Loading...
EA182395 - Building - Commercial/Industrial - Issued Date 05/23/2023 PERMIT City of Eagan , ® Permit"': Building 3830 Pilot Knob Rd ®®®® ® ® ®®, Permit Number: EA182395 Eagan,MN 55122 •-®® •® (651)675-5675 1111111111111111111111111111111111111111111111111 www.cityofeagan.com * E A 1 8 2 3 9 5 * Date Issued: 5/23/2023 Site Address: 1424 Yankee Doodle Rd Lot: 1 Block: 1 Addition: Bicentennial 3rd PID:10-14002-01-010 Use: Chase Bank * 1 0 — 1 4 0 0 2 — 0 1 — 0 1 0 Description: Sub Type: Commercial/Industrial Construction Type: Work Type: Sign Description: Census Code: - Occupancy: Zoning: Square Feet: 0 Comments: Fee Summary: BL-Base Fee $381.40 0801.4085 BL-Plan Review 65% $247.91 0720.4222 Valuation: 20,000.00 Surcharge-Based on Valuation $10.00 9001.2195 Total: $639.31 Contractor: - Applicant - Owner: Leroy Signs Inc Bas Re Holdings LLC 6325 Welcome Avenue N 12508 Norway Cir Brooklyn Park MN 55429 Burnsville MN 55337 (763)535-0080 This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature ssued B : Signature ' -- -----1------------- For Ofti ) .� Building Permit#: 40 I I S&W permit M. EAGAN Permit Fee: I I ®® I Date Received: I 3830 PILOT KNOB ROAD i EAGAN, MN 55122. G E N E 1 I (651)675-5675 1 FAX:(651)675-5694 1 I I Date Issued: 1 Plan Submittal: ulldin Ins ections ci ofea an` APR 2 9 2'�9�3 �-------------------------j COMMERCIAL 8UJLD1NCvP=E=RM1T APPLICATION Date: ' Site Address: 1 qa4 : l0,1) e.- 4oxJ Imo. &QA Suite#: Tenant Name:. P-::)QJ' Tenant Is: R New ❑ Existing n Former Tenant(If applicable): Name: L-� Phone: ' s O'ut Y1 LY s { ^: Applicant Is: ❑ Owner C&Contractor ❑ Agent Email: l I^!, 12.1/0 '� 5. C.b Description of work: 4-- ` ns ,11 A t.t Construction Cost: L Y ` Company ZL eo� Contact: Address/City/Zip: �* 3 Z S 4v e, Phone 00 180 Email: i '•' " License#: �' Expiration Date Company: Contact: Address/City/Zip: Phone: :bt: Email: Company: Contact: -. CD „ Address/City/Zip: Phone: Email: License# Expiration Date: I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. `NOTE:Plan 4n—,d'su oit :do'60trients':tHat; du in "ate conside�et3ab''.he `ubir anfoRnation.:P. talons f the`info'rm on ma be classlfle .3+s pon. ukilic:if"ou."rssviste s i11c-4:0 asions that wodld' qtR jt-.*t a Ci to`conclude that:the .are�,trades�rets: 1 hereby acknowledge that this information is complete and accurate;that the work will be In conformance with the ordinances and codes of the City of Eagan; that I understand this Is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be In accordance with the approved plan In the case of work which requires a review and approval of plans, x x, C lmiL c Applicant's Printed Name Applicant's Signature SUB TYPES Site Address: _ Foundation _ Public Facility Antennae Commercial/Industrial Accessory Building Tenant; Apartments _ Greenhouse/Tent Permit#: WORK TYPES _ New Interior Improvement Demolish Building* Addition Exterior Improvement ` Demolish Interior _ Alteration _ Retaining Wall Demolish Foundation "Demolition of entire building-give PCA handout to applicant DESCRIPTION Valuation Code Edition �� #718MCES System Plan Review Zoning SAC Units Census Code Stories City Water #of Units Square Feet Fire Sprinklers Type of Construction c Length Occupancy — Width QUIRED INSPECTIONS Footings,_„_,New Building_,_,_Addition Retaining Wall Foundation l=ounda#Ian Before Backfill Other: Vapor Barrier Other: Framing 30 Minutes 1 Hour Insulation Sheetrock Final/C.O.Required Roof:_Decking _Insulation _ice&Water _Final Final/No C.O. Required Siding:_Lath _Brick_EFIS Fireplace:_,Rough In Air Test _Final Pool:,_footings Alr/Gas Tests _Final Final C/0 Inspection: Sched, ire Marshal to be present:_Yes '` No New Business to Eagan: Reviewed By: . Building Inspector FEES 1,!6 Base Fee Landscape Guarantee(9001.2257) 0- Surcharge Surcharge Tree Mitigation (9111.4677) Plan Review 7 Tree Performance Security(9111.2257) MCES SAC Stormwater Performance Security(6501.2257) City SAC S&W Permit&Surcharge Treatment Plant Treatment Plant(Irrigation) Park Dedication (9328.4670) Trail Dedication (9375.4671) TOTAL: $ 0.00 Revised 8/19/2022. r COMMERCIAL BUILDING PERMIT EAGAN SUBMITTAL REQUIREMENTS i Interior Improvement New Buildings AND Additions ❑ Project Narrative, including a description of the A preconstruction meeting will be scheduled by the company operation and maximum number of City after the permit Is issued. employees on the primary shift El Scaled Architectural Plans ❑ Project Narrative, including a description of the ❑ Code Analysis company operation and maximum number of y employees on the primary shift ❑ Key Plan E] Soils Report ❑ Energy Calculations** ❑ Scaled Structural Plans ❑ Fire Stopping Submittals - ❑ Scaled Architectural Plans ❑ Met Council SAC Determination(651)602-1000 o HVAC units are required on building elevation/site plan ❑ Civil Plans ❑ Landscaping Plans ❑ Code Analysis* ❑ Energy Calculations** ❑ Emergency Response Site Plan ❑ Special Inspection&Testing Schedule ❑ Stormwater Management Permit ❑ Fire Stopping Submittals =_= ❑ Met Council SAC Determination(651)602-1000 ✓ Call the Minnesota Department of Health at(651)201-4500 for details regarding food&beverage or lodging facilities. ✓ Plumbing, Mechanical, Electrical-, Fire Suppression, and Sign Permit plans should be submitted with their respective permit applications * Contact Building Inspections for a sample. ** Energy Code Compliance Forms are available at www.cityofeagan.com/permkhandouts. 3830 PILOT KNOB ROAD I EAGAN,MN 55122 (651)675-56751 FAX:(651)675-5694 buildinginspections(C-citvofeaaan.com If you have a hearing or speechisa bill ,contact us through your preferred telecommunications relay service. Revised 8/19/2022