EA186395 - Building - Commercial/Industrial - Edward Jones - Issued Date 10/11/2023 PERMIT
City of Eagan ® ® , Permit Type: Building
0'
3830 Pilot Knob Rd '
'�` � � '� EAGAN Permit Number: EA186395
Eagan, MN 55122 •--- ---�
(651)675-5675
www.cityofeagan.com * E A 1 8 6 3 9 5
Date Issued: 10/11/2023
Site Address: 1895 Plaza Dr 300
Lot: 2 Block: 1 Addition: Galaxie Cliff Plaza 3rd
PID:10-28702-01-020
Use: Edward.Tones * 1 o — 2 8 7 0 2 — 0 1 — 0 2 0
Description:
Sub Type: Commercial/Industrial Construction Type: 11-B
Work Type: Int Impr
Description: interior tenant alteration
Census Code: - Occupancy: B
Zoning:
Square Feet: 1,844
Comments:
Fee Summary: BL-Base Fee $2,381.40 0801.4085
Valuation: 276,600.00 BL-Plan Review 65% $1,547.91 0720.4222
Surcharge-Based on Valuation $138.50 9001.2195
Total: $4,067.81
Contractor: Owner: - Applicant -
JP McDonald Construction Inc Cliffside Plaza LLC
701 Decatur Ave N,Suite 202 5520 Shadyside Lane
Golden Valley MN 55427 White Bear Lake MN 55110
(763)286-3413
This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature Issued By: Signature
LM��g11ed 1019
-----—--------------------
I
-------------------
For Office Use Q
Building Permit#: / 3 I
S&W Permit P. j
EAGAN
40
I Permit Fee: I
I
jDate Received: of
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I
(651)675-56751 FAX:(651)675-5694 Date Issued:
Plan Submittal:buildinginspections(cDcitvofeaaan.com --------------------------I
COMMERCIAL BUILDING PERMIT APPLICATION
Date: 08/29/2023 Site Address: 1895 Plaza Drive sine M 200
Tenant Name: Edward Jones Tenant Is: 0 New ❑ Existing
Former Tenant(if applicable): Life Wellness Center
SCI
Name: Michael Lombardo Phone: 314-242-1379
P�
Email:
michael.lombardo@thelawrenco
z Applicant is: ❑ Owner ❑ Contractor 0 Agent Ema
Interior tenant alteration - Non-structural
V Description of work:
y o
$276,600
" Construction Cost:
r Company: JP McDonald Construction Contact: Jesse McDonald
mo
� m
�Buu Address/City/zip: 701 Decatur Ave N Suite 202 Golden Valley MN 55427
fl Phone: 763-286-3413 Email: jesse@jpmcdonaldconstruction.com
1.. €
License#: Expiration Date:
ts',`1sxT,�'ne
'' Company:
Lawrence Group conte : Michael Lombardo
Eing reeler Address/City2p:
319 N. 4th St., Suite 1000, St. Louis, MO 63102
314-242-1379 michael.lombardo@thelawrencegroup.col
Phone: Email:
S9 6 ' Company: TBD Contact:
8 F
`Con
Address/City/Zip:or�
x Phone: Email:
License#: Expiration Date:
0 1 understand that Plumbing, Mechanical, Fire Suppression,and Sign work require separate applications.
NOTE-M,dans a :u ng "-a!pe . 1�haE suMniE are cons) „ ,; . be:publktCr>Ifptmsn.` '
IA c ass(tledas.noil. c , ilei creaso wou rmlt theCco�u rare. n
I hereby acknowledge that this Information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this Is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the
approved plan in the case of work which requires a review and approval of plans.
),Michael Lobmardo X
Applicant's Printed Name Appll t' ature
O O F,ICE`�1SF,Qji Y
SUB TYPES Site Address: 1 895 Plaza D
Foundation Public Facility — Antennae Tenant: Edward Jones
— —
Commerciallindustrial — Accessory Building
Apartments _ Greenhouse/Tent Permit#:
WORK TYPES
_ New X Interior Improvement Demolish Building*
_ Addition _ Exterior Improvement Demolish Interior
_ Alteration — Retaining Wall Demolish Foundation
'Demolition of entire building-give PCA handout to applicant
DESCRIPTION
Valuation Code Edition 2o?4 MCES System ��/
Plan Review — Zoning SAC Units G� �G"�'Gr
Census Code Stories City Water Lj
#of Units — Square Feet Fire Sprinklers
Type of Construction ITZ R Length
Occupancy _� Width
REQUIRED INSPECTIONS
Footings_New Building_Addition Retaining Wall
Foundation Foundation Before Backfill Other:
Vapor Barrier Other:
Framing 30 Minutes--/ 1 Hour
Insulation
Shestrock Final/C.O.Required
Roof:_Decidng _Insulation _Ice&Water _Final Final/No C.O.Required
Siding:_Lath _Brick_EFIS
Fireplace:_Rough In Air Test _Final
Pool:_Footings Air/Gas Tests _Final
Final C/O Inspection: Scher le Fire Marshal to be present: Yes No
New Business to Eagan:
Reviewed By: Building Inspector
FEES
Base Fee jr 3 1 46 Landscape Guarantee(9001.2257)
Surcharge 1.3S Sa Tree Mitigation(9111.4677)
Plan Review 15'f 2 9' Tree Performance Security(9111.2257)
MCES SAC Storrnwater Performance Security(6501.2257)
City SAC
S&W Permit&Surcharge
Treatment Plant
Treatment Plant(Irrigation)
Park Dedication(9328.4670)
Trail Dedication(9375.4671) TOTAL: $ 0.00 & f 0�7 7.
Revised 8'1912022
MCES USE:Letter Reference: 230912A9 Address ID:5266 Payment ID:470833 12�
Date of Determination:09/12/23 Determination Expiration:09/12/25
Greetings!
Please see the determination below.
Project Name: Edward Jones
Project Address: 1895 Plaza Drive
Suite#/Campus: 200
City Name: Eagan
Applicant: Michael Lombardo, Lawrence Group
Special Notes: The City is required to report this project with the normal SAC Activity Report if a permit is issued.
Charge Calculation:
Office: 1734 sq.ft. @ 2650 sq.ft./SAC=0.65
Total Charge: 0.65
Credit Calculation:
RHS Office Bldg(SAC 10/97)
Office: 1734 sq.ft. @ 2400 sq.ft./SAC=0.72
Total Credit: 0.72
Net SAC: -0.07 = 0 SAC Due
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the
business use and size at the time of the final inspection. If there is a change in use or size,a redetermination will need to be
made. If you have any questions email me at:tonijanzig@metc.state.mn.us.
Thank you,
Toni Janzig
SAC Technician
Please visit our SAC website by going to: http://www.metrocouncii.org/SACprogram
Robert390 -- ••0
Phone • •00 0 0 Paul,•00 1 TTY 651.291.0904 - METROPOLITAN
Ao Eqlal(-)��portw?4�1 Fmaif)ycr A C 0 U N C I L