EA186821 - Building - Commercial/Industrial - Issued Date 09/19/2023 PERMIT
City of Eagan , e Permit Type: Building
3830 Pilot Knob RdIL 0 Permit Number: EA186821
Eagan, MN 55122
(651)675-5675 EAGAN
www.cityofeagan.com '® * E R 1 8 6 8 2 1
Date Issued: 9/19/2023
Site Address: 2983 Center Ct
Lot: 9 Block: 5 Addition: Eagandale Center Industrial Pk 1st
PID:10-22500-05-090 11111111111111111111 1113MR11MEM
Use: Air Care-Go * 1 0 — 2 2 5 0 0 — 0 S — 0 9 0
Description:
Sub Type: Commercial/Industrial Construction Type:
Work Type: Reroof
Description: installation of a 60 Mil Adhered EPDM
Census Code: - Occupancy:
Zoning:
Square Feet: 0
Comments:
Fee Summar • BL-Base Fee 1 861.65
Summary: $ 0801.4085
Valuation: 199,477.00 BL-Plan Review 65% $1,210.07 0720.4222
Surcharge-Based on Valuation $100.00 9001 2195
Total: $3,171.72
Contractor: - Applicant - Owner:
Allweather Roof Deborah H&Marvin F Tstes Johnson
9211 Plymouth Avenue N 13347 80th St NW
Golden Valley MN 55427 Annandale MN 55302
(612)227-4859
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature Issued By: Signature
For Office Use
186821
r e r Building Permit#:
a� ° .►� ®® m. I S&W Permit#:
I
EAGAU— I Permit Fee: '—j- I
I
I
Date Received: 9/13/2023
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I I
(651)675-5675 1 FAX: (651)675-5694 I Date Issued: I
Plan Submittal: buildinginspections(a)-cityofeagan com I ______
COMMERCIAL BUILDING PERMIT APPLICATION
Date: 9/13/2023 site Address: 2983 Center Court suite#:
Tenant Name: Air Care-Go Tenant is: ❑ New 0 Existing
Former Tenant(if applicable):
Name: Allweather Roof - Lynn Telander Phone: 612-226-0613
Applicant `
Applicant is: ❑ Owner 0 Contractor ❑ Agent Email: lynn.telander@allweatherroof.com
Type of Description of work: Installation of a 60 Mil Adhered EPDM
Work $199,477.00
Construction Cost:
Company: Allweather Roof Contact: Lynn Telander
Building:e Address/City/Zip: 9211 Plymouth Avenue North, Golden Valley, MIN 55427
rantractdr , 612-721-2545 lynn.telander@allweatherroof.com
allweatherroof.com
�gPhone: Email:
License#: BC008035 Expiration Date: 03-31-2025
Company: N/A Contact:
Architect/
Ehgiheer Address/City/Zip:
Phone: Email:
SeWer& Company: N/A Contact:
Water
ContCacfpr Address/City/Zip:
Required for phone:
new construction, Email:
and additions
r-� License#: Expiration Date:
1u I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
NOTE; Ptans and stlpporting,,.docutttietti A "t you"submit are considered.ta a public information. F�ortions of the information
m2 -be classified as rton- ublid if ou rovide s ecific reasons that would ermit the 5i to conclude that they.are trade secrets.
I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit;that the work will be in accordance with the
approved plan in the case of work which requires a review and approval of plans.
X Lynn Telander x i�
Applicant's Printed Name Applicant's Signa re
FQR OFFICE"'USE ONLY
SUB TYPES Site Address: 2983 Center Court
_ Foundation _ Public Facility _ Antennae Air Care-Go
Commercial/Industrial _ Accessory Building Tenant:
Apartments — Greenhouse/Tent Permit#: 186821
WORK TYPES
New — Interior Improvement Demolish Building*
Addition _ Exterior Improvement Demolish Interior
Alteration — Retaining Wall Demolish Foundation
DESCRIPTION *Demolition of entire building-give PCA handout to applicant
Valuation Code Edition MCES System
Plan Review Zoning SAC Units
Census Code Stories City Water
#of Units Square Feet Fire Sprinklers
Type of Construction Length
Occupancy Width
REQUIRED INSPECTIONS
Footings_New Building_Addition Retaining Wall
Foundation Foundation Before Backfill Other:
Vapor Barrier Other:
Framing 30 Minutes 1 Hour
Insulation
Sheetrock Final/C.O. Required
Roof:_Decking '+Insulation _Ice&Water Final Final/No C.O. Required
Siding:_Lath _Brick_EFIS
Fireplace:_Rough In _Air Test _Final
Pool:_Footings —Air/Gas Tests Final
Final C/O Inspection: Schedule Fire Marshal to be present: Yes No
New Business to Eagan:
Reviewed By: , Building Inspector
FEES
Base Fee19► r
� Landscape Guarantee (9001.2257)
Surcharge l 00- D u Tree Mitigation (9111.4677)
Plan Review Z['�_�7 Tree Performance Security (9111.2257)
MCES SAC Stormwater Performance Security (6501.2257)
City SAC
S&W Permit& Surcharge
Treatment Plant
Treatment Plant(Irrigation)
Park Dedication (9328.4670) J 1 7(77b
Trail Dedication (9375.4671) TOTAL: