Loading...
EA181221 - Building - Commercial/Industrial - Smart Data Solutions - Issued Date 04/13/2023 PERMIT City of Eagan ® ® Permit Type: Building 3830 Pilot Knob Rd ®® ® ®®®®® A& g0WAjb AkPermit Number: EA181221 0 Eagan,MN 55122 EAUAN (651)675-5675 www.cityofeagan.com * E A 1 8 1 2 2 1 Date Issued: 4/13/2023 Site Address: 2900 Lone Oak Pkwy 130 Lot: 1 Block: 1 Addition: Blue Ridge 3rd PID:10-14577-01-010 11111111111 IN 11111111111111111111111111 IN 111111111111111111111 11111M Use: Smart Data Solutions * 1 0 — 1 4 5 7 7 — 0 1 — 0 1 0 Description: Sub Type: Commercial/Industrial Construction Type: II-B Work Type: Int Impr Description: Tenant Buildout Census Code: - Occupancy: B Zoning: PD Square Feet: 14,722 Comments: Fee Summary: BL-Base Fee $1,902.15 0801.4085 Valuation: 205,740.00 BL-Plan Review 65% $1,236.40 0720.4222 Surcharge-Based on Valuation $103.00 9001.2195 Total: $3,241.55 Contractor: - Applicant - Owner: Bainey Group Lone Oak LLC 14700 28th Avenue North,Suite 30 %Capital Partners Plymouth MN 55447 5201 Eden Ave Ste 50 (763)557-6911 Edina MN 55436 This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature ssued B : Signature EC IVE LM 4113 _+ � w1 r-------------------------I I For Office Use 1181221 BY: Building Permit#: I ®®a ® ® o o � j ®� I S&W Permit EAGAN I #: I Permit Fee: W 24 I_cic j Date Received: 2/2/23 I 3830 PILOT KNOB ROAD I EAGAN, WIN 55122-1810 1 j (651)675-5675 1 FAX: (651)675-5694 1 Date Issued: I Plan Submittal: buildinainspectionsO-citvofeaoan.com -----1 COMMERCIAL BUILDING PERMIT APPLICATION Date: 02/20/2023 SlteAddress: 2900 Lone Oak Parkway Suite#: 130 Tenant Name: Smart Data Solutions Tenant is: ® New 1:1Existing Former Tenant(if applicable): ra The Bainey Group 763-231-6911 Name: Phone: Applicant Applicant is: ❑ Owner IN Contractor ❑Agent Email: heathermQbainey..com Type 0 ' _ Description of work: Tenant Buildout Wo'k Construction Cost: $205, 740 . 00 Company: The Bainey Group Contact: Heather Mayer Rtrihdlirtg ; Address/City/Zip: 14700 28th Ave N Suite 30 Plymouth, MN 55447 avorifr Ctor Phone: 763-231-8196 Email: heatherm@bainey.com License#: Expiration Date: Company: Genesis Architecture Contact: Scott Wrasman brt�i»4 . ' ilt@eAdress/City2ip: 1600 Utica Ave S Suite 300 St . Louis Park, MN �ftgt d Phone: 952-897-7700 Email: SbWer& Company: Contact: C+�ntr�adtor ! Address/City/Zip: Required for Phone: Email: new construction and:additions License#: Expiration Date: ® I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. NOTA.,Plans and supporting documents"that you submit are considered be to public Information, Portions of the Information ma be ciassifled as non-public, if you provide s eciflc reasons that would "emit the`City to"conclude that they are trade secrets. I hereby acknowledge that this Information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x Hilary Unruhx Hilary Unruh M Applicant's Printed Name Applicant's Signature ® ® o COMMERCIAL BUILDING PERMIT cm AG A N SUBMITTAL REQUIREMENTS Interior Improvement New Buildings AND Additions ❑ Project Narrative, including a description of the A preconstruction meeting will be sch duled by the company operation and maximum number of City after the permit is issued. employees on the primary shift ❑ Scaled Architectural Plans Project Narrative, including a d cription of the El Code Analysis mpany operation and maxi m number of y em oyees on the primary sh' ❑ Key Plan ❑ Soils port ❑ Energy Calculations" Scaled S ctural Plans ❑ Fire Stopping Submittals ❑ Scaled Arch ctural PI s ❑ Met Council SAC Determination (651)602-1000 o HVAC units a req red on building elevation/site p n ❑ Civil Plans ❑ Landscaping PI ns ❑ Code Analys' • ElEnergy C ulations"" ❑ Emerge cy Response Site Plan ❑ Spec' I Inspection &Testing Sched ❑ St mwater Management Permit ❑ ire Stopping Submittals Met Council SAC Determination(651)602-100 ✓ Call the Minnesota Department of Health at(651)2014500 for details regarding food & beverage or lodging facilities. ✓ Plumbing, Mechanical, Electrical, Fire Suppression, and Sign Permit plans should be submitted with their respective permit applications Contact Building Inspections for a sample. "* Energy Code Compliance Forms are available at www.cityofeagan.com/permithandouts. 3830 PILOT KNOB ROAD i EAGAN, MN 55122 (651)675-5675 1 FAX: (651)675-5694 buildinginspectionso-citvofeaaan.com If you have a hearing or speech disability,contact us through your preferred telecommunications relay service. Revised 8/19/2022 FOROFFICE IISE(ONLY," SUB TYPES Site Address:2900 Lone Oak Pwy S130 _ Foundation _ Public Facility _ Antennae Tenant: Smart Data Solutions Commercial/Industrial _ Accessory Building Apartments _ Greenhouse/Tent Permit#: 181221 WORK TYPES New X Interior Improvement Demolish Building* _ Addition _ Exterior Improvement Demolish Interior _ Alteration _ Retaining Wall Demolish Foundation *Demolition of entire building—give PCA handout to applicant DESCRIPTION / Valuation U57,-114D Code Edition A4N13L-LOZo MCES System Plan Review �— Zoning �A SAC Units c 16,4 Ir Census Code Stories City Water vy #of Units Square Feet - 5r 7 Fire Sprinklers Type of Construction (3 Length Occupancy '$ Width REQUIRED INSPECTIONS Footings_New Building—Addition Retaining Wali Foundation Foundation Before Backfill Other: Vapor Barrier Other: Framing 30 Minutes- 1 Hour Insulation Sheetrock Final/C.O.Required Roof:_Decking _Insulation _ice&Water _Final Final/No C.O.Required Siding:_Lath _Brick_EFIS Fireplace:_Rough In Air Test _Final Pool:_Footings —Air/Gas Tests _Final Final C/O Inspection: She le Fire Marshal to be present: X Yes No New Business to Eagan: Reviewed By: , Building Inspector FEES Base Fee I?OZ• 157 Landscape Guarantee(9001.2257) Surcharge /D3. Tree Mitigation (9111.4677) 00e Plan Review I Zoo• �n Tree Performance Security(9111.2257) / MCES SAC Stormwater Performance Security (6501.2257) City SAC SSW Permit S Surcharge Treatment Plant Treatment Plant(Irrigation) Park Dedication (9328.4670) Trail Dedication (9375.4671) TOTAL: $ 0.00 U Revised 8/10./2022 MCES USE:Letter Reference: 230208136 Address ID:5172 Payment ID:465951 112'L I Date of Determination:02/08/23 Determination Expiration:02/08/25 Greetingsl Please see the determination below. Project Name: Smart Data Solutions Project Address: 2900 Lone Oak Parkway Suite#/Campus: 130,The Waters I City Name: Eagan Applicant: Angie Groth, Hilary Unruh, Heather Mayer,The Bainey Group Special Notes: This project has 14,583 gross square feet of space and Cardia previously paid as office/warehouse/mixed use for this space reported 09/2013.There is no change of use,and no additional SAC is due. The City is required to report this project with the normal SAC Activity Report if a permit is issued. Net SAC: 0.00 = 0 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size,a redetermination will need to be made. If you have any questions email me at:sara.running@metc.state.mn.us. Thank you, Sara Running SAC Technician Please visit our SAC website by going to:http://www.metrocouncil.org/SACprogram 390 Robert Street55101-1805 Phone 651.602.1000 1 Fax651.602.1550 I TFY651291.0904oc METROPOLITAN -11)Equal Qpporlunily Employer C 0 U N C I L