EA181221 - Building - Commercial/Industrial - Smart Data Solutions - Issued Date 04/13/2023 PERMIT
City of Eagan ® ® Permit Type: Building
3830 Pilot Knob Rd ®® ® ®®®®® A& g0WAjb AkPermit Number: EA181221
0
Eagan,MN 55122 EAUAN
(651)675-5675
www.cityofeagan.com * E A 1 8 1 2 2 1
Date Issued: 4/13/2023
Site Address: 2900 Lone Oak Pkwy 130
Lot: 1 Block: 1 Addition: Blue Ridge 3rd
PID:10-14577-01-010 11111111111 IN 11111111111111111111111111 IN 111111111111111111111 11111M
Use: Smart Data Solutions * 1 0 — 1 4 5 7 7 — 0 1 — 0 1 0
Description:
Sub Type: Commercial/Industrial Construction Type: II-B
Work Type: Int Impr
Description: Tenant Buildout
Census Code: - Occupancy: B
Zoning: PD
Square Feet: 14,722
Comments:
Fee Summary: BL-Base Fee $1,902.15 0801.4085
Valuation: 205,740.00 BL-Plan Review 65% $1,236.40 0720.4222
Surcharge-Based on Valuation $103.00 9001.2195
Total: $3,241.55
Contractor: - Applicant - Owner:
Bainey Group Lone Oak LLC
14700 28th Avenue North,Suite 30 %Capital Partners
Plymouth MN 55447 5201 Eden Ave Ste 50
(763)557-6911 Edina MN 55436
This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature ssued B : Signature
EC IVE LM 4113
_+ � w1 r-------------------------I
I For Office Use
1181221
BY: Building Permit#: I
®®a ® ® o o
� j
®� I S&W Permit
EAGAN I #:
I Permit Fee: W 24 I_cic
j Date Received: 2/2/23
I
3830 PILOT KNOB ROAD I EAGAN, WIN 55122-1810 1 j
(651)675-5675 1 FAX: (651)675-5694 1 Date Issued: I
Plan Submittal: buildinainspectionsO-citvofeaoan.com -----1
COMMERCIAL BUILDING PERMIT APPLICATION
Date: 02/20/2023 SlteAddress: 2900 Lone Oak Parkway Suite#: 130
Tenant Name:
Smart Data Solutions Tenant is: ® New 1:1Existing
Former Tenant(if applicable):
ra
The Bainey Group 763-231-6911
Name: Phone:
Applicant
Applicant is: ❑ Owner IN Contractor ❑Agent Email: heathermQbainey..com
Type 0 ' _ Description of work: Tenant Buildout
Wo'k
Construction Cost: $205, 740 . 00
Company: The Bainey Group Contact: Heather Mayer
Rtrihdlirtg ; Address/City/Zip:
14700 28th Ave N Suite 30 Plymouth, MN 55447
avorifr Ctor
Phone: 763-231-8196 Email: heatherm@bainey.com
License#: Expiration Date:
Company: Genesis Architecture Contact: Scott Wrasman
brt�i»4 . '
ilt@eAdress/City2ip: 1600 Utica Ave S Suite 300 St . Louis Park, MN
�ftgt d
Phone: 952-897-7700 Email:
SbWer& Company: Contact:
C+�ntr�adtor ! Address/City/Zip:
Required for Phone: Email:
new construction
and:additions
License#: Expiration Date:
® I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
NOTA.,Plans and supporting documents"that you submit are considered be to public Information, Portions of the Information
ma be ciassifled as non-public, if you provide s eciflc reasons that would "emit the`City to"conclude that they are trade secrets.
I hereby acknowledge that this Information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the
approved plan in the case of work which requires a review and approval of plans.
x Hilary Unruhx Hilary Unruh M
Applicant's Printed Name Applicant's Signature
® ® o
COMMERCIAL BUILDING PERMIT
cm AG A N SUBMITTAL REQUIREMENTS
Interior Improvement New Buildings AND Additions
❑ Project Narrative, including a description of the A preconstruction meeting will be sch duled by the
company operation and maximum number of City after the permit is issued.
employees on the primary shift
❑ Scaled Architectural Plans Project Narrative, including a d cription of the
El Code Analysis mpany operation and maxi m number of
y em oyees on the primary sh'
❑ Key Plan ❑ Soils port
❑ Energy Calculations" Scaled S ctural Plans
❑ Fire Stopping Submittals ❑ Scaled Arch ctural PI s
❑ Met Council SAC Determination (651)602-1000 o HVAC units a req red on building
elevation/site p n
❑ Civil Plans
❑ Landscaping PI ns
❑ Code Analys' •
ElEnergy C ulations""
❑ Emerge cy Response Site Plan
❑ Spec' I Inspection &Testing Sched
❑ St mwater Management Permit
❑ ire Stopping Submittals
Met Council SAC Determination(651)602-100
✓ Call the Minnesota Department of Health at(651)2014500 for details regarding food & beverage or lodging facilities.
