Loading...
EA185654 - Building - Commercial/Industrial - Issued Date 08/24/2023 PERMIT City of Eagan Permit Type: Building 3830 Pilot Knob Rd Permit Number: EA185654 Eagan, MN 55122 (651)675-5675 EAGAN www.cityofeagan.com * E A 1 8 5 6 5 4 Date Issued: 8/24/2023 Site Address: 3100 Courthouse Lane Lot: 3 Block: 2 Addition: Oakview Center PID:10-53790-02-030 Use: PS Midwest One LLC * 1 0 — 5 3 7 9 0 — 0 Z — 0 3 D Description: Sub Type: Commercial/Industrial Construction Type: II-B Work Type: Solar Description: 173.9kW Solar Photovoltaic Roof Mounted Array Census Code: - Occupancy: S-1 Zoning: Square Feet: 0 Comments: Fee Summary: BL-Base Fee $1,076.80 0801.4085 Valuation: 86,950.00 BL-Plan Review 65% $699.92 0720.4222 Surcharge-Based on Valuation $43.50 9001 2195 Total: $1,820.22 Contractor: - Applicant - Owner: MN Solar Ps Mid West One LLC(Public Storage) 11830 Cty Rd 13 SE 701 Western Ave Ste 500 Watertown MN 55388 Glendale CA 91201 (320)444-5694 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature Issued By: Signature M E C E I V E�pi�, -------------------------- For Office Use 0 Building Permit#: 185654 S&W Permit#: EAGAN IPermit Fee: 1X20. 2-21 I Date Received: 8/1/2023 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-56751 FAX: (651)675-5694 _cityofeagan.com Plan Submittal: buildinginspectionsp ——————————————————————————I I Date Issued: I COMMERCIAL BUILDING PERMIT APPLICATION Date: 8/1/23 Site Address: 3100 Courthouse Ln, Eagan, MN 55121 Suite#: Tenant Name: I (AZ Tenant is: El New 2 Existing Former Tenant(if applicable): Leah Johnson 320.444.5694 Name: Phone: Applicant Applicant is: El Owner 0 Contractor El Agent Email: Leah @ mnsolarandmore.com Type of Description of work: 173.9kW Solar Photovoltaic Roof Mounted Array Work 86,950 I Construction Cost: MN Solar Leah Johnson Company: Contact: 11830 County Rd 13 SE, Watertown, MN 55388 Building Address/City/Zip: Contractor 320.444.5694 Leah@ mnsolarandmore.com j Kai ICA) Phone: Email: License#: BC777439 Expiration Date: 3/31/24 Company: Contact: Architect/ Engineer Address/City/Zip-, Phone: Email: .......... 111___­ ewer Company: Contact: Water Contractor Address/City/Zip: Required for Phone: Email: new construction and additions I License#: Expiration Date: El I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non=�ublic_if ou�rovide specific reasons that would permit the City to conclude that thpy are trade secrets. I I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Leah Johnson fk4, Applicant's Printed Name Applicis *nature FOR OFFICE USE ONLY SUB TYPES Site Address:lm-I COU,(tbov-fe Tenant: Foundation _ Public Facility Antennae VS M)dWaLD 0- Commercial/Industrial Accessory Building Apartments _ Greenhouse/Tent Permit#: WORK TYPES _ New _ Interior Improvement Demolish Building* Addition Exterior Improvement Demolish Interior _ Alteration _ Retaining Wall Demolish Foundation *Demolition of entire building—give PCA handout to applicant DESCRIPTION 91 Valuation 0 9S�' Code Edition � MCES System - Plan Review -X Zoning SAC Units Census Code "" Stories City Water #of Units Square Feet Fire Sprinklers Type of Construction Length Occupancy T— p Y S'I Width REQUIRED INSPECTIONS Footings_New Building—Addition Retaining Wall Foundation Foundation Before Backfill Other: Vapor Barrier Other: Framing 30 Minutes 1 Hour Insulation Sheetrock Final/C.O. Required Roof:_Decking _Insulation _Ice &Water _Final Final/No C.O. Required Siding:_Lath _Brick_EFIS Fireplace:_Rough In _Air Test _Final Pool:_Footings —Air/Gas Tests _Final Final C/O Inspection: Schedulec7ire Marshal to be present: Yes - No New Business to Eagan: 1' Reviewed By: /: , Building Inspector FEES Base Fee fU7t Landscape Guarantee (9001.2257) Surcharge e Ary3. Tree Mitigation (9111.4677) �-- 2 Plan Review Tree Performance Security (9111.2257) MCES SAC Stormwater Performance Security (6501.2257) City SAC S&W Permit& Surcharge -- Treatment Plant Treatment Plant (Irrigation) Park Dedication (9328.4670) G-`=— Trail Dedication (9375.4671) TOTAL: $ 0.00