EA181223 - Building - Commercial/Industrial - FIS - Issued Date 02/15/2023 PERMIT
City of Eagan . , Permit Type: Building
3830 Pilot Knob Rd •e•�:�;:, Permit Number: EA181223
Eagan,MN 55122 •- - EAGAN
(651)675-5675 111111111111
www.cityofeagan.com * E R 1 8 1 2 2 3
Date Issued: 2/15/2023
Site Address: 2900 Lone Oak Pkwy 120
Lot: 1 Block: 1 Addition: Blue Ridge 3rd
PID:10-14577-01-010
Use: FIS * 10 - 14577 - 0 1 - 0 10 *
Description:
Sub Type: Commercial/Industrial Construction Type: II-B
Work Type: Int Impr
Description: Tenant Buildout
Census Code: - Occupancy: B
Zoning:
Square Feet: 4,928
Comments:
Fee Summary: BL-Base Fee $1,517.40 0801.4085
Valuation: 148,890.00 BL-Plan Review 65% $986.31 0720.4222
Surcharge-Based on Valuation $74.45 9001.2195
Total: $2,578.16
Contractor: - Applicant _ Owner:
Bainey Group Lone Oak LLC
14700 28th Avenue North,Suite 30 %Capital Partners
Plymouth MN 55447 5201 Eden Ave Ste 50
(763)557-6911 Edina MN 55436
This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature ssued B : Signature
ECT
Zd`3'
�9 2 ( I r-------------------------I
I For Office Use
1 181223
®, f ® �YBuilding Permit M
® � d 0 I i
®® I S&W Permit M
SIM
I QQ
Permit Fee: ���U .
I
j Date Received: 2/2/2023
3830 PILOT KNOB ROAD EAGAN, MN 55122-1810 I j
(651)675-5675 1 FAX: (651)675-5694 Date Issued: i
Plan Submittal: buildinainspections(cDcityofeagan.com --------------------------I
COMMERCIAL BUILDING PERMIT APPLICATION
Date: 02/02/2023 Site Address: 2900 Lone Oak Parkway Suite#: 120
Tenant Name: Fis Tenant is: ® New ❑ Existing
Former Tenant(if applicable):
Name: Heather Mayer Phone: 763-231-8196
Applc,A t
;. Applicant is: ❑ Owner ® Contractor ❑Agent Email: heatherm@bainey.com
Description of work: Tenant Buildout
Construction Cost: $148, 890 . 00The Baine Group Heather Mayer
Company: Y P Contact:
u�
-NyAddress/City/Zip: 14700 28th Ave N Suit 30 Plymouth, MN 55447
+ otactt�rr ' Email:
763-8188 heatherm@bainey.com
Pho,
a License#: Expiration Date:
Genesis Architecture Scott lNrasman
Company: Contact:
ti'giCtg�I Address/City/Z. 1600 Utica Ave S Suite 300 St . Louis Park, MN,
t lM1
w
.' Phone: 952-897-7700 Email:
:
e m
4VIlE31' t Company: Contact:
a�
ti + ['s. Address/Cityj On
/Zip:
NACa
$kiYl '
Phone: Email:
r �tnd��dd #rts
License#: Expiration Date:
® 1 understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
NbT Plan artd suppork�ng d�rcunts that you'sybfrii>are'coria der dhtd lie. Ub lc fprrlt #+off. l i) tlbrt$`r#the,irif
y01 ormati+rsn
rt►�" :t�e:cl'a� �li�e. ::-�>�ncn+ "ritbll+c 1f ,big. :irc�Yide.s : clftc rea��ais'�►at�rii`Id. e �t.thal4�l. t+��oftd(tiv�e�.fhat"th� �tr..�katradesi�,��fs�';
I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the
approved plan in the case of work which requires a review and approval of plans.
