Loading...
EA182389 - Building - Commercial/Industrial - Issued Date 05/01/2023City of Eagan Permit Type: Building 3830 Pilot Knob Rd °e° e 8 °� Permit Number: EA182389 Eagan, MN 55122 °-®® ®®®B EAGAN (651) 675-5675 111111111111 www.cityofeagan.com * E R 1 8 2 3 8 9 Date Issued: 5/1/2023 Site Address: 3459 Washington Dr Lot: 1 Block: 1 Addition: Bicentennial 7th PID:10-14006-01-010 Use: Washington Drive Investors * 1 0— 1 4 0 0 6— 0 1— 0 1 0 Description: Sub Type: Commercial/Industrial Construction Type: Work Type: Reroof Description: Census Code: - Occupancy: Zoning: Square Feet: 0 Comments: Fee Summary: BL- Base Fee $1,281.15 0801.4085 Valuation: 114,000.00 BL - Plan Review 65% $832.75 0720.4222 Surcharge - Based on Valuation $57.00 9001.2195 Total: $2,170.90 Contractor: - Applicant - . Owner: Single Ply Systems Inc Washington Drive Investors 10951 Nesbitt Ave S 102 Jonathan Blvd N Ste 200 Bloomington MN 55437 Chaska MN 55318 (651) 688-7554 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature ssued B : Signature r-------------------------I I For Office Use I I Building Permit* I ®� ® ® I I ®% ® ®® 00 ®� ®� ®� ®0 I S&W Permit #: �M A Al I I Permit Fee. I I I E C E I V E Date Received: 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I j (651) 675-5675 1 FAX: (651) 675-5694 I Date Issued: Plan Submittal: buildinginsr)ectionsCaD-citvofeaaan.com A�I� 2 ��� I _----_i COMMERCIAL BA IT APPLICATION Date: 4-20-2023 Site Address: 3459 Washington Dr. Suite M Tenant Name: Tenant is: ❑ New 0 Existing Former Tenant (if applicable): Name: Nate Cline Phone: 651-688-7554 Applicant Applicant is: ❑ Owner 14 Contractor ❑ Agent Email: natee@singleplysystems.com "type of Description of work: Reroof building. Install new insulation and 60 mil tpo membrane work 114,000 Construction Cost: Company: Single Ply Systems Contact: Nate Cline Building_ Address/City/Zip:10951 Nesbitt Ave S. Bloomington MN 55437 Contractor' Phone: 651-688-7554 Email: natec@singleplysystems.com License #: NA Expiration Date: Company: Contact: Architect/' Engineer Address/City/Zip: Phone: Email: Sewer & Company: Contact: Water Contractor Address/City/Zip: Required for Phone: Email: new construction and additions License #: Expiration Date: I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information ma be classified as non ubllc if you provide specific reasons that woq!0 permit the C1 to conclude that they are trade secrets. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Digitally signed Nate Cline Nate Cline Date: 2023.04.200 14:44:00 xNate Cline x -05'00' Applicant's Printed Name Applicant's Signature SUB TYPES _ Foundation Commercial/Industrial Apartments _ Public Facility _ Antennae Accessory Building Greenhouse / Tent Site Address: 3459 Washington Dr. WORK TYPES New _ Interior Improvement Demolish Building" Addition _ Exterior Improvement Demolish Interior _ Alteration _ Retaining Wall Demolish Foundation 'Demolition of entire building — give PCA handout to applicant DESCRIPTION Footings _ New Building _ Addition t/ Valuation d07 Code Edition's ') MCES System _- Plan Review Zoning — SAC Units Census Code Stories –® City Water # of Units Square Feet Fire Sprinklers Type of Construction Length Occupancy Width Pool: _Footings —Air/Gas Tests _Final REQUIRED INSPECTIONS Footings _ New Building _ Addition Retaining Wall Foundation Foundation Before Backfill Other: Vapor Barrier Other: Framing 30 Minutes 1 Hour r Insulation Sheetrock Final / C.O. Required Roof: _Decking _Insulation _Ice & Water _Final ` L Final / No C.O. Required Siding: _ Lath _Brick _ EFIS Fireplace: _Rough In Air Test _Final Pool: _Footings —Air/Gas Tests _Final / Final C/O Inspection: Schedule Fire Marshal to be present: Yes No � New Business to Eagan: �j Reviewed By: "�� �`�� – , Building Inspector FEES Base Fee �s Landscape Guarantee (9001.2257) Surcharge 6 I Tree Mitigation (9111.4677) Plan Review Tree Performance Security (9111.2257) MCES SAC Stormwater Performance Security (6501.2257) City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication (9328.4670) Trail Dedication (9375.4671) TOTAL: $ 0.00 tRevi s e d 8 i,)/ '1022