EA180611 - Building - Single Fam - Issued Date 02/21/2023PERMIT
City of Eagan , ,
Permit Type:
Building
, ,
3830 Pilot Knob Rd `.' i % °:
�•'- �° �°
Permit Number:
EA180611
Eagan, MN 55122 •--• ---•EAGAN
(651) 675-5675
1111111111111111111111111111111111111111111111111
www.cityofeagan.com
* E R 1 8 0 6 1
1*
Date Issued:
2/21/2023
Site Address: 4755 Cypress Pt
Lot: 2 Block: 2 Addition: Fairway Hills 4th
PID:10-25603-02-020
Use: * 1 0— 2 5 6 0 3— 0
2— 0 2 0
Description:
Sub Type: Single Fam Construction Type:
V -B
Work Type: Solar
Description: Installation of a flush -mounted rooftop solar PV
system on the residence Occupancy:
IRC -1
Census Code: 434 - Residential Additions, Alterations
Zoning: R-1
Square Feet: 0
Comments: Improvements to the home may require smoke detectors in all bedrooms.
Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State
Building Code).
Fee Summary: BL - Plan Review - Fixed $40.00
0720.4222
Valuation: 12,000.00 BL - Solar/Wind Energy $94.00
0801.4085
Surcharge -Fixed $1.00
9001.2195
Total: $135.00
Contractor: - Applicant - Owner:
All Energy Solar Katherine Ann Bierlein
1264 Energy Lane 4755 Cypress Pt
St Paul MN 55108 Eagan MN 55123
(651) 842-9404
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature
sued B : Signature
yy� �1 r�----------------
For Office Use
A ! I I Permit #:
0��• eels Fee:
I Permit ��� I
EAGA IEEB®OE I 1
DEC 9 �Q�� I Date Received:l2/9/22
3830 PILOT KNOB ROAD i EAGAN, MN 55122-1810 01 1
(651) 675-56751 FAX: (651) 675-5694 BY: I Staff: I
buildinainsr)ectionsO-cityofeacian.com I -----------------J
2022 RESIDENTIAL BUILDING PERMIT APPLICATION
Date: 12/9/2022 site Address: 4755 Cyress Pt Unit #:
Name: Jeff Bierlein Phone: (952) 239-4183
Resident! 4755 Cyress Pt, Eagan, MN 55123
owner Address / City / Zip:
Applicant is: Owner V( Contractor Owner Email:
Type of Work
Description of work: Installation of a flush -mounted rooftop solar PV system on the residence
Construction Cost: $12,000 Multi -Family Building: (Yes / No_�
Company: All Energy Solar contact: Colin Buechel
Contractor
Address: 1264 Energy Ln city: St Paul
State: MN Zip: 55108 Phone: 651-842-9404 Email: Colin.buechel@allenergysolar.com
BC665819 h Z a t 5 ail
License #: Lead Certificate #:
if the project is exempt from lead certification, please explain why: R-1, Fairway Hills 4th Add
N/A less than 6 sqft disturbed
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
Yes No If yes, date and address of master plan:
Licensed Plumber: Phone:
Mechanical Contractor: Phone:
Sewer & water Contractor: Phone:
Fire Suppression Contractor: Phone:
NOTE: Pans and supporting documents that you submit are considered to be public Information. Portions of the Information may be
classified as non- `ublic /f you grovide s ec/ffc reasons that would ' ermit the Cl to conclude that th2Z are ?rade secrets.
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at
www.citvofeacian.com/subscribe.
