EA182787 - Building - Commercial/Industrial - Issued Date 08/10/2023City of Eagan PERMIT , m , ® Permit Type: Building
3830 Pilot Knob Rd Permit Number: EA182787
Eagan, MN 55122 __ ----
(651) 675-5675 EAGAN
EMEM
www.cityofeagan.com a E R 1 B 2 7 8 7*
Date Issued: 8/10/2023
Site Address: 1340 Corporate Center Cur
Lot: 3 Block: 2 Addition: Eagandale Office Park 2nd
PID:10-22531-02-030
Use: Interstate Companies * 1171 — Z Z
Description:
Sub Type: Commercial/Industrial
Work Type: Solar Construction Type:
Description: Installation of a flat roof ballasted solar PV system
Census Code: - Occupancy:
Zoning:
Square Feet: 0
Comments:
Fee Summary: BL - Base Fee $1,524.15 0801.4085
Valuation: 150,000.00 BL - Plan Review 65% $990.70 0720.4222
Surcharge - Based on Valuation $75.00 9001 2195
Total: $2,589.85
Contractor:
All Energy Solar
1264 Energy Lane
St Paul MN 55108
(651) 842-9404
- Applicant - I Owner:
Shree Eagan LLC
% Sri Eagan LLC
11800 Singletree Lane Ste 301
Eden Prairie MN 55344
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature sued B 5eSignature
RBY
ECEIVE
MAY 0 9 2023
,
o
a e
pp �p E AG A N
aw sw _vep
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810
(651) 675-5675 1 FAX: (651) 675-5694
Plan Submittal: buildinainspectionsacitvofeaaan com
-------------------------
For Office Use
I I
Building Permit #: 182787 I
I I
I I
S&W Permit #:
Permit Fee: 2i ` • S
jDate Received: 5/9/2023
I I
I I
Date Issued:
--------------------------I
COMMERCIAL BUILDING PERMIT APPLICATION
Date: 5/9/2023 site Address: 1340 Corporate Center Curve
Tenant Name: Interstate Companies Inc
Tenant is: El New �Z Existing
Former Tenant (if applicable): _
Name: All Energy Solar
Suite #:
Phone: 651-842-9404
Applicant is: ❑ Owner 0 Contractor ❑ Agent Email: Permit@allenergysolar.com
Description of work: Installation of a flat roof ballasted solar PV system
Construction Cost: $150,000
Company: All Energy Solar
Address/City/zip: 1264 Energy Ln, St Paul, MN 55108
Contact: f - I. nl„�t �� l
Phone: 651-842-9404 Email: permit@allenergysolar.com
License* BC665819, EA667674
Company:
Address/City/Zip:
Phone: Email:
Company:
Address/City/Zip:
Phone:
License #:
Email:
ration Date: 3/31/2025, 2/29/2024
ration Date:
Contact:
Contact:
❑ I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
NQTF• Phn�'�na a.•.a»1a,1z:.1:.�;...�_ _,.... __.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the
approved plan in the case of work which requires a review and approval of plans.
X Colin Buechel
Applicant's Printed Name
X r,&&, 5azc" .�C.ti
Applicant's Signature
FOR-OFF(CE USE'ONLY
SUB TYPES
Foundation
1340 Corporate Center Curve
Site Address:
_ _ Public Facility
Commercial/industrial
Antennaey
Interstate Companies Inc
Accessory Building
Tenent:
_—
Apartments Greenhouse / Tent
--
..................................._..___...................._....._....__...__._.__..
Permit #: 182787
WORK TYPES
— New _ Interior Improvement
Demolish Building*
— Addition Exterior Improvement
— Alteration Retaining Wall
Demolish Interior
—
Demolish Foundation
! /
DESCRIPTION 5; *Demolition of entire building - give PCA handout to applicant
Valuation SQ bo Code Edition
2040 A0gL
Plan Review
y MCES System !-
Zoning
Census Code "'
_.
SAC Units
—
Stories
# of Units —'
_
City Water
Square Feet—
Type of Construction
-�'
Fire Sprinklers
Length
Occupancy '- Width
�-
REQUIRED INSPECTIONS
Footings _ New Building _ Addition
Retaining Wall
Foundation Foundation Before Backfill
Other:
Vapor Barrier
Framing 30 Minutes 1 Hour
Other:
Insulation
Sheetrock
Roof: _Decking _Insulation _Ice & Water _Final
Final / C.O. Required
Final / No C.O. Required
Siding: _Lath _Brick _ EFIS
_�
Fireplace: _Rough In _Air Test
_Final
Pool: _Footings —Air/Gas Tests _Final
Final C/O Inspection: Schedule Fire Marshal to be present:
Yes �(
No
New Business to Eagan:
Reviewed By: _ _ -- , Building Inspector
FEES
!S
Base Fee Landscape Guarantee (9001.2257)
Surcharge 75
Tree Mitigation (9111.4677)
Plan Review �f
916 Tree Performance Security (9111.2257)
MCES SAC r Stormwater Performance Security (6501.2257) -
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant (Irrigation)
Park Dedication (9328.4670) - BS
2 S�
Trail Dedication (9375.4671) TOTAL: $ 0•00 '