Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
EA187776 - Building - Deck - Issued Date 11/09/2023
PERMIT City of Eagan Permit Type: Building 3830 Pilot Knob Rd ® '`, Permit Number: EA187776 Eagan,MN 55122 (651)675-5675 11 Mil 1111111111111111 www.cityofeagan.com * E R 1 8 7 7 7 6 Date Issued: 11/9/2023 Site Address: 3831 Aidan Ct Lot: 17 Block: 1 Addition: Tipperary PID:10-76815-01-170 [9111111111111111111 1111111111111H1111111HREM Use: * 10 - 768 15 - 0 1 - 170 * Description: Sub Type: Deck Construction Type: V-B Work Type: New Description: Census Code: 434-Residential Additions,Alterations Occupancy: IRC-1 Zoning: R-1 S Square Feet: 0 Comments: Fee Summary: (BL)Plan Review $118.82 0720.4222 Valuation: 8,000.00 BL-Base Fee $182.80 0801.4085 Surcharge-Based on Valuation $4.00 9001.2195 Total: $305.62 Contractor: Owner: - Applicant - Krishna Kanth Bonthala 3831 Aidan Ct Eagan MN 55123 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature Issued By: Signature i --------------------- For Office Use Building Permit#: I �0 S&W PermitEAGAN 1 #: l Permit F .. ECEIVE ' I Date Received: I 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I (651)675-5675 1 FAX: (651)675-5694 0(,f r3 1 2023 I Date Issued: l buildinginspections(@cityofeagan.com I--------------------- RESIDENTIAL BUILDING PERMIT APPLICATION Date: & 0_6ite Address: .5 193 1 fti t> c* !sc &I Ad Unit#: Applicant is: wner ❑ Contractor Name: X_-,161 A •J �/���" 'T L t� Homeowner Address:5 e�I �� � [ City: A(,* State: Zip: hone: t!-`rf" V ail: 9 i.$HJWPA' kA�i j y�c tL9 ,n AIL <ot� Description of work: 4W Type of Work Construction Cost: Type of building: Single Family ❑ Townhome, of units ❑ Twin Home Company: Contact: Building Address: City: Contractor State: Zip: Phone: Email: License#: Expiration Date: Sewer & Company: Contact: Water Contractor Address: City: Required for State: Zip: Phone: Email: new construction License#: Expiration Date: I understand that Plumbing, Mechanical, and Fire Suppression work require separate applications. NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Contact Gopher State One Call at(651)454-0002 or www.gopherstateonecall.org for protection against underground utility damage. Contact Gopher State One Call 48 hours before you intend to dig to receive locates of underground utilities. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Applicant's Printed Name Applicant's Signature FOR OFFICE USE ONLY Site Address: I&II I AikA-Aaan & Permit#: SUB TYPES _ Single Family _ Fireplace Lower Level _ 01 of_Plex Foundation _ Porch Deck Garage _ Pool WORK TYPES New Repair _ Siding _ Retaining Wall _ Addition Fire Repair Reroof _ Move Building _ Alteration _ Water Damage _ Windows _ Demolish Building* Replace Egress Window _ Solar *Demolition of entire building-give PCA handout to applicant DESCRIPTION Calculated Valuation 9"b©O Occupancy 7..ft- I MCES System Plan Review 025% .0100% Code Edition Mn/QC-acx?6 SAC Units Census Code Zoning Q'IS City Water #of Units Stories Booster Pump #of Buildings Square Feet PRV Type of Construction Fire Suppression Required Separate Stormwater Management Permit Required REQUIRED INSPECTIONS Footings: New Addition Deck Meter Size: Foundation: Before Backfill Poured Wall Siding:_Stucco Lath _Stone Lath _Brick Framing: 1 Hour y_Residential Alteration Roof:_Ice&Water _Final Braced Wall Framing/Blocking Erosion Control Braced Wall Sheathing (prior to house wrap) Pool:_Footings —Air/Gas Tests _Final Interior Braced Wall Panel(s) Retaining Wall:_Footings_Backfill_Final Firewalls Fire Suppression:_Rough In_Final Insulation Windows Radon Control Other: Drain Tile Grading Final/No C.O. Required Final/C.O. Required Reviewed By: , Building Inspector FEES New 26 x a0 �ec IL jd Calculated Valuation ooC:.� Base Fee Plan Review State Surcharge Met Council SAC City SAC Treatment Plant Water Supply&Storage S&W Permit&Surcharge Meter Radio Read Other: TOTAL $ 0.00