EA182389 - Building - Commercial/Industrial - Issued Date 05/01/2023City of Eagan Permit Type: Building
3830 Pilot Knob Rd °e° e 8 °� Permit Number: EA182389
Eagan, MN 55122 °-®® ®®®B
EAGAN
(651) 675-5675 111111111111
www.cityofeagan.com * E R 1 8 2 3 8 9
Date Issued: 5/1/2023
Site Address: 3459 Washington Dr
Lot: 1 Block: 1 Addition: Bicentennial 7th
PID:10-14006-01-010
Use: Washington Drive Investors * 1 0— 1 4 0 0 6— 0 1— 0 1 0
Description:
Sub Type: Commercial/Industrial Construction Type:
Work Type: Reroof
Description:
Census Code: - Occupancy:
Zoning:
Square Feet: 0
Comments:
Fee Summary: BL- Base Fee $1,281.15 0801.4085
Valuation: 114,000.00 BL - Plan Review 65% $832.75 0720.4222
Surcharge - Based on Valuation $57.00 9001.2195
Total:
$2,170.90
Contractor: - Applicant - . Owner:
Single Ply Systems Inc Washington Drive Investors
10951 Nesbitt Ave S 102 Jonathan Blvd N Ste 200
Bloomington MN 55437 Chaska MN 55318
(651) 688-7554
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature
ssued B : Signature
r-------------------------I
I For Office Use
I I
Building Permit* I
®� ® ® I I
®% ® ®® 00
®� ®� ®� ®0 I S&W Permit #:
�M A Al
I
I Permit Fee. I
I I
E C E I V E Date Received:
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I j
(651) 675-5675 1 FAX: (651) 675-5694 I Date Issued:
Plan Submittal: buildinginsr)ectionsCaD-citvofeaaan.com A�I� 2 ��� I _----_i
COMMERCIAL BA IT APPLICATION
Date: 4-20-2023 Site Address: 3459 Washington Dr. Suite M
Tenant Name: Tenant is: ❑ New 0 Existing
Former Tenant (if applicable):
Name: Nate Cline Phone: 651-688-7554
Applicant
Applicant is: ❑ Owner 14 Contractor ❑ Agent Email: natee@singleplysystems.com
"type of Description of work: Reroof building. Install new insulation and 60 mil tpo membrane
work 114,000
Construction Cost:
Company: Single Ply Systems Contact: Nate Cline
Building_ Address/City/Zip:10951 Nesbitt Ave S. Bloomington MN 55437
Contractor'
Phone: 651-688-7554 Email: natec@singleplysystems.com
License #: NA Expiration Date:
Company: Contact:
Architect/'
Engineer Address/City/Zip:
Phone: Email:
Sewer & Company: Contact:
Water
Contractor Address/City/Zip:
Required for Phone: Email:
new construction
and additions
License #: Expiration Date:
I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information
ma be classified as non ubllc if you provide specific reasons that woq!0 permit the C1 to conclude that they are trade secrets.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the
approved plan in the case of work which requires a review and approval of plans.
Digitally signed Nate Cline
Nate Cline
Date: 2023.04.200 14:44:00
xNate Cline x -05'00'
Applicant's Printed Name Applicant's Signature
SUB TYPES
_ Foundation
Commercial/Industrial
Apartments
_ Public Facility _ Antennae
Accessory Building
Greenhouse / Tent
Site Address: 3459 Washington Dr.
WORK TYPES
New _ Interior Improvement Demolish Building"
Addition _ Exterior Improvement Demolish Interior
_ Alteration _ Retaining Wall Demolish Foundation
'Demolition of entire building — give PCA handout to applicant
DESCRIPTION
Footings _ New Building _ Addition
t/
Valuation d07
Code Edition's
') MCES System _-
Plan Review
Zoning
— SAC Units
Census Code
Stories
–® City Water
# of Units
Square Feet
Fire Sprinklers
Type of Construction
Length
Occupancy
Width
Pool: _Footings —Air/Gas Tests _Final
REQUIRED INSPECTIONS
Footings _ New Building _ Addition
Retaining Wall
Foundation Foundation Before Backfill
Other:
Vapor Barrier
Other:
Framing 30 Minutes 1 Hour
r Insulation
Sheetrock
Final / C.O. Required
Roof: _Decking _Insulation _Ice & Water _Final
` L Final / No C.O. Required
Siding: _ Lath _Brick _ EFIS
Fireplace: _Rough In Air Test _Final
Pool: _Footings —Air/Gas Tests _Final
/
Final C/O Inspection: Schedule Fire Marshal to be present:
Yes No
�
New Business to Eagan:
�j
Reviewed By: "�� �`�� – , Building Inspector
FEES
Base Fee
�s Landscape Guarantee (9001.2257)
Surcharge 6 I Tree Mitigation (9111.4677)
Plan Review Tree Performance Security (9111.2257)
MCES SAC Stormwater Performance Security (6501.2257)
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant (Irrigation)
Park Dedication (9328.4670)
Trail Dedication (9375.4671) TOTAL: $ 0.00
tRevi s e d 8 i,)/ '1022