CALL BEFORE YOU DIG. Contact Gopher State One Call at (651) 454-0002 or www.aooherstateonecall.oro for protection against underground utility
damage. Contact Gopher State One Call 48 hours before you intend to dig to receive locates of underground utilities.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan In the case of work which requires a review and approval of plans,
X Colin Buechel X eg;zl ga4chljol
Applicant's Printed Name Applicant's Signature
FOR OFFICE USE ONLY
DESCRIPTION
Calculated Valuation 0, Opp
Plan Review
(25%100% --1
Census Code
# of Units
# of Buildings
Type of Construction VI&
REQUIRED INSPECTIONS
Footings (New Building)
Footings (Deck)
Footings (Addition)
Foundation Foundation Before Backfill
Roof: _Ice & Water _Final
✓ Framing r 30 Minutes 1 Hour
Fireplace: _Rough In _Air Test _Final
Insulation
Sheathing
Sheetrock
Fire Walls
Braced Walls
Shower Pan
Occupancy TtItc-t
Code Edition NArAr_g
Zoning
Stories
Square Feet
Length
Width
MCES System
SAC Units
City Water
Booster Pump
PRV
Fire Suppression Required
Meter Size:
Final / C.O. Required
✓ Final / No C.O. Required
HVAC _ Service Test Gas Line Air Test _ Hood
Pool: _Footings —Air/Gas Tests _Final
Drain Tile
Siding: _Stucco Lath _Stone Lath _Brick _ EFIS
Windows
Retaining Wall: _ Footings _ Backfill _ Final
Radon Control
Fire Suppression: _Rough In _Final
Erosion Control Stormwater Management
Other: Permit Required:
Reviewed By: S . Ak,tl , Building Inspector
RESIDENTIAL FEES /V�w roa>t�e� �• to.s �ec. f
Calculated Valuation %a,0oo
Base Fee
Plan Review
State Surcharge
MCES SAC
City SAC
Treatment Plant
Water Supply & Storage
S&W Permit & Surcharge
Radio Read
Other:
Copies:
TOTAL $ 0.00
Site Address: y'?sr
-0-ware".
Permit #: %8O Co i t
SUB TYPES
Foundation
_ Fireplace
_ Porch (3 -Season)
_ Miscellaneous
Single Family
_ Garage
_ Porch (4 -Season)
— Accessory Building
_ Multi
_ Deck
_ Porch (Screen/Gazebo/Pergola)
_ 01 of _ Plex
_ Lower Level
_ Pool
WORK TYPES
New
_ Repair
_ Siding
_ Retaining Wall
_ Addition
_ Fire Repair
_ Reroof
_ Move Building
_ Alteration
_ Water Damage
_ Windows
_ Demolish Building*
Replace
_ Egress Window
✓ Solar
"Demolition of entire building - give PCA
handout to applicant
DESCRIPTION
Calculated Valuation 0, Opp
Plan Review
(25%100% --1
Census Code
# of Units
# of Buildings
Type of Construction VI&
REQUIRED INSPECTIONS
Footings (New Building)
Footings (Deck)
Footings (Addition)
Foundation Foundation Before Backfill
Roof: _Ice & Water _Final
✓ Framing r 30 Minutes 1 Hour
Fireplace: _Rough In _Air Test _Final
Insulation
Sheathing
Sheetrock
Fire Walls
Braced Walls
Shower Pan
Occupancy TtItc-t
Code Edition NArAr_g
Zoning
Stories
Square Feet
Length
Width
MCES System
SAC Units
City Water
Booster Pump
PRV
Fire Suppression Required
Meter Size:
Final / C.O. Required
✓ Final / No C.O. Required
HVAC _ Service Test Gas Line Air Test _ Hood
Pool: _Footings —Air/Gas Tests _Final
Drain Tile
Siding: _Stucco Lath _Stone Lath _Brick _ EFIS
Windows
Retaining Wall: _ Footings _ Backfill _ Final
Radon Control
Fire Suppression: _Rough In _Final
Erosion Control Stormwater Management
Other: Permit Required:
Reviewed By: S . Ak,tl , Building Inspector
RESIDENTIAL FEES /V�w roa>t�e� �• to.s �ec. f
Calculated Valuation %a,0oo
Base Fee
Plan Review
State Surcharge
MCES SAC
City SAC
Treatment Plant
Water Supply & Storage
S&W Permit & Surcharge
Radio Read
Other:
Copies:
TOTAL $ 0.00