EA185279 - Building - Pool - Issued Date 07/18/2023 PERMIT
City of Eagan ® ® ® ® Permit Type: Building
3830 Pilot Knob Rd °®° ® m °°° Permit Number: EA185279
®®® ®®®® AM
MR ow E
Eagan,MN 55122 ®®®® ®--® E AU A
(651)675-5675
www.cityofeagan.com E R 1 8 5 2 7 9 �k
Date Issued: 7/18/2023
Site Address: 4305 Sequoia Dr
Lot: 8 Block: 5 Addition: Evergreen Park
PID:10-24880-05-080
Use: * 1 0 — 2 4 8 8 0 — 0 5 — 0 8 0
Description:
Sub Type: Pool Construction Type: V-B
Work Type: New
Description: Above Ground
Census Code: - Occupancy: IRC-1
Zoning: R-1
Square Feet: 0
Comments:
Fee Summary: BL-Above Ground Pool $94.00 0801.4085
BL-Plan Review-Fixed $40.00 0720.4222
Surcharge-Fixed $1.00 9001.2195
Total: $135.00
Contractor: Owner: - Applicant -
Larry D Disher
4305 Sequoia Dr
Eagan MN 55122
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature slued B : Signature
- vti Lek ECEIVE
--------------
JUL 17 2023 1 For Office Use
1 185279 l
® ® ® ® SY, I Building Permit#:00 Alk
l
I
Amft�E A
I
®®0j S&WPermit#: I
off—
Permit Fee: I
Date Received:
7/17/2023
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I
(651)675-56751 FAX: (651)675-5694 I Date Issued:
buildinQinsoectionsOcitvofeagan.com L_____________________
RESIDENTIAL BUILDING PERMIT APPLICATION
Date: 7/6/23 site Address: 4305 Sequoia Drive Unit#:
Applicant is: Owner ❑ Contractor
Name: Larry and Jill Disher
Homeowner Address: 4305 Sequoia Drive City: Eagan
State: MN Z; : 55122 phone: 651-357-3051c�mail: jillraer@yahoo.com
Description of work: Above Ground Pool: 4000 gallons
Type of. 0
'WorkConstruction Cost: R-1 , Evergreen Park
Type of building: 0 Single Family ❑ Townhome, of units ❑ Twin Home
Company: N/A Contact:
Building Address: City:
Contractor
State: Zip: Phone: Email:
License#: Expiration Date:
Sewer,& Company: N/A Contact:
Water.
Contractor Address: City:
Required for State: Zip: Phone: Email:
new construction
License#: Expiration Date:
0 1 understand that Plumbing, Mechanical, and Fire Suppression work require separate applications.
NOTE: Pians and supporting documents that you submit are considered to be public information. Portions of the
information may bs olassifled'as'noh-puiilic if' protide spsciflo reasons that wauld.permit the Clty t6i,conclude that '
are trade secrets.
CALL BEFORE YOU DIG. Contact Gopher State One Call at(651)454-0002 or www.aooherstateonecall.ora for protection against underground utility
damage. Contact Gopher State One Call 48 hours before you intend to dig to receive locates of underground utilities.
hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
X Jill Rentmeester Disher X
Applicant's Printed Name Applicant's Signature
. ..._... ..
FOR OFFICE USE ONLY
Site Address: 4305 Sequoia Drive Permit#: 185279
SUB TYPES
Single Family _ Fireplace _ Lower Level
_ 01 of_Plex _ Foundation Porch
Deck _ Garage -7 Pool
WORK TYPES
_ New _ Repair _ Siding _ Retaining Wall
Addition _ Fire Repair _ Reroof _ Move Building
Alteration _ Water Damage _ Windows _ Demolish Building*
Replace _ Egress Window _ Solar *Demolition of entire building-give PCA
handout to applicant
DESCRIPTION
Calculated Valuation It35• Occupancy IMCES System
Plan Review 025% 0100% Code Edition /�4--1,9za SAC Units
Census Code Zoning gr-L City Water
#of Units Stories Booster Pump
#of Buildings Square Feet PRV
Type of Construction d>rj Fire Suppression Required
Separate Stormwater Management Permit Required
REQUIRED INSPECTIONS
Footings: New Addition Deck Meter Size:
Foundation: Before Backfill Poured Wall Siding:_Stucco Lath _Stone Lath _Brick
Framing: 1 Hour Residential Alteration Roof:_Ice&Water _Final
Braced Wall Framing/Blocking Erosion Control
Braced Wall Sheathing (prior to house wrap) Pool:_Footings _Air/Gas Tests Y Final
Interior Braced Wall Panel(s) Retaining Wall:_Footings_Backfill_Final
Firewalls Fire Suppression:_Rough In_Final
Insulation Windows
Radon Control Other:
Drain Tile
Grading Final/No C.O. Required
Final/C.O. Required
Reviewed By: , Building Inspector
FEES
Calculated Valuation
Base Fee
Plan Review
State Surcharge
Met Council SAC
City SAC
Treatment Plant
Water Supply&Storage
S&W Permit&Surcharge
Meter
Radio Read
Other:
TOTAL