Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
EA187884 - Building - Commercial/Industrial - Scratch Kitchen - Issued Date 12/06/2023
PERMIT City of Eagan , , e Permit Type: Building 3830 Pilot Knob Rd Eagan, MN 55122 N%- =w,®°, EAGAN Permit Number: EA187884 (651) 675-5675 www.cityofeagan.com * E R 1 8 7 8 8 4 Date Issued: 12/6/2023 Site Address: 3450 Pilot Knob Rd 103 Lot: 1 Block: 1 Addition: MVTA Eagan Transit Station PID:10-49600-01-010 Use: Scratch Kitchen * 1 0— 4 9 6 0 0— 0 1— 0 1 0 Description: Sub Type: Commercial/Industrial Construction Type: II -B Work Type: Int Impr Description: Census Code: - Occupancy: A-2 Zoning: PD Square Feet: 0 Comments: Fee Summary: BL - Base Fee $215.90 0801.4085 Valuation: 10,000.00 BL - Plan Review 65% $140.34 0720.4222 Surcharge - Based on Valuation $5.00 9001.2195 Total: $361.24 Contractor: - Applicant - Owner: Seville Construction Inc Minnesota Valley Transit Authority 19638 Jasper Terr % Burnsville Transit Station Lakeville MN 55044 100 East Highway 13 (612) 590-7011 Burnsville MN 55337--286 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature Issued By: Signature l_l�'1 12/S ECEIVE NOV 0 3 2023 1I For Office Use I Building Permit #: I I S&W Permit #: 11 , EAGAN I I I Permit Fee: I •2=� Date Received: 13j 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I (651) 675-5675 1 FAX: (651) 675-5694 Date Issued: Plan Submittal: buildinginspections(a-)cityofeagan.com --------------------------i COMMERCIAL BUILDING PERMIT APPLICATION I Date: Z-5 Site Address:3/5 0 P1 )j r 1 t D6V` Suite #: Tenant Name: )OYO'Ank Pt 7. ,eV / O- Tenant is: PNew ❑ Existing _ Former Tenant (if applicable): ,/ b �u..Name: 1�1 t"-� � .�� Phone: Applicant Applicant is: ❑ Owner ❑ Contractor ❑ Agent Email: 0_aG0Y i ,�j Type of Description of work: ,IJ � cx ✓ IV zA I s- *,c 6S�S' 4-r,4 0,5b 600Y` Work $ _ t mConstruction �Cost: gw� Y ©9 wall lzdlaj, P`_fi..,U 5LUjCompany: �CKSP�tAC ,,, _�CContact: ,�—— /,1'fL—QZ Building Address/City/Zip:1C b3 q' i���— �. f 5.�5 _57-Contractor l rp _ J I PInoneC&17-), /a LL -70 Email: Coyv\ ( License #: '70 b $ Y Expiration Date: 0 Z mm ,4ucN �Jmm ^ Company: A Y Contact. l Architect/ I Engineer Address/City/Zip:I_ � 3 Tt� AVS %.i` � Phone: N Email: r �f `1 � }� /r ► J ( r cll s ayc - corn,_ . n. mx�.+.+. m.mm..m _�..mrmmm�wmmwrwmic..mmrwww�wemwv.wwwmww Sewer & Company: Contact: Water Contractor Address/City/Zip: Required for I new construction Phone: Email: and additions I' License #: Expiration Date: I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. m..�,�..�......�. m. �� �...r.�. ..,rwvv ,�....,. .,.u.0 NOTE Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non �ubhc tf Yourprovtde s�eciftc„reasons that would e�rmit the City to conclude that they are trade secrets I hereby acknowledge that this information is complete and accurate: that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in t e case of work which requires a review and approval of plans. X 46tbi�F6 go, C(a (16,0 NL X Applicant's Printed Name Applicant's Signature SUB TYPES _ Foundation Commercial/Industrial Apartments WORK TYPES New Addition Alteration FOR OFFICE USE ONLY Public Facility Accessory Building Greenhouse / Tent ✓Interior Improvement Exterior Improvement Retaining Wall Antennae Site Address: Tenant: Permit #: Demolish Building" Demolish Interior Demolish Foundation "Demolition of entire building - give PCA handout to applicant DESCRIPTION ) Valuation Code Edition A Dc�}�� .-24U MCES System Plan Review Zoning PT;! SAC Units Census Code Stories City Water # of Units Square Feet — Fire Sprinklers yes Type of Construction Length r Occupancy A•Z.. Width _ REQUIRED INSPECTIONS Footings _ New Building _ Addition Retaining Wall Foundation Foundation Before Backfill Other: Vapor Barrier Other: Framing 30 Minutes ✓1 Hour Insulation Sheetrock ✓ Final / C.O. Required Roof: _Decking _Insulation _Ice & Water _Final Final / No C.O. Required Siding: _ Lath _Brick _ EFIS Fireplace: _Rough In _Air Test _Final Pool: _Footings —Air/Gas Tests _Final Final C/O Inspection: Schedule Fire Marshal to be present: ✓Yes No New Business / Ale - to Eagan: <<S Reviewed Reviewed By: , Building Inspector FEES Base Fee Z!S • g° Landscape Guarantee (9001.2257) Surcharge 06 Tree Mitigation (9111.4677) Plan Review 140. A Tree Performance Security (9111.2257) ~ MCES SAC Stormwater Performance Security (6501.2257) City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication (9328.4670) Trail Dedication (9375.4671) TOTAL: 3W. 2-4 MCES USE: Letter Reference: 231114139 Address ID: 5563 Payment ID: 473462 Date of Determination: 11/14/23 Greetings! Please see the determination below. Determination Expiration: 11/14/25 Project Name: Scratch Pizzeria Project Address: 3450 Pilot Knob Road Suite #/Campus: 103 City Name: Eagan Applicant: Randy Cooper, Scratch Pizzeria Special Notes: It is the Council's understanding there will be no outdoor seating. If at any time outdoor seating is added, a determination is required, and additional SAC may be due. The City is required to report this project with the normal SAC Activity Report if a permit is issued. Charge Calculation: Food & Drink: 2746 sq. ft. @ 300 sq. ft. / SAC = 9.15 Total Charge: 9.15 Credit Calculation: Leeann Chin (Non -Conforming GSF 09/10) Food & Drink: 2746 sq. ft. @ 300 sq. ft. / SAC = 9.15 Total Credit: 9.15 Net SAC: 0.00 = 0 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions email me at: sara.runnine@metc.state.mn.us. Thank you, Sara Running SAC Technician Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram