EA185082 - Building - Commercial/Industrial - Issued Date 08/08/2023 PERMIT
City of Eagan ® , Permit Type: Building
3830 Pilot Knob Rd
e � EAGAN Permit Number: EA185082
Eagan, MN 55122 "��' '��°
(651)675-5675
www.cityofeagan.com .� * E R 1 8 5 0 8 z
Date Issued: 8/8/2023
Site Address: 2024 Rahn Way
Lot: 1 Block: 1 Addition: Rahn Ridge
PID:10-62750-01-010
Use: The House Church * 1 O — 6 Z 7 S 0 — 0 1 — 0 1 0
Description:
Sub Type: Commercial/Industrial Construction Type: Il-B
Work Type: Int Impr
Description: demo wall,make two storage rooms
Census Code: - Occupancy: A-3
Zoning: PD
Square Feet: 0
Comments:
Fee Summary: BL-Base Fee $331.75 0801.4085
BL-Plan Review 65% $215.64 0720.4222
Valuation: 16,665.00 Surcharge-Based on Valuation $8.50 9001.2195
Total: $555.89
Contractor: - Applicant - Owner:
Appro Development House Church Inc The
21476 Grenada Ave 2024 Rahn Way
Lakeville MN 55044-0000 Eagan MN 55122
(952)469-2171
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature issued B<Signature
}rh 9I
For Office Use I
i 185082
.p I Building Permit#: I
i r I
a S&W Permit#: i
t
55 5, g 1
GAN I Permit Fee:
I I
I 7/6/2023
Date Received: I
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I I
(651)675-5675 1 FAX: (651)675-5694 j Date Issued:
Plan Submittal: lauildinoinsgections'�7acityofeacfan.com L—_—_— .---------------_--�
COMMERCIAL BUILDING PERMIT APPLICATION
Date: Site Address: 7 D--Q`a< n L-•� Suite#:
i
Tenant Name: �%�+e N o s �5 �,� �� , Tenant is: ❑ New Existing
Former Tenant(if applicable):
r.... ,_... .. _....m . ....
Name: l rz,o e J tl o .. a..�" Phone:
.
Applicant
wrier E30Contractor ❑ Agent Email:Applicant is: ❑ Orf s C .¢a �.a aa� . a o.•.-+
Type Of � Description of work: �
yp ti
p e .,,.. W �,t1 en.t� � t..+o o a.a " ?D•^r•S
Work SA-
Construction Cost �{ 1 1. —- - -- -
i Company. /� a• 1� eJe.io��arne.af'
Contact:
Building Address/City/Zip: l y?to C�R r.�.o•./a v 6 L awe r: t 1 r�+� 6Y y
Contractor Ole t
Phone; 4.5�• `lla-o$ol. Email: C'+ c'
License#: Expiration Date
�,,, ' A)a It
Company: T S Contact: Josh L
It Architect/
Engineer Address/City/zip: 8',Sd Ia a Id e� t/a�l a- oa
Phone 7&3 S'fS 3131 Email: w ll t r at' (' • a o ti^
Sewer& Company: A Contact:
Water
Contractor Address/City/Zip:
i Required for Phone: Email:
I new construction
and additions Ex iration Date
License#: P
_....._ .... � _. ._
understand that Plumbing, Mechanical, Flre Suppression, and Sign work require separate applications.
..
NOTE:Plans and supporting documents that you submit are considered to be public information Portions of the information
m�be classlfled as non-public if ou_ rovlde s eclflc reasons that would ermlt the CI to conclude that the are trade secrets
I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan
that I understand this is not a permit, but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with thi
approved plan in the case of work which requires a review and approval of plans.
X is o ra t,k - x
Applicant's Prin d Name Applicant's S nature
FOR OFFICE USE ONLY
SUB TYPES 2024 Rahn Way
Foundation Public Facility Antennae The House Church
Commercial/Industrial Accessory Building 185082
Apartments _ Greenhouse/Tent
WORK TYPES
New Interior Improvement Demolish Building*
_ Addition _ Exterior Improvement Demolish Interior
Alteration — Retaining Wall Demolish Foundation
"Demolition of entire building—give PCA handout to applicant
DESCRIPTION ' -' L
Valuation ��1 -7 Code Edition AW 2P2-P MCES System
Plan Review Zoning IT D SAC Units
Census Code Stories y City Water
#of Units Square Feet Fire Sprinklers —/—W-5—
Type of Construction )1�1�-2 Length
Occupancy Width
REQUIRED INSPECTIONS
Footings—New Building_Addition Retaining Wall
Foundation Foundation Before Backfill Other:
Vapor Barrier Other:
Framing 30 Minutes�1 Hour
Insulation
Sheetrock Final/C.O. Required
Roof:_Decking _Insulation _Ice&Water _Final X Final/No C.O.Required
Siding:_Lath _Brick_EFIS
Fireplace:_Rough in _Air Test _Final
Pool:_Footings —Air/Gas Tests _Final
Final C/O Inspection: Schedule Fire Marshal to be present: X Yes No
New Business to Eagan: /lf
Reviewed By: +*iY 5 '�'� , Building Inspector
FEES
Base Feel. Landscape Guarantee (9001.2257) _..
Surcharge o Tree Mitigation (9111.4677)
Plan Review oZ rJ.ivy Tree Performance Security (9111.2257)
MCES SAC Stormwater Performance Security (6501.2257)
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant(Irrigation)
Park Dedication (9328.4670)
555.�g
Trail Dedication (9375.4671) TOTAL: