective work.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the
ordinances and odes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and
work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which
requires a review and approval of plans.
The undersigned accepts full responsibility for compliance with the Stormwater Management Ordinance of the City of
Eagan and agrees to comply with the Stormwater Pall troy n, Prevention Plan or equivalent in full.
xJustin Iverson x �' 1/5/23
Applicant's Printed Name Applicant's Signature Date
x Elias Saman x a-- L- 2--?
Owner's Printed Name Owner's Signature Date
Performance Security Release
The following information will determine to whom the escrow deposit will be returned. Security will be returned in the form
of a check.
Name: STEINER CONSTRUCTION SERVICES, INC.
Address / City / Zip: 6497 CITY WEST PARKWAY, EDEN PRAIRIE, MN 55344
Phone: 952-767-3000 Email: JWASHLESKI@STEINERCS.COM
Amount: 6,500.00 Permit Number.
FOR OFFICE USE ONLY
SUB TYPE
XStonnwabr Management Permit
DESCRIPTION
Addition
New
WORK TYPE
Apartments X Commerciallindustrial
Multl Family Public Facility
Single Family
_ Demolition _ Pool
_ Retaining Wall _ Other.
InRE U R D NSPECTiONS
spection
X Final Inspection
SECURITY
Erosion and Sediment Control Deposit (6501.22M $6,500
Other. SWrmwaetPefamw=seWftceWlM67) $7,000
Total: 1 Sao Prrni
Reviewed. By ri er r Resources Date. 02/07/2023
Items to be included in the Plan Review Memo:
Planning - PD Amendment has not yet been recorded. Awaiting revised plans. ST 8/1/2022
-PD Amendment not yet recorded. Negative escrow must be paid. Awaiting revised photometric plan.
Park dedication rate is $1,057 per 1,000 SF of building area and $1,451 per net acre for trail
dedication. (0.56 acres) ST 11/1/22
Utilities (8/24/2022) - The sanitary connection needs to be wet tapped into the sanitary mainline
before or after the manhole, will not allow direct connection into existing manhole. Hydrant needs an
isolation gate valve and add hydrant detail plate #100.
Forestry (9-9-22) - This property was developed Pre -1996 Tree preservation ordinance. No
Significant Trees exist on this site, Therefore there are no tree preservation issues or required
mitigation.
Water Resources (9/8/2022) - Waiting on Owner to return signed Stormwater Management
Agreement