Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
EA184530 - Building - Commercial/Industrial - Axxys Construction - Issued Date 07/21/2023
FOR OFFICE USE ONLY SUB TYPES 6131 OW SMLEV MEMORIAL MW, EAOAk, lAtVb¢, Site Address: trE1iC4J Foundation Public Facility Antennae AXXYS CONSTRUCTION _ Commercial/Industrial Apartments _ _ Accessory Building Greenhouse /Tent _ Tenant: Permit #: tq+O — _ WORK TYPES Final / C.O. Required Roof: _Decking _Insulation _Ice & Water _ New Interior Improvement Demolish Building* _ Addition _ Exterior Improvement Demolish Interior Alteration Retaining Wall Demolish Foundation New Business to Eagan: yr -5 Reviewed By: *Demolition of entire building — give PCA handout to applicant DESCRIPTION Valuation �Sd®�y Code Edition ��® MCES System V/ Plan Review Zoning SAC Units ell Census Code — Stories _..e City Water # of Units Square Feet �, IT -2 Fire Sprinklers A'10 Type of Construction �— Length —� Occupancy Width REQUIRED INSPECTIONS Footings _ New Building — Addition Retaining Wall Foundation Foundation Before Backfill Other: Vapor Barrier Other: Framing 30 Minutes 1 Hour Insulation Sheetrock Final / C.O. Required Roof: _Decking _Insulation _Ice & Water _Final Final / No C.O. Required Siding: _ Lath _Brick _ EFIS Fireplace: _Rough In _Air Test _Final Pool: _Footings —Kir/Gas Tests _Final Final C/O Inspection: Schedule Fire Marshal to be present: Yes No New Business to Eagan: yr -5 Reviewed By: , Building inspector FEES Base Fee Surcharge Plan Review MCES SAC City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication (9328.4670) Trail Dedication (9375.4671) Landscape Guarantee (9001.2257) Tree Mitigation (9111.4677) GW Z Tree Performance Security (9111.2257) Stormwater Performance Security (6501,2257) T �O TOTAL: $ 0.00 7 S� I:E.vi erl ii/ i CV7022 PERMIT City of Eagan Permit Type: Building 3830 Pilot Knob Rd Eagan, MN 55122 ®®, ® ®®®®® ®®®®&Ufto A Ik 0Permit EAU/8A`N Number: EA184530 (651) 675-5675 111111111111 www.cityofeagan.com * E A 1 B 4 5 3 0 Date Issued: 7/21/2023 Site Address: 4131 Old Sibley Mem Hwy 200 Lot: 2 Block: 1 Addition: Preusse 3rd PID:10-59102-01-020 Use: Axxys Construction * 1 0— 5 9 1 0 2— 0 1— 0 2 0 Description: Sub Type: Commercial/Industrial Construction Type: II -B Work Type: Int Impr Description: Census Code: - Occupancy: B Zoning: Square Feet: 6,137 Comments: Fee Summary: BL - Base Fee $2,199.15 0801.4085 Valuation: 250,000.00 BL - Plan Review 65% $1,429.45 0720.4222 Surcharge - Based on Valuation $125.00 9001.2195 Total: $3,753.60 Contractor: - Applicant - Owner: Axxys Construction Rjr Enterprises LLC 4101 Nicols Rd, #100 18901 Jordan Tri Eagan MN 55122 Lakeville MN 55044 (618) 308-0152 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature sued B : Signature r--------------------------, For Office Use I i 44 53 I Building Permit #: I I I Q©®q �00 0 1S&W Permit � I � ��-OPermit Fee!i jI I I E C i V EI Date Received: j 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1 (651) 675-56751 FAX: (651) 675-5694 J U N 12 20213 I Date Issued: I Plan Submittal: huildinainspections cItvofeaaan.R t-------------------------- COMMERCIAL BUIL®INC PERMIT APPLICATION Date: 06/12/2023 Site Address: 4131 OLD SIBLEY MEMORIAL HWY, EAGAN, MN, 55122 Suite #: 200 Tenant Name: AXXYS CONSTRUCTION Tenant is: 0 New ❑ Existing Former Tenant (if applicable): Name: Justin Vrooman Phone: 612-800-7878 x513 >Applic�nt Applicant is: ❑ Owner ® Contractor ❑ Agent Email: JVr00man@aXxySCOnstruCtlOn.Com Type of . Description of work: INTERIOR IMPROVEMENT Construction Cost: ��✓�', Work company: AXXYS CONSTRUCTION contact: Justin Vrooman Building Addreas/clry/z1p.4101 NICOLS RD SUITE 100.EAGAN, MINNESOTA 55122, USA 612-800-7878vrooman@axx sconstruction.com Phone: Email: Y 'Contractor jefteuvoij e aoyscoY�rtwo License #: NA Expiration Date: / Company: KPAUL PARTNERSHIP INC. Contact: Stephanie Leonard Architect/ Engineer Address/City/Zip: 1420 Celebration Blvd. Suite 300 Celebration, FL 34747 Phone: 289-644-2531 Email: sleonard@kpaularchitect.com Sower& Company: Contact: Water Contractor Address/City/Zip: Required fpr• ;: naW cohstr6o0oft ; Phone: Email: and eddlkjdns License #: Expiration Date: ® i understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. NOTE. Putts and supporting ddcu►n®rats that yduAubrnik'are cots derd°' xc# k� pulbti lrfc�rrr�atfbr�� Portions cif the tnformafion Jnr► be classltldd'a nosy ublic If ou rovide s eeiflc'r'easo , s`tha> ,uvot ldr el�rimit°the ,Gilt to arsnciudethat thby are trado se. rets, I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this Is not a permit, but only an application for a permit, and work Is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans, /,1� x'Y'i ab Y !fir -.fir.! Applicant's Printed Name Signature dM MCES USE: Letter Reference: 230720B2 Address ID: 5534 Payment ID: 469568 Date of Determination: 07/20/23 Greetingsl Please see the determination below. Determination Expiration: 07/20/25 Project Name: Axxys Construction Project Address: 4131 Old Sibley Memorial Highway Suite #/Campus: 206 City Name: Eagan Applicant: Yohan Ohayon, Axxys Construction 1e4530 1V 123 Special Notes: The City is required to report this project with the normal SAC Activity Report if a permit is issued. Charge Calculation: Office: 5902 sq. ft. @ 2650 sq. ft. / SAC = 2.23 Total Charge: 2.23 Credit Calculation: FAI (SAC 07/96) 5902 sq. ft. / 9000 sq. ft. = 66% x 3 SAC =1.98 Total Credit: 1.98 Net SAC: 0.25 = 0 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions email me at: sara.running@metc.state.mn.us. Thank you, Sara Running SAC Technician Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram METROPOLITAN C 0 U N C I L