Loading...
EA185082 - Building - Commercial/Industrial - Issued Date 08/08/2023 PERMIT City of Eagan ® , Permit Type: Building 3830 Pilot Knob Rd e � EAGAN Permit Number: EA185082 Eagan, MN 55122 "��' '��° (651)675-5675 www.cityofeagan.com .� * E R 1 8 5 0 8 z Date Issued: 8/8/2023 Site Address: 2024 Rahn Way Lot: 1 Block: 1 Addition: Rahn Ridge PID:10-62750-01-010 Use: The House Church * 1 O — 6 Z 7 S 0 — 0 1 — 0 1 0 Description: Sub Type: Commercial/Industrial Construction Type: Il-B Work Type: Int Impr Description: demo wall,make two storage rooms Census Code: - Occupancy: A-3 Zoning: PD Square Feet: 0 Comments: Fee Summary: BL-Base Fee $331.75 0801.4085 BL-Plan Review 65% $215.64 0720.4222 Valuation: 16,665.00 Surcharge-Based on Valuation $8.50 9001.2195 Total: $555.89 Contractor: - Applicant - Owner: Appro Development House Church Inc The 21476 Grenada Ave 2024 Rahn Way Lakeville MN 55044-0000 Eagan MN 55122 (952)469-2171 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature issued B<Signature }rh 9I For Office Use I i 185082 .p I Building Permit#: I i r I a S&W Permit#: i t 55 5, g 1 GAN I Permit Fee: I I I 7/6/2023 Date Received: I 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I I (651)675-5675 1 FAX: (651)675-5694 j Date Issued: Plan Submittal: lauildinoinsgections'�7acityofeacfan.com L—_—_— .---------------_--� COMMERCIAL BUILDING PERMIT APPLICATION Date: Site Address: 7 D--Q`a< n L-•� Suite#: i Tenant Name: �%�+e N o s �5 �,� �� , Tenant is: ❑ New Existing Former Tenant(if applicable): r.... ,_... .. _....m . .... Name: l rz,o e J tl o .. a..�" Phone: . Applicant wrier E30Contractor ❑ Agent Email:Applicant is: ❑ Orf s C .¢a �.a aa� . a o.•.-+ Type Of � Description of work: � yp ti p e .,,.. W �,t1 en.t� � t..+o o a.a " ?D•^r•S Work SA- Construction Cost �{ 1 1. —- - -- - i Company. /� a• 1� eJe.io��arne.af' Contact: Building Address/City/Zip: l y?to C�R r.�.o•./a v 6 L awe r: t 1 r�+� 6Y y Contractor Ole t Phone; 4.5�• `lla-o$ol. Email: C'+ c' License#: Expiration Date �,,, ' A)a It Company: T S Contact: Josh L It Architect/ Engineer Address/City/zip: 8',Sd Ia a Id e� t/a�l a- oa Phone 7&3 S'fS 3131 Email: w ll t r at' (' • a o ti^ Sewer& Company: A Contact: Water Contractor Address/City/Zip: i Required for Phone: Email: I new construction and additions Ex iration Date License#: P _....._ .... � _. ._ understand that Plumbing, Mechanical, Flre Suppression, and Sign work require separate applications. .. NOTE:Plans and supporting documents that you submit are considered to be public information Portions of the information m�be classlfled as non-public if ou_ rovlde s eclflc reasons that would ermlt the CI to conclude that the are trade secrets I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan that I understand this is not a permit, but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with thi approved plan in the case of work which requires a review and approval of plans. X is o ra t,k - x Applicant's Prin d Name Applicant's S nature FOR OFFICE USE ONLY SUB TYPES 2024 Rahn Way Foundation Public Facility Antennae The House Church Commercial/Industrial Accessory Building 185082 Apartments _ Greenhouse/Tent WORK TYPES New Interior Improvement Demolish Building* _ Addition _ Exterior Improvement Demolish Interior Alteration — Retaining Wall Demolish Foundation "Demolition of entire building—give PCA handout to applicant DESCRIPTION ' -' L Valuation ��1 -7 Code Edition AW 2P2-P MCES System Plan Review Zoning IT D SAC Units Census Code Stories y City Water #of Units Square Feet Fire Sprinklers —/—W-5— Type of Construction )1�1�-2 Length Occupancy Width REQUIRED INSPECTIONS Footings—New Building_Addition Retaining Wall Foundation Foundation Before Backfill Other: Vapor Barrier Other: Framing 30 Minutes�1 Hour Insulation Sheetrock Final/C.O. Required Roof:_Decking _Insulation _Ice&Water _Final X Final/No C.O.Required Siding:_Lath _Brick_EFIS Fireplace:_Rough in _Air Test _Final Pool:_Footings —Air/Gas Tests _Final Final C/O Inspection: Schedule Fire Marshal to be present: X Yes No New Business to Eagan: /lf Reviewed By: +*iY 5 '�'� , Building Inspector FEES Base Feel. Landscape Guarantee (9001.2257) _.. Surcharge o Tree Mitigation (9111.4677) Plan Review oZ rJ.ivy Tree Performance Security (9111.2257) MCES SAC Stormwater Performance Security (6501.2257) City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant(Irrigation) Park Dedication (9328.4670) 555.�g Trail Dedication (9375.4671) TOTAL: