EA181165 - Building - Commercial/Industrial - Issued Date 04/04/2023 PERMIT
City of Eagan e , Permit Type: Building
3830 Pilot Knob Rd ®0e Permit Number: EA181165
Eagan, MN 55122 m- ®® EAGAN
(651)675-5675 1111111111111111111111111111111111111111111111111
www.cityofeagan.com * E R 1 8 1 1 6 S *
Date Issued: 4/4/2023
Site Address: 3259 Terminal Dr
Lot: 061 Block: 1 Addition: Sibley Terminal Industrial Park
PID:10-68050-01-061 IN 11111111111111111111111111
Use: Aspen Waste Service * 1 0 — 6 8 0 S 0 — 0 1 — 0 6 1
Description:
Sub Type: Commercial/Industrial Construction Type: II-B
Work Type: Int Impr
Description: Phase 2
Census Code: - Occupancy: B
Zoning: S-1
Square Feet: 6,588
Comments:
Fee Summary: BL-Base Fee $6,636.65 0801.4085
Valuation: 1,000,000.00 BL-Plan Review 65% $4,313.82 0720.4222
Surcharge-Based on Valuation $500.00 9001.2195
SAC-Commercial/Industrial $2,485.00 9220.2275
City SAC(01 Unit) $139.00 9376.4681
Treatment Plant-Commercial $1,126.00 6101.4684
Treatment Plant(Irrigation) $1,126.00 6101.4684
Landscape Guarantee $7,500.00 9001.2257
Total: $23,826.47
Contractor: Owner: - Applicant -
Aws Eagan LLC
2951 Weeks Ave SE Ste 203
Minneapolis MN 55414-471
This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature sued B : Signature
r
CEIVE _____
I For Office Uso
------------------I (� InI
s 1 J i Building Permit#: J b Ul
0®iEUANY: SBWPermit#:
pq�a so+/ I yI
Permit F Ej�,
I
Date Received: I
3830 PILOT KNOB ROAD I EAGAN,MN 55122-1810 I I
(651)675-56751 FAX:(651)675-5594 j
Date Issued: I
Plan Submittal:buildinainsaeo ionsDcltvofeagan.com L-------_
COMMERCIAL BUILDING PERMIT APPLICATION
Date: 1/30/23 Site Address: 3259 Terminal Drive suite#:
Tenant Name: Aspen Waste Systems Tenant Is: ❑ New 2 Existing
Former Tenant if applicable):
Name: AWS-Eagan, LLC / Thor Nelson Phone: 612-720-8467
Applicant
Applicant Is: 0 Owner ❑ Contractor ❑Agent Email:
Type of Description of work: Phase 2: Office Demo and Reconstruction
work000.00
Construction cost: 1,000,
Company: Aspen Waste Systems contact Thor Nelson I
Building Adaress,cnyizlp:2951 Weeks Ave. SE, Minneapolis, MN 55414
Contractor
Phone: 612-720-8467 Email: tnelson@aspenwaste.com f
�
License#: Expiration Date: I
Company: Daniel K. Duffy Architects, Inc. contact Dan. Duffy i
Architect/ 13911 Ridgedale Dr. #401
Englneer= Address/Clty21p:
Phone:952-541-7888 Email: dan.duffy a Dduffyarchitects.com
Sewer& Company: MU&E Contact: Charlie Wilson
Water 13932 Lake Drive NE Forest Lake MN 55025
Contractor Address/City/Zip:
Required for phone: 651-464-5532 Email: charlie@mnue.net
new construction
addltlona.,:';
License#: 8937 iration Date: 4/2/24
0 1 understand.that Plumbing, Mechanical, Fire Suppression,and Sign work require separate applications.
NOTE:Pians and supporting documents that you submit are considered to ben. Portlonss'o>5 thg 900490i"", ;r
ma be claselfied as non- ubllc If you rovidle s ecific reasons thatwouid rmlt the Cl to conclude that:the A teada.sec e t
I hereby acknowledge that this Information Is complete and accurate;that the work will be In conformance with the ordinances and codes of the City of Eagan;.
that I understand this Is not a permit,but only an application for a permit,and work Is not to start without a permit;that the work will be In accordance with the
approved plan In the case of work which requires a review and approval of plans.
xThor Nelson )k—
Appllcanre Printed Name Applicants ignature
FOR OFFICE USE ONLY
SUB TYPES Site Address:
3259 Terminal Drive
_ Foundation _ Public Facility _ Antennae Tenant: Aspen Waste Systems
_ Commerclal/Industrial _ Accessory Building
_ Apartments _ Greenhouse/Tont Permit#:
WORK TYPES
_ New _ interior Improvement Demolish Building*
Addition Exterior Improvement Demolish Interior
_ Alteration _ Retaining Wall Demolish Foundation
'Demolition of entire building-give PCA handout to applicant
DESCRIPTION
Valuation jpoo.006 Code Edition 2ozo MCES System ;K .g.�
Plan Review Zoning SAC Units LL f
Census Code Stories , City Water
#of Units Square Feet G S Fire Sprinklers �C
Type of Construction 10 Length
T
Occupancy 9, -1 Width
REQUIRED INSPECTIONS i
Footings ew Building_Addition Retaining Wall
Foundation Foundation Before Backfill Other: I
Vapor BarrierOther:
Framing_30 Minutes 1 Hour
Insulation
Sheetrock Final/C.O.Required
Roof: XDecking Insulation _Ice&Water-X Final Final/No C.O.Required
Siding:_Lath _Brick_EFIS
Fireplace:_Rough In _Air Test _Final
Pool:_Footings Air/Gas Tests _Final
Final C/O Inspection: Schedule Fire Marshal to be present: X Yes No '
i
New Business to Eagan:
Reviewed By: Building Inspector
i
FEES
Base Fee ✓ '� Landscape Guarantee(9001.2257) 7
Surcharge Svo Tree Mitigation (9111.4677)
Plan Review IF IYP Tree Performance Security (9111.2257)
MCES SAC Stormwater Performance Security(6501.2257)
City SAC `3 9.
S&W Permit&Surcharge --
Treatment Plant ✓ '� -Z ®�
Treatment Plant(Irrigation)
0
Park Dedication (9328.4670) f y7
Trail Dedication (9375.4671) TOTAL: $ 0.00 �Z�.
Revised 8/1912022
PLAN REVIEW MEMO
EAGAN
Permit# 181165
Received By: Sally Calms Date Received: 1/30/2023
Plan Reviewer: Mike Grannes
Date: 1/30/2023
Project Name: Aspen Waste System Phase 2
Sub Type, Work Type: Office Demo&Reconstruction
Address: 3259 Terminal Drive
Contractor: AWS-Eagan, LLC Contact: Thor Nelson
Email: tnelson@aspenwaste.com Phone: 612-720-8467
Architect/Engineer: Daniel K. Duffy Architects Inc Contact: Dan Duffy
Email: dan.duffy@duffyarchitects.con Phone: 952-541-7888
The plans are located on the J:Drive under the Project Name. Please review the plans and updated the memo
accordingly.
Name Division Date Reviewed Additional Actions
Damn Bramwell Fire 1/31/2023 Reviewed, ready to be issu(B No additional items needed El
Brian Leyendecker Water Resources 2/10/2023 Reviewed, ready to be issued
Brent Massmann Utilities 2/14/2023 Reviewed, ready to be issued No additional items needed
Mike Grannes Building Inspections 2/2/2023 Reviewed, ready to be issued No additional items needed
Aaron Nelson Engineering 2/28/2023 Reviewed, ready to be issued No additional items needed
Pam Dudziak Planning 3/7/2023 Reviewed, ready to be issued No additional items needed
Indicate below any fees that are to be collected with the building permit.
Amount Staff Initials
❑ Yes 1Z No Park Dedication(9328.4670) PJD Zoning: 1-1
❑ Yes IZ No Trall Dedication(9375.4671) PJD
1Z Yes ❑ No Landscape Guarantee(9001.2257) $7,500.00 PJD
❑ Yes 14 No Tree Mitigation(9111.4677) PJD
❑ Yes ❑ No Tree Performance Security(9111.2257)
❑ Yes 1Z No Stormwater Performance Security(6501.2257)
❑ Yes 14 No Sewer&Water Permit Required
W1 Yes ❑ No REF Reconciliation between Engineering&Finance
❑ Yes V] No Street/Curb Cut Required
❑ Yes 14 No PRV Required
❑ Yes 0 No Stormwater Management Permit Required, Deposit due on Stormwater Management Permit:
❑ Yes ❑ No Sign Permit
MCES USE:Letter Reference: 230203A4 Address ID:5343 Payment ID:465815
Date of Determination:02/03/23 Determination Expiration:02/03/25
Greetingsl
Please see the determination below.
Project Name: Aspen Waste
Project Address: 3259 Terminal Drive
Suite#/Campus: N/A
City Name: Eagan
Applicant: Dan Duffy, Daniel K. Duffy Architects, Inc.
Special Notes: None
Charge Calculation:
Vehicle Garage/Public Works: 13,017 sq.ft. @ 4300 sq.ft./SAC=3.03
Self-Serve/Wash Bay: 2 bays x 3 SAC/bay=6.00
Total Charge: 9.03
Credit Calculation:
Aspen Waste (SAC 08/22)=8.36
Total Credit: 8.36
Net SAC: 0.67 = 1 SAC Due
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the
business use and size at the time of the final inspection. If there is a change in use or size,a redetermination will need to be
made. If you have any questions email me at:toni.ianzig@metc.state.mn.us.
Thank you,
Toni Janzig
SAC Technician
Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram
- .I son • • METROPOLITAN
• C 0 U N C I L