Loading...
EA186325 - Building - Commercial/Industrial - Issued Date 09/28/2023City of Eagan 3830 Pilot Knob Rd Eagan, MN 55122 (651) 675-5675 www.cityofeagan.com PERMIT s ® e " 0 Permit Type: Building �01 ,.a IL E EAGAN Permit Number: EA186325 E R 1 8 6 3 2 5 Date Issued: 9/28/2023 Site Address: 1900 Shawnee Rd Lot: 3 Block: 2 Addition: Cedar Industrial Park PID:10-16800-02-030 Use: Public Storage * 1 0— 1 6 8 0 0— 0 3— 0 3 0* Description; Sub Type: Work Type: Description: Census Code: Zoning: Square Feet: Comments: Commercial/Industrial Solar I-1 0 Construction Type: Occupancy: BL - Base Fee Fee Summary: 5 l0 0720.4222 Valuation: 58,260.00 BL - Plan Review 65% $46 Surcharge - Based on Valuation $29.13 9001.2195 Total: $1,415.46 Contractor: Cedar Creek Energy Corporation 10361 Jamestown St NE Blaine MN 55449 (763) 450-9767 - Applicant - I Owner: Ps Mid -West One LLC Attn: Mn 19041 PO Box 25025 Glendale CA 91221--502 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature Issued By: Signature � 1EAGAN �1 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-5675 1 FAX: (651) 675-5694 Plan Submittal: build inginspections cDcitvofeagan.corn r— — — — — — — — — — — — — — — — — — — — — — — — — For Office Use ' 186325 I Building Permit #: I � I � S&W Permit #: 4 15. 4� I I �I I Permit Fee:� I I I I Date Received: I I I I I Date Issued: I --------------------------I COMMERCIAL BUILDING PERMIT APPLICATION Date: 8/25/2023 site Address: 1900 Shawnee Rd Eagan, MN 55122 Suite #: Tenant Name: No Tenant (Storage Units) Tenant is: ❑ New ❑ Existing Former Tenant (if applicable): Applicant Name: Cedar Creek Energy Phone: 763-432-5261 Applicant is: ❑ Owner 14 Contractor ❑ Agent Email:.permits@cedarcreekenergy.com Type of Description of work: Roof Mounted Solar Array on storage units. Construction Cost: 58 260 Work Company: Contact: Building Address/City/Zip: Contractor Phone: Email: License #: Expiration Date: Architect/ Company: Contact: Engineer Address/City/Zip: Phone: Email: Sewer & Company: Contact: Water Contractor Address/City/Zip: Required for new construction Phone: Email: and additions License #: Expiration Date: 1 understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. X Trystian Alperin Applicant's Printed Name Digitally signed by trystian alperin trystlan alperin Date: 2023.08.2510:28:25 -05'00' Applicant's Signature SUB TYPES Foundation Commercial/Industrial Apartments FOR OFFICE USE ONLY Public Facility Accessory Building Greenhouse/ Tent Site Address: 1900 Shawnee Rd Eagan, MN 55122 Antennae Tenant: No Tenant (Storage Units) Permit #: 186325 WORK TYPES New _ Interior Improvement Demolish Building" Addition Exterior Improvement Demolish Interior Alteration _ Retaining Wall Demolish Foundation `Demolition of entire building — give PCA handout to applicant DESCRIPTION Valuation 5�j2b0 Code Edition MMCES System Plan Review ✓ Zoning r -s„ SAC Units Census Code Stories City Water ' # of Units Square Feet Fire Sprinklers Type of Construction Length Occupancy Width REQUIRED INSPECTIONS Footings _ New Building _ Addition Retaining Wall Foundation Foundation Before Backfill Other: Vapor Barrier Other: Framing 30 Minutes X 1 Hour Insulation Sheetrock Final / C.O. Required Roof: _Decking _Insulation _Ice & Water _Final y- Final / No C.O. Required Siding: _ Lath _Brick _ EFIS Fireplace: _Rough In _Air Test _Final Pool: _Footings —Air/Gas Tests _Final Final C/O Inspection: Schedule Fire Marshal to be present: Yes x No Akz New Business to Eagan: —i Reviewed By: , Building Inspector FEES Base Fee Surcharge Plan Review MCES SAC City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication (9328.4670) Trail Dedication (9375.4671) FIP 54o . Z0 Landscape Guarantee (9001.2257) Tree Mitigation (9111.4677) }% • 13 Tree Performance Security (9111.2257) Stormwater Performance Security (6501.2257) TOTAL: � It 415. 4