Loading...
EA186779 - Building - Commercial/Industrial - Summit Medical - Issued Date 10/12/2023City of Eagan 3830 Pilot Knob Rd Eagan, MN 55122 (651) 675-5675 www.cityofeagan.com PERMIT Permit Type: Building ,a ®® Permit Number: EA186779 --- EAGAN � *ER 186779* Date Issued: 10/12/2023 Site Address: 815 Vikings Pkwy 100 Lot: 1 Block: 1 Addition: Lone Oak 4th PID:10-45703-01-010 Use: Summit Medical * 1 0— 4 5 7 0 3— 0 1— 0 1 0* Description: Sub Type: Commercial/Industrial Work Type: Int Impr Description: Tenant Improvements Census Code: - Zoning: Square Feet: 51,092 Comments: Construction Type: 11-B Occupancy: Fee Summary: BL - Base Fee $5,261.65 0801.4085 BL - Plan Review 65% $3,420.07 0720.4222 Valuation: 750,000.00 Surcharge - Based on Valuation $375.00 9001.2195 Total: $9,056.72 Contractor: - Applicant - Owner: Sever Construction Company Mve West LLC 5151 Edina Industrial Blvd 2685 VIking Cir Edina MN 55439 Eagan MN 55121 (952) 698-6186 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. 1 hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature Issued By: Signature 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651) 675-56751 FAX: (651) 675-5694 Plan Submittal: buildir ii3,5pections@aityofeagan.com ------------------------- For Office Use I 186779 1 Building Permit #: I f I S&W Permit #: � I I Permit F4 i I I I Date Received: 9/12/2023 I I I I I Date Issued: t -------------------------- COMMERCIAL ----_.-----------.__—__—_J COMMERCIAL BUILDING PERMIT APPLICATION Date: 09/12/2023 site Address: 815 Vikings Parkway Tenant Name: Summit Medical Name: Khalid Maye Tenant is: ❑ New 0 Existing Former Tenant (if applicable): Applicant F _ IApplicant is: ❑ Owner 0 Contractor ❑ Agent Type of Work Description of work: Tenant Improvements Construction Cost: 750,000'00 Company: Sever Construction Company Phone suite #: 100 612-730-5463 Email: Khalid.Maye@SeverCo.com Contact: Khalid Maye Building Address/City/Zip: 5151 Edina Industrial Blvd., Suite 650, Edina, MN 55439 Contractor Phone: 952-746-5338 Email: Khalid.Maye@SeverCo.com License #: Company: BDH Design Expiration Date: Contact: Brittney Bechthold Architect/ 201 Irving Avenue North, Suite 200, Minneapolis, MN 55405 Engineer Address/City/Zip: Phone: 952-345-8362 Email: bbechthold@BDH.design Sewer & Company: Water Contractor Address/City/Zip: Required for Phone: new construction - -�- and additions License M Email: Expiration Date: Contact: 0 1 understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. NOTE Plans and supporting documents that you submit are considered to be public information Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x Matthew H. Sever x Applicant's Printed Name Applicant's Signature MCES USE: Letter Reference: 231003A9 Address ID: 5229 Payment ID: 471569 Date of Determination: 10/03/23 Greetings! Please see the determination below. Determination Expiration: 10/03/25 Project Name: Summit Medical Project Address: 815 Vikings Parkway Suite #/Campus: 100, Waters II City Name: Eagan Applicant: Khalid Maye, Sever Construction Company I13b-)7 9 Special Notes: This project has 70,835 gross square feet of mixed-use space and Summit Medical and Patterson Companies previously paid as mixed use for this space reported 01/23, 04/14, 05/11, and 03/15. There is no change of use, and no additional SAC is due. The City is required to report this project with the normal SAC Activity Report if a permit is issued. Net SAC: 0.00 = 0 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions email me at: sara.running@metc.state.mn.us. Thank you, Sara Running SAC Technician Please visit our SAC website by going to: http://www.metrocouncii.org/SACprogram