x Hilary Unruh x Hilary Unruh, , ^""^
Applicant's Printed Name Applicant's Signature
s
® ® o e ® o
COMMERCIAL BUILDING PERMIT
E AGA N SUBMITTAL REQUIREMENTS
Interior Improvement New uildin s AND Additions
Project Narrative, including a description of the A precon truction meeting will be schedule y the
company operation and maximum number of City after t permit is issued. /
employees on the primary shift
Scaled Architectural Plans ❑ Project N rative, including a descri tion of the
rn
company o ration and maximu umber of
Code Analysis employees o the primary shift
Ke �
y Plan ❑ Soils Report
`❑ Energy Calculations** ❑ Scaled Structural lans
Fire Stopping Submittals ❑ Scaled Architecture Ian
s m❑ Met Council SAC Determination (651)602-1000 o HVAC units are req it d on building
elevation/site plan/
❑ Civil Plans
❑ Landscaping Plan
❑ Code Analysis *
❑ Energy Calcula ons**
❑ Emergency sponse Site Plan
❑ Special Ins ction &Testing Sched e
❑ Stormwat r Management Permit
❑ Fire Sto ping Submittals
❑ Met C uncil SAC Determination(651)60 -1000
✓ Call the Minnesota Department of Health at(651)201-4500 for details regarding food &beverage or lodging facilities.
✓ Plumbing, Mechanical, Electrical, Fire Suppression, and Sign Permit plans should be submitted with their respective
permit applications
* Contact Building Inspections for a sample.
** Energy Code Compliance Forms are available at www.cityofeagan.com/permithandouts.
3830 PILOT KNOB ROAD I EAGAN, MN 55122
(651)675-56751 FAX: (651)675-5694 buildinoinspectionse-citvofeaoan.com
If you have a hearing or speech disability,contact us through your preferred telecommunications relay service.
Revised 8/19/2022
rt d �fyG,tiS,E'{,lN�.Y
SUB TYPES Site Address:29 S12()Lone oak Pkwy
_Foundation _ Public Facility _ Antennae Tenant: FIS
Commercial/industrial _ Accessory Building
_ Apartments _ Greenhouse/Tent Permit#: 181223
WORK TYPES
New Interior Improvement Demolish Building*
_ Addition _ Exterior Improvement Demolish Interior
Alteration _ Retaining Wall Demolish Foundation
*Demolition of entire building—give PCA handout to applicant
DESCRIPTION
Valuation IY9 89 b Code Edition Z®�� MCES System �]
Plan Review Zoning SAC Units � iW10
Census Code �" Stories City Water
#of Units ''® Square Feet �9 Fire Sprinklers
Type of Construction Length
Occupancy Width
REQUIRED INSPECTIONS
Footings_New Building_Addition Retaining Wall
Foundation Foundation Before Backfill Other:
Vapor Barrier Other:
Framing 30 Minutes 1 Hour
Insulation
Sheetrock Final/C.O.Required
Roof:_Decking _Insulation _Ice&Water _Final Final/No C.O.Required
Siding:_Lath _Brick_EFIS
Fireplace:_Rough In Air Test _Final
Pool:_Footings —Air/Gas Tests _Final
Final C/O Inspection: Schedule Fire Marshal to be present: Yes No
New Business to Eagan: Ves
Reviewed By: , Building Inspector
FEES
Base Fee o� �. Landscape Guarantee(9001.2257)
SurchargeTree Mitigation (9111.4677)
Plan Review �`. Tree Performance Security (9111.2257)
MCES SAC Stormwater Performance Security(6501.2257)
City SAC
S&W Permit&Surcharge
Treatment Plant
Treatment Plant(Irrigation)
Park Dedication (9328.4670)
S
Trail Dedication (9375.4671) TOTAL: $ 0.00
Revised 8119/2022
MCES USE:Letter Reference: 230214C2 Address ID:5172 Payment ID:466013
Date of Determination:02/14/23 Determination Expiration:02/14/25
Greetingsl
Please see the determination below.
Project Name: Fis
Project Address: 2900 Lone Oak Parkway
Suite#/Campus: 120,The Water I
City Name: Eagan
Applicant: Angie Groth, Heather Mayer,and Hilary Unruh,The Bainey Group
Special Notes: The City is required to report this project with the normal SAC Activity Report if a permit is issued.
Charge Calculation:
Office: 4533 sq.ft. @ 2650 sq.ft./SAC=1.71
Total Charge: 1.71
Credit Calculation:
Patterson Dental(SAC 05/16)
4533 sq.ft./19,829 sq.ft.=23%x 6.92 SAC=1.59
Total Credit: 1.59
Net SAC: 0.12 = 0 SAC Due
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the
business use and size at the time of the final inspection. If there is a change in use or size,a redetermination will need to be
made. If you have any questions email me at:sara.running@metc.state.mn.us.
Thank you,
Sara Running
SAC Technician
Please visit our SAC website by going to: http://www.metrocouncil.ore/SACprogram
• -6
. . . METROPOLITAN
WIN C 0 U N C I L