EA186325 - Building - Commercial/Industrial - Issued Date 09/28/2023City of Eagan
3830 Pilot Knob Rd
Eagan, MN 55122
(651) 675-5675
www.cityofeagan.com
PERMIT
s ® e
" 0
Permit Type:
Building
�01 ,.a
IL E
EAGAN
Permit Number:
EA186325
E R 1 8 6 3
2 5
Date Issued: 9/28/2023
Site Address: 1900 Shawnee Rd
Lot: 3 Block: 2 Addition: Cedar Industrial Park
PID:10-16800-02-030
Use: Public Storage * 1 0— 1 6 8 0 0— 0 3— 0 3 0*
Description;
Sub Type:
Work Type:
Description:
Census Code:
Zoning:
Square Feet:
Comments:
Commercial/Industrial
Solar
I-1
0
Construction Type:
Occupancy:
BL - Base Fee
Fee Summary: 5 l0 0720.4222
Valuation: 58,260.00 BL - Plan Review 65% $46
Surcharge - Based on Valuation $29.13 9001.2195
Total: $1,415.46
Contractor:
Cedar Creek Energy Corporation
10361 Jamestown St NE
Blaine MN 55449
(763) 450-9767
- Applicant - I Owner:
Ps Mid -West One LLC
Attn: Mn 19041
PO Box 25025
Glendale CA 91221--502
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature
Issued By: Signature
� 1EAGAN
�1
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810
(651) 675-5675 1 FAX: (651) 675-5694
Plan Submittal: build inginspections cDcitvofeagan.corn
r— — — — — — — — — — — — — — — — — — — — — — — — —
For Office Use
' 186325 I
Building Permit #:
I �
I �
S&W Permit #:
4 15. 4� I
I �I
I Permit Fee:�
I I
I
I Date Received:
I I
I I
I Date Issued: I
--------------------------I
COMMERCIAL BUILDING PERMIT APPLICATION
Date: 8/25/2023 site Address: 1900 Shawnee Rd Eagan, MN 55122 Suite #:
Tenant Name:
No Tenant (Storage Units) Tenant is: ❑ New ❑ Existing
Former Tenant (if applicable):
Applicant
Name: Cedar Creek Energy Phone: 763-432-5261
Applicant is: ❑ Owner 14 Contractor ❑ Agent Email:.permits@cedarcreekenergy.com
Type of
Description of work: Roof Mounted Solar Array on storage units.
Construction Cost: 58 260
Work
Company: Contact:
Building
Address/City/Zip:
Contractor
Phone: Email:
License #: Expiration Date:
Architect/
Company: Contact:
Engineer
Address/City/Zip:
Phone: Email:
Sewer &
Company: Contact:
Water
Contractor
Address/City/Zip:
Required for
new construction
Phone: Email:
and additions
License #: Expiration Date:
1 understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
NOTE: Plans and
supporting documents that you submit are considered to be public information. Portions of the information
may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the
approved plan in the case of work which requires a review and approval of plans.
X Trystian Alperin
Applicant's Printed Name
Digitally signed by trystian alperin
trystlan alperin Date: 2023.08.2510:28:25
-05'00'
Applicant's Signature
SUB TYPES
Foundation
Commercial/Industrial
Apartments
FOR OFFICE USE ONLY
Public Facility
Accessory Building
Greenhouse/ Tent
Site Address: 1900 Shawnee Rd Eagan, MN 55122
Antennae Tenant: No Tenant (Storage Units)
Permit #: 186325
WORK TYPES
New
_ Interior Improvement
Demolish Building"
Addition
Exterior Improvement
Demolish Interior
Alteration
_ Retaining Wall
Demolish Foundation
`Demolition of entire building — give PCA handout to applicant
DESCRIPTION
Valuation
5�j2b0 Code Edition
MMCES System
Plan Review
✓ Zoning
r -s„ SAC Units
Census Code
Stories
City Water '
# of Units
Square Feet
Fire Sprinklers
Type of Construction
Length
Occupancy
Width
REQUIRED INSPECTIONS
Footings _ New Building _ Addition Retaining Wall
Foundation Foundation Before Backfill Other:
Vapor Barrier Other:
Framing 30 Minutes X 1 Hour
Insulation
Sheetrock Final / C.O. Required
Roof: _Decking _Insulation _Ice & Water _Final y- Final / No C.O. Required
Siding: _ Lath _Brick _ EFIS
Fireplace: _Rough In _Air Test _Final
Pool: _Footings —Air/Gas Tests _Final
Final C/O Inspection: Schedule Fire Marshal to be present: Yes x No
Akz New Business to Eagan:
—i Reviewed By: , Building Inspector
FEES
Base Fee
Surcharge
Plan Review
MCES SAC
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant (Irrigation)
Park Dedication (9328.4670)
Trail Dedication (9375.4671)
FIP
54o . Z0 Landscape Guarantee (9001.2257)
Tree Mitigation (9111.4677)
}% • 13 Tree Performance Security (9111.2257)
Stormwater Performance Security (6501.2257)
TOTAL: � It 415. 4