EA187683 - Building - Commercial/Industrial - Issued Date 11/29/2023 PERMIT
City of Eagan a , Permit Type: Building
3830 Pilot Knob Rd EAGAN
Permit Number: EA187683
Eagan,MN 55122 �-�-
(651)675-5675
www.cityofeagan.com * E A 1 8 7 6 8 3
Date Issued: 11/29/2023
Site Address: 1500 Central Park Commons Dr
Lot: 1 Block: 1 Addition: Central Park Commons
PID:10-16955-01-010 IT 111111111 IM"
Use: Hy-Vee * 10 — 16955 - 0 1 - 0 10
Description:
Sub Type: Commercial/Industrial Construction Type:
Work Type: Int Impr
Description: interior sales floor remodel
Census Code: - Occupancy:
Zoning:
Square Feet: 0
Comments:
Fee Summary: BL-Base Fee $133.15 0801.4085
BL-Plan Review 65% $86.55 0720.4222
Valuation: 5,000.00 Surcharge-Based on Valuation $2.50 9001.2195
Total: $222.20
Contractor: - Applicant - Owner:
Hy-Vee Construction Svf Cpc Eagan LLC
5605 NE 22nd Street 1500 Central Park Commons Dr
Des Moines IA 50313 Eagan MN 55121
(515)645-2329
This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature Issued By: Signature
ECEIVE
OCT 25 2023 --------------------------,
I For Office Use
a i ,BY: Building Permit#: 187683
®gyp
S&W Permit#:
less ®�"0EAGAN I I
I
Permit Fee:
I
10/25/2023
3830 PILOT KNOB ROAD I EAGAN, MDate Received:
N 55122-1810 I I
(651)675-5675 1 FAX: (651)675-5694 I Date Issued: I
Plan Submittal: buildinginspections aC�cityofeagan com I
--------------------------
COMMERCIAL BUILDING PERMIT APPLICATION
Date: 10/24/23 site Address: 1500Central Park Cmns Dr
Suite#:
Tenant Name: Hy Vee Grocery Tenant is:
❑ New 14 Existing
Former Tenant(if applicable):
Applicant Pat O'Neal Phone: 515-360-8361 I
� Name:
Applicant is: ❑ Owner 23 Contractor El Agent Email.. pat.oneal@hy-veeconstruction.com
-veeconstruction.com
Type of Description of work: Interior sales floor remodel
Work
Construction Cost:_99'000
company: Hy Vee Construction Contact: Pat O'Neal —�
Building Address/City/Zip: 5605 NE 22nd Street
Contractor
Phone: 515-645-2323 Email: Pat.oneal@hy-veeconstruction.com
�amLicense#:� Expiration Date:
Architect/ Company: Contact:
.
Engineer ,� Address/City/Zip:
Phone: Email:
Sewer & I Company: Contact:
Water
Contractor Address/City/Zip:
Required for Phone: Email:
new construction
and additions
License#: Expiration Date:
1 understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information
ma be classif ed as non ublic if ou rovide s ecific reasons that would permit theoCity to conclude that they are trade secrets.
I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit;that the work will be in accordance with the
approved plan in the case of work which requires a review and approval of plans.
XPat O'Neal
X
Applicant's Printed Name Applicant's Signature
FOR OFFICE USE ONLY
SUB TYPES Site Address: 1500Central Park Cmns Dr
Foundation
_ Public Facility _ AntennaeH Vee Grocer
Commercial/Industrial Accessory Building Tenant: y y
Apartments Greenhouse/Tent 1 87683
F�rtttit :
WORK TYPES
New Interior Improvement Demolish Building'
_ Addition _ Exterior Improvement Demolish Interior
— Alteration _ Retaining Wall Demolish Foundation
DESCRIPTION *Demolition of entire building-give PCA handout to applicant
Valuation 00"0 Code Edition --4W( C'ZAPXO MCES System
Plan Review Zoning ..
SAC Units
Census Code Stories _
City Water
#of Units Square Feet .,
Fire Sprinklers
Type of Construction Length
Occupancy - Width --
REQUIRED INSPECTIONS
Footings_New Building_Addition Retaining Wall
Foundation Foundation Before Backfill Other:
Vapor Barrier Other:
Framing 30 Minutes 1 Hour
Insulation
Sheetrock Final/C.O. Required
Roof:_Decking _Insulation _Ice&Water _Final Final/No C.O. Required
_ Siding:_Lath _Brick_EFIS
Fireplace:_Rough In _Air Test _Final
Pool:_Footings _Air/Gas Tests _Final
Final C/O Inspection: Schedule Fire Marshal to be present: Yes ✓ No
Reviewed By: Ao" 4/j&o%-
New Business to Eagan: .-rc,
Building Inspector
FEES
Base Fee 133-fyi
Landscape Guarantee (9001.2257)
Surcharge 2 .50 Tree Mitigation (9111.4677)
Plan Review $(O Tree Performance Security (9111.2257)
MCES SAC Stormwater Performance Security (6501.2257)
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant (Irrigation) „
Park Dedication (9328.4670)
Trail Dedication (9375.4671) TOTAL: $ 2 ZZ'ZO