EA187248 - Building - Commercial/Industrial - Issued Date 10/17/2023 PERMIT
City of Eagan • , ® Permit Type: Building
3830 Pilot Knob Rd ,-+••q %,; Permit Number: EA187248
Eagan, MN 55122 •- - EAGAN
(651)675-5675 1111111111111 IN 11111111111111111111111111111111
www.cityofeagan.com * E R 1 8 7 2 4 8 *
Date Issued: 10/17/2023
Site Address: 1260 Promenade P1
Lot: 7 Block: 2 Addition: Eagan Promenade
PID:10-22472-02-070
Use: Panera Bread * 1 0 — 2 2 4 7 2 — 0 Z — 0 7 0
Description:
Sub Type: Commercial/Industrial Construction Type:
Work Type: Reroof
Description:
Census Code: - Occupancy:
Zoning:
Square Feet: 0
Comments:
Fee Summary: BL-Base Fee $1,178.20 0801.4085
BL-Plan Review 65% $765.83 0720.4222
Valuation: 98,702.00 Surcharge-Based on Valuation $49.50 9001.2195
Total: $1,993.53
Contractor: - Applicant - Owner:
All Elements Inc Apache Commons LLP
301 Chelsea Road 794 Monet Ct
Monticello MN 55362 Mendota Heights MN 55120-260
(763)314-0234
This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature Issued By: Signature
-------------------------
I For Office Use
Building Permit M 1 6 I
1
0" 0
•�ee a S&W Permit#:
;
. a
E 'EAE
1 Permit Fee: I
I Date Received:
3830 PILOT KNOB ROAD I EAGAN, MN 55122- Q^
i 0 i-J I t 1
(651)675-5675 1 FAX: (651)675-5694 I Date Issued: I
Plan Submittal:buildin(iins ections cit ofea a ) L-------------------------� i
' I
COMMERCIAL BUILDING PERMIT APPLICATION
Date: 10/3/23 Site Address: 1260 Promenade Place suite M i
Tenant Name: Panera Bread Tenant Is: ❑ New 0 Existing
Former Tenant(if applicable):
Name: All Elements, IncPhone; 763-314-2034
Applicant
A plicant Is: ❑ Owner 0 Contractor ❑ Agent Email: pauI@allelementsinc.net
Type Of Description of work; Remove existing BUR roof system. Install new R-30 insulation and 50 mil PVC roof membrane
Work $98,702
Construction Cost:
Company: Contact;
Building_ Address/City/Zip:
Contractor
Phone: Email:
License M Expiration Date:
Company: Contact:
Architect/
Engineer Address/City/Zip:
Phone: Email:
Sewer&` Company; Contact:
_ water `
Contractor. Address/City/Zip:
Required for phone: Email:
new construction
and additions
License M Expiration Date:
I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
NOTE: Plans and supporting documents that you submit are considered to be public nformation. Portions of the Information
ma be classifled as non- ublic.if ou rovlde specific reasons that.would permit the Git to conclude that the are trade secrets.
I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this Is not a permit,but only an application for a permit,and work is not to start without a permit; that the work will be In accordance with the
approved plan in the case of work which requires a review and approval of plans.
xPaul Levisee `
X
Applicant's Printed Name Ap Ilcant's Sig ature
FOR OFFICE USE ONLY
SUB TYPES Site Address:
_ Foundation _ Public Facility _ Antennae
Tenant:
Commercial/Industrial _ Accessory Building _ Miscellaneous
Apartments Greenhouse/Tent Permit#:
WORK TYPES
_ New _ Interior Improvement Fire Repair _ Demolish Building*
Addition X Exterior Improvement Water Damage Demolish Interior
Alteration _ Repair Retaining Wall _ Demolish Foundation
*Demolition of entire building-give PCA handout to applicant
DESCRIPTION Q
Valuation /��'lD'L Occupancy 4-4. MCES System
Plan Review ✓ Code Edition 41WC.- Z°Z'O SAC Units
(25%_100% Zoning City Water
Census Code - Stories 1 Booster Pump
#of Units - Square Feet 511(o PRV
#of Buildings Length Fire Sprinklers 7�
Type of Construction Width
REQUIRED INSPECTIONS
Footings_New Building_Deck_Addition Drain Tile
Foundation Foundation Before Backfill Retaining Wall
Vapor Barrier Erosion Control
Framing 30 Minutes 1 Hour Steel Reinforcement
Insulation Street/Curb Cut Inspection
Sheetrock Other:
Roof: te Decking ✓Insulation _Ice&Water _✓Final Meter Size:
Siding:_Stucco Lath _Stone Lath _Brick_EFIS Electronic Set of Final Revised Plans
Windows
Fireplace:_Rough In _Air Test _Final Final/C.O. Required
Pool:_Footings —Air/Gas Tests _Final Final/No C.O. Required
Final C/O Inspection: Schedule Fire Marshal to be present: Yes ✓ No
Reviewed By: , Planning New Business to Eagan:
Reviewed By: A%t27 js&" , Building Inspector
FEES
Base Fee —�17?• 1�0 Landscape Guarantee (9001.2257)
Plan Review f 1W5$3 Tree Mitigation (9111.4677)
Surcharge 3S
g �• Tree Performance Security (9111.2257)
MCES SAC Stormwater Performance Security (6501.2257)
City SAC Erosion &Sediment Control Deposit(6501.2257)
S&W Permit& Surcharge
Treatment Plant .,
Treatment Plant(irrigation)
Park Dedication (9328.4670)
Trail Dedication (9375.4671) TOTAL: $ � 3 3$