EA185993 - Zoning - Residential - Issued Date 08/10/2023 PERMIT
City of Eagan 6 p , Permit Type: Zoning
3830 Pilot Knob Rd
Eagan, MN 55122 '--- EAG Permit Number: EA185993
A •waA
(651)675-5675 AN
www.cityofeagan.com MW
5 9 9 3 *
Date Issued: 8/10/2023
Site Address: 4242 Lodgepole Dr
Lot: 8 Block: 1 Addition: Evergreen Park
PID:10-24880-01-080
Use:
* 1 0 — 2 4 8 8 0 — 0 1 — 0 8 0 *
Description:
Sub Type: Residential
Work Type: Driveway Construction Type:
Description:
Census Code: - Occupancy:
Zoning:
Square Feet:
Comments:
Fee Summary:
Total:
Contractor: - Applicant - Owner:
Valley Blacktopping Inc
4135 South Robert Trail Jeffrey D Boily
4242 Lodgepole Dr
Eagan MN 55123 Eagan MN 55122
(651)452-6845
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
1 hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature sued B : Signature
[-----------------`
Por8��eVwr |
|
4 AM pcnnuAV 11
� /
|
|
|
N�-- AV IL
Date Received: /
| '
|
Staff: |
/
3830 PILOT KNOB ROAD | EAGAN.MN 55122�1810 `________ ___—
(651)D75-5@85 !FAX: (651)875'5G84 planningecitycifeagan.corn
ZONING PERMIT APPLICATION
Ej Please identify improvements on amoo|md site plan drawing that shows lot Unes, structures, and existing
conditions.
For projects involving significant land disturbance, a Stormwater Management Permit and collection of security
may berequired.
Site Address: 12 .4o6C_-ePcL-e
Property 1
Information
Valley Blacktopping, Inc. 651.452.6845
Name: Phone:
4135 South Robert Trail City/State/Zip:
Address: Eagan, MN 55123
Applicant Signature: Date: 5/16/23
Email address: rjohnson@valleybiacktopping.com
0 Retaining Wall<4 feet @ Driveway
0 Shed (if over 120 sq,ft.,indicate matching
13 Patio 0 Sport Court roof style and exterior materials to
Type of Work 0 Sidewalk 0 Fence house)
[3 Other:
Description of work:
Planning Setbacks, hard surface coverage, shoreland zoning, bluff zonelsetbacks, etc.
Denied Date: 8/10/2023 Staff:
i Notes:
Okay as presented. Maximum width at right-of-way is 22 feet. Please refer to driveway handout.
Applicant/Contractor is responsible for determining location of property lines
Revised Plans
Approved: Yes I No Date: Staff:
Engineering Grading,drainage, utility easements,wetlands,erosion control, improvements in the Right-of-Way,etc,
Approved Denied Date: Staff:
Approved: Yes No Date: Staff:
Comments
You y subscribe to receive — electronic-- notification-- ''~^ the ~`, of proposed ordinances by siu".00 vv for an email update on the utya website at
CALL BEFORE YOU DIG. Contact Gopher State One Call m(65,)4a4-o0nz for protection against underground utility damage.
Contact Gopher State One Call 4Ohours before you intend mdig to receive locates of underground utilities.