Loading...
EA180611 - Building - Single Fam - Issued Date 02/21/2023PERMIT City of Eagan , , Permit Type: Building , , 3830 Pilot Knob Rd `.' i % °: �•'- �° �° Permit Number: EA180611 Eagan, MN 55122 •--• ---•EAGAN (651) 675-5675 1111111111111111111111111111111111111111111111111 www.cityofeagan.com * E R 1 8 0 6 1 1* Date Issued: 2/21/2023 Site Address: 4755 Cypress Pt Lot: 2 Block: 2 Addition: Fairway Hills 4th PID:10-25603-02-020 Use: * 1 0— 2 5 6 0 3— 0 2— 0 2 0 Description: Sub Type: Single Fam Construction Type: V -B Work Type: Solar Description: Installation of a flush -mounted rooftop solar PV system on the residence Occupancy: IRC -1 Census Code: 434 - Residential Additions, Alterations Zoning: R-1 Square Feet: 0 Comments: Improvements to the home may require smoke detectors in all bedrooms. Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State Building Code). Fee Summary: BL - Plan Review - Fixed $40.00 0720.4222 Valuation: 12,000.00 BL - Solar/Wind Energy $94.00 0801.4085 Surcharge -Fixed $1.00 9001.2195 Total: $135.00 Contractor: - Applicant - Owner: All Energy Solar Katherine Ann Bierlein 1264 Energy Lane 4755 Cypress Pt St Paul MN 55108 Eagan MN 55123 (651) 842-9404 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature sued B : Signature yy� �1 r�---------------- For Office Use A ! I I Permit #: 0��• eels Fee: I Permit ��� I EAGA IEEB®OE I 1 DEC 9 �Q�� I Date Received:l2/9/22 3830 PILOT KNOB ROAD i EAGAN, MN 55122-1810 01 1 (651) 675-56751 FAX: (651) 675-5694 BY: I Staff: I buildinainsr)ectionsO-cityofeacian.com I -----------------J 2022 RESIDENTIAL BUILDING PERMIT APPLICATION Date: 12/9/2022 site Address: 4755 Cyress Pt Unit #: Name: Jeff Bierlein Phone: (952) 239-4183 Resident! 4755 Cyress Pt, Eagan, MN 55123 owner Address / City / Zip: Applicant is: Owner V( Contractor Owner Email: Type of Work Description of work: Installation of a flush -mounted rooftop solar PV system on the residence Construction Cost: $12,000 Multi -Family Building: (Yes / No_� Company: All Energy Solar contact: Colin Buechel Contractor Address: 1264 Energy Ln city: St Paul State: MN Zip: 55108 Phone: 651-842-9404 Email: Colin.buechel@allenergysolar.com BC665819 h Z a t 5 ail License #: Lead Certificate #: if the project is exempt from lead certification, please explain why: R-1, Fairway Hills 4th Add N/A less than 6 sqft disturbed COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? Yes No If yes, date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer & water Contractor: Phone: Fire Suppression Contractor: Phone: NOTE: Pans and supporting documents that you submit are considered to be public Information. Portions of the Information may be classified as non- `ublic /f you grovide s ec/ffc reasons that would ' ermit the Cl to conclude that th2Z are ?rade secrets. You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeacian.com/subscribe. CALL BEFORE YOU DIG. Contact Gopher State One Call at (651) 454-0002 or www.aooherstateonecall.oro for protection against underground utility damage. Contact Gopher State One Call 48 hours before you intend to dig to receive locates of underground utilities. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan In the case of work which requires a review and approval of plans, X Colin Buechel X eg;zl ga4chljol Applicant's Printed Name Applicant's Signature FOR OFFICE USE ONLY DESCRIPTION Calculated Valuation 0, Opp Plan Review (25%100% --1 Census Code # of Units # of Buildings Type of Construction VI& REQUIRED INSPECTIONS Footings (New Building) Footings (Deck) Footings (Addition) Foundation Foundation Before Backfill Roof: _Ice & Water _Final ✓ Framing r 30 Minutes 1 Hour Fireplace: _Rough In _Air Test _Final Insulation Sheathing Sheetrock Fire Walls Braced Walls Shower Pan Occupancy TtItc-t Code Edition NArAr_g Zoning Stories Square Feet Length Width MCES System SAC Units City Water Booster Pump PRV Fire Suppression Required Meter Size: Final / C.O. Required ✓ Final / No C.O. Required HVAC _ Service Test Gas Line Air Test _ Hood Pool: _Footings —Air/Gas Tests _Final Drain Tile Siding: _Stucco Lath _Stone Lath _Brick _ EFIS Windows Retaining Wall: _ Footings _ Backfill _ Final Radon Control Fire Suppression: _Rough In _Final Erosion Control Stormwater Management Other: Permit Required: Reviewed By: S . Ak,tl , Building Inspector RESIDENTIAL FEES /V�w roa>t�e� �• to.s �ec. f Calculated Valuation %a,0oo Base Fee Plan Review State Surcharge MCES SAC City SAC Treatment Plant Water Supply & Storage S&W Permit & Surcharge Radio Read Other: Copies: TOTAL $ 0.00 Site Address: y'?sr -0-ware". Permit #: %8O Co i t SUB TYPES Foundation _ Fireplace _ Porch (3 -Season) _ Miscellaneous Single Family _ Garage _ Porch (4 -Season) — Accessory Building _ Multi _ Deck _ Porch (Screen/Gazebo/Pergola) _ 01 of _ Plex _ Lower Level _ Pool WORK TYPES New _ Repair _ Siding _ Retaining Wall _ Addition _ Fire Repair _ Reroof _ Move Building _ Alteration _ Water Damage _ Windows _ Demolish Building* Replace _ Egress Window ✓ Solar "Demolition of entire building - give PCA handout to applicant DESCRIPTION Calculated Valuation 0, Opp Plan Review (25%100% --1 Census Code # of Units # of Buildings Type of Construction VI& REQUIRED INSPECTIONS Footings (New Building) Footings (Deck) Footings (Addition) Foundation Foundation Before Backfill Roof: _Ice & Water _Final ✓ Framing r 30 Minutes 1 Hour Fireplace: _Rough In _Air Test _Final Insulation Sheathing Sheetrock Fire Walls Braced Walls Shower Pan Occupancy TtItc-t Code Edition NArAr_g Zoning Stories Square Feet Length Width MCES System SAC Units City Water Booster Pump PRV Fire Suppression Required Meter Size: Final / C.O. Required ✓ Final / No C.O. Required HVAC _ Service Test Gas Line Air Test _ Hood Pool: _Footings —Air/Gas Tests _Final Drain Tile Siding: _Stucco Lath _Stone Lath _Brick _ EFIS Windows Retaining Wall: _ Footings _ Backfill _ Final Radon Control Fire Suppression: _Rough In _Final Erosion Control Stormwater Management Other: Permit Required: Reviewed By: S . Ak,tl , Building Inspector RESIDENTIAL FEES /V�w roa>t�e� �• to.s �ec. f Calculated Valuation %a,0oo Base Fee Plan Review State Surcharge MCES SAC City SAC Treatment Plant Water Supply & Storage S&W Permit & Surcharge Radio Read Other: Copies: TOTAL $ 0.00