Loading...
EA182805 - Building - Commercial/Industrial - Issued Date 06/21/2023 PERMIT City of Eagan ® ® , ® Permit Type: Building 3830 Pilot Knob Rd ®®®®® ®®®® Permit Number: EA182805 Eagan,MN 55122 ®®®® --®® EAGAN (651)675-5675 111111111111 www.cityofeagan.com * E R 1 8 2 8 0 S Date Issued: 6/21/2023 Site Address: 2600 Vikings Cir Lot: I Block: 1 Addition: Viking Lakes 2nd PID:10-82011-01-010 Use: Minnesota Vikings * 1 0 — 8 2 0 1 1 — 0 1 — 0 1 0 Description: Sub Type: Commercial/Industrial Construction Type: II-B Work Type: Int Impr Description: remodel of training area spaces into exam room an( offices Occupancy: A-3 Census Code: - B Zoning: PD Square Feet: 0 Comments: Fee Summary: BL-Base Fee $2,064.15 0801.4085 Valuation: 230,000.00 BL-Plan Review 65% $1,341.70 0720.4222 Surcharge-Based on Valuation $115.00 9001.2195 Total: $3,520.85 Contractor: - Applicant - Owner: RJM Construction Minnesota VIkingsfootball LLC 830 Boone Ave N 2600 VIkings Cir Golden Valley MN 55427 Eagan MN 55121 (952)837-8600 This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature ssued B . Signature r-------------------------- I For Office Use I 182805 1 I Building Permit#: I S&W PermitEAGAN 1 1 Fee: �31 5- O I Permit I I Date Received: 5/10/2023 1 3830 PILOT KNOB ROAD I EAGAN,MN 55122-1810 I 1 651 675-5675 FAX: 651 675-56I I ( � I ( ) 94 1 Date Issued: I Plan Submittal:buildinalnsnectionsOictWofeaoan.c om t-----------------_-------- COMMERCIAL BUILDING PERMIT APPLICATION u Date: 05/10/2023 Site Address: 2600 Vikings Circle, Eagan, MN 55121 suite#: o Tenant Name: Minnesota Vikings Tenant Is: ❑ New Ila Existing j Former Tenant(if applicable): Name: RJM Construction - Kris Hahn Phone: 612-710-0282 Applicant Applicant is: ❑ Owner 0 Contractor ❑Agent Email: kris.hahn@rjmconstruction.com rjmconstruction.com Type of Description of work: Remodel of training area spaces into exam room and offices Work $230,000 Construction Cost: Company: RJM Constructioncontact: Kris Hahn 830 Boone Avenue North, Golden Valley, MN 55427 Building Address/City2ip: onnY j Contractor Phone: 612-710-0282 Email: kris.hahn@rjmconstruction.com D License#: Expiration Date: Company: Nelson Contact: Scott Hierlinger Architect! 901 Marquette Avenue S, Minneapolis, MN 55402 Engineer Address/City/Zip: Phone: 612-370-1581 Email: shierlinger@nelsonww.com Sewer& Company: N/A Contact: Water Contractor Address/City/Zip: Required for Phone: Email: new construction and additions License#: Expiration Date: 0 1 understand that Plumbing, Mechanical, Fire Suppression,and Sign work require separate applications. NOTE:Plans and supporting documents that you submit are considered to be public Information. Portions of the Information ma be classified as nontpublic If you provide ap2cfflc reasons that would permit the Chy to conclude that thSj are trade secrets. I hereby acknowledge that this information Is complete and accurate;that the work will be In conformance with the ordinances and codes of the City of Eagan; that I understand this Is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be In accordance with the approved plan in the case of worts which requires a review and approval of plans. X Kris Hahn X Appllcant's Printed Name Appllcant's Signature FOR OFFICE USE ONLY SUB TYPES Site Address: zsoo,ranasc�a.eaa�.na�se,2, _ Foundation _ Public Facility Antennae Tenant: Minnesota Vikings CommerciaUlndustrial _ Accessory Building — Apartments _ Greenhouse/Tent Permit#: 182805 WORK TYPES _ New 4-Interior Improvement Demolish Building* Addition _ Exterior Improvement _ Demolish Interior _ Alteration _ Retaining Wall Demolish Foundation *Demolition of entire building—give PCA handout to applicant DESCRIPTION Valuation 7i 1Code Edition ANX-ZOU MCES System Plan Review Zoning SAC Units (le'44ov- Census Code Stories City Water #of Units Square Feet All. 9Z5 Fire Sprinklers S Type of Construction t .F Length Occupancy , A•3 Width REQUIRED INSPECTIONS Footings_New Building_Addition Retaining Wall Foundation Foundation Before Backfill Other: Vapor Barrier Other: Framing 30 Minutes V 1 Hour Insulation Sheetrock Final/C.O.Required Roof:_Decking _Insulation _Ice&Water _Final -X- Final/No C.O.Required Siding:_Lath _Brick_EFIS Fireplace:_Rough In Air Test _Final Pool:_Footings —Air/Gas Tests _Final Final C/O Inspection: Schedule Fire Marshal to be present:, Yes No �o New Business to Eagan: NO Reviewed By: OrS �l•� Building Inspector FEES Base Fee Z't �' t S Landscape Guarantee(9001.2257) Surcharge '(5• Tree Mitigation (9111.4677) Plan Review l� }(. Tree Performance Security(9111.2257) MCES SAC Stormwater Performance Security(6501.2257) City SAC S&W Permit&Surcharge Treatment Plant Treatment Plant(irrigation) Park Dedication (9328.4670) cl S Trall Dedication(9375.4671) TOTAL: $ 3�5 MCES USE:Letter Reference: 23052367 Address ID:709397 Payment ID:468101 Date of Determination:05/23/23 Determination Expiration:05/23/25 Greetings I Please see the determination below. Project Name: Minnesota Vikings Project Address: 2600 Vikings Circle Suite#/Campus: TCO Performance Center City Name: Eagan Applicant: Kris Hahn, RJM Construction Special Notes: The City is required to report this project with the normal SAC Activity Report if a permit is issued. Charge Calculation: Office: 793 sq.ft. @ 2400 sq.ft./SAC=0.33 Meeting: 686 sq.ft. @ 1650 sq.ft./SAC=0.42 Fixture Units: 1.00 fixture units @ 17 fixture units/SAC=0.06 Total Charge: 0.81 Credit Calculation: MV Eagan Ventures(SAC 03/17) Office: 1695 sq.ft. @ 2400 sq.ft./SAC=0.71 Meeting: 193 sq.ft. @ 1650 sq.ft./SAC=0.12 Fixture Units: 1 fixture unit @ 17 fixture units/SAC=0.06 Total Credit: 0.89 Net SAC: -0.08 = 0 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size,a redetermination will need to be made. If you have any questions email me at:toni.ianzig@metc.state.mn.us. Thank you, Toni Janzig SAC Technician Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram - . METROPOLITAN • C O U N C I L