✓ Plumbing, Mechanical, Electrical, Fire Suppression, and Sign Permit plans should be submitted with their respective
permit applications
Contact Building Inspections for a sample.
"* Energy Code Compliance Forms are available at www.cityofeagan.com/permithandouts.
3830 PILOT KNOB ROAD i EAGAN, MN 55122
(651)675-5675 1 FAX: (651)675-5694 buildinginspectionso-citvofeaaan.com
If you have a hearing or speech disability,contact us through your preferred telecommunications relay service.
Revised 8/19/2022
FOROFFICE IISE(ONLY,"
SUB TYPES Site Address:2900 Lone Oak Pwy S130
_ Foundation _ Public Facility _ Antennae Tenant: Smart Data Solutions
Commercial/Industrial _ Accessory Building
Apartments _ Greenhouse/Tent Permit#: 181221
WORK TYPES
New X Interior Improvement Demolish Building*
_ Addition _ Exterior Improvement Demolish Interior
_ Alteration _ Retaining Wall Demolish Foundation
*Demolition of entire building—give PCA handout to applicant
DESCRIPTION /
Valuation U57,-114D Code Edition A4N13L-LOZo MCES System
Plan Review �— Zoning �A SAC Units c 16,4 Ir
Census Code Stories City Water vy
#of Units Square Feet - 5r 7 Fire Sprinklers
Type of Construction (3 Length
Occupancy '$ Width
REQUIRED INSPECTIONS
Footings_New Building—Addition Retaining Wali
Foundation Foundation Before Backfill Other:
Vapor Barrier Other:
Framing 30 Minutes- 1 Hour
Insulation
Sheetrock Final/C.O.Required
Roof:_Decking _Insulation _ice&Water _Final Final/No C.O.Required
Siding:_Lath _Brick_EFIS
Fireplace:_Rough In Air Test _Final
Pool:_Footings —Air/Gas Tests _Final
Final C/O Inspection: She le Fire Marshal to be present: X Yes No
New Business to Eagan:
Reviewed By: , Building Inspector
FEES
Base Fee I?OZ• 157 Landscape Guarantee(9001.2257)
Surcharge /D3. Tree Mitigation (9111.4677) 00e
Plan Review I Zoo• �n Tree Performance Security(9111.2257) /
MCES SAC Stormwater Performance Security (6501.2257)
City SAC
SSW Permit S Surcharge
Treatment Plant
Treatment Plant(Irrigation)
Park Dedication (9328.4670)
Trail Dedication (9375.4671) TOTAL: $ 0.00 U
Revised 8/10./2022
MCES USE:Letter Reference: 230208136 Address ID:5172 Payment ID:465951 112'L I
Date of Determination:02/08/23 Determination Expiration:02/08/25
Greetingsl
Please see the determination below.
Project Name: Smart Data Solutions
Project Address: 2900 Lone Oak Parkway
Suite#/Campus: 130,The Waters I
City Name: Eagan
Applicant: Angie Groth, Hilary Unruh, Heather Mayer,The Bainey Group
Special Notes: This project has 14,583 gross square feet of space and Cardia previously paid as office/warehouse/mixed use for
this space reported 09/2013.There is no change of use,and no additional SAC is due. The City is required to report this project
with the normal SAC Activity Report if a permit is issued.
Net SAC: 0.00 = 0 SAC Due
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the
business use and size at the time of the final inspection. If there is a change in use or size,a redetermination will need to be
made. If you have any questions email me at:sara.running@metc.state.mn.us.
Thank you,
Sara Running
SAC Technician
Please visit our SAC website by going to:http://www.metrocouncil.org/SACprogram
390 Robert Street55101-1805
Phone 651.602.1000 1 Fax651.602.1550 I TFY651291.0904oc METROPOLITAN
-11)Equal Qpporlunily Employer C 0 U N C I L