Loading...
EA186821 - Building - Commercial/Industrial - Issued Date 09/19/2023 PERMIT City of Eagan , e Permit Type: Building 3830 Pilot Knob RdIL 0 Permit Number: EA186821 Eagan, MN 55122 (651)675-5675 EAGAN www.cityofeagan.com '® * E R 1 8 6 8 2 1 Date Issued: 9/19/2023 Site Address: 2983 Center Ct Lot: 9 Block: 5 Addition: Eagandale Center Industrial Pk 1st PID:10-22500-05-090 11111111111111111111 1113MR11MEM Use: Air Care-Go * 1 0 — 2 2 5 0 0 — 0 S — 0 9 0 Description: Sub Type: Commercial/Industrial Construction Type: Work Type: Reroof Description: installation of a 60 Mil Adhered EPDM Census Code: - Occupancy: Zoning: Square Feet: 0 Comments: Fee Summar • BL-Base Fee 1 861.65 Summary: $ 0801.4085 Valuation: 199,477.00 BL-Plan Review 65% $1,210.07 0720.4222 Surcharge-Based on Valuation $100.00 9001 2195 Total: $3,171.72 Contractor: - Applicant - Owner: Allweather Roof Deborah H&Marvin F Tstes Johnson 9211 Plymouth Avenue N 13347 80th St NW Golden Valley MN 55427 Annandale MN 55302 (612)227-4859 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature Issued By: Signature For Office Use 186821 r e r Building Permit#: a� ° .►� ®® m. I S&W Permit#: I EAGAU— I Permit Fee: '—j- I I I Date Received: 9/13/2023 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I I (651)675-5675 1 FAX: (651)675-5694 I Date Issued: I Plan Submittal: buildinginspections(a)-cityofeagan com I ______ COMMERCIAL BUILDING PERMIT APPLICATION Date: 9/13/2023 site Address: 2983 Center Court suite#: Tenant Name: Air Care-Go Tenant is: ❑ New 0 Existing Former Tenant(if applicable): Name: Allweather Roof - Lynn Telander Phone: 612-226-0613 Applicant ` Applicant is: ❑ Owner 0 Contractor ❑ Agent Email: lynn.telander@allweatherroof.com Type of Description of work: Installation of a 60 Mil Adhered EPDM Work $199,477.00 Construction Cost: Company: Allweather Roof Contact: Lynn Telander Building:e Address/City/Zip: 9211 Plymouth Avenue North, Golden Valley, MIN 55427 rantractdr , 612-721-2545 lynn.telander@allweatherroof.com allweatherroof.com �gPhone: Email: License#: BC008035 Expiration Date: 03-31-2025 Company: N/A Contact: Architect/ Ehgiheer Address/City/Zip: Phone: Email: SeWer& Company: N/A Contact: Water ContCacfpr Address/City/Zip: Required for phone: new construction, Email: and additions r-� License#: Expiration Date: 1u I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. NOTE; Ptans and stlpporting,,.docutttietti A "t you"submit are considered.ta a public information. F�ortions of the information m2 -be classified as rton- ublid if ou rovide s ecific reasons that would ermit the 5i to conclude that they.are trade secrets. I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. X Lynn Telander x i� Applicant's Printed Name Applicant's Signa re FQR OFFICE"'USE ONLY SUB TYPES Site Address: 2983 Center Court _ Foundation _ Public Facility _ Antennae Air Care-Go Commercial/Industrial _ Accessory Building Tenant: Apartments — Greenhouse/Tent Permit#: 186821 WORK TYPES New — Interior Improvement Demolish Building* Addition _ Exterior Improvement Demolish Interior Alteration — Retaining Wall Demolish Foundation DESCRIPTION *Demolition of entire building-give PCA handout to applicant Valuation Code Edition MCES System Plan Review Zoning SAC Units Census Code Stories City Water #of Units Square Feet Fire Sprinklers Type of Construction Length Occupancy Width REQUIRED INSPECTIONS Footings_New Building_Addition Retaining Wall Foundation Foundation Before Backfill Other: Vapor Barrier Other: Framing 30 Minutes 1 Hour Insulation Sheetrock Final/C.O. Required Roof:_Decking '+Insulation _Ice&Water Final Final/No C.O. Required Siding:_Lath _Brick_EFIS Fireplace:_Rough In _Air Test _Final Pool:_Footings —Air/Gas Tests Final Final C/O Inspection: Schedule Fire Marshal to be present: Yes No New Business to Eagan: Reviewed By: , Building Inspector FEES Base Fee19► r � Landscape Guarantee (9001.2257) Surcharge l 00- D u Tree Mitigation (9111.4677) Plan Review Z['�_�7 Tree Performance Security (9111.2257) MCES SAC Stormwater Performance Security (6501.2257) City SAC S&W Permit& Surcharge Treatment Plant Treatment Plant(Irrigation) Park Dedication (9328.4670) J 1 7(77b Trail Dedication (9375.4671) TOTAL: