Loading...
EA182536 - Fire - Commercial - Midwest Surgery Center - Issued Date 05/08/2023City of Eagan 3830 Pilot Knob Rd Eagan, MN 55122 (651) 675-5675 www.cityofeagan.com PERMIT Site Address: 2975 Holiday Ct 100 Lot: 1 Block: 1 Addition: PID:10-22455-01-010 Use: Midwest Surgery Center Description: Sub Type: Commercial Work Type: New Description: Sprinkler System - 3/4" Fire Meter Construction Type: Occupancy: Zoning: Sprinkled Area Updated Building of Permit Totals Stories: 0 0 Square Feet: 0 0 Percent of Bldg: 0 0 Comments: Please call (651) 675-5900 for a final inspection. Permit Type: Fire Permit Number: EA182536 1111111111111111111111111111111111111111111111111 * E R 1 8 2 S 3 6* Date Issued: 5/8/2023 i sui i �iwu Fee Summary: FI - Permit Fee % $570.01 0801.4096 Valuation: 57 001.00 Surcharge Based on Valuation $28.50 9001.2195 3/4" Meter $300.00 6101.4509 Radio Read Unit (Domestic) $240.00 6101.4509 Total: $1,138.51 Contractor: _ Applicant _ Owner: Gilbert Mechanical Contractors Eagan Mob Partners LLC 5251 74th St W % Davis Real Estate Services Group L Edina MN 55439 33 6th St S Ste 4650 (952) 835-3810 Minneapolis MN 55402 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature ./i -s ssued B : Signature EAGAN Site Address: 2975 Holiday Ct 100 Lot: 1 Block: 1 Addition: PID:10-22455-01-010 Use: Midwest Surgery Center Description: Sub Type: Commercial Work Type: New Description: Sprinkler System - 3/4" Fire Meter Construction Type: Occupancy: Zoning: Sprinkled Area Updated Building of Permit Totals Stories: 0 0 Square Feet: 0 0 Percent of Bldg: 0 0 Comments: Please call (651) 675-5900 for a final inspection. Permit Type: Fire Permit Number: EA182536 1111111111111111111111111111111111111111111111111 * E R 1 8 2 S 3 6* Date Issued: 5/8/2023 i sui i �iwu Fee Summary: FI - Permit Fee % $570.01 0801.4096 Valuation: 57 001.00 Surcharge Based on Valuation $28.50 9001.2195 3/4" Meter $300.00 6101.4509 Radio Read Unit (Domestic) $240.00 6101.4509 Total: $1,138.51 Contractor: _ Applicant _ Owner: Gilbert Mechanical Contractors Eagan Mob Partners LLC 5251 74th St W % Davis Real Estate Services Group L Edina MN 55439 33 6th St S Ste 4650 (952) 835-3810 Minneapolis MN 55402 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature ./i -s ssued B : Signature cqh-ej (519 R EAGAN e R 0 0 w 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-5675 1 FAX: (651) 675-5694 buildinginspectionsacityofeagan.com r— — — — — — — — — — — — — — — — i For Office Use Permit* 182536 Permit Fee: V -✓ I I I I I I Staff: I -----------------I Payment Recvd: _Yes X No I I I I I Plans: X Electronic _ Paper I ----------------- 2023 ---------------- 2023 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION Date: April 27, Site Address: 2023 2975 Holiday Court Midwest Surgery Center - - Tenant: Suite #: Requirements: one electronic set of drawings, specifications, cut sheets on materials and components Property Owner Type of Work Name: TIMCO Construction Address / City / zip: 2820 Vicksburg Lane N licant is: Owner Y Contractor Phone: 763-694-0250 Plymouth, MN. 55447 Description of work: Provide a wet fire protection per NFPA 13, 2016, MSFC 2020 Construction Cost: 57001.00 Estimated Completion Date: Nov. 20, 2023 Name: Gilbert Mechanical Contractors, LLC License #: C010 I Contractor Address: 5251 W. 74th Street City: Edina State: MN Zip: 55439 Phone: 612-619-3476 Contact: Jerome Petroski Email: jetroski@gilbertmech.com FIRE PERMIT TYPE WORK TYPE eV' Sprinkler System (# of heads New _ Addition s Fire Pump _ Standpipe _ Alterations _ Remodel Other: Other: DESCRIPTION OF WORK: Commercial Residential Educational FEES 57001.00 Contract Value $ $65.00 Permit Fee Minimum (does not include State Surcharge) 570 01 Surcharge = Contract Value x $0.0005 If the project valuation is over $1 million, please call for Surcharge $100.00 3/4" Fire Meter - $300.00 includes State Surcharge X.01 = $ Permit Fee = $ 28'50 Surcharge _ $ 598.51 = $ 540.00 TOTALFEE Fire Meter Radio Read (required with Fire Meters) - $240 = $ 1138.51 TOTAL FEE You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.cityofeagan.com/subscribe. I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that 1 understand this is not a permit, but only an application for a permit, and work is not to start without a permit, that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. oig"eny signed by Jerome Petroslo Jerome Petroski Jerome Petroski ON C=US Eyhancilucgilbenme. LLC", 0='Gilbert Mechancial Contractors. LLC", CN=Jerome Petroslo X X Date': 2023.09.27 133118-05'00' Applicant's Printed Name Applicant's Signature FOR OFFICE USE REQUIRED INSPECTIONS X Hydrostatic Trip Conditions of Issuance: Permit Reviewed by: Darrin Bramwell Flow Alarm Pump Test Drain Test X Rough In Central Station X Final Date: 5 1 5 1 2023 3830 PILOT KNOB ROAD I EAGAN, MN 55122 (651) 675-5675 1 FAX: (651) 675-5694 buildinginspections(a)-cityofeagan.com If you have a hearing or speech disability, contact us through your preferred telecommunications relay service.