EA182610 - Building - Greenhouse/Tent - Issued Date 05/31/2023 PERMIT
City of Eagan ® ® ® ® Permit Type: Building
3830 Pilot Knob Rd ®0® ®®®®® Permit Number: EA182610
Eagan, MN 55122 ®m®® ®®®® EAGAN
(651)675-5675
www.cityofeagan.com E A 1 8 2 6 1 0
Date Issued: 5/31/2023
Site Address: 610 Opperman Dr
Lot: 1 Block: 1 Addition: West Publishing Co Ist
PID:10-83 806-01-010
Use: Thomson Reuters-Event 6-27-2023 * 1 0 — 8 3 8 0 6 — 0 1 — 0 1 0
Description:
Sub Type: Greenhouse/Tent Construction Type:
Work Type: Temporary
Description: 4 Temporay tents 80x150, 60x80,3000, 1 O 20
Census Code: - Occupancy:
Zoning:
Square Feet: 0
Comments:
Fee Summary: BL-Plan Review-Fixed $40.00 0720.4222
Greenhouse/Tent $94.00 0801.4085
Surcharge-Fixed $1.00 9001.2195
Total: $135.00
Contractor: Owner: - Applicant -
Ultimate Events West Publishing Company
13405 15th Avenue N %Ryan LLC Dept 402
Plymouth MN 55441 PO Box 4900
(952)346-0101 Scottsdale AZ 85261
This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature ssued B : Signature
r-------------------------I
I For Office Use
I
® ® ® Building Permit#:
°® 0 ® ®® �EAGAN I I
®® ®® ®® ®® I SBWPermit M II
I Permit Fee: I
ECEO E
I Date Received: I
3830 PILOT KNOB ROAD i EAGAN, MN 55122-1 1 I j
(651)675-5675 1 FAX: (651)675-5694 ;; ��� " "
Date Issued_ I
Plan Submittal: buildin ins ections ci ofea an. ————— --------------I
COMMERCIAL 8 " MIT APPLICATION
Date: 6/27/2023 Site Address: 610 Opperman Dr Eagan MN suite M
Tenant Name: Thomson Reuters (Vicki Krinke) Tenant Is: ❑ New 0 Existing
Former Tenant(if applicable):
Name: Thomson Reuters (Vicki Krinke) Phone: (651) 219-0508
Applicant .
Applicant is: ;4 Owner ❑ Contractor ❑ Agent Email:
Type of Description of work: Installation of 4 temporary canopies 80'x150', 60'x80', 30'x60 & 10'x20'
Work 33 484.00
Construction Cost: �
Company: Ulimate Events Contact: Gina Vincent
Butiding Address/City/Zip: 13405 15th Ave N Plymouth, MN 55441
contractor 763-559-8368 gvincent@ue-mn.com
ue-mn.com
Phone: Email:
License M Expiration Date:
Company: Contact:
Architect)
Engineer ._ Address/City/Zip:
Phone: Email:
sewer$e Company: Contact:
Water
Coritrador Address/City/Zip:
Required for Phone: Email:
new,construction E
and addltions
License M Expiration Date:
❑ I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
NOTE:Plans and supporting documents,that you,submit are considered to.be,public information. Portions of the information
ma be-classified one that would ertnit the C to conclude that the .are trade secrets.
I hereby acknowledge that this information Is complete and accurate;that the work will be In conformance with the ordinances and codes of the City of Eagan;
that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work wail be In accordance with the
approved plan in the case of work which requires a review and approval of plans.
x Victoria L Krinke x
Applicant's Printed Name Applicant's Signature
FOR OFFICE USE ONLY
SUB TYPES Site Address: 610 Opperman Dr Eagan MN
_ Foundation _ Public Facility _ Antennae Thomson Reuters(Vicki Krinke)
_ Commercial/Industrial _ Accessory Building Tenant:
Apartments Greenhouse/Tent Permit#: I �
WORK TYPES
New _ Interior Improvement Demolish Building*
Addition ?R Exterior Improvement Demolish Interior
_ Alteration _ Retaining Wall Demolish Foundation
`Demolition of entire building—give PCA handout to applicant
DESCRIPTION ,r
Valuation 7 g7 Code Edition ���� � MCES System
Plan Review Zoning SAC Units
Census Code Stories City Water
#of Units Square Feet ® Fire Sprinklers
Type of Construction Length
Occupancy Width
REQUIRED INSPECTIONS
Footings_New Building_Addition Retaining Wall
Foundation Foundation Before Backfill Other:
Vapor Barrier Other:
Framing 30 Minutes 1 Hour
Insulation
Sheetrock Final/C.O.Required
Roof:_Decking _Insulation _Ice&Water _Final 'X Final/No C.O.Required
Siding:_Lath _Brick_EFIS
Fireplace:_Rough In _Air Test _Final
Pool:_Footings —Air/Gas Tests _Final
Final C/O Inspection: Sche ule Fire Marshal to be present: Yes No
X New Business to Eagan:
Reviewed By: �' I — , Building Inspector
FEES
Base Fee Landscape Guarantee(9001.2257)
Surcharge Tree Mitigation (9111.4677)
Plan Review Tree Performance Security (9111.2257)
MCES SAC Stormwater Performance Security (6501.2257)
City SAC
S&W Permit&Surcharge
Treatment Plant .
Treatment Plant(irrigation)
Park Dedication (9328.4670)
Trail Dedication (9375.4671) TOTAL: $ 0.00
Revised 8/19!2022