EA186154 - Zoning - Residential - Issued Date 08/18/2023 PERMIT
City of Eagan Permit Type: Zoning
3830 Pilot Knob Rd a ® Permit Number: EA186154
;�-
Eagan, MN 55122 a--- »» EAG
(651)675-5675
www.cityofeagan.com * E R 1 8 6 1 5 4
Date Issued: 8/18/2023
Site Address: 514 Chapel Ct
Lot: 3 Block: 1 Addition: Cherrywood Knoll
PID:10-17050-01-030
Use: * 10 17050 0 1 - 030
Description:
Sub Type: Residential Construction Type:
Work Type: Sport Court
Description: 25 x 26 Basketball Court
Census Code: - Occupancy:
Zoning:
Square Feet:
Comments:
Fee Summary:
Total:
Contractor: - Applicant - Owner:
Millz House Jennifer Zabala
14645 Felton Ct#104 514 Chapel Ct
Apple Valley MN 55124 Eagan MN 55121
(952)456-2286
This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature Issued By: Signature
r-----------------I
I For Office Use
i B I
iii ► �� I Permit#: 186154
Date Received:
EAGAN
I I
I
1 Staff:
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 1 ———————————————— I
(651) 675-5685 1 FAX: (651)675-5694 planningP-cityofeagan.com
ZONING PERMIT APPLICATION
F� Please identify improvements on a scaled site plan drawing that shows lot lines, structures, and existing
conditions.
For projects involving significant land disturbance, a Stormwater Management Permit and collection of security
may be required.
Property Site Address:
514 Chapel Court
Information Jen Zabala
Owner Name:
Name: Alan Mills Phone: 952-456-2286
14645 Felton Court City/State/Zip: Apple Valley, MN 55124
Contact Address: 8/14/23
Applicant Signature: Date:
alanifmillihouse.com
Email address:
❑ Retaining Wall<4 feet ❑ Driveway ❑ Shed (if over 120 sq.ft.,indicate matching
❑ Patio ® Sport Court roof style and exterior materials to
Type of Work ', ❑Sidewalk ❑ Fence house)
Description of work:
25' x 26' Basketball court 0 Other:
Planning Setbacks,hard surface coverage,shoreland zoning, bluff zone/setbacks,etc.
rove Denied Date: 8/14/2023 Staff: �CizC�
Notes:
Okay as presented. Applicant/Contractor is responsible for determining location of property lines
Revised Plans
Approved: Yes/No Date: Staff:
Engineering Grading, drainage, utility easements,wetlands, erosion control, improvements in the Right-of-Way, etc,
Approved / Denied Date: Staff:
Notes:
Revised Plans
Approved: Yes/No Date: Staff:
Comments
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at
www.cityofeagan.com/subscribe.
CALL BEFORE YOU DIG. Contact Gopher State One Call at(651)454-0002 or www.gopherstateonecall.org for protection against underground utility damage.
Contact Gopher State One Call 48 hours before you intend to dig to receive locates of underground utilities.