EA182805 - Building - Commercial/Industrial - Issued Date 06/21/2023 PERMIT
City of Eagan ® ® , ® Permit Type: Building
3830 Pilot Knob Rd ®®®®® ®®®® Permit Number: EA182805
Eagan,MN 55122 ®®®® --®® EAGAN
(651)675-5675 111111111111
www.cityofeagan.com * E R 1 8 2 8 0 S
Date Issued: 6/21/2023
Site Address: 2600 Vikings Cir
Lot: I Block: 1 Addition: Viking Lakes 2nd
PID:10-82011-01-010
Use: Minnesota Vikings * 1 0 — 8 2 0 1 1 — 0 1 — 0 1 0
Description:
Sub Type: Commercial/Industrial Construction Type: II-B
Work Type: Int Impr
Description: remodel of training area spaces into exam room an(
offices Occupancy: A-3
Census Code: - B
Zoning: PD
Square Feet: 0
Comments:
Fee Summary: BL-Base Fee $2,064.15 0801.4085
Valuation: 230,000.00 BL-Plan Review 65% $1,341.70 0720.4222
Surcharge-Based on Valuation $115.00 9001.2195
Total: $3,520.85
Contractor: - Applicant - Owner:
RJM Construction Minnesota VIkingsfootball LLC
830 Boone Ave N 2600 VIkings Cir
Golden Valley MN 55427 Eagan MN 55121
(952)837-8600
This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature ssued B . Signature
r--------------------------
I For Office Use
I 182805 1
I Building Permit#: I
S&W PermitEAGAN 1
1 Fee: �31 5- O I
Permit I
I Date Received: 5/10/2023 1
3830 PILOT KNOB ROAD I EAGAN,MN 55122-1810 I 1
651 675-5675 FAX: 651 675-56I I
( � I ( ) 94 1 Date Issued: I
Plan Submittal:buildinalnsnectionsOictWofeaoan.c om t-----------------_--------
COMMERCIAL BUILDING PERMIT APPLICATION
u
Date: 05/10/2023 Site Address: 2600 Vikings Circle, Eagan, MN 55121 suite#: o
Tenant Name: Minnesota Vikings Tenant Is: ❑ New Ila Existing j
Former Tenant(if applicable):
Name: RJM Construction - Kris Hahn Phone: 612-710-0282
Applicant
Applicant is: ❑ Owner 0 Contractor ❑Agent Email: kris.hahn@rjmconstruction.com
rjmconstruction.com
Type of Description of work: Remodel of training area spaces into exam room and offices
Work $230,000
Construction Cost:
Company: RJM Constructioncontact: Kris Hahn
830 Boone Avenue North, Golden Valley, MN 55427
Building Address/City2ip: onnY j
Contractor
Phone: 612-710-0282 Email: kris.hahn@rjmconstruction.com D
License#: Expiration Date:
Company: Nelson Contact: Scott Hierlinger
Architect! 901 Marquette Avenue S, Minneapolis, MN 55402
Engineer Address/City/Zip:
Phone: 612-370-1581 Email: shierlinger@nelsonww.com
Sewer& Company: N/A Contact:
Water
Contractor Address/City/Zip:
Required for Phone: Email:
new construction
and additions
License#: Expiration Date:
0 1 understand that Plumbing, Mechanical, Fire Suppression,and Sign work require separate applications.
NOTE:Plans and supporting documents that you submit are considered to be public Information. Portions of the Information
ma be classified as nontpublic If you provide ap2cfflc reasons that would permit the Chy to conclude that thSj are trade secrets.
I hereby acknowledge that this information Is complete and accurate;that the work will be In conformance with the ordinances and codes of the City of Eagan;
that I understand this Is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be In accordance with the
approved plan in the case of worts which requires a review and approval of plans.
X Kris Hahn X
Appllcant's Printed Name Appllcant's Signature
FOR OFFICE USE ONLY
SUB TYPES Site Address: zsoo,ranasc�a.eaa�.na�se,2,
_ Foundation _ Public Facility Antennae Tenant: Minnesota Vikings
CommerciaUlndustrial _ Accessory Building
—
Apartments _ Greenhouse/Tent Permit#: 182805
WORK TYPES
_ New 4-Interior Improvement Demolish Building*
Addition _ Exterior Improvement _ Demolish Interior
_ Alteration _ Retaining Wall Demolish Foundation
*Demolition of entire building—give PCA handout to applicant
DESCRIPTION
Valuation 7i 1Code Edition ANX-ZOU MCES System
Plan Review Zoning SAC Units (le'44ov-
Census Code Stories City Water
#of Units Square Feet All. 9Z5 Fire Sprinklers S
Type of Construction t .F Length
Occupancy , A•3 Width
REQUIRED INSPECTIONS
Footings_New Building_Addition Retaining Wall
Foundation Foundation Before Backfill Other:
Vapor Barrier Other:
Framing 30 Minutes V 1 Hour
Insulation
Sheetrock Final/C.O.Required
Roof:_Decking _Insulation _Ice&Water _Final -X- Final/No C.O.Required
Siding:_Lath _Brick_EFIS
Fireplace:_Rough In Air Test _Final
Pool:_Footings —Air/Gas Tests _Final
Final C/O Inspection: Schedule Fire Marshal to be present:, Yes No
�o New Business to Eagan: NO
Reviewed By: OrS �l•� Building Inspector
FEES
Base Fee Z't �' t S Landscape Guarantee(9001.2257)
Surcharge '(5• Tree Mitigation (9111.4677)
Plan Review l� }(. Tree Performance Security(9111.2257)
MCES SAC Stormwater Performance Security(6501.2257)
City SAC
S&W Permit&Surcharge
Treatment Plant
Treatment Plant(irrigation)
Park Dedication (9328.4670) cl
S
Trall Dedication(9375.4671) TOTAL: $ 3�5
MCES USE:Letter Reference: 23052367 Address ID:709397 Payment ID:468101
Date of Determination:05/23/23 Determination Expiration:05/23/25
Greetings I
Please see the determination below.
Project Name: Minnesota Vikings
Project Address: 2600 Vikings Circle
Suite#/Campus: TCO Performance Center
City Name: Eagan
Applicant: Kris Hahn, RJM Construction
Special Notes: The City is required to report this project with the normal SAC Activity Report if a permit is issued.
Charge Calculation:
Office: 793 sq.ft. @ 2400 sq.ft./SAC=0.33
Meeting: 686 sq.ft. @ 1650 sq.ft./SAC=0.42
Fixture Units: 1.00 fixture units @ 17 fixture units/SAC=0.06
Total Charge: 0.81
Credit Calculation:
MV Eagan Ventures(SAC 03/17)
Office: 1695 sq.ft. @ 2400 sq.ft./SAC=0.71
Meeting: 193 sq.ft. @ 1650 sq.ft./SAC=0.12
Fixture Units: 1 fixture unit @ 17 fixture units/SAC=0.06
Total Credit: 0.89
Net SAC: -0.08 = 0 SAC Due
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the
business use and size at the time of the final inspection. If there is a change in use or size,a redetermination will need to be
made. If you have any questions email me at:toni.ianzig@metc.state.mn.us.
Thank you,
Toni Janzig
SAC Technician
Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram
- . METROPOLITAN
•
C O U N C I